FALSE0000801337FY201912/3100008013372019-01-012019-12-310000801337exch:XNYSus-gaap:CommonClassAMember2019-01-012019-12-310000801337exch:XNYSus-gaap:SeriesFPreferredStockMember2019-01-012019-12-31iso4217:USD00008013372019-06-30xbrli:shares00008013372020-02-2700008013372019-12-3100008013372018-12-31iso4217:USDxbrli:shares0000801337us-gaap:SeriesFPreferredStockMember2019-12-310000801337us-gaap:SeriesFPreferredStockMember2018-12-3100008013372018-01-012018-12-3100008013372017-01-012017-12-3100008013372019-01-012019-09-3000008013372018-01-012018-09-3000008013372017-01-012017-09-300000801337us-gaap:PreferredStockMember2016-12-310000801337us-gaap:CommonStockMember2016-12-310000801337us-gaap:AdditionalPaidInCapitalMember2016-12-310000801337us-gaap:RetainedEarningsMember2016-12-310000801337us-gaap:TreasuryStockMember2016-12-310000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2016-12-3100008013372016-12-310000801337us-gaap:RetainedEarningsMember2017-01-010000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2017-01-0100008013372017-01-010000801337us-gaap:RetainedEarningsMember2017-01-012017-12-310000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2017-01-012017-12-310000801337us-gaap:CommonStockMember2017-01-012017-12-310000801337us-gaap:AdditionalPaidInCapitalMember2017-01-012017-12-310000801337us-gaap:SeriesEPreferredStockMember2017-01-012017-12-310000801337us-gaap:SeriesEPreferredStockMemberus-gaap:RetainedEarningsMember2017-01-012017-12-310000801337us-gaap:SeriesFPreferredStockMemberus-gaap:RetainedEarningsMember2017-01-012017-12-310000801337us-gaap:SeriesFPreferredStockMember2017-01-012017-12-310000801337us-gaap:TreasuryStockMember2017-01-012017-12-310000801337us-gaap:PreferredStockMemberus-gaap:SeriesEPreferredStockMember2018-01-012018-12-310000801337us-gaap:SeriesEPreferredStockMember2018-01-012018-12-310000801337us-gaap:SeriesFPreferredStockMemberus-gaap:PreferredStockMember2018-01-012018-12-310000801337us-gaap:SeriesFPreferredStockMember2018-01-012018-12-310000801337us-gaap:PreferredStockMember2017-12-310000801337us-gaap:CommonStockMember2017-12-310000801337us-gaap:AdditionalPaidInCapitalMember2017-12-310000801337us-gaap:RetainedEarningsMember2017-12-310000801337us-gaap:TreasuryStockMember2017-12-310000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2017-12-3100008013372017-12-310000801337us-gaap:RetainedEarningsMemberus-gaap:AccountingStandardsUpdate201802Member2018-01-010000801337us-gaap:AccountingStandardsUpdate201802Member2018-01-010000801337us-gaap:RetainedEarningsMember2018-01-012018-12-310000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2018-01-012018-12-310000801337us-gaap:CommonStockMember2018-01-012018-12-310000801337us-gaap:AdditionalPaidInCapitalMember2018-01-012018-12-310000801337us-gaap:SeriesFPreferredStockMemberus-gaap:RetainedEarningsMember2018-01-012018-12-310000801337us-gaap:TreasuryStockMember2018-01-012018-12-310000801337us-gaap:AdditionalPaidInCapitalMember2019-01-012019-12-310000801337us-gaap:RetainedEarningsMember2019-01-012019-12-310000801337us-gaap:TreasuryStockMember2019-01-012019-12-310000801337us-gaap:PreferredStockMember2018-12-310000801337us-gaap:CommonStockMember2018-12-310000801337us-gaap:AdditionalPaidInCapitalMember2018-12-310000801337us-gaap:RetainedEarningsMember2018-12-310000801337us-gaap:TreasuryStockMember2018-12-310000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2018-12-310000801337us-gaap:AccountingStandardsUpdate201808Memberus-gaap:RetainedEarningsMember2019-09-300000801337us-gaap:AccountingStandardsUpdate201808Member2019-09-300000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-01-012019-12-310000801337us-gaap:CommonStockMember2019-01-012019-12-310000801337us-gaap:SeriesFPreferredStockMember2019-01-012019-12-310000801337us-gaap:SeriesFPreferredStockMemberus-gaap:RetainedEarningsMember2019-01-012019-12-310000801337us-gaap:PreferredStockMember2019-12-310000801337us-gaap:CommonStockMember2019-12-310000801337us-gaap:AdditionalPaidInCapitalMember2019-12-310000801337us-gaap:RetainedEarningsMember2019-12-310000801337us-gaap:TreasuryStockMember2019-12-310000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-12-3100008013372019-01-010000801337srt:MinimumMemberus-gaap:BuildingAndBuildingImprovementsMember2019-01-012019-12-310000801337us-gaap:BuildingAndBuildingImprovementsMembersrt:MaximumMember2019-01-012019-12-310000801337us-gaap:LeaseholdImprovementsMembersrt:MinimumMember2019-01-012019-12-310000801337us-gaap:LeaseholdImprovementsMembersrt:MaximumMember2019-01-012019-12-310000801337srt:MinimumMemberus-gaap:FurnitureAndFixturesMember2019-01-012019-12-310000801337us-gaap:FurnitureAndFixturesMembersrt:MaximumMember2019-01-012019-12-310000801337srt:MinimumMemberus-gaap:InformationTechnologyAndDataProcessing2019-01-012019-12-310000801337srt:MaximumMemberus-gaap:InformationTechnologyAndDataProcessing2019-01-012019-12-31xbrli:pure0000801337us-gaap:PerformanceSharesMembersrt:MinimumMember2019-01-012019-12-310000801337us-gaap:PerformanceSharesMembersrt:MaximumMember2019-01-012019-12-310000801337us-gaap:AccountingStandardsUpdate201602Member2019-01-010000801337us-gaap:OtherAssetsMemberus-gaap:VariableInterestEntityNotPrimaryBeneficiaryMember2019-12-310000801337us-gaap:OtherAssetsMemberus-gaap:VariableInterestEntityNotPrimaryBeneficiaryMember2018-12-310000801337us-gaap:VariableInterestEntityNotPrimaryBeneficiaryMemberus-gaap:AccountsPayableAndAccruedLiabilitiesMember2019-09-300000801337us-gaap:VariableInterestEntityNotPrimaryBeneficiaryMemberus-gaap:AccountsPayableAndAccruedLiabilitiesMember2018-12-310000801337us-gaap:OtherInvestmentsMemberus-gaap:VariableInterestEntityNotPrimaryBeneficiaryMember2019-12-310000801337us-gaap:OtherInvestmentsMemberus-gaap:VariableInterestEntityNotPrimaryBeneficiaryMember2018-12-310000801337us-gaap:UnfundedLoanCommitmentMemberus-gaap:VariableInterestEntityNotPrimaryBeneficiaryMember2019-12-310000801337us-gaap:UnfundedLoanCommitmentMemberus-gaap:VariableInterestEntityNotPrimaryBeneficiaryMember2018-12-310000801337us-gaap:USTreasuryBillSecuritiesMember2019-12-310000801337us-gaap:USTreasuryBillSecuritiesMember2018-12-310000801337us-gaap:CollateralizedMortgageObligationsMember2019-12-310000801337us-gaap:CollateralizedMortgageObligationsMember2018-12-310000801337us-gaap:MortgageBackedSecuritiesIssuedByUSGovernmentSponsoredEnterprisesMember2019-12-310000801337us-gaap:MortgageBackedSecuritiesIssuedByUSGovernmentSponsoredEnterprisesMember2018-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMember2019-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMember2018-12-310000801337us-gaap:CommercialMortgageBackedSecuritiesMember2019-12-310000801337us-gaap:CommercialMortgageBackedSecuritiesMember2018-12-310000801337us-gaap:CollateralizedLoanObligationsMember2019-12-310000801337us-gaap:CollateralizedLoanObligationsMember2018-12-310000801337us-gaap:CorporateDebtSecuritiesMember2019-12-310000801337us-gaap:CorporateDebtSecuritiesMember2018-12-310000801337us-gaap:MunicipalBondsMember2019-12-310000801337us-gaap:MunicipalBondsMember2018-12-31wbs:numberOfHoldings0000801337wbs:CallableMember2019-12-310000801337us-gaap:CommercialPortfolioSegmentMember2019-12-310000801337us-gaap:CommercialPortfolioSegmentMember2018-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMember2019-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMember2018-12-310000801337us-gaap:ResidentialPortfolioSegmentMember2019-12-310000801337us-gaap:ResidentialPortfolioSegmentMember2018-12-310000801337us-gaap:ConsumerPortfolioSegmentMember2019-12-310000801337us-gaap:ConsumerPortfolioSegmentMember2018-12-310000801337wbs:LeasingReceivableMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:FinanceLeasesPortfolioSegmentMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:FinanceLeasesPortfolioSegmentMember2019-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:FinancingReceivables30To59DaysPastDueMember2019-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:FinancingReceivables60To89DaysPastDueMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2019-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:ConsumerBorrowerMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:ConsumerBorrowerMember2019-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:ConsumerBorrowerMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMember2019-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMember2019-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2018-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2018-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:FinanceLeasesPortfolioSegmentMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:FinanceLeasesPortfolioSegmentMember2018-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:FinancingReceivables30To59DaysPastDueMember2018-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:FinancingReceivables60To89DaysPastDueMember2018-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2018-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2018-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:ConsumerBorrowerMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:ConsumerBorrowerMember2018-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:ConsumerBorrowerMember2018-12-310000801337us-gaap:FinancingReceivables30To59DaysPastDueMember2018-12-310000801337us-gaap:FinancingReceivables60To89DaysPastDueMember2018-12-310000801337us-gaap:CommercialPortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:ResidentialPortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:ConsumerPortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:CommercialPortfolioSegmentMember2017-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMember2017-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMember2017-12-310000801337us-gaap:ResidentialPortfolioSegmentMember2017-12-310000801337us-gaap:ConsumerPortfolioSegmentMember2017-12-310000801337us-gaap:CommercialPortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:ResidentialPortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:ConsumerPortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:CommercialPortfolioSegmentMember2016-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMember2016-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMember2016-12-310000801337us-gaap:ResidentialPortfolioSegmentMember2016-12-310000801337us-gaap:ConsumerPortfolioSegmentMember2016-12-310000801337us-gaap:CommercialPortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:ResidentialPortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:ConsumerPortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2019-01-012019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2018-01-012018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2017-01-012017-12-310000801337us-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2019-01-012019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2018-01-012018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberwbs:AssetBasedLoansMember2017-01-012017-12-310000801337us-gaap:RealEstateMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:RealEstateMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:RealEstateMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:ConstructionLoansMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2019-01-012019-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2018-01-012018-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2017-01-012017-12-310000801337us-gaap:PassMemberus-gaap:CommercialPortfolioSegmentMember2019-12-310000801337us-gaap:PassMemberus-gaap:CommercialPortfolioSegmentMember2018-12-310000801337us-gaap:PassMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:PassMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:PassMemberus-gaap:FinanceLeasesPortfolioSegmentMember2019-12-310000801337us-gaap:PassMemberus-gaap:FinanceLeasesPortfolioSegmentMember2018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:SpecialMentionMember2019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:SpecialMentionMember2018-12-310000801337us-gaap:SpecialMentionMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:SpecialMentionMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMemberus-gaap:SpecialMentionMember2019-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMemberus-gaap:SpecialMentionMember2018-12-310000801337us-gaap:SubstandardMemberus-gaap:CommercialPortfolioSegmentMember2019-12-310000801337us-gaap:SubstandardMemberus-gaap:CommercialPortfolioSegmentMember2018-12-310000801337us-gaap:SubstandardMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-12-310000801337us-gaap:SubstandardMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-12-310000801337us-gaap:SubstandardMemberus-gaap:FinanceLeasesPortfolioSegmentMember2019-12-310000801337us-gaap:SubstandardMemberus-gaap:FinanceLeasesPortfolioSegmentMember2018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:DoubtfulMember2019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:DoubtfulMember2018-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMemberus-gaap:DoubtfulMember2019-12-310000801337us-gaap:CommercialRealEstatePortfolioSegmentMemberus-gaap:DoubtfulMember2018-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMemberus-gaap:DoubtfulMember2019-12-310000801337us-gaap:FinanceLeasesPortfolioSegmentMemberus-gaap:DoubtfulMember2018-12-310000801337us-gaap:PerformingFinancingReceivableMember2019-12-310000801337us-gaap:PerformingFinancingReceivableMember2018-12-310000801337us-gaap:NonperformingFinancingReceivableMember2019-12-310000801337us-gaap:NonperformingFinancingReceivableMember2018-12-310000801337us-gaap:NonperformingFinancingReceivableMemberwbs:TroubledDebtRestructuresMember2019-12-310000801337us-gaap:NonperformingFinancingReceivableMemberwbs:TroubledDebtRestructuresMember2018-12-31wbs:loan0000801337us-gaap:ExtendedMaturityMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2019-01-012019-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2018-01-012018-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2017-01-012017-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2019-01-012019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2018-01-012018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2017-01-012017-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMemberwbs:CombinationOfRateAndMaturityMember2019-01-012019-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMemberwbs:CombinationOfRateAndMaturityMember2018-01-012018-12-310000801337us-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMemberwbs:CombinationOfRateAndMaturityMember2017-01-012017-12-310000801337wbs:OtherconcessionsMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2019-01-012019-12-310000801337wbs:OtherconcessionsMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2018-01-012018-12-310000801337wbs:OtherconcessionsMemberus-gaap:CommercialPortfolioSegmentMemberus-gaap:CommercialAndIndustrialSectorMember2017-01-012017-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2017-01-012017-12-310000801337wbs:CombinationOfRateAndMaturityMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-01-012019-12-310000801337wbs:CombinationOfRateAndMaturityMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-01-012018-12-310000801337wbs:CombinationOfRateAndMaturityMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2017-01-012017-12-310000801337wbs:OtherconcessionsMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2019-01-012019-12-310000801337wbs:OtherconcessionsMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2018-01-012018-12-310000801337wbs:OtherconcessionsMemberus-gaap:RealEstateLoanMemberus-gaap:CommercialRealEstatePortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:FinanceLeasesPortfolioSegmentMember2019-01-012019-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:FinanceLeasesPortfolioSegmentMember2018-01-012018-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:FinanceLeasesPortfolioSegmentMember2017-01-012017-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:ExtendedMaturityMember2019-01-012019-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:ExtendedMaturityMember2018-01-012018-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:ExtendedMaturityMember2017-01-012017-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2019-01-012019-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2018-01-012018-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2017-01-012017-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberwbs:CombinationOfRateAndMaturityMember2019-01-012019-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberwbs:CombinationOfRateAndMaturityMember2018-01-012018-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberwbs:CombinationOfRateAndMaturityMember2017-01-012017-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberwbs:OtherconcessionsMember2019-01-012019-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberwbs:OtherconcessionsMember2018-01-012018-12-310000801337us-gaap:ResidentialPortfolioSegmentMemberwbs:OtherconcessionsMember2017-01-012017-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2019-01-012019-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2018-01-012018-12-310000801337us-gaap:ExtendedMaturityMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2017-01-012017-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2019-01-012019-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2018-01-012018-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberus-gaap:ContractualInterestRateReductionMember2017-01-012017-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberwbs:CombinationOfRateAndMaturityMemberus-gaap:HomeEquityLoanMember2019-01-012019-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberwbs:CombinationOfRateAndMaturityMemberus-gaap:HomeEquityLoanMember2018-01-012018-12-310000801337us-gaap:ConsumerPortfolioSegmentMemberwbs:CombinationOfRateAndMaturityMemberus-gaap:HomeEquityLoanMember2017-01-012017-12-310000801337wbs:OtherconcessionsMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2019-01-012019-12-310000801337wbs:OtherconcessionsMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2018-01-012018-12-310000801337wbs:OtherconcessionsMemberus-gaap:ConsumerPortfolioSegmentMemberus-gaap:HomeEquityLoanMember2017-01-012017-12-310000801337us-gaap:PassMemberwbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMember2019-12-310000801337us-gaap:PassMemberwbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMember2018-12-310000801337wbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMemberus-gaap:SpecialMentionMember2019-12-310000801337wbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMemberus-gaap:SpecialMentionMember2018-12-310000801337us-gaap:SubstandardMemberwbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMember2019-12-310000801337us-gaap:SubstandardMemberwbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMember2018-12-310000801337wbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMemberus-gaap:DoubtfulMember2019-12-310000801337wbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMemberus-gaap:DoubtfulMember2018-12-310000801337wbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMember2019-12-310000801337wbs:CommerialCommercialRealEstateEquipmentFinancingTDRsMember2018-12-310000801337us-gaap:ReserveForOffBalanceSheetActivitiesMember2018-12-310000801337us-gaap:ReserveForOffBalanceSheetActivitiesMember2017-12-310000801337us-gaap:ReserveForOffBalanceSheetActivitiesMember2016-12-310000801337us-gaap:ReserveForOffBalanceSheetActivitiesMember2019-01-012019-12-310000801337us-gaap:ReserveForOffBalanceSheetActivitiesMember2018-01-012018-12-310000801337us-gaap:ReserveForOffBalanceSheetActivitiesMember2017-01-012017-12-310000801337us-gaap:ReserveForOffBalanceSheetActivitiesMember2019-12-310000801337us-gaap:ResidentialMortgageMember2019-01-012019-12-310000801337us-gaap:ResidentialMortgageMember2018-01-012018-12-310000801337us-gaap:ResidentialMortgageMember2017-01-012017-12-310000801337us-gaap:ResidentialMortgageMemberwbs:ResidentialMortgageLoansServicingRetainedMember2019-01-012019-12-310000801337us-gaap:ResidentialMortgageMemberwbs:ResidentialMortgageLoansServicingRetainedMember2018-01-012018-12-310000801337us-gaap:ResidentialMortgageMemberwbs:ResidentialMortgageLoansServicingRetainedMember2017-01-012017-12-310000801337us-gaap:CommercialLoanMember2019-01-012019-12-310000801337us-gaap:CommercialLoanMember2018-01-012018-09-300000801337us-gaap:CommercialLoanMember2017-01-012017-12-310000801337us-gaap:ResidentialMortgageMember2019-12-310000801337us-gaap:ResidentialMortgageMember2018-01-012018-09-300000801337srt:MinimumMember2019-12-310000801337srt:MaximumMember2019-12-3100008013372019-09-300000801337wbs:CommunityBankingMember2019-12-310000801337wbs:HSABankMember2019-12-310000801337us-gaap:CoreDepositsMemberwbs:HSABankMember2019-12-310000801337us-gaap:CoreDepositsMemberwbs:HSABankMember2018-12-310000801337us-gaap:CustomerRelationshipsMemberwbs:HSABankMember2019-12-310000801337us-gaap:CustomerRelationshipsMemberwbs:HSABankMember2018-12-310000801337us-gaap:ResearchMember2019-12-310000801337us-gaap:InvestmentCreditMember2019-12-310000801337us-gaap:StateAndLocalJurisdictionMember2017-01-012017-12-310000801337us-gaap:DomesticCountryMember2017-01-012017-12-310000801337us-gaap:StateAndLocalJurisdictionMember2019-12-310000801337us-gaap:StateAndLocalJurisdictionMember2019-12-310000801337us-gaap:GeneralBusinessMember2019-12-310000801337srt:ScenarioForecastMembersrt:MinimumMember2020-01-012020-01-010000801337srt:ScenarioForecastMembersrt:MaximumMember2020-12-312020-12-310000801337wbs:OriginalMaturityOfOneYearOrLessMember2019-12-310000801337wbs:OriginalMaturityOfOneYearOrLessMemberus-gaap:SecuritiesSoldUnderAgreementsToRepurchaseMember2019-12-310000801337wbs:OriginalMaturityOfOneYearOrLessMember2018-12-310000801337wbs:OriginalMaturityOfOneYearOrLessMemberus-gaap:SecuritiesSoldUnderAgreementsToRepurchaseMember2018-12-310000801337wbs:OriginalmaturityofgreaterthanoneyearnoncallableMember2019-12-310000801337wbs:OriginalmaturityofgreaterthanoneyearnoncallableMemberus-gaap:SecuritiesSoldUnderAgreementsToRepurchaseMember2019-12-310000801337wbs:OriginalmaturityofgreaterthanoneyearnoncallableMember2018-12-310000801337wbs:OriginalmaturityofgreaterthanoneyearnoncallableMemberus-gaap:SecuritiesSoldUnderAgreementsToRepurchaseMember2018-12-310000801337us-gaap:SecuritiesSoldUnderAgreementsToRepurchaseMember2019-12-310000801337us-gaap:SecuritiesSoldUnderAgreementsToRepurchaseMember2018-12-310000801337us-gaap:FederalFundsPurchasedMember2019-12-310000801337us-gaap:FederalFundsPurchasedMember2018-12-310000801337us-gaap:FederalFundsPurchasedAndSecuritiesSoldUnderAgreementsToRepurchaseMember2019-12-310000801337us-gaap:FederalFundsPurchasedAndSecuritiesSoldUnderAgreementsToRepurchaseMember2018-12-310000801337us-gaap:DebtInstrumentRedemptionPeriodOneMemberus-gaap:SeniorNotesMember2019-12-310000801337us-gaap:DebtInstrumentRedemptionPeriodOneMemberus-gaap:SeniorNotesMember2018-12-310000801337us-gaap:SeniorNotesMemberus-gaap:DebtInstrumentRedemptionPeriodTwoMember2019-12-310000801337us-gaap:SeniorNotesMemberus-gaap:DebtInstrumentRedemptionPeriodTwoMember2018-12-310000801337us-gaap:JuniorSubordinatedDebtMember2019-12-310000801337us-gaap:JuniorSubordinatedDebtMember2018-12-310000801337us-gaap:LongTermDebtMember2019-12-310000801337us-gaap:LongTermDebtMember2018-12-310000801337us-gaap:SeniorNotesMember2019-12-310000801337us-gaap:LondonInterbankOfferedRateLIBORMember2019-12-310000801337us-gaap:CommonStockMember2018-12-310000801337us-gaap:TreasuryStockMember2019-01-012019-12-310000801337us-gaap:CommonStockMember2019-12-310000801337us-gaap:PreferredStockMember2019-12-310000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2016-12-310000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2016-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2016-12-310000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2017-01-012017-12-310000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2017-01-012017-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2017-01-012017-12-310000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2017-01-010000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2017-01-010000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2017-01-010000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2017-12-310000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2017-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2017-12-310000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2018-01-012018-09-300000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2018-01-012018-09-300000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2018-01-012018-09-300000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2018-01-012018-09-300000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2018-09-300000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2018-09-300000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2018-09-300000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2018-09-300000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2019-01-012019-09-300000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2019-01-012019-09-300000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2019-01-012019-09-300000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-01-012019-09-300000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMember2019-09-300000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2019-09-300000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2019-09-300000801337us-gaap:AccumulatedOtherComprehensiveIncomeMember2019-09-300000801337us-gaap:AccumulatedNetInvestmentGainLossIncludingPortionAttributableToNoncontrollingInterestMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2019-01-012019-12-310000801337us-gaap:AccumulatedNetInvestmentGainLossIncludingPortionAttributableToNoncontrollingInterestMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2018-01-012018-12-310000801337us-gaap:AccumulatedNetInvestmentGainLossIncludingPortionAttributableToNoncontrollingInterestMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2017-01-012017-12-310000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2019-01-012019-12-310000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2018-01-012018-12-310000801337us-gaap:AccumulatedNetUnrealizedInvestmentGainLossMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2017-01-012017-12-310000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2019-01-012019-12-310000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2018-01-012018-12-310000801337us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2017-01-012017-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetUnamortizedGainLossMember2019-01-012019-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetUnamortizedGainLossMember2018-01-012018-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetUnamortizedGainLossMember2017-01-012017-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2019-01-012019-12-310000801337us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2018-01-012018-12-310000801337wbs:RiskBasedCapitalRequiredforCapitalAdequacytoRiskWeightedAssetsMember2019-12-310000801337wbs:RiskBasedCapitalRequiredtobeWellCapitalizedtoRiskWeightedAssetsMember2019-12-310000801337srt:SubsidiariesMember2019-12-310000801337srt:SubsidiariesMemberwbs:RiskBasedCapitalRequiredforCapitalAdequacytoRiskWeightedAssetsMember2019-12-310000801337srt:SubsidiariesMemberwbs:RiskBasedCapitalRequiredtobeWellCapitalizedtoRiskWeightedAssetsMember2019-12-310000801337wbs:RiskBasedCapitalRequiredforCapitalAdequacytoRiskWeightedAssetsMember2018-12-310000801337wbs:RiskBasedCapitalRequiredtobeWellCapitalizedtoRiskWeightedAssetsMember2018-12-310000801337srt:SubsidiariesMember2018-12-310000801337srt:SubsidiariesMemberwbs:RiskBasedCapitalRequiredforCapitalAdequacytoRiskWeightedAssetsMember2018-12-310000801337srt:SubsidiariesMemberwbs:RiskBasedCapitalRequiredtobeWellCapitalizedtoRiskWeightedAssetsMember2018-12-310000801337us-gaap:RestrictedStockMember2019-01-012019-12-310000801337us-gaap:RestrictedStockMember2018-01-012018-12-310000801337us-gaap:RestrictedStockMember2017-01-012017-12-310000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:InterestRateContractMember2019-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:InterestRateContractMember2018-12-310000801337us-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2019-09-300000801337us-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2018-12-310000801337us-gaap:NondesignatedMemberwbs:MortgageBankingDerivativesMemberus-gaap:CreditDefaultSwapBuyingProtectionMember2019-09-300000801337us-gaap:NondesignatedMemberwbs:MortgageBankingDerivativesMemberus-gaap:CreditDefaultSwapSellingProtectionMember2019-09-300000801337us-gaap:NondesignatedMemberwbs:MortgageBankingDerivativesMemberus-gaap:CreditDefaultSwapBuyingProtectionMember2018-12-310000801337us-gaap:NondesignatedMemberwbs:MortgageBankingDerivativesMemberus-gaap:CreditDefaultSwapSellingProtectionMember2018-12-310000801337us-gaap:NondesignatedMemberus-gaap:OtherContractMember2019-09-300000801337us-gaap:NondesignatedMemberus-gaap:OtherContractMember2018-12-310000801337us-gaap:NondesignatedMember2019-09-300000801337us-gaap:NondesignatedMember2018-12-310000801337exch:CMESus-gaap:NondesignatedMember2019-12-310000801337exch:CMESus-gaap:NondesignatedMember2018-12-310000801337us-gaap:InterestRateFloorMember2019-12-310000801337us-gaap:LoanOriginationCommitmentsMember2019-12-310000801337us-gaap:InterestRateLockCommitmentsMember2019-12-310000801337us-gaap:CrossCurrencyInterestRateContractMember2019-12-310000801337us-gaap:CrossCurrencyInterestRateContractMember2018-12-310000801337us-gaap:DesignatedAsHedgingInstrumentMember2019-12-310000801337us-gaap:DesignatedAsHedgingInstrumentMember2018-12-310000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:OperatingExpenseMemberus-gaap:FairValueHedgingMemberus-gaap:LongTermDebtMember2019-01-012019-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:OperatingExpenseMemberus-gaap:FairValueHedgingMemberus-gaap:LongTermDebtMember2018-01-012018-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:OperatingExpenseMemberus-gaap:FairValueHedgingMemberus-gaap:LongTermDebtMember2017-01-012017-12-310000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:OperatingExpenseMemberus-gaap:FairValueHedgingMember2019-01-012019-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:OperatingExpenseMemberus-gaap:FairValueHedgingMember2018-01-012018-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:OperatingExpenseMemberus-gaap:FairValueHedgingMember2017-01-012017-12-310000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:FairValueHedgingMember2019-01-012019-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:FairValueHedgingMember2018-01-012018-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:FairValueHedgingMember2017-01-012017-12-310000801337us-gaap:CashFlowHedgingMemberus-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2019-01-012019-09-300000801337us-gaap:CashFlowHedgingMemberus-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2018-01-012018-09-300000801337us-gaap:CashFlowHedgingMemberus-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2017-01-012017-12-310000801337us-gaap:CashFlowHedgingMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMemberus-gaap:OtherIncomeMember2019-01-012019-09-300000801337us-gaap:CashFlowHedgingMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMemberus-gaap:OtherIncomeMember2018-01-012018-09-300000801337us-gaap:CashFlowHedgingMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMemberus-gaap:OtherIncomeMember2017-01-012017-12-310000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:CashFlowHedgingMember2019-01-012019-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:CashFlowHedgingMember2018-01-012018-09-300000801337us-gaap:DesignatedAsHedgingInstrumentMemberus-gaap:CashFlowHedgingMember2017-01-012017-12-310000801337us-gaap:LongTermDebtMember2019-09-300000801337us-gaap:LongTermDebtMember2018-12-310000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2019-01-012019-09-300000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2018-01-012018-09-300000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:InterestRateContractMember2017-01-012017-12-310000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberwbs:MortgageBankingDerivativesMember2019-01-012019-09-300000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberwbs:MortgageBankingDerivativesMember2018-01-012018-09-300000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberwbs:MortgageBankingDerivativesMember2017-01-012017-12-310000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:OtherContractMember2019-01-012019-09-300000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:OtherContractMember2018-01-012018-09-300000801337us-gaap:OperatingExpenseMemberus-gaap:NondesignatedMemberus-gaap:OtherContractMember2017-01-012017-12-310000801337us-gaap:NondesignatedMember2019-01-012019-09-300000801337us-gaap:PriceRiskDerivativeMember2019-12-310000801337us-gaap:CashFlowHedgingMember2019-12-310000801337us-gaap:CashFlowHedgingMember2019-01-012019-12-310000801337exch:CMES2019-12-310000801337us-gaap:CostApproachValuationTechniqueMember2019-12-310000801337us-gaap:MarketApproachValuationTechniqueMember2019-12-310000801337wbs:LoansheldforsaleMember2019-12-310000801337wbs:LoansheldforsaleMember2018-12-310000801337wbs:RabbiTrustMember2019-12-310000801337us-gaap:PrivateEquityFundsDomesticMember2019-09-300000801337us-gaap:CollateralizedMortgageObligationsMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:CollateralizedMortgageObligationsMemberus-gaap:FairValueMeasurementsRecurringMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MortgageBackedSecuritiesIssuedByUSGovernmentSponsoredEnterprisesMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MortgageBackedSecuritiesIssuedByUSGovernmentSponsoredEnterprisesMember2019-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Member2019-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2019-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMember2019-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberus-gaap:CommercialMortgageBackedSecuritiesMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMember2019-12-310000801337us-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMember2019-12-310000801337us-gaap:CollateralizedLoanObligationsMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:CollateralizedLoanObligationsMemberus-gaap:FairValueMeasurementsRecurringMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CorporateDebtSecuritiesMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CorporateDebtSecuritiesMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberus-gaap:DerivativeFinancialInstrumentsAssetsMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:DerivativeFinancialInstrumentsAssetsMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:DerivativeFinancialInstrumentsAssetsMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberus-gaap:LoanOriginationCommitmentsMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:LoanOriginationCommitmentsMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:LoanOriginationCommitmentsMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:LoanOriginationCommitmentsMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberwbs:InvestmentsHeldInRabbiTrustMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberwbs:InvestmentsHeldInRabbiTrustMember2019-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Member2019-12-310000801337us-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMember2019-12-310000801337us-gaap:USTreasuryBillSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Member2018-12-310000801337us-gaap:USTreasuryBillSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337us-gaap:CollateralizedMortgageObligationsMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:CollateralizedMortgageObligationsMemberus-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MortgageBackedSecuritiesIssuedByUSGovernmentSponsoredEnterprisesMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:MortgageBackedSecuritiesIssuedByUSGovernmentSponsoredEnterprisesMember2018-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Member2018-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337wbs:AgencyCommercialMortgageBackedSecuritiesMemberus-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberus-gaap:CommercialMortgageBackedSecuritiesMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMember2018-12-310000801337us-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CommercialMortgageBackedSecuritiesMember2018-12-310000801337us-gaap:CollateralizedLoanObligationsMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:CollateralizedLoanObligationsMemberus-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CorporateDebtSecuritiesMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:CorporateDebtSecuritiesMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Member2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberus-gaap:DerivativeFinancialInstrumentsAssetsMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:DerivativeFinancialInstrumentsAssetsMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMemberus-gaap:DerivativeFinancialInstrumentsAssetsMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:DerivativeFinancialInstrumentsAssetsMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberus-gaap:LoanOriginationCommitmentsMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:LoanOriginationCommitmentsMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:LoanOriginationCommitmentsMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberus-gaap:FairValueInputsLevel1Memberwbs:InvestmentsHeldInRabbiTrustMember2018-12-310000801337us-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMemberwbs:InvestmentsHeldInRabbiTrustMember2018-12-310000801337us-gaap:FairValueMeasurementsRecurringMemberwbs:InvestmentsHeldInRabbiTrustMember2018-12-310000801337us-gaap:FairValueMeasuredAtNetAssetValuePerShareMemberus-gaap:FairValueMeasurementsRecurringMember2018-12-310000801337us-gaap:PrivateEquityFundsDomesticMemberus-gaap:FairValueMeasurementsNonrecurringMember2019-12-310000801337us-gaap:FairValueMeasurementsNonrecurringMember2019-12-310000801337us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMember2019-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMember2018-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberus-gaap:FairValueInputsLevel3Member2019-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberus-gaap:FairValueInputsLevel3Member2018-12-310000801337us-gaap:ResidentialMortgageMemberus-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMember2019-12-310000801337us-gaap:ResidentialMortgageMemberus-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberus-gaap:FairValueInputsLevel3Member2019-12-310000801337us-gaap:ResidentialMortgageMemberus-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMember2018-12-310000801337us-gaap:ResidentialMortgageMemberus-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberus-gaap:FairValueInputsLevel3Member2018-12-310000801337us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:DepositsOtherThanTimeDepositsMember2019-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:DepositsOtherThanTimeDepositsMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:DepositsOtherThanTimeDepositsMember2018-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:DepositsOtherThanTimeDepositsMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:TimeDepositsMember2019-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:TimeDepositsMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:TimeDepositsMember2018-12-310000801337us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueMeasurementsNonrecurringMemberwbs:TimeDepositsMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:PensionPlansDefinedBenefitMember2018-12-310000801337us-gaap:PensionPlansDefinedBenefitMember2017-12-310000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2018-12-310000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2017-12-310000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2018-12-310000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2017-12-310000801337us-gaap:PensionPlansDefinedBenefitMember2019-01-012019-12-310000801337us-gaap:PensionPlansDefinedBenefitMember2018-01-012018-12-310000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2019-01-012019-12-310000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2018-01-012018-12-310000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2019-01-012019-12-310000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2018-01-012018-12-310000801337us-gaap:PensionPlansDefinedBenefitMember2019-12-310000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2019-12-310000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2019-12-310000801337us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2019-12-310000801337us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2018-12-310000801337us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2019-01-012019-12-310000801337us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2018-01-012018-12-310000801337us-gaap:PensionPlansDefinedBenefitMember2017-01-012017-12-310000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2019-01-012019-09-300000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2018-01-012018-09-300000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2017-01-012017-12-310000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2019-01-012019-09-300000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2018-01-012018-09-300000801337us-gaap:DefinedBenefitPostretirementHealthCoverageMember2017-01-012017-12-310000801337us-gaap:ExchangeTradedFundsMemberus-gaap:FairValueInputsLevel1Member2019-12-310000801337us-gaap:ExchangeTradedFundsMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueInputsLevel3Memberus-gaap:ExchangeTradedFundsMember2019-12-310000801337us-gaap:ExchangeTradedFundsMember2019-12-310000801337us-gaap:ExchangeTradedFundsMemberus-gaap:FairValueInputsLevel1Member2018-12-310000801337us-gaap:ExchangeTradedFundsMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueInputsLevel3Memberus-gaap:ExchangeTradedFundsMember2018-12-310000801337us-gaap:ExchangeTradedFundsMember2018-12-310000801337us-gaap:DefinedBenefitPlanCashAndCashEquivalentsMemberus-gaap:FairValueInputsLevel1Member2019-12-310000801337us-gaap:DefinedBenefitPlanCashAndCashEquivalentsMemberus-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueInputsLevel3Memberus-gaap:DefinedBenefitPlanCashAndCashEquivalentsMember2019-12-310000801337us-gaap:DefinedBenefitPlanCashAndCashEquivalentsMember2019-12-310000801337us-gaap:DefinedBenefitPlanCashAndCashEquivalentsMemberus-gaap:FairValueInputsLevel1Member2018-12-310000801337us-gaap:DefinedBenefitPlanCashAndCashEquivalentsMemberus-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueInputsLevel3Memberus-gaap:DefinedBenefitPlanCashAndCashEquivalentsMember2018-12-310000801337us-gaap:DefinedBenefitPlanCashAndCashEquivalentsMember2018-12-310000801337us-gaap:DefinedBenefitPlanCommonCollectiveTrustMember2019-12-310000801337us-gaap:DefinedBenefitPlanCommonCollectiveTrustMember2018-12-310000801337us-gaap:FairValueInputsLevel1Member2019-12-310000801337us-gaap:FairValueInputsLevel2Member2019-12-310000801337us-gaap:FairValueInputsLevel3Member2019-12-310000801337us-gaap:FairValueInputsLevel1Member2018-12-310000801337us-gaap:FairValueInputsLevel2Member2018-12-310000801337us-gaap:FairValueInputsLevel3Member2018-12-310000801337us-gaap:FixedIncomeFundsMember2019-12-310000801337us-gaap:FixedIncomeFundsMember2018-12-310000801337us-gaap:EquityFundsMember2019-12-310000801337us-gaap:EquityFundsMember2018-12-310000801337us-gaap:PensionPlansDefinedBenefitMember2019-10-012019-12-310000801337us-gaap:SupplementalEmployeeRetirementPlanDefinedBenefitMember2019-10-012019-12-3100008013372020-01-010000801337us-gaap:RestrictedStockMember2019-01-012019-12-310000801337us-gaap:RestrictedStockMember2018-01-012018-12-310000801337us-gaap:RestrictedStockMember2017-01-012017-12-310000801337us-gaap:RestrictedStockMember2018-12-310000801337us-gaap:PerformanceSharesMember2018-12-310000801337us-gaap:EmployeeStockOptionMember2018-12-310000801337us-gaap:PerformanceSharesMember2019-01-012019-12-310000801337us-gaap:EmployeeStockOptionMember2019-01-012019-12-310000801337us-gaap:RestrictedStockMember2019-12-310000801337us-gaap:PerformanceSharesMember2019-12-310000801337us-gaap:EmployeeStockOptionMember2019-12-310000801337srt:MinimumMember2019-01-012019-12-310000801337srt:MaximumMember2019-01-012019-12-310000801337us-gaap:RestrictedStockMembersrt:MaximumMember2019-12-310000801337wbs:IncentiveStockOptionsMember2019-01-012019-12-310000801337wbs:NonQualifiedStockOptionsMember2019-12-310000801337wbs:IncentiveStockOptionsMember2019-12-31wbs:Segment0000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2019-12-310000801337us-gaap:OperatingSegmentsMemberwbs:HSABankMember2019-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2019-12-310000801337us-gaap:CorporateNonSegmentMember2019-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2018-12-310000801337us-gaap:OperatingSegmentsMemberwbs:HSABankMember2018-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2018-12-310000801337us-gaap:CorporateNonSegmentMember2018-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2019-01-012019-12-310000801337us-gaap:OperatingSegmentsMemberwbs:HSABankMember2019-01-012019-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2019-01-012019-12-310000801337us-gaap:CorporateNonSegmentMember2019-01-012019-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2018-01-012018-12-310000801337us-gaap:OperatingSegmentsMemberwbs:HSABankMember2018-01-012018-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2018-01-012018-12-310000801337us-gaap:CorporateNonSegmentMember2018-01-012018-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:HSABankMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2017-01-012017-12-310000801337us-gaap:CorporateNonSegmentMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:CommercialBankingMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:HSABankMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:CommunityBankingMember2019-01-012019-09-300000801337us-gaap:CorporateNonSegmentMemberwbs:DepositServiceFeesMember2019-01-012019-09-300000801337wbs:DepositServiceFeesMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMemberwbs:HSABankMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMemberwbs:CommunityBankingMember2019-01-012019-09-300000801337us-gaap:CorporateNonSegmentMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2019-01-012019-09-300000801337us-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2019-01-012019-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2019-01-012019-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:HSABankMember2019-01-012019-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2019-01-012019-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:CorporateNonSegmentMember2019-01-012019-09-300000801337wbs:OtherNonInterestIncomeMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:HSABankMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2019-01-012019-09-300000801337us-gaap:CorporateNonSegmentMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:CommercialBankingMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:HSABankMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:CommunityBankingMember2019-01-012019-09-300000801337wbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberus-gaap:CorporateNonSegmentMember2019-01-012019-09-300000801337wbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMember2019-01-012019-09-300000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:CommercialBankingMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:HSABankMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:CommunityBankingMember2018-01-012018-09-300000801337us-gaap:CorporateNonSegmentMemberwbs:DepositServiceFeesMember2018-01-012018-09-300000801337wbs:DepositServiceFeesMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMemberwbs:HSABankMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMemberwbs:CommunityBankingMember2018-01-012018-09-300000801337us-gaap:CorporateNonSegmentMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2018-01-012018-09-300000801337us-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2018-01-012018-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2018-01-012018-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:HSABankMember2018-01-012018-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2018-01-012018-09-300000801337wbs:OtherNonInterestIncomeMemberus-gaap:CorporateNonSegmentMember2018-01-012018-09-300000801337wbs:OtherNonInterestIncomeMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:HSABankMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2018-01-012018-09-300000801337us-gaap:CorporateNonSegmentMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:CommercialBankingMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:HSABankMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:CommunityBankingMember2018-01-012018-09-300000801337wbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberus-gaap:CorporateNonSegmentMember2018-01-012018-09-300000801337wbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMember2018-01-012018-09-300000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:CommercialBankingMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:HSABankMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:DepositServiceFeesMemberwbs:CommunityBankingMember2017-01-012017-12-310000801337us-gaap:CorporateNonSegmentMemberwbs:DepositServiceFeesMember2017-01-012017-12-310000801337wbs:DepositServiceFeesMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:CommercialBankingMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMemberwbs:HSABankMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMemberwbs:CommunityBankingMember2017-01-012017-12-310000801337us-gaap:CorporateNonSegmentMemberus-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2017-01-012017-12-310000801337us-gaap:InvestmentAdvisoryManagementAndAdministrativeServiceMember2017-01-012017-12-310000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:CommercialBankingMember2017-01-012017-12-310000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:HSABankMember2017-01-012017-12-310000801337wbs:OtherNonInterestIncomeMemberus-gaap:OperatingSegmentsMemberwbs:CommunityBankingMember2017-01-012017-12-310000801337wbs:OtherNonInterestIncomeMemberus-gaap:CorporateNonSegmentMember2017-01-012017-12-310000801337wbs:OtherNonInterestIncomeMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:CommercialBankingMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:HSABankMember2017-01-012017-12-310000801337us-gaap:OperatingSegmentsMemberwbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberwbs:CommunityBankingMember2017-01-012017-12-310000801337wbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMemberus-gaap:CorporateNonSegmentMember2017-01-012017-12-310000801337wbs:NonInterestIncomeWithintheScopeofOtherGAAPTopicsMember2017-01-012017-12-310000801337us-gaap:CommitmentsToExtendCreditMember2019-12-310000801337us-gaap:CommitmentsToExtendCreditMember2018-12-310000801337us-gaap:StandbyLettersOfCreditMember2019-12-310000801337us-gaap:StandbyLettersOfCreditMember2018-12-310000801337us-gaap:LetterOfCreditMember2019-12-310000801337us-gaap:LetterOfCreditMember2018-12-310000801337us-gaap:AllowanceForCreditLossMember2018-12-310000801337us-gaap:AllowanceForCreditLossMember2017-12-310000801337us-gaap:AllowanceForCreditLossMember2019-01-012019-12-310000801337us-gaap:AllowanceForCreditLossMember2018-01-012018-12-310000801337us-gaap:AllowanceForCreditLossMember2019-12-310000801337srt:ParentCompanyMember2019-12-310000801337srt:ParentCompanyMember2018-12-310000801337srt:ParentCompanyMember2019-01-012019-12-310000801337srt:ParentCompanyMember2018-01-012018-12-310000801337srt:ParentCompanyMember2017-01-012017-12-310000801337srt:ParentCompanyMember2017-12-310000801337srt:ParentCompanyMember2016-12-3100008013372019-01-012019-03-3100008013372019-04-012019-06-3000008013372019-07-012019-09-3000008013372019-10-012019-12-3100008013372018-01-012018-03-3100008013372018-04-012018-06-3000008013372018-07-012018-09-3000008013372018-10-012018-12-31

UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549 
_______________________________________________________________________________
FORM 10-K
_______________________________________________________________________________
 Annual Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
For the fiscal year ended December 31, 2019
or
 Transition Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
For the transition period from ____ to ____
Commission File Number: 001-31486
_______________________________________________________________________________________________
WEBSTER FINANCIAL CORPORATION
(Exact name of registrant as specified in its charter)
 _______________________________________________________________________________
Delaware 
06-1187536
(State or other jurisdiction of incorporation or organization) (I.R.S. Employer Identification No.)
145 Bank Street, Waterbury, Connecticut 06702
(Address and zip code of principal executive offices)
Registrants telephone number, including area code: (203) 578-2202

Securities registered pursuant to Section 12(b) of the Act:
Title of each classTrading SymbolsName of exchange on which registered
Common Stock, $0.01 par valueWBSNew York Stock Exchange
Depository Shares, each representing 1/1000th interest in a shareWBS PrFNew York Stock Exchange
of 5.25% Series F Non-Cumulative Perpetual Preferred Stock
Securities registered pursuant to Section 12(g) of the Act: None
____________________________________________________________________________________________________
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. ☒  Yes    ☐  No
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Act.   ☐  Yes  ☒  No
Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    ☒  Yes    ☐  No
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (Section 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).  ☒  Yes  ☐  No
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer”, “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer  Accelerated filerNon-accelerated filerSmaller reporting company
Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transaction period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Exchange Act Rule 12b-2).    Yes     No
Aggregate market value of Webster Financial Corporation’s common stock held by non-affiliates was approximately $4.3 billion, based on the June 30, 2019 closing price on the New York Stock Exchange, as of the last trading day of the registrant’s most recently completed second quarter.
Number of shares of common stock, par value $.01 per share, outstanding as of February 27, 2020 was 91,629,752.
Documents Incorporated by Reference
Part III: Definitive Proxy Statement (the “Proxy Statement”) for the Annual Meeting of Shareholders to be held on April 23, 2020.





INDEX

  Page No.
Forward-Looking Statements
Key to Acronyms and Terms
Item 1.Business
Item 1A.Risk Factors
Item 1B.Unresolved Staff Comments
Item 2.Properties
Item 3.Legal Proceedings
Item 4.Mine Safety Disclosures
Item 5.Market for Registrant's Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
Item 6.Selected Financial Data
Item 7.Management's Discussion and Analysis of Financial Condition and Results of Operations
Item 7A.Quantitative and Qualitative Disclosures About Market Risk
Item 8.Financial Statements and Supplementary Data
Item 9.Changes in and Disagreements with Accountants on Accounting and Financial Disclosure
Item 9A.Controls and Procedures
Item 9B.Other Information
Item 10.Directors, Executive Officers and Corporate Governance
Item 11.Executive Compensation
Item 12.Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
Item 13.Certain Relationships and Related Transactions, and Director Independence
Item 14.Principal Accountant Fees and Services
Item 15.Exhibits and Financial Statement Schedules
Item 16.Form 10-K Summary

i


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
FORWARD-LOOKING STATEMENTS
This Annual Report on Form 10-K contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements can be identified by words such as “believes,” “anticipates,” “expects,” “intends,” “targeted,” “continue,” “remain,” “will,” “should,” “may,” “plans,” “estimates,” and similar references to future periods; however, such words are not the exclusive means of identifying such statements. References to the “Company,” “Webster,” “we,” “our,” or “us” mean Webster Financial Corporation and its consolidated subsidiaries.
Examples of forward-looking statements include, but are not limited to:
projections of revenues, expenses, income or loss, earnings or loss per share, and other financial items;
statements of plans, objectives and expectations of Webster or its management or Board of Directors;
statements of future economic performance; and
statements of assumptions underlying such statements.
Forward-looking statements are based on Webster’s current expectations and assumptions regarding its business, the economy and other future conditions. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks and changes in circumstances that are difficult to predict. Webster’s actual results may differ materially from those contemplated by the forward-looking statements, which are neither statements of historical fact nor guarantees or assurances of future performance.
Factors that could cause our actual results to differ from those discussed in the forward-looking statements include, but are not limited to:
our ability to successfully execute our business plan and manage our risks;
local, regional, national and international economic conditions and the impact they may have on us and our customers;
volatility and disruption in national and international financial markets;
changes in the level of non-performing assets and charge-offs;
changes in estimates of future reserve requirements based upon the periodic review thereof under relevant regulatory and accounting requirements;
adverse conditions in the securities markets that lead to impairment in the value of securities in our investment portfolio;
inflation, changes in interest rates, and securities market and monetary fluctuations;
the timely development and acceptance of new products and services and the perceived value of these products and services by customers;
changes in deposit flows, consumer spending, borrowings and savings habits;
our ability to implement new technologies and maintain secure and reliable technology systems;
performance by our counterparties and vendors;
our ability to increase market share and control expenses;
changes in the competitive environment among banks, financial holding companies and other financial services providers;
changes in laws and regulations (including laws and regulations concerning taxes, banking, securities, insurance and healthcare) with which we and our subsidiaries must comply;
the effect of changes in accounting policies and practices applicable to us, including changes in our allowance for loan and lease losses and other impacts of our adoption of new accounting guidance regarding the recognition of credit losses; and
legal and regulatory developments including the resolution of legal proceedings or regulatory or other governmental inquiries and the results of regulatory examinations or reviews.
All forward-looking statements in this Annual Report on Form 10-K speak only as of the date they are made. Factors or events that could cause the Company’s actual results to differ may emerge from time to time, and it is not possible for the Company to predict all of them. The Company undertakes no obligation to publicly update any forward-looking statement, whether as a result of new information, future developments or otherwise, except as may be required by law.
ii


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
KEY TO ACRONYMS AND TERMS
Agency CMBS
Agency commercial mortgage-backed securities
Agency CMO
Agency collateralized mortgage obligations
Agency MBS
Agency mortgage-backed securities
ALCO
Asset/Liability Committee
ALLL
Allowance for loan and lease losses
AOCL
Accumulated other comprehensive loss, net of tax
ARRC
Alternative Reference Rates Committee
ASC / ASU
Accounting Standards Codification / Accounting Standards Update
Basel III
Capital rules under a global regulatory framework developed by the Basel Committee on Banking Supervision
BHC Act
Bank Holding Company Act of 1956, as amended
Capital Rules
Final rules establishing a new comprehensive capital framework for U.S. banking organizations
CECL
Current expected credit losses
CET1 capital
Common Equity Tier 1 Capital, defined by Basel III capital rules
CFPB
Consumer Financial Protection Bureau
CFTC
Commodity Futures Trading Commission
CLO
Collateralized loan obligation securities
CMBS
Non-agency commercial mortgage-backed securities
CME
Chicago Mercantile Exchange
CRA
Community Reinvestment Act of 1977
DIF
Federal Deposit Insurance Fund
Dodd-Frank
Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010
DTA
Deferred tax asset
EGRRCPA
Economic Growth, Regulatory Relief, and Consumer Protection Act of 2018
ERMC
Enterprise Risk Management Committee
FASB
Financial Accounting Standards Board
FDIC
Federal Deposit Insurance Corporation
FHLB
Federal Home Loan Bank
FICO
Fair Isaac Corporation
FINRA
Financial Industry Regulatory Authority
FRA
Federal Reserve Act
FRB
Federal Reserve Bank
FTP
Funds Transfer Pricing, a matched maturity funding concept
GAAP
U.S. Generally Accepted Accounting Principles
Holding Company
Webster Financial Corporation
HSA Bank
HSA Bank, a division of Webster Bank, National Association
LEP
Loss emergence period
LGDLoss given default
LIBORLondon Interbank Offered Rate
LPLLPL Financial Holdings Inc.
NAVNet asset value
NIINet interest income
OCCOffice of the Comptroller of the Currency
OCI / OCLOther comprehensive income (loss)
OREOOther real estate owned
OTTIOther-than-temporary impairment
PDProbability of default
PPNRPre-tax, pre-provision net revenue
QMQualified mortgage
ROURight-of-use
SALTState and local tax
SECUnited States Securities and Exchange Commission
SERPSupplemental defined benefit retirement plan
SIPCSecurities Investor Protection Corporation
SOFRSecured overnight financing rate
Tax ActTax Cuts and Jobs Act of 2017
TDR
Troubled debt restructuring, defined in ASC 310-40 “Receivables-Troubled Debt Restructurings by Creditors
UTBUnrecognized tax benefit
VIE / VOE
Variable interest entity / voting interest entity, defined in ASC 810-10 “Consolidation-Overall”
Webster Bank or the BankWebster Bank, National Association, a wholly-owned subsidiary of Webster Financial Corporation
Webster or the CompanyWebster Financial Corporation, collectively with its consolidated subsidiaries

iii


PART 1
ITEM 1. BUSINESS
Company Overview
Webster Financial Corporation is a bank holding company and financial holding company under the Bank Holding Company Act of 1956, as amended (BHC Act), incorporated under the laws of Delaware in 1986, and headquartered in Waterbury, Connecticut. At December 31, 2019, Webster had assets of $30.4 billion, net loans and leases of $19.8 billion, deposits of $23.3 billion, and shareholders’ equity of $3.2 billion.
Webster had 3,298 full-time equivalent employees at December 31, 2019. Webster provides its employees with comprehensive benefits, some of which are provided on a contributory basis, including medical and dental plans, a 401(k) savings plan with a company matching contribution, life insurance, and short-term and long-term disability coverage.
Webster Financial Corporation’s common stock is traded on the New York Stock Exchange under the symbol WBS. Webster’s internet address is www.websterbank.com and investor relations internet address is www.wbst.com. Webster makes available free of charge on these websites its Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, definitive proxy statements, and amendments, if any, to those documents filed or furnished pursuant to Section 13(a) of the Securities Exchange Act of 1934, as soon as practicable after it electronically files such material with, or furnishes it to, the United States Securities and Exchange Commission (SEC). These documents are also available to the public on the Internet at the SEC’s website at www.sec.gov. Information on Webster’s website and its investor relations website is not incorporated by reference into this report.
Subsidiaries of Webster Financial Corporation
Webster Financial Corporation’s principal consolidated subsidiary is Webster Bank (the Bank). Its other directly consolidated subsidiaries are Webster Wealth Advisors, Inc. and Webster Licensing, LLC. The Holding Company also owns all of the outstanding common stock of Webster Statutory Trust which is an unconsolidated financial vehicle that has issued, and may in the future issue, trust preferred securities.
Webster Bank’s significant direct subsidiaries include the following: Webster Servicing, which provides a variety of services to health savings accounts; Webster Mortgage Investment Corporation, a passive investment subsidiary whose primary function is to provide servicing on qualified passive investments, such as residential real estate and commercial mortgage real estate loans acquired from Webster Bank; Webster Business Credit Corporation, which offers asset-based lending services; and Webster Capital Finance, Inc., which offers equipment financing for end users of equipment. Webster Bank also has various other subsidiaries that are not significant to the consolidated group.
Business Segments
Webster Bank delivers a wide range of banking, investment, and financial services to individuals, families, and businesses through three reportable segments - Commercial Banking, HSA Bank, and Community Banking.
Commercial Banking provides lending, deposit, and treasury and payment solutions with a focus on building relationships with companies that have annual revenues greater than $25 million. Commercial Banking is comprised of the following:
Middle Market delivers a full array of financial services to a diversified group of companies, leveraging industry specialization and delivering competitive products and services, primarily in the Northeast.
Commercial Real Estate provides financing, primarily in the Northeast, for the acquisition, development, construction, or refinancing of commercial real estate for which the property is the primary security for the loan and income generated from the property is the primary repayment source.
Webster Business Credit Corporation is one of the top 25 asset-based lenders in the U.S. that builds relationships with growing middle market companies by financing core working capital and other financing needs primarily with revolving credit facilities with advance rates against accounts receivable and inventory. Webster Business Credit Corporation lends primarily in the eastern half of the U.S.
Webster Capital Finance offers small to mid-ticket financing for critical equipment, specializing in construction, transportation, environmental, and manufacturing equipment. Webster Capital Finance lends primarily in the eastern half of the U.S. and also in other select markets.
Treasury and payment solutions delivers a broad range of deposit, lending, treasury, and trade services, primarily in the Northeast, via a dedicated team of treasury professionals and local commercial bankers. Treasury and payment solutions is comprised of Government and Institutional Banking, Cash Management Sales, and Product Management to deliver holistic solutions to Webster’s increasingly sophisticated business and institutional clients.
Private Banking provides local, full relationship banking that serves high net worth clients, not-for-profit organizations, and business clients with asset management, financial planning services, trust services, loan products, and deposit products. These client relationships generate fee revenue on assets under management or administration, while a majority of the relationships also include lending and/or deposit accounts which provide net interest income and other ancillary fees.
1


HSA Bank is a division of Webster Bank with a focus on providing health savings accounts, while also delivering health reimbursement arrangements and flexible spending and commuter benefit account administration services to employers and individuals in all 50 states. It is a leading bank administrator of health savings accounts based on assets under administration. Health savings accounts are distributed nationwide directly to employers and individual consumers as well as through national and regional insurance carriers, benefit consultants, and financial advisors. At December 31, 2019, HSA Bank had approximately 3 million accounts with more than $8.5 billion in health savings account deposits and linked investment balances.
Community Banking serves consumers and business banking customers primarily throughout southern New England and Westchester County, New York. Community Banking is comprised of personal and business banking, as well as a distribution network consisting of 157 banking centers, 309 ATMs, a customer care center, and a full range of web and mobile based banking services.
Personal Banking offers consumer deposit and fee-based services, residential mortgages, home equity lines/loans, unsecured consumer loans, and credit card products. In addition, investment and securities-related services, including brokerage and investment advice, are offered through a strategic partnership with LPL Financial Holdings Inc. (LPL), a broker dealer registered with the SEC, a registered investment advisor under federal and applicable state laws, a member of the Financial Industry Regulatory Authority (FINRA), and a member of the Securities Investor Protection Corporation (SIPC). Webster Bank has employees located throughout its banking center network who, through LPL, are registered representatives.
Business Banking offers credit, deposit, and cash flow management products to businesses and professional service firms with annual revenues of up to $25 million. This group builds broad customer relationships through business bankers and business certified banking center managers, supported by a team of customer care center bankers and industry and product specialists.
Competition
Webster is subject to strong competition from banks, thrifts, credit unions, non-bank health savings account trustees, consumer finance companies, investment companies, insurance companies, and online lending and savings institutions. Certain of these competitors are larger financial institutions with substantially greater resources, lending limits, larger branch systems, and a wider array of commercial and consumer banking services than Webster. Competition could intensify in the future as a result of industry consolidation, the increasing availability of products and services from non-bank entities, greater technological developments in the industry, and continued bank regulatory reforms.
Webster faces substantial competition for deposits and loans throughout its market areas. The primary factors in competing for deposits are interest rates, personalized services, the quality and range of financial services, convenience of office locations and hours, mobile banking and other automated services. Competition for deposits comes from other commercial banks, thrifts, credit unions, non-bank health savings account trustees, mutual funds, and other investment alternatives. The primary factors in competing for consumer and commercial loans are interest rates, loan origination fees, ease and convenience of loan origination channels, the quality and range of lending services, personalized service, and ability to close within customers’ desired time frame. Competition for origination of loans comes primarily from commercial banks, non-bank lenders, savings institutions, mortgage banking firms, mortgage brokers, online lenders, and insurance companies. Other factors which affect competition include the general and local economic conditions, current interest rate levels, and volatility in the lending markets.
Supervision and Regulation
Webster and its bank and non-bank subsidiaries are subject to comprehensive regulation under federal and state laws. The regulatory framework applicable to bank holding companies and their subsidiary banks is intended to protect depositors, the Federal Deposit Insurance Fund (DIF), and the U.S. banking system as a whole. This system is not designed to protect equity investors in bank holding companies. Set forth below is a summary of the significant laws and regulations applicable to Webster and its bank and non-bank subsidiaries. The description that follows is qualified in its entirety by reference to the full text of the statutes, regulations, and policies that are described. Such statutes, regulations, and policies are subject to ongoing review by Congress, state legislatures, and federal and state regulatory agencies. A change in any of the statutes, regulations, or regulatory policies applicable to Webster and its bank and non-bank subsidiaries could have a material effect on the results of the Company.
Webster Financial Corporation is a separate and distinct legal entity from Webster Bank and its other subsidiaries. As a registered bank holding company and a financial holding company, it is subject to inspection, examination, and supervision by the Board of Governors of the Federal Reserve System and is regulated under the BHC Act. Webster is under the jurisdiction of the SEC and is subject to the disclosure and other regulatory requirements of the Securities Act of 1933, as amended, and the Securities Exchange Act of 1934, as amended, as administered by the SEC. Webster is subject to the rules for companies listed on the New York Stock Exchange. In addition, the Consumer Financial Protection Bureau (CFPB) supervises Webster for compliance with federal consumer financial protection laws. Webster is also subject to oversight by state attorneys general for compliance with state consumer protection laws. Webster’s non-bank subsidiaries are subject to federal and state laws and regulations, including regulations of the Federal Reserve System.
2


Webster Bank is organized as a national banking association under the National Bank Act. Webster Bank is subject to the supervision of, and to regular examination by, the Office of the Comptroller of the Currency (OCC) as its primary federal regulator, as well as by the Federal Deposit Insurance Corporation (FDIC) as its deposit insurer. Webster Bank’s deposits are insured by the FDIC up to the applicable deposit insurance limits in accordance with FDIC laws and regulations.
The Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 (Dodd-Frank) significantly changed the financial regulatory regime in the United States. Since the enactment of Dodd-Frank, U.S. banks and financial services firms have been subject to enhanced regulation and oversight. Several provisions of Dodd-Frank are subject to further rulemaking, guidance, and interpretation by the federal banking agencies. The current administration and its appointees to the federal banking agencies have expressed interest in reviewing, revising, and perhaps repealing portions of Dodd-Frank and certain of its implementing regulations.
As such, among other things, the Economic Growth, Regulatory Relief, and Consumer Protection Act of 2018 (EGRRCPA) amended certain provisions of Dodd-Frank as well as statutes administered by the Federal Reserve System, the FDIC, and the OCC. The amendments resulting from EGRRCPA provide limited regulatory relief for certain financial institutions and additional tailoring of banking and consumer protection laws, while preserving the existing framework under which U.S. financial institutions are regulated, including the discretionary authority of the Federal Reserve System, the FDIC, and the OCC to supervise bank holding companies and insured depository institutions.
In addition, EGRRCPA includes certain other banking-related consumer protection and securities law-related provisions. Many of these provisions must be implemented through rules adopted by the federal banking agencies and certain changes remain subject to substantial regulatory discretion of the federal banking agencies. Although the federal banking agencies have made progress on several rules required under EGRRCPA, its full impact remains unclear for the immediate future. The Company expects to continue to evaluate the potential impact of EGRRCPA as it is further implemented by the regulators.
Bank Holding Company Regulation
Webster Financial Corporation is a bank holding company as defined under the BHC Act. The BHC Act generally limits the business of bank holding companies to banking, managing or controlling banks, and other activities that the Board of Governors of the Federal Reserve System has determined to be so closely related to banking as to be a proper incident thereto. Bank holding companies that have elected to become financial holding companies, such as Webster Financial Corporation, may engage in any activity, or acquire and retain the shares of a company engaged in any activity, that is either (i) financial in nature or incidental to such financial activity (as determined by the Board of Governors of the Federal Reserve System in consultation with the Secretary of the Treasury) or (ii) complementary to a financial activity, and that does not pose a substantial risk to the safety and soundness of depository institutions or the financial system (as solely determined by the Board of Governors of the Federal Reserve System). Activities that are financial in nature include securities underwriting and dealing, insurance underwriting, and making merchant banking investments.
Mergers and Acquisitions
The BHC Act, Bank Merger Act, and other federal and state statutes regulate the direct and indirect acquisition of depository institutions. The BHC Act requires Federal Reserve System prior approval for a bank holding company to acquire, directly or indirectly, 5% or more of any class of voting securities of a commercial bank or its parent holding company, and for a company other than a bank holding company to acquire 25% or more of any class of voting securities of a bank or bank holding company.  Under the Change in Bank Control Act, any person or company may not acquire, directly or indirectly, control of a bank without providing 60 days prior notice and receiving a non-objection from the appropriate federal banking agency. 
Under the Bank Merger Act, the prior approval of the appropriate federal banking agency is required for insured depository institutions to merge or enter into purchase and assumption transactions.  In reviewing applications seeking approval of merger or purchase and assumption transactions, the federal banking agencies will consider, among other things, the competitive effect and public benefits of the transactions, the capital position of the combined banks, the applicant’s performance record under the Community Reinvestment Act of 1977 (CRA), and the effectiveness of the merging banks in combating money laundering.
Enhanced Prudential Standards
Section 165 of Dodd-Frank imposes enhanced prudential standards on larger banking organizations. However, EGRRCPA makes bank holding companies with less than $100 billion in assets, such as Webster Financial Corporation, exempt from the enhanced prudential standards imposed under Section 165 including, but not limited to, the resolution planning and enhanced liquidity and risk management requirements therein. Further, on October 15, 2019, EGRRCPA was amended by raising the applicability threshold for company-run stress test requirements for bank holding companies from $10 billion or more in assets to $250 billion or more in assets. As a result, Webster Financial Corporation is relieved from the requirement to conduct company-run stress testing for itself and Webster Bank. However, while the federal banking agencies will not require company-run stress testing, the capital planning and risk management practices of the Company will continue to be reviewed through regular supervisory processes of the Federal Reserve System and the OCC. The Company will continue to perform certain stress tests internally and incorporate the economic models and information developed through its stress testing program into its risk management and business planning activities.
3


Furthermore, under a previously issued rule of the Federal Reserve System implementing enhanced prudential standards required by Dodd-Frank, bank holding companies with more than $10 billion in assets were subject to certain rules, including a requirement to establish a separate risk committee of independent directors to manage enterprise-wide risk. EGRRCPA subsequently increased the asset threshold for requiring a bank holding company to establish a separate risk committee of independent directors from $10 billion to $50 billion. Notwithstanding the changes implemented by EGRRCPA, the Company has retained its Risk Committee of the Board of Directors.
Debit Card Interchange Fees
Dodd-Frank requires that any interchange transaction fee charged for a debit transaction be reasonable and proportional to the cost incurred by the issuer for the transaction and includes regulations that establish such fee standards, eliminate exclusivity arrangements between issuers and networks for debit card transactions, limit restrictions on merchant discounting for use of certain payment forms, and minimum-maximum amount thresholds as a condition for acceptance of credit cards. The Federal Reserve System, pursuant to Dodd-Frank, approved a final debit card interchange rule which caps an issuer’s base fee at 21 cents per transaction and allows for an additional amount equal to 5 basis points of the transaction's value. The Federal Reserve System separately issued a final rule that also allows a fraud-prevention adjustment of one-cent per transaction conditioned upon an issuer developing, implementing, and updating reasonably designed fraud-prevention policies and procedures.
Identity Theft
The SEC and the Commodity Futures Trading Commission (CFTC) jointly issued final rules and guidelines implementing the provisions of Dodd-Frank which require certain regulated entities to establish programs to address risks of identity theft. The rules require financial institutions and creditors to develop and implement a written identity theft prevention program that is designed to detect, prevent, and mitigate identity theft in connection with certain existing accounts or the opening of new accounts. The rules include guidelines to assist entities in the formulation and maintenance of programs that would satisfy these requirements. In addition, the rules establish special requirements for any credit and debit card issuers that are subject to the jurisdiction of the SEC or the CFTC to assess the validity of notifications of changes of address under certain circumstances. Webster implemented an ID Theft Prevention Program, approved by its Board of Directors, in compliance with these requirements.
Volcker Rule
Section 619 of Dodd-Frank, commonly known as the Volcker Rule, restricts the ability of banking entities, such as Webster and Webster Bank, from: (i) engaging in proprietary trading and (ii) investing in or sponsoring certain covered funds, subject to certain limited exceptions. Under the Volcker Rule, the term covered funds is defined as any issuer that would be an investment company under the Investment Company Act but for the exemption in section 3(c)(1) or 3(c)(7) of that Act, which includes collateralized loan obligation securities (CLO) and collateralized debt obligation securities. There are also several exemptions from the definition of covered fund, including, among other things, loan securitization, joint ventures, certain types of foreign funds, entities issuing asset-backed commercial paper, and registered investment companies. The EGRRCPA and subsequent promulgation of inter-agency final rules have aimed to simplify and tailor requirements related to the Volcker Rule, including eliminating collection of certain metrics and reducing the compliance burdens associated with other metrics for banks with less than $20 billion in average trading assets and liabilities. The Federal Reserve has granted Webster until July 21, 2022 to bring its holdings into compliance with the Volcker Rule.
Dividends
The primary source of liquidity at the Holding Company is dividends from Webster Bank. Prior approval from the OCC is required for a national bank to declare a dividend in any year that would exceed the sum of its net income for that year and its undistributed net income for the preceding two years, less any required transfers to surplus. Webster Bank paid the Holding Company $360.0 million in dividends during the year ended December 31, 2019 and had $302.8 million of undistributed net income available for payment of dividends at December 31, 2019.
In addition, Webster Financial Corporation and Webster Bank are subject to other regulatory policies and requirements relating to the payment of dividends, including requirements to maintain adequate capital above regulatory minimums. Federal regulatory agencies are authorized to determine, under certain circumstances relating to the financial condition of a bank holding company or a bank, that the payment of dividends would be an unsafe or unsound practice and to prohibit payment thereof. The federal banking agencies have indicated that paying dividends that deplete a bank’s capital base to an inadequate level would be an unsafe and unsound banking practice, and that banking organizations should generally pay dividends only out of current operating earnings.
4


Federal Reserve System
Federal Reserve System regulations require depository institutions to maintain cash reserves against their transaction accounts, primarily interest-bearing and regular checking accounts. The required cash reserves can be in the form of vault cash and, if vault cash does not fully satisfy the required cash reserves, in the form of a balance maintained with Federal Reserve Banks (FRBs). The Board of Governors of the Federal Reserve System generally makes annual adjustments to the tiered cash reserve requirements. The regulations require that Webster maintain cash reserves against aggregate transaction accounts in excess of the exempt amount of $16.3 million at December 31, 2019. Effective January 16, 2020, amounts greater than $16.9 million up to and including $127.5 million have a reserve requirement of 3% and amounts in excess of $127.5 million have a reserve requirement of 10%. Webster Bank is in compliance with these cash reserve requirements.
As a national bank and member of the Federal Reserve System, Webster Bank is required to hold capital stock of the FRB of Boston. The required shares may be adjusted up or down based on changes to Webster Bank’s common stock and paid-in surplus. Webster Bank was in compliance with these requirements, with a total investment in FRB of Boston stock of $59.8 million at December 31, 2019. The FRBs pay, to member banks with total assets greater than $10 billion, a semi-annual dividend equal to the lesser of 6% or the yield on the 10-year Treasury note auctioned at the last auction prior to the dividend payment date. For the semi-annual period ended December 31, 2019, the FRB of Boston declared a cash dividend equal to an annual yield of 1.84%.
Federal Home Loan Bank System
The Federal Home Loan Bank (FHLB) System provides a central credit facility for member institutions. Webster Bank is a member of the FHLB of Boston and is required to purchase and hold shares of capital stock in the FHLB for both membership and activity-based purposes. Capital stock requirements include an amount equal to 0.35% of the aggregate principal amount of the Bank’s unpaid residential mortgage loans and similar obligations at the beginning of each year, up to a maximum of $25 million, plus an amount that varies from 3.0% to 4.5% depending on the maturities of its FHLB advances, which totaled approximately $1.9 billion at December 31, 2019. Webster Bank was in compliance with these requirements, with a FHLB stock investment of $89.3 million at December 31, 2019. On November 4, 2019, the FHLB paid a quarterly cash dividend equal to an annual yield of 5.73%.
Source of Strength Doctrine
Federal Reserve System policy requires bank holding companies to act as a source of financial and managerial strength to their subsidiary banks. Section 616 of Dodd-Frank codified the requirement that bank holding companies act as a source of financial strength. As a result, Webster Financial Corporation is expected to commit resources to support Webster Bank, including at times when Webster Financial Corporation may not be in a financial position to provide such resources. Any capital loans by a bank holding company to any of its subsidiary banks are subordinate in right of payment to deposits and to certain other indebtedness of such subsidiary banks. The U.S. bankruptcy code provides that, in the event of a bank holding company’s bankruptcy, any commitment by the bank holding company to a federal bank regulatory agency to maintain the capital of a subsidiary bank will be assumed by the bankruptcy trustee and entitled to priority of payment. In addition, under the National Bank Act, if the capital stock of Webster Bank is impaired by losses or otherwise, the OCC is authorized to require payment of the deficiency by assessment upon the Holding Company. If the assessment is not paid within three months, the OCC could order a sale of the Webster Bank stock held by Webster Financial Corporation to cover any deficiency.
Capital Adequacy
The Federal Reserve System, the OCC, and the FDIC adopted Capital Rules in accordance with BASEL III, which generally implement the capital framework for strengthening international capital standards. The Capital Rules define the components of regulatory capital, as well as address other issues affecting the numerator in the regulatory capital ratios of a banking institution. The Capital Rules also address asset risk weights and other matters affecting the denominator in the regulatory capital ratios of a banking institution.
The Capital Rules (i) include the capital measure Common Equity Tier 1 Capital, defined by Basel III capital rules (CET1 capital) and related regulatory capital ratio of CET1 to risk-weighted assets; (ii) specify that Tier 1 capital consists of CET1 capital and additional Tier 1 capital instruments meeting certain revised requirements; (iii) mandate that most deductions or adjustments to regulatory capital measures be made to CET1 capital and not to the other components of capital; and (iv) expand the scope of deductions from and adjustments to capital as compared to existing regulations.
Under the Capital Rules, for most banking organizations, including Webster, the most common form of additional Tier 1 capital is non-cumulative perpetual preferred stock, and the most common forms of Tier 2 capital are subordinated notes and the qualifying portion of the allowance for loan and lease losses (ALLL), all subject to specific requirements of the Capital Rules. Tier 1 capital to adjusted, as defined, average consolidated assets is known as the Tier 1 leverage ratio.
5


Pursuant to the Capital Rules, ratio thresholds are as follows:
 Adequately CapitalizedWell Capitalized
CET1 risk-based capital4.5 %6.5 %
Total risk-based capital8.0  10.0  
Tier 1 risk-based capital6.0  8.0  
Tier 1 leverage capital 4.0  5.0  
The Capital Rules, which became fully phased-in on January 1, 2019, in addition to the minimum risk-weighted asset ratios, also include a capital conservation buffer composed entirely of CET1 capital. The capital conservation buffer is designed to absorb losses during periods of economic stress. Banking institutions must hold a capital conservation buffer above its minimum risk-based capital requirements in order to avoid limitations on distributions, such as dividends, equity, other capital instrument repurchases, and certain discretionary bonus payments to executive officers, based on the amount of any shortfall. The capital standards applicable to Webster and Webster Bank include an additional capital conservation buffer for which the lowest capital ratio excess over adequately capitalized must be at least 2.5%.
The Capital Rules provide for a number of deductions from and adjustments to CET1 capital. These include, for example, the requirement that mortgage servicing assets, certain deferred tax assets (DTAs), and significant investments in non-consolidated financial institutions be deducted from CET1 capital to the extent that any one such category exceeds 10% of CET1 capital or all such items in the aggregate exceed 15% of CET1 capital.
Under the Basel III Rule, certain off-balance sheet commitments and obligations are converted into risk-weighted assets that, together with on-balance sheet assets, are the base against which regulatory capital is measured. The risk-weighting categories are standardized for bank holding companies and banks based on a risk-sensitive analysis, depending on the nature of the exposure. Risk weights range from 0% for U.S. government securities to 1,250% for exposures such as certain tranches of securitization or certain equity exposures.
In September 2017, the federal banking agencies proposed simplifying the Capital Rules. On July 9, 2019, the federal banking agencies adopted a final rule, replacing a substantially similar interim rule, to simplify several requirements of the regulatory capital rules for non-advanced approaches institutions, such as the Company. The final rule simplifies the capital treatment for mortgage servicing assets, certain deferred tax assets, investments in the capital instruments of unconsolidated financial institutions, and minority interests.
Prompt Corrective Action and Safety and Soundness
Pursuant to Section 38 of the Federal Deposit Insurance Act, federal banking agencies are required to take prompt corrective action should an insured depository institution fail to meet certain capital adequacy standards. At each successive lower capital category, an insured depository institution is subject to more restrictions and prohibitions, including restrictions on growth, restrictions on interest rates paid on deposits, restrictions or prohibitions on payment of dividends, and restrictions on the acceptance of brokered deposits. Furthermore, if an insured depository institution is classified in one of the under-capitalized categories, it is required to submit a capital restoration plan to the appropriate federal banking agency, and the holding company must guarantee the performance of that plan.
Prompt corrective action ratios are as follows:
 WellAdequatelyUnderSignificantly
CapitalizedCapitalizedCapitalizedUnder-Capitalized
CET1 risk-based capital6.5 %4.5 %< 4.5%  < 3.0%  
Total risk-based capital10.0  8.0  < 8.0  < 6.0  
Tier 1 risk-based capital8.0  6.0  < 6.0  < 4.0  
Tier 1 leverage capital 5.0  4.0  < 4.0  < 3.0  
Based upon its capital levels, a bank that is classified as well capitalized, adequately capitalized, or under-capitalized may be treated as though it were in the next lower capital category if the appropriate federal banking agency, after notice and opportunity for hearing, determines that an unsafe or unsound condition or practice warrants such treatment. An insured depository institution with a ratio of tangible equity to total assets that is less than 2% is considered critically under-capitalized.
Bank holding companies and insured depository institutions may also be subject to potential enforcement actions of varying levels of severity by the federal banking agencies for unsafe or unsound practices in conducting their business, or for violation of any law, rule, regulation, condition imposed in writing by the agency, or term of a written agreement with the agency. In more serious cases, enforcement actions may include the issuance of directives to increase capital; the issuance of formal and informal agreements; the imposition of civil monetary penalties; the issuance of a cease and desist order that can be judicially enforced; the issuance of removal and prohibition orders against officers, directors, and other institution affiliated parties; the termination of the insured depository institution’s deposit insurance; the appointment of a conservator or receiver for the insured depository institution; and the enforcement of such actions through injunctions or restraining orders based upon a judicial determination that the FDIC, as receiver, would be harmed if such equitable relief was not granted.
6


Transactions with Affiliates and Insiders
Under federal law, transactions between insured depository institutions and their affiliates are governed by Sections 23A and 23B of the Federal Reserve Act (FRA) and Federal Reserve Regulation W. In a bank holding company context, at a minimum, the parent holding company of a bank, and any companies which are controlled by such parent holding company, are affiliates of the bank. Generally, sections 23A and 23B of the FRA are intended to protect insured depository institutions from losses arising from transactions with non-insured affiliates by limiting the extent to which a bank or its subsidiaries may engage in covered transactions with any one affiliate and with all affiliates of the bank in the aggregate, and requiring that such transactions be on terms consistent with safe and sound banking practices.
Further, Section 22(h) of the FRA and its implementing Regulation O restricts loans to directors, executive officers, and principal stockholders or insiders. Under Section 22(h), loans to insiders and their related interests may not exceed, together with all other outstanding loans to such persons and affiliated entities, the institution’s total capital and surplus. Loans to insiders above specified amounts must receive the prior approval of the Board of Directors. Further, under Section 22(h) of the FRA, loans to directors, executive officers, and principal stockholders must be made on terms substantially the same as offered in comparable transactions to other persons, except that such insiders may receive preferential loans made under a benefit or compensation program that is widely available to the bank’s employees and does not give preference to the insider over the employees. Section 22(g) of the FRA places additional limitations on loans to executive officers.
Consumer Protection and Consumer Financial Protection Bureau Supervision
Dodd-Frank centralized responsibility for consumer financial protection by creating the CFPB, an independent agency charged with responsibility for implementing, enforcing, and examining compliance with federal consumer financial protection laws. The Company is subject to a number of federal and state laws designed to protect borrowers and promote lending to various sectors of the economy and population. These laws include the Equal Credit Opportunity Act, the Fair Credit Reporting Act, the Fair Debt Collection Procedures Act, the Truth in Lending Act, the Home Mortgage Disclosure Act, the Real Estate Settlement Practices Act, various state law counterparts, and the Consumer Financial Protection Act of 2010, which is part of Dodd-Frank. Dodd-Frank does not prevent states from adopting stricter consumer protection standards. State regulation of financial products and potential enforcement actions could also adversely affect the Company’s business, financial condition or operations.
The ability-to-repay provision of the Truth in Lending Act requires creditors to make reasonable, good faith determinations that borrowers are able to repay their mortgages before extending the credit based on a number of factors and consideration of financial information about the borrower from reasonably reliable third-party documents. Under Dodd-Frank and the qualified mortgage provisions of the Truth in Lending Act, commonly known as the Qualified Mortgage (QM) Rule, loans meeting the definition of qualified mortgage are entitled to a presumption that the lender satisfied the ability-to-repay requirements. The presumption is a conclusive presumption/safe harbor for prime loans meeting QM requirements and a refutable presumption for higher-priced/subprime loans meeting QM requirements. The QM definition incorporates the statutory requirements, such as not allowing negative amortization or terms longer than 30 years. The QM Rule also adds an explicit maximum 43% debt-to-income ratio for borrowers if the loan is to meet the QM definition, though some mortgages that meet GSE, FHA, and VA underwriting guidelines may, for a period not to exceed seven years, meet the QM definition without being subject to the 43% debt-to-income limits. The CFPB is expected to continue to issue and amend rules implementing the consumer financial protection laws, which may impact Webster Bank’s operations.
Financial Privacy and Data Security
Webster is subject to federal laws, including the Gramm-Leach-Bliley Act and certain state laws containing consumer privacy protection provisions. These provisions limit the ability of banks and other financial institutions to disclose nonpublic information about consumers to affiliated and non-affiliated third parties and limit the reuse of certain consumer information received from non-affiliated financial institutions. These provisions require notice of privacy policies to consumers and, in some circumstances, allow consumers to prevent disclosure of certain nonpublic personal information to affiliates or non-affiliated third parties by means of opt-out or opt-in authorizations.
The Gramm-Leach-Bliley Act requires that financial institutions implement comprehensive written information security programs that include administrative, technical, and physical safeguards to protect consumer information. Federal banking agencies have also adopted guidelines for establishing information security standards and programs to protect such information. These guidelines, along with related regulatory materials, increasingly focus on risk management and processes related to information technology and the use of third-parties in the provision of financial products and services. The federal bank regulatory agencies expect financial institutions to establish lines of defense and to ensure that their risk management processes address the risk posed by compromised customer credentials, and also expect financial institutions to maintain sufficient business continuity planning processes to ensure rapid recovery, resumption, and maintenance of the institution’s operations after a cyber attack.
7


Further, pursuant to interpretive guidance issued under the Gramm-Leach-Bliley Act and certain state laws, financial institutions are required to notify customers of security breaches that result in unauthorized access to their non-public personal information. In October 2016, the federal bank regulatory agencies issued proposed rules on enhanced cybersecurity risk-management and resilience standards that would apply to very large financial institutions and to services provided by third parties to these institutions. The comment period for these proposed rules has closed and a final rule has not been published. Although the proposed rules would apply only to bank holding companies and banks with $50 billion or more in total consolidated assets, these rules could influence the federal bank regulatory agencies’ expectations and supervisory requirements for information security standards and cybersecurity programs of financial institutions with less than $50 billion in total consolidated assets, such as the Company.
Depositor Preference
The Federal Deposit Insurance Act provides that, in the event of the liquidation or other resolution of an insured depository institution, the claims of depositors of the institution, including the claims of the FDIC as subrogee of insured depositors and certain claims for administrative expenses of the FDIC as a receiver, will have priority over other general unsecured claims against the institution. If an insured depository institution fails, insured and uninsured depositors, along with the FDIC, will have priority in payment ahead of unsecured, non-deposit creditors, including the parent bank holding company, with respect to any extensions of credit they have made to such insured depository institution.
Federal Deposit Insurance
The FDIC’s deposit insurance limit is $250,000 per depositor, per insured bank, for each account ownership category. Substantially all of the deposits of Webster Bank are insured up to applicable limits by the DIF of the FDIC and are subject to deposit insurance assessments to maintain the DIF.
The Bank’s quarterly assessment is calculated using the FDIC’s standardized risk-based assessment methodology, determined by the FDIC, which multiplies the Bank’s assessment base by its assessment rate. The assessment base is defined as the average consolidated total assets less the average tangible equity of the Bank. The assessment rate is based on measures of the institution’s capital adequacy, asset quality, management, earnings, liquidity and sensitivity to market risk, commonly known as CAMELS ratings, which are certain financial measures to assess an institution’s ability to withstand asset-related stress and funding-related stress, and a measure of loss severity that estimates the relative magnitude of potential losses to the FDIC in the event of the Bank’s failure. The FDIC also has the ability to make discretionary adjustments to the base assessment rate to reflect idiosyncratic quantitative and qualitative risk factors not captured in the FDIC’s standardized risk-based assessment methodology.
Under the Federal Deposit Insurance Act, the FDIC may terminate deposit insurance upon a finding that the institution has engaged in unsafe and unsound practices, is in an unsafe or unsound condition to continue operations, or has violated any applicable law, regulation, rule, order, or condition imposed by the FDIC. Webster’s management is not aware of any practice, condition, or violation that might lead to the termination of its deposit insurance.
Incentive Compensation
Dodd-Frank required the federal banking agencies and the SEC to establish joint regulations or guidelines for specified regulated entities with at least $1 billion in total consolidated assets, which includes the Holding Company and Webster Bank, prohibiting incentive-based payment arrangements that encourage inappropriate risks by providing an executive officer, employee, director, or principal shareholder with excessive compensation, fees, or benefits that could lead to material financial loss to the entity. The federal banking agencies and the SEC proposed regulations which have not yet been finalized. If the regulations are adopted in the form initially proposed in 2016, they will restrict the manner in which executive compensation is presently structured.
Community Reinvestment Act and Fair Lending Laws
Webster Bank has a responsibility under the CRA, as implemented by OCC regulations to help meet the credit needs of its communities, including low and moderate-income neighborhoods. The CRA does not establish specific lending requirements or programs for financial institutions nor does it limit an institution’s discretion to develop the types of products and services that it believes are best suited to its particular community. The OCC examines Webster Bank’s record of compliance with the CRA. In addition, the Equal Credit Opportunity Act and the Fair Housing Act prohibit discrimination in lending practices on the basis of characteristics specified in those statutes. Webster Bank’s failure to comply with the provisions of the CRA could, at a minimum, result in regulatory restrictions on its activities and the activities of Webster Financial Corporation. Webster Bank’s failure to comply with the Equal Credit Opportunity Act and the Fair Housing Act could result in enforcement actions against it by the OCC, as well as other federal regulatory agencies, including the CFPB and the Department of Justice. Webster Bank’s latest OCC CRA rating was Outstanding.
8


On December 17, 2019, the OCC and the FDIC issued a joint notice of proposed rulemaking to modernize the regulations implementing the CRA. The proposed rule, if finalized, will apply to all insured banks, such as Webster Bank. Under the rulemaking, the federal banking agencies intend to (i) clarify which activities qualify for CRA credit, (ii) update where activities count for CRA credit, (iii) create a more transparent and objective method for measuring CRA performance, and (iv) provide for more transparent, consistent, and timely CRA-related data collection, record keeping, and reporting. Webster Financial Corporation and Webster Bank expect to monitor developments with respect to this rulemaking and assess the impact, if any, of changes to the CRA regulations proposed by the federal banking agencies.
USA PATRIOT Act
Under Title III of the USA PATRIOT Act, all financial institutions are required to take certain measures to identify their customers, prevent money laundering, monitor customer transactions, and report suspicious activity to U.S. law enforcement agencies. Financial institutions also are required to respond to requests for information from federal banking agencies and law enforcement agencies. Information sharing among financial institutions for the above purposes is encouraged by an exemption granted to complying financial institutions from the privacy provisions of the Gramm-Leach-Bliley Act and other privacy laws. Financial institutions that hold correspondent accounts for foreign banks or provide private banking services to foreign individuals are required to take measures to avoid dealing with certain foreign individuals or entities, including foreign banks with profiles that raise money laundering concerns, and are prohibited from dealing with foreign “shell banks” and persons from jurisdictions of particular concern. The primary federal banking agencies and the Secretary of the Treasury have adopted regulations to implement several of these provisions. All financial institutions also are required to establish internal anti-money laundering programs. The effectiveness of a financial institution in combating money laundering activities is a factor to be considered in any application submitted by the financial institution under the Bank Merger Act. Webster has in place a Bank Secrecy Act and USA PATRIOT Act compliance program and engages in very few transactions of any kind with foreign financial institutions or foreign persons.
Office of Foreign Assets Control Regulation
The United States government has imposed economic sanctions that affect transactions with designated foreign countries, nationals, and others. These are typically known as the “OFAC” rules based on their administration by the U.S. Treasury Department Office of Foreign Assets Control. The Office of Foreign Assets Control-administered sanctions targeting countries take many different forms. Generally, they contain one or more of the following elements: (i) restrictions on trade with or investment in a sanctioned country, including prohibitions against direct or indirect imports from and exports to a sanctioned country and prohibitions on U.S. persons engaging in financial transactions relating to making investments in, or providing investment-related advice or assistance to, a sanctioned country; and (ii) a blocking of assets in which the government or specially designated nationals of the sanctioned country have an interest, by prohibiting transfers of property subject to U.S. jurisdiction (including property in the possession or control of U.S. persons). Blocked assets (property and bank deposits) cannot be paid out, withdrawn, set off, or transferred in any manner without a license from the Office of Foreign Assets Control. Failure to comply with these sanctions could have serious legal and reputational consequences.
Future Legislative Initiatives
Federal and state legislatures may introduce legislation that will impact the financial services industry. In addition, federal banking agencies may introduce regulatory initiatives that are likely to impact the financial services industry, generally. Such initiatives may include proposals to expand or contract the powers of bank holding companies and/or depository institutions or proposals to substantially change the financial institution regulatory system. Such legislation could change banking statutes and the operating environment of the Company in substantial and unpredictable ways. If enacted, such legislation could increase or decrease the cost of doing business, limit or expand permissible activities, or affect the competitive balance among banks, savings associations, credit unions, and other financial institutions. The Company cannot predict whether any such legislation will be enacted, or, if enacted, the effect that it or any implementing regulations would have on the financial condition or results of operations of the Company. A change in statutes, regulations, or regulatory policies applicable to Webster or any of its subsidiaries could have a material effect on the business of the Company.
Risk Management Framework
Webster maintains a comprehensive risk management program with a defined enterprise risk management framework which provides a structured approach for identifying, assessing, and managing risks across the Company in a coordinated manner, including strategic and reputational, credit, information security and technology, operational and compliance, market, liquidity, and capital risks as discussed in detail in the sections below.
Strategic and Reputational Risks
The enterprise risk management framework enables the aggregation of risk across the enterprise and ensures the Company has the tools, programs, and processes in place to support informed decision making in order to anticipate risks before they materialize and to maintain Webster’s risk profile consistent with its risk strategy and appetite.
9


The enterprise risk management framework includes a risk appetite statement approved annually by the Board of Directors. The risk appetite statement is supported by board and business level scorecards with defined risk tolerances that indicate the level of risk that the Company is willing to accept. The risk appetite is refreshed annually to ensure alignment of risk appetite with Webster’s strategy and financial plan.
Webster promotes proactive risk management by all employees and clear ownership and accountability across three lines of defense to enable an effective and credible challenge in line with Webster’s strong risk culture. Employees in each line of business serve as the first line of defense and have responsibility for identifying, managing and owning the risks in their businesses. Risk and enterprise support functions serve as the second line of defense and are responsible for providing guidance, oversight, and challenge to the first line of defense. Internal Audit and Credit Risk Review, both of which report independently of management, serve as the third line of defense and ensure through review and testing that appropriate risk management controls, processes, and systems are in place and functioning effectively.
The Risk Committee of the Board of Directors, comprised of independent directors, oversees all of Webster’s risk-related matters and provides input and guidance to the Board of Directors and the executive team, as appropriate. Webster’s Enterprise Risk Management Committee (ERMC), which reports directly to the Risk Committee of the Board of Directors, is chaired by the Chief Risk Officer and is comprised of Webster’s executive management and senior risk officers.
The Chief Risk Officer is responsible for establishing and maintaining Webster’s enterprise risk management framework and overseeing credit risk, operational and compliance risk, Bank Secrecy Act compliance and loan workout/recovery programs. The Corporate Treasurer, who reports to the Chief Financial Officer, is responsible for overseeing market, liquidity, and capital risk management activities. The Chief Information Officer, who reports to the Chief Executive Officer, is responsible for overseeing information security and technology risk management activities.
Credit Risk
Webster manages and controls credit risk in its loan and investment portfolios through established underwriting practices, adherence to standards, and utilization of various portfolio and transaction monitoring tools and processes. Credit policies and underwriting guidelines provide limits on exposure and establish various other standards as deemed necessary and prudent. Additional approval requirements and reporting are implemented to ensure proper risk identification, decision rationale, risk ratings, and disclosure of policy exceptions.
Credit risk management policies and transaction approvals are managed under the supervision of the Chief Credit Officer who reports to the Chief Risk Officer. The Chief Credit Officer and team of credit executives are independent of the loan production and treasury functions. The credit risk function oversees the underwriting, approval, and portfolio management process, establishes and ensures adherence to credit policies, and manages the collections and problem asset resolution activities.
As part of credit risk management governance, Webster has an established Credit Risk Management Committee that meets regularly to review key credit risk topics, issues, and policies. The Credit Risk Management Committee reviews Webster’s credit risk scorecard, which covers key risk indicators and limits established as part of the Company’s risk appetite framework. The Credit Risk Management Committee is chaired by the Chief Credit Officer and includes senior managers responsible for lending as well as senior managers from the credit risk management function. Important findings regarding credit quality and trends within the loan and investment portfolios are regularly reported by the Chief Credit Officer to the ERMC and Risk Committee of the Board of Directors.
In addition to the credit risk management team, there is an independent Credit Risk Review function that assesses risk ratings and credit underwriting process for all areas of the organization that incur credit risk. The head of Credit Risk Review reports directly to the Risk Committee of the Board of Directors and administratively to the Chief Risk Officer. Credit Risk Review findings are reported to the Credit Risk Management Committee, ERMC, and Risk Committee of the Board of Directors. Corrective measures are monitored and tested to ensure risk issues are mitigated or resolved.
Information Security and Technology Risks
The use of technology to store and process information and an increasing use of mobile devices and cloud technologies to conduct financial transactions exposes Webster to the risk of potential operational disruption or information security incidents. Sources of these risks include deliberate or accidental acts by employees, external parties, technology failure, third-party security practices, and environmental factors. Webster is committed to detecting, preventing, and responding to incidents that may impact the confidentiality, integrity, and availability of information assets, and has established a comprehensive information security and technology program under the direction of the Chief Information Security Officer. Webster's information technology risk function is responsible for the technology risk framework and associated policies, procedures, and processes. Oversight of both the information security and information technology risk programs is provided by the Information Risk Committee, which is chaired by the Director of Information Technology Risk.
10


Operational and Compliance Risks
Operational risk represents the risk of loss resulting from inadequate or failed internal processes, people, and systems or from external events. The Operational Risk function is responsible for establishing processes and tools to identify, manage, and aggregate operational risk across the organization; providing guidance and advice on operational risk matters; and educating the organization on operational risks. Compliance risk represents the risk of non-adherence to applicable laws and regulations, including fines penalties and reputation damage. Specific programs and functions have been implemented to manage the risks associated with legal and regulatory requirements, suppliers and other third-parties, information security, business disruption, fraud, analytical and forecasting models, and new products and services.
Webster’s Operational Risk Management Committee, which consists of senior risk officers and senior managers responsible for operational and compliance risk management across the Company, periodically reviews the aforementioned programs, as well as key operational risk trends, issues, and mitigation activities. The Director of Enterprise and Operational Risk Management chairs the Operational Risk Management Committee and is responsible for overseeing the development and implementation of Webster’s operational risk management framework.
Market Risk
Market risk refers to the risk of loss arising from adverse changes in interest rates, foreign currency exchange rates, commodity prices, and other relevant market rates and prices, such as equity prices. The risk of loss is assessed from the perspective of adverse changes in fair values, cash flows, and future earnings. Due to the nature of its operations, Webster is primarily exposed to interest rate risk. Webster’s interest rate sensitivity is monitored on an ongoing basis by its Asset/Liability Committee (ALCO). The primary goal of ALCO is to manage interest rate risk to maximize earnings and net economic value in changing interest rate and business environments, subject to Board approved risk limits. ALCO is chaired by Webster’s Corporate Treasurer and members include the Chief Executive Officer, Chief Financial Officer, Chief Risk Officer, and Heads of Commercial and Community Banking. ALCO activities and findings are regularly reported to the ERMC and the Board of Directors.
Liquidity Risk
Liquidity risk refers to the ability to meet a demand for funds by converting assets into cash or cash equivalents and by increasing liabilities at an acceptable cost. Liquidity management for Webster Bank involves maintaining the ability to meet day-to-day and longer-term cash flow requirements of customers, whether they are depositors wishing to withdraw funds or borrowers requiring funds to meet their credit needs. Sources of funds include deposits, borrowings, or sales of assets such as unencumbered investment securities.
The Holding Company requires funds for dividends to shareholders, payment of debt obligations, repurchase of shares, potential acquisitions, and for general corporate purposes. Its sources of funds include dividends from Webster Bank, income from investment securities, and the issuance of equity and debt in the capital markets.
Both the Holding Company and Webster Bank maintain a level of liquidity necessary to achieve their business objectives under both normal and stressed conditions. Liquidity risk is monitored and managed by ALCO and reviewed regularly with the ERMC and the Board of Directors.
Capital Risk
Webster aims to maintain adequate capital in both normal and stressed environments to support its business objectives and risk appetite. ALCO monitors regulatory and tangible capital levels according to regulatory requirements and management operating ranges and recommends capital conservation, generation, and/or deployment strategies. ALCO also has responsibility for the annual capital plan, capital ratio range setting, contingency planning and stress testing, which are all reviewed and approved by the ERMC and the Board of Directors at least annually.
Internal Audit
Internal Audit provides independent, objective assurance and advisory services by applying a risk-based approach to selectively test and evaluate the design and operating effectiveness of applicable internal controls throughout the Company. This evaluation function brings a systematic and disciplined approach to enhancing the effectiveness of the Company’s governance, risk management, and internal control processes.
Results of Internal Audit reviews are reported to management and the Audit Committee of the Board of Directors. Corrective measures are monitored to ensure risk issues are mitigated or resolved. The General Auditor reports functionally to the Audit Committee and administratively to the Chief Executive Officer. The appointment or replacement of the General Auditor is overseen by the Audit Committee.
Additional information on risks and uncertainties and additional factors that could affect the Company’s results of operations can be found in Item 1A and elsewhere within this Form 10-K for the year ended December 31, 2019, and in other reports Webster Financial Corporation files with the SEC.
11


ITEM 1A. RISK FACTORS
Investment in our securities involves risks and uncertainties, some of which are inherent in the financial services industry and others of which are more specific to our business. The discussion below addresses the material risks and uncertainties, of which we are currently aware, that could adversely affect our business and impact results of operations or financial condition. Before making an investment decision, you should carefully consider the risks and uncertainties described below together with all of the other information included or incorporated by reference in this report. If any of the events or circumstances described in the following risks factors actually occurs, our business, results of operations, or financial condition could be harmed as a result.
Risks Relating to the Economy, Financial Markets, and Interest Rates
Difficult conditions in the economy and the financial markets may have a materially adverse effect on our business, financial condition and results of operations.
Our financial performance is highly dependent upon the business environment in the markets where we operate and in the United States as a whole. Unfavorable or uncertain economic and market conditions can be caused by declines in economic growth, decreases in business activity, weakening of investor or business confidence, limitations on the availability or increases in the cost of credit and capital, increases in inflation, changes in interest rates, changes in laws, high unemployment, national and international political turmoil, the imposition of tariffs on trade, natural disasters or a combination of these or other factors.
In particular, we may face the following risks in connection with developments in the current economic and market environment:
consumer and business confidence levels may decline and lead to less credit usage and increases in delinquencies and default rates;
our ability to assess the creditworthiness of our customers may be impaired if the models and approaches we use to select, manage, and underwrite our customers become less predictive of future behaviors;
customer desire to do business with us may decline, whether as a result of a decreased demand for loans or other financial products and services or decreased deposits or other investments in accounts with us;
competition in our industry could intensify as a result of the continued consolidation of financial services companies and changes in financial services technologies; and
the effects of recent and proposed changes in laws.
The business environment and financial markets in the U.S. have experienced volatility in recent years and may continue to do so for the foreseeable future. There can be no assurance that economic conditions will not worsen. Difficult economic conditions could adversely affect our business, results of operations and financial condition.
Changes in local economic conditions could adversely affect our business.
A significant percentage of our loans are secured by real estate, primarily across the Northeast. Our success depends in part upon economic conditions in Southern New England and our other geographic markets. Adverse changes in such local markets could reduce our growth in loans and deposits, impair our ability to collect our loans, increase problem loans and charges-offs, and otherwise negatively affect our performance and financial condition.
The soundness of other financial institutions could adversely affect our business.
Our ability to engage in routine funding transactions could be adversely affected by the actions and commercial soundness of other financial institutions. Financial services companies are interrelated as a result of trading, clearing, counterparty or other relationships. We have exposure to many different industries and counterparties, and we routinely execute transactions with counterparties in the financial services industry, including brokers and dealers, commercial banks, investment banks, mutual and hedge funds, and other institutional clients. As a result, defaults by, or even rumors or questions about, one or more financial services companies, or the financial services industry generally, have led to market-wide liquidity problems and could lead to losses or defaults by us or by other institutions. Many of these transactions expose us to credit risk in the event of default of our counterparty or client. In addition, our credit risk may be exacerbated if the collateral held by us cannot be realized or is liquidated at prices not sufficient to recover the full amount of the loan or derivative exposure due us. There is no assurance that any such losses would not materially and adversely affect our business, financial condition, or results of operations.
We may not pay dividends if we are not able to receive dividends from our subsidiary, Webster Bank.
We are a separate and distinct legal entity from our banking and non-banking subsidiaries and depend on the payment of cash dividends from Webster Bank and our existing liquid assets as the principal sources of funds for paying cash dividends on our common stock. Unless we receive dividends from Webster Bank or choose to use our liquid assets, we may not be able to pay dividends. Webster Bank’s ability to pay dividends is subject to its ability to earn net income and to meet certain regulatory requirements. See the sub-section captioned “Dividends” in Item 1 of this report for a discussion of regulatory and other restrictions on dividend declarations.
12


Changes in interest rates and spreads could have an impact on earnings and financial condition which could have a negative impact on the value of our stock.
Our consolidated earnings and financial condition are dependent to a large degree upon net interest income, which is the difference between interest earned from loans and investments and interest paid on deposits and borrowings. The narrowing of interest rate spreads could adversely affect our earnings and financial condition. We cannot predict with certainty or control changes in interest rates. Regional and local economic conditions and the policies of regulatory authorities, including monetary policies of the FRB, affect interest income and interest expense. While we have ongoing policies and procedures designed to manage the risks associated with changes in market interest rates, changes in interest rates still may have an adverse effect on our profitability. For example, high interest rates could affect the amount of loans that we can originate because higher rates could cause customers to apply for fewer mortgages, cause depositors to shift funds from accounts that have a comparatively lower cost to accounts with a higher cost, or cause us to experience customer attrition due to competitor pricing. If the cost of interest-bearing deposits increases at a rate greater than the yields on interest-earning assets increase, net interest income will be negatively affected. Changes in the asset and liability mix may also affect net interest income. Similarly, lower interest rates cause higher yielding assets to prepay and floating or adjustable rate assets to reset to lower rates. If we were not able to reduce our funding costs sufficiently, due to either competitive factors or the maturity schedule of existing liabilities, then our net interest margin would decline.
The uncertainty about the future of London Interbank Offered Rate (LIBOR) may adversely impact our business.
The United Kingdom Financial Conduct Authority, the authority that regulates LIBOR, has announced it intends to stop compelling banks to submit rates for the calculation of LIBOR after 2021, which may result in the use of LIBOR in financial contracts being phased out by the end of 2021. The Alternative Reference Rates Committee (ARRC) has proposed that the secured overnight financing rate (SOFR) represents best practice as the alternative to LIBOR for use in derivatives and other financial contracts that are currently indexed to LIBOR. ARRC has proposed a paced market transition plan to SOFR from LIBOR, and organizations are currently working on industry wide and company specific transition plans as it relates to derivatives and cash markets exposed to LIBOR. It is not possible at this time to predict what rate or rates may become accepted alternatives to LIBOR, or what the effect of any such changes in views or alternatives may be on the markets for LIBOR-indexed financial instruments. The market transition away from LIBOR to an alternative reference rate, such as SOFR, is complex and could have a range of adverse effects on our loan and lease and investment portfolios, asset-liability management, business, financial condition, and results of operations. Webster has interest rate swap agreements and other instruments that are indexed to LIBOR and is currently monitoring and evaluating this activity and the related risks.
Our stock price can be volatile.
Stock price volatility may negatively impact the price at which our common stock may be sold, and may also negatively impact the timing of any sale. Our stock price can fluctuate widely in response to a variety of factors, among other things:
actual or anticipated variations in operating results;
changes in recommendations by securities analysts;
operating and stock price performance of other companies that investors deem comparable to us;
news reports relating to trends, concerns, and other issues in the financial services and healthcare industries;
new technology used or services offered by competitors;
perceptions in the marketplace regarding us and/or our competitors;
significant acquisitions or business combinations, strategic partnerships, joint ventures, or capital commitments by or involving us or our competitors;
failure to integrate acquisitions or realize anticipated benefits from acquisitions;
additional investments from third parties;
issuance of additional shares of stock;
changes in government regulations or actions by government regulators; and
geo-political conditions such as acts or threats of terrorism or military conflicts.
General market fluctuations, industry factors, and general economic and political conditions and events, such as economic slowdowns or recessions, interest rate changes, credit loss trends, or currency fluctuations, could also cause our stock price to decrease regardless of our operating results.
13


Regulatory, Compliance, Environmental and Legal Risks
We are subject to extensive government regulation and supervision, which may interfere with our ability to conduct our business and may negatively impact our financial results.
We, primarily through Webster Bank and certain non-bank subsidiaries, are subject to extensive federal and state regulation and supervision. Banking regulations are intended to protect depositors’ funds, the DIF, and the safety and soundness of the banking system as a whole, not shareholders. These regulations affect our lending practices, capital structure, investment practices, dividend policy and growth, among other things. Congress and federal regulatory agencies continually review banking laws, regulations, and policies for possible changes. Changes to statutes, regulations, or regulatory policies, including changes in interpretation or implementation of statutes, regulations, or policies, could affect us in substantial and unpredictable ways. Such changes could subject us to additional costs, limit the types of financial services and products we may offer, and/or limit what we may charge for certain banking services, among other things. Additionally, recent changes to the legal and regulatory framework governing our operation, including the continued implementation of Dodd-Frank and EGRRCPA, have and will continue to affect the lending, investment, trading, and operating activities of financial institutions and their holding companies. Dodd-Frank imposed additional regulatory obligations and increased scrutiny from federal banking agencies. In general, we expect this focus to continue and compliance requirements can be costly to implement. Compliance personnel and resources may increase our costs of operations and adversely impact our earnings.
Failure to comply with laws, regulations, or policies could result in sanctions by regulatory agencies, civil money penalties, and/or reputation damage, which could have a material adverse effect on our business, financial condition, and results of operations.
While we have policies and procedures designed to prevent any such violations, there can be no assurance that such violations will not occur. See the section captioned “Supervision and Regulation” in Item 1 of this report for further information.
Changes in accounting standards and policies could materially impact how we report our results of operations and financial condition.
Our accounting policies and methods are fundamental to how we record and report our results of operations and financial condition. Accordingly, we exercise judgment in selecting and applying these accounting policies and methods so they comply with U.S. Generally Accepted Accounting Principles (GAAP). The Financial Accounting Standards Board (FASB), regulatory agencies, and other bodies that establish accounting standards periodically change the financial accounting and reporting standards governing the preparation of our financial statements. Additionally, those bodies may change prior interpretations or positions on how these standards should be applied. The impact of these changes can be difficult to predict and can materially impact how we report our results of operations and financial condition. We could be required to apply new or revised guidance retrospectively, which may result in the revision of prior period financial statements by material amounts. Such changes could also require the Company to incur additional personnel, technology, or other costs. For example, under CECL, the new accounting standard on credit losses which became effective for us on January 1, 2020, credit losses on loans and held-to-maturity securities and other financial assets carried at amortized cost will be required to be recognized earlier than in the past. The CECL methodology requires that “expected lifetime credit losses” be recorded at the time the financial asset is originated or acquired, with adjustments each period to the extent the estimate for “expected lifetime credit losses” have changed. The CECL methodology replaces the existing impairment models under GAAP that generally require that a loss be incurred before it is recognized. A discussion of accounting standards recently adopted and issued but not yet adopted, including CECL, can be found in Note 1 to the Consolidated Financial Statements.
Health care reforms could adversely affect our HSA Bank division, revenues, financial position and results of operations.
The enactment of health care reforms affecting health savings accounts at the federal or state level may affect our HSA Bank division, which is a bank custodian of health savings accounts. We cannot predict if any such reforms will ultimately become law, or, if enacted, what their terms or the regulations promulgated pursuant to such laws will be. Any health care reforms enacted may be phased in over a number of years but, if enacted, could, with respect to the operations of our HSA Bank, reduce revenues, increase costs, and require us to revise the ways in which we conduct business or put us at risk for loss of business. In addition, our results of operations, financial position, and cash flows could be materially adversely affected by such changes.
Changes in the federal, state or local tax laws may negatively impact our financial performance. 
We are subject to changes in tax law that could increase our effective tax rates. While the Tax Cuts and Jobs Act of 2017 ("Tax Act") reduced the federal corporate tax rate from 35% to 21% beginning in 2018, which has had a favorable impact on our earnings and capital generation abilities, the new legislation also enacted limitations on certain deductions, such as FDIC deposit insurance premiums, which partially offset the increase in net earnings from the lower tax rate. In addition, further changes in the tax law, changes in interpretations, guidance or regulations that may be promulgated, or actions that we may take as a result of the Tax Act could negatively impact our business. Similarly, our customers are likely to continue to experience varying effects from both the individual and business tax provisions of the Tax Act and such effects, whether positive or negative, may have a corresponding impact on our financial performance and the economy as a whole.
14


We are subject to financial and reputational risks from potential liability arising from lawsuits.
The nature of our business ordinarily results in a certain amount of claims and legal action. Whether claims and related legal actions are founded or unfounded, if such claims and legal actions are not resolved in a manner favorable to us, they may result in significant financial liability and/or adversely affect our market perception, the products and services we offer, as well as impact customer demand for those products and services. We assess our liabilities and contingencies in connection with outstanding legal proceedings as well as certain threatened claims utilizing the latest and most reliable information. For matters where a loss is not probable or the amount of the loss cannot be estimated, no accrual is established. For matters where it is probable we will incur a loss and the amount can be reasonably estimated, we establish an accrual for the loss. Once established, the accrual is adjusted periodically to reflect any relevant developments. The actual cost of any outstanding legal proceedings or threatened claims, however, may turn out to be substantially higher than the amount accrued. These costs may adversely affect our business, results of operations, and prospects.
We are exposed to risk of environmental liabilities with respect to properties to which we obtain title.
A large portion of our loan portfolio is secured by real estate. In the course of our business, we may foreclose and take title to real estate and could be subject to environmental liabilities with respect to these properties. We may be held liable to a government entity or to third parties for property damage, personal injury, investigation, and clean-up costs incurred by these parties in connection with environmental contamination, or may be required to clean up hazardous or toxic substances or chemical releases at a property. The costs associated with investigation and remediation activities could be substantial. In addition, if we are the owner or former owner of a contaminated site, we may be subject to common law claims by third parties based on damages and costs resulting from environmental contamination emanating from the property. These costs and claims could adversely affect our business, results of operations, and prospects.
Risks Relating to Business Environment and Operations
We operate in a highly competitive industry and market area. If we fail to compete effectively, our financial condition and results of operations may be materially adversely affected.
We face substantial competition in all areas of our operations from a variety of different competitors, many of which are larger and may have more financial resources than we do. Such competitors primarily include national, regional, and community banks within the various markets in which we operate. We also face competition from many other types of financial institutions, including, without limitation, savings and loans, credit unions, non-bank health savings account trustees, finance companies, brokerage firms, insurance companies, online lenders, factoring companies, and other financial intermediaries. Some of the financial services organizations with which the Company competes are not subject to the same degree of regulation as is imposed on bank holding companies and federally insured depository institutions, which may give them certain advantages over the Company in accessing funding and in providing various services. The financial services industry could become even more competitive as a result of legislative, regulatory, and technological changes and continued consolidation. Technology has lowered barriers to entry and made it possible for non-banks to offer products and services traditionally provided by banks. Additionally, due to their size, many competitors may be able to achieve economies of scale and, as a result, may offer a broader range of products and services than we do, as well as better pricing for those products and services.
Our ability to compete successfully depends on a number of factors, including, among other things:
the ability to develop, maintain and build upon long-term customer relationships based on top quality service, high ethical standards, and safe, sound assets;
the ability to expand market position;
the scope, relevance, and pricing of products and services offered to meet customer needs and demands;
the rate at which we introduce new products and services relative to our competitors;
customer satisfaction with our level of service and products; and
industry and general economic trends.
Failure to perform in any of these areas could significantly weaken our competitive position, which could adversely affect our growth and profitability, which, in turn, could have a material adverse effect on our financial condition and results of operations.
The loss of key partnerships could adversely affect our HSA Bank division.
Our HSA Bank division relies on partnerships with various health insurance carriers and other partners to maximize our distribution model. In particular, health plan partners who provide high deductible health plan options are a significant source of new and existing health savings account holders. If these health plan partners or other partners choose to align with our competitors, our results of operations, business, and prospects could be adversely affected.
We may not be able to attract and retain skilled people.
Our success depends in large part on our ability to attract and retain key people. Competition for the best people in most activities in which we engage can be intense and we may not be able to hire people or retain them. The unexpected loss of services of key personnel could have a material adverse impact on the business as we would lose their skills, knowledge of the market, and years of industry experience, and may have difficulty promptly finding qualified replacement personnel.
15


We continually encounter technological change. The failure to understand and adapt to these changes could negatively impact our business.
Financial services industries continually experience rapid technological change with frequent introductions of new technology-driven products and services. An effective use of technology can increase efficiency, enable financial institutions to better serve customers, and reduce costs. However, some new technologies needed to compete effectively result in incremental operating costs and capital investments. Our future success depends in part upon our ability to address the needs of our customers by using technology to provide products and services that will satisfy customer demands, as well as to create additional efficiencies in operations. Many of our competitors, because of their larger size and available capital, have substantially greater resources to invest in technological improvements. We may not be able to effectively implement new technology-driven products and services or be successful in marketing these products and services to our customers within the same time frame as our large competitors. Failure to successfully keep pace with technological change affecting the financial services industry could have a material adverse impact on our business and, in turn, our financial condition and results of operations.
A failure or breach of our systems, or those of our third party vendors and other service providers, including as a result of cyber attacks, could disrupt our businesses, result in the misuse of confidential or proprietary information, damage our reputation, increase our costs, and cause losses.
As a large financial institution, we depend on our ability to process, record, and monitor a large number of customer transactions, and customer, public, and regulatory expectations regarding operational and information security have increased over time. Accordingly, our operational systems and infrastructure must continue to be safeguarded and monitored for potential failures, disruptions, and breakdowns. Our business, financial, accounting, data processing systems, or other operating systems and facilities, including mobile banking and other recently developed technologies, may stop operating properly or become disabled or compromised as a result of a number of factors that may be wholly or partially beyond our control. For example, there could be sudden increases in customer transaction volume; electrical or telecommunications outages; natural disasters; pandemics; events arising from political or social matters, including terrorist acts; and cyber attacks. Although we have business continuity plans and believe we have robust information security procedures and controls in place, disruptions or failures in the physical infrastructure or operating systems that support our businesses and customers, or cyber attacks or security breaches of the networks, systems, or devices on which customers’ personal information is stored and that our customers use to access our products and services, could result in customer attrition, regulatory fines, penalties or intervention, reputational damage, reimbursement or other compensation costs, and/or additional compliance costs, which could have a materially adverse effect on our results of operations and financial condition.
Third parties with whom we do business or that facilitate our business activities, including exchanges, clearing houses, financial intermediaries, or vendors that provide services or security solutions for our operations, could also be sources of operational and information security risk to us, including breakdowns or failures of their own systems, capacity constraints, and cyber attacks.
In recent years, information security risks for financial institutions have increased due in part to the increased sophistication and activities of organized crime, hackers, terrorists, hostile foreign governments, activists, and other external parties. There have been several instances involving financial services and consumer-based companies reporting unauthorized access to, and disclosure of, client or customer information or the destruction or theft of corporate data. There have also been highly publicized cases where hackers have requested ransom-payments in exchange for not disclosing customer information.
Although to date we have not experienced any material losses relating to cyber attacks or other information security breaches, there can be no assurance that we will not suffer such losses in the future. Our risk and exposure to these matters remains heightened, and as a result, the continued development and enhancement of our controls, processes, and practices designed to protect and facilitate the recovery of our systems, computers, software, data, and networks from attack, damage, or unauthorized access remain a high priority for us. As an additional layer of protection, we have purchased network and privacy liability risk insurance coverage which includes digital asset loss, business interruption loss, network security liability, privacy liability, network extortion, and data breach coverage, though there can be no assurance that such insurance will fully cover any actual losses. As cyber threats continue to evolve, we may be required to expend significant additional resources to modify our protective measures or to investigate and remediate any information security vulnerabilities.
Disruptions in services provided by third-party vendors may result in a material adverse effect on our business.
We rely on third-party vendors to provide products and services necessary to maintain day-to-day operations. For example, we are dependent on our vendor-provided core banking processing systems to process a large number of increasingly complex transactions. Accordingly, we are exposed to the risk that these vendors might not perform in accordance with the contracted arrangements or service level agreements because of changes in the vendor’s organizational structure, financial condition, support for existing products, services, and technology strategic focus or for any other reason. Such failure to perform could be disruptive to our operations, which could have a materially adverse impact on our business, results of operations, and financial condition. While we require third-party outsourced service providers to have business continuity and disaster recovery plans that are aligned with our overall recovery plans, we cannot be assured that such plans will operate successfully or in a timely manner so as to prevent any such material adverse impact.
16


New lines of business or new products and services may subject us to additional risks. A failure to successfully manage these risks may have a material adverse effect on our business.
From time to time, we may implement new lines of business, offer new products and services within existing lines of business, or shift our asset mix. There are substantial risks and uncertainties associated with these efforts, particularly in instances where the markets are not fully developed. In developing and marketing new lines of business and/or new products and services, and/or shifting asset mix, we may invest significant time and resources. Initial timetables for the introduction and development of new lines of business and/or new products or services may not be achieved, and price and profitability targets may not prove attainable. External factors, such as compliance with regulations, competitive alternatives, and shifting market preferences, may also impact the successful implementation of a new line of business or a new product or service. Furthermore, any new line of business and/or new product or service could have a significant impact on the effectiveness of our system of internal controls. Failure to successfully manage these risks in the development and implementation of new lines of business or new products or services could have a material adverse effect on our business, results of operations, and financial condition.
We face risks in connection with completed or potential acquisitions.
From time to time, we may evaluate expansion through the acquisition of banks or branches, or other financial businesses or assets. Such acquisitions involve various risks commonly associated with acquisitions, including, among other things:
the possible loss of key employees and customers;
potential business disruptions;
potential changes in banking or tax laws or regulations that may affect the business;
potential exposure to unknown or contingent liabilities; and
potential difficulties in integrating the target business into our own.
Acquisitions typically involve the payment of a premium over book and market values, and therefore, some dilution of the Company’s tangible book value and net income per common share may occur in connection with any future transaction. Furthermore, failure to realize the expected revenue increases, cost savings, increases in geographic or product presence, and/or other projected benefits from an acquisition could have a material adverse effect on the Company’s business, financial condition and results of operations.
Our controls and procedures may fail or be circumvented, which may result in a material adverse effect on our business.
Management regularly reviews and updates our internal controls, disclosure controls and procedures, and corporate governance policies and procedures. Any system of controls, however well designed and operated, is based in part on certain assumptions and can provide only reasonable, not absolute, assurances that the objectives of the system are met. Any failure or circumvention of our controls and procedures, failure to implement any necessary improvement of our controls and procedures, or failure to comply with regulations related to controls and procedures could have a material adverse effect on our business, results of operations and financial condition.
Our business may be adversely affected by fraud.
As a financial institution, we are inherently exposed to operational risk in the form of theft and other fraudulent activity by employees, customers, and other third parties targeting the Company or the Company’s customers or data. Such activity may take many forms, including check fraud, electronic fraud, wire fraud, phishing, social engineering and other dishonest acts. Although we devote substantial resources to maintaining effective policies and internal controls to identify and prevent such incidents, given the increasing sophistication of possible perpetrators, we may experience financial losses or reputational harm as a result of fraud.
17


Risks Relating to Accounting Estimates
Our allowance for loan and lease losses may be insufficient.
Our business is subject to periodic fluctuations based on national and local economic conditions. These fluctuations are not predictable, cannot be controlled and may have a material adverse impact on our operations and financial condition. For example, declines in housing activity including declines in building permits, and home prices, may make it more difficult for our borrowers to sell their homes or refinance their debt. Sales may also slow, which could strain the resources of real estate developers and builders. We may suffer higher loan and lease losses as a result of these factors and the resulting impact on our borrowers. A declining economy could negatively affect employment levels and impact the ability of our borrowers to service their debt. Bank regulatory agencies also periodically review our allowance for loan and lease losses and may require an increase in the provision for loan and lease losses or the recognition of further loan charge-offs, based on judgments different than those of management. In addition, if charge-offs in future periods exceed the allowance for loan and lease losses, we may need, depending on an analysis of the adequacy of the allowance for loan and lease losses, additional provisions to increase the allowance for loan and lease losses. Any increases in the allowance for loan and lease losses will result in a decrease in net income and, possibly, capital, and may have a material adverse effect on our financial condition and results of operations. See Note 1 to the Consolidated Financial Statements for information regarding the adoption of the CECL methodology and the resulting impact to the Company.
We may not be able to fully realize the balance of our net DTA.
The value of our DTA is partially reduced by a valuation allowance. A valuation allowance is provided when it is more-likely-than-not that some portion of our DTA will not be realized. We regularly assess available positive and negative evidence to determine whether it is more-likely-than-not that our net DTA will not be realized. Realization of a DTA requires us to apply significant judgment and is inherently speculative because it requires estimates that cannot be made with certainty. If we were to conclude that a significant portion of our remaining DTA is not more-likely-than-not to be realized, the required valuation allowance could adversely affect our financial position, results of operations and regulatory capital ratios.
If our goodwill were determined to be impaired it could have a negative impact on our profitability.
Webster evaluates goodwill for impairment on an annual basis, or more frequently if necessary. A significant decline in our expected future cash flows, a continuing period of market disruption, market capitalization to book value deterioration, or slower growth rates may require us to record charges in the future related to the impairment of our goodwill. If we were to conclude that a future write-down is necessary, we would record the appropriate charge, which may have a material adverse effect on our financial condition and results of operations.
If all or a significant portion of the unrealized losses in our investment securities were determined to be other-than-temporarily impaired, we would recognize a material charge to our earnings and our capital ratios would be adversely impacted.
When the fair value of a security declines, management must assess whether that decline is other-than-temporary. When management reviews whether a decline in fair value is other-than-temporary, it considers numerous factors, many of which involve significant judgment. No assurance can be provided that the amount of the unrealized losses will not increase.
To the extent that any portion of the unrealized losses in our investment securities portfolio is determined to be other-than-temporary impairment, we will recognize a charge to our earnings in the quarter during which such determination is made and our capital ratios will be adversely impacted. If any such charge is deemed significant, a rating agency might downgrade our credit rating or put us on a credit watch. A downgrade or a significant reduction in our capital ratios might adversely impact our ability to access the capital markets or might increase our cost of capital. Even if we do not determine that the unrealized losses associated with the investment portfolio require an impairment charge, increases in such unrealized losses adversely impact the tangible common equity ratio, which may adversely impact credit rating agency and investor sentiment. Any such negative perception also may adversely impact our ability to access the capital markets or might increase our cost of capital.
ITEM 1B. UNRESOLVED STAFF COMMENTS
Not applicable
18


ITEM 2. PROPERTIES
The Company maintains its headquarters in Waterbury, Connecticut. This owned facility houses the Company’s executive and primary administrative functions, as well as the principal banking headquarters of Webster Bank. Other key operation and administration functions are in an owned facility in New Britain, Connecticut and in leased facilities in Stamford, Hartford, and Southington, Connecticut. The Company considers its properties suitable and adequate for present needs.
In addition to the properties noted above, the Company’s segments maintain the following leased or owned offices. Lease expiration dates vary, up to 67 years, with renewal options for 1 to 10 years. For additional information regarding leases and rental payments refer to Note 7: Leasing in the Notes to Consolidated Financial Statements contained elsewhere in this report.
Commercial Banking
The Commercial Banking segment maintains offices across a footprint that primarily ranges from Boston, Massachusetts to Washington, D.C. Significant properties are located in: Hartford, New Haven, Stamford, and Waterbury, Connecticut; Boston, Massachusetts; New York City and White Plains, New York; Conshohocken, Pennsylvania; and Providence, Rhode Island.
The Commercial Banking segment also includes: Webster Capital Finance with headquarters in Southington, Connecticut; Webster Business Credit Corporation with headquarters in New York, New York and offices in Atlanta, Georgia, Baltimore, Maryland, Boston, Massachusetts, Chicago, Illinois, Dallas, Texas, Charlotte, North Carolina, and New Milford, Connecticut; and Private Banking with headquarters in Stamford, Connecticut and offices in Hartford, New Haven, Waterbury, and Greenwich, Connecticut, Boston, Massachusetts, and Providence, Rhode Island.
HSA Bank
The HSA Bank segment is headquartered in Milwaukee, Wisconsin with an office in Sheboygan, Wisconsin.
Community Banking
The Community Banking segment maintains the following banking centers:
LocationLeasedOwnedTotal
Connecticut73  39  112  
Massachusetts19  10  29  
Rhode Island   
New York —   
Total banking centers105  52  157  

ITEM 3. LEGAL PROCEEDINGS
From time to time, Webster Financial Corporation or its subsidiaries are subject to certain legal proceedings and claims in the ordinary course of business. Management presently believes that the ultimate outcome of these proceedings, individually and in the aggregate, will not be material to Webster or its consolidated financial position. Webster establishes an accrual for specific legal matters when it determines that the likelihood of an unfavorable outcome is probable and the loss is reasonably estimable. Legal proceedings are subject to inherent uncertainties, and unfavorable rulings could occur that could cause Webster to adjust its litigation accrual or could have, individually or in the aggregate, a material adverse effect on its business, financial condition, or operating results. Webster believes it has defenses to all claims asserted against it in existing litigation matters and intends to defend itself in those matters.
ITEM 4. MINE SAFETY DISCLOSURES
Not applicable

19


PART II
ITEM 5. MARKET FOR REGISTRANTS COMMON EQUITY, RELATED STOCKHOLDER MATTERS, AND ISSUER PURCHASES OF EQUITY SECURITIES
Market Information
Webster Financial Corporation’s common shares trade on the New York Stock Exchange under the symbol WBS.
On February 27, 2020, there were 5,105 shareholders of record as determined by Broadridge, the Company’s transfer agent.
Recent Sales of Unregistered Securities
No unregistered securities were sold by Webster Financial Corporation during the three year period ended December 31, 2019.
Issuer Purchases of Equity Securities
The following table provides information with respect to any purchase of equity securities for Webster Financial Corporation’s common stock made by or on behalf of Webster or any “affiliated purchaser,” as defined in Rule 10b-18(a)(3) under the Securities Exchange Act of 1934, during the three months ended December 31, 2019:
Period
Total
Number of
Shares
Purchased (1)
Average Price
Paid Per Share
Total Number of Shares Purchased as Part of Publicly Announced Plans or Programs
Maximum
Dollar Amount Available for Repurchase
Under the Plans or Programs (2)
October7,479  $43.79  —  $200,000,000  
November—  —  —  200,000,000  
December—  —  —  200,000,000  
Total7,479  43.79  —  200,000,000  
(1)All shares purchased during the three months ended December 31, 2019 were acquired outside of the repurchase program at market prices and related to stock compensation plan activity.
(2)Webster maintains a common stock repurchase program which authorizes management to purchase shares of its common stock, in open market or privately negotiated transactions, subject to market conditions and other factors. On October 29, 2019, the Company announced that its Board of Directors approved a modification to this program, originally approved on October 24, 2017, increasing the maximum dollar amount available for repurchase to $200 million. This program will remain in effect until fully utilized or until modified, superseded, or terminated.
20


Performance Graph
The performance graph compares Webster Financial Corporation’s cumulative shareholder return on its common stock over the last five fiscal years to the cumulative total return of the Standard & Poor’s 500 Index (S&P 500 Index) and the Keefe, Bruyette & Woods Regional Banking Index (KRX Index).
Cumulative shareholder return is measured by dividing total dividends, assuming dividend reinvestment, for the measurement period plus share price change for a period by the share price at the beginning of the measurement period. The cumulative shareholder return over a five-year period assumes a simultaneous initial investment of $100, on December 31, 2014, in Webster Financial Corporation common stock and in each of the indices above.

wbs-20191231_g1.jpg
Period Ending December 31,
201420152016201720182019
Webster Financial Corporation$100  $117  $176  $185  $166  $185  
S&P 500 Index$100  $101  $113  $138  $132  $174  
KRX Index$100  $106  $147  $150  $124  $153  

ITEM 6. SELECTED FINANCIAL DATA
The required information is set forth below, in Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations, under the section captioned "Results of Operations," which is incorporated herein by reference.
21


ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following discussion should be read in conjunction with the Consolidated Financial Statements and the accompanying Notes thereto of Webster Financial Corporation contained elsewhere in this report. For a comparison of the 2018 results to the 2017 results and other 2017 information not included herein, refer to the "Management’s Discussion and Analysis of Financial Condition and Results of Operations” included under the section captioned "Comparison of 2018 to 2017" in Part II, Item 7 of the Company’s Annual Report on Form 10-K for the year ended December 31, 2018.
Results of Operations
Selected Financial DataAt or for the years ended December 31,
(Dollars in thousands, except per share data)20192018201720162015
Balance Sheets
Total assets$30,389,344  $27,610,315  $26,487,645  $26,072,529  $24,641,118  
Loans and leases, net19,827,890  18,253,136  17,323,864  16,832,268  15,496,745  
Investment securities8,219,751  7,224,150  7,125,429  7,151,749  6,907,683  
Deposits23,324,746  21,858,845  20,993,729  19,303,857  17,952,778  
Borrowings3,529,271  2,634,703  2,546,141  4,017,948  4,040,799  
Preferred stock145,037  145,037  145,056  122,710  122,710  
Total shareholders' equity3,207,770  2,886,515  2,701,958  2,527,012  2,413,960  
Statements Of Income
Interest income$1,154,583  $1,055,167  $913,605  $821,913  $760,040  
Interest expense199,456  148,486  117,318  103,400  95,415  
Net interest income955,127  906,681  796,287  718,513  664,625  
Provision for loan and lease losses37,800  42,000  40,900  56,350  49,300  
Non-interest income285,315  282,568  259,478  264,478  237,777  
Non-interest expense715,950  705,616  661,075  623,191  555,341  
Income before income tax expense486,692  441,633  353,790  303,450  297,761  
Income tax expense (1)
103,969  81,215  98,351  96,323  93,032  
Net income$382,723  $360,418  $255,439  $207,127  $204,729  
Earnings applicable to common shareholders$372,985  $351,703  $246,831  $198,423  $195,361  
Per Share Data
Basic earnings per common share$4.07  $3.83  $2.68  $2.17  $2.15  
Diluted earnings per common share4.06  3.81  2.67  2.16  2.13  
Dividends and dividend equivalents declared per common share1.53  1.25  1.03  0.98  0.89  
Dividends declared per Series A preferred stock share—  —  —  —  21.25  
Dividends declared per Series E preferred stock share—  —  1,600.00  1,600.00  1,600.00  
Dividends declared per Series F preferred stock share1,312.50  1,323.44  —  —  —  
Book value per common share33.28  29.72  27.76  26.17  24.99  
Tangible book value per common share (non-GAAP)
27.19  23.60  21.59  19.94  18.69  
Key Performance Ratios
Tangible common equity ratio (non-GAAP)
8.39 %8.05 %7.67 %7.19 %7.12 %
Return on average assets1.32  1.33  0.97  0.82  0.87  
Return on average common shareholders’ equity12.83  13.37  9.92  8.44  8.70  
Return on average tangible common shareholders' equity (non-GAAP)
16.01  17.17  13.00  11.36  11.96  
Net interest margin3.55  3.60  3.30  3.12  3.08  
Efficiency ratio (non-GAAP)
56.77  57.75  60.33  62.01  59.93  
Asset Quality Ratios
Non-performing loans and leases as a percentage of loans and leases0.75 %0.84 %0.72 %0.79 %0.89 %
Non-performing assets as a percentage of loans and leases plus OREO0.79  0.87  0.76  0.81  0.92  
Non-performing assets as a percentage of total assets0.52  0.59  0.50  0.53  0.59  
ALLL as a percentage of non-performing loans and leases138.56  137.22  158.00  144.98  125.05  
ALLL as a percentage of loans and leases1.04  1.15  1.14  1.14  1.12  
Net charge-offs as a percentage of average loans and leases0.21  0.16  0.20  0.23  0.23  
Ratio of ALLL to net charge-offs5.09 x7.16 x5.68 x5.25 x5.21 x
(1)The enactment of the Tax Act in December 2017 impacted income tax expense. Refer to Note 9 to the Consolidated Financial Statements contained in Item 8 of this Annual Report on Form 10-K for additional information.
22


The non-GAAP financial measures identified in the preceding table provide investors with information useful in understanding the Company's financial performance, performance trends and financial position. These measures are used by management for internal planning and forecasting purposes, as well as by securities analysts, investors and other interested parties to compare peer company operating performance. Management believes that the presentation, together with the accompanying reconciliations provides a complete understanding of the factors and trends affecting the Company's business and allows investors to view its performance in a similar manner. These non-GAAP financial measures should not be considered a substitute for GAAP basis measures and results. Because non-GAAP financial measures are not standardized, it may not be possible to compare these measures with other companies that present measures having the same or similar names.
The following tables reconcile non-GAAP financial measures with financial measures defined by GAAP:
At December 31,
(Dollars and shares in thousands, except per share data)20192018201720162015
Tangible book value per common share (non-GAAP):
Shareholders' equity (GAAP)$3,207,770  $2,886,515  $2,701,958  $2,527,012  $2,413,960  
Less: Preferred stock (GAAP)145,037  145,037  145,056  122,710  122,710  
 Goodwill and other intangible assets (GAAP)560,290  564,137  567,984  572,047  577,699  
Tangible common shareholders' equity (non-GAAP)$2,502,443  $2,177,341  $1,988,918  $1,832,255  $1,713,551  
Common shares outstanding92,027  92,247  92,101  91,868  91,677  
Tangible book value per common share (non-GAAP)$27.19  $23.60  $21.59  $19.94  $18.69  
Tangible common equity ratio (non-GAAP):
Tangible common shareholders' equity (non-GAAP)$2,502,443  $2,177,341  $1,988,918  $1,832,255  $1,713,551  
Total assets (GAAP)$30,389,344  $27,610,315  $26,487,645  $26,072,529  $24,641,118  
Less: Goodwill and other intangible assets (GAAP)560,290  564,137  567,984  572,047  577,699  
Tangible assets (non-GAAP)$29,829,054  $27,046,178  $25,919,661  $25,500,482  $24,063,419  
Tangible common equity ratio (non-GAAP)8.39 %8.05 %7.67 %7.19 %7.12 %
For the years ended December 31,
(Dollars in thousands)20192018201720162015
Return on average tangible common shareholders' equity (non-GAAP):
Net Income (GAAP)$382,723  $360,418  $255,439  $207,127  $204,729  
Less: Preferred stock dividends (GAAP)7,875  7,853  8,184  8,096  8,711  
Add: Intangible assets amortization, tax-affected (GAAP)3,039  3,039  2,640  3,674  4,121  
Income adjusted for preferred stock dividends and intangible assets amortization (non-GAAP)$377,887  $355,604  $249,895  $202,705  $200,139  
Average shareholders' equity (non-GAAP)$3,067,719  $2,782,132  $2,617,275  $2,481,417  $2,387,286  
Less: Average preferred stock (non-GAAP)145,037  145,068  124,978  122,710  134,682  
  Average goodwill and other intangible assets (non-GAAP)562,188  566,048  570,054  574,785  579,366  
 Average tangible common shareholders' equity (non-GAAP)$2,360,494  $2,071,016  $1,922,243  $1,783,922  $1,673,238  
Return on average tangible common shareholders' equity (non-GAAP)16.01 %17.17 %13.00 %11.36 %11.96 %
Efficiency ratio (non-GAAP):
Non-interest expense (GAAP)$715,950  $705,616  $661,075  $623,191  $555,341  
Less: Foreclosed property activity (GAAP)(173) (139) (238) (326) 517  
  Intangible assets amortization (GAAP)3,847  3,847  4,062  5,652  6,340  
  Other expense (non-GAAP) (1)
1,757  11,878  9,029  3,513  975  
Non-interest expense (non-GAAP)$710,519  $690,030  $648,222  $614,352  $547,509  
Net interest income (GAAP)$955,127  $906,681  $796,287  $718,513  $664,625  
Add: Tax-equivalent adjustment (non-GAAP)9,695  9,026  16,953  13,637  10,617  
 Non-interest income (GAAP)285,315  282,568  259,478  264,478  237,777  
 Other (non-GAAP) (2)
1,448  1,244  1,798  1,780  1,111  
Less: Gain on sale of investment securities, net (GAAP)29  —  —  414  609  
Gains on sale of banking centers and asset redemption (GAAP)—  4,596  —  7,331  —  
Income (non-GAAP)$1,251,556  $1,194,923  $1,074,516  $990,663  $913,521  
Efficiency ratio (non-GAAP)56.77 %57.75 %60.33 %62.01 %59.93 %

(1)Other expense (non-GAAP) includes business and facility optimization charges. In addition, there was a $10.0 million charge relating to additional FDIC premiums in 2018 and a $3.8 million charge for debt prepayment penalties in 2017.
(2)Other (non-GAAP) includes low income housing credits.
23


The following table presents daily average balances, interest, yield/rate, and net interest margin on a fully tax-equivalent basis:
 Years ended December 31,
 201920182017
(Dollars in thousands)Average
Balance
InterestYield/RateAverage
Balance
InterestYield/RateAverage
Balance
InterestYield/Rate
Assets
Interest-earning assets:
Loans and leases$19,209,611  $927,395  4.83 %$18,033,587  $845,146  4.69 %$17,295,027  $712,794  4.12 %
Investment securities (1)
7,761,937  229,989  2.97  7,137,326  211,227  2.93  7,047,744  210,044  2.97  
FHLB and FRB stock113,518  4,956  4.37  132,607  6,067  4.58  155,949  5,988  3.84  
Interest-bearing deposits56,458  1,211  2.14  63,178  1,125  1.78  63,397  698  1.10  
Securities7,931,913  236,156  2.98  7,333,111  218,419  2.98  7,267,090  216,730  2.98  
Loans held for sale22,437  727  3.24  15,519  628  4.04  29,680  1,034  3.49  
Total interest-earning assets27,163,961  $1,164,278  4.29 %25,382,217  $1,064,193  4.18 %24,591,797  $930,558  3.78 %
Non-interest-earning assets1,897,078  1,640,385  1,669,370  
Total assets$29,061,039  $27,022,602  $26,261,167  
Liabilities and equity
Interest-bearing liabilities:
Demand deposits$4,300,407  $—  — %$4,185,183  $—  — %$4,079,493  $—  — %
Health savings accounts6,240,201  12,316  0.20  5,540,000  10,980  0.20  4,839,988  9,612  0.20  
Interest-bearing checking, money market and savings9,144,086  54,566  0.60  9,115,168  36,559  0.40  9,508,416  27,287  0.29  
Time deposits3,267,913  62,695  1.92  2,818,271  42,868  1.52  2,137,574  25,354  1.19  
Total deposits22,952,607  129,577  0.56  21,658,622  90,407  0.42  20,565,471  62,253  0.30  
Securities sold under agreements to repurchase and other borrowings1,008,704  17,953  1.78  784,998  13,491  1.72  876,660  14,365  1.64  
FHLB advances1,201,839  31,399  2.61  1,339,492  33,461  2.50  1,764,347  30,320  1.72  
Long-term debt (1)
468,111  20,527  4.51  225,895  11,127  4.93  225,639  10,380  4.60  
Total borrowings2,678,654  69,879  2.62  2,350,385  58,079  2.47  2,866,646  55,065  1.92  
Total interest-bearing liabilities25,631,261  $199,456  0.78 %24,009,007  $148,486  0.62 %23,432,117  $117,318  0.50 %
Non-interest-bearing liabilities362,059  231,463  211,775  
Total liabilities25,993,320  24,240,470  23,643,892  
Preferred stock145,037  145,068  124,978  
Common shareholders' equity2,922,682  2,637,064  2,492,297  
Total shareholders' equity3,067,719  2,782,132  2,617,275  
Total liabilities and equity$29,061,039  $27,022,602  $26,261,167  
Tax-equivalent net interest income964,822  915,707  813,240  
Less: Tax-equivalent adjustments(9,695) (9,026) (16,953) 
Net interest income$955,127  $906,681  $796,287  
Net interest margin3.55 %3.60 %3.30 %
(1)For purposes of yield/rate computation, unrealized gain (loss) balances on available-for-sale securities and senior fixed-rate notes hedges are excluded.
24


Net interest income and net interest margin are impacted by the level of interest rates, mix of assets earning and liabilities bearing those interest rates, and the volume of interest-earning assets and interest-bearing liabilities. These factors are influenced by changes in economic conditions that impact interest rate policy, competitive conditions that impact loan and deposit pricing strategies, as well as the extent of interest lost to non-performing assets.
Net interest income is the difference between interest income on earning assets, such as loans and investments, and interest expense on liabilities, such as deposits and borrowings, which are used to fund those assets. Net interest income is the Company's largest source of revenue, representing 77.0% of total revenue for the year ended December 31, 2019.
Net interest margin is the ratio of tax-equivalent net interest income to average earning assets for the period.
Webster manages the risk of changes in interest rates on net interest income and net interest margin through ALCO and through related interest rate risk monitoring and management policies. ALCO meets at least monthly to make decisions on the investment securities and funding portfolios based on the economic outlook, its interest rate expectations, the portfolio risk position, and other factors.
Four main tools are used for managing interest rate risk:
the size, duration and credit risk of the investment portfolio,
the size and duration of the wholesale funding portfolio,
interest rate contracts, and
the pricing and structure of loans and deposits.
The federal funds rate target range was 1.50-1.75% at December 31, 2019, as compared to 2.25-2.50% at December 31, 2018 and 1.25-1.50% at December 31, 2017. Refer to the "Asset/Liability Management and Market Risk" section for further discussion of Webster's interest rate risk position.
Comparison of 2019 to 2018
Financial Performance
For the year ended December 31, 2019, net income of $382.7 million increased 6.2% from the year ended December 31, 2018, due to increased net interest income, driven by strong loan growth and stable credit quality across all businesses. Although net interest income increased, net interest margin decreased 5 basis points to 3.55% for the year ended December 31, 2019 from 3.60% for the year ended December 31, 2018. Non-interest income improved, led by growth in deposit service fees and mortgage banking activities, while a modest increase in non-interest expense partially offset the growth in revenues.
Income before income tax expense was $486.7 million for the year ended December 31, 2019, an increase of $45.1 million from $441.6 million for the year ended December 31, 2018.
Income tax expense was $104.0 million, for an effective tax rate of 21.4%, for the year ended December 31, 2019 as compared to $81.2 million, for an effective rate of 18.4%, for the year ended December 31, 2018.
Net income of $382.7 million and diluted earnings per share of $4.06 for the year ended December 31, 2019 increased from net income of $360.4 million and diluted earnings per share of $3.81 for the year ended December 31, 2018.
The efficiency ratio, a non-GAAP financial measure which quantifies the cost expended to generate a dollar of revenue, was 56.77% for 2019 and 57.75% for 2018. The improvement in the ratio highlights the Company's strong growth in revenues accelerating at a rate greater than the increase in non-interest expenses.
Net charge-offs as a percentage of average loans and leases was 0.21% for the year ended December 31, 2019 as compared to 0.16% for the year ended December 31, 2018. Non-performing assets as a percentage of loans, leases, and other real estate owned (OREO) decreased to 0.79% at December 31, 2019 from 0.87% at December 31, 2018 due to growth in loan and lease balances, and also in part from the decrease in non-performing asset balances during the year.
Net Interest Income
Net interest income totaled $955.1 million for the year ended December 31, 2019 as compared to $906.7 million for the year ended December 31, 2018, an increase of $48.4 million. On a fully tax-equivalent basis, net interest income increased $49.1 million when compared to 2018.
Net interest margin decreased 5 basis points to 3.55% for the year ended December 31, 2019 from 3.60% for the year ended December 31, 2018. The decrease in net interest margin is primarily due to increases in rates for interest-bearing liabilities rising at a greater rate than increases in yields for interest-earning assets.
25


Average interest-earning assets during 2019 increased $1.8 billion compared to 2018, primarily from loans and leases growth of $1.2 billion. The average yield on interest-earning assets increased 11 basis points to 4.29% during 2019 from 4.18% during 2018, primarily impacted by changes in market interest rates as well as changes in the volume and relative mix of interest-earning assets. Average interest-bearing liabilities during 2019 increased $1.6 billion compared to 2018, primarily from health savings account growth of $0.7 billion and an increase in borrowings of $0.9 billion. The average cost of interest-bearing liabilities increased 16 basis points to 0.78% during 2019 compared to 0.62% during 2018, from both the effects of the federal funds rate being increased throughout 2018 and then decreased only in the latter part of 2019, and higher borrowing levels.
Changes in Net Interest Income
The following table presents the components of the change in net interest income attributable to changes in rate and volume, and reflects net interest income on a fully tax-equivalent basis:
Years ended December 31,
2019 vs. 2018
Increase (decrease) due to
(In thousands)
Rate (1)
VolumeTotal
Change in interest on interest-earning assets:
Loans and leases$27,010  $55,239  $82,249  
Loans held for sale(124) 224  100  
Securities (2)
393  17,344  17,737  
Total interest income$27,279  $72,807  $100,086  
Change in interest on interest-bearing liabilities:
Deposits$32,318  $6,853  $39,171  
Borrowings(1,654) 13,454  11,800  
Total interest expense$30,664  $20,307  $50,971  
Net change in net interest income$(3,385) $52,500  $49,115  
(1)The change attributable to mix, a combined impact of rate and volume, is included with the change due to rate.
(2)Securities include: Investment securities, FHLB and FRB stock, and Interest-bearing deposits.
Average loans and leases for the year ended December 31, 2019 increased $1.2 billion compared to the average for the year ended December 31, 2018. The loan and lease portfolio comprised 70.7% of the average interest-earning assets at December 31, 2019 compared to 71.0% at December 31, 2018. The loan and lease portfolio yield increased 14 basis points to 4.83% for the year ended December 31, 2019 compared to 4.69% for the year ended December 31, 2018. The increase in the yield on the average loan and lease portfolio is primarily due to the impact of variable rate loans resetting higher and growth in commercial loans with higher yields.
Average securities for the year ended December 31, 2019 increased $598.8 million compared to the average for the year ended December 31, 2018. Securities comprised 29.2% of the average interest-earning assets at December 31, 2019 compared to 28.9% at December 31, 2018. Securities yield was 2.98% for both the year ended December 31, 2019 and the year ended December 31, 2018.
Average deposits for the year ended December 31, 2019 increased $1.3 billion compared to the average for the year ended December 31, 2018, comprised of $115.2 million in non-interest-bearing deposits and $1.2 billion in interest-bearing deposits. The increase is primarily due to growth in health savings accounts and time deposits. The average cost of deposits increased 14 basis points to 0.56% for the year ended December 31, 2019 from 0.42% for the year ended December 31, 2018. The increase is due to selected deposit product rate increases and a change in mix into certificate of deposit accounts. Higher cost time deposits increased to 17.5% for the year ended December 31, 2019 from 16.1% for the year ended December 31, 2018, as a percentage of total interest-bearing deposits.
Average borrowings for the year ended December 31, 2019 increased $328.3 million compared to the average for the year ended December 31, 2018. Securities sold under agreements to repurchase and other borrowings increased $223.7 million, while FHLB advances decreased $137.7 million. The Company completed an underwritten public offering of $300 million senior fixed-rate notes on March 25, 2019, which resulted in an increase of $242.2 million in average long-term debt. See "Sources of Funds and Liquidity" for further discussion of the notes issued. The average cost of borrowings increased 15 basis points to 2.62% for the year ended December 31, 2019 from 2.47% for the year ended December 31, 2018. The increase is largely a result of the senior notes and changes in the federal funds rate.
Provision for Loan and Lease Losses
The provision for loan and lease losses was $37.8 million for the year ended December 31, 2019, which decreased $4.2 million compared to the year ended December 31, 2018. This level of provision for loan and lease losses is primarily due to loan growth, mix and stable asset quality. Refer to the sections captioned "Loans and Leases" through "Allowance for Loan and Lease Losses Methodology," contained elsewhere in this report for further details.
26


Non-Interest Income
 Years ended December 31,Increase (decrease)
(Dollars in thousands)20192018AmountPercent
Deposit service fees$168,022  $162,183  $5,839  3.6 %
Loan and lease related fees31,327  32,025  (698) (2.2) 
Wealth and investment services32,932  32,843  89  0.3  
Mortgage banking activities6,115  4,424  1,691  38.2  
Increase in cash surrender value of life insurance policies14,612  14,614  (2) —  
Gain on sale of investment securities, net29  —  29  100.0  
Other income32,278  36,479  (4,201) (11.5) 
Total non-interest income$285,315  $282,568  $2,747  1.0 %
Total non-interest income was $285.3 million for the year ended December 31, 2019, an increase of $2.7 million compared to $282.6 million for the year ended December 31, 2018. The increase is primarily attributable to higher deposit service fees and mortgage banking activities, partially offset by lower other income.
Deposit service fees totaled $168.0 million for 2019 compared to $162.2 million for 2018. The increase was a result of higher checking account service charges and check card interchange fees attributable to health savings account growth.
Mortgage banking activities totaled $6.1 million for 2019 compared to $4.4 million for 2018. The increase was primarily the result of higher originations for sale and higher rate lock activity due to lower rates.
Other income totaled $32.3 million for 2019 compared to $36.5 million for 2018. The decrease was primarily due to a gain of $4.6 million on the sale of banking centers in 2018. Bank owned life insurance gains were substantially offset by a write-down in one equity method investment in 2019 compared to 2018.
Non-Interest Expense
 Years ended December 31,Increase (decrease)
(Dollars in thousands)20192018AmountPercent
Compensation and benefits$395,402  $381,496  $13,906  3.6 %
Occupancy57,181  59,463  (2,282) (3.8) 
Technology and equipment105,283  97,877  7,406  7.6  
Intangible assets amortization3,847  3,847  —  —  
Marketing16,286  16,838  (552) (3.3) 
Professional and outside services21,380  20,300  1,080  5.3  
Deposit insurance17,954  34,749  (16,795) (48.3) 
Other expense98,617  91,046  7,571  8.3  
Total non-interest expense$715,950  $705,616  $10,334  1.5 %
Total non-interest expense was $716.0 million for the year ended December 31, 2019, an increase of $10.3 million compared to $705.6 million for the year ended December 31, 2018. The increase is primarily attributable to higher compensation and benefits, technology and equipment, and other expense, partially offset by lower deposit insurance.
Compensation and benefits totaled $395.4 million for 2019 compared to $381.5 million for 2018. The increase was due to strategic hires, annual merit increases, and other benefit costs.
Technology and equipment totaled $105.3 million for 2019 compared to $97.9 million for 2018. The increase was due to higher service contracts to support strategic and infrastructure projects for continued investment in the businesses.
Other expense totaled $98.6 million for 2019 compared to $91.0 million for 2018. The increase is due to a $1.7 million business optimization expense in 2019, as well as legal settlements and sales costs.
Deposit insurance totaled $18.0 million for 2019 compared to $34.7 million for 2018. The decrease reflects the benefit of the temporary FDIC deposit insurance fund surcharge ending in 2018 and a $10.0 million charge in 2018 related to additional FDIC premiums.
27


Income Taxes
Webster recognized income tax expense of $104.0 million for the year ended December 31, 2019 and $81.2 million for the year ended December 31, 2018, and the effective tax rates were 21.4% and 18.4%, respectively. The increase in tax expense reflects both the higher level of pre-tax income and a lower level of net discrete tax benefits in 2019, and the increase in the effective tax rate principally reflects the lower level of net discrete tax benefits recognized in 2019 compared to 2018, which included tax planning benefits related to the Tax Act.
The Company's gross DTAs applicable to its net operating loss and credit carryforwards of $69.8 million, or $31.6 million net of the $38.2 related valuation allowance, pertain to state and local tax (SALT). The valuation allowance reflects management's estimates of the Company's taxable income projected through the year 2032 and includes assumptions about the content and apportionment of its income among its legal entities for SALT purposes. Those estimates and assumptions reflect the Company's plans and strategies for growth from its ordinary and recurring operations over the near term by legal entity, as well as a longer-term 4% growth rate assumption. Management believes the $31.6 million net DTAs are more likely than not realizable and their estimates form a reasonable basis for this determination.
For additional information on Webster's income taxes, including its DTAs, refer to Note 9: Income Taxes in the Notes to Consolidated Financial Statements contained elsewhere in this report.
Segment Reporting
Webster’s operations are organized into three reportable segments that represent its primary businesses - Commercial Banking, HSA Bank, and Community Banking. These segments reflect how executive management responsibilities are assigned, the type of customer served, how products and services are provided, and how discrete financial information is currently evaluated. Certain Corporate Treasury activities, along with the amounts required to reconcile profitability metrics to amounts reported in accordance with GAAP, are included in the Corporate and Reconciling category. Refer to Note 20: Segment Reporting in the Notes to Condensed Consolidated Financial Statements contained elsewhere in this report for a reconciliation of segment information to amounts reported in accordance with GAAP and for a description of segment reporting methodology.
Commercial Banking is comprised of Commercial Banking and Private Banking operating segments.
Commercial Banking provides commercial and industrial lending and leasing, commercial real estate lending, and treasury and payment solutions. Specifically, Webster Bank deploys lending through middle market, commercial real estate, equipment financing, asset-based lending and specialty lending units. These groups utilize a relationship approach model throughout their footprint when providing lending, deposit, and cash management services to middle market companies. In addition, Commercial Banking serves as a referral source to the other lines of business.
Private Banking provides asset management, financial planning services, trust services, loan products, and deposit products for high net worth clients, not-for-profit organizations, and business clients. These client relationships generate fee revenue on assets under management or administration, while a majority of the relationships also include lending and, or, deposit accounts which generates net interest income and other ancillary fees.
HSA Bank offers comprehensive consumer directed healthcare solutions that include, health savings accounts, health reimbursement accounts, flexible spending accounts, and other financial solutions. Health savings accounts are used in conjunction with high deductible health plans in order to facilitate tax advantages for account holders with respect to health care spending and savings, in accordance with applicable laws. Health savings accounts are offered through employers for the benefit of their employees or directly to individual consumers and are distributed nationwide directly as well as through national and regional insurance carriers, benefit consultants and financial advisors.
HSA Bank deposits provide long duration low-cost funding that is used to minimize the Company’s use of wholesale funding in support of the Company’s loan growth. In addition, non-interest revenue is generated predominantly through service fees and interchange income.
Community Banking is comprised of Personal Banking and Business Banking operating segments.
Through a distribution network, consisting of 157 banking centers and 309 ATMs, a customer care center, and a full range of web and mobile-based banking services, it serves consumer and business customers primarily throughout southern New England and into Westchester County, New York.
Personal Banking offers consumer deposit and fee-based services, residential mortgages, home equity lines, or loans, unsecured consumer loans, and credit card products. In addition, investment and securities-related services, including brokerage and investment advice are offered through a strategic partnership with LPL, a broker dealer registered with the SEC, a registered investment advisor under federal and applicable state laws, a member of the FINRA, and a member of the SIPC. Webster Bank has employees located throughout its banking center network, who, through LPL, are registered representatives.
Business Banking offers credit, deposit, and cash flow management products to businesses and professional service firms with annual revenues of up to $25 million. This group builds broad customer relationships through business bankers and business certified banking center managers, supported by a team of customer care center bankers and industry and product specialists.
28


Commercial Banking
Operating Results:
Years ended December 31,
(In thousands)201920182017
Net interest income$372,845  $356,509  $322,393  
Non-interest income59,063  64,765  55,194  
Non-interest expense181,580  174,054  154,037  
Pre-tax, pre-provision net revenue250,328  247,220  223,550  
Provision for loan and lease losses25,407  32,388  34,066  
Income before income tax expense224,921  214,832  189,484  
Income tax expense55,331  52,849  52,676  
Net income$169,590  $161,983  $136,808  
Comparison of 2019 to 2018
Pre-tax, pre-provision net revenue increased $3.1 million in 2019 compared to 2018. Net interest income increased $16.3 million, primarily due to loan growth. Non-interest income decreased $5.7 million, driven by less syndication and client interest rate hedging activity. Non-interest expense increased $7.5 million, related to investments in people and technology.
The provision for loan and lease losses allocation decreased by $7.0 million due to stable asset quality.
Comparison of 2018 to 2017
Pre-tax, pre-provision net revenue increased $23.7 million in 2018 compared to 2017. Net interest income increased $34.1 million, primarily due to loan and deposit growth and higher loan and deposit margins. Non-interest income increased $9.6 million, primarily due to loan related fees and client interest rate hedging activities. Non-interest expense increased $20.0 million, related to FDIC insurance and investments in people and technology.
The provision for loan and lease losses decreased by $1.7 million due to stable asset quality and overall credit environment.
Selected Balance Sheet and Off-Balance Sheet Information:
At December 31,
(In thousands)201920182017
Loans and leases$11,499,573  $10,437,319  $9,323,376  
Deposits4,382,051  4,030,554  4,122,608  
Assets under administration/management2,304,350  1,930,199  2,039,375  
Loans and leases increased $1.1 billion at December 31, 2019 compared to December 31, 2018, and increased $1.1 billion at December 31, 2018 compared to December 31, 2017, in line with our strategic priority to expand commercial banking.

Loan originations were $4.1 billion, $4.4 billion and $3.2 billion in 2019, 2018 and 2017, respectively.

Deposits increased $351.5 million at December 31, 2019 compared to December 31, 2018, as a result of new business development and customers holding more balances at the bank. Deposits decreased $92.1 million at December 31, 2018 compared to December 31, 2017, primarily due to a decrease in municipal deposits.
The Private Banking operating segment held approximately $1.8 billion, $1.5 billion, and $1.7 billion in assets under management and $539.7 million, $422.5 million, and $357.5 million in assets under administration at December 31, 2019, December 31, 2018, and December 31, 2017, respectively.
29


HSA Bank
Operating Results:
Years ended December 31,
(In thousands)201920182017
Net interest income$167,239  $143,255  $104,704  
Non-interest income97,041  89,323  77,378  
Non-interest expense135,586  124,594  113,143  
Pre-tax net revenue128,694  107,984  68,939  
Income tax expense33,460  28,076  19,165  
Net income$95,234  $79,908  $49,774  
Comparison of 2019 to 2018
Pre-tax, net revenue increased $20.7 million in 2019 compared to 2018. Net interest income increased $24.0 million, reflecting growth in deposits and improvement in deposit spreads. Non-interest income increased $7.7 million, primarily due to a higher volume of fee and interchange income due to growth in the number of accounts. Non-interest expense increased $11.0 million, primarily due to increased compensation and benefits, processing costs related to incremental account growth and investments in expanded sales and relationship management teams.
Comparison of 2018 to 2017
Pre-tax, net revenue increased $39.0 million in 2018 compared to 2017. Net interest income increased $38.6 million, reflecting growth in deposits and improvement in deposit spreads. Non-interest income increased $11.9 million, primarily due to a higher volume of fee and interchange income as a result of the growth in the number of accounts. Non-interest expense increased $11.5 million, primarily due to increased compensation and benefits, processing costs related to incremental account growth, and investments in expanded sales force.
Selected Balance Sheet and Off-Balance Sheet Information:
At December 31,
(In thousands)201920182017
Deposits$6,416,135  $5,740,601  $5,038,681  
Assets under administration, through linked brokerage accounts2,070,910  1,460,204  1,268,402  
Total footings$8,487,045  $7,200,805  $6,307,083  

Deposits increased $0.7 billion at December 31, 2019 compared to December 31, 2018 and increased $0.7 billion at December 31, 2018 compared to December 31, 2017. These increases are related to organic deposit and account growth.
HSA Bank deposits accounted for 27.5% and 26.3% of the Company’s total deposits as of December 31, 2019 and December 31, 2018, respectively.
Assets under administration, through linked brokerage accounts, increased $610.7 million at December 31, 2019 compared to December 31, 2018, primarily due to the increasing number of account holders with investment accounts plus increases in market values of investments over the year. Assets under administration, through linked brokerage accounts, increased $191.8 million at December 31, 2018 compared to December 31, 2017, primarily due to the increasing number of account holders with investment accounts partially offset by the fourth quarter decline in market value of investments.


30


Community Banking
Operating Results:
Years ended December 31,
(In thousands)201920182017
Net interest income$400,744  $404,869  $383,700  
Non-interest income109,270  109,669  107,368  
Non-interest expense388,399  384,599  373,081  
Pre-tax, pre-provision net revenue121,615  129,939  117,987  
Provision for loan and lease losses12,393  9,612  6,834  
Income before income tax expense109,222  120,327  111,153  
Income tax expense21,735  23,945  30,899  
Net income$87,487  $96,382  $80,254  
Comparison of 2019 to 2018
Pre-tax, pre-provision net revenue decreased $8.3 million in 2019 compared to 2018. Net interest income decreased $4.1 million, primarily due to decline in interest rate spreads in loans and deposits portfolio stemming from lower interest rate environment. Decrease in rate spreads was partially offset by growth in balances for loan and deposit portfolios. Non-interest income decreased $0.4 million, as increased income from mortgage banking activities and increased fees from loan servicing and interest rate hedging activities were offset by a $4.6 million gain from the sale of six banking centers recorded in the prior year. Non-interest expense increased $3.8 million, primarily due to higher compensation and benefits and continued investments in technology, partially offset by lower marketing-related costs and occupancy expenses.
The provision for loan and lease losses increased by $2.8 million in large part due to loan growth.
Comparison of 2018 to 2017
Pre-tax, pre-provision net revenue increased $12.0 million in 2018 compared to 2017. Net interest income increased $21.2 million, primarily due to growth in deposit balances, as well as improved interest spreads on deposits. Non-interest income increased $2.3 million, due to a gain on the sale of six banking centers, coupled with growth in deposit and loan fees. These were partially offset by decreased fee income from mortgage banking activities as a result of lower mortgage production. Non-interest expense increased $11.5 million, primarily due to higher compensation related expenses and continued investments in technology.
The provision for loan and lease losses increased by $2.8 million primarily due to changes in loan balances and asset quality.
Selected Balance Sheet and Off-Balance Sheet Information:
At December 31,
(In thousands)201920182017
Loans$8,537,341  $8,028,115  $8,200,154  
Deposits12,527,903  11,856,652  11,476,334  
Assets under administration3,712,311  3,391,946  3,376,185  
Loan portfolio balances increased $509.2 million at December 31, 2019 compared to December 31, 2018. The increase was primarily driven by growth in residential mortgage balances and business banking balances. Mortgage balances growth included a $242.2 million portfolio purchase in the first quarter. Growth in business banking balances also contributed. This overall growth was partially offset by continued net attrition in home equity balances as loan principal paydowns exceeded new loan production. Loan portfolio balances decreased $172.0 million at December 31, 2018 compared to December 31, 2017. The decrease is related to net attrition in the residential mortgage and home equity balances as loan principal paydowns exceeded new loan production. These balance declines were partially offset by growth in the business banking portfolio.
Loan originations were $2.2 billion, $1.3 billion, and $1.9 billion for the years ended 2019, 2018 and 2017, respectively. The increase of $854.6 million in originations for the year ended December 31, 2019 is driven by increased production in residential mortgages, home equity, and business banking products.
Deposits increased $671.3 million at December 31, 2019 compared to December 31, 2018, resulting from growth in savings, transaction, and time deposit products. Deposits increased $380.3 million at December 31, 2018 compared to December 31, 2017, due to the Boston expansion and growth in time deposit balances.
Additionally, at December 31, 2019, 2018 and 2017, Webster Bank's investment services division held $3.7 billion, $3.4 billion, and $3.4 billion, respectively, of assets under administration through its strategic partnership with LPL.
31


Financial Condition
Webster had total assets of $30.4 billion at December 31, 2019 compared to $27.6 billion at December 31, 2018, an increase of $2.8 billion, or 10.1% as:
loans and leases of $19.8 billion, net of ALLL of $209.1 million, at December 31, 2019 increased $1.6 billion compared to loans and leases of $18.3 billion, net of ALLL of $212.4 million, at December 31, 2018. The net increase was driven by strong commercial and residential loan origination activity, while;
total deposits of $23.3 billion at December 31, 2019 increased $1.5 billion compared to $21.9 billion at December 31, 2018. Non-interest-bearing deposits increased 6.8%, and interest-bearing deposits increased 6.7% during the year ended December 31, 2019, primarily due to growth in health savings accounts balances.
At December 31, 2019, total shareholders' equity was $3.2 billion compared to $2.9 billion at December 31, 2018, an increase of $321.3 million or, 11.1%. Changes in shareholders' equity for the year ended December 31, 2019 include:
an increase of $382.7 million for net income;
an increase of $94.6 million for other comprehensive income (OCI), primarily from higher market values for the available-for-sale securities portfolio;
reductions of $141.3 million for common share dividends and $7.9 million for preferred share dividends, and;
a reduction of $19.6 million for purchases of treasury stock, at cost.
The quarterly cash dividend to common shareholders was increased for the eighth consecutive year on April 22, 2019 to $0.40 per common share from $0.33 per common share. On January 28, 2020, Webster Financial Corporation’s Board of Directors declared a quarterly dividend of $0.40 per share. Refer to the "Selected Financial Highlights" section contained elsewhere in this item and Note 14: Regulatory Matters in the Notes to Consolidated Financial Statements contained elsewhere in this report for information on Webster’s regulatory capital levels and ratios.
Investment Securities
Webster Bank's investment securities are managed within regulatory guidelines and corporate policy, which include limitations on aspects such as concentrations in and type of investments as well as minimum risk ratings per type of security. The OCC may establish additional individual limits on a certain type of investment if the concentration in such investment presents a safety and soundness concern. In addition to Webster Bank, the Holding Company also may directly hold investment securities from time-to-time. At December 31, 2019, the Company had no investments in obligations of individual states, counties, or municipalities which exceeded 10% of consolidated shareholders’ equity.
Webster maintains, through its Corporate Treasury function, investment securities that are primarily used to provide a source of liquidity for operating needs, to generate interest income, and as a means to manage interest-rate risk. Investment securities are classified into two major categories, available-for-sale and held-to-maturity. Available-for-sale currently consists of U.S. Treasury Bills, agency collateralized mortgage obligations (Agency CMO), agency mortgage-backed securities (Agency MBS), agency commercial mortgage-backed securities (Agency CMBS), non-agency commercial mortgage-backed securities (CMBS), CLO, and corporate debt. Held-to-maturity currently consists of Agency CMO, Agency MBS, Agency CMBS, municipal bonds and notes, and CMBS.
The carrying value of investment securities totaled $8.2 billion at December 31, 2019 and $7.2 billion at December 31, 2018.
Available-for-sale investment securities increased by $27.1 million, primarily due to increases in market value more than offsetting portfolio activity. The tax-equivalent yield in the portfolio was 2.94% for the year ended December 31, 2019 compared to 2.89% for the year ended December 31, 2018.
Held-to-maturity investment securities increased by $968.5 million, primarily due to principal purchase activity for Agency MBS and Agency CMBS more than offsetting principal paydowns throughout the portfolio. The tax-equivalent yield in the portfolio was 2.98% for the year ended December 31, 2019 compared to 2.96% for the year ended December 31, 2018.
These investment securities were evaluated by management and were determined not to be other-than-temporarily impaired, at December 31, 2019 and 2018. The Company does not have the intent to sell these investment securities, and it is more likely than not that it will not have to sell these securities before the recovery of their cost basis. The total unrealized loss was $30.3 million at December 31, 2019.
The benchmark 10-year U.S. Treasury rate decreased to 1.92% on December 31, 2019 from 2.69% on December 31, 2018.
32


The following table summarizes the amortized cost and fair value of investment securities:
At December 31,
 20192018
(In thousands)Amortized
Cost
Unrealized
Gains
Unrealized
Losses
Fair ValueAmortized
Cost
Unrealized
Gains
Unrealized
Losses
Fair Value
Available-for-sale:
U.S. Treasury Bills$—  $—  $—  $—  $7,549  $ $—  $7,550  
Agency CMO184,500  2,218  (917) 185,801  238,968  412  (4,457) 234,923  
Agency MBS1,580,743  35,456  (4,035) 1,612,164  1,521,534  1,631  (42,076) 1,481,089  
Agency CMBS587,974  513  (6,935) 581,552  608,167  —  (41,930) 566,237  
CMBS432,085  38  (252) 431,871  447,897  645  (2,961) 445,581  
CLO92,628  45  (468) 92,205  114,641  94  (1,964) 112,771  
Corporate debt23,485  —  (1,245) 22,240  55,860  —  (5,281) 50,579  
Securities available-for-sale$2,901,415  $38,270  $(13,852) $2,925,833  $2,994,616  $2,783  $(98,669) $2,898,730  
Held-to-maturity:
Agency CMO$167,443  $1,123  $(1,200) $167,366  $208,113  $287  $(5,255) $203,145  
Agency MBS2,957,900  60,602  (8,733) 3,009,769  2,517,823  8,250  (79,701) 2,446,372  
Agency CMBS1,172,491  6,444  (5,615) 1,173,320  667,500  53  (22,572) 644,981  
Municipal bonds and notes740,431  32,709  (21) 773,119  715,041  2,907  (18,285) 699,663  
CMBS255,653  2,278  (852) 257,079  216,943  405  (2,388) 214,960  
Securities held-to-maturity$5,293,918  $103,156  $(16,421) $5,380,653  $4,325,420  $11,902  $(128,201) $4,209,121  
The following table summarizes debt securities period-end amount by contractual maturity, or a firm call date, and the respective weighted-average coupon yields:
At December 31, 2019
Within 1 Year1 - 5 Years5 - 10 YearsAfter 10 YearsTotal
(Dollars in thousands)AmountWeighted
Average Coupon Yield
AmountWeighted
Average Coupon Yield
AmountWeighted
Average Coupon Yield
AmountWeighted
Average Coupon Yield
AmountWeighted
Average Coupon Yield
Available-for-sale:
Agency CMO$—  — %$—  — %$8,715  2.24 %$177,085  2.51 %$185,800  2.49 %
Agency MBS—  —  —  —  12,220  2.07  1,599,944  2.77  1,612,164  2.76  
Agency CMBS—  —  —  —  —  —  581,553  2.39  581,553  2.39  
CMBS—  —  —  —  186,391  3.14  245,480  3.06  431,871  3.10  
CLO—  —  —  —  92,205  3.69  —  —  92,205  3.69  
Corporate debt—  —  —  —  —  —  22,240  2.45  22,240  2.45  
Securities available-for-sale$—  — %$—  — %$299,531  3.24 %$2,626,302  2.69 %$2,925,833  2.75 %
Held-to-maturity:
Agency CMO$—  — %$—  — %$—  — %$167,443  2.48 %$167,443  2.48 %
Agency MBS—  —  2,887  3.86  5,983  2.25  2,949,030  2.71  2,957,900  2.71  
Agency CMBS—  —  —  —  189,980  2.74  982,511  2.63  1,172,491  2.65  
Municipal bonds and notes7,635  3.26  2,986  4.29  60,952  2.79  668,858  2.94  740,431  2.94  
CMBS—  —  —  —  —  —  255,653  2.75  255,653  2.75  
Securities held-to-maturity$7,635  3.26 %$5,873  4.08 %$256,915  2.74 %$5,023,495  2.72 %$5,293,918  2.73 %
Total debt securities$7,635  3.26 %$5,873  4.08 %$556,446  3.01 %$7,649,797  2.71 %$8,219,751  2.73 %
Webster Bank has the ability to use its investment portfolio as well as interest-rate derivative financial instruments, within internal policy guidelines to manage interest rate risk as part of its asset/liability strategy. Refer to Note 16: Derivative Financial Instruments in the Notes to Consolidated Financial Statements contained elsewhere in this report for additional information concerning the use of derivative financial instruments.
33


Loans and Leases
The following table provides the composition of loans and leases:
At December 31,
 20192018201720162015
(Dollars in thousands)Amount%Amount%Amount%Amount%Amount%
Commercial:
Commercial non-mortgage$5,313,989  26.5$5,269,557  28.5$4,551,580  26.0$4,151,740  24.4$3,575,042  22.8
Asset-based1,049,978  5.2971,876  5.3837,490  4.8808,836  4.7755,709  4.8
Total commercial6,363,967  31.76,241,433  33.85,389,070  30.84,960,576  29.14,330,751  27.6
Commercial real estate:
Commercial real estate5,736,262  28.64,715,949  25.54,249,549  24.24,141,025  24.33,696,596  23.6
Commercial construction223,707  1.1218,816  1.2279,531  1.6375,041  2.2300,246  1.9
Total commercial real estate5,959,969  29.74,934,765  26.74,529,080  25.84,516,066  26.53,996,842  25.5
Equipment financing533,048  2.7504,351  2.7545,877  3.1630,040  3.7594,984  3.8
Residential4,944,480  24.74,389,866  23.84,464,651  25.54,232,771  24.94,042,960  25.8
Consumer:
Home equity1,998,631  10.02,153,911  11.72,336,846  13.32,395,483  14.12,439,415  15.6
Other consumer219,266  1.1227,257  1.2237,695  1.4274,336  1.6248,830  1.6
Total consumer2,217,897  11.12,381,168  12.92,574,541  14.72,669,819  15.72,688,245  17.2
Net unamortized premiums16,693  0.114,809  0.115,316  0.19,402  0.17,477  
Net deferred fees932  (903) 5,323  7,914  10,476  0.1
Total loans and leases$20,036,986  100.0$18,465,489  100.0$17,523,858  100.0$17,026,588  100.0$15,671,735  100.0
Total commercial loans were $6.4 billion at December 31, 2019, a net increase of $122.5 million from December 31, 2018. The growth in commercial loans is primarily related to new originations of $2.0 billion in commercial non-mortgage loans for the year ended December 31, 2019, partially offset by loan payments.
Asset-based loans increased $78.1 million from December 31, 2018, reflective of $469.1 million in originations and line usage during the year ended December 31, 2019, partially offset by loan payments.
Total commercial real estate loans were $6.0 billion at December 31, 2019, a net increase of $1.0 billion from December 31, 2018 as a result of originations of $1.8 billion during the year ended December 31, 2019, partially offset by loan payments.
Equipment financing loans and leases were $533.0 million at December 31, 2019, a net increase of $28.7 million from December 31, 2018, primarily the result of increased originations during the year ended December 31, 2019.
Total residential loans were $4.9 billion at December 31, 2019, a net increase of $554.6 million from December 31, 2018, primarily due to originations of $1.0 billion, partially offset by loan repayments during the year ended December 31, 2019.
Total consumer loans were $2.2 billion at December 31, 2019, a net decrease of $163.3 million from December 31, 2018, primarily the result of net paydowns in the equity line and loan products partially offset by originations of $575.4 million during the year ended December 31, 2019.
34


The following table provides information for the contractual maturity and interest-rate profile of loans and leases:
At December 31, 2019
Contractual Maturity
(In thousands)One Year Or LessOne To Five YearsMore Than Five YearsTotal
Commercial:
Commercial non-mortgage$707,746  $3,598,518  $990,347  $5,296,611  
Asset-based232,588  794,691  19,607  1,046,886  
Total commercial940,334  4,393,209  1,009,954  6,343,497  
Commercial real estate:
Commercial real estate573,473  2,080,806  3,068,401  5,722,680  
Commercial construction28,898  168,292  29,470  226,660  
Total commercial real estate602,371  2,249,098  3,097,871  5,949,340  
Equipment financing25,410  401,712  110,219  537,341  
Residential1,402  28,535  4,942,748  4,972,685  
Consumer:
Home equity11,707  69,884  1,932,953  2,014,544  
Other consumer17,047  189,112  13,420  219,579  
Total consumer28,754  258,996  1,946,373  2,234,123  
Total loans and leases$1,598,271  $7,331,550  $11,107,165  $20,036,986  
Interest-Rate Profile
(In thousands)One Year Or LessOne To Five YearsMore Than Five YearsTotal
Fixed rate$212,721  $1,025,217  $4,541,640  $5,779,578  
Variable rate1,385,550  6,306,333  6,565,525  14,257,408  
Total loans and leases$1,598,271  $7,331,550  $11,107,165  $20,036,986  
Credit Policies and Procedures
Webster Bank has credit policies and procedures in place designed to support lending activity within an acceptable level of risk. Management reviews and approves these policies and procedures on a regular basis. To assist management with its review, reports related to loan production, loan quality, concentrations of credit, loan delinquencies, non-performing loans, and potential problem loans are generated by loan reporting systems.
Commercial loans are underwritten after evaluating and understanding the borrower’s ability to operate and service its debt. Assessment of management is a critical element of the underwriting process and credit decision. Once it is determined that the borrower’s management possesses sound ethics and solid business acumen, current and projected cash flows are examined to determine the ability of the borrower to repay obligations as agreed. Commercial and industrial loans are primarily made based on the identified cash flows of the borrower and secondarily on the underlying collateral provided by the borrower. The cash flows of borrowers, however, may not be as expected, and the collateral securing these loans may fluctuate in value. Most commercial and industrial loans are secured by the assets being financed and may incorporate personal guarantees of the principals.
Commercial real estate loans are subject to underwriting standards and processes similar to commercial and industrial loans, in addition to those specific to real estate loans. These loans are viewed primarily as cash flow loans and secondarily as loans secured by real estate. Repayment of these loans is largely dependent on the successful operation of the property securing the loan, the market in which the property is located, and the tenants of the property securing the loan. The properties securing the Company’s commercial real estate portfolio are diverse in terms of type and geographic location, which reduces the Company's exposure to adverse economic events that may affect a particular market. Management monitors and evaluates commercial real estate loans based on collateral, geography, and risk grade criteria. Commercial real estate loans may be adversely affected by conditions in the real estate markets or in the general economy. Management periodically utilizes third-party experts to provide insight and guidance about economic conditions and trends affecting its commercial real estate loan portfolio.
Consumer loans are subject to policies and procedures developed to manage the risk characteristics of the portfolio. Policies and procedures, coupled with relatively small individual loan amounts and predominately collateralized structures, spread across many different borrowers, minimize risk. Trend and outlook reports are reviewed by management on a regular basis, with policies and procedures modified, or developed, as needed. Underwriting factors for mortgage and home equity loans include the borrower’s Fair Isaac Corporation (FICO) score, the loan amount relative to property value, and the borrower’s debt to income level and are also influenced by regulatory requirements. Additionally, Webster Bank originates both qualified mortgage and non-qualified mortgage loans as defined by applicable CFPB rules.
35


Asset Quality
Management maintains asset quality within established risk tolerance levels through its underwriting standards, servicing, and management of loan and lease performance. Loans and leases, particularly where a heightened risk of loss has been identified, are regularly monitored to mitigate further deterioration which could potentially impact key measures of asset quality in future periods. Past due loans and leases, non-performing assets, and credit loss levels are considered to be key measures of asset quality.
The following table provides key asset quality ratios:
At or for the years ended December 31,
20192018201720162015
Non-performing loans and leases as a percentage of loans and leases0.75 %0.84 %0.72 %0.79 %0.89 %
Non-performing assets as a percentage of loans and leases plus OREO0.79  0.87  0.76  0.81  0.92  
Non-performing assets as a percentage of total assets0.52  0.59  0.50  0.53  0.59  
ALLL as a percentage of non-performing loans and leases138.56  137.22  158.00  144.98  125.05  
ALLL as a percentage of loans and leases1.04  1.15  1.14  1.14  1.12  
Net charge-offs as a percentage of average loans and leases0.21  0.16  0.20  0.23  0.23  
Ratio of ALLL to net charge-offs5.09x7.16x5.68x5.25x5.21x
Potential Problem Loans and Leases
Potential problem loans and leases are defined by management as certain loans and leases that, for:
commercial, commercial real estate, and equipment financing are performing loans and leases classified as Substandard and have a well-defined weakness that could jeopardize the full repayment of the debt; and
residential and consumer are performing loans 60-89 days past due and accruing.
Potential problem loans and leases exclude loans and leases past due 90 days or more and accruing, non-accrual loans and leases, and troubled debt restructurings (TDRs).
Management monitors potential problem loans and leases due to a higher degree of risk associated with them. The current expectation of probable losses is included in the ALLL; however, management cannot predict whether these potential problem loans and leases ultimately will become non-performing or result in a loss. The Company had potential problem loans and leases of $216.7 million at December 31, 2019 compared to $226.9 million at December 31, 2018.
Past Due Loans and Leases
The following table provides information regarding loans and leases past due 30 days or more and accruing income:
At December 31,
20192018201720162015
(Dollars in thousands)
Amount (1)
% (2)
Amount (1)
% (2)
Amount (1)
% (2)
Amount (1)
% (2)
Amount (1)
% (2)
Commercial:
Commercial non-mortgage$2,697  0.05  $1,700  0.03  $5,809  0.13  $1,949  0.05  $4,052  0.11  
Commercial real estate:
Commercial real estate1,700  0.03  1,514  0.03  551  0.01  8,173  0.20  2,250  0.06  
Equipment financing5,785  1.09  915  0.18  2,358  0.43  1,596  0.25  602  0.10  
Residential13,598  0.28  12,789  0.29  13,771  0.31  11,202  0.26  15,032  0.37  
Consumer:
Home equity13,761  0.69  14,595  0.68  18,397  0.79  14,578  0.61  13,261  0.54  
Other consumer5,074  2.31  2,729  1.20  3,997  1.68  3,715  1.35  2,000  0.80  
Loans and leases past due 30-89 days42,615  0.21  34,242  0.19  44,883  0.26  41,213  0.24  37,197  0.24  
Commercial non-mortgage—  —  104  —  644  0.01  749  0.02  22  —  
Commercial real estate—  —  —  —  243  0.01  —  —  —  —  
Residential—  —  —  —  —  —  —  —  2,029  0.05  
Loans and leases past due 90 days and accruing—  —  104  —  887  0.01  749  —  2,051  0.01  
Total loans and leases over 30 days past due and accruing income42,615  0.21  34,346  0.19  45,770  0.26  41,962  0.25  39,248  0.25  
Deferred costs and unamortized premiums 92  86  77  86  86  
Total$42,707  $34,432  $45,847  $42,048  $39,334  
(1)Past due loan and lease balances exclude non-accrual loans and leases.
(2)Represents the principal balance of past due loans and leases as a percentage of the outstanding principal balance within the comparable loan and lease category. The percentage excludes the impact of deferred costs and unamortized premiums, net.
36


Non-performing Assets
The following table provides information regarding lending-related non-performing assets:
At December 31,
 20192018201720162015
(Dollars in thousands)
Amount (1)
% (2)
Amount (1)
% (2)
Amount (1)
% (2)
Amount (1)
% (2)
Amount (1)
% (2)
Commercial:
Commercial non-mortgage$59,360  1.12  $55,951  1.06  $39,402  0.87  $38,550  0.93  $27,086  0.76  
Asset-based loans139  0.01  224  0.02  589  0.07  —  —  —  —  
Total commercial59,499  0.93  56,175  0.90  39,991  0.74  38,550  0.78  27,086  0.63  
Commercial real estate:
Commercial real estate9,940  0.17  8,243  0.17  4,484  0.11  9,859  0.24  16,750  0.45  
Commercial construction1,614  0.72  —  —  —  —  662  0.18  3,461  1.15  
Total commercial real estate11,554  0.19  8,243  0.17  4,484  0.10  10,521  0.23  20,211  0.51  
Equipment financing5,433  1.02  6,314  1.25  393  0.07  225  0.04  706  0.12  
Residential43,100  0.87  49,069  1.12  44,407  0.99  47,201  1.12  54,101  1.34  
Consumer:
Home equity 30,130  1.51  33,456  1.55  35,601  1.52  35,875  1.50  37,279  1.53  
Other consumer1,190  0.54  1,493  0.66  1,706  0.72  1,663  0.61  558  0.22  
Total consumer31,320  1.41  34,949  1.47  37,307  1.45  37,538  1.41  37,837  1.41  
Total non-performing loans and leases (3)
150,906  0.75  154,750  0.84  126,582  0.72  134,035  0.79  139,941  0.89  
Deferred costs and unamortized premiums 153  17  (69) (219) 128  
Total$151,059  $154,767  $126,513  $133,816  $140,069  
Total non-performing loans and leases$150,906  $154,750  $126,582  $134,035  $139,941  
Foreclosed and repossessed assets:
Residential and consumer 6,203  6,460  5,759  3,911  5,029  
Commercial271  407  305  —  —  
Total foreclosed and repossessed assets6,474  6,867  6,064  3,911  5,029  
Total non-performing assets$157,380  $161,617  $132,646  $137,946  $144,970  
(1)Balances by class exclude the impact of net deferred costs and unamortized premiums.
(2)Represents the principal balance of non-performing loans and leases as a percentage of the outstanding principal balance within the comparable loan and lease category. The percentage excludes the impact of deferred costs and unamortized premiums.
(3)Includes non-accrual restructured loans and leases of $101.0 million, $91.9 million, $74.3 million, $75.7 million and $100.9 million as of December 31, 2019, 2018, 2017, 2016 and 2015, respectively.
The following table provides detail of non-performing loan and lease activity:
Years ended December 31,
(In thousands)2019  2018  
Beginning balance$154,750  $126,582  
Additions123,400  124,991  
Paydowns, net of draws(52,161) (54,468) 
Charge-offs(48,156) (35,298) 
Other reductions(26,927) (7,057) 
Ending balance$150,906  $154,750  
Impaired Loans and Leases
Loans are considered impaired when, based on current information and events, it is probable the Company will be unable to collect all amounts due in accordance with the original contractual terms of the loan agreement, including scheduled principal and interest payments. Impairment is evaluated on a pooled basis for smaller-balance loans of a similar nature. Consumer and residential loans for which the borrower has been discharged in Chapter 7 bankruptcy are considered collateral dependent impaired loans at the date of discharge. Commercial, commercial real estate, and equipment financing loans and leases over a specific dollar amount, risk rated substandard or worse and non-accruing are evaluated individually for impairment. All TDRs or loans that have had a partial charge-off are evaluated individually for impairment, as well. Impairment may be evaluated at the present value of estimated future cash flows using the original interest rate of the loan or at the fair value of collateral, less estimated selling costs. To the extent that an impaired loan or lease balance is collateral dependent, the Company determines the fair value of the collateral.
For residential and consumer collateral dependent loans, a third-party appraisal is obtained upon loan default. Fair value of the collateral for residential and consumer collateral dependent loans is reevaluated every six months, by either a new appraisal or other internal valuation methods. Fair value is also reassessed, with any excess amount charged off, for consumer loans that reach 180 days past due per Federal Financial Institutions Examination Council guidelines.
37


For commercial, commercial real estate, and equipment financing collateral dependent loans and leases, Webster's impairment process requires the Company to determine the fair value of the collateral by obtaining a third-party appraisal or asset valuation, an interim valuation analysis, blue book reference, or other internal methods. Fair value of the collateral for commercial loans is reevaluated quarterly. Whenever the Company has a third-party real estate appraisal performed by independent licensed appraisers, a licensed in-house appraisal officer or qualified individual reviews these appraisals for compliance with the Financial Institutions Reform Recovery and Enforcement Act and the Uniform Standards of Professional Appraisal Practice.
A fair value shortfall is recorded as an impairment reserve against the ALLL. Subsequent to an appraisal or other fair value estimate, should reliable information come to management's attention that the value has declined further, additional impairment may be recorded to reflect the particular situation, thereby increasing the ALLL. Any impaired loan for which no specific valuation allowance was necessary at December 31, 2019 and December 31, 2018 is the result of either sufficient cash flow or sufficient collateral coverage of the book balance.
At December 31, 2019, there were 1,423 impaired loans and leases with a recorded investment balance of $256.4 million, which included loans and leases of $125.8 million with an impairment allowance of $14.2 million, compared to 1,501 impaired loans and leases with a recorded investment balance of $259.3 million, which included loans and leases of $93.1 million, with an impairment allowance of $15.4 million at December 31, 2018. The reduction of $1.1 million in impairment allowance reflects management's current assessment on the resolution of these credits based on collateral considerations, guarantees, or expected future cash flows of the impaired loans.
Troubled Debt Restructurings
A modified loan is considered a TDR when two conditions are met: (i) the borrower is experiencing financial difficulties; and (ii) the modification constitutes a concession. Modified terms are dependent upon the financial position and needs of the individual borrower. The Company considers all aspects of the restructuring in determining whether a concession has been granted, including the debtor's ability to access market rate funds. In general, a concession exists when the modified terms of the loan are more attractive to the borrower than standard market terms. The most common types of modifications include covenant modifications, forbearance, and/or other concessions. If the buyer does not perform in accordance with the modified terms, the loan is reevaluated to determine the most appropriate course of action, which may include foreclosure. Loans for which the borrower has been discharged under Chapter 7 bankruptcy are considered collateral dependent TDRs and thus, impaired at the date of discharge and charged down to the fair value of collateral less cost to sell.
The Company’s policy is to place each consumer loan TDR, except those that were performing prior to TDR status, on non-accrual status for a minimum period of six months. Commercial TDRs are evaluated on a case-by-case basis for determination of whether or not to place them on non-accrual status. Loans qualify for return to accrual status once they have demonstrated performance with the restructured terms of the loan agreement for a minimum of six months. Initially, all TDRs are reported as impaired. Generally, TDRs are classified as impaired loans and reported as TDR for the remaining life of the loan. Impaired and TDR classification may be removed if the borrower demonstrates compliance with the modified terms for a minimum of six months and through one fiscal year-end, and the restructuring agreement specifies a market rate of interest equal to that which would be provided to a borrower with similar credit at the time of restructuring. In the limited circumstance that a loan is removed from TDR classification, it is the Company’s policy to continue to base its measure of loan impairment on the contractual terms specified by the loan agreement.
The following tables provide information for TDRs:
Years ended December 31,
(In thousands)20192018
Beginning balance$230,414  $221,404  
Additions105,981  75,565  
Paydowns, net of draws(74,888) (48,643) 
Charge-offs(21,776) (14,283) 
Transfers to OREO(2,293) (3,629) 
Ending balance$237,438  $230,414  
At December 31,
(In thousands)
20192018
Accrual status$136,449  $138,479  
Non-accrual status100,989  91,935  
Total recorded investment of TDRs$237,438  $230,414  
Specific reserves for TDR included in the balance of ALLL$12,956  $11,930  
Additional funds committed to borrowers in TDR status 4,856  3,893  

38


At December 31,
20192018201720162015
(In thousands)Amount
% (2)
Amount
% (2)
Amount
% (2)
Amount
% (2)
Amount
% (2)
Commercial (1)
$112,152  0.87  $87,739  0.75  $61,673  0.59  $58,464  0.58  $89,817  1.01  
Residential90,096  1.81  103,531  2.34  114,295  2.55  119,391  2.81  134,448  3.31  
Consumer35,190  1.58  39,144  1.63  45,436  1.75  45,673  1.70  48,425  1.79  
Total recorded investment of TDRs$237,438  1.18  $230,414  1.25  $221,404  1.26  $223,528  1.31  $272,690  1.74  

(1)Consists of commercial, commercial real estate and equipment financing loans and leases.
(2)Represents the balance of TDR as a percentage of the outstanding balance within the comparable loan and lease category. The percentage includes the impact of deferred costs and unamortized premiums.
Allowance for Loan and Lease Losses Methodology
The Company's policy for ALLL methodology is considered a critical accounting policy. Executive management reviews and advises on the adequacy of the ALLL reserve which is maintained on a quarterly basis at a level management deems sufficient to cover probable losses inherent within the loan and lease portfolios.
The process for estimating probable losses is based on predictive models that measure the current risk profile of the loan portfolio and combines the measurement with other quantitative and qualitative factors, that together with an impairment reserve determines the overall reserve requirement. Management applies significant judgments and assumptions that influence the loss estimate and ALLL balance. Quantitative and qualitative considerations by management include factors such as the nature and volume of portfolio growth, national and regional economic conditions and trends, other internal performance metrics, and assumptions as to how each of these factors is expected to impact near term loss trends. While actual future conditions and losses realized may vary significantly from present judgments and assumptions, management believes the ALLL is adequate as of December 31, 2019.
The Company’s methodology for assessing an appropriate level for the ALLL includes three key elements:
Impaired loans and leases are analyzed either on an individual or pooled basis and assessed for a specific reserve which is measured based on the present value of expected future cash flows discounted at the effective interest rate of the loan or lease, except that as a practical expedient impairment may be measured based on a loan or lease's observable market price, or the fair value of the collateral, if the loan or lease is collateral dependent. A loan or lease is collateral dependent if the repayment of the loan or lease is expected to be provided solely by the underlying collateral. Management considers the pertinent facts and circumstances for each impaired loan or lease when selecting an appropriate method to measure impairment then reviews and evaluates each selection to ensure its continued appropriateness.
Loans and leases that are not considered impaired and have similar risk characteristics are segmented into homogeneous pools and modeled using quantitative methods to determine a loss estimate. Loss estimates incorporate a loss emergence period (LEP) model which represents the period of time between a loss event first occurring and the confirming event of its charge-off. A LEP is determined for each loan type based on the Company's historical performance experience and is reassessed at least annually. Commercial portfolios utilize an expected loss methodology that is based on probability of default (PD) and loss given default (LGD) models. PD and LGD models generally are derived using the Company's portfolio specific data over a defined look back period and are refreshed annually. The PD and LGD models based on borrower and facility risk ratings assigned to each loan are updated throughout the year should the financial condition of a borrower change. Residential and consumer portfolios use roll rate models to estimate probable inherent losses. The models calculate the roll rate at which loans migrate from one delinquency category to the next worse delinquency category and eventually to loss. The roll rate models use the recent delinquency and loss experience based upon a specified look back period and are segmented based on product type and common risk characteristics. The models also incorporate an estimated pay down factor by product type. The roll rate calculations are performed quarterly and are done consistently from period to period. The portfolio performance and assumptions utilized are regularly reviewed, while the roll rate model is evaluated on an annual basis.
Management also considers qualitative factors, consistent with inter-agency regulatory guidance, that are not explicitly factored in the quantitative models but that can have an incremental or regressive impact on losses incurred in the current loan and lease portfolio.
39


At December 31, 2019, the ALLL was $209.1 million compared to $212.4 million at December 31, 2018. The decrease of $3.3 million in the reserve at December 31, 2019 compared to December 31, 2018 is primarily due to lower reserves on impaired loans in the residential and home-equity loan portfolios. The ALLL reserve remains adequate to cover inherent losses in the loan and lease portfolios. ALLL as a percentage of loans and leases, also known as the reserve coverage, decreased to 1.04% at December 31, 2019 as compared to 1.15% at December 31, 2018, and reflects an updated assessment of inherent losses and impaired reserves conducted throughout the year. ALLL as a percentage of non-performing loans and leases increased to 138.56% at December 31, 2019 from 137.22% at December 31, 2018.
The following table provides an allocation of the ALLL by portfolio:
At December 31,
20192018201720162015
(Dollars in thousands)Amount
% (1)
Amount
% (1)
Amount
% (1)
Amount
% (1)
Amount
% (1)
Commercial$91,756  1.45  $98,793  1.59  $89,533  1.67  $71,905  1.46  $59,977  1.39  
Commercial real estate65,245  1.10  60,151  1.22  49,407  1.09  47,477  1.05  41,598  1.04  
Equipment financing4,668  0.87  5,129  1.01  5,806  1.06  6,479  1.02  5,487  0.91  
Residential20,919  0.42  19,599  0.44  19,058  0.42  23,226  0.55  25,876  0.64  
Consumer26,508  1.19  28,681  1.20  36,190  1.40  45,233  1.68  42,052  1.56  
Total ALLL$209,096  1.04  $212,353  1.15  $199,994  1.14  $194,320  1.14  $174,990  1.12  
(1)Percentage represents allocated ALLL to total loans and leases within the comparable category. However, the allocation of a portion of the allowance to one category of loans and leases does not preclude its availability to absorb losses in other categories.
The ALLL reserve allocated to the commercial portfolio at December 31, 2019 decreased $7.0 million compared to December 31, 2018. The year-over-year decrease is primarily attributable to improved net rating migration.
The ALLL reserve allocated to the commercial real estate portfolio at December 31, 2019 increased $5.1 million compared to December 31, 2018. The year-over-year increase is primarily attributable to loan growth of $1.0 billion, partially offset by improved net rating migration.
The ALLL reserve allocated to the equipment financing portfolio at December 31, 2019 decreased $0.5 million compared to December 31, 2018. The year-over-year decrease is primarily attributable to improved net rating migration.
The ALLL reserve allocated to the residential loan portfolio at December 31, 2019 increased $1.3 million compared to December 31, 2018. The year-over-year increase is primarily attributable to higher loss rates, partially offset by a decrease in TDR loans of $13.4 million.
The ALLL reserve allocated to the consumer portfolio at December 31, 2019 decreased $2.2 million compared to December 31, 2018. The year-over-year decrease is primarily attributable to improved credit quality and a decrease in the loan portfolio balance.
40


The following table provides detail of activity in the ALLL:
At or for the years ended December 31,
(In thousands)20192018201720162015
Beginning balance$212,353  $199,994  $194,320  $174,990  $159,264  
Provision37,800  42,000  40,900  56,350  49,300  
Charge-offs:
Commercial(29,033) (18,220) (8,147) (18,360) (11,522) 
Commercial real estate(3,501) (2,061) (9,275) (2,682) (7,578) 
Equipment financing(793) (423) (558) (565) (273) 
Residential(4,153) (3,455) (2,500) (4,636) (6,508) 
Consumer(15,000) (19,228) (24,447) (20,669) (17,679) 
Total charge-offs(52,480) (43,387) (44,927) (46,912) (43,560) 
Recoveries:
Commercial1,626  4,439  2,358  1,626  2,738  
Commercial real estate45  161  165  631  647  
Equipment financing78  75  117  536  1,360  
Residential1,363  1,980  1,024  1,756  875  
Consumer8,311  7,091  6,037  5,343  4,366  
Total recoveries11,423  13,746  9,701  9,892  9,986  
Net charge-offs
Commercial(27,407) (13,781) (5,789) (16,734) (8,784) 
Commercial real estate(3,456) (1,900) (9,110) (2,051) (6,931) 
Equipment financing(715) (348) (441) (29) 1,087  
Residential(2,790) (1,475) (1,476) (2,880) (5,633) 
Consumer(6,689) (12,137) (18,410) (15,326) (13,313) 
Net charge-offs(41,057) (29,641) (35,226) (37,020) (33,574) 
Ending balance$209,096  $212,353  $199,994  $194,320  $174,990  
Net charge-offs for the years ended December 31, 2019 and 2018 were $41.1 million and $29.6 million, respectively. Net charge-offs increased by $11.4 million during the year ended December 31, 2019 compared to the year ended December 31, 2018. The increase in net charge-off activity is primarily due to a large commercial loan charge-off.
The following table provides a summary of total net charge-offs to average loans and leases by category:
Years ended December 31,
20192018201720162015
Commercial0.43 %0.23 %0.11 %0.36 %0.22 %
Commercial real estate0.07  0.04  0.20  0.05  0.18  
Equipment financing0.14  0.07  0.07  —  (0.20) 
Residential0.06  0.03  0.03  0.07  0.15  
Consumer0.29  0.49  0.70  0.56  0.51  
Total net charge-offs to total average loans and leases0.21 %0.16 %0.20 %0.23 %0.23 %
Reserve for Unfunded Credit Commitments
A reserve for unfunded credit commitments provides for probable losses inherent with funding the unused portion of legal commitments to lend. Reserve calculation factors are consistent with the ALLL methodology for funded loans using the PD, LGD, and LEP applied to the underlying borrower risk and facility grades, and a draw down factor applied to utilization rates.
The following tables provide detail of activity in the reserve for unfunded credit commitments:
At or for the years ended December 31,
(In thousands)20192018201720162015
Beginning balance$2,506  $2,362  $2,287  $2,119  $5,151  
(Benefit) provision(139) 144  75  168  (3,032) 
Ending balance$2,367  $2,506  $2,362  $2,287  $2,119  

41


Sources of Funds and Liquidity
Sources of Funds. The primary source of Webster Bank’s cash flows for use in lending and meeting its general operational needs is deposits. Operating activities, such as loan and mortgage-backed securities repayments, and other investment securities sale proceeds and maturities also provide cash flows. While scheduled loan and investment security repayments are a relatively stable source of funds, loan and investment security prepayments and deposit inflows are influenced by prevailing interest rates and local economic conditions and are inherently uncertain. Additional sources of funds are provided by FHLB advances or other borrowings.
Federal Home Loan Bank and Federal Reserve Bank Stock. Webster Bank is a member of the FHLB System, which consists of eleven district Federal Home Loan Banks, each subject to the supervision and regulation of the Federal Housing Finance Agency. An activity-based capital stock investment in the FHLB of Boston is required in order for Webster Bank to access advances and other extensions of credit for sources of funds and liquidity purposes. The FHLB capital stock investment is restricted in that there is no market for it, and it can only be redeemed by the FHLB. Webster Bank held FHLB Boston capital stock of $89.3 million at December 31, 2019 compared to $98.6 million at December 31, 2018 for its membership and for outstanding advances and other extensions of credit. Webster Bank received $4.0 million in dividends from the FHLB Boston during 2019.
Additionally, Webster Bank is required to hold FRB of Boston stock equal to 6% of its capital and surplus of which 50% is paid. The remaining 50% is subject to call when deemed necessary by the Federal Reserve System. The FRB capital stock investment is restricted in that there is no market for it, and it can only be redeemed by the FRB. Webster Bank held $59.8 million and $50.7 million of FRB of Boston capital stock at December 31, 2019 and December 31, 2018, respectively. Webster Bank received $1.0 million in dividends from the FRB of Boston during 2019.
Deposits. Webster Bank offers a wide variety of deposit products for checking and savings (including: ATM and debit card use, direct deposit, ACH payments, combined statements, mobile banking services, internet-based banking, bank by mail, as well as overdraft protection via line of credit or transfer from another deposit account) designed to meet the transactional, savings, and investment needs for both consumer and business customers throughout its primary market area. Webster Bank manages the flow of funds in its deposit accounts and provides a variety of accounts and rates consistent with FDIC regulations. Webster Bank’s Retail Pricing Committee and its Commercial and Institutional Liability Pricing Committee meet regularly to determine pricing and marketing initiatives.
Total deposits were $23.3 billion, $21.9 billion, and $21.0 billion at December 31, 2019, 2018, and 2017, respectively. The trending increase is primarily due to health savings accounts growth. Time deposits that exceed the FDIC limit, presently $250 thousand, represent approximately 2.8%, 2.5%, and 2.7%, of total deposits at December 31, 2019, 2018, and 2017, respectively. For additional information related to period-end balances and rates, refer to Note 10: Deposits in the Notes to Consolidated Financial Statements contained elsewhere in this report.
Daily average balances of deposits by type and weighted-average rates paid thereon for the periods as indicated:
Years ended December 31,
201920182017
(Dollars in thousands)Average BalanceAverage RateAverage BalanceAverage RateAverage BalanceAverage Rate
Non-interest-bearing:
Demand$4,300,407  $4,185,183  $4,079,493  
Interest-bearing:
Checking2,604,931  0.14 %2,585,593  0.08 %2,601,962  0.07 %
Health savings accounts6,240,201  0.20  5,540,000  0.20  4,839,988  0.20  
Money market2,365,367  1.27  2,351,188  0.95  2,488,422  0.61  
Savings4,173,788  0.50  4,178,387  0.29  4,418,032  0.23  
Time deposits3,267,913  1.92  2,818,271  1.52  2,137,574  1.19  
Total interest-bearing18,652,200  0.69  17,473,439  0.52  16,485,978  0.38  
Total average deposits$22,952,607  0.56 %$21,658,622  0.42 %$20,565,471  0.30 %
Total average deposits increased $1.3 billion, or 6.0%, in 2019 compared to 2018 and increased $1.1 billion, or 5.3%, in 2018 compared to 2017. The increases were driven by continued growth in health savings account deposits and time deposits.
The following table presents time deposits with a denomination of $100,000 or more at December 31, 2019 by maturity periods:
(In thousands)
Due within 3 months$750,372  
Due after 3 months and within 6 months307,748  
Due after 6 months and within 12 months354,561  
Due after 12 months221,994  
Time deposits with a denomination of $100 thousand or more$1,634,675  
42


Borrowings. Borrowings primarily consist of FHLB advances which are utilized as a source of funding for liquidity and interest rate risk management purposes. At December 31, 2019 and December 31, 2018, FHLB advances totaled $1.9 billion and $1.8 billion, respectively. Webster Bank had additional borrowing capacity from the FHLB of approximately $2.9 billion and $2.6 billion at December 31, 2019 and December 31, 2018, respectively. Webster Bank also had additional borrowing capacity from the FRB of $0.9 billion and $0.6 billion at December 31, 2019 and December 31, 2018, respectively.
Securities sold under agreements to repurchase, whereby securities are delivered to counterparties under an agreement to repurchase the securities at a fixed price in the future, to a lesser extent, are also utilized as a source of funding. Unpledged investment securities of $5.5 billion at December 31, 2019 could have been used for collateral on borrowings such as repurchase agreements or, alternatively, to increase borrowing capacity by approximately $5.0 billion with the FHLB or approximately $5.2 billion with the FRB. In addition, Webster Bank may utilize term and overnight Fed funds to meet short-term borrowing needs.
Long-term debt consists of senior fixed-rate notes maturing in 2024 and 2029, and junior subordinated notes maturing in 2033, and totaled $0.5 billion and $0.2 billion at December 31, 2019 and December 31, 2018, respectively. The Company completed an underwritten public offering of $300 million senior fixed-rate notes on March 25, 2019, of which it invested the net proceeds of $296 million in Webster Bank as permanent capital to be used for working capital needs and other general purposes. The notes carry a 4.10% coupon rate and mature on March 29, 2029. During 2019, the Company initiated a fair value hedging relationship for the notes to swap the fixed interest rate to a variable rate. As a result, the effective interest rate was 3.40% at December 31, 2019.
Total borrowed funds were $3.5 billion, $2.6 billion and $2.5 billion, and represented 11.6%, 9.5% and 9.6% of total assets at December 31, 2019, 2018 and 2017, respectively. The increase in 2019 compared to 2018 is due to loan and securities growth exceeding deposit growth. For additional information related to period-end balances and rates, refer to Note 11: Borrowings in the Notes to Consolidated Financial Statements contained elsewhere in this report.
Daily average balances of borrowings by type and weighted-average rates paid thereon for the periods as indicated:
Years ended December 31,
201920182017
(Dollars in thousands)Average BalanceAverage RateAverage BalanceAverage RateAverage BalanceAverage Rate
FHLB advances$1,201,839  2.61 %$1,339,492  2.50 %$1,764,347  1.72 %
Securities sold under agreements to repurchase296,498  0.88  467,873  1.57  695,922  1.79  
Fed funds purchased712,206  2.16  317,125  1.94  180,738  1.06  
Long-term debt468,111  4.51  225,895  4.93  225,639  4.60  
Total average borrowings$2,678,654  2.62 %$2,350,385  2.47 %$2,866,646  1.92 %
Total average borrowings increased $328.3 million, or 14.0%, in 2019 compared to 2018. The increase in 2019 compared to 2018 was due to the issuance of $300 million of senior fixed-rate notes in March 2019 and a related $17 million basis adjustment reflecting changes in the benchmark rate. Total average borrowings decreased $516.3 million, or 18.0%, in 2018 compared to 2017. The decrease in 2018 compared to 2017 was the result of deposits growing faster than loans which allowed for a lower usage of FHLB advances. Average borrowings represented 9.2%, 8.7%, and 10.9% of average total assets for December 31, 2019, 2018, and 2017, respectively.
The following table sets forth additional information for short-term borrowings:
At or for the years ended December 31,
201920182017
(Dollars in thousands)AmountRateAmountRateAmountRate
Securities sold under agreements to repurchase:
At end of year$240,431  0.19 %$236,874  0.35 %$288,269  0.17 %
Average during year203,895  0.51  245,407  0.25  310,853  0.18  
Highest month-end balance during year240,431  —  264,491  —  335,902  —  
Fed funds purchased:
At end of year600,000  1.59  345,000  2.52  55,000  1.37  
Average during year712,206  2.16  317,125  1.96  180,738  1.06  
Highest month-end balance during year1,230,000  —  424,400  —  182,000  —  
43


The following table summarizes contractual obligations to make future payments as of December 31, 2019:
  
Payments Due by Period (1)
(In thousands)Less than
one year
1-3 years3-5 yearsAfter 5
years
Total
Senior notes$—  $—  $150,000  $317,486  $467,486  
Junior subordinated debt—  —  —  77,320  77,320  
FHLB advances1,690,000  200,130  50,229  8,117  1,948,476  
Securities sold under agreements to repurchase240,431  —  200,000  —  440,431  
Fed funds purchased600,000  —  —  —  600,000  
Deposits with stated maturity dates2,621,413  431,917  51,435  —  3,104,765  
Operating lease liabilities24,474  48,612  37,659  63,651  174,396  
Purchase obligations52,288  25,985  1,455  —  79,728  
Total contractual obligations$5,228,606  $706,644  $490,778  $466,574  $6,892,602  
(1)Amounts for borrowings do not include interest.
The Company also has the following obligations which have been excluded from the above table:
unfunded commitments remaining for particular investments in private equity funds of $42.3 million, for which neither the payment timing, nor eventual obligation is certain;
credit related financial instruments with contractual amounts totaling $6.4 billion, of which many of these commitments are expected to expire unused or only partially used, and therefore, the total amount of these commitments does not necessarily reflect future cash payments; and
liabilities for uncertain tax positions totaling $5.5 million, for which uncertainty exists regarding the amount that may ultimately be paid, as well as the timing of any such payment.
Liquidity. Webster meets its cash flow requirements at an efficient cost under various operating environments through proactive liquidity management at both the Holding Company and Webster Bank. Liquidity comes from a variety of cash flow sources such as operating activities, including principal and interest payments on loans and investments; financing activities, including unpledged securities which can be sold or utilized to secure funding; and new deposits. Webster is committed to maintaining a strong, increasing base of core deposits, consisting of demand, checking, savings, health savings, and money market accounts, to support growth in its loan and lease portfolio. Liquidity is reviewed and managed in order to maintain stable, cost effective funding to promote overall balance sheet strength. Net cash provided by operating activities was $303.9 million for the year ended December 31, 2019 as compared to $469.4 million for the year ended December 31, 2018. The most significant impact was due to derivatives activity.
Holding Company Liquidity. The primary source of liquidity at the Holding Company is dividends from Webster Bank. Webster Bank paid $360 million in dividends to the Holding Company during the year ended December 31, 2019. To a lesser extent, investment income, net proceeds from investment sales, borrowings, and public offerings may provide additional liquidity. The main uses of liquidity are the payment of principal and interest to holders of senior notes and junior subordinated debt, the payment of dividends to preferred and common shareholders, repurchases of its common stock, and purchases of investment securities. There are certain restrictions on the payment of dividends by Webster Bank to the Holding Company, which are described in the section captioned "Supervision and Regulation" in Item 1 contained elsewhere in this report. At December 31, 2019, there was $302.8 million of retained earnings available for the payment of dividends by Webster Bank to the Holding Company.
The Company has a common stock repurchase program authorized by the Board of Directors, with $200.0 million of remaining repurchase authority at December 31, 2019. In addition, Webster periodically acquires common shares outside of the repurchase program related to stock compensation plan activity. The Company records the purchase of shares of common stock at cost based on the settlement date for these transactions. During the year ended December 31, 2019, a total of 346,361 shares of common stock were repurchased at a cost of approximately $19.6 million, of which 227,199 shares were purchased under the common stock repurchase program at a cost of approximately $13.0 million, and 119,162 shares were purchased at market prices for a cost of approximately $6.6 million relating to stock compensation plan activity.
44


Webster Bank Liquidity. Webster Bank's primary source of funding is core deposits. The primary use of this funding is for loan portfolio growth. Including time deposits, Webster Bank had a loan to total deposit ratio of 85.9% and 84.5% at December 31, 2019 and December 31, 2018, respectively.
Webster Bank is required by OCC regulations to maintain liquidity sufficient to ensure safe and sound operations. Whether liquidity is adequate, as assessed by the OCC, depends on such factors as the overall asset/liability structure, market conditions, competition, and the nature of the institution’s deposit and loan customers. Webster Bank exceeded all regulatory liquidity requirements as of December 31, 2019. Webster Bank's latest OCC CRA rating was Outstanding. The Company has a detailed liquidity contingency plan designed to respond to liquidity concerns in a prompt and comprehensive manner. The plan is designed to provide early detection of potential problems, and details specific actions required to address liquidity stress scenarios.
Applicable OCC regulations require Webster Bank, as a commercial bank, to satisfy certain minimum leverage and risk-based capital requirements. As an OCC regulated commercial institution, it is also subject to minimum tangible capital requirements. As of December 31, 2019, Webster Bank was in compliance with all applicable capital requirements and exceeded the FDIC requirements for a well-capitalized institution. Refer to Note 14: Regulatory Matters in the Notes to Consolidated Financial Statements contained elsewhere in this report for a further discussion of regulatory requirements applicable to Webster Financial Corporation and Webster Bank.
The liquidity position of the Company is continuously monitored, and adjustments are made to the balance between sources and uses of funds as deemed appropriate. Management is not aware of any events that are reasonably likely to have a material adverse effect on the Company’s liquidity, capital resources, or operations. In addition, management is not aware of any regulatory recommendations regarding liquidity, which, if implemented, would have a material adverse effect on the Company.
Off-Balance Sheet Arrangements
Webster engages in a variety of financial transactions that, in accordance with GAAP, are not recorded in the financial statements or are recorded in amounts that differ from the notional amounts. Such transactions are utilized in the normal course of business, for general corporate purposes or for customer financing needs. Corporate purpose transactions are structured to manage credit, interest rate, and liquidity risks, or to optimize capital. Customer transactions are structured to manage their funding requirements or facilitate certain trade arrangements. These transactions give rise to, in varying degrees, elements of credit, interest rate, and liquidity risk. For the year ended December 31, 2019, Webster did not engage in any off-balance sheet transactions that would have a material effect on its financial condition.
Asset/Liability Management and Market Risk
An effective asset/liability management process must balance the risks and rewards from both short and long-term interest rate risks in determining management strategy and action. To facilitate and manage this process, interest rate sensitivity is monitored on an ongoing basis by ALCO. The primary goal of ALCO is to manage interest rate risk to maximize net income and net economic value over time in changing interest rate environments subject to Board approved risk limits. The Board sets policy limits for earnings at risk for parallel ramps in interest rates over twelve months of plus and minus 100, 200, and 300 basis points, as well as interest rate curve twist shocks of plus and minus 50 and 100 basis points. Economic value, or equity at risk, limits are set for parallel shocks in interest rates of plus and minus 100, 200, and 300 basis points.
Due to the federal funds rate target range set at 1.50-1.75% as of December 31, 2019, the declining interest rate scenarios of minus 200 basis points, or more, for both earnings at risk and equity at risk were not run per ALCO policy. Instead, scenarios were run with short and long term rates declining to zero, but not below. In 2019, ALCO implemented a balance sheet repositioning strategy with the goal of reducing asset sensitivity to falling rates which included the purchase of interest rate floors. ALCO also regularly reviews earnings at risk scenarios for non-parallel changes in rates, as well as longer-term scenarios of up to four years in the future.
Management measures interest rate risk using simulation analysis to calculate earnings and equity at risk. These risk measures are quantified using simulation software. Key assumptions relate to the behavior of interest rates and spreads, prepayment speeds, and the run-off of deposits. From such simulations, interest rate risk is quantified, and appropriate strategies are formulated and implemented.
Earnings at risk is defined as the change in earnings, excluding provision for loan and lease losses and income tax expense, due to changes in interest rates. Interest rates are assumed to change up or down in a parallel fashion, and earnings results are compared to a flat rate scenario as a base. The flat rate scenario holds the end of the period yield curve constant over the twelve month forecast horizon. Earnings simulation analysis incorporates assumptions about balance sheet changes such as asset and liability growth and mix changes and loan and deposit pricing. It is a measure of short-term interest rate risk.
Equity at risk is defined as the change in the net economic value of assets and liabilities due to changes in interest rates compared to a base net economic value. Equity at risk analyzes sensitivity in the present value of cash flows over the expected life of existing assets, liabilities, and off-balance sheet contracts. It is a measure of the long-term interest rate risk to future earnings streams embedded in the current balance sheet.
45


Asset sensitivity is defined as earnings or net economic value increasing compared to a base scenario when interest rates rise and decreasing when interest rates fall. In other words, assets are more sensitive to changing interest rates than liabilities and, therefore, re-price faster. Likewise, liability sensitivity is defined as earnings or net economic value decreasing compared to a base scenario when interest rates rise and increasing when interest rates fall.
Key assumptions underlying the present value of cash flows include the behavior of interest rates and spreads, asset prepayment speeds, and attrition rates on deposits. Cash flow projections from the model are compared to market expectations for similar collateral types and adjusted based on experience with Webster Bank's own portfolio. The model's valuation results are compared to observable market prices for similar instruments whenever possible. The behavior of deposit and loan customers is studied using historical time series analysis to model future customer behavior under varying interest rate environments.
The equity at risk simulation process uses multiple interest rate paths generated by an arbitrage-free trinomial lattice term structure model. The Base Case rate scenario, against which all others are compared, uses the month-end LIBOR/Swap yield curve as a starting point to derive forward rates for future months. Using interest rate swap option volatilities as inputs, the model creates multiple rate paths for this scenario with forward rates as the mean. In shock scenarios, the starting yield curve is shocked up or down in a parallel fashion. Future rate paths are then constructed in a similar manner to the Base Case.
Cash flows for all instruments are generated using product specific prepayment models and account specific system data for properties such as maturity date, amortization type, coupon rate, repricing frequency, and repricing date. The asset/liability simulation software is enhanced with a mortgage prepayment model and a collateralized mortgage obligation database. Instruments with explicit options such as caps, floors, puts and calls, and implicit options such as prepayment and early withdrawal ability require such a rate and cash flow modeling approach to more accurately quantify value and risk.
On the asset side, risk is impacted the most by mortgage loans and mortgage-backed securities, which can typically prepay at any time without penalty and may have embedded caps and floors. In the loan portfolio, floors are a benefit to interest income in low rate environments. Floating-rate loans at floors pay a higher interest rate than a loan at a fully indexed rate without a floor, as with a floor there is a limit on how low the interest rate can fall. As market rates rise, however, the interest rate paid on these loans does not rise until the fully indexed rate rises through the contractual floor.
On the liability side, there is a large concentration of customers with indeterminate maturity deposits who have options to add or withdraw funds from their accounts at any time. Implicit floors on deposits, based on historical data, are modeled. Webster Bank also has the option to change the interest rate paid on these deposits at any time.
Webster's earnings at risk model incorporates net interest income (NII) and non-interest income and expense items, some of which vary with interest rates. These items include mortgage banking income, servicing rights, cash management fees, and derivative mark-to-market adjustments.
Four main tools are used for managing interest rate risk:
the size, duration, and credit risk of the investment portfolio;
the size and duration of the wholesale funding portfolio;
interest rate contracts; and
the pricing and structure of loans and deposits.
ALCO meets at least monthly to make decisions on the investment and funding portfolios based on the economic outlook, the Committee's interest rate expectations, the risk position, and other factors. ALCO delegates pricing and product design responsibilities to individuals and sub-committees but monitors and influences their actions on a regular basis.
Various interest rate contracts, including futures and options, interest rate swaps, and interest rate caps and floors can be used to manage interest rate risk. These interest rate contracts involve, to varying degrees, credit risk and interest rate risk. Credit risk is the possibility that a loss may occur if a counterparty transaction fails to perform according to the terms of the contract. The notional amount of interest rate contracts is the amount upon which interest and other payments are based. The notional amount is not exchanged, and therefore, should not be taken as a measure of credit risk. Refer to Note 16: Derivative Financial Instruments in the Notes to Consolidated Financial Statements contained elsewhere in this report for additional information.
Certain derivative instruments, primarily forward sales of mortgage-backed securities, are utilized by Webster Bank in its efforts to manage risk of loss associated with its mortgage banking activities. Prior to closing and funds disbursement, an interest-rate lock commitment is generally extended to the borrower. During such time, Webster Bank is subject to risk that market rates of interest may change impacting pricing on loan sales. In an effort to mitigate this risk, forward delivery sales commitments are established, thereby setting the sales price.
46


The following table summarizes the estimated impact that gradual parallel changes in interest rates of 100 and 200 basis points, over a twelve month period starting December 31, 2019 and December 31, 2018, might have on Webster’s NII for the subsequent twelve month period compared to NII assuming no change in interest rates:
-200bp-100bp+100bp+200bp
December 31, 2019
n/a (1)
(4.7)% 2.7%  4.8%  
December 31, 2018(10.9)% (4.7)% 3.2%  5.9%  
(1)Impact not calculated for scenarios with negative interest rates. Impact from -175bp scenario was (8.1)%.
The following table summarizes the estimated impact that gradual parallel changes in interest rates of 100 and 200 basis points, over a twelve month period starting December 31, 2019 and December 31, 2018, might have on Webster’s pre-tax, pre-provision net revenue (PPNR) for the subsequent twelve month period, compared to PPNR assuming no change in interest rates:
-200bp-100bp+100bp+200bp
December 31, 2019
n/a (1)
(7.7)% 4.1%  7.1%  
December 31, 2018(18.3)% (7.9)% 5.0%  9.2%  
(1)Impact not calculated for scenarios with negative interest rates. Impact from -175bp scenario was (13.2)%.
Interest rates are assumed to change up or down in a parallel fashion, and NII and PPNR results in each scenario are compared to a flat rate scenario as a base. The flat rate scenario holds the end of period yield curve constant over a twelve month forecast horizon. The flat rate scenario as of December 31, 2019 and December 31, 2018 assumed a federal funds rate of 1.75% and 2.50%, respectively. Asset sensitivity for both NII and PPNR on December 31, 2019 was lower as compared to December 31, 2018, with the exception of the minus 100 basis points NII scenario. This lower asset sensitivity is primarily due to repositioning the balance sheet by adding fixed-rate securities, buying interest rate floors, fixed rate loan growth, and shortening the weighted average life of the time deposits portfolio to 8 months as of December 31, 2019 versus 14 months as of December 31, 2018.
Webster can also hold futures, options, and forward foreign currency contracts to minimize the price volatility of certain assets and liabilities. Changes in the market value of these positions are recognized in earnings.
The following table summarizes the estimated impact that immediate non-parallel changes in interest rates might have on Webster’s NII for the subsequent twelve month period starting December 31, 2019 and December 31, 2018:
Short End of the Yield CurveLong End of the Yield Curve
-100bp-50bp+50bp+100bp-100bp-50bp+50bp+100bp
December 31, 2019(5.1)% (2.5)% 1.0 %  2.1 %  (4.7)% (2.2)% 1.7 %  2.9 %  
December 31, 2018(7.1)% (3.3)% 1.7%  3.4%  (3.3)% (1.6)% 1.3%  2.3%  
The following table summarizes the estimated impact that immediate non-parallel changes in interest rates might have on Webster’s PPNR for the subsequent twelve month period starting December 31, 2019 and December 31, 2018:
Short End of the Yield CurveLong End of the Yield Curve
 -100bp-50bp+50bp+100bp-100bp-50bp+50bp+100bp
December 31, 2019(7.9)% (3.8)% 1.1%  2.4%  (8.1)% (3.9)% 3.0%  5.1%  
December 31, 2018(11.6)% (5.4)% 2.4%  4.8%  (5.6)% (2.9)% 2.4%  4.2%  
The non-parallel scenarios are modeled with the short end of the yield curve moving up or down 50 and 100 basis points while the long end of the yield curve remains unchanged, and vice versa. The short end of the yield curve is defined as terms of less than eighteen months, and the long end as terms of greater than eighteen months. These results above reflect the annualized impact of immediate rate changes.
Sensitivity to increases in the short end of the yield curve for NII and PPNR decreased from December 31, 2018 due primarily to balance sheet repositioning and an increase in balances of fixed-rate loans. NII and PPNR were more sensitive to changes in the long end of the yield curve as of December 31, 2019 when compared to December 31, 2018 due to increased forecast prepayment speeds resulting from decreases in the long end of the yield curve, which shortens asset duration by increasing prepayments for MBS and residential mortgages.
47


The following table summarizes the estimated economic value of assets, liabilities, and off-balance sheet contracts at December 31, 2019 and December 31, 2018 and the projected change to economic values if interest rates instantaneously increase or decrease by 100 basis points:
  
Book
Value
Estimated
Economic
Value
Estimated Economic Value Change
 
(Dollars in thousands)-100 bp+100 bp
At December 31, 2019
Assets$30,389,344  $29,984,052  $598,578  $(720,572) 
Liabilities27,181,574  26,226,758  839,154  (708,815) 
Net$3,207,770  $3,757,294  $(240,576) $(11,757) 
Net change as % base net economic value(6.4)%(0.3)%
At December 31, 2018
Assets$27,610,315  $26,972,752  $568,122  $(677,864) 
Liabilities24,723,800  23,119,466  719,658  (615,650) 
Net$2,886,515  $3,853,286  $(151,536) $(62,214) 
Net change as % base net economic value(3.9)%(1.6)%
Changes in economic value can be best described using duration. Duration is a measure of the price sensitivity of financial instruments for small changes in interest rates. For fixed-rate instruments, it can also be thought of as the weighted-average expected time to receive future cash flows. For floating-rate instruments, it can be thought of as the weighted-average expected time until the next rate reset. The longer the duration, the greater the price sensitivity for given changes in interest rates. Floating-rate instruments may have durations as short as one day and, therefore, have very little price sensitivity due to changes in interest rates. Increases in interest rates typically reduce the value of fixed-rate assets as future discounted cash flows are worth less at higher discount rates. A liability's value decreases for the same reason in a rising rate environment. A reduction in value of a liability is a benefit to Webster.
Duration gap is the difference between the duration of assets and the duration of liabilities. A duration gap near zero implies that the balance sheet is matched and would exhibit no change in estimated economic value for a small change in interest rates. Webster's duration gap was negative 0.8 years at December 31, 2019 and negative 0.7 years at December 31, 2018 when measured using 50 basis point changes in rates. A negative duration gap implies that liabilities are longer than assets and, therefore, they have more price sensitivity than assets and will reset their interest rates slower than assets. Consequently, Webster's net estimated economic value would generally be expected to increase when interest rates rise as the benefit of the decreased value of liabilities would more than offset the decreased value of assets. The opposite would generally be expected to occur when interest rates fall. Earnings would also generally be expected to increase when interest rates rise and decrease when interest rates fall over the longer term absent the effects of new business booked in the future. As of December 31, 2019, long-term rates have fallen by 77 basis points when compared to December 31, 2018. This lower starting point shortens asset duration by increasing residential loans and MBS prepayment speeds.
These estimates assume that management does not take any action to mitigate any positive or negative effects from changing interest rates. The earnings and economic values estimates are subject to factors that could cause actual results to differ. Management believes that Webster's interest rate risk position at December 31, 2019 represents a reasonable level of risk given the current interest rate outlook. Management, as always, is prepared to act in the event that interest rates do change rapidly.
Impact of Inflation and Changing Prices
The consolidated financial statements and related data presented herein have been prepared in accordance with GAAP, which generally requires the measurement of financial position and operating results in terms of historical dollars without considering changes in the relative purchasing power of money over time due to inflation.
Unlike most industrial companies, substantially all of the assets and liabilities of a banking institution are monetary in nature. As a result, interest rates have a more significant impact on Webster's performance than the effects of general levels of inflation. Interest rates do not necessarily move in the same direction or in the same magnitude as the price of goods and services.
48


Critical Accounting Policies and Accounting Estimates
The Company's significant accounting policies, as described in the Notes to Consolidated Financial Statements, are fundamental to understanding its results of operations and financial condition. As stated in Note 1 to the Consolidated Financial Statements contained in Item 8 of this report, the preparation of financial statements in accordance with GAAP requires management to make judgments and accounting estimates that affect the amounts reported in the Consolidated Financial Statements and the accompanying Notes. While the Company bases estimates on historical experience, current information and other factors deemed to be relevant, actual results could differ materially from those estimates.
Accounting estimates are necessary in the application of certain accounting policies and procedures and can be susceptible to significant change. Critical accounting policies are defined as those that are most important to the portrayal of the Company's financial condition and results of operation, and that require management to make the most difficult, subjective, and complex judgments about matters that are inherently uncertain and which could potentially result in materially different amounts using different assumptions or under different conditions. The two critical accounting policies identified by management, which are discussed with the appropriate committees of the Board of Directors, are summarized below.
Allowance for Loan and Lease Losses
The ALLL is a reserve established through a provision for loan and lease losses charged to expense, which represents management’s best estimate of probable losses that are inherent within the Company’s portfolio of loans and leases as of the balance sheet date. Changes in the ALLL and, therefore, in the related provision for loan and lease losses can materially affect net income. The level of the ALLL reflects management’s judgment based on continuing evaluation of specific credit risks, loss experience, current portfolio quality, present economic, political, adequacy of underlying collateral, present value of expected future cash flows and regulatory conditions and inherent risks not captured in quantitative modeling and methodologies, as well as trends therein. The allowance balance may be allocated for specific portfolio segments; however, the entire allowance balance is available to absorb credit losses inherent in the total loan and lease portfolio.
While management utilizes its best judgment and information available, the ultimate adequacy of the ALLL is dependent upon a variety of factors beyond the Company’s control, including performance of the Company’s loan portfolio, the economy, interest rate sensitivity, and other external factors. Management evaluates the composition of the ALLL on a quarterly basis. Composition of the ALLL, including valuation methodology, is more fully described in Note 4: Loans and Leases in the Notes to Consolidated Financial Statements contained elsewhere in this report and in Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations, section captioned "Allowance for Loan and Lease Losses Methodology."
Realizability of Deferred Tax Assets
In accordance with Accounting Standards Codification (ASC) Topic 740, "Income Taxes," certain aspects of accounting for income taxes require significant management judgment, including assessing the realizability of DTAs. A DTA represents an item for which a benefit may be recognized for financial accounting purposes if it has been determined to be more likely than not realizable for tax purposes in a future period. A DTA valuation allowance represents the portion of a DTA determined unlikely to be realized in the future based on management's judgment. Such judgment is often subjective and involves estimates and assumptions about matters that are inherently uncertain, including with respect to the existence, and amount, of taxable income necessary to realize a DTA in future periods.
While management believes it has utilized a reasonable method for its determination of DTAs and the related valuation allowance, should factors and conditions differ materially from those used by management, the actual realization of DTAs could differ materially from the reported amounts. Management evaluates the realizability and the sufficiency of the reported amounts on a quarterly basis. Income taxes are more fully described in Note 9: Income Taxes in the Notes to Consolidated Financial Statements contained elsewhere in this report and in Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations, section captioned "Income Taxes."
Recently Issued Accounting Standards Updates
Refer to Note 1 in the Notes to Consolidated Financial Statements contained in Item 8 of this report for a summary of recently issued Accounting Standards Updates (ASUs) and the expected impact on the Company's financial statements.
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
The required information is set forth above, in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, refer to the section captioned "Asset/Liability Management and Market Risk," which is incorporated herein by reference.
49


ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

Index to Consolidated Financial Statements
Page No.
Report of Independent Registered Public Accounting Firm
Consolidated Balance Sheets
Consolidated Statements of Income
Consolidated Statements of Comprehensive Income
Consolidated Statements of Shareholders' Equity
Consolidated Statements of Cash Flows
Notes to Consolidated Financial Statements

50


Report of Independent Registered Public Accounting Firm
To the Shareholders and Board of Directors
Webster Financial Corporation:
Opinion on the Consolidated Financial Statements
We have audited the accompanying consolidated balance sheets of Webster Financial Corporation and subsidiaries (the "Company") as of December 31, 2019 and 2018, the related consolidated statements of income, comprehensive income, shareholders’ equity, and cash flows for each of the years in the three-year period ended December 31, 2019, and the related notes (collectively, the consolidated financial statements). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2019 and 2018, and the results of its operations and its cash flows for each of the years in the three-year period ended December 31, 2019, in conformity with U.S. generally accepted accounting principles.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States)(PCAOB), the Company's internal control over financial reporting as of December 31, 2019, based on criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission, and our report dated February 28, 2020 expressed an unqualified opinion on the effectiveness of the Company’s internal control over financial reporting.
Basis for Opinion
These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matters
The critical audit matters communicated below are matters arising from the current period audit of the consolidated financial statements that were communicated or required to be communicated to the audit committee and that: (1) relate to accounts or disclosures that are material to the consolidated financial statements and (2) involve our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.
Assessment of the allowance for loan and lease losses related to loans and leases collectively evaluated for impairment
As discussed in Notes 1 and 4 to the consolidated financial statements, the Company’s allowance for loan and lease losses for loans and leases collectively evaluated for impairment (non-impaired ALLL) was $194.8 million of the total allowance for loan and lease losses of $209.1 million as of December 31, 2019. The Company estimated the quantitative valuation allowance for non-impaired commercial loans and leases using a historical loss methodology that estimates the probability of default (PD) and loss given default (LGD), which are based on credit risk ratings. The Company estimated the quantitative valuation allowance for non-impaired consumer loans using roll rate models which estimate probable inherent losses. The models calculate the roll rate at which loans migrate from one delinquency category to the next worse delinquency category and eventually to loss. In addition, the Company’s non-impaired ALLL includes a qualitative element consisting of qualitative factors determined based on general economic conditions and other factors that may be internal or external to the Company.
We identified the assessment of the non-impaired ALLL as a critical audit matter because it involves significant measurement uncertainty requiring complex auditor judgment, and knowledge and experience in the industry. This assessment encompassed the evaluation of the non-impaired ALLL methodology, inclusive of the methodologies used to estimate (1) the PD and LGD and their key factors and assumptions, including the look back periods, the loss emergence periods, and risk ratings for commercial loans and leases, (2) the roll rates and their key factors and assumptions, including the look back periods, the loss emergence periods, and the pay down factors by product type for consumer loans, and (3) the qualitative factors.
51


The primary procedures we performed to address the critical audit matter included the following. We tested certain internal controls over the (1) development and approval of the non-impaired ALLL methodology, (2) determination of the key factors and assumptions used to estimate the PD and LGD and the roll rates, (3) determination of the qualitative factors, and (4) analysis of the ALLL results. We tested management’s process to develop the non-impaired ALLL estimate by testing certain sources of data, factors, and assumptions that the Company used, and considered the relevance and reliability of such data, factors, and assumptions. We evaluated the qualitative factor framework and related adjustments by (1) evaluating the determination of each qualitative factor adjustment, and (2) evaluating trends in the non-impaired ALLL, inclusive of the qualitative factor adjustments, for consistency with changes in the loan portfolio and credit performance. In addition, we involved credit risk professionals with specialized industry knowledge and experience who assisted in evaluating:
the non-impaired ALLL methodology for compliance with U.S. generally accepted accounting principles,
the look back period assumptions by (1) evaluating that loss data in the look back period is representative of the credit characteristics of the current portfolio and (2) evaluating the sufficiency of loss data within the look back period,
the appropriateness of the methodology used to develop the loss emergence period assumption by considering the Company’s credit risk policies,
the appropriateness of the methodology used to develop the pay down factors by considering consumer loan balance changes over time by product type,
the framework used to develop the resulting qualitative factors and the effect of those factors on the non-impaired ALLL compared with relevant credit risk factors and consistency with credit trends, including the maximum qualitative factor adjustment and the metrics, and
the appropriateness of credit risk ratings for a selection of commercial loans and leases.
Assessment of the realizability of the deferred tax asset associated with the Company's state and local tax net operating loss carryforwards
As discussed in Note 9 to the consolidated financial statements, as of December 31, 2019, the Company had $69.8 million of net operating losses (NOLs) and credit carry forwards related to state and local taxes (SALT), which are recorded as a deferred tax asset (DTA). A valuation allowance of $38.2 million was recorded at December 31, 2019 related to SALT NOLs. The determination of the valuation allowance is subjective and involves estimates and assumptions about matters that are inherently uncertain, including the amount of taxable income necessary to realize a DTA in future periods.
We identified the assessment of the realizability of the DTAs associated with the Company’s SALT NOLs as a critical audit matter due to the complexity and related auditor judgment required to evaluate the future taxable income that would be necessary to realize the DTA. This assessment encompassed the evaluation of estimates and assumptions related to the projections of taxable income, allocation of income among its relevant legal entities, and estimates of SALT apportionment rates.
The primary procedures we performed to address this critical audit matter included the following. We tested certain internal controls over the Company’s SALT DTA valuation allowance assessment process, including controls over the determination of the estimates and assumptions. We evaluated the Company’s projections of taxable income by (1) comparing the historical taxable income projections to actual results to assess the Company’s ability to accurately forecast, (2) evaluating the forecasted growth rates for interest rate-sensitive assets and liabilities, by comparing the growth assumptions to historical experience, strategy, and industry outlooks, (3) testing projections of net interest income by comparing interest rates used to historical rates and third-party forecasted rates, and (4) comparing the long-term growth rate assumption to third-party forecasted rates and industry research. We evaluated the allocation of income among its relevant legal entities by comparing to historical allocations taking in to consideration forecasted growth. We evaluated the SALT apportionment rates by comparing to historical apportionment rates and by re-performing the calculation of the rates based on forecasted SALT taxable income. We involved federal and SALT professionals with specialized skills and knowledge, who assisted in assessing the Company’s application of the relevant tax laws and regulations and in evaluating the SALT apportionment rates.

/s/ KPMG LLP
We have served as the Company's auditor since 2013.
Hartford, Connecticut
February 28, 2020
52


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
December 31,
(In thousands, except share data)20192018
Assets:
Cash and due from banks$185,341  $260,422  
Interest-bearing deposits72,554  69,077  
Investment securities available-for-sale, at fair value2,925,833  2,898,730  
Investment securities held-to-maturity (fair value of 5,380,653 and 4,209,121)
5,293,918  4,325,420  
Federal Home Loan Bank and Federal Reserve Bank stock149,046  149,286  
Loans held for sale (valued under fair value option 35,750 and 7,908)
36,053  11,869  
Loans and leases20,036,986  18,465,489  
Allowance for loan and lease losses(209,096) (212,353) 
Loans and leases, net19,827,890  18,253,136  
Deferred tax assets, net61,975  96,516  
Premises and equipment, net270,413  124,850  
Goodwill538,373  538,373  
Other intangible assets, net21,917  25,764  
Cash surrender value of life insurance policies550,651  543,616  
Accrued interest receivable and other assets455,380  313,256  
Total assets$30,389,344  $27,610,315  
Liabilities and shareholders' equity:
Deposits:
Non-interest-bearing$4,446,463  $4,162,446  
Interest-bearing18,878,283  17,696,399  
Total deposits23,324,746  21,858,845  
Securities sold under agreements to repurchase and other borrowings1,040,431  581,874  
Federal Home Loan Bank advances1,948,476  1,826,808  
Long-term debt540,364  226,021  
Operating lease liabilities174,396    
Accrued expenses and other liabilities153,161  230,252  
Total liabilities27,181,574  24,723,800  
Shareholders’ equity:
Preferred stock, 0.01 par value: Authorized - 3,000,000 shares;
Series F issued and outstanding (6,000 shares)
145,037  145,037  
Common stock, $0.01 par value: Authorized - 200,000,000 shares;
Issued (93,686,311 shares)
937  937  
Paid-in capital1,113,250  1,114,394  
Retained earnings2,061,352  1,828,303  
Treasury stock, at cost (1,659,749 and 1,508,456 shares)
(76,734) (71,504) 
Accumulated other comprehensive loss, net of tax(36,072) (130,652) 
Total shareholders' equity3,207,770  2,886,515  
Total liabilities and shareholders' equity$30,389,344  $27,610,315  
See accompanying Notes to Consolidated Financial Statements.
53


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF INCOME
Years ended December 31,
(In thousands, except per share data)201920182017
Interest Income:
Interest and fees on loans and leases$924,693  $842,449  $708,566  
Taxable interest and dividends on securities207,294  191,493  181,131  
Non-taxable interest on securities21,869  20,597  22,874  
Loans held for sale727  628  1,034  
Total interest income1,154,583  1,055,167  913,605  
Interest Expense:
Deposits129,577  90,407  62,253  
Securities sold under agreements to repurchase and other borrowings17,953  13,491  14,365  
Federal Home Loan Bank advances31,399  33,461  30,320  
Long-term debt20,527  11,127  10,380  
Total interest expense199,456  148,486  117,318  
Net interest income955,127  906,681  796,287  
Provision for loan and lease losses37,800  42,000  40,900  
Net interest income after provision for loan and lease losses917,327  864,681  755,387  
Non-interest Income:
Deposit service fees168,022  162,183  151,137  
Loan and lease related fees31,327  32,025  26,448  
Wealth and investment services32,932  32,843  31,055  
Mortgage banking activities6,115  4,424  9,937  
Increase in cash surrender value of life insurance policies14,612  14,614  14,627  
Gain on sale of investment securities, net29      
Impairment loss on securities recognized in earnings    (126) 
Other income32,278  36,479  26,400  
Total non-interest income285,315  282,568  259,478  
Non-interest Expense:
Compensation and benefits395,402  381,496  356,505  
Occupancy57,181  59,463  60,490  
Technology and equipment105,283  97,877  89,464  
Intangible assets amortization3,847  3,847  4,062  
Marketing16,286  16,838  17,421  
Professional and outside services21,380  20,300  16,858  
Deposit insurance17,954  34,749  25,649  
Other expense98,617  91,046  90,626  
Total non-interest expense715,950  705,616  661,075  
Income before income tax expense486,692  441,633  353,790  
Income tax expense103,969  81,215  98,351  
Net income382,723  360,418  255,439  
Preferred stock dividends and other(9,738) (8,715) (8,608) 
Earnings applicable to common shareholders$372,985  $351,703  $246,831  
Earnings per common share:
Basic$4.07  $3.83  $2.68  
Diluted4.06  3.81  2.67  
See accompanying Notes to Consolidated Financial Statements.
54


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
 Years ended December 31,
(In thousands)201920182017
Net income$382,723  $360,418  $255,439  
Other comprehensive income (loss), net of tax:
Investment securities available-for-sale88,625  (43,427) (7,590) 
Derivative instruments129  5,703  4,565  
Defined benefit pension and postretirement benefit plans5,826  (1,397) 4,135  
Other comprehensive income (loss), net of tax94,580  (39,121) 1,110  
Comprehensive income$477,303  $321,297  $256,549  
See accompanying Notes to Consolidated Financial Statements.

55


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF SHAREHOLDERS’ EQUITY
(In thousands, except per share data)Preferred
Stock
Common
Stock
Paid-In
Capital
Retained
Earnings
Treasury
Stock, at cost
Accumulated
Other
Comprehensive
Loss, Net of Tax
Total Shareholders'
Equity
Balance at December 31, 2016$122,710  $937  $1,125,937  $1,425,320  $(70,899) $(76,993) $2,527,012  
Adoption of ASU No. 2018-02, Income Statement-Reporting Comprehensive Income (Topic 220)-Reclassification of Certain Tax Effects from AOCI—  —  —  15,648  —  (15,648)   
Net income—  —  —  255,439  —  —  255,439  
Other comprehensive income, net of tax—  —  —  —  —  1,110  1,110  
Common stock dividends/equivalents $1.03 per share
—  —  168  (95,097) —  —  (94,929) 
Series E preferred stock dividends $1,600.00 per share
—  —  —  (8,096) —  —  (8,096) 
Dividends accrued on Series F preferred stock—  —  —  (88) —  —  (88) 
Stock-based compensation—  —  —  2,636  11,548  —  14,184  
Exercise of stock options—  —  (3,941) —  12,200  —  8,259  
Common shares acquired from stock compensation plan activity—  —  —  —  (11,694) —  (11,694) 
Common stock repurchase program—  —  —  —  (11,585) —  (11,585) 
Redemption of Series E preferred stock(122,710) —  —  —  —  —  (122,710) 
Issuance of Series F preferred stock145,056  —  —  —  —  —  145,056  
Balance at December 31, 2017145,056  937  1,122,164  1,595,762  (70,430) (91,531) 2,701,958  
Adoption of ASU No. 2017-08, Receivables-Nonrefundable Fees and Other Costs (Subtopic 310-20)-Premium Amortization on Purchased Callable Debt Securities and ASU No. 2016-01, Financial Instruments-Overall (Subtopic 825-10)-Recognition and Measurement of Financial Assets and Financial Liabilities—  —  —  (1,373) —  —  (1,373) 
Net income—  —  —  360,418  —  —  360,418  
Other comprehensive loss, net of tax—  —  —  —  —  (39,121) (39,121) 
Common stock dividends/equivalents $1.25 per share
—  —  99  (115,442) —  —  (115,343) 
Series F preferred stock dividends $1,323.4375 per share
—  —  —  (7,875) —  —  (7,875) 
Dividends accrued on Series F preferred stock—  —  —  22  —  —  22  
Stock-based compensation—  —  (1,541) 3,275  9,878  —  11,612  
Exercise of stock options—  —  (5,762) —  7,935  —  2,173  
Stock units conversion to shares—  —  (566) (6,484) 7,050  —    
Common shares acquired from stock compensation plan activity—  —  —  —  (13,779) —  (13,779) 
Common stock repurchase program—  —  —  —  (12,158) —  (12,158) 
Series F preferred stock issuance adjustment(19) —  —  —  —  —  (19) 
Balance at December 31, 2018145,037  937  1,114,394  1,828,303  (71,504) (130,652) 2,886,515  
Adoption of ASU No. 2016-02, Leases (Topic 842) and subsequent ASUs issued to amend this topic—  —  —  (513) —  —  (513) 
Net income—  —  —  382,723  —  —  382,723  
Other comprehensive income, net of tax—  —  —  —  —  94,580  94,580  
Common stock dividends/equivalents $1.53 per share
—  —  —  (141,286) —  —  (141,286) 
Series F preferred stock dividends $1,312.50 per share
—  —  —  (7,875) —  —  (7,875) 
Stock-based compensation—  —  885    11,741  —  12,626  
Exercise of stock options—  —  (2,029) —  2,648  —  619  
Common shares acquired from stock compensation plan activity—  —  —  —  (6,616) —  (6,616) 
Common stock repurchase program—  —  —  —  (13,003) —  (13,003) 
Balance at December 31, 2019$145,037  $937  $1,113,250  $2,061,352  $(76,734) $(36,072) $3,207,770  
See accompanying Notes to Consolidated Financial Statements.
56


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
 Years ended December 31,
(In thousands)201920182017
Operating Activities:
Net income$382,723  $360,418  $255,439  
Adjustments to reconcile net income to net cash provided by operating activities:
Provision for loan and lease losses37,800  42,000  40,900  
Deferred tax expense (benefit)927  9,472  (9,074) 
Depreciation and amortization37,507  38,750  37,172  
Amortization of premiums/discounts, net49,731  50,984  45,444  
Stock-based compensation12,626  11,612  12,276  
Gain on sale, net of write-down, on foreclosed and repossessed assets(729) (709) (784) 
Loss (gain) on sale, net of write-down, on premises and equipment1,340  346  (15) 
Impairment loss on securities recognized in earnings    126  
Gain on the sale of investment securities, net(29)     
Increase in cash surrender value of life insurance policies(14,612) (14,614) (14,627) 
Gain from life insurance policies(4,933) (2,553)   
Mortgage banking activities(6,115) (4,424) (9,937) 
Proceeds from sale of loans held for sale216,239  188,025  333,027  
Originations of loans held for sale(240,305) (171,883) (287,634) 
Net change in right-of-use lease assets2,479      
Net (increase) decrease in derivative contract assets net of liabilities(123,752) (4,615) 32,763  
Gain on sale of banking center deposits  (4,596)   
Net increase in accrued interest receivable and other assets(23,790) (739) (19,790) 
Net (decrease) increase in accrued expenses and other liabilities(23,257) (28,066) 29,680  
Net cash provided by operating activities303,850  469,408  444,966  
Investing Activities:
Purchases of available-for-sale investment securities(549,541) (873,108) (660,106) 
Proceeds from available-for-sale investment securities maturities/principle payments556,283  538,747  984,732  
Proceeds from sales of available-for-sale investment securities70,087      
Purchases of held-to-maturity investment securities(1,571,604) (393,693) (1,043,278) 
Proceeds from held-to-maturity investment securities maturities/principle payments573,703  524,862  687,439  
Net proceeds from Federal Home Loan Bank stock240  2,280  43,080  
Alternative investments (capital call) return of capital, net(6,065) (1,215) 873  
Net increase in loans(1,642,501) (990,014) (549,213) 
Proceeds from loans not originated for sale20,931  1,687  14,679  
Proceeds from life insurance policies12,866  4,271  746  
Proceeds from the sale of foreclosed properties and repossessed assets11,562  8,011  7,603  
Proceeds from the sale of premises and equipment  567  3,357  
Additions to premises and equipment(25,717) (32,958) (28,546) 
Divestiture of banking center deposits, net cash paid  (107,361)   
Proceeds from redemption of other assets
    7,581  
Net cash used for investing activities (1)
(2,549,756) (1,317,924) (531,053) 
See accompanying Notes to Consolidated Financial Statements.

57


WEBSTER FINANCIAL CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS, continued
 Years ended December 31,
(In thousands)201920182017
Financing Activities:
Net increase in deposits1,465,377  979,519  1,690,197  
Proceeds from Federal Home Loan Bank advances9,200,000  8,960,000  12,255,000  
Repayments of Federal Home Loan Bank advances(9,078,332) (8,810,297) (13,420,791) 
Net increase (decrease) in securities sold under agreements to repurchase and other borrowings458,557  (61,395) (306,257) 
Issuance of long-term debt300,000      
Debt issuance costs(3,642)     
Redemption of Series E preferred stock    (122,710) 
Issuance of Series F preferred stock    145,056  
Dividends paid to common shareholders(140,783) (114,959) (94,630) 
Dividends paid to preferred shareholders(7,875) (7,875) (8,096) 
Exercise of stock options619  2,173  8,259  
Common stock repurchase program(13,003) (12,158) (11,585) 
Common shares acquired related to stock compensation plan activity(6,616) (13,779) (11,694) 
Net cash provided by financing activities2,174,302  921,229  122,749  
Net (decrease) increase in cash and cash equivalents (1)
(71,604) 72,713  36,662  
Cash and cash equivalents at beginning of period (1)
329,499  256,786  220,124  
Cash and cash equivalents at end of period (1)
$257,895  $329,499  $256,786  
Supplemental disclosure of cash flow information:
Interest paid$197,200  $144,726  $114,046  
Income taxes paid110,057  60,925  109,059  
Noncash investing and financing activities:
Transfer of loans and leases to foreclosed properties and repossessed assets$10,440  $8,105  $8,972  
Transfer of loans from portfolio to loans held for sale16,609  5,443  7,234  
Right-of-use lease assets recorded157,234      
Lessee operating lease liabilities recorded178,802      
(1)The Consolidated Statements of Cash Flows for the years ended December 31, 2018 and 2017 have been revised to present an aggregated total change in cash and due from banks and interest-bearing deposits. Previously, cash flows from interest-bearing deposits was presented as a component of Net cash used for investing activities.
See accompanying Notes to Consolidated Financial Statements.

58


Note 1: Summary of Significant Accounting Policies
Nature of Operations
Webster Financial Corporation is a bank holding company and financial holding company under the BHC Act, incorporated under the laws of Delaware in 1986 and headquartered in Waterbury, Connecticut. Webster Bank is the principal consolidated subsidiary of Webster Financial Corporation. Webster Bank and its HSA Bank division deliver a wide range of banking, investment, and financial services to individuals, families, and businesses.
Webster Bank serves consumer and business customers with mortgage lending, financial planning, trust, and investment services through a distribution network consisting of banking centers, ATMs, a customer care center, and a full range of web and mobile-based banking services throughout southern New England and Westchester County, New York. It also offers equipment financing, commercial real estate lending, asset-based lending, and treasury and payment solutions primarily in the eastern U.S. HSA Bank is a leading provider of health savings accounts, while also delivering health reimbursement arrangements, and flexible spending and commuter benefit account administration services to employers and individuals in all 50 states.
Basis of Presentation
The accounting and reporting policies of the Company that materially affect its financial statements conform with GAAP, and align with general practices within the financial services industry. The Consolidated Financial Statements and the accompanying Notes thereto include the accounts of Webster Financial Corporation and all other entities in which it has a controlling financial interest. Intercompany accounts and transactions have been eliminated in consolidation.
Assets that the Company holds or manages in a fiduciary or agency capacity for customers, typically referred to as assets under administration or assets under management, are not included in the consolidated balance sheets as those assets are not Webster's, and the Company is not the primary beneficiary.
Certain prior period amounts have been reclassified to conform to the current year's presentation. These reclassifications had an immaterial effect on the Company's consolidated financial statements.
Principles of Consolidation
The purpose of consolidated financial statements is to present the results of operations and the financial position of the Company and its subsidiaries as if the consolidated group were a single economic entity. In accordance with the applicable accounting guidance for consolidations, the consolidated financial statements include any voting interest entity (VOE) in which the Company has a controlling financial interest and any variable interest entity (VIE) for which the Company is deemed to be the primary beneficiary. The Company generally consolidates its VOEs if the Company, directly or indirectly, owns more than 50% of the outstanding voting shares of the entity and the non-controlling shareholders do not hold any substantive participating or controlling rights.
The Company evaluates VIEs to understand the purpose and design of the entity, and its involvement in the ongoing activities of the VIE and will consolidate the VIE if it has (i) the power to direct the activities of the VIE that most significantly affect the VIE's economic performance and (ii) an obligation to absorb losses of the VIE, or the right to receive benefits from the VIE, that could potentially be significant to the VIE.
The Company accounts for unconsolidated partnerships and certain other investments using the equity method of accounting if it has the ability to significantly influence the operating and financial policies of the investee. This is generally presumed to exist when the Company owns between 20% and 50% of a corporation, or when it has greater than 3%-5% interest in a limited partnership or similarly structured entity. Refer to Note 2: Variable Interest Entities for further information.
Use of Estimates
The preparation of financial statements in accordance with GAAP requires management to make estimates and assumptions that affect the amounts of assets and liabilities as of the date of the financial statements as well as income and expense during the period. Actual results could differ from those estimates.
59


Cash and Cash Equivalents
Cash and cash equivalents, as referenced in the consolidated statement of cash flows, is comprised of cash and due from banks and interest-bearing deposits. Cash equivalents have a maturity of three months or less.
Cash and due from banks, as referenced in the consolidated balance sheets, includes cash on hand, certain deposits at the FRB of Boston, and cash due from banks. Restricted cash related to Federal Reserve System requirements and cash collateral received on derivative positions are included in cash and due from banks.
Interest-bearing deposits, as referenced in the consolidated balance sheets, includes deposits at the FRB of Boston in excess of reserve requirements and federal funds sold to other financial institutions. Federal funds sold essentially represents an uncollateralized loan and therefore the Company regularly evaluates the credit risk associated with the other financial institutions to assure that Webster does not become exposed to any significant credit risk on those cash equivalents.
Investment in Debt Securities
Investment securities are classified as available-for-sale or held-to-maturity at the time of purchase. Any classification change subsequent to trade date is reviewed for compliance with corporate objectives and accounting policies. Debt securities classified as held-to-maturity are those which Webster has the ability and intent to hold to maturity. Securities classified as held-to-maturity are recorded at amortized cost net of unamortized premiums and discounts. Discount accretion income and premium amortization expense are recognized as interest income using the effective interest method, with consideration given to prepayment assumptions on mortgage backed securities. Premiums are amortized to the earliest call date for debt securities purchased at a premium, with explicit, non-contingent call features and are callable at a fixed price and preset date. Securities classified as available-for-sale are recorded at fair value with unrealized gains and losses recorded as a component of other comprehensive income (OCI) or other comprehensive loss (OCL). If securities are transferred from available-for-sale to held-to-maturity they are recorded at fair value at the time of transfer and the respective gain or loss would be recorded as a separate component of OCI or OCL and amortized as an adjustment to interest income over the remaining life of such security.
Securities classified as available-for-sale or held-to-maturity and in an unrealized loss position are evaluated for other-than-temporary impairment (OTTI) on a quarterly basis. The evaluation considers several qualitative factors, including the period of time the security has been in a loss position, and the amount of the unrealized loss. If the Company intends to sell a debt security or it is more likely than not the Company will be required to sell the debt security prior to recovery of its amortized cost basis, it is written down to fair value, and the loss is recognized in non-interest income. If the Company does not intend to sell the debt security and it is more likely than not that the Company will not be required to sell the debt security prior to recovery of its amortized cost basis, only the credit component of the unrealized loss is recorded as an impairment charge in non-interest income. The remaining loss component would be recorded to accumulated other comprehensive loss, net of tax (AOCL).
Debt security transactions are recognized on the trade date, which is the date the order to buy or sell the security is executed. The carrying value plus any related accumulated OCI or OCL balance of sold securities is used to calculate the realized gain or loss on sale. The specific identification method is used to determine realized gains and losses on sales of securities. Refer to Note 3: Investment Securities for further information.
Investment in Equity Securities
The Company’s accounting treatment for equity investments differs for those with and without readily determinable fair values. Equity investments with readily determinable fair values are recorded at fair value with changes in fair value recorded in non-interest income. For equity investments without readily determinable fair values, the Company elected the measurement alternative, and therefore carry these investments at cost, less impairment, if any, plus or minus changes in observable prices. Certain equity investments that do not have a readily available fair value may qualify for net asset value (NAV) measurement based on specific requirements. The Company's alternative investments accounted for at NAV consist of investments in non-public entities that generally cannot be redeemed since the Company’s investments are distributed as the underlying equity is liquidated. On a quarterly basis, the Company reviews its equity investments without readily determinable fair values for impairment. If the equity investment is considered impaired, an impairment loss equal to the amount by which the carrying value exceeds its fair value is recorded through a charge to earnings. The impairment loss may be reversed in a subsequent period if there are observable transactions for the identical or similar investment of the same issuer at a higher amount than the carrying amount that was established when the impairment was recognized. Impairment as well as upward or downward adjustments resulting from observable price changes in orderly transactions for identical or similar investments are included in non-interest income.
Equity investments in entities that finance affordable housing and other community development projects provide a return primarily through the realization of tax benefits. The Company applies the proportional amortization method to account for its investments in qualified affordable housing projects.
60


Investment in Federal Home Loan Bank and Federal Reserve Bank Stock
Webster Bank is a member of the FHLB and the Federal Reserve System, and is required to maintain an investment in capital stock of the FHLB of Boston and FRB of Boston. Based on redemption provisions, the stock of both the FHLB and the FRB has no quoted market value and is carried at cost. Membership stock is reviewed for impairment as economic circumstances warrant special review.
Loans Held for Sale
Loans that are classified as held for sale at the time of origination are accounted for under the fair value option. Loans not originated for sale but subsequently transferred to held for sale are valued at the lower of cost or fair value and are valued on an individual asset basis. Any cost amount in excess of fair value is recorded as a valuation allowance and recognized as a reduction of other non-interest income.
Gains or losses on the sale of loans held for sale are recorded as part of mortgage banking activities. Cash flows from the sale of loans that were originated specifically for resale are presented as operating cash flows. Cash flows from the sale of loans originated for investment then subsequently transferred to held for sale are presented as investing cash flows. Refer to Note 5: Transfers of Financial Assets for further information.
Transfers and Servicing of Financial Assets
Transfers of financial assets are accounted for as sales when control over the assets has been surrendered. Control over transferred assets is generally considered to have been surrendered when: (i) the transferred assets are legally isolated from the Company or its consolidated affiliates, even in bankruptcy or other receivership; (ii) the transferee has the right to pledge or exchange the assets with no conditions that constrain the transferee and provide more than a trivial benefit to the Company; and (iii) the Company does not maintain the obligation or unilateral ability to reclaim or repurchase the assets.
The Company sells financial assets in the normal course of business, the majority of which are residential mortgage loan sales, primarily to government-sponsored enterprises through established programs, commercial loan sales through participation agreements, and other individual or portfolio loan and securities sales. In accordance with accounting guidance for asset transfers, the Company considers any ongoing involvement with transferred assets in determining whether the assets can be derecognized from the balance sheet. With the exception of servicing and certain performance-based guarantees, the Company’s continuing involvement with financial assets sold is minimal and generally limited to market customary representation and warranty clauses covering certain characteristics of the mortgage loans sold and the Company's origination process. The gain or loss on sale depends on the previous carrying amount of the transferred financial assets, the consideration received, and any other assets obtained or liabilities incurred in exchange for the transferred assets.
When the Company sells financial assets, it may retain servicing rights and/or other interests in the financial assets. Servicing assets and any other interests held by the Company are recorded at fair value upon transfer, and thereafter are carried at the lower of cost or fair value. Refer to Note 5: Transfers of Financial Assets for further information.
Loans and Leases
Loans and leases are stated at the principal amount outstanding, net of amounts charged off, unearned income, unamortized premiums and discounts, and deferred loan and lease fees or costs which are recognized as yield adjustments using the effective interest method. These yield adjustments are amortized over the contractual life of the related loans and leases adjusted for prepayments when applicable. Interest on loans and leases is credited to interest income as earned based on the interest rate applied to principal amounts outstanding. Prepayment fees are recognized in non-interest income. Cash flows from loans and leases are presented as investing cash flows.
Non-accrual Loans
Loans and leases are placed on non-accrual status when collection of principal and interest in accordance with contractual terms is doubtful, generally when principal or interest payments become 90 days delinquent, unless the loan or lease is well secured and in process of collection, or sooner if management concludes circumstances indicate that the borrower may be unable to meet contractual principal or interest payments. Residential real estate loans, excluding loans fully insured against loss and in the process of collection, and consumer loans are placed on non-accrual status at 90 days past due, or at the date when the Company is notified that the borrower is discharged in bankruptcy. Residential loans that are more than 90 days past due, fully insured against loss, and in the process of collection, remain accruing and are reported as 90 days or more past due and accruing. Commercial, commercial real estate loans, and equipment finance loans or leases are subject to a detailed review when 90 days past due to determine accrual status, or when payment is uncertain and a specific consideration is made to put a loan or lease on non-accrual status.
61


When loans and leases are placed on non-accrual status, the accrual of interest is discontinued, and any unpaid accrued interest is reversed and charged against interest income. If ultimate repayment of a non-accrual loan or lease is expected, any payments received are applied in accordance with contractual terms. If ultimate repayment is not expected on commercial, commercial real estate, and equipment finance loans and leases, any payment received on a non-accrual loan or lease is applied to principal until the unpaid balance has been fully recovered. Any excess is then credited to interest income when received. If the Company determines, through a current valuation analysis, that principal can be repaid on residential real estate and consumer loans, interest payments may be taken into income as received on a cash basis.
Loans are generally removed from non-accrual status when they become current as to principal and interest or demonstrate a period of performance under contractual terms and, in the opinion of management, are fully collectible as to principal and interest. Pursuant to regulatory guidance, a loan discharged under Chapter 7 of the U.S. bankruptcy code is removed from non-accrual status when the bank expects full repayment of the remaining pre-discharged contractual principal and interest, and had at least six consecutive months of current payments. Refer to Note 4: Loans and Leases for further information.
Allowance for Loan and Lease Losses
ALLL is a reserve established through a provision for loan and lease losses charged to expense and represents management’s best estimate of probable losses that may be incurred within the existing loan and lease portfolio as of the balance sheet date. The ALLL consists of three elements: (i) specific valuation allowances established for probable losses on impaired loans and leases; (ii) quantitative valuation allowances calculated using loss experience for like loans and leases with similar characteristics and trends, adjusted, as necessary, to reflect the impact of current conditions; and (iii) qualitative factors determined based on general economic conditions and other factors that may be internal or external to the Company. The reserve level reflects management’s view of trends in losses, current portfolio quality, and present economic, political, and regulatory conditions. The ALLL may be allocated for specific portfolio segments; however, the entire balance is available to absorb credit losses inherent in the total loan and lease portfolio. A charge-off is recorded when all or a portion of the loan or lease is deemed to be uncollectible. While management utilizes its best judgment based on the information available at the time, the ultimate adequacy of the allowance is dependent upon a variety of factors that are beyond the Company’s control, which include the performance of the Company’s portfolio, economic conditions, interest rate sensitivity, and other external factors.
The process for estimating probable losses is based on predictive models that measure the current risk profile of the loan and lease portfolio and combines the measurement with other quantitative and qualitative factors. To measure credit risk for the commercial, commercial real estate, and equipment financing portfolios, the Company employs a dual grade credit risk grading system for estimating the PD and the LGD. The credit risk grade system assigns a rating to each borrower and to the facility, which together form a Composite Credit Risk Profile. The credit risk grade system categorizes borrowers by common financial characteristics that measure the credit strength of borrowers and facilities by common structural characteristics. The Composite Credit Risk Profile has ten grades, with each grade corresponding to a progressively greater risk of loss. Grades (1) - (6) are considered pass ratings, and (7) - (10) are considered criticized as defined by the regulatory agencies. Risk ratings, assigned to differentiate risk within the portfolio, are reviewed on an ongoing basis and revised to reflect changes in a borrowers’ current financial position and outlook, risk profile, and the related collateral and structural position. Loan officers review updated financial information or other loan factors on at least an annual basis for all pass rated loans to assess the accuracy of the risk grade. Criticized loans undergo more frequent reviews and enhanced monitoring. A (7) "Special Mention" asset has the potential weakness that, if left uncorrected, may result in deterioration of the repayment prospects for the asset. An (8) "Substandard" asset has a well defined weakness that jeopardizes the full repayment of the debt. An asset rated (9) "Doubtful" has all of the same weaknesses as a substandard credit with the added characteristic that the weakness makes collection or liquidation in full, given current facts, conditions, and values, improbable. Assets classified as (10) "Loss" in accordance with regulatory guidelines are considered uncollectible and charged off.
For residential and consumer loans, the Company considers factors such as past due status, updated FICO scores, employment status, collateral, geography, loans discharged in bankruptcy, and the status of first lien position loans on second lien position loans as credit quality indicators. On an ongoing basis for portfolio monitoring purposes, the Company estimates the current value of property secured as collateral for home equity and residential first mortgage lending products. The estimate is based on home price indices compiled by the S&P/Case-Shiller Home Price Indices. The real estate price data is applied to the loan portfolios taking into account the age of the most recent valuation and geographic area. Back-testing is performed to compare original estimated losses and actual observed losses, resulting in ongoing refinements. The balance resulting from this process together with specific valuation allowances determines the overall reserve level.
62


Charge-offs of Uncollectible Loans
Any loan may be charged-off if a loss confirming event has occurred. Loss confirming events usually involve the receipt of specific adverse information about the borrower and may include bankruptcy (unsecured), foreclosure, or receipt of an asset valuation indicating a shortfall between the value of the collateral and the book value of the loan when that collateral asset is the sole source of repayment. The Company generally charges-off commercial loans when it is determined that the specific loan or a portion thereof is uncollectible. This determination is based on facts and circumstances of the individual loans and normally includes considering the viability of the related business, the value of any collateral, the ability and willingness of any guarantors to perform and the overall financial condition of the borrower. The Company generally charges-off residential real estate loans to the estimated fair value of their collateral, net of selling costs, when they become 180 days past due.
Impaired Loans
Loans and leases are considered impaired when, based on current information and events, it is probable the Company will be unable to collect all amounts due in accordance with the original contractual terms of the loan agreement, including scheduled principal and interest payments. Impairment is evaluated on a pooled basis for smaller-balance homogeneous residential, consumer loans and small business loans. Commercial, commercial real estate, and equipment financing loans and leases over a specific dollar amount and all TDRs are evaluated individually for impairment. A loan identified as a TDR is considered an impaired loan for its entire term, with few exceptions. If a loan is impaired, a specific valuation allowance may be established, and the loan is reported net, at the present value of estimated future cash flows using the loan’s original interest rate or at the fair value of collateral less cost to sell if repayment is expected from collateral liquidation. Interest payments on non-accruing impaired loans are typically applied to principal unless collectability of the principal amount is reasonably assured, in which case interest is recognized on a cash basis. Factors considered by management in determining impairment include payment status, collateral value, discharged bankruptcy, and the likelihood of collecting scheduled principal and interest payments. Refer to Note 4: Loans and Leases for further information.
Reserve for Unfunded Commitments
The reserve for unfunded commitments provides for probable losses inherent with funding the unused portion of legal commitments to lend. The unfunded reserve calculation includes factors that are consistent with the ALLL methodology for funded loans using the PD, LGD, and a draw down factor applied to the underlying borrower risk and facility grades. The reserve for unfunded credit commitments is included within other liabilities in the consolidated balance sheets, and changes in the reserve are reported as a component of other non-interest expense in the consolidated statements of income. Refer to Note 22: Commitments and Contingencies for further information.
Troubled Debt Restructurings
A modified loan is considered a TDR when the following two conditions are met: (i) the borrower is experiencing financial difficulty; and (ii) the modification constitutes a concession. The Company considers all aspects of the restructuring in determining whether a concession has been granted, including the borrower's ability to access funds at a market rate. In general, a concession exists when the modified terms of the loan are more attractive to the borrower than standard market terms. Modified terms are dependent upon the financial position and needs of the individual borrower. The most common types of modifications include covenant modifications and forbearance. Loans for which the borrower has been discharged under Chapter 7 bankruptcy are considered collateral dependent TDR, impaired at the date of discharge, and charged down to the fair value of collateral less cost to sell, if management considers that loss potential likely exists.
The Company’s policy is to place consumer loan TDRs, except those that were performing prior to TDR status, on non-accrual status for a minimum period of six months. Commercial TDR are evaluated on a case-by-case basis for determination of whether or not to place them on non-accrual status. Loans qualify for return to accrual status once they have demonstrated performance with the restructured terms of the loan agreement for a minimum of six months. Initially, all TDRs are reported as impaired. Generally, TDRs are classified as impaired loans and reported as TDR for the remaining life of the loan. Impaired and TDR classification may be removed if the borrower demonstrates compliance with the modified terms for a minimum of six months and through a fiscal year-end and the restructuring agreement specifies a market rate of interest equal to that which would be provided to a borrower with similar credit at the time of restructuring. In the limited circumstance that a loan is removed from TDR classification, it is the Company’s policy to continue to base its measure of loan impairment on the contractual terms specified by the loan agreement. Refer to Note 4: Loans and Leases for further information.
63


Foreclosed and Repossessed Assets
Real estate acquired through foreclosure or completion of a deed in lieu of foreclosure and other assets acquired through repossession are recorded at fair value less estimated cost to sell at the date of transfer. Subsequent to the acquisition date, the foreclosed and repossessed assets are carried at the lower of cost or fair value less estimated selling costs and are included within other assets in the consolidated balance sheet. Independent appraisals generally are obtained to substantiate fair value and may be subject to adjustment based upon historical experience or specific geographic trends impacting the property. Upon transfer to OREO the excess of loan balance over fair value less cost to sell is charged off against the ALLL. Subsequent write-downs in value, maintenance costs as incurred, and gains or losses upon sale are charged to non-interest expense in the consolidated statement of income.
Property and Equipment
Property and equipment is carried at cost, less accumulated depreciation and amortization, which is computed on a straight-line basis over the estimated useful lives of the assets, as follows:

MinimumMaximum
Building and Improvements5 40years
Leasehold improvements5 20years (or lease term, if shorter)
Fixtures and equipment5 10years
Data processing and software3 7years
Repairs and maintenance costs are charged to non-interest expense as incurred. Property and equipment that is actively marketed for sale is reclassified to assets held for disposition. The cost and accumulated depreciation and amortization relating to property and equipment retired or otherwise disposed of are eliminated, and any resulting losses are charged to non-interest expense. Refer to Note 6: Premises and Equipment for further information.
Leasing
A right-of-use (ROU) asset and corresponding lease liability is recognized at the lease commencement date when the Company is a lessee. ROU lease assets are included in premises and equipment on the consolidated balance sheet. A ROU asset reflects the present value of the future minimum lease payments adjusted for any initial direct costs, incentives, or other payments prior to the lease commencement date. A lease liability represents a legal obligation to make lease payments and is determined by the present value of the future minimum lease payments discounted using the rate implicit in the lease, or the Company’s incremental borrowing rate. Variable lease payments that are dependent on an index, or rate, are initially measured using the index or rate at the commencement date and are included in the measurement of the lease liability. Renewal options are not included as part of the ROU asset or lease liability unless the option is deemed reasonably certain to exercise.
For real estate leases, lease components and non-lease components are accounted for as a single lease component. For equipment leases, lease and non-lease components are accounted for separately. Operating lease expense is comprised of operating lease costs and variable lease costs, net of sublease income, and is reflected as part of occupancy within non-interest expense in the consolidated statement of income. Operating lease expense is recorded on a straight-line basis. Refer to Note 7: Leasing for further information.
Goodwill
Goodwill represents the excess purchase price of businesses acquired over the fair value of the identifiable net assets acquired and is assigned to specific reporting units. Goodwill is not subject to amortization but rather is evaluated for impairment annually, or more frequently if events occur or circumstances change indicating it would more likely than not result in a reduction of the fair value of a reporting unit below its carrying value.
Goodwill may be evaluated for impairment by performing a qualitative assessment to determine whether it is more likely than not that the fair value of the reporting unit is less than its carrying amount, including goodwill. If the qualitative assessment indicates it is more likely than not that the fair value of the reporting unit is less than its carrying amount, including goodwill, then a quantitative process will be performed that requires the Company to utilize an equally weighted combined income and market approach to arrive at an indicated fair value range for the reporting unit. In Step 1, the fair value of a reporting unit is compared to its carrying amount, including goodwill, to ascertain if a goodwill impairment exists. If the fair value of the reporting unit exceeds its carrying amount, goodwill of the reporting unit is not considered impaired, and it is not necessary to continue to Step 2 of the impairment process. Otherwise, Step 2 is performed where the implied fair value of goodwill is compared to the carrying value of goodwill in the reporting unit. If a reporting unit's carrying value of goodwill exceeds fair value of goodwill, the difference is charged to non-interest expense.
64


The Company completed a qualitative assessment for its reporting units during its most recent annual impairment review to determine if the quantitative impairment test was necessary. Based on its qualitative assessment, the Company determined that there was no evidence of impairment to the balance of its goodwill. Refer to Note 8: Goodwill and Other Intangible Assets for further information.
Other Intangible Assets
Other intangible assets represent purchased assets that lack physical substance but can be distinguished from goodwill because of contractual or other legal rights, or because it is capable of being sold or exchanged either separately or in combination with a related contract, asset, or liability. Other intangible assets with finite useful lives, such as core deposits and customer relationships, are amortized to non-interest expense over their estimated useful lives and are evaluated for impairment whenever events occur or circumstances change indicating the carrying amount of the asset may not be recoverable. Refer to Note 8: Goodwill and Other Intangible Assets for further information.
Cash Surrender Value of Life Insurance
Investment in life insurance represents the cash surrender value of life insurance policies on certain current and former employees of Webster. Cash surrender value increases are recorded in non-interest income, decreases are the result of collection on the policies, with death benefit proceeds in excess of cash surrender value recorded in other non-interest income upon the death of an insured.
Securities Sold Under Agreements to Repurchase
These agreements are accounted for as secured financing transactions since Webster maintains effective control over the transferred investment securities and the transfer meets the other criteria for such accounting. Obligations to repurchase the sold investment securities are reflected as a liability in the consolidated balance sheets. The investment securities sold, with agreement to repurchase, to wholesale dealers are transferred to a custodial account for the benefit of the dealer or bank with whom each transaction is executed. The dealers or banks may sell, loan, or otherwise hypothecate such securities to other parties in the normal course of their operations and agree to resell to Webster the same securities at the maturity date of the agreements. Webster also enters into repurchase agreements with Bank customers. The investment securities sold with agreement to repurchase to Bank customers are not transferred but internally pledged to the repurchase agreement transaction. Refer to Note 11: Borrowings for further information.
Revenue From Contracts With Customers
Revenue from contracts with customers generally comprises non-interest income earned by the Company in exchange for services provided to customers and is recognized when services are complete or as they are rendered. These revenue streams include deposit service fees, wealth and investment services, and an insignificant component of other non-interest income in the consolidated statement of income. The Company identifies the performance obligations included in the contracts with customers, determines the transaction price, allocates the transaction price to the performance obligations, as applicable, and recognizes revenue when performance obligations are satisfied. Services provided over a period of time are typically transferred to customers evenly over the term of the contracts and revenue is recognized evenly over the period services are provided. Contract receivables are included in accrued interest receivable and other assets. Payment terms vary by services offered, and the time between completion of performance obligations and payment is typically not significant. Refer to Note 21: Revenue from Contracts with Customers for further information.
Share-Based Compensation
Webster maintains stock compensation plans under which restricted stock, restricted stock units, non-qualified stock options, incentive stock options, or stock appreciation rights may be granted to employees and directors. Share awards are issued from available treasury shares. Share-based compensation cost is recognized over the vesting period, is based on the grant-date fair value, net of a reduction for estimated forfeitures which is adjusted for actual forfeitures as they occur, and is reported as a component of compensation and benefits expense. Awards are generally subject to a 3-year vesting period, while certain conditions provide for a 1-year vesting period. Excess tax benefit or tax deficiency results when tax return deductions differ from recognized compensation cost determined using the grant-date fair value approach for financial statement purposes.
For restricted stock and restricted stock unit awards, fair value is measured using the Company's common stock closing price at the date of grant. For certain performance-based restricted stock awards, fair value is measured using the Monte Carlo valuation methodology, which provides for the 3-year performance period. Awards ultimately vest in a range from zero to 150% of the target number of shares under the grant. Compensation expense is subject to adjustment based on management's assessment of Webster's return on equity performance relative to the target number of shares condition. Stock option awards use the Black-Scholes Option-Pricing Model to measure fair value at the date of grant. Dividends are paid on the time-based shares upon grant and are non-forfeitable, while dividends are accrued on the performance-based awards and paid on vested shares when the performance target is met. Refer to Note 19: Share-Based Plans for further information.
65


Income Taxes
Income tax expense, or benefit, is comprised of two components, current and deferred. The current component reflects taxes payable or refundable for a current period based on applicable tax laws, and the deferred component represents the tax effects of temporary differences between amounts recognized for financial accounting and tax purposes. Deferred tax assets and liabilities reflect the tax effects of such differences that are anticipated to result in taxable or deductible amounts in the future, when the temporary differences reverse. DTAs are recognized if it is more likely than not they will be realized, and may be reduced by a valuation allowance if it is more likely than not that all or some portion will not be realized.
Tax positions that are uncertain but meet a more likely than not recognition threshold are initially and subsequently measured as the largest amount of tax benefit that has a greater than 50% likelihood of being realized upon settlement with a taxing authority that has full knowledge of all relevant information. The determination of whether or not a tax position meets the more likely than not recognition threshold considers the facts, circumstances, and information available at the reporting date and is subject to management's judgment. Webster recognizes interest expense and penalties on uncertain tax positions as a component of income tax expense and recognizes interest income on refundable income taxes as a component of other non-interest income. Refer to Note 9: Income Taxes for further information.
Earnings Per Common Share
Earnings per common share is presented under the two-class method. Basic earnings per common share is computed by dividing earnings allocated to common shareholders by the weighted-average number of common shares outstanding during the applicable period, excluding outstanding participating securities. Certain unvested restricted stock awards are participating securities as they have non-forfeitable rights to dividends. Diluted earnings per common share is computed using the weighted-average number of shares determined for the basic earnings per common share computation plus the dilutive effect of stock compensation and warrants for common stock using the treasury stock method. A reconciliation of the weighted-average shares used in calculating basic earnings per common share and the weighted-average common shares used in calculating diluted earnings per common share is provided in Note 15: Earnings Per Common Share.
Comprehensive Income
Comprehensive income includes all changes in shareholders’ equity during a period, except those resulting from transactions with shareholders. Comprehensive income consists of net income, and the after-tax effect of the following items: changes in net unrealized gain/loss on securities available for sale, changes in net unrealized gain/loss on derivative instruments, and changes in net actuarial gain/loss and prior service cost for defined benefit pension and other postretirement benefit plans. Comprehensive income is reported in the consolidated statement of shareholders' equity, consolidated statement of comprehensive income, and Note 13: Accumulated Other Comprehensive Loss, Net of Tax.
Derivative Instruments and Hedging Activities
Derivatives are recognized at fair value, with exchange-traded contracts based on quoted market prices while non-exchange traded contracts are based on dealer quotes, pricing models, discounted cash flow methodologies, or similar techniques for which the determination of fair value may require management judgment or estimation, relating to future rates and credit activities. Derivatives are included in accrued interest receivable and other assets and in accrued expenses and other liabilities on the consolidated balance sheet. Cash flows from derivative financial instruments are included in net cash provided by operating activities on the consolidated cash flow statement.
Derivatives Designated in Hedge Relationships. The Company uses derivatives to hedge exposures, or to modify interest rate characteristics, for certain balance sheet accounts under its interest rate risk management strategy. The Company designates derivatives in qualifying hedge relationships as fair value or cash flow hedges for accounting purposes. Derivative financial instruments receive hedge accounting treatment if they are qualified and properly designated as a hedge and remain highly effective in offsetting changes in the fair value or cash flows attributable to the risk being hedged both at hedge inception and on an ongoing basis throughout the life of the hedge. Quarterly prospective and retrospective assessments are performed to ensure hedging relationships continue to be highly effective. If a hedge relationship were no longer highly effective, hedge accounting would be discontinued.
The change in fair value on a derivative designated and qualifying as a fair value hedge, as well as the offsetting change in fair value on the hedged item attributable to the risk being hedged, is recognized in earnings in the same accounting period. The gain or loss on a derivative designated and qualifying as a cash flow hedge is initially recorded as a component of AOCL and subsequently reclassified to interest income as hedged interest payments are received or to interest expense as hedged interest payments are made in the same period during which the hedged transaction affects earnings.
Derivatives Not Designated in Hedge Relationships. The Company also enters into derivative transactions which are not designated in a hedge relationship. Derivative financial instruments not designated in a hedge relationship are recorded at fair value with changes in fair value recognized in other non-interest income on the consolidated statement of income.
66


Offsetting Assets and Liabilities. The Company presents derivative assets and derivative liabilities with the same counterparty and the related variation margin of cash collateral are presented on a net basis in the consolidated balance sheet. Cash collateral relating to the initial margin is included in accrued interest receivable and other assets on the consolidated balance sheet. Securities collateral is not offset. The Company clears all dealer eligible contracts through the Chicago Mercantile Exchange (CME), and has elected to record non-cleared derivative positions subject to a legally enforceable master netting agreement on a net basis.
Refer to Note 16: Derivative Financial Instruments for further information.
Fair Value Measurements
The Company measures many of its assets and liabilities on a fair value basis, in accordance with ASC Topic 820, "Fair Value Measurement." Fair value is used on a recurring basis for certain assets and liabilities in which fair value is the primary basis of accounting. Examples of these include derivative instruments, available-for-sale securities and loans held for sale where the Company has elected the fair value option. Additionally, fair value is used on a non-recurring basis to evaluate assets or liabilities for impairment. Examples of these include impaired loans and leases, mortgage servicing assets, long-lived assets, goodwill, and loans not originated for sale but subsequently transferred to held for sale, which are accounted for at the lower of cost or fair value. Further information regarding the Company's policies and methodology used to measure fair value is presented in Note 17: Fair Value Measurements.
Employee Retirement Benefit Plan
Webster Bank maintains a noncontributory defined benefit pension plan covering all employees that were participants on or before December 31, 2007. Costs related to this qualified plan, based upon actuarial computations of current and future benefits for eligible employees, are charged to non-interest expense and are funded in accordance with the requirements of the Employee Retirement Income Security Act. The plan is recorded as an asset if over-funded or a liability if under-funded. There is a supplemental retirement plan for select executive level employees that were participants on or before December 31, 2007. There is also a postretirement healthcare benefits plan for certain retired employees.
Recently Adopted Accounting Standards Updates
Effective January 1, 2019, the following new accounting guidance was adopted by the Company:
ASU No. 2018-16, Derivatives and Hedging (Topic 815) - Inclusion of the Secured Overnight Financing Rate (SOFR) Overnight Index Swap (OIS) Rate as a Benchmark Interest Rate for Hedge Accounting Purposes.
The Update permits the use of the OIS rate based on SOFR as a U.S. benchmark interest rate for hedge accounting purposes under Topic 815 in addition to the interest rates on direct U.S. Treasury obligations, the London Interbank Offered Rate swap rate, the OIS rate based on the Fed Funds Effective Rate, and the Securities Industry and Financial Markets Association Municipal Swap Rate.
The Company adopted the Update during the first quarter of 2019 on a prospective basis. The adoption of this guidance did not have a material effect on the Company's consolidated financial statements.
ASU No. 2017-12, Derivatives and Hedging (Topic 815) - Targeted Improvements to Accounting for Hedging Activities.
The purpose of the Update is to better align a company’s risk management and financial reporting for hedging activities with the economic objectives of those activities. The Update expands an entity's ability to hedge non-financial and financial risk components and reduce complexity in hedges of interest rate risk. The guidance eliminates the requirement to separately measure and report hedge ineffectiveness, and generally requires the entire change in fair value of a hedging instrument to be presented in the same income statement line in which the earnings effect of the hedged item is reported.
The Company adopted the Update during the first quarter of 2019 on a modified retrospective basis. The adoption of this guidance did not have a material effect on the Company's consolidated financial statements. The Company has provided enhanced disclosures in Note 16: Derivative Financial Instruments as a result of adopting this Update.
67


ASU No. 2016-02, Leases (Topic 842) and subsequent ASUs issued to amend this Topic.
The Updates introduce a lessee model that requires substantially all leases to be recorded as assets and liabilities on the balance sheet and requires expanded quantitative and qualitative disclosures regarding key information about leasing arrangements. The lessor model remains substantially the same with targeted improvements that do not materially impact the Company.
The Company adopted the Updates during the first quarter of 2019 using the new transition method option that allows the use of effective date, January 1, 2019, as the date of initial application of the new lease accounting standard and to recognize a cumulative-effect adjustment to the opening balance of retained earnings upon adoption. The Company elected the transition relief package of practical expedients which forgoes the requirement to reassess the existence of leases in existing contracts, their lease classification and the accounting treatment of their initial direct costs. As a practical expedient, the Company has also made a policy election to not separate non-lease components from lease components for its real estate leases and instead account for each separate lease components and non-lease components associated with that lease component as a single lease component. The Company will separately account for the lease and non-lease components in its equipment leases. The Company determines whether a contract contains a lease based on whether a contract, or a part of a contract, conveys the right to control the use of an identified asset for a period of time in exchange for consideration. The discount rate used is either the rate implicit in the lease, or when a rate cannot be readily determined an incremental borrowing rate. The incremental borrowing rate is the rate of interest that the Company would have to pay to borrow on a collateralized basis over a similar term and amount equal to the lease payments, in a similar economic environment.
As a result of adopting this Update, the Company recognized $157.2 million of right-of-use asset (ROU) and $178.8 million of lease liability, as of January 1, 2019. The Company also recorded a $513 thousand cumulative-effect adjustment directly to retained earnings as of January 1, 2019 for abandoned leased properties and the remaining deferred gains on sale-leaseback transactions which occurred prior to the date of adoption. Refer to Note 7: Leasing for further information.
Accounting Standards Issued but not yet Adopted
The following list identifies ASUs applicable to the Company that have been issued by the FASB but are pending adoption:
ASU No. 2019-12, Income Taxes (Topic 740) - Simplifying the Accounting for Income Taxes.
The Update provides simplifications to the accounting for income taxes related to a variety of topics and makes minor codification improvements. Changes include a requirement that the effects of an enacted change in tax law be reflected in the computation of the annual effective tax rate in the first interim period that includes the enactment date of the new legislation.
The Update will be effective for the Company on January 1, 2021. The Company does not expect this Update to have a material impact on its consolidated financial statements.
ASU No. 2019-04, Codification Improvements to Topic 326, Financial Instruments - Credit Losses, Topic 815, Derivatives and Hedging, and Topic 825, Financial Instruments.
The Update amends guidance on credit losses, hedge accounting, and recognition and measurement of financial instruments. The changes provide clarifications and codification improvements in relation to recently issued accounting updates. The amendments to the guidance on credit losses are considered in the paragraphs below related to our adoption of ASU 2016-13, and will be adopted concurrently with those Updates.
The Update became effective for the Company on January 1, 2020. The Company does not expect these changes to have a material impact on its consolidated financial statements.
ASU No. 2018-15, Intangibles - Goodwill and Other - Internal-Use Software (Subtopic 350-40) - Customer’s Accounting for Implementation Costs Incurred in a Cloud Computing Arrangement That Is a Service Contract.
The Update aligns the requirements for capitalizing implementation costs incurred in a hosting arrangement that is a service contract with the requirements for capitalizing implementation costs incurred to develop or obtain internal-use software. The updated guidance also requires an entity to amortize the capitalized implementation costs as an expense over the term of the hosting arrangement and to present in the same income statement line item as the fees associated with the hosting arrangement.
The Update became effective for the Company on January 1, 2020. The Company will apply the amendments in this update prospectively to all implementation costs incurred after the date of adoption. The Company does not expect these changes to have a material impact on its consolidated financial statements.
ASU No. 2018-14, Compensation-Retirement Benefits - Defined Benefit Plan - General (Subtopic 715-20) - Disclosure Framework - Changes to the Disclosure Requirements for Defined Benefit Plans.  
The Update modifies disclosure requirements for employers that sponsor defined benefit pension and other postretirement plans.
The Update will be effective for the Company on January 1, 2021. The Company does not expect this Update to have a material impact on its consolidated financial statements.
68


ASU No. 2018-13, Fair Value Measurement (Topic 820) - Disclosure Framework - Changes to the Disclosure Requirements for Fair Value Measurement.
The Update modifies the disclosure requirements on fair value measurements. The updated guidance will no longer require entities to disclose the amount and reasons for transfers between Level 1 and Level 2 of the fair value hierarchy. However, it will require public companies to disclose changes in unrealized gains and losses for the period included in other comprehensive income for recurring Level 3 fair value measurements held at the end of the reporting period and the range and weighted average of significant unobservable inputs used to develop Level 3 measurements.
The Update became effective for the Company on January 1, 2020. The Company does not expect these changes to have a material impact on its consolidated financial statements.
ASU No. 2017-04, Intangibles - Goodwill and Other (Topic 350) - Simplifying the Test for Goodwill Impairment.
The Update simplifies quantitative goodwill impairment testing by requiring entities to compare the fair value of a reporting unit with its carrying amount and recognize an impairment charge for any amount by which the carrying amount exceeds the fair value of a reporting unit, up to but not exceeding the amount of goodwill allocated to the reporting unit.
The Update changes current guidance by eliminating the second step of the goodwill impairment analysis which involves calculating the implied fair value of goodwill determined in the same manner as the amount of goodwill recognized in a business combination upon acquisition. Entities will still have the option to first perform the qualitative assessment for a reporting unit to determine if the quantitative impairment test is necessary.
The Update must be applied prospectively and became effective for the Company on January 1, 2020. The Company does not expect this new guidance to have a material impact on its consolidated financial statements.
ASU No. 2016-13, Financial Instruments - Credit Losses (Topic 326) - Measurement of Credit Losses on Financial Instruments and subsequent ASUs issued to clarify this Topic.
The Updates will replace the existing incurred loss approach for recognizing credit losses with a new credit loss methodology known as the current expected credit loss (CECL) model. The CECL methodology requires earlier recognition of credit losses using a lifetime credit loss measurement approach for financial assets carried at amortized cost. The CECL methodology also requires consideration of a broader range of reasonable and supportable information to determine credit loss estimates.
To implement the new standard, the Company established a project lead and empowered a steering committee comprised of members from different disciplines including Credit, Accounting, Finance, Financial Analytics, Information Technology, and Treasury, as well as specific working groups focused on key components of the development process. Through the working groups, the Company evaluated the effect that the Updates have on its financial statements and related disclosures. The CECL credit models incorporate assumptions used to calculate credit losses over the estimated life of the applicable financial assets and include the impact of forecasted macroeconomic conditions. During the fourth quarter of 2019, the Company continued testing CECL credit models, processes, and controls in parallel with the existing incurred loss approach. The Company is continuing to work on finalizing CECL accounting policies and drafting required disclosures under these Updates.
Adopting the new standard required the Company to make certain policy elections and decisions on how expected losses are measured. Under CECL, the Company will estimate lifetime credit losses based on three portfolio segments: commercial loans and leases, consumer loans and lines of credit, and HTM debt securities. Expected losses within the commercial and consumer portfolio segments will be collectively assessed using PD/LGD models. Expected losses on HTM debt securities will be collectively assessed with separate models for each type of security. Through the Company’s established CECL Committee, policy elections, key assumptions, processes, and models will be reviewed and updated as necessary.
These Updates became effective for the Company on January 1, 2020, at which time the CECL processes, controls, and models became the Company’s primary method for calculating and recording the allowance for credit losses. The Company will adopt the Updates using the modified retrospective approach. Upon adoption of the Updates the Company expects an increase of approximately 30% in its allowance for credit losses, reflected as a reduction, net of tax, to the Company's beginning total shareholders' equity at January 1, 2020. Upon adoption the Company’s allowance for credit losses became reflective of all credit losses expected over the lifetime of the Company’s applicable financial assets. The allowance for credit losses will be based on the composition, characteristics, and credit quality of the loan and securities portfolios as of the reporting date and will include consideration of current economic conditions and reasonable and supportable forecasts at that date. The entire increase in the allowance for credit losses will be reflected in the Company's regulatory capital ratios and will not have a significant impact.
69


Note 2: Variable Interest Entities
The Company has an investment interest in the following entities that meet the definition of a VIE.
Consolidated
Rabbi Trust. The Company established a Rabbi Trust to meet the obligations due under its Deferred Compensation Plan for Directors and Officers and to mitigate the expense volatility of the aforementioned plan. The funding of the Rabbi Trust and the discontinuation of the Deferred Compensation Plan for Directors and Officers occurred during 2012.
Investments held in the Rabbi Trust primarily consist of mutual funds that invest in equity and fixed income securities. The Company is considered the primary beneficiary of the Rabbi Trust as it has the power to direct the activities of the Rabbi Trust that significantly affect the VIE's economic performance and it has the obligation to absorb losses of the VIE that could potentially be significant to the VIE.
The Company consolidates the invested assets of the trust along with the total deferred compensation obligations and includes them in accrued interest receivable and other assets and accrued expenses and other liabilities, respectively, in the consolidated balance sheets. Earnings in the Rabbi Trust, including appreciation or depreciation, are reflected as other non-interest income, and changes in the corresponding liability are reflected as compensation and benefits, in the consolidated statement of income. Refer to Note 17: Fair Value Measurements for additional information.
Non-Consolidated
Tax Credit - Finance Investments. The Company makes non-marketable equity investments in entities that finance affordable housing and other community development projects and provide a return primarily through the realization of tax benefits. In most instances the investments require the funding of capital commitments in the future. While the Company's investment in an entity may exceed 50% of its outstanding equity interests, the entity is not consolidated as the Company is not involved in its management. For these investments, the Company determined it is not the primary beneficiary due to its inability to direct the activities that most significantly impact the economic performance of the VIEs. The Company applies the proportional amortization method to account for its investments in qualified affordable housing projects.
At December 31, 2019 and December 31, 2018, the aggregate carrying value of the Company's tax credit-finance investments was $42.5 million and $29.1 million, respectively, which represents the Company's maximum exposure to loss. At December 31, 2019 and December 31, 2018, unfunded commitments have been recognized, totaling $15.1 million and $10.4 million, respectively, and are included in accrued expenses and other liabilities in the consolidated balance sheets.
Webster Statutory Trust. The Company owns all the outstanding common stock of Webster Statutory Trust, a financial vehicle that has issued, and in the future may issue, trust preferred securities. The trust is a VIE in which the Company is not the primary beneficiary. The trust's only assets are junior subordinated debentures issued by the Company, which were acquired by the trust using the proceeds from the issuance of the trust preferred securities and common stock. The junior subordinated debentures are included in long-term debt in the consolidated balance sheets, and the related interest expense is reported as interest expense on long-term debt in the consolidated statement of income.
Other Non-Marketable Investments. The Company invests in various alternative investments in which it holds a variable interest. These investments are non-public entities which cannot be redeemed since the Company’s investment is distributed as the underlying equity is liquidated. For these investments, the Company has determined it is not the primary beneficiary due to its inability to direct the activities that most significantly impact the economic performance of the VIEs.
At December 31, 2019 and December 31, 2018, the aggregate carrying value of the Company's other non-marketable investments in VIEs was $21.8 million and $17.6 million, respectively, and the maximum exposure to loss of the Company's other non-marketable investments in VIEs, including unfunded commitments, was $64.2 million and $31.0 million, respectively. Refer to Note 17: Fair Value Measurements for additional information.
The Company's equity interests in Other Non-Marketable Investments, as well as Tax Credit-Finance Investments and Webster Statutory Trust, are included in accrued interest receivable and other assets in the consolidated balance sheet. For a description of the Company's accounting policy regarding the consolidation of VIEs, refer to Note 1: Summary of Significant Accounting Policies under the section “Principles of Consolidation”.
70


Note 3: Investment Securities
A summary of the amortized cost and fair value of investment securities is presented below:
At December 31,
 20192018
(In thousands)Amortized
Cost
Unrealized
Gains
Unrealized
Losses
Fair ValueAmortized
Cost
Unrealized
Gains
Unrealized
Losses
Fair Value
Available-for-sale:
U.S. Treasury Bills$  $  $  $  $7,549  $1  $  $7,550  
Agency CMO184,500  2,218  (917) 185,801  238,968  412  (4,457) 234,923  
Agency MBS1,580,743  35,456  (4,035) 1,612,164  1,521,534  1,631  (42,076) 1,481,089  
Agency CMBS587,974  513  (6,935) 581,552  608,167    (41,930) 566,237  
CMBS432,085  38  (252) 431,871  447,897  645  (2,961) 445,581  
CLO92,628  45  (468) 92,205  114,641  94  (1,964) 112,771  
Corporate debt23,485    (1,245) 22,240  55,860    (5,281) 50,579  
Total available-for-sale$2,901,415  $38,270  $(13,852) $2,925,833  $2,994,616  $2,783  $(98,669) $2,898,730  
Held-to-maturity:
Agency CMO$167,443  $1,123  $(1,200) $167,366  $208,113  $287  $(5,255) $203,145  
Agency MBS2,957,900  60,602  (8,733) 3,009,769  2,517,823  8,250  (79,701) 2,446,372  
Agency CMBS1,172,491  6,444  (5,615) 1,173,320  667,500  53  (22,572) 644,981  
Municipal bonds and notes740,431  32,709  (21) 773,119  715,041  2,907  (18,285) 699,663  
CMBS255,653  2,278  (852) 257,079  216,943  405  (2,388) 214,960  
Total held-to-maturity$5,293,918  $103,156  $(16,421) $5,380,653  $4,325,420  $11,902  $(128,201) $4,209,121  
Other-Than-Temporary Impairment
The amount in the amortized cost columns in the table above includes OTTI related to certain CLO positions that were previously considered Covered Funds as defined by Section 619 of Dodd-Frank. The Company has taken measures to bring its CLO positions into compliance with these requirements.
The following table presents the changes in OTTI:
Years ended December 31,
(In thousands)201920182017
Beginning balance$822  $1,364  $3,243  
Reduction for investment securities called  (542) (2,005) 
Additions for OTTI not previously recognized in earnings    126  
Ending balance$822  $822  $1,364  

71


Fair Value and Unrealized Losses
The following tables provide information on fair value and unrealized losses for the individual investment securities with an unrealized loss, aggregated by classification and length of time that the individual investment securities have been in a continuous unrealized loss position:
 At December 31, 2019
 Less Than Twelve MonthsTwelve Months or LongerTotal
(Dollars in thousands)Fair
Value
Unrealized
Losses
Fair
Value
Unrealized
Losses
# of
Holdings
Fair
Value
Unrealized
Losses
Available-for-sale:
Agency CMO$36,447  $(352) $32,288  $(565) 9  $68,735  $(917) 
Agency MBS41,408  (193) 299,674  (3,842) 79  341,082  (4,035) 
Agency CMBS174,406  (1,137) 357,717  (5,798) 34  532,123  (6,935) 
CMBS355,260  (232) 7,480  (20) 29  362,740  (252) 
CLO—  —  43,232  (468) 2  43,232  (468) 
Corporate debt—  —  22,240  (1,245) 4  22,240  (1,245) 
Total available-for-sale in an unrealized loss position$607,521  $(1,914) $762,631  $(11,938) 157  $1,370,152  $(13,852) 
Held-to-maturity:
Agency CMO$26,480  $(174) $54,602  $(1,026) 11  $81,082  $(1,200) 
Agency MBS164,269  (1,165) 727,778  (7,568) 105  892,047  (8,733) 
Agency CMBS488,091  (5,591) 4,148  (24) 21  492,239  (5,615) 
Municipal bonds and notes2,508  (21) —  —  1  2,508  (21) 
CMBS85,422  (852) —  —  8  85,422  (852) 
Total held-to-maturity in an unrealized loss position$766,770  $(7,803) $786,528  $(8,618) 146  $1,553,298  $(16,421) 

 At December 31, 2018
 Less Than Twelve MonthsTwelve Months or LongerTotal
(Dollars in thousands)Fair
Value
Unrealized
Losses
Fair
Value
Unrealized
Losses
# of
Holdings
Fair
Value
Unrealized
Losses
Available-for-sale:
Agency CMO$15,524  $(72) $180,641  $(4,385) 36  $196,165  $(4,457) 
Agency MBS321,678  (2,078) 975,084  (39,998) 184  1,296,762  (42,076) 
Agency CMBS—  —  566,237  (41,930) 37  566,237  (41,930) 
CMBS343,457  (2,937) 5,193  (24) 39  348,650  (2,961) 
CLO83,305  (1,695) 14,873  (269) 5  98,178  (1,964) 
Corporate debt35,990  (1,820) 14,589  (3,461) 8  50,579  (5,281) 
Total available-for-sale in an unrealized loss position$799,954  $(8,602) $1,756,617  $(90,067) 309  $2,556,571  $(98,669) 
Held-to-maturity:
Agency CMO$691  $(1) $182,396  $(5,254) 25  $183,087  $(5,255) 
Agency MBS288,635  (1,916) 1,892,951  (77,785) 272  2,181,586  (79,701) 
Agency CMBS—  —  635,284  (22,572) 56  635,284  (22,572) 
Municipal bonds and notes68,351  (882) 414,776  (17,403) 223  483,127  (18,285) 
CMBS24,881  (270) 132,464  (2,118) 20  157,345  (2,388) 
Total held-to-maturity in an unrealized loss position$382,558  $(3,069) $3,257,871  $(125,132) 596  $3,640,429  $(128,201) 
72


Impairment Analysis
The following impairment analysis summarizes the basis for evaluating if investment securities within the Company’s available-for-sale and held-to-maturity portfolios are other-than-temporarily impaired as of December 31, 2019. Unless otherwise noted for an investment security type, management does not intend to sell these investment securities and has determined, based upon available evidence, that it is more likely than not that the Company will not be required to sell these investment securities before the recovery of their amortized cost. As such, based on the following impairment analysis, the Company does not consider any of these investment securities, in unrealized loss positions, to be other-than-temporarily impaired at December 31, 2019.
Available-for-Sale Securities
Agency CMO. There were unrealized losses of $0.9 million on the Company’s investment in Agency CMO at December 31, 2019, compared to $4.5 million at December 31, 2018. Unrealized losses decreased due to lower market rates while principal balances decreased for this asset class since December 31, 2018. These investments are issued by a government or government sponsored agency and therefore, are backed by certain government guarantees, either direct or implicit. There has been no change in the credit quality, and the contractual cash flows are performing as expected.
Agency MBS. There were unrealized losses of $4.0 million on the Company’s investment in residential mortgage-backed securities issued by government agencies at December 31, 2019, compared to $42.1 million at December 31, 2018. Unrealized losses decreased due to lower market rates, while principal balances increased for this asset class since December 31, 2018. These investments are issued by a government or government sponsored agency and therefore, are backed by certain government guarantees, either direct or implicit. There has been no change in the credit quality, and the contractual cash flows are performing as expected.
Agency CMBS. There were unrealized losses of $6.9 million on the Company's investment in commercial mortgage-backed securities issued by government agencies at December 31, 2019, compared to $41.9 million at December 31, 2018. Unrealized losses decreased due to lower market rates while principal balances decreased for this asset class since December 31, 2018. These investments are issued by a government or government sponsored agency and therefore, are backed by certain government guarantees, either direct or implicit. There has been no change in the credit quality, and the contractual cash flows are performing as expected.
CMBS. There were unrealized losses of $252 thousand on the Company’s investment in CMBS at December 31, 2019, compared to $3.0 million at December 31, 2018. The portfolio of mainly floating rate CMBS experienced reduced market spreads which resulted in higher market prices and lower unrealized losses while principal balances declined for this asset class since December 31, 2018. Internal stress tests are performed on individual bonds to monitor potential losses under stress scenarios. Contractual cash flows for the bonds continue to perform as expected.
CLO. There were unrealized losses of $468 thousand on the Company’s investments in CLO at December 31, 2019 compared to $2.0 million of unrealized losses at December 31, 2018. Unrealized losses decreased due to reduced market spreads while principal balances decreased due to call activity and amortization for this asset class since December 31, 2018. Internal stress tests are performed on individual bonds to monitor potential losses under stress scenarios. Contractual cash flows for the bonds continue to perform as expected.
Corporate debt. There were $1.2 million of unrealized losses on the Company's corporate debt portfolio at December 31, 2019, compared to $5.3 million at December 31, 2018. Unrealized losses decreased due to reduced market spreads while principal balances decreased since December 31, 2018. The Company performs periodic credit reviews of the issuer to assess the likelihood for ultimate recovery of amortized cost.
Held-to-Maturity Securities
Agency CMO. There were unrealized losses of $1.2 million on the Company’s investment in Agency CMO at December 31, 2019, compared to $5.3 million at December 31, 2018. Unrealized losses decreased due to lower market rates while principal balances decreased for this asset class since December 31, 2018. These investments are issued by a government or government sponsored agency and therefore, are backed by certain government guarantees, either direct or implicit. There has been no change in the credit quality, and the contractual cash flows are performing as expected.
Agency MBS. There were unrealized losses of $8.7 million on the Company’s investment in residential mortgage-backed securities issued by government agencies at December 31, 2019, compared to $79.7 million at December 31, 2018. Unrealized losses decreased due to lower market rates while principal balances increased for this asset class since December 31, 2018. These investments are issued by a government or government sponsored agency and therefore, are backed by certain government guarantees, either direct or implicit. There has been no change in the credit quality, and the contractual cash flows are performing as expected.
73


Agency CMBS. There were unrealized losses of $5.6 million on the Company’s investment in commercial mortgage-backed securities issued by government agencies at December 31, 2019, compared to $22.6 million at December 31, 2018. Unrealized losses decreased due to lower market rates while principal balances increased for this asset class since December 31, 2018. These investments are issued by a government or government sponsored agency and therefore, are backed by certain government guarantees, either direct or implicit. There has been no change in the credit quality, and the contractual cash flows are performing as expected.
Municipal bonds and notes. There were unrealized losses of $21 thousand on the Company’s investment in municipal bonds and notes at December 31, 2019, compared to $18.3 million at December 31, 2018. Unrealized losses decreased due to lower market rates while principal balances increased for this asset class since December 31, 2018. The Company performs periodic credit reviews of the issuers and the securities are currently performing as expected.
CMBS. There were unrealized losses of $852 thousand on the Company’s investment in CMBS at December 31, 2019, compared to $2.4 million unrealized losses at December 31, 2018. Unrealized losses decreased due to lower market rates on mainly seasoned fixed rate conduit transactions while principal balances increased for this asset class since December 31, 2018. Internal stress tests are performed on individual bonds to monitor potential losses under stress scenarios.
Sales of Available-for Sale Securities
For the year ended December 31, 2019, proceeds from sales of available-for-sale securities were $70.1 million. These sales produced gross realized gains of $773 thousand and a gross realized loss of $744 thousand from the tender of a corporate debt security, which resulted in a net gain on sale of investment securities of $29 thousand. There were no sales during the years ended December 31, 2018 and 2017.
Contractual Maturities
The amortized cost and fair value of debt securities by contractual maturity are set forth below:
At December 31, 2019
 Available-for-SaleHeld-to-Maturity
(In thousands)Amortized
Cost
Fair
Value
Amortized
Cost
Fair
Value
Due in one year or less$  $  $1,084  $1,088  
Due after one year through five years    4,621  4,747  
Due after five through ten years299,979  299,531  245,473  249,501  
Due after ten years2,601,436  2,626,302  5,042,740  5,125,317  
Total debt securities$2,901,415  $2,925,833  $5,293,918  $5,380,653  
For the maturity schedule above, mortgage-backed securities and CLO, which are not due at a single maturity date, have been categorized based on the maturity date of the underlying collateral. Actual principal cash flows may differ from this maturity date presentation as borrowers have the right to prepay obligations with or without prepayment penalties.
At December 31, 2019, the Company had a carrying value of $1.3 billion in callable debt securities in its CMBS, CLO, and municipal bond portfolios. The Company considers prepayment risk in the evaluation of its interest rate risk profile. These maturities may not reflect actual durations, which may be impacted by prepayments.
Investment securities with a carrying value totaling $2.7 billion at December 31, 2019 and $2.2 billion at December 31, 2018 were pledged to secure public funds, trust deposits, repurchase agreements, and for other purposes, as required or permitted by law.
74


Note 4: Loans and Leases
The following table summarizes loans and leases:
At December 31,
(In thousands)20192018
Commercial$6,343,497  $6,216,606  
Commercial Real Estate5,949,339  4,927,145  
Equipment Financing537,341  508,397  
Residential4,972,685  4,416,637  
Consumer2,234,124  2,396,704  
Loans and leases (1) (2)
$20,036,986  $18,465,489  
(1)Loans and leases include net deferred fees and net premiums and discounts of $17.6 million and $13.9 million at December 31, 2019 and December 31, 2018, respectively.
(2)At December 31, 2019, the Company had pledged $7.9 billion of eligible loans as collateral to support borrowing capacity at the FHLB of Boston and the FRB of Boston.
The equipment financing portfolio includes net investment in leases of $169.3 million at December 31, 2019. Total undiscounted cash flows to be received from the Company's net investment in leases are $184.1 million at December 31, 2019 and are primarily due within the next five years. The Company's lessor portfolio has recognized interest income of $5.5 million for year ended December 31, 2019.
Loans and Leases Portfolio Aging
The following tables summarize the aging of loans and leases:
 At December 31, 2019
(In thousands)30-59 Days
Past Due and
Accruing
60-89 Days
Past Due and
Accruing
90 or More Days Past Due
and Accruing
Non-accrualTotal Past Due and Non-accrualCurrentTotal Loans
and Leases
Commercial:
Commercial non-mortgage$2,094  $617  $  $59,369  $62,080  $5,234,531  $5,296,611  
Asset-based      139  139  1,046,747  1,046,886  
Commercial real estate:
Commercial real estate1,256  454    9,950  11,660  5,713,939  5,725,599  
Commercial construction      1,613  1,613  222,127  223,740  
Equipment financing5,493  292    5,433  11,218  526,123  537,341  
Residential 7,166  6,441    43,193  56,800  4,915,885  4,972,685  
Consumer:
Home equity 8,267  5,551    30,170  43,988  1,970,556  2,014,544  
Other consumer4,269  807    1,192  6,268  213,312  219,580  
Total$28,545  $14,162  $  $151,059  $193,766  $19,843,220  $20,036,986  

 At December 31, 2018
(In thousands)30-59 Days
Past Due and
Accruing
60-89 Days
Past Due and
Accruing
90 or More Days Past Due
and Accruing
Non-accrualTotal Past Due and
Non-accrual
CurrentTotal Loans
and Leases
Commercial:
Commercial non-mortgage$1,011  $702  $104  $55,810  $57,627  $5,189,808  $5,247,435  
Asset-based      224  224  968,947  969,171  
Commercial real estate:
Commercial real estate1,275  245    8,242  9,762  4,698,552  4,708,314  
Commercial construction          218,831  218,831  
Equipment financing510  405    6,314  7,229  501,168  508,397  
Residential8,513  4,301    49,188  62,002  4,354,635  4,416,637  
Consumer:
Home equity9,250  5,385    33,495  48,130  2,121,049  2,169,179  
Other consumer1,774  957    1,494  4,225  223,300  227,525  
Total$22,333  $11,995  $104  $154,767  $189,199  $18,276,290  $18,465,489  
Interest on non-accrual loans and leases that would have been recorded as additional interest income for the years ended December 31, 2019, 2018, and 2017, had the loans and leases been current in accordance with their original terms, totaled $11.3 million, $9.7 million, and $8.4 million, respectively.
75


Allowance for Loan and Lease Losses
The following tables summarize the activity in, as well as the loan and lease balances that were evaluated for, the ALLL: 
 At or for the Year ended December 31, 2019
(In thousands)CommercialCommercial
Real Estate
Equipment
Financing
ResidentialConsumerTotal
Allowance for loan and lease losses:
Balance at January 1, 2019$98,793  $60,151  $5,129  $19,599  $28,681  $212,353  
Provision for loan and lease losses20,370  8,550  254  4,110  4,516  37,800  
Charge-offs(29,033) (3,501) (793) (4,153) (15,000) (52,480) 
Recoveries1,626  45  78  1,363  8,311  11,423  
Balance at December 31, 2019$91,756  $65,245  $4,668  $20,919  $26,508  $209,096  
Individually evaluated for impairment7,867  1,143  418  3,618  1,203  14,249  
Collectively evaluated for impairment$83,889  $64,102  $4,250  $17,301  $25,305  $194,847  
Loan and lease balances:
Individually evaluated for impairment$102,393  $23,297  $5,433  $90,096  $35,191  $256,410  
Collectively evaluated for impairment6,241,104  5,926,042  531,908  4,882,589  2,198,933  19,780,576  
Loans and leases$6,343,497  $5,949,339  $537,341  $4,972,685  $2,234,124  $20,036,986  

 At or for the Year ended December 31, 2018
(In thousands)CommercialCommercial
Real Estate
Equipment
Financing
ResidentialConsumerTotal
Allowance for loan and lease losses:
Balance at January 1, 2018$89,533  $49,407  $5,806  $19,058  $36,190  $199,994  
Provision for loan and lease losses23,041  12,644  (329) 2,016  4,628  42,000  
Charge-offs(18,220) (2,061) (423) (3,455) (19,228) (43,387) 
Recoveries4,439  161  75  1,980  7,091  13,746  
Balance at December 31, 2018$98,793  $60,151  $5,129  $19,599  $28,681  $212,353  
Individually evaluated for impairment7,824  1,661  196  4,286  1,383  15,350  
Collectively evaluated for impairment$90,969  $58,490  $4,933  $15,313  $27,298  $197,003  
Loan and lease balances:
Individually evaluated for impairment$99,512  $10,828  $6,315  $103,531  $39,144  $259,330  
Collectively evaluated for impairment6,117,094  4,916,317  502,082  4,313,106  2,357,560  18,206,159  
Loans and leases$6,216,606  $4,927,145  $508,397  $4,416,637  $2,396,704  $18,465,489  

 At or for the Year ended December 31, 2017
(In thousands)CommercialCommercial
Real Estate
Equipment
Financing
ResidentialConsumerTotal
Allowance for loan and lease losses:
Balance at January 1, 2017$71,905  $47,477  $6,479  $23,226  $45,233  $194,320  
Provision for loan and lease losses23,417  11,040  (232) (2,692) 9,367  40,900  
Charge-offs(8,147) (9,275) (558) (2,500) (24,447) (44,927) 
Recoveries2,358  165  117  1,024  6,037  9,701  
Balance at December 31, 2017$89,533  $49,407  $5,806  $19,058  $36,190  $199,994  
Individually evaluated for impairment9,786  272  23  4,805  1,668  16,554  
Collectively evaluated for impairment$79,747  $49,135  $5,783  $14,253  $34,522  $183,440  
Loan and lease balances:
Individually evaluated for impairment$72,471  $11,226  $3,325  $114,295  $45,436  $246,753  
Collectively evaluated for impairment5,296,223  4,512,602  546,908  4,376,583  2,544,789  17,277,105  
Loans and leases$5,368,694  $4,523,828  $550,233  $4,490,878  $2,590,225  $17,523,858  
76


Impaired Loans and Leases
The following tables summarize impaired loans and leases:
 At December 31, 2019
(In thousands)Unpaid
Principal
Balance
Total
Recorded
Investment
Recorded
Investment
No Allowance
Recorded
Investment
With Allowance
Related
Valuation
Allowance
Commercial non-mortgage$140,096  $102,254  $29,739  $72,515  $7,862  
Asset-based465  139    139  5  
Commercial real estate27,678  21,684  13,205  8,479  1,143  
Commercial construction1,614  1,613  1,613      
Equipment financing5,591  5,433  2,159  3,274  418  
Residential98,790  90,096  56,231  33,865  3,618  
Consumer home equity38,503  35,191  27,672  7,519  1,203  
Total$312,737  $256,410  $130,619  $125,791  $14,249  

 At December 31, 2018
(In thousands)Unpaid
Principal
Balance
Total
Recorded
Investment
Recorded
Investment
No Allowance
Recorded
Investment
With Allowance
Related
Valuation
Allowance
Commercial non-mortgage$120,165  $99,287  $65,724  $33,563  $7,818  
Asset based550  225    225  6  
Commercial real estate13,355  10,828  2,125  8,703  1,661  
Commercial construction          
Equipment financing6,368  6,315  2,946  3,369  196  
Residential113,575  103,531  64,899  38,632  4,286  
Consumer home equity44,654  39,144  30,576  8,568  1,383  
Total$298,667  $259,330  $166,270  $93,060  $15,350  
The following table summarizes the average recorded investment and interest income recognized for impaired loans and leases:
Years ended December 31,
201920182017
(In thousands)Average
Recorded
Investment
Accrued
Interest
Income
Cash Basis Interest Income Average
Recorded
Investment
Accrued
Interest
Income
Cash Basis Interest Income Average
Recorded
Investment
Accrued
Interest
Income
Cash Basis Interest Income
Commercial non-mortgage$100,771  $3,241  $—  $85,585  $3,064  $—  $62,459  $1,095  $—  
Asset based182    —  407    —  295    —  
Commercial real estate16,256  385  —  11,027  198  —  17,397  417  —  
Commercial construction806    —      —  594  12  —  
Equipment financing5,874    —  4,820  112  —  4,872  207  —  
Residential96,814  3,502  1,078  108,913  3,781  1,106  116,859  4,138  1,264  
Consumer home equity37,167  1,045  981  42,290  1,158  980  45,578  1,323  1,046  
Total$257,870  $8,173  $2,059  $253,042  $8,313  $2,086  $248,054  $7,192  $2,310  
The following table summarizes commercial, commercial real estate and equipment financing loans and leases segregated by risk rating exposure:
CommercialCommercial Real EstateEquipment Financing
At December 31,At December 31,At December 31,
(In thousands)201920182019201820192018
(1) - (6) Pass$5,985,338  $5,781,138  $5,860,981  $4,773,298  $528,561  $494,585  
(7) Special Mention94,809  206,351  26,978  75,338  808  1,303  
(8) Substandard259,490  222,405  61,380  78,509  7,972  12,509  
(9) Doubtful3,860  6,712          
Total$6,343,497  $6,216,606  $5,949,339  $4,927,145  $537,341  $508,397  
77


Troubled Debt Restructurings
The following table summarizes information for TDRs:
At December 31,
(Dollars in thousands)20192018
Accrual status$136,449  $138,479  
Non-accrual status100,989  91,935  
Total recorded investment of TDR$237,438  $230,414  
Specific reserves for TDR included in the balance of ALLL$12,956  $11,930  
Additional funds committed to borrowers in TDR status4,856  3,893  
For years ended December 31, 2019, 2018 and 2017, Webster charged off $21.8 million, $14.3 million, and $3.2 million, respectively, for the portion of TDRs deemed to be uncollectible.
The following table provides information on the type of concession for loans and leases modified as TDRs:
Years ended December 31,
201920182017
Number of
Loans and
Leases
Post-Modification
Recorded
Investment(1)
Number of
Loans and
Leases
Post-Modification
Recorded
Investment(1)
Number of
Loans and
Leases
Post-Modification
Recorded
Investment(1)
(Dollars in thousands)
Commercial non mortgage:
Extended Maturity15  $2,413  12  $823  12  $1,233  
Adjusted Interest rates2  112          
Combination Rate and Maturity11  673  15  8,842  18  9,592  
Other (2)
28  65,186  20  41,248  4  6,375  
Commercial real estate:
Extended Maturity3  8,356  2  97      
Combination Rate and Maturity    3  1,485      
Other (2)
3  4,816  1  5,111      
Equipment Financing
Extended Maturity    4  736      
Residential:
Extended Maturity7  1,327  1  20  16  2,569  
Adjusted Interest rates        2  335  
Combination Rate and Maturity15  2,241  9  947  12  1,733  
Other (2)
8  1,001  21  3,573  39  6,200  
Consumer home equity:
Extended Maturity6  599  4  469  12  976  
Adjusted Interest rates        1  247  
Combination Rate and Maturity4  140  6  618  14  3,469  
Other (2)
34  1,907  45  2,812  73  4,907  
Total136  $88,771  143  $66,781  203  $37,636  
(1)Post-modification balances approximate pre-modification balances. The aggregate amount of charge-offs as a result of the restructurings was not significant.
(2)Other includes covenant modifications, forbearance, loans discharged under Chapter 7 bankruptcy, and/or other concessions.
For the year ended December 31, 2019 there were six Commercial non-mortgage and one Commercial Real Estate TDRs with a recorded investment of $0.8 million and $1.7 million, respectively, that had been modified within the previous 12 months and for which there was a payment default. There were no significant amounts for the years ended December 31, 2018 and 2017.
The recorded investment of TDRs in commercial, commercial real estate, and equipment financing segregated by risk rating exposure is as follows:
At December 31,
(In thousands)20192018
(1) - (6) Pass$3,952  $13,165  
(7) Special Mention63  84  
(8) Substandard104,277  67,880  
(9) Doubtful3,860  6,610  
Total$112,152  $87,739  

78


Note 5: Transfers of Financial Assets
Transfers of Financial Assets
The Company sells financial assets in the normal course of business, primarily residential mortgage loans sold to government-sponsored enterprises through established programs and securitization. Residential mortgage origination fees, adjustments for changes in fair value, and gain or loss on loans sold are included as mortgage banking activities in the consolidated statement of income.
The Company may be required to repurchase a loan in the event of certain breaches of the representations and warranties, or in the event of default of the borrower within 90 days of sale, as provided for in the sale agreements. A reserve for loan repurchases provides for estimated losses pertaining to the potential repurchase of loans associated with the Company's mortgage banking activities. The reserve reflects loan repurchase requests received by the Company for which management evaluates the identity of counterparty, the vintage of the loans sold, the amount of open repurchase requests, specific loss estimates for each open request, the current level of loan losses in similar vintages held in the residential loan portfolio, and estimated recoveries on the underlying collateral. The reserve also reflects management’s expectation of losses from loan repurchase requests for which the Company has not yet been notified. The provision recorded at the time of the loan sale is netted from the gain or loss recorded in mortgage banking activities, while any incremental provision, post loan sale, is recorded in other non-interest expense in the consolidated statement of income.
The following table provides a summary of activity in the reserve for loan repurchases:
 Years ended December 31,
(In thousands)201920182017
Beginning balance$674  $872  $790  
Provision (benefit) charged to expense1,865  (160) 100  
Repurchased loans and settlements charged off(2,031) (38) (18) 
Ending balance$508  $674  $872  
The increase to the provision and corresponding charge-off during 2019 was related to a discrete legal settlement in connection with previously sold loans.
The following table provides information for mortgage banking activities:
 Years ended December 31,
(In thousands)201920182017
Residential mortgage loans held for sale:
Proceeds from sale$216,239  $188,025  $335,656  
Loans sold with servicing rights retained199,114  166,909  304,788  
Net gain on sale4,031  3,146  6,211  
Ancillary fees1,614  1,544  2,629  
Fair value option adjustment470  (266) 1,097  
Additionally, loans not originated for sale were sold approximately at carrying value, except as noted, for cash proceeds of: $17.0 million for certain commercial loans, resulting in a gain of $0.7 million, and $4.0 million for certain residential loans for the year ended December 31, 2019; $1.3 million for certain commercial loans and $0.4 million for certain residential loans for the year ended December 31, 2018; and $7.2 million for certain commercial loans and $7.4 for certain residential loans for the year ended December 31, 2017.
The Company has retained servicing rights on residential mortgage loans totaling $2.4 billion and $2.5 billion at December 31, 2019 and 2018, respectively.
The following table presents the changes in carrying value for mortgage servicing assets:
 Years ended December 31,
(In thousands)201920182017
Beginning balance$21,215  $25,139  $24,466  
Additions3,587  4,459  9,249  
Amortization(7,318) (8,383) (8,576) 
Ending balance$17,484  $21,215  $25,139  
Loan servicing fees, net of mortgage servicing rights amortization, were $1.9 million, $1.2 million, and $0.8 million, for the years ended December 31, 2019, 2018, and 2017, respectively, and are included as a component of loan and lease related fees in the consolidated statement of income.
Refer to Note 17: Fair Value Measurements for additional information on loans held for sale and mortgage servicing assets.
79


Note 6: Premises and Equipment
A summary of premises and equipment follows:
  
At December 31,
(In thousands)20192018
Land$10,997  $10,997  
Buildings and improvements77,892  79,619  
Leasehold improvements77,346  77,669  
Fixtures and equipment73,946  75,219  
Data processing and software263,445  252,723  
Property and equipment503,626  496,227  
Less: Accumulated depreciation and amortization(388,562) (371,377) 
Property and equipment, net115,064  124,850  
Leased assets, net155,349    
Premises and equipment, net$270,413  $124,850  

Depreciation and amortization of property and equipment was $33.7 million, $34.9 million, and $33.1 million for the years ended December 31, 2019, 2018, and 2017, respectively.
Additional information about leased assets is provided in Note 7: Leasing.
Assets held for disposition are included as a component of accrued interest receivable and other assets in the consolidated balance sheets.
The following table provides a summary of activity for assets held for disposition:
Years ended December 31,
(In thousands)20192018
Beginning balance$91  $144  
Additions  498  
Write-downs(91) (137) 
Sales  (414) 
Ending balance$  $91  

80


Note 7: Leasing
The Company enters into leases, as lessee, primarily for office space, banking centers, and certain other operational assets. These leases are generally classified as operating leases, however, an insignificant amount are classified as finance leases. The Company's operating leases generally have lease terms for periods of 5 to 20 years with various renewal options. The Company does not have any material sub-lease agreements.
The following table summarizes lessee information related to the Company’s operating ROU assets and lease liability:
At December 31, 2019
(In thousands)Operating Leases  Consolidated Balance Sheet Line Item Location  
ROU lease assets $155,052  Premises and equipment, net
 
 
Lease liabilities174,396  Operating lease liabilities  
The components of operating lease cost and other related information are as follows:
(In thousands)At or for the Year ended December 31, 2019
Lease Cost:
Operating lease costs$29,908  
Variable lease costs4,889  
Sublease income(577) 
Total operating lease cost$34,220  
Other Information:
Cash paid for amounts included in the measurement of lease liabilities$31,223  
Right-of-use assets obtained in exchange for new operating lease liabilities22,948  
Weighted-average remaining lease term, in years8.39
Weighted-average discount rate - operating leases3.31  %
The undiscounted scheduled maturities reconciled to total operating lease liabilities are as follows:
(In thousands)At December 31, 2019
2020$28,504  
202130,070  
202226,548  
202323,647  
202420,215  
Thereafter74,134  
Total operating lease liability payments203,118  
Less: Present value adjustment28,722  
Lease liabilities$174,396  
Refer to Note 4: Loans and Leases for information relating to leases included within the equipment financing portfolio in which the Company is lessor.

81


Note 8: Goodwill and Other Intangible Assets
The net carrying amount for goodwill at December 31, 2019 was $538.4 million, comprised of $516.6 million in Community Banking and $21.8 million in HSA Bank. There was no change to these carrying amounts during 2019.
Other intangible assets by reportable segment consisted of the following:
 At December 31,
20192018
(In thousands)Gross Carrying
Amount
Accumulated
Amortization
Net Carrying
Amount
Gross Carrying
Amount
Accumulated
Amortization
Net Carrying
Amount
Other intangible assets:
HSA Bank - Core deposits$22,000  $13,073  $8,927  $22,000  $10,842  $11,158  
HSA Bank - Customer relationships21,000  8,010  12,990  21,000  6,394  14,606  
Total other intangible assets$43,000  $21,083  $21,917  $43,000  $17,236  $25,764  
At December 31, 2019, the remaining estimated aggregate future amortization expense for other intangible assets is as follows:
(In thousands)
2020$3,847  
20213,847  
20223,847  
20233,847  
20241,615  
Thereafter4,914  

Note 9: Income Taxes
Income tax expense reflects the following expense (benefit) components:
 Years ended December 31,
(In thousands)201920182017
Current:  
Federal$84,447  $58,334  $96,364  
State and local18,595  13,409  11,061  
Total current103,042  71,743  107,425  
Deferred:
Federal811  8,508  39,568  
State and local116  964  (48,642) 
Total deferred927  9,472  (9,074) 
Total federal85,258  66,842  135,932  
Total state and local18,711  14,373  (37,581) 
Income tax expense$103,969  $81,215  $98,351  
Included in the Company's income tax expense for the years ended December 31, 2019, 2018, and 2017, are net tax credits of $4.8 million, $1.2 million, and $1.6 million, respectively. Income tax expense in 2017 also included benefits from operating loss carryforwards of $25.1 million. These net tax credits and benefits are exclusive of the Tax Act impacts.
The $4.8 million of net tax credits in 2019 includes $3.0 million, related to federal and state research tax credits, $2.4 million of which relates to the Company’s qualifying technology expenditures incurred between 2015 and 2018.
The Company's deferred state and local benefit in 2017 includes $47.5 million related to a reduction in its beginning-of-year valuation allowance for SALT DTA's, or $37.5 million net of deferred federal expense of $10.0 million. The deferred state and local benefit in 2017 also includes $1.8 million from other SALT DTA adjustments, net of federal effects.
The Company's deferred federal expense in 2017 also includes $31.5 million from a re-measurement of its DTA upon the enactment of the Tax Act. Due to a $10.6 million impact of the Tax Act on the $39.3 million of net SALT DTA adjustments noted above, the Company reported a $20.9 million expense attributable to the Tax Act, and a $28.7 million net benefit from SALT DTAs in 2017.
82


The following table reflects a reconciliation of reported income tax expense to the amount that would result from applying the federal statutory rate of 21.0% in 2019, and 2018, and 35.0% and 2017:
 Years ended December 31,
 201920182017
(Dollars in thousands)AmountPercentAmountPercentAmountPercent
Income tax expense at federal statutory rate$102,205  21.0 %$92,743  21.0 %$123,826  35.0 %
Reconciliation to reported income tax expense:
SALT expense, net of federal14,782  3.0  11,354  2.6  8,189  2.3  
Tax-exempt interest income, net(6,752) (1.4) (6,475) (1.5) (10,826) (3.1) 
Increase in cash surrender value of life insurance(3,069) (0.6) (3,069) (0.7) (5,120) (1.4) 
Excess tax benefits, net(2,251) (0.4) (4,483) (1.0) (6,349) (1.8) 
Non-deductible FDIC Deposit insurance premiums1,904  0.4  2,215  0.5      
SALT DTA adjustments, net of federal        (28,724) (8.1) 
Tax Act impacts, net    (10,982) (2.5) 20,891  5.9  
Other, net(2,850) (0.6) (88)   (3,536) (1.0) 
Income tax expense and effective tax rate$103,969  21.4 %$81,215  18.4 %$98,351  27.8 %
Included in the Tax Act impacts, net for 2018 are $10.4 million of tax planning benefits related to the Tax Act.
The following table reflects the significant components of the DTAs, net:
  At December 31,
(In thousands)20192018
Deferred tax assets:
Allowance for loan and lease losses$53,851  $54,390  
Net operating loss and credit carry forwards69,827  70,808  
Compensation and employee benefit plans24,518  29,623  
Lease liabilities under operating leases45,923    
Net unrealized loss on securities available for sale  25,060  
Other9,521  14,388  
Gross deferred tax assets203,640  194,269  
Valuation allowance38,181  38,181  
Total deferred tax assets, net of valuation allowance$165,459  $156,088  
Deferred tax liabilities:
Net unrealized gain on securities available for sale$6,430  $  
ROU assets under operating leases40,908    
Equipment financing leases31,332  28,140  
Premises and equipment7,838  10,293  
Loan origination costs, net6,816  9,608  
Goodwill and other intangible assets6,172  6,293  
Other3,988  5,238  
Gross deferred tax liabilities103,484  59,572  
Deferred tax assets, net$61,975  $96,516  
The Company's DTAs, net decreased by $34.5 million during 2019, reflecting the $0.9 million deferred tax expense and a $33.6 million benefit allocated directly to shareholders' equity.
The $38.2 million valuation allowance at December 31, 2019 is attributable to SALT net operating loss carryforwards, which approximated $1.2 billion.
SALT net operating loss carryforwards approximated $1.2 billion at December 31, 2019 and are scheduled to expire in varying amounts during tax years 2024 through 2032. The valuation allowance has been established for approximately $644.4 million of those net operating loss carryforwards estimated to expire unused. Credit carryovers of $0.7 million, net at December 31, 2019 have a five-year carryover period and are scheduled to expire in varying amounts during tax years 2020 through 2024.
Management believes it is more likely than not that the results of future operations will generate sufficient taxable income to realize its total DTAs, net of the valuation allowance. Although taxable income in prior years is no longer able to be included as a source of taxable income, due to the general repeal of the carryback of net operating losses under the Tax Act, significant positive evidence remains in support of management's conclusion regarding the realizability of Webster's DTAs, including projected future reversals of existing taxable temporary differences and book-taxable income levels in recent and projected in future years. There can, however, be no assurance that any specific level of future income will be generated or that the Company’s DTAs will ultimately be realized.
83


A deferred tax liability of $15.3 million has not been recognized for certain thrift bad-debt reserves, established before 1988, that would become taxable upon the occurrence of certain events: distributions by Webster Bank in excess of certain earnings and profits; the redemption of Webster Bank’s stock; or liquidation. Webster does not expect any of those events to occur. At December 31, 2019 the cumulative taxable temporary differences applicable to those reserves approximated $58.0 million.
The following table reflects a reconciliation of the beginning and ending balances of unrecognized tax benefits (UTBs):
Years ended December 31,
(In thousands)201920182017
Beginning balance$2,856  $3,595  $3,847  
Additions as a result of tax positions taken during the current year1,106  249  584  
Additions as a result of tax positions taken during prior years1,744  71  7  
Reductions as a result of tax positions taken during prior years(238) (474) (61) 
Reductions relating to settlements with taxing authorities(18) (97) (392) 
Reductions as a result of lapse of statute of limitation periods(637) (488) (390) 
Ending balance$4,813  $2,856  $3,595  
At December 31, 2019, 2018, and 2017, there were $3.9 million, $2.3 million, and $2.8 million, respectively, of UTBs that if recognized would affect the effective tax rate.
Webster recognizes interest and penalties related to UTBs, where applicable, in income tax expense. During the years ended December 31, 2019, 2018, and 2017, Webster recognized a benefit of $0.1 million, none, and an expense of $0.2 million, respectively. At December 31, 2019 and 2018, the Company had accrued interest and penalties related to UTBs of $1.8 million.
Webster has determined it is reasonably possible that its total UTBs could decrease by an amount in the range of $1.9 million to $2.7 million by the end of 2020 as a result of potential lapses in statute-of-limitation periods and/or potential settlements with state and local taxing authorities concerning apportionment and tax-base determinations.
Webster's federal tax returns for all years subsequent to 2014 remain open to examination. Webster's tax returns to its principal state tax jurisdictions of Connecticut, Massachusetts, New York, and Rhode Island for years subsequent to 2014 are either under or remain open to examination.
Note 10: Deposits
A summary of deposits by type follows:
At December 31,
(In thousands)20192018
Non-interest-bearing:
Demand$4,446,463  $4,162,446  
Interest-bearing:
Health savings accounts6,416,135  5,740,601  
Checking2,689,734  2,518,472  
Money market2,312,840  2,100,084  
Savings4,354,809  4,140,696  
Time deposits3,104,765  3,196,546  
Total interest-bearing18,878,283  17,696,399  
Total deposits$23,324,746  $21,858,845  
Time deposits and interest-bearing checking, included in above balances, obtained through brokers$652,151  $869,003  
Time deposits, included in above balance, that exceed the FDIC limit661,334  555,949  
Demand deposit overdrafts reclassified as loan balances1,721  2,245  
The scheduled maturities of time deposits are as follows:
(In thousands)At December 31, 2019
2020$2,621,413  
2021358,454  
202273,463  
202329,283  
202422,152  
Total time deposits$3,104,765  

84


Note 11: Borrowings
Total borrowings of $3.5 billion at December 31, 2019 and $2.6 billion at December 31, 2018, are described in detail below.
The following table summarizes securities sold under agreements to repurchase and other borrowings:
At December 31,
(In thousands)20192018
Total OutstandingRateTotal OutstandingRate
Securities sold under agreements to repurchase (1):
Original maturity of one year or less$240,431  0.19 %$236,874  0.35 %
Original maturity of greater than one year, non-callable200,000  1.78      
Total securities sold under agreements to repurchase440,431  0.91  236,874  0.35  
Fed funds purchased600,000  1.59  345,000  2.52  
Securities sold under agreements to repurchase and other borrowings$1,040,431  1.30  $581,874  1.64  
(1)The Company has right of offset with respect to all repurchase agreement assets and liabilities. Total securities sold under agreements to repurchase are presented as gross transactions, as only liabilities are outstanding for the periods presented.
Repurchase agreements are used as a source of borrowed funds and are collateralized by U.S. Government agency mortgage-backed securities. Repurchase agreement counterparties are limited to primary dealers in government securities and commercial/municipal customers through the Corporate Treasury function.
The following table provides information for FHLB advances:
At December 31,
20192018
(Dollars in thousands)Total
Outstanding
Weighted-
Average Contractual Coupon Rate
Total
Outstanding
Weighted-
Average Contractual Coupon Rate
Maturing within 1 year$1,690,000  1.79 %$1,403,026  2.55 %
After 1 but within 2 years200,000  2.53  215,000  1.73  
After 2 but within 3 years130    200,000  3.16  
After 3 but within 4 years229  2.95  150    
After 4 but within 5 years50,000  1.59  242  2.95  
After 5 years8,117  2.66  8,390  2.65  
FHLB advances$1,948,476  1.87  $1,826,808  2.52  
Aggregate carrying value of assets pledged as collateral$7,318,748  $6,689,761  
Remaining borrowing capacity 2,937,644  2,568,664  
Webster Bank is in compliance with FHLB collateral requirements for the periods presented. Eligible collateral, primarily certain residential and commercial real estate loans, has been pledged to secure FHLB advances.
The following table summarizes long-term debt:
At December 31,
(Dollars in thousands)20192018
4.375 Senior fixed-rate notes due February 15, 2024$150,000  $150,000  
4.100 %
Senior fixed-rate notes due March 25, 2029 (1)
317,486    
Junior subordinated debt Webster Statutory Trust I floating-rate notes due September 17, 2033 (2)
77,320  77,320  
Total notes and subordinated debt544,806  227,320  
Discount on senior fixed-rate notes(1,412) (608) 
Debt issuance cost on senior fixed-rate notes(3,030) (691) 
Long-term debt$540,364  $226,021  
(1)In March 2019, the Company completed a $300 million senior fixed-rate notes issuance. The fixed interest rate has been designated in a fair value hedging relationship and swapped to a weighted-average variable rate of 3.40% at December 31, 2019. The $17.5 million basis adjustment included in the carrying value reflects the changes in the benchmark rate.
(2)The interest rate on Webster Statutory Trust I floating-rate notes, which varies quarterly based on 3-month LIBOR plus 2.95%, was 4.85% at December 31, 2019 and 5.74% at December 31, 2018.
85


Note 12: Shareholders' Equity
Share activity during the year ended December 31, 2019 is as follows:
Preferred Stock Series FCommon Stock IssuedTreasury Stock HeldCommon Stock Outstanding
Balance at January 1, 20196,000  93,686,311  1,508,456  92,177,855  
Restricted share activity    (16,045) 16,045  
Stock options exercised    (59,861) 59,861  
Common stock repurchased    227,199  (227,199) 
Balance at December 31, 20196,000  93,686,311  1,659,749  92,026,562  
Common Stock
Webster maintains a common stock repurchase program which authorizes management to purchase shares of its common stock, in open market or privately negotiated transactions, subject to market conditions and other factors. On October 29, 2019, the Company's Board of Directors approved a modification to this program, originally approved on October 24, 2017, increasing the maximum dollar amount available for repurchase to $200 million. Common stock repurchased during 2019 was acquired at an average cost of $57.23 per common share. The shares were acquired prior to the modification and, therefore, the remaining repurchase authority under the common stock repurchase program was $200.0 million at December 31, 2019.
Preferred Stock
Webster has 6,000,000 depository shares outstanding, each representing 1/1000th ownership interest in a share of Webster's 5.25% Series F Non-Cumulative Perpetual Preferred Stock, par value $0.01 per share, with a liquidation preference of $25,000 per share (equivalent to $25 per depository share) (the Series F Preferred Stock). Webster will pay dividends as declared by the Board of Directors or a duly authorized committee of the Board. Dividends are payable at a rate of 5.25% per annum, quarterly in arrears, on the fifteenth day of each March, June, September, and December. Dividends on the Series F Preferred Stock are not cumulative and are not mandatory. If for any reason the Board of Directors or a duly authorized committee of the Board does not declare a dividend on the Series F Preferred Stock for any dividend period, such dividend will not accrue or be payable, and Webster will have no obligation to pay dividends for such dividend period, whether or not dividends are declared for any future dividend periods. The terms of the Series F Preferred Stock prohibit the Company from declaring or paying any cash dividends on its common stock, unless Webster has declared and paid full dividends on the Series F Preferred Stock for the most recently completed dividend period.
The Company may redeem the Series F Preferred Stock, at its option in whole or in part, on December 15, 2022, or any dividend payment date thereafter, or in whole but not in part upon a "regulatory capital treatment event" as defined in the certificate of designation, at a redemption price equal to the liquidation preference plus any declared and unpaid dividends, without accumulation of any undeclared dividends. The Series F Preferred Stock does not have any voting rights except with respect to authorizing or increasing the authorized amount of senior stock, certain changes to the terms of the Series F Preferred Stock, or in the case of certain dividend non-payments.
86


Note 13: Accumulated Other Comprehensive Loss, Net of Tax
The following table summarizes the changes in AOCL by component:
(In thousands)Available For Sale Securities Derivative InstrumentsDefined Benefit Pension and Other Postretirement Benefit PlansTotal
Balance at December 31, 2016$(15,476) $(17,068) $(44,449) $(76,993) 
Other comprehensive (loss) income before reclassifications(7,590) 181  98  (7,311) 
Amounts reclassified from accumulated other comprehensive loss  4,384  4,037  8,421  
Net current-period other comprehensive (loss) income, net of tax(7,590) 4,565  4,135  1,110  
Balance at Adoption of ASU No. 2018-02, Income Statement - Reporting Comprehensive Income (Topic 220) - Reclassification of Certain Tax Effects from AOCI(4,881) (2,513) (8,254) (15,648) 
Balance at December 31, 2017(27,947) (15,016) (48,568) (91,531) 
Other comprehensive (loss) income before reclassifications(43,427) 208  (7,122) (50,341) 
Amounts reclassified from accumulated other comprehensive loss  5,495  5,725  11,220  
Net current-period other comprehensive (loss) income, net of tax(43,427) 5,703  (1,397) (39,121) 
Balance at December 31, 2018(71,374) (9,313) (49,965) (130,652) 
Other comprehensive income (loss) before reclassifications88,647  (4,945) 1,622  85,324  
Amounts reclassified from accumulated other comprehensive loss(22) 5,074  4,204  9,256  
Net current-period other comprehensive income, net of tax88,625  129  5,826  94,580  
Balance at December 31, 2019$17,251  $(9,184) $(44,139) $(36,072) 
The following table provides information for the items reclassified from AOCL:
Years ended December 31,
Accumulated Other Comprehensive Loss Components201920182017Associated Line Item in the Consolidated Statement Of Income
(In thousands)
Available-for-sale securities:
Unrealized gains on investments$29  $  $  Gain on sale of investment securities, net  
Tax expense(7)     Income tax expense  
Net of tax$22  $  $  
Derivative instruments:
Hedge terminations$(5,509) $(7,425) $(7,160) Interest expense  
Premium amortization(1,323)     Interest income  
Tax benefit1,758  1,930  2,776  Income tax expense  
Net of tax$(5,074) $(5,495) $(4,384) 
Defined benefit pension and other postretirement benefit plans:
Amortization of net loss$(5,706) $(7,708) $(6,612) Other non-interest expense  
Tax benefit1,502  1,983  2,575  Income tax expense  
Net of tax$(4,204) $(5,725) $(4,037) 

87


The following tables summarize the items and related tax effects for each component of OCI/OCL, net of tax:
Year ended December 31, 2019
(In thousands)Pre-Tax AmountTax Benefit (Expense)Net of Tax Amount
Available-for-sale securities:
Net unrealized gain during the period$120,333  $(31,686) $88,647  
Reclassification for net gain included in net income(29) 7  (22) 
Total available-for-sale securities120,304  (31,679) 88,625  
Derivative instruments:
Net unrealized loss during the period(6,672) 1,727  (4,945) 
Reclassification adjustment for net loss included in net income6,832  (1,758) 5,074  
Total derivative instruments160  (31) 129  
Defined benefit pension and other postretirement benefit plans:
Current year actuarial gain2,202  (580) 1,622  
Reclassification adjustment for amortization of net loss included in net income5,706  (1,502) 4,204  
Total defined benefit pension and postretirement benefit plans7,908  (2,082) 5,826  
Other comprehensive income, net of tax$128,372  $(33,792) $94,580  
Year ended December 31, 2018  
(In thousands)Pre-Tax AmountTax Benefit (Expense)Net of Tax Amount
Available-for-sale securities:
Net unrealized loss during the period$(58,792) $15,365  $(43,427) 
Reclassification for net gain included in net income      
Total available-for-sale securities(58,792) 15,365  (43,427) 
Derivative instruments:
Net unrealized gain during the period280  (72) 208  
Reclassification adjustment for net loss included in net income7,425  (1,930) 5,495  
Total derivative instruments7,705  (2,002) 5,703  
Defined benefit pension and other postretirement benefit plans:
Current year actuarial loss(9,600) 2,478  (7,122) 
Reclassification adjustment for amortization of net loss included in net income7,708  (1,983) 5,725  
Total defined benefit pension and postretirement benefit plans(1,892) 495  (1,397) 
Other comprehensive loss, net of tax$(52,979) $13,858  $(39,121) 
Year ended December 31, 2017  
(In thousands)Pre-Tax AmountTax Benefit (Expense)Net of Tax Amount
Available-for-sale securities:
Net unrealized loss during the period$(12,423) $4,833  $(7,590) 
Reclassification for net gain included in net income      
Total available-for-sale securities(12,423) 4,833  (7,590) 
Derivative instruments:
Net unrealized gain during the period291  (110) 181  
Reclassification adjustment for net loss included in net income7,160  (2,776) 4,384  
Total derivative instruments7,451  (2,886) 4,565  
Defined benefit pension and other postretirement benefit plans:
Current year actuarial gain155  (57) 98  
Reclassification adjustment for amortization of net loss included in net income6,612  (2,575) 4,037  
Total defined benefit pension and postretirement benefit plans6,767  (2,632) 4,135  
Other comprehensive income, net of tax$1,795  $(685) $1,110  

88


Note 14: Regulatory Matters
Capital Requirements
Webster Financial Corporation is subject to regulatory capital requirements administered by the Federal Reserve System, while Webster Bank is subject to regulatory capital requirements administered by the OCC. Regulatory authorities can initiate certain mandatory actions if Webster Financial Corporation or Webster Bank fail to meet minimum capital requirements, which could have a direct material effect on the Company's financial statements. Under capital adequacy guidelines and the regulatory framework for prompt corrective action, both Webster Financial Corporation and Webster Bank must meet specific capital guidelines that involve quantitative measures of assets, liabilities, and certain off-balance sheet items calculated under regulatory accounting practices. These quantitative measures require minimum amounts and ratios to ensure capital adequacy.
Basel III, total risk-based capital is comprised of three categories: CET1 capital, additional Tier 1 capital, and Tier 2 capital. CET1 capital includes common shareholders' equity, less deductions for goodwill, other intangibles, and certain deferred tax adjustments. Common shareholders' equity, for purposes of CET1 capital, excludes AOCL components as permitted by the opt-out election taken by Webster upon adoption of Basel III. Tier 1 capital is comprised of CET1 capital plus perpetual preferred stock, while Tier 2 capital includes qualifying subordinated debt and qualifying allowance for credit losses, that together equal total capital.
The following table provides information on the capital ratios for Webster Financial Corporation and Webster Bank:
ActualCapital Requirements
 Adequately CapitalizedWell Capitalized
(Dollars in thousands)AmountRatioAmountRatioAmountRatio
At December 31, 2019
Webster Financial Corporation
CET1 risk-based capital$2,516,361  11.56 %$979,739  4.5 %$1,415,179  6.5 %
Total risk-based capital2,950,181  13.55  1,741,758  8.0  2,177,198  10.0  
Tier 1 risk-based capital2,661,398  12.22  1,306,319  6.0  1,741,758  8.0  
Tier 1 leverage capital 2,661,398  8.96  1,188,507  4.0  1,485,634  5.0  
Webster Bank
CET1 risk-based capital$2,527,645  11.61 %$979,497  4.5 %$1,414,829  6.5 %
Total risk-based capital2,739,108  12.58  1,741,328  8.0  2,176,660  10.0  
Tier 1 risk-based capital2,527,645  11.61  1,305,996  6.0  1,741,328  8.0  
Tier 1 leverage capital 2,527,645  8.51  1,187,953  4.0  1,484,941  5.0  
At December 31, 2018
Webster Financial Corporation
CET1 risk-based capital$2,284,978  11.44 %$898,972  4.5 %$1,298,514  6.5 %
Total risk-based capital2,722,194  13.63  1,598,172  8.0  1,997,715  10.0  
Tier 1 risk-based capital2,430,015  12.16  1,198,629  6.0  1,598,172  8.0  
Tier 1 leverage capital 2,430,015  9.02  1,077,303  4.0  1,346,628  5.0  
Webster Bank
CET1 risk-based capital$2,170,566  10.87 %$898,317  4.5 %$1,297,569  6.5 %
Total risk-based capital2,385,425  11.95  1,597,008  8.0  1,996,260  10.0  
Tier 1 risk-based capital2,170,566  10.87  1,197,756  6.0  1,597,008  8.0  
Tier 1 leverage capital 2,170,566  8.06  1,076,712  4.0  1,345,889  5.0  
Dividend Restrictions
Webster Financial Corporation is dependent upon dividends from Webster Bank to provide funds for its cash requirements, including payments of dividends to shareholders. Banking regulations may limit the amount of dividends that may be paid. Approval by regulatory authorities is required if the effect of dividends declared would cause the regulatory capital of Webster Bank to fall below specified minimum levels, or if dividends declared exceed the net income for that year combined with the undistributed net income for the preceding two years. Dividends paid by Webster Bank to Webster Financial Corporation totaled $360 million and $290 million during the years ended December 31, 2019 and 2018, respectively.
Cash Restrictions
Webster Bank is required by Federal Reserve System regulations to hold cash reserve balances, on hand or with Federal Reserve Banks. Pursuant to this requirement, the Bank held $93.8 million and $81.2 million at December 31, 2019 and 2018, respectively.
89


Note 15: Earnings Per Common Share
Reconciliation of the calculation of basic and diluted earnings per common share follows:
 Years ended December 31,
(In thousands, except per share data)201920182017
Earnings for basic and diluted earnings per common share:
Net income$382,723  $360,418  $255,439  
Less: Preferred stock dividends7,875  7,853  8,184  
Net income available to common shareholders374,848  352,565  247,255  
Less: Earnings applicable to participating securities (1)
1,863  862  424  
Earnings applicable to common shareholders$372,985  $351,703  $246,831  
Shares:
Weighted-average common shares outstanding - basic91,559  91,930  91,965  
Effect of dilutive securities323  297  391  
Weighted-average common shares outstanding - diluted91,882  92,227  92,356  
Earnings per common share (1):
Basic$4.07  $3.83  $2.68  
Diluted 4.06  3.81  2.67  
(1)Earnings per common share amounts under the two-class method, for nonvested time-based restricted shares with nonforfeitable dividends and dividend rights, are determined the same as the presentation above.
Dilutive Securities
The Company maintains stock compensation plans under which restricted stock, restricted stock units, non-qualified stock options, incentive stock options, or stock appreciation rights may be granted to employees and directors. The effect of dilutive securities for the periods presented is primarily the result of outstanding stock options, as well as non-participating restricted stock.
Potential common shares from non-participating restricted stock of $73 thousand, $47 thousand, and $58 thousand for the years ended December 31, 2019, 2018, and 2017, respectively, are excluded from the effect of dilutive securities because they would have been anti-dilutive under the treasury stock method.
Refer to Note 12: Shareholders' Equity and Note 19: Share-Based Plans for further information relating to potential common shares excluded from the effect of dilutive securities.
90


Note 16: Derivative Financial Instruments
Derivative Positions and Offsetting
Derivatives Designated in Hedge Relationships. Interest rate swaps allow the Company to change the fixed or variable nature of an interest rate without the exchange of the underlying notional amount. Certain pay fixed/receive variable interest rate swaps are designated as cash flow hedges to convert floating-rate debt into fixed-rate debt, while certain receive fixed/pay variable interest rate swaps are designated as fair value hedges to convert fixed-rate long-term debt into a variable-rate obligation. Certain purchased options are designated as cash flow hedges. Purchased options allow the Company to limit the potential adverse impact of variable interest rates by establishing a cap or a floor strike rate in exchange for an upfront premium. The purchased options designated as cash flow hedges represent interest rate caps where payment is received from the counterparty if interest rates rise above the contractual strike rate and interest rate floors where payment is received from the counterparty when interest rates fall below the contractual strike rate.
Derivatives Not Designated in Hedge Relationships. The Company also enters into other derivative transactions to manage economic risks but does not designate the instruments in hedge relationships. Further, the Company enters into derivative contracts to accommodate customer needs. Derivative contracts with customers are offset with dealer counterparty transactions structured with matching terms to ensure minimal impact on earnings.
The following table presents the notional amounts and fair values of derivative positions:
At December 31, 2019At December 31, 2018
Asset DerivativesLiability DerivativesAsset DerivativesLiability Derivatives
(In thousands)Notional
Amounts
Fair
Value
Notional
Amounts
Fair
Value
Notional
Amounts
Fair
Value
Notional
Amounts
Fair
Value
Designated as hedging instruments:
Interest rate derivatives (1) (2)
$1,225,000  $11,855  $300,000  $3,153  $325,000  $3,050  $  $  
Not designated as hedging instruments:
Interest rate derivatives (1)
4,869,139  133,455  4,090,522  9,732  4,435,530  42,205  3,643,985  38,029  
Mortgage banking derivatives (3)
27,873  329  57,000  110  13,599  226  17,000  293  
Other (4)
76,544  398  275,279  818  85,432  797  140,601  688  
Total not designated as hedging instruments4,973,556  134,182  4,422,801  10,660  4,534,561  43,228  3,801,586  39,010  
Gross derivative instruments, before netting$6,198,556  146,037  $4,722,801  13,813  $4,859,561  46,278  $3,801,586  39,010  
Less: Master netting agreements
4,779  4,779  2,495  2,495  
Cash collateral8,100  1,871  4,936    
Total derivative instruments, after netting$133,158  $7,163  $38,847  $36,515  
(1)Balances related to Chicago Mercantile Exchange (CME) are presented as a single unit of account. In accordance with its rule book, CME legally characterizes variation margin payments as settlement of derivatives rather than collateral against derivative positions. Notional amounts of interest rate swaps cleared through CME include $1.1 billion and $1.9 billion for asset derivatives and $2.6 billion and $1.1 billion for liability derivatives at December 31, 2019 and December 31, 2018, respectively. The related fair values approximate zero.
(2)The increase in the notional amount is for $1.0 billion of interest rate floors purchased due to balance sheet management activities.
(3)Notional amounts related to residential loan commitments include mandatory forward commitments of $57.0 million, while notional amounts do not include approved floating rate commitments of $7.3 million, at December 31, 2019.
(4)Other derivatives include foreign currency forward contracts related to lending arrangements and customer hedging activity, a Visa equity swap transaction, and risk participation agreements. Notional amounts of risk participation agreements include $65.7 million and $65.0 million for asset derivatives and $223.4 million and $96.3 million for liability derivatives at December 31, 2019 and December 31, 2018, respectively, that have insignificant related fair values.
The following table presents fair value positions transitioned from gross to net upon application of counterparty netting agreements:
At December 31, 2019
(In thousands)Gross
Amount
Offset AmountNet Amount on Balance Sheet Amounts Not Offset  Net Amounts
Asset derivatives$13,012  12,879  $133  $299  $432  
Liability derivatives6,710  6,650  60  329  389  
At December 31, 2018
(In thousands)Gross
Amount
Offset AmountNet Amount on Balance Sheet Amounts Not Offset    Net Amounts  
Asset derivatives$9,928  $7,431  $2,497  $  $2,497  
Liability derivatives2,566  2,495  71  756  827  
91


Derivative Activity
The following table presents the change in fair value for derivatives designated as fair value hedges as well as the offsetting change in fair value on the hedged item and the income statement effect of derivatives designated as cash flow hedges:
Recognized InYears ended December 31,
(In thousands)Net Interest Income201920182017
Fair value hedges:
Recognized on derivativesLong-term debt$17,486  $  $  
Recognized on hedged itemsLong-term debt(17,486)     
Net recognized on fair value hedges$  $  $  
Cash flow hedges:
Interest rate derivativesLong-term debt$4,241  $6,557  $7,885  
Interest rate derivativesInterest and fees on loans and leases1,314      
Net recognized on cash flow hedges$5,555  $6,557  $7,885  
Additional information related to fair value hedges:
Consolidated Balance Sheet Line Item in Which Hedged Item is LocatedCarrying Amount of Hedged ItemCumulative Amount of Fair Value Hedging Adjustment Included in Carrying Amount
At December 31,At December 31,
(In thousands)2019201820192018
Long-term debt$317,486  $  $17,486  $  
The following table presents the effect on the income statement for derivatives not designated as hedging instruments:
Recognized InYears ended December 31,
(In thousands)Non-interest Income201920182017
Interest rate derivativesOther income$8,477  $10,376  $2,702  
Mortgage banking derivativesMortgage banking activities(6) (378) (2,062) 
OtherOther income1,100  2,391  (526) 
Total not designated as hedging instruments$9,571  $12,389  $114  
Purchased options designated as cash flow hedges exclude time-value premiums from the assessment of hedge effectiveness. Time-value premiums are amortized on a straight-line basis. During 2019, $1.3 million was amortized to net interest income. At December 31, 2019, the remaining unamortized balance of time-value premiums was $12.1 million.
Over the next twelve months, an estimated $4.8 million reduction to interest expense will be reclassified from AOCL relating to cash flow hedges, and an estimated $2.3 million increase to interest expense will be reclassified from AOCL relating to hedge terminations. At December 31, 2019, the remaining unamortized loss on terminated cash flow hedges is $4.9 million. The maximum length of time over which forecasted transactions are hedged is 10 years.
Additional information about cash flow hedge activity impacting AOCL and the related amounts reclassified to earnings is provided in Note 13: Accumulated Other Comprehensive Loss, Net of Tax. Information about the valuation methods used to measure the fair value of derivatives is provided in Note 17: Fair Value Measurements.
Derivative Exposure
Webster reviews collateral positions on a daily basis and exchanges collateral with counterparties in accordance with standard ISDA documentation, Dodd-Frank requirements, central clearing rules, and other related agreements. The Company had approximately $121.6 million in net margin posted with financial counterparties or the derivative clearing organization at December 31, 2019, which is primarily comprised of $56.6 million in initial margin collateral posted at CME and $71.3 million in CME variation margin posted. At December 31, 2019, $8.4 million of cash collateral received is included in cash and due from banks on the consolidated balance sheet and is considered restricted in nature.
Webster regularly evaluates the credit risk of its derivative customers, taking into account the likelihood of default, net exposures, and remaining contractual life, among other related factors. Credit risk exposure is mitigated as transactions with customers are generally secured by the same collateral of the underlying transactions being hedged. Current net credit exposure relating to interest rate derivatives with Webster Bank customers was $132.3 million at December 31, 2019. In addition, the Company monitors potential future exposure, representing its best estimate of exposure to remaining contractual maturity. The potential future exposure relating to interest rate derivatives with Webster Bank customers totaled $39.6 million at December 31, 2019. For additional information regarding accounting policies for derivative financial instruments refer to Note 1: Summary of Significant Accounting Policies under the section “Derivative Instruments and Hedging Activities”.
92


Note 17: Fair Value Measurements
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. Fair value is best determined using quoted market prices. However, in many instances, quoted market prices are not available. In such instances, fair values are determined using appropriate valuation techniques. Various assumptions and observable inputs must be relied upon in applying these techniques. Accordingly, categorization within the valuation hierarchy is based upon the lowest level of input that is significant to the fair value measurement. As such, the fair value estimates may not be realized in an immediate transfer of the respective asset or liability.
Fair value estimates are made at a specific point in time, based on relevant market information and information about the financial instrument. These estimates do not reflect any premium or discount that could result from offering for sale at one time the entire holdings or any part of a particular financial instrument. Fair value estimates are based on judgments regarding future expected loss experience, current economic conditions, risk characteristics of various financial instruments, and other factors. These factors are subjective in nature and involve uncertainties and matters of significant judgment and, therefore, cannot be determined with precision. Changes in assumptions could significantly affect the estimates.
Fair Value Hierarchy
The three levels within the fair value hierarchy are as follows:
Level 1: Valuation is based upon unadjusted quoted prices in active markets for identical assets or liabilities that the reporting entity has the ability to access at the measurement date.
Level 2: Fair value is calculated using significant inputs other than quoted market prices that are directly or indirectly observable for the asset or liability. The valuation may rely on quoted prices for similar assets or liabilities in active markets, quoted prices for identical or similar assets or liabilities in inactive markets, inputs other than quoted prices that are observable for the asset or liability (such as interest rates, rate volatility, prepayment speeds, credit ratings,) or inputs that are derived principally or corroborated by market data, by correlation, or other means.
Level 3: Inputs for determining the fair value of the respective assets or liabilities are not observable. Level 3 valuations are reliant upon pricing models and techniques that require significant management judgment or estimation.
Assets and Liabilities Measured at Fair Value on a Recurring Basis
Available-for-Sale Investment Securities. When quoted prices are available in an active market, the Company classifies available-for-sale investment securities within Level 1 of the valuation hierarchy. U.S. Treasury Bills are classified within Level 1 of the fair value hierarchy.
When quoted market prices are not available, the Company employs an independent pricing service that utilizes matrix pricing to calculate fair value. Such fair value measurements consider observable data such as dealer quotes, market spreads, cash flows, yield curves, live trading levels, trade execution data, market consensus prepayments speeds, credit information, and respective terms and conditions for debt instruments. Management maintains procedures to monitor the pricing service's results and has an established process to challenge their valuations, or methodologies, that appear unusual or unexpected. Available-for-Sale investment securities which include Agency CMO, Agency MBS, Agency CMBS, CMBS, CLO, and corporate debt, are classified within Level 2 of the fair value hierarchy.
Derivative Instruments. Foreign exchange contracts are valued based on unadjusted quoted prices in active markets and classified within Level 1 of the fair value hierarchy.
All other derivative instruments are valued using third-party valuation software, which considers the present value of cash flows discounted using observable forward rate assumptions. The resulting fair value is validated against valuations performed by independent third parties and are classified within Level 2 of the fair value hierarchy. Webster evaluates the credit risk of its counterparties to determine if any fair value adjustment related to credit risk may be required, by considering factors such as the likelihood of default by the counterparty, its net exposure, remaining contractual life, as well as the collateral securing the position. The change in value of derivative assets and liabilities attributable to credit risk was not significant during the reported periods.
93


Mortgage Banking Derivatives. Forward sales of mortgage loans and mortgage-backed securities are utilized by the Company in its efforts to manage risk of loss associated with its mortgage loan commitments and mortgage loans held for sale. Prior to closing and funding certain single-family residential mortgage loans, an interest rate lock commitment is generally extended to the borrower. During the period from commitment date to closing date, the Company is subject to the risk that market rates of interest may change. If market rates rise, investors generally will pay less to purchase such loans resulting in a reduction in the gain on sale of the loans or, possibly, a loss. In an effort to mitigate such risk, forward delivery sales commitments are established, under which the Company agrees to deliver whole mortgage loans to various investors or issue mortgage-backed securities. The fair value of mortgage banking derivatives is determined based on current market prices for similar assets in the secondary market and, therefore, classified within Level 2 of the fair value hierarchy.
Originated Loans Held For Sale. Residential mortgage loans typically are classified as held for sale upon origination based on management's intent to sell such loans. The Company generally records residential mortgage loans held for sale under the fair value option of ASC Topic 825 "Financial Instruments." Electing to measure originated loans held for sale at fair value reduces certain timing differences and better matches changes in the value of these assets with changes in the value of the derivatives used as an economic hedge on these assets. The fair value of residential mortgage loans held for sale is based on quoted market prices of similar loans sold in conjunction with securitization transactions. Accordingly, such loans are classified within Level 2 of the fair value hierarchy.
The following table compares the fair value to unpaid principal balance of assets accounted for under the fair value option:
At December 31, 2019At December 31, 2018
(In thousands)Fair ValueUnpaid Principal BalanceDifferenceFair ValueUnpaid Principal BalanceDifference
Originated loans held for sale$35,750  $35,186  $564  $7,908  $8,227  $(319) 
Investments Held in Rabbi Trust. Investments held in the Rabbi Trust primarily include mutual funds that invest in equity and fixed income securities. Shares of mutual funds are valued based on net asset value, which represents quoted market prices for the underlying shares held in the mutual funds. Therefore, investments held in the Rabbi Trust are classified within Level 1 of the fair value hierarchy. The Company has elected to measure the investments held in the Rabbi Trust at fair value. The cost basis of the investments held in the Rabbi Trust is $1.6 million as of December 31, 2019.
Alternative Investments. Equity investments have a readily determinable fair value when quoted prices are available in an active market. Accordingly, such alternative investments are classified within Level 1 of the fair value hierarchy.
Equity investments that do not have a readily available fair value may qualify for NAV practical expedient measurement, based on specific requirements. The Company's alternative investments accounted for at NAV consist of investments in non-public entities that generally cannot be redeemed since the Company’s investments are distributed as the underlying equity is liquidated. Alternative investments recorded at NAV are not classified within the fair value hierarchy. At December 31, 2019, these alternative investments had a remaining unfunded commitment of $23.8 million.
94


Summaries of the fair values of assets and liabilities measured at fair value on a recurring basis are as follows:
 At December 31, 2019
(In thousands)Level 1Level 2Level 3NAVTotal
Financial assets held at fair value:
U.S. Treasury Bills$—  $—  $—  $—  $—  
Agency CMO—  185,801  —  —  185,801  
Agency MBS—  1,612,164  —  —  1,612,164  
Agency CMBS  581,552      581,552  
CMBS  431,871      431,871  
CLO—  92,205  —  —  92,205  
Corporate debt—  22,240  —  —  22,240  
Total available-for-sale investment securities—  2,925,833  —  —  2,925,833  
Gross derivative instruments, before netting (1)
328  145,709  —  —  146,037  
Originated loans held for sale  35,750  —    35,750  
Investments held in Rabbi Trust4,780  —  —  —  4,780  
Alternative investments    —  4,331  4,331  
Total financial assets held at fair value$5,108  $3,107,292  $—  $4,331  $3,116,731  
Financial liabilities held at fair value:
Gross derivative instruments, before netting (1)
$611  $13,202  $—  $—  $13,813  

 At December 31, 2018
(In thousands)Level 1Level 2Level 3NAVTotal
Financial assets held at fair value:
U.S. Treasury Bills$7,550  $—  $—  $—  $7,550  
Agency CMO—  234,923  —  —  234,923  
Agency MBS—  1,481,089  —  —  1,481,089  
Agency CMBS  566,237      566,237  
CMBS  445,581      445,581  
CLO—  112,771  —  —  112,771  
Corporate debt—  50,579  —  —  50,579  
Total available-for-sale investment securities7,550  2,891,180  —  —  2,898,730  
Gross derivative instruments, before netting (1)
758  45,520  —    46,278  
Originated loans held for sale  7,908  —  —  7,908  
Investments held in Rabbi Trust4,307  —  —    4,307  
Alternative investments    —  2,563  2,563  
Total financial assets held at fair value$12,615  $2,944,608  $—  $2,563  $2,959,786  
Financial liabilities held at fair value:
Gross derivative instruments, before netting (1)
$588  $38,422  $—  $  $39,010  
(1)For information relating to the impact of netting derivative assets and derivative liabilities as well as the impact from offsetting cash collateral paid to the same derivative counterparties refer to Note 16: Derivative Financial Instruments.
95


Assets Measured at Fair Value on a Non-Recurring Basis
Certain assets are measured at fair value on a non-recurring basis; that is, the assets are not measured at fair value on an ongoing basis but are subject to fair value adjustments in certain circumstances, for example, when there is evidence of impairment. At December 31, 2019, no significant assets classified within Level 3 were identified and measured under this basis. The following is a description of valuation methodologies used for assets measured on a non-recurring basis.
Alternative Investments. The measurement alternative has been elected for alternative investments without readily determinable fair values that do not qualify for the NAV practical expedient. The measurement alternative requires investments to be accounted for at cost minus impairment, if any, plus or minus changes resulting from observable price changes in orderly transactions for the identical or a similar investment of the same issuer. These alternative investments are investments in non-public entities that generally cannot be redeemed since the investment is distributed as the underlying equity is liquidated. Accordingly, these alternative investments are classified within Level 2 of the fair value hierarchy.The carrying amount of these alternative investments was $12.6 million at December 31, 2019. No reductions for impairments, or adjustments due to observable price changes, was identified during the year ended December 31, 2019.
Transferred Loans Held For Sale. Certain loans are transferred to loans held for sale once a decision has been made to sell such loans. These loans are accounted for at the lower of cost or fair value and are considered to be recognized at fair value when they are recorded at below cost. This activity primarily consists of commercial loans with observable inputs and is classified within Level 2. On the occasion that these loans should include adjustments for changes in loan characteristics using unobservable inputs, the loans would be classified within Level 3.
Impaired Loans and Leases. Impaired loans and leases are reported based on one of three measures: (i) the present value of expected future cash flows discounted at the loan's original effective interest rate; (ii) the loan's observable market price; or (iii) the fair value of the collateral, less estimated cost to sell, if the loan is collateral dependent. Accordingly, certain impaired loans and leases may be subject to measurement at fair value on a non-recurring basis. The Company has measured impairment generally based on the fair value of the loan’s collateral or using a discounted cash flow analysis. Impaired collateral dependent loans and leases are primarily expected to be repaid solely by the underlying collateral and are valued based on the estimated fair value of such collateral using customized discounting criteria. As such, impaired loans and leases are classified within Level 3 of the fair value hierarchy.
Other Real Estate Owned and Repossessed Assets. The total book value of OREO and repossessed assets was $6.5 million at December 31, 2019. OREO and repossessed assets are accounted for at the lower of cost or fair value and are considered to be recognized at fair value when recorded below cost. The fair value of OREO is based on independent appraisals or internal valuation methods, less estimated selling costs. The valuation may consider available pricing guides, auction results, and price opinions. Certain assets require assumptions about factors that are not observable in an active market in the determination of fair value; as such, OREO and repossessed assets are classified within Level 3 of the fair value hierarchy.
Fair Value of Financial Instruments and Servicing Assets
The Company is required to disclose the estimated fair value of financial instruments for which it is practicable to estimate fair value, as well as servicing assets. The following is a description of valuation methodologies used for those assets and liabilities.
Cash, Due from Banks, and Interest-bearing Deposits. The carrying amount of cash, due from banks, and interest-bearing deposits is used to approximate fair value, given the short time frame to maturity and, as such, these assets do not present unanticipated credit concerns. Cash, due from banks, and interest-bearing deposits are classified within Level 1 of the fair value hierarchy.
Held-to-Maturity Investment Securities. When quoted market prices are not available, the Company employs an independent pricing service that utilizes matrix pricing to calculate fair value. Such fair value measurements consider observable data such as dealer quotes, market spreads, cash flows, yield curves, live trading levels, trade execution data, market consensus prepayments speeds, credit information, and respective terms and conditions for debt instruments. Management maintains procedures to monitor the pricing service's results and has an established process to challenge their valuations, or methodologies, that appear unusual or unexpected. Held-to-Maturity investment securities, which include Agency CMO, Agency MBS, Agency CMBS, CMBS, and municipal bonds and notes, are classified within Level 2 of the fair value hierarchy.
Loans and Leases, net. The estimated fair value of loans and leases held for investment is calculated using a discounted cash flow method, using future prepayments and market interest rates inclusive of an illiquidity premium for comparable loans and leases. The associated cash flows are adjusted for credit and other potential losses. Fair value for impaired loans and leases is estimated using the net present value of the expected cash flows. Loans and leases are classified within Level 3 of the fair value hierarchy.
96


Deposit Liabilities. The fair value of demand deposits, savings accounts, and certain money market deposits is the amount payable on demand at the reporting date. Deposit liabilities are classified within Level 2 of the fair value hierarchy.
Time Deposits. The fair value of a fixed-maturity certificate of deposit is estimated using the rates currently offered for deposits of similar remaining maturities. Time deposits are classified within Level 2 of the fair value hierarchy.
Securities Sold Under Agreements to Repurchase and Other Borrowings. The fair value of securities sold under agreements to repurchase and other borrowings that mature within 90 days is the carrying value. Fair value for all other balances are estimated using discounted cash flow analysis based on current market rates adjusted for associated credit risks, as appropriate. Securities sold under agreements to repurchase and other borrowings are classified within Level 2 of the fair value hierarchy.
Federal Home Loan Bank Advances and Long-Term Debt. The fair value of FHLB advances and long-term debt is estimated using a discounted cash flow technique. Discount rates are matched with the time period of the expected cash flow and are adjusted, as appropriate, to reflect credit risk. FHLB advances and long-term debt are classified within Level 2 of the fair value hierarchy.
Mortgage Servicing Assets. Mortgage servicing assets are initially recorded at fair value and subsequently measured under the amortization method. Mortgage servicing assets are subject to impairment testing and thereafter carried at the lower of cost or fair value. Amortization and impairment charges, if any, are included as a component of other non-interest income in the consolidated statement of income. Fair value is calculated as the present value of estimated future net servicing income and relies on market based assumptions for loan prepayment speeds, servicing costs, discount rates, and other economic factors; as such, the primary risk inherent in valuing mortgage servicing assets is the impact of fluctuating interest rates on the servicing revenue stream. Mortgage servicing assets are classified within Level 3 of the fair value hierarchy.
Fair value of selected financial instruments and servicing assets amounts are as follows:
At December 31,
 20192018
(In thousands)Carrying
Amount
Fair
Value
Carrying
Amount
Fair
Value
Financial Assets:
Level 2
Held-to-maturity investment securities$5,293,918  $5,380,653  $4,325,420  $4,209,121  
Level 3
Loans and leases, net19,827,890  19,961,632  18,253,136  18,155,798  
Mortgage servicing assets17,484  33,250  21,215  45,478  
Financial Liabilities:
Level 2
Deposit liabilities, other than time deposits$20,219,981  $20,219,981  $18,662,299  $18,662,299  
Time deposits3,104,765  3,102,316  3,196,546  3,175,948  
Securities sold under agreements to repurchase and other borrowings1,040,431  1,041,042  581,874  581,874  
FHLB advances1,948,476  1,950,035  1,826,808  1,826,381  
Long-term debt (1)
540,364  555,775  226,021  229,306  
(1)Adjustments to the carrying amount of long-term debt for basis adjustment, unamortized discount, and debt issuance cost on senior fixed-rate notes are not included for determination of fair value. Refer to Note 11: Borrowings for additional information.
97


Note 18: Retirement Benefit Plans
Defined Benefit Pension and Other Postretirement Benefits
Webster Bank offered a defined benefit noncontributory pension plan through December 31, 2007 for eligible employees who met certain minimum service and age requirements. Pension plan benefits are based upon employee earnings during the period of credited service. A supplemental defined benefit retirement plan (SERP) was also offered to certain employees who were at the Executive Vice President level or above through December 31, 2007. The SERP provides eligible participants with additional pension benefits. Webster Bank also provides postretirement healthcare benefits to certain retired employees.
The Webster Bank Pension Plan and the SERP were frozen as of December 31, 2007. No additional benefits have been accrued since that time. Employees hired on or after January 1, 2007 receive no qualified or supplemental retirement income under the plans. All other employees accrue no additional qualified or supplemental retirement benefits after January 1, 2008, and the amount of their qualified and supplemental retirement benefits will not exceed the amount of benefits determined as of December 31, 2007.
The measurement date is December 31 for the Webster Bank Pension Plan, SERP, and postretirement healthcare benefits. The mortality assumptions used in the pension liability assessment for the year ended December 31, 2019 were the Pri-2012 mortality table projected to measurement date with scale MP-2019.
The following table sets forth changes in benefit obligation, changes in plan assets, and the funded status of the defined benefit pension and other postretirement benefits at December 31:
  
Pension PlanSERPOther
(In thousands)201920182019201820192018
Change in benefit obligation:
Beginning balance$209,513  $229,318  $1,835  $13,096  $2,612  $3,094  
Interest cost7,941  7,212  65  103  85  78  
Actuarial loss (gain)33,157  (18,499) 163    (103) (352) 
Benefits paid and administrative expenses(9,207) (8,518) (128) (11,364) (195) (208) 
Ending balance (1)
241,404  209,513  1,935  1,835  2,399  2,612  
Change in plan assets:
Beginning balance191,972  216,225          
Actual return on plan assets46,856  (15,735)         
Employer contributions10,000    128  11,364  195  208  
Benefits paid and administrative expenses(9,207) (8,518) (128) (11,364) (195) (208) 
Ending balance239,621  191,972          
Funded status of the plan at year end (2)
$(1,783) $(17,541) $(1,935) $(1,835) $(2,399) $(2,612) 
(1)The total accumulated benefit obligation for the defined benefit pension and other postretirement benefits was $245.7 million and $214.0 million at December 31, 2019 and 2018, respectively.
(2)The underfunded status amounts are included in accrued expense and other liabilities in the consolidated balance sheets.
The following table summarizes the impact on AOCL related to the defined benefit pension and other postretirement benefits at December 31:
  
Pension PlanSERPOther
(In thousands)201920182019201820192018
Net actuarial loss (gain) included in AOCL$56,555  $64,523  $602  $453  $(458) $(368) 
Deferred tax benefit (expense)12,528  14,623  133  103  (101) (83) 
Amounts included in accumulated AOCL, net of tax$44,027  $49,900  $469  $350  $(357) $(285) 
Expected future benefit payments for the defined benefit pension and other postretirement benefits are presented below:
(In thousands)Pension PlanSERPOther
2020$9,010  $131  $314  
20219,797  134  295  
202210,490  133  274  
202310,488  132  252  
202410,883  135  229  
2025-202959,126  627  815  

98


The components of the net periodic benefit cost (benefit) for the defined benefit pension and other postretirement benefits were as follows for the years ended December 31:
Pension PlanSERPOther
(In thousands)201920182017201920182017201920182017
Service cost $  $  $50  $  $  $  $  $  $  
Interest cost on benefit obligations7,941  7,212  7,314  65  103  375  85  78  92  
Expected return on plan assets(11,436) (12,716) (12,296)             
Recognized net loss (gain)5,705  4,862  5,864  14  2,846  748  (13)     
Net periodic benefit cost (benefit)$2,210  $(642) $932  $79  $2,949  $1,123  $72  $78  $92  
Changes in funded status related to the defined benefit pension and other postretirement benefits and recognized as a component of OCI in the consolidated statement of comprehensive income as follows for the years ended December 31:
Pension PlanSERPOther
(In thousands)201920182017201920182017201920182017
Net (gain) loss$(2,263) $9,952  $(561) $164  $  $1,037  $(103) $(352) $(631) 
Amounts reclassified from AOCL(5,705) (4,862) (5,864) (14) (2,846) (748) 13      
Total (gain) loss recognized in OCI$(7,968) $5,090  $(6,425) $150  $(2,846) $289  $(90) $(352) $(631) 
The Company expects a $4.1 million net actuarial loss will be recognized as a component of net periodic benefit cost in 2020.
Fair Value Measurement
The following is a description of the valuation methodologies used to measure the fair value of pension plan assets and includes the classification of those instruments within the valuation hierarchy:
Exchange traded fund. The exchange traded fund has quoted market prices on an exchange, in an active market, which represents the net asset value of the shares held in the fund and is classified within Level 1 of the fair value hierarchy. The fair value for the exchange traded fund is benchmarked against the Standard & Poor's 500 Index.
Money market fund. The money market fund is carried at cost, which approximates fair value given the short time frame to maturity for cash and cash equivalents and is classified within Level 1 of the fair value hierarchy.
Common collective trusts. Common collective trusts hold investments in fixed income and equity funds. Transactions may occur daily within a trust. Should a full redemption of the trust be initiated, the investment advisor reserves the right to temporarily delay withdrawals in order to ensure that the liquidation of securities is carried out in an orderly business manner. A trustee for each common collective trust provides the net asset value of its underlying investments, less its liabilities, which represents the fair value of the trust under the NAV practical expedient. Common collective trusts are benchmarked against the Standard and Poor’s 500 Stock Index, the S&P 400 Mid Cap Index, the Russell 2000 Index, the MSCI ACWI ex U.S. Index, and the Barclays Capital U.S. Long Credit Index.
A summary of the fair value and hierarchy classification of financial assets of the pension plan is as follows:
At December 31,
  
20192018
(In thousands)Level 1Level 2Level 3TotalLevel 1Level 2Level 3Total
Exchange traded fund$36,552  $  $  $36,552  $30,641  $  $  $30,641  
Money market fund1,225      1,225  1,695      1,695  
Investments measured at NAV (1)
—  —  —  201,844  —  —  —  159,636  
Total pension plan assets$37,777  $  $  239,621  $32,336  $  $  $191,972  


(1)Common collective trust investments are recorded at NAV. Investments measured at NAV are not classified within the fair value hierarchy. The amounts presented in this table are intended to permit reconciliation of the total pension plan assets to amounts presented elsewhere for pension plan assets.
Asset Management
The following table presents the target allocation and the pension plan asset allocation for the periods indicated, by asset category:
  
Target AllocationPercentage of Pension Plan Assets
202020192018
Fixed income investments62 %61 %56 %
Equity investments38  38  43  
Cash and cash equivalents  1  1  
Total100 %100 %100 %
99


The Retirement Plan Committee is a fiduciary under ERISA and is charged with the responsibility for directing and monitoring the investment management of the pension plan. To assist the Retirement Plan Committee in this function, it engages the services of investment managers and advisors who possess the necessary expertise to manage the pension plan assets within the established investment policy guidelines and objectives. The investment policy guidelines and objectives are reviewed at a minimum annually by the Retirement Plan Committee.
The primary objective of the pension plan investment strategy is to provide long-term total return through capital appreciation and dividend and interest income. The Plan invests in registered investment companies and bank collective trusts. The volatility, as measured by standard deviation, of the pension plan assets should not exceed that of the Composite Index. The investment policy guidelines allow the pension plan assets to be invested in certain types of cash equivalents, fixed income securities, equity securities, mutual funds, and collective trusts. Investments in mutual funds and collective trust funds are substantially limited to funds with the securities characteristic of their assigned benchmarks.
The pension plan investment strategy is designed to maintain a diversified portfolio with a target average long-term rate of 5.75%, however, there is no certainty that the portfolio will perform to expectations. Asset allocations are monitored monthly and the portfolio is re-balanced when appropriate.
Weighted-average assumptions used to determine benefit obligations at December 31 are as follows:
  
Pension PlanSERPOther
  
201920182019201820192018
Discount rate3.07 %4.12 %2.82 %3.95 %2.50 %3.69 %
Weighted-average assumptions used to determine net periodic benefit cost for the years ended December 31 are as follows:
  
Pension PlanSERPOther
  
201920182017201920182017201920182017
Discount rate4.12 %3.50 %4.01 %3.95 %3.30 %3.63 %3.69 %3.00 %3.27 %
Expected long-term return on assets6.00 %6.00 %6.50 %n/an/an/an/an/an/a
Assumed healthcare cost trendn/an/an/an/an/an/a6.50 %7.00 %7.50 %
The assumed healthcare cost-trend rate for 2020 is 6.50%, declining 0.25% each year thereafter until 2028 when the rate will be 4.60%. An increase of 1.0% in the assumed healthcare cost-trend rate for 2019 would have increased the net periodic postretirement benefit cost by $3 thousand and increased the accumulated benefit obligation by $97 thousand. A decrease of 1.0% in the assumed healthcare cost trend rate for 2019 would have decreased the net periodic postretirement benefit cost by $3 thousand and decreased the accumulated postretirement benefit obligation by $89 thousand.
Multiple-Employer Plan
For the benefit of former employees of a bank acquired by the Company, the Bank is a sponsor of a multiple-employer pension plan that does not segregate the assets or liabilities of its employers participating in the plan. The plan administrator confirmed Webster Bank’s portion of the plan is under-funded by $2.4 million as of July 1, 2019, the date of the latest actuarial valuation.
The following table sets forth contributions and funding status of Webster Bank's portion of this plan:
(Dollars in thousands)Contributions by Webster Bank for the year ended December 31,Funded Status of the Plan at December 31,
Plan NameEmployer Identification NumberPlan Number20192018201720192018
Pentegra Defined Benefit Plan for Financial Institutions13-5645888333$863  $679  $614  At least 80 percentAt least 80 percent
Multi-employer accounting is applied to the Fund. As a multiple-employer pension plan, there are no collective bargained contracts affecting its contribution or benefit provisions. Any shortfall amortization basis is being amortized over seven years, as required by the Pension Protection Act. All benefit accruals were frozen as of September 1, 2004. The Company's contributions to this plan did not exceed more than 5% of total contributions in the plan for the years ended December 31, 2019, 2018, and 2017.
Webster Bank Retirement Savings Plan
Webster Bank provides an employee retirement savings plan governed by section 401(k) of the Internal Revenue Code. Webster Bank matches 100% of the first 2% and 50% of the next 6% of employees’ pre-tax contributions based on annual compensation. If a participant fails to make a pre-tax contribution election within 90 days of his or her date of hire, automatic pre-tax contributions will commence 90 days after his or her date of hire at a rate equal to 3% of compensation.
Compensation and benefit expense included $13.2 million, $12.4 million, and $12.0 million for the years ended December 31, 2019, 2018, and 2017, respectively, of employer contributions.
100


Note 19: Share-Based Plans
Stock Compensation Plans
Webster maintains stock compensation plans to better align the interests of its employees and directors with those of its shareholders. The Plans have shareholder approval for up to 13.4 million shares of common stock. At December 31, 2019, there were 1.6 million common shares remaining available for grant, while no stock appreciation rights have been granted. Stock compensation cost is recognized over the required service vesting period for the awards, based on the grant-date fair value, net of estimated forfeitures, and is included as a component of compensation and benefits reflected in non-interest expense.
Stock compensation expense for restricted stock of $12.6 million, $11.6 million, and $12.3 million, and an income tax benefit of $6.1 million, $8.5 million, and $11.8 million, was recognized for the years ended December 31, 2019, 2018, and 2017, respectively. At December 31, 2019 there was $15.7 million of unrecognized stock compensation expense for restricted stock, expected to be recognized over a weighted-average period of 1.9 years.
The following table summarizes the activity under the stock compensation plans for the year ended December 31, 2019:
Unvested Restricted Stock Awards OutstandingStock Options Outstanding
Time-BasedPerformance-Based
Number of
Shares
Weighted-Average
Grant Date
Fair Value
Number of
Shares
Weighted-Average
Grant Date
Fair Value
Number  of
Shares
Weighted-Average
Exercise Price
Balance at January 1, 2019464,831  $47.48  270,044  $44.34  480,792  $21.73  
Granted189,894  55.40  123,514  56.14      
Vested190,199  38.05  160,254  32.75  —  —  
Forfeited14,302  56.26          
Exercised—  —  —  —  59,861  10.36  
Balance at December 31, 2019450,224  54.53  233,304  54.94  420,931  23.35  

Time-based restricted stock. Time-based restricted stock awards vest over the applicable service period ranging from 1 to 3 years. The number of time-based awards that may be granted to an eligible individual in a calendar year is limited to 100,000 shares. Compensation expense is recorded over the vesting period based on fair value, which is measured using the Company's common stock closing price at the date of grant.
Performance-based restricted stock. Performance-based restricted stock awards vest after a 3 year performance period. The awards vest with a share quantity dependent on that performance, in a range from zero to 150%. The performance criteria for 50% of the shares granted in 2019 is based upon Webster's ranking for total shareholder return versus Webster's compensation peer group companies and the remaining 50% is based upon Webster's average of return on equity during the 3 year vesting period. The compensation peer group companies are utilized because they represent the financial institutions that best compare with Webster. The Company records compensation expense over the vesting period, based on a fair value calculated using the Monte-Carlo simulation model, which allows for the incorporation of the performance condition for the 50% of the performance-based shares tied to total shareholder return versus the compensation peer group, and based on a fair value of the market price on the date of grant for the remaining 50% of the performance-based shares tied to Webster's return on equity. Compensation expense is subject to adjustment based on management's assessment of Webster's return on equity performance relative to the target number of shares condition.
The total fair value of restricted stock awards vested during the years ended December 31, 2019, 2018, and 2017 was $12.5 million, $11.1 million, and $12.7 million, respectively.
Stock options. Stock option awards have an exercise price equal to the market price of Webster Financial Corporation's stock on the date of grant. Each option grants the holder the right to acquire a share of Webster Financial Corporation common stock over a contractual life of up to 10 years. There have been no stock options granted since 2013. At December 31, 2019, there was stock options outstanding for 420,931 shares of common stock, all of which are exercisable, with a weighted-average exercise price of $23.35 and a weighted-average remaining contractual life of 2.7 years, comprised of 387,043 non-qualified stock options and 33,888 incentive stock options.
Total pretax intrinsic value, which is the difference between Webster's closing stock price on the last trading day of the year and the weighted-average exercise price multiplied by the number of shares, represents aggregate intrinsic value that would have been received by the option holders had they all exercised their options at that time. At December 31, 2019, as all awarded options have vested, all of the outstanding options are exercisable, and the aggregate intrinsic value of these options was $12.6 million. The total intrinsic value of options exercised during the years ended December 31, 2019, 2018, and 2017 was $2.4 million, $9.7 million, and $11.1 million, respectively.
101


Note 20: Segment Reporting
Webster’s operations are organized into three reportable segments that represent its primary businesses - Commercial Banking, HSA Bank, and Community Banking. These segments reflect how executive management responsibilities are assigned, the type of customer served, how products and services are provided, and how discrete financial information is currently evaluated. Certain Corporate Treasury activities, along with the amounts required to reconcile profitability metrics to amounts reported in accordance with GAAP, are included in the Corporate and Reconciling category.
Description of Segment Reporting Methodology
Webster uses an internal profitability reporting system to generate information by operating segment, which is based on a series of management estimates for funds transfer pricing, and allocations for non-interest expense, provision for loan and lease losses, income taxes, and equity capital. These estimates and allocations, certain of which are subjective in nature, are periodically reviewed and refined. Changes in estimates and allocations that affect the reported results of any operating segment do not affect the consolidated financial position or results of operations of Webster as a whole. The full profitability measurement reports, which are prepared for each operating segment, reflect non-GAAP reporting methodologies. The differences between full profitability and GAAP results are reconciled in the Corporate and Reconciling category.
Webster allocates interest income and interest expense to each business, while any mismatch associated with the matched maturity funding concept called Funds Transfer Pricing is absorbed in the Corporate Treasury function. The allocation process considers the specific interest rate risk and liquidity risk of financial instruments and other assets and liabilities in each line of business. The matched maturity funding concept considers the origination date and the earlier of the maturity date or the repricing date of a financial instrument to assign a Funds Transfer Pricing (FTP) rate for loans and deposits originated each day. Loans are assigned an FTP rate for funds used and deposits are assigned an FTP rate for funds provided.
Webster allocates a majority of non-interest expense to each reportable segment using a full-absorption costing process. Costs, including corporate overhead, are analyzed, pooled by process, and assigned to the appropriate reportable segment.
The results of funds transfer pricing and allocations for non-interest expense, as well as non-interest income produces pre-tax, pre-provision net revenue, under which basis the segments are reviewed by executive management.
Webster also allocates the provision for loan and lease losses to each segment based on management’s estimate of the inherent loss content in each of the specific loan and lease portfolios. During the three months ended June 30, 2019, Webster refined and improved the precision of this allocation approach. Prior period provision for loan and lease losses amounts, and resulting impacts from income tax expense were revised accordingly. Allowance for loan and lease losses are included within the Corporate and Reconciling category’s total assets.
Beginning in 2018, income tax expense is estimated for each reportable segment individually. The 2017 income tax expense was estimated for all segments using the consolidated effective tax rate.
The following table presents total assets for Webster's reportable segments and the Corporate and Reconciling category:
 Total Assets
(In thousands)Commercial
Banking
HSA
Bank
Community BankingCorporate and
Reconciling
Consolidated
Total
At December 31, 2019$11,541,803  $80,176  $9,348,727  $9,418,638  $30,389,344  
At December 31, 201810,477,050  70,826  8,727,335  8,335,104  27,610,315  

102


The following tables present the operating results, including all appropriate allocations, for Webster’s reportable segments and the Corporate and Reconciling category:
 Year ended December 31, 2019
(In thousands)Commercial
Banking
HSA
Bank
Community BankingCorporate and
Reconciling
Consolidated
Total
Net interest income$372,845  $167,239  $400,744  $14,299  $955,127  
Non-interest income59,063  97,041  109,270  19,941  285,315  
Non-interest expense181,580  135,586  388,399  10,385  715,950  
Pre-tax, pre-provision net revenue250,328  128,694  121,615  23,855  524,492  
Provision for loan and lease losses25,407    12,393    37,800  
Income before income tax expense224,921  128,694  109,222  23,855  486,692  
Income tax expense55,331  33,460  21,735  (6,557) 103,969  
Net income$169,590  $95,234  $87,487  $30,412  $382,723  

Year ended December 31, 2018
(In thousands)Commercial
Banking
HSA
Bank
Community BankingCorporate and
Reconciling
Consolidated
Total
Net interest income$356,509  $143,255  $404,869  $2,048  $906,681  
Non-interest income64,765  89,323  109,669  18,811  282,568  
Non-interest expense174,054  124,594  384,599  22,369  705,616  
Pre-tax, pre-provision net revenue247,220  107,984  129,939  (1,510) 483,633  
Provision for loan and lease losses32,388    9,612    42,000  
Income before income tax expense214,832  107,984  120,327  (1,510) 441,633  
Income tax expense52,849  28,076  23,945  (23,655) 81,215  
Net income$161,983  $79,908  $96,382  $22,145  $360,418  

Year ended December 31, 2017
(In thousands)Commercial
Banking
HSA
Bank
Community BankingCorporate and
Reconciling
Consolidated
Total
Net interest income$322,393  $104,704  $383,700  $(14,510) $796,287  
Non-interest income55,194  77,378  107,368  19,538  259,478  
Non-interest expense154,037  113,143  373,081  20,814  661,075  
Pre-tax, pre-provision net revenue223,550  68,939  117,987  (15,786) 394,690  
Provision for loan and lease losses34,066    6,834    40,900  
Income before income tax expense189,484  68,939  111,153  (15,786) 353,790  
Income tax expense52,676  19,165  30,899  (4,389) 98,351  
Net income$136,808  $49,774  $80,254  $(11,397) $255,439  


103


Note 21: Revenue from Contracts with Customers
The following tables present revenues within the scope of ASC 606, Revenue from Contracts with Customers and the net amount of other sources of non-interest income that is within the scope of other GAAP topics:
Year ended December 31, 2019
(In thousands)Commercial
Banking
HSA
Bank
Community
Banking
Corporate and
Reconciling
Consolidated
Total
Non-interest Income:
Deposit service fees$12,136  $92,096  $63,572  $218  $168,022  
Wealth and investment services10,330    22,637  (35) 32,932  
Other  4,945  2,394    7,339  
Revenue from contracts with customers22,466  97,041  88,603  183  208,293  
Other sources of non-interest income36,597    20,667  19,758  77,022  
Total non-interest income$59,063  $97,041  $109,270  $19,941  $285,315  

Year ended December 31, 2018
(In thousands)Commercial
Banking
HSA
Bank
Community
Banking
Corporate and
Reconciling
Consolidated
Total
Non-interest Income:
Deposit service fees$12,775  $85,809  $63,522  $77  $162,183  
Wealth and investment services10,145    22,732  (34) 32,843  
Other  3,514  2,133    5,647  
Revenue from contracts with customers22,920  89,323  88,387  43  200,673  
Other sources of non-interest income41,845    21,282  18,768  81,895  
Total non-interest income$64,765  $89,323  $109,669  $18,811  $282,568  

Year ended December 31, 2017
(In thousands)Commercial
Banking
HSA
Bank
Community
Banking
Corporate and
Reconciling
Consolidated
Total
Non-interest Income:
Deposit service fees$12,203  $74,448  $64,194  $292  $151,137  
Wealth and investment services9,817    21,274  (36) 31,055  
Other  2,930  823    3,753  
Revenue from contracts with customers22,020  77,378  86,291  256  185,945  
Other sources of non-interest income33,174    21,077  19,282  73,533  
Total non-interest income$55,194  $77,378  $107,368  $19,538  $259,478  
The major types of revenue streams that are within the scope of ASC 606 are described below:
Deposit service fees, predominately consist of fees earned from deposit accounts and interchange fees. Fees earned from deposit accounts relate to event-driven services and periodic account maintenance activities. Webster's obligations for event-driven services are satisfied at the time the service is delivered, while the obligations for maintenance services is satisfied monthly. Interchange fees are assessed as the performance obligation is satisfied, which is at the point in time the card transaction is authorized.
Wealth and investment services, consists of fees earned from investment and securities-related services, trust and other related services. Obligations for wealth and investment services are generally satisfied over time through a time-based measurement of progress, but certain obligations may be satisfied at points in time for activities that are transactional in nature.
These disaggregated amounts are reconciled to non-interest income as presented in Note 20: Segment Reporting. Contracts with customers did not generate significant contract assets and liabilities.



104


Note 22: Commitments and Contingencies
Credit-Related Financial Instruments
The Company offers credit-related financial instruments, in the normal course of business to meet certain financing needs of its customers, that involve off-balance sheet risk. These transactions may include an unused commitment to extend credit, standby letter of credit, or commercial letter of credit. Such transactions involve, to varying degrees, elements of credit risk.
Commitments to Extend Credit. The Company makes commitments under various terms to lend funds to customers at a future point in time. These commitments include revolving credit arrangements, term loan commitments, and short-term borrowing agreements. Most of these loans have fixed expiration dates or other termination clauses where a fee may be required. Since commitments routinely expire without being funded, or after required availability of collateral occurs, the total commitment amount does not necessarily represent future liquidity requirements.
Standby Letter of Credit. A standby letter of credit commits the Company to make payments on behalf of customers if certain specified future events occur. The Company has recourse against the customer for any amount required to be paid to a third party under a standby letter of credit, which is often part of a larger credit agreement under which security is provided. Historically, a large percentage of standby letters of credit expire without being funded. The contractual amount of a standby letter of credit represents the maximum amount of potential future payments the Company could be required to make, and is the Company's maximum credit risk.
Commercial Letter of Credit. A commercial letter of credit is issued to facilitate either domestic or foreign trade arrangements for customers. As a general rule, drafts are committed to be drawn when the goods underlying the transaction are in transit. Similar to a standby letter of credit, a commercial letter of credit is often secured by an underlying security agreement including the assets or inventory they relate to.
The following table summarizes the outstanding amounts of credit-related financial instruments with off-balance sheet risk:
At December 31,
(In thousands)20192018
Commitments to extend credit$6,162,658  $5,840,585  
Standby letter of credit188,103  189,040  
Commercial letter of credit29,180  21,181  
Total credit-related financial instruments with off-balance sheet risk$6,379,941  $6,050,806  
These commitments subject the Company to potential exposure in excess of amounts recorded in the financial statements, and therefore, management maintains a specific reserve for unfunded credit commitments. This reserve is reported as a component of accrued expenses and other liabilities in the consolidated balance sheet.
The following table provides a summary of activity in the reserve for unfunded credit commitments:
Years ended December 31,
(In thousands)201920182017
Beginning balance$2,506  $2,362  $2,287  
(Benefit) provision(139) 144  75  
Ending balance$2,367  $2,506  $2,362  

105


Note 23: Parent Company Information
Financial information for the Parent Company only is presented in the following tables:
Condensed Balance Sheets  
  
December 31,
(In thousands)20192018
Assets:
Cash and due from banks$510,940  $317,473  
Intercompany debt securities150,000  150,000  
Investment in subsidiaries3,079,549  2,633,848  
Due from subsidiaries  36  
Alternative investments5,356  3,252  
Other assets13,537  12,003  
Total assets$3,759,382  $3,116,612  
Liabilities and shareholders’ equity:
Senior notes$463,044  $148,701  
Junior subordinated debt77,320  77,320  
Accrued interest payable6,057  2,664  
Due to subsidiaries52    
Other liabilities5,139  1,412  
Total liabilities551,612  230,097  
Shareholders’ equity3,207,770  2,886,515  
Total liabilities and shareholders’ equity$3,759,382  $3,116,612  

Condensed Statements of Income
  
  
  
  
Years ended December 31,
(In thousands)201920182017
Operating Income:
Dividend income from bank subsidiary$360,000  $290,000  $120,000  
Interest on securities and deposits10,728  7,342  4,477  
Alternative investments (loss) income(256) 290  1,504  
Other non-interest income382  805  204  
Total operating income370,854  298,437  126,185  
Operating Expense:
Interest expense on borrowings21,062  11,127  10,380  
Non-interest expense15,527  19,105  23,008  
Total operating expense36,589  30,232  33,388  
Income before income tax benefit and equity in undistributed earnings of subsidiaries334,265  268,205  92,797  
Income tax benefit4,671  2,207  3,004  
Equity in undistributed earnings of subsidiaries43,787  90,006  159,638  
Net income$382,723  $360,418  $255,439  
106


Condensed Statements of Comprehensive Income
  
  
  
  
Years ended December 31,
(In thousands)201920182017
Net income$382,723  $360,418  $255,439  
Other comprehensive income (loss), net of tax:
Net unrealized gains on derivative instruments1,479  1,447  1,216  
Other comprehensive income (loss) of subsidiaries93,101  (40,568) (106) 
Other comprehensive income (loss), net of tax94,580  (39,121) 1,110  
Comprehensive income$477,303  $321,297  $256,549  

Condensed Statements of Cash Flows
  
  
  
 Years ended December 31,
(In thousands)201920182017
Net cash provided by operating activities$362,617  $282,986  $115,957  
Investing activities:
Alternative investments capital call(1,850)     
Investment in subsidiaries(296,000)     
Proceeds from the sale of other assets    7,581  
Net cash (used for) provided by investing activities(297,850)   7,581  
Financing activities:
Issuance of long-term debt296,358      
Preferred stock issued    145,056  
Preferred stock redeemed    (122,710) 
Cash dividends paid to common shareholders(140,783) (114,959) (94,630) 
Cash dividends paid to preferred shareholders(7,875) (7,875) (8,096) 
Exercise of stock options619  2,173  8,259  
Common stock repurchased and acquired from stock compensation plan activity(19,619) (25,937) (23,279) 
Net cash provided by (used for) financing activities128,700  (146,598) (95,400) 
Increase in cash and due from banks193,467  136,388  28,138  
Cash and due from banks at beginning of year317,473  181,085  152,947  
Cash and due from banks at end of year$510,940  $317,473  $181,085  
107


Note 24: Selected Quarterly Consolidated Financial Information (Unaudited)
  
2019
(In thousands, except per share data)First QuarterSecond QuarterThird QuarterFourth Quarter
Interest income$286,190  $292,257  $294,136  $282,000  
Interest expense44,639  50,470  53,597  50,750  
Net interest income241,551  241,787  240,539  231,250  
Provision for loan and lease losses8,600  11,900  11,300  6,000  
Non-interest income68,612  75,853  69,931  70,919  
Non-interest expense175,686  180,640  179,894  179,730  
Income before income tax expense125,877  125,100  119,276  116,439  
Income tax expense26,141  26,451  25,411  25,966  
Net income$99,736  $98,649  $93,865  $90,473  
Earnings applicable to common shareholders$97,549  $96,193  $91,442  $88,066  
Earnings per common share:
Basic$1.06  $1.05  $1.00  $0.96  
Diluted1.06  1.05  1.00  0.96  
 
 2018
(In thousands, except per share data)First QuarterSecond QuarterThird QuarterFourth Quarter
Interest income$245,921  $260,491  $268,363  $280,392  
Interest expense31,753  35,481  37,991  43,261  
Net interest income214,168  225,010  230,372  237,131  
Provision for loan and lease losses11,000  10,500  10,500  10,000  
Non-interest income68,747  68,374  72,284  73,163  
Non-interest expense171,615  180,459  178,783  174,759  
Income before income tax expense100,300  102,425  113,373  125,535  
Income tax expense20,075  20,743  13,700  26,697  
Net income$80,225  $81,682  $99,673  $98,838  
Earnings applicable to common shareholders$78,083  $79,489  $97,460  $96,666  
Earnings per common share:
Basic$0.85  $0.87  $1.06  $1.05  
Diluted0.85  0.86  1.06  1.05  

Note 25: Subsequent Events
The Company has evaluated events from the date of the Consolidated Financial Statements and accompanying Notes thereto, December 31, 2019, through the issuance of this Annual Report on Form 10-K and determined that no significant events were identified requiring recognition or disclosure in this report.
108


ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
None
ITEM 9A. CONTROLS AND PROCEDURES
Disclosure Controls and Procedures
Under the supervision and with the participation of the Company’s management, including the Chief Executive Officer and Chief Financial Officer, the Company has evaluated the effectiveness of the design and operation of Webster’s disclosure controls and procedures (as defined in Rule 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended) as of the end of the period covered by this report. Based upon that evaluation, management, including the Chief Executive Officer and Chief Financial Officer, concluded that Webster’s disclosure controls and procedures were effective as of the end of the period covered by this report.
Internal Control over Financial Reporting
Webster’s management has issued a report on its assessment of the effectiveness of Webster’s internal control over financial reporting as of December 31, 2019.
Webster’s independent registered public accounting firm has issued a report, expressing an unqualified opinion, on the effectiveness of Webster’s internal control over financial reporting as of December 31, 2019.
There were no changes made in Webster’s internal control over financial reporting that occurred during the most recent fiscal quarter that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. The reports of Webster’s management and of Webster’s independent registered public accounting firm follow.
Management’s Report on Internal Control over Financial Reporting
The management of Webster Financial Corporation and its Subsidiaries is responsible for establishing and maintaining adequate internal control over financial reporting (as defined in Rule13a-15(f) under the Securities Exchange Act of 1934, as amended). Our internal control over financial reporting is a process designed under the supervision of our Chief Executive Officer and Chief Financial Officer to provide reasonable assurance regarding the reliability of financial reporting and the preparation of our financial statements for external purposes in accordance with generally accepted accounting principles.
A material weakness is defined as a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the Company's annual or interim financial statements will not be prevented or detected on a timely basis.
Management assessed the effectiveness of the Company's internal control over financial reporting as of December 31, 2019 based on criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on this assessment, management concluded that the Company's internal control over financial reporting was effective as of December 31, 2019.
KPMG LLP, the independent registered public accounting firm that audited the consolidated financial statements of the Corporation included in this Annual Report on Form 10-K, has issued an attestation report on the effectiveness of the Corporation's internal control over financial reporting as of December 31, 2019. The report, which expresses an unqualified opinion on the effectiveness of the Corporation's internal control over financial reporting as of December 31, 2019, is included below under the heading Report of Independent Registered Public Accounting Firm.

/s/ John R. Ciulla/s/ Glenn I. MacInnes
John R. CiullaGlenn I. MacInnes
President and Chief Executive OfficerExecutive Vice President and Chief Financial Officer

February 28, 2020
109


Report of Independent Registered Public Accounting Firm
To the Shareholders and Board of Directors
Webster Financial Corporation:
Opinion on Internal Control Over Financial Reporting
We have audited Webster Financial Corporation and subsidiaries’ (the Company) internal control over financial reporting as of December 31, 2019, based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2019, based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated balance sheets of the Company as of December 31, 2019 and 2018, the related consolidated statements of income, comprehensive income, shareholders' equity, and cash flows for each of the years in the three-year period ended December 31, 2019, and the related notes (collectively, the consolidated financial statements), and our report dated February 28, 2020 expressed an unqualified opinion on those consolidated financial statements.
Basis for Opinion
The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management's Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audit also included performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
Definition and Limitations of Internal Control Over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.


/s/ KPMG LLP
Hartford, Connecticut
February 28, 2020

ITEM 9B. OTHER INFORMATION
Not applicable

110


PART III
ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
Executive Officers of the Registrant
Webster’s executive officers are each appointed to serve for a one-year period. Information concerning their principal occupation during at least the last five years is set forth below.
John R. Ciulla, 54, is President and Chief Executive Officer and a director of Webster and Webster Bank. He was appointed as Chief Executive Officer and a director of Webster Financial Corporation in January 2018. Mr. Ciulla joined Webster in 2004 and has served in a variety of management positions at the Company, including Chief Credit Risk Officer and Senior Vice President, Commercial Banking, where he was responsible for several business units. He was promoted from Executive Vice President and Head of Middle Market Banking to lead Commercial Banking in January 2014 and to President in October 2015. Prior to joining Webster, he was Managing Director of The Bank of New York, where he worked from 1997 to 2004. Mr. Ciulla serves on the Federal Reserve System’s Federal Advisory Council as a representative of the Federal Reserve Bank of Boston. He also serves on the board of the Connecticut Business and Industry Association (CBIA) and is a member of the board of the Business Council of Fairfield County.
Glenn I. MacInnes, 58, is Executive Vice President and Chief Financial Officer of Webster and Webster Bank. He joined Webster in 2011. Prior to joining Webster, Mr. MacInnes was Chief Financial Officer at New Alliance Bancshares for two years and was employed for 11 years at Citigroup in a series of senior positions, including Deputy CFO for Citibank North America and CFO of Citibank (West) FSB. Mr. MacInnes serves on the Board of Wellmore Behavioral Health, Inc.
Daniel H. Bley, 51, is Executive Vice President and Chief Risk Officer of Webster and Webster Bank since August of 2010. Prior to joining Webster, Mr. Bley worked at ABN AMRO and Royal Bank of Scotland from 1990 to 2010, having served as Managing Director of Financial Institutions Credit Risk and Group Senior Vice President, Head of Financial Institutions and Trading Credit Risk Management. Mr. Bley currently serves on the Board of Directors of Junior Achievement of Greater Fairfield County.
Bernard M. Garrigues, 61, is Executive Vice President and Chief Human Resources Officer of Webster and Webster Bank. Mr. Garrigues joined Webster in April 2014. Prior to joining Webster, Mr. Garrigues was with TIMEX Group in Middlebury, Connecticut, where he was the Chief Human Resources Officer having comprehensive global HR responsibility for several thousand employees in 22 countries. Previously, he worked 21 years for General Electric where he served as global head of HR with a number of GE businesses, including GE Commercial Finance, GE Capital Real Estate, GE Capital IT Solutions and Healthcare in both the United States and Europe. Mr. Garrigues is Six Sigma Green Belt certified, a published author, and a seasoned guest lecturer.
Karen A. Higgins-Carter, 50, is Executive Vice President and Chief Information Officer of Webster and Webster Bank. Ms. Higgins-Carter joined Webster in July 2018. Prior to joining Webster, Ms. Higgins-Carter was Managing Director and Head of the Office of the Chief Information and Operations Officer for the Americas at Mitsubishi UFJ (MUFG) Financial Group from November 2016 to July 2018, where she was responsible for developing and leading the execution of the company’s IT strategic plan, IT governance, information risk management, communications, employee development and engagement. Prior to Mitsubishi UFJ, Ms. Higgins-Carter served as Technology General Manager at Bridgewater Associates from November 2014 to November 2016, and as Managing Director and Head of Consumer Risk Technology at JP Morgan Chase from June 2012 to August 2014.
Nitin J. Mhatre, 49, is Executive Vice President, Head of Community Banking of Webster and Webster Bank. He joined Webster in October 2008 as Executive Vice President, Consumer Lending of Webster Bank and was appointed Executive Vice President, Consumer Finance in January 2009. He was promoted to his current position in August of 2013. Prior to joining Webster, Mr. Mhatre worked at Citigroup across multiple geographies including St. Louis, Missouri, Stamford, Connecticut, Guam, USA and India, in various capacities. In his most recent position, he was the Managing Director for the Home Equity Retail business for CitiMortgage based in Stamford, Connecticut. Mr. Mhatre is Chairman of the Board for the Consumer Bankers Association headquartered in Washington, D.C., and also serves on the board of Junior Achievement of Southwest New England.
Christopher J. Motl, 49, is Executive Vice President, Head of Commercial Banking of Webster and Webster Bank. He joined Webster in 2004 and was responsible for establishing and growing the Sponsor and Specialty Banking Group and was most recently Executive Vice President and Director of Middle Market Banking. Prior to joining Webster, Mr. Motl worked at CoBank, where he was Vice President and Relationship Manager. Mr. Motl is on the board of Special Olympics of Connecticut and the Travelers Championship.
111


Brian R. Runkle, 51, is Executive Vice President of Bank Operations of Webster and Webster Bank. Mr. Runkle joined Webster in August 2016. Prior to joining Webster, Mr. Runkle served in several leadership roles at General Electric across the country from 1999 to 2016, including Managing Director, Risk for GE Capital. He is Six Sigma Master Black Belt certified. Mr. Runkle was a volunteer team leader and campaign member for United Way in Connecticut.
Charles L. Wilkins, 58, is Executive Vice President of Webster and Webster Bank and Head of HSA Bank. He joined Webster in January 2014. Prior to joining Webster, he was President of his own consulting practice specializing in healthcare and financial services from June 2012 to December 2013.
Harriet Munrett Wolfe, 66, is Executive Vice President, General Counsel and Corporate Secretary of Webster and Webster Bank. She joined Webster in March 1997 as Senior Vice President and Counsel, was appointed Secretary in June 1997, and General Counsel in September 1999. In January 2003, she was appointed Executive Vice President. Prior to this, Ms. Wolfe was in private practice. Ms. Wolfe serves as a board member of the University of Connecticut Foundation, Inc., and as a member of the Foundation’s Audit Committee; she previously served as a member of the Executive Committee, and Chair of the Real Estate Committee.
Albert J. Wang, 44, is Chief Accounting Officer of Webster and Webster Bank. He joined Webster in September 2017 and is responsible for Webster’s accounting, tax and financial reporting activities. Prior to joining Webster, Mr. Wang served as Executive Vice President and Chief Accounting Officer for the Banc of California from July 2016 to September 2017. Previously, Mr. Wang served in various leadership positions with Santander Bank from December 2010 to July 2016, most recently as Chief Accounting Officer. Mr. Wang’s earlier management roles included those at PricewaterhouseCoopers from June 2004 until December 2010, where he provided assurance and business advisory services to depository and lending institutions. Mr. Wang is a Certified Public Accountant with over 20 years of accounting and finance experience working with domestic and offshore companies.
Directors and Corporate Governance
Webster has adopted a Code of Business Conduct and Ethics that applies to all directors, officers and employees, including the principal executive officers, principal financial officer and principal accounting officer. The Company has also adopted corporate governance guidelines and charters for the Audit, Compensation, Nominating and Corporate Governance, Executive, and Risk Committees of the Board of Directors. The corporate governance guidelines and the charters of the Audit, Compensation, and Nominating and Corporate Governance Committees can be found on the Company’s website (www.websterbank.com).
A printed copy of any of these documents may be obtained without charge directly from the Company at the following address:
Webster Financial Corporation
145 Bank Street
Waterbury, Connecticut 06702
Attn: Investor Relations
Telephone: (203) 578-2202
Additional information required under this item may be found under the sections captioned “Information as to Nominees,” "Corporate Governance'" and “Delinquent Section 16(a) Reports” in the Proxy Statement, which will be filed with the Securities and Exchange Commission no later than 120 days after the close of the fiscal year ended December 31, 2019, and is incorporated herein by reference.
ITEM 11. EXECUTIVE COMPENSATION
Information regarding compensation of executive officers and directors is omitted from this report and may be found in the Proxy Statement under the sections captioned “Compensation Discussion and Analysis” and “Compensation of Directors,” and the information included therein is incorporated herein by reference.
112


ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
Stock-Based Compensation Plans
Information regarding stock-based compensation plans as of December 31, 2019, is presented in the table below:
Plan Category
Number of Shares to be Issued Upon Exercise of Outstanding Awards (1)
Weighted-Average
Exercise Price of
Outstanding Awards
Number of Shares Available for Future Grants
Plans approved by shareholders420,931  $23.35  2,346,565  
Plans not approved by shareholders—  —  —  
Total420,931  $23.35  2,346,565  
(1)Does not include performance-based restricted shares of 349,956, for which there is no exercise price.
Further information required by this Item is omitted herewith and may be found under the sections captioned “Stock Owned by Management” and “Principal Holders of Voting Securities of Webster” in the Proxy Statement and such information included therein is incorporated herein by reference.
Additional information is presented in Note 19: Share-Based Plans in the Notes to Consolidated Financial Statements contained elsewhere in this report.
ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
Information regarding certain relationships and related transactions, and director independence is omitted from this report and may be found under the sections captioned “Certain Relationships,” “Compensation Committee Interlocks and Insider Participation” and “Corporate Governance” in the Proxy Statement and the information included therein is incorporated herein by reference.
ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
Information regarding principal accounting fees and services is omitted from this report and may be found under the section captioned “Auditor Fee Information” in the Proxy Statement and the information included therein is incorporated herein by reference.
PART IV
ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES
Financial Statements
The Company’s Consolidated Financial Statements and the accompanying Notes thereto, and the report of the independent registered public accounting firm thereon, are included in Part II - Item 8. Financial Statements and Supplementary Data of this Form 10-K.
Financial Statement Schedules
All financial statement schedules for the Company have been included in the consolidated financial statements, or the notes thereto, or have been omitted because they are either inapplicable or not required.
Exhibits
A list of exhibits to this Form 10-K is set forth below.

113


Exhibit Number
Exhibit Description
Exhibit Included
Incorporated by Reference
Form
Exhibit
Filing Date
3
Certificate of Incorporation and Bylaws
3.1
10-Q
3.1
8/9/2016
3.2
8-K
3.1
6/11/2008
3.3
8-K
3.1
11/24/2008
3.4
8-K
3.1
7/31/2009
3.5
8-K
3.2
7/31/2009
3.6
8-A12B
3.3
12/4/2012
3.7
8-A12B
3.3
12/12/2017
3.8
8-K
3.1
6/12/2014
4
Instruments Defining the Rights of Security Holders
4.1X
4.2
10-K
4.1
3/10/2006
4.3
10-K
10.41
3/27/1997
4.4
8-K
4.1
12/12/2017
4.5
8-K
4.1
2/11/2014
4.6
8-K
4.2
2/11/2014
4.7
8-A12B
4.3
12/12/2017
4.88-K4.13/25/2019
4.98-K4.23/25/2019
10
Material Contracts (1)
10.1
DEF 14A
10.1
3/18/2016
10.2
8-K
10.2
12/21/2007
10.3
8-K
10.1
12/21/2007
10.4
DEF 14A
A
3/15/2013
10.5
10-Q
10.1
5/7/2019
10.6
10-K
10.6
3/1/2017
10.7
8-K
10.1
12/27/2012
10.8
10-K
10.20
3/1/2017
10.9
10-Q
10.1
5/5/2017
10.10
10-K
10.13
2/28/2013
114


Exhibit Number
Exhibit Description
Exhibit Included
Incorporated by Reference
Form
Exhibit
Filing Date
10.11
10-K
10.22
2/28/2013
10.12
10-K
10.13
2/28/2014
10.13
10-Q
10.5
5/5/2017
10.14
10-Q
10.1
8/6/2014
10.15
10-Q
10.2
8/6/2014
10.16
10-K
10.18
3/1/2018
10.17
10-Q
10.2
5/5/2017
10.18
10-Q
10.3
5/5/2017
10.19
10-Q
10.4
5/5/2017
10.20
8-K
10.1
9/19/2017
10.21
10-K
10.23
3/1/2018
10.22
10-K
10.24
3/1/2018
10.23
10-Q
10.25
8/3/2018
10.24
10-Q
10.26
11/5/2018
21
X
23
X
31.1
X
31.2
X
32.1
X (2)
32.2
X (2)
101.INSXBRL Instance Document - the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document
101.SCHXBRL Taxonomy Extension Schema DocumentX
101.CALXBRL Taxonomy Extension Calculation Linkbase DocumentX
101.DEFXBRL Taxonomy Extension Definitions Linkbase DocumentX
101.LABXBRL Taxonomy Extension Label Linkbase DocumentX
101.PREXBRL Taxonomy Extension Presentation Linkbase DocumentX
(1) Material contracts are management contracts, or compensatory plans, or arrangements in which directors or executive officers are eligible to participate.
(2) Exhibit is furnished herewith and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, or otherwise subject to the liability of that section, and shall not be deemed to be incorporated by reference into any filing under the Securities Act of 1933 or the Securities Exchange Act of 1934.
ITEM 16. FORM 10-K SUMMARY
Not applicable
115


SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized, on February 28, 2020.
WEBSTER FINANCIAL CORPORATION
By/s/ John R. Ciulla
 John R. Ciulla
 President and Chief Executive Officer
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on February 28, 2020.
Signature:Title:
/s/ John R. CiullaPresident and Chief Executive Officer, and Director
John R. Ciulla(Principal Executive Officer)
/s/ Glenn I. MacInnesExecutive Vice President and Chief Financial Officer
Glenn I. MacInnes(Principal Financial Officer)
/s/ Albert J. WangSenior Vice President and Chief Accounting Officer
Albert J. Wang(Principal Accounting Officer)
/s/ James C. SmithChairman of the Board of Directors
James C. Smith
/s/ William L. AtwellLead Director
William L. Atwell
/s/ John J. CrawfordDirector
John J. Crawford
/s/ Elizabeth E. FlynnDirector
Elizabeth E. Flynn
/s/ E. Carol HaylesDirector
E. Carol Hayles
/s/ Laurence C. MorseDirector
Laurence C. Morse
/s/ Karen R. OsarDirector
Karen R. Osar
/s/ Mark PettieDirector
Mark Pettie
/s/ Lauren C. StatesDirector
Lauren C. States

116