Korea Electric Power
KEP
#935
Rank
S$33.00 B
Marketcap
S$25.71
Share price
-5.52%
Change (1 day)
158.76%
Change (1 year)

Korea Electric Power - 20-F annual report 2023


Text size:
Table of Contents
0000887225falseFYM5KRKRThe Company used initial cost as their fair value because there was not enough information to determine fair value, and the range of the estimated fair value is wide.The maturity of mid- to long-term CPs corresponds to contract period of commercial paper repurchase agreements.According to the shareholders’ agreement, the parties have joint control over all decisions related to finance and operation. Accordingly, the entity is classified as joint ventures.The joint arrangement which the Company has joint control is structured through a separate company. The parties have joint control over the joint arrangement are classified as joint ventures, judging that they have rights to the net assets of the arrangement.The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.The effective percentage of ownership is less than 50%. However, the entity is classified as a joint venture, because all consent was required to make decisions on related activities.Korea Electric Vehicle Charging Service is not a related party of the Company as of December 31, 2023 as the sale of shares was completed for the year ended December 31, 2022.As of December 31, 2023, the annual reporting period of all subsidiaries ends on December 31, except for Mira Power Limited, Columboola Solar Farm Hold Co Pty., Ltd., Columboola Solar Farm Nominees Pty., Ltd., Columboola Solar Farm Op Trust and Columboola Solar Farm Fin Co Pty., Ltd.Korea Development Bank’s interest of ₩1,056,176 million is included.Bondholders may not require prepayment in any case, and the Company has a call option to repay all of these bonds on or after 12 years from the date of issuance of the bonds, or on each interest payment date henceforth. In addition, there is a step-up clause from the date of the initial call option exercise. Although these instruments have contractual maturity dates, the contractual agreements allow these subsidiaries to indefinitely extend the maturity dates and defer the payment of interest without modification to the other terms of the instruments. When the Company decides not to pay dividends on common shares, they are not required to pay interest on the hybrid bonds.This represents the total guarantee amounts associated with the financial guarantee contracts. Financial guarantee liabilities which are recognized as of December 31, 2022 and 2023 are W67,240 and ₩49,992 million, respectively.Depending on the counterparty exercising the right, the contract may be early settled on the same date every year from June 15, 2023.Included in trade and other receivables, net, in the consolidated statements of financial position. The balance of trade receivables from construction contracts are ₩85,757 million and ₩101,180 million, as of December 31, 2022 and 2023, respectively. Included in non-financial liabilities as advance received in the consolidated statements of financial position. The revenue recognized on December 31, 2023 from the amounts included in contract liabilities at the end of the prior year is ₩117,311 million.The Company guarantees to provide supplemental funding for business with respect to excessive business expenses or insufficient repayment of borrowings.This is an L/C opening guarantee for the performance of each contract in relation to the power sales contract and gas supply contract of South Jamaica Power Company Limited, a joint venture of the Company.This is based on the amount of loan commitment limit.As of December 31, 2023, the Company has established guarantees for pledge for transfer of rights of long-term borrowings, pledge for insurance claims, pledge for shares, etc.The Company recorded the fair value of derivatives in accordance with the shareholders’ agreement of its associate, Hyundai Green Power Co., Ltd., as other derivatives. In addition, the fair value of the derivatives regarding the power sales agreement of its subsidiary, Elara Energy Project, LLC, were recorded as other derivatives.The Company recorded the fair value of derivatives regarding the Power Purchase Agreement (“PPA”) of its subsidiary Columboola Solar Farm Hold Co Pty., Ltd. as other derivatives.As of December 31, 2023, the commitment amounts include the Shin-Hanul Unit #1, construction of which has completed during the year ended December 31, 2022. In addition, as of December 31, 2023, Shin-hanul Unit #2 is in commissioning.Bankruptcy was declared during the year ended December 31, 2023. The Company cannot hold significant influence due to the appointment of a bankruptcy trustee, so the Company was reclassified from an associate to financial assets at fair value through other comprehensive income.The percentage of ownership shown above is after considering the treasury stocks and others.The effective percentage of ownership is less than 20%. However, the Company can exercise significant influence by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of the Company’s financial and operating policy of the board of directors.The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Company exercises significant influence over the entity.The effective percentage of ownership is 100%. However, the Government regulates the Company’s ability to make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and the Company’s other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. The Company can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.The Company is planning to sell its investments in YTN Co., Ltd. based on the resolution of the Board of Directors on November 23, 2022, but investments in YTN Co., Ltd. are not classified as assets held-for-sale as the Company hasn't started the active selling procedures as of December 31, 2022.After additional acquisition of the shares, the effective percentage of ownership is more than 50%. However, the Company does not hold control over relevant business while it exercises significant influence by participating in the board of directors by the shareholders’ agreement. Accordingly, the entity is classified as an associate.The effective percentage of ownership is less than 20%. However, the Company can exercise significant influence by virtue of its contractual right to appoint one out of four members of the steering committee of the entity. Moreover, the Company has significant financial transactions, which can affect its significant influence on the entity.The effective percentage of ownership decreased due to the disproportionate paid-in capital increase during the year ended December 31, 2022. The effective percentage of ownership is more than 50% but the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.The effective percentage of ownership is 14.29% due to the acquisition of treasury stocks. The effective percentage of ownership is less than 20%. However, the Company exercises significant influence over the decisions related to finance and operation by virtue of right to nominate directors to the board of directors of the entity.The effective percentage of ownership decreased due to the disproportionate paid-in capital increase, and the effective percentage of ownership is less than 20%. However, the Company exercises significant influence over all decisions related to finance and operation.The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Company exercises significant influence over the decisions related to finance and operation.The Company is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation, and KV Holdings, Inc. The timing of and proceeds from such sales transaction is not specified as of December 31, 2022.The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement, all critical financial and operating decisions must be agreed to by all ownership parties and the Company can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.According to the Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.) Investment Agreement signed in March 2011, the Company has a commitment to guarantee principal and certain returns on shares of Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.). held by NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation. Since NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation have put option regarding their share of the entity, the Company was deemed to have acquired an additional 15.64% stake. As a result, the effective percentage of ownership is 46.3% in the current and prior period. In accordance with shareholders’ agreement signed during the current period, the Company has joint control with other investors in making important financial and operation decisions, so it has been reclassified from an associate to a joint venture.The effective percentage of ownership is less than 20%. However, according to the shareholders' agreement, decisions related principal operation must be agreed by all ownership parties. Accordingly, the Company can exercise significant influence.The effective percentage of ownership is less than 20%. However, decisions in relevant activities must be agreed by ownership parties. Accordingly, the entity is classified as joint ventures.After additional acquisition of the shares, the effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all members of the board of directors. Accordingly, the entity is classified as a joint venture.Taebaek Wind Power Co., Ltd. was changed from an associate to a joint venture for the year ended December 31, 2023.Applicable tax rates are 27.5%, 26.5% and 25.64% as of December 31, 2021, 2022 and 2023, respectively.The effective tax rate for the year ended December 31, 2021, 2022 and 2023 is not calculated due to income tax benefit.The effective percentage of ownership increased due to the disproportionate capital reduction of financial investors during the year ended December 31, 2022.The Company is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation, and KV Holdings, Inc. The timing of and proceeds from such sales transaction is not specified as of December 31, 2023.The nominal percentage of ownership is 75.29% and the effective percentage of ownership is 56.91%, as the Company has an obligation to provide excessive dividend income to Gunsan City when a certain rate of return defined in the shareholders’ agreement is met.Changjuk Wind Power Co., Ltd. was reclassified from an associate to a subsidiary for the year ended December 31, 2022, and the amount is before reclassification to a subsidiary.KEPCO-Uhde Inc. is not a related party of the Company as of December 31, 2023 as the liquidation process was completed for the year ended December 31, 2023.Namjeongsusang Solar Power Operation Co., Ltd. is not a related party of the Company as of December 31, 2023 as the sale of shares was completed for the year ended December 31, 2023.Busan Green Energy Co., Ltd. was declared bankrupt for the year ended December 31, 2023 and was excluded from an associate due to the appointment of a bankruptcy trustee.The Company has estimated the fair value of Set Holding by using the discounted cash flow method and has recognized the difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the year ended December 31, 2022.Reclassified from a joint venture to a subsidiary during the year ended December 31, 2022. Transactions are made before the reclassification.Although the nominal percentage of ownership is 29%, the effective percentage of ownership is 54.24%, considering the interest of financial investors as a liability component.To eliminate or reduce an accounting mismatch, the Company may elect to recognize the amount of change in fair value in profit or loss.On initial recognition of an equity investment that is not held for trading, the Company may irrevocably elect to present subsequent changes in the investment’s fair value in OCI.The Company recognized an impairment loss on all of the equity securities of Naepo Green Energy Co., Ltd. before the prior year, and the acquisition cost of the securities provided as collateral is ₩29,200 million.The Company has entered into an agreement to settle and pay the estimated loss amount in case damages occur in relation to the fulfillment of the mandatory supply volume according to the mandatory supply agreement for coal ash.Samcheok Eco Materials Co., Ltd., an associate of the Company has issued the hybrid bonds. If the bonds are not repaid by December 8, 2026, the parent company and shareholders except the parent company must purchase the bonds from the acquirer. As of December 31, 2023, derivative liabilities of W18,752,903,155 were recognized in relation to this obligation.1.84% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT+0.35% is applied thereafter.1.87% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT+0.35% is applied thereafter.The effective percentage of ownership decreased due to the disproportionate paid-in capital increase during the year ended December 31, 2023. The effective percentage of ownership is more than 50% but the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.The effective percentage of ownership is more than 50% but the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.Although the Company’s effective percentage of ownership is less than 20%, the Company can exercise significant influence on the entity through its contractual right to appoint one director to the entity’s board of directors.The effective percentage of ownership changed due to the disproportionate capital reduction of financial investors during the year ended December 31, 2023.Although the nominal percentage of ownership is 2.35%, the effective percentage of ownership is 25.54%, considering redeemable convertible preferred stock as a liability component. The redeemable convertible preferred stock has been repaid in the current period.the Company is planning to sell its investments in YTN Co., Ltd. based on the resolution of the Board of Directors on November 23, 2022, but investments in YTN Co., Ltd. are not classified as assets held-for-sale as the Company hasn’t started the active selling procedures as of December 31, 2023.The effective percentage of ownership is more than 50%. However, by the shareholders’ agreement, the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision committee. Accordingly, the entity is classified as an associate.Although the Company’s effective percentage of ownership is less than 20%, the entity has been classified as an associate as the Company has significant influence on the entity considering the fact that ordinary resolutions passed at the shareholders’ meeting require the majority decision and the Company has the right to elect the entity’s directors.The effective percentage of ownership is more than 50% but the Company does not hold control over the entity according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.The effective percentage of ownership decreased due to the disproportionate paid-in capital increase.The Company sold all of its shares in YTN Co., Ltd. (21.43 %) on February 15, 2024 at the price of W221,490 million as the Korea Communications Commission approved to sell the Company’s shares in entirety on February 7, 2024 (see Note 51).An indicator of impairment has been identified for the Company’s investment in Korea Gas Corporation (“KOGAS”) for the years ended December 31, 2022 and 2023 as management determined that the carrying amount of the investment in KOGAS at ₩2,085,296 million and ₩1,970,642 million respectively were significantly higher than its fair value. Accordingly, management has assessed the recoverable amount of the investment by estimating the Company’s share of the present value of the estimated future cash flows expected to be generated by KOGAS. The carrying amount of KOGAS as at December 31, 2022 and 2023 are supported by the recoverable amount determination and as such, no impairment has been recognized for the years ended December 31, 2022 and 2023.For the years ended December 31, 2021, 2022 and 2023, the net loss on valuation of derivatives applying cash flow hedge accounting of ₩15,778 million, ₩24,415 million and ₩3,654 million, net of tax, are included in other comprehensive loss, respectively.As of December 31, 2023, the Company has entered into a credit extension agreement for derivatives transactions with Nonghyup Bank, Hana Bank, and Woori Bank as ancillary to currency swap transactions.The maturities cannot be presently determined.Maximum exposure associated with the financial guarantee contracts is the maximum amounts of the obligation.Equity investments held by the Company are excluded.The Company recognized an impairment loss on all of the equity securities of Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.) before the prior year, and the acquisition cost of the securities provided as collateral is ₩47,067 million.Pursuant to the guarantee agreement, the Company recognized other provisions of ₩8,418 million as the possibility of economic benefit outflow to fulfill the obligation was deemed probable and the amount could be reasonably estimated.Excludes lease liabilities.The Company has disposed of shares of Korea Electric Vehicle Charging Service during the year ended December 31, 2022, and it is not a related party to the Company as of December 31, 2022.Changes such as additional allowances or cancellation of allowances are reflected.The effective percentage of ownership is 37%, considering potential common stock.The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all members of the board of directors. Accordingly, the entity is classified as a joint venture.Due to the changes in the agreement, the Company lost its control over the entity. Accordingly, the entity is reclassified to a joint venture from a subsidiary. Although the effective percentage of ownership is more than 50%, decisions in relevant activities must be agreed by all members of the board of directors.Including translation effect of foreign currency lease liabilities and others.The Company has estimated the fair value of Set Holding by using the discounted cash flow method and has recognized the difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the year ended December 31, 2023.The percentage of effective ownership is more than 20%. However, according to the shareholders’ agreement, decisions related principal operation must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.The investee declared bankruptcy during the year ended December 31, 2023. The Company has no capacity to exercise significant influence on the investee due to the receivership of the investee by a trustee in bankruptcy, so the investment was reclassified as financial assets measured at fair value through other comprehensive income.The credit limits of guarantees to RE Holiday Holdings LLC include the credit limits of guarantees to their subsidiariesXe-Pian Xe-Namnoy Power Co., Ltd., an associate of the Company, has entered a contract to pay an incentive type of impounding bonus to SK Eco Plant Co., Ltd. when the Xe-Pian Xe-Na-mnoy Dam is completed. If Xe-Pian Xe-Namnoy Power Co., Ltd. fails to pay SK Eco Plant Co., Ltd., the Company guarantees the payment, and the amount is USD 5,000,000.The Company provided a payment guarantee to Jordan Tafila wind power project for opening L/C for Debt Service Reserve Account (DSRA).The Company provided a payment guarantee to Chile Kelar project for opening L/C for Debt Service Reserve Account (DSRA), and others.In relation to the agreement to purchase hybrid securities issued by Samcheok Eco Materials Co., Ltd., an associate of the Company, the Company has recognized as other derivative liabilities the fair value of ₩18,752 million for its performance obligation to the underwriter of the bonds. In addition, the Company has granted stock option to Chester Solar IV SpA, a joint venture of the Company, and 4 other third party investors, and recorded the related fair value of ₩5,986 million (prior year : ₩6,197 million) as other derivative liabilities.The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred stock into ordinary stock.Although the nominal percentage of ownership is 2.35%, the effective percentage of ownership is 25.54%, considering redeemable convertible preferred stock as a liability component.During the year ended December 31, 2023, the entity was reclassified from an associate to financial assets measured at fair value through other comprehensive income.The entire amount has been set as bad debt.According to the REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.). Investment Agreement signed in March 2011, the Company has a commitment to guarantee principal and certain returns on shares of REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.). held by NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation. Since NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation have put option regarding their share of the entity, the Company was deemed to have acquired an additional 15.64% stake. As a result, the effective percentage of ownership is 46.3% in the current and prior period. In accordance with shareholders' agreement signed during the current period, the Company has joint control with other investors in making important financial and operation decisions, so it has been reclassified from an associate to a joint venture.Although the Company’s effective percentage of ownership is more than 50%, the entity is reclassified as a joint venture since the entity’s material financial and operational decisions require unanimous agreement of members in the board of directors due to the shareholders’ agreement concluded during the year ended December 31, 2023.Although the Company’s effective percentage of ownership is more than 50%, the entity is reclassified as a joint venture considering the minimum number of the entity’s board of directors’ members required to agree for making decision on material financial and operational policies, as the joint shareholders’ agreement changed during the year ended December 31, 2023.Although the Company’s effective percentage of ownership is less than 20%, the entity is reclassified as a joint venture considering the Company can exercise significant influence on the entity due to the Company’s contractual right to appoint a director to the entity’s board of directors and the minimum number of the entity’s board of directors members required to agree for making decision on material financial and operational policies in accordance with the joint shareholders’ agreement .Although the Company’s effective percentage of ownership is more than 50%, the entity is classified as a joint venture since the entity’s material financial and operational decisions require unanimous agreement of members in the board of directors.Although the investment has not yet been paid, commitment to pay 35% of investment in the future has been made.Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩114,118 million.The board of directors of KEPCO Engineering & Construction Company, Inc., a subsidiary of the Company, made a resolution to sell its old office building in Yongin-si, Gyeonggi-do, and reclassified the buildings, structures, and land as assets held-for-sale expecting its carrying amount would be recovered through a sale transaction. In accordance with the resolution of the Board of Directors on April 1, 2022, a sales contract for the assets scheduled for sale was entered into on April 13, 2022, and the related down payment and interim payment of ₩52,666 million were recorded as long-term advance received.The board of directors of Korea Electric Power Corporation, the controlling company, made a resolution to sell the Uijeongbu substation, and reclassified the buildings and land as assets held-for-sale expecting its carrying amount would be recovered through a sale transaction during the year ended December 31, 2022.‘Others’ consist of various financial assets managed by external asset management companies.The shares were acquired through a debt-to-equity conversion during the year ended December 31, 2023, in accordance with the corporate rehabilitation procedures of BDI Co., Ltd. Since the Company has no capacity to exercise significant influence until the rehabilitation procedures are complete, the Company has classified the investment as financial assets measured at fair value through other comprehensive income.This includes a guarantee related to L/C for debt repayment allowance provided to DE Energia SpA, a joint venture of the Company.The credit limits of guarantees to KAS INVESTMENT I LLC, KAS INVESTMENT II LLC include the credit limits of guarantees to their subsidiaries.Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩1,024,927 million.Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩114,347 million.Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩943,316 million.Including the present value of unguaranteed residual value amounting to ₩22,910 million and ₩25,521 million, as of December 31, 2022 and 2023, respectively.The carrying amount of mining rights is nil, because KEPCO Australia Pty., Ltd. and KEPCO Bylong Australia Pty., Ltd. had recognized impairment losses in full.‘Others’ include MMT, etc.The amounts exclude financial assets and deferred tax assets.The common stocks of Dongducheon Dream Power Co., Ltd. held by the Company were pledged as collateral.Middle East and other Asian countries make up the majority of overseas revenue and non-current assets. Since the overseas revenue or non-current assets attributable to particular countries are not material, they are not disclosed individually.The effect on the shareholders’ equity excluding the impact of income taxes.The KEPCO Act requires KEPCO to appropriate a legal reserve equal to at least 20 percent of net income for each accounting period until the reserve equals 50 percent of KEPCO’s common stock. The legal reserve is not available for cash dividends; however, this reserve may be credited to paid-in capital or offset against accumulated deficit by the resolution of the shareholders.The reserve for research and human development is appropriated by KEPCO to use as qualified tax credits to reduce corporate tax liabilities. The reserve is available for cash dividends for a certain period as defined by the Restriction of Special Taxation Act of Korea.The Company, together with other shareholders, has provided a guarantee for the project financing of Pulau Indah Power Plant Sdn. Bhd., by establishing the right of pledge on the shares of Pulau Indah Power Plant Sdn. Bhd.Including a power purchase agreement (“PPA”) with CGN Yulchon Generation Co., Ltd.The effect on the equity excluding the impact of income taxes. 0000887225 2021-01-01 2021-12-31 0000887225 2022-01-01 2022-12-31 0000887225 2023-01-01 2023-12-31 0000887225 2022-12-31 0000887225 2023-12-31 0000887225 2021-12-31 0000887225 2020-12-31 0000887225 ifrs-full:OrdinarySharesMember 2022-12-31 0000887225 ifrs-full:CurrencyRiskMember 2022-12-31 0000887225 kep:HaenanumEnergyFundMember 2022-12-31 0000887225 kep:KOMIPOEuropeBVMember 2022-12-31 0000887225 kep:EnergyInnovationFundIMember 2022-12-31 0000887225 kep:KOMIPOVanphongPowerServiceLLCMember 2022-12-31 0000887225 kep:YeongYangApollonPhotovoltaicCo.Ltd.Member 2022-12-31 0000887225 kep:KHNPUSALLCMember 2022-12-31 0000887225 kep:OgiriSolarPowerCoLtdMember 2022-12-31 0000887225 kep:MohaSolarCoLtdMember 2022-12-31 0000887225 kep:KEPCOUSMember 2022-12-31 0000887225 kep:KOWEPOLaoInternationalMember 2022-12-31 0000887225 kep:EWPBylongMember 2022-12-31 0000887225 kep:FirstkeepersMember 2022-12-31 0000887225 kep:KSOLARSHINANCoLtdMember 2022-12-31 0000887225 kep:KhnpChileSpaMember 2022-12-31 0000887225 kep:KEPCOLGCNSMangilaoHoldingsMember 2022-12-31 0000887225 kep:PTKoreaEnergyIndonesiaMember 2022-12-31 0000887225 kep:PTSiborpaEcoPowerMember 2022-12-31 0000887225 kep:JejuHanlimOffshoreWindCoMember 2022-12-31 0000887225 kep:YeongYangHorusPhotovoltaicCoLtdMember 2022-12-31 0000887225 kep:YeongYangSolarManagementCoLtdMember 2022-12-31 0000887225 kep:YeongYangInnovationCoLtdMember 2022-12-31 0000887225 kep:SolarvaderCoLtdMember 2022-12-31 0000887225 kep:YeongYangCorporationCo.Ltd.Member 2022-12-31 0000887225 kep:KEPCOFMSMember 2022-12-31 0000887225 kep:KOSPOServiceCo.LtdMember 2022-12-31 0000887225 kep:KOWEPOServiceCo.Ltd.Member 2022-12-31 0000887225 kep:PT.KOMIPOEnergyIndonesiaMember 2022-12-31 0000887225 kep:MangilaoIntermediateHoldingsMember 2022-12-31 0000887225 kep:SecutecMember 2022-12-31 0000887225 kep:KEPCOMCSMember 2022-12-31 0000887225 kep:KEPCOECServiceCoLtdMember 2022-12-31 0000887225 kep:KPSPartnersCoLtdMember 2022-12-31 0000887225 kep:GuamUkuduPowerLLCMember 2022-12-31 0000887225 kep:PajuEcoenergyMember 2022-12-31 0000887225 kep:MiraPowerLimitedMember 2022-12-31 0000887225 kep:KOSEPMaterialMember 2022-12-31 0000887225 kep:CommerceandIndustryEnergyMember 2022-12-31 0000887225 kep:KOSPOChileSpAMember 2022-12-31 0000887225 kep:KEPCOEnergySolutionMember 2022-12-31 0000887225 kep:KOMIPOBylongMember 2022-12-31 0000887225 kep:ChitoseSolarPowerPlantMember 2022-12-31 0000887225 kep:KOSPOPowerServicesLimitadaMember 2022-12-31 0000887225 kep:KOENBylongMember 2022-12-31 0000887225 kep:KOSPOBylongMember 2022-12-31 0000887225 kep:HeeMangSunlightPowerMember 2022-12-31 0000887225 kep:KEPCOKPSPhilippinesCorpMember 2022-12-31 0000887225 kep:PTKOWEPOSumselOperationandMaintenanceServicesMember 2022-12-31 0000887225 kep:KOSPOYoungnamPowerMember 2022-12-31 0000887225 kep:FujeijWindPowerCompanyMember 2022-12-31 0000887225 kep:EnergyNewIndustrySpecializedInvestmentPrivateInvestmentTrustMember 2022-12-31 0000887225 kep:KEPCOPhilippinesHoldingsMember 2022-12-31 0000887225 kep:KEPCOInternationalHongKongMember 2022-12-31 0000887225 kep:KEPCOIlijanCorporationMember 2022-12-31 0000887225 kep:KoreaSouthernPowerMember 2022-12-31 0000887225 kep:KEPCOPlantServiceEngineeringMember 2022-12-31 0000887225 kep:KoreaEastWestPowerMember 2022-12-31 0000887225 kep:KEPCOGansuInternationalMember 2022-12-31 0000887225 kep:KEPCOKDNMember 2022-12-31 0000887225 kep:KEPCOLebanonSARLMember 2022-12-31 0000887225 kep:KEPCOPhilippinesCorporationMember 2022-12-31 0000887225 kep:KEPCOInternationalPhilippinesMember 2022-12-31 0000887225 kep:KEPCONuclearFuelMember 2022-12-31 0000887225 kep:KoreaWesternPowerMember 2022-12-31 0000887225 kep:KEPCOEngineeringConstructionCompanyMember 2022-12-31 0000887225 kep:KoreaMidlandPowerMember 2022-12-31 0000887225 kep:KoreaSoutheastPowerMember 2022-12-31 0000887225 kep:KoreaHydroNuclearPowerMember 2022-12-31 0000887225 kep:KaPowerLimitedMember 2022-12-31 0000887225 kep:WesternPowerChanggiSolarCoLtdMember 2022-12-31 0000887225 kep:YeongdeokSunriseWindPowerCo.Ltd.Member 2022-12-31 0000887225 kep:KowepoEuropeB.v.Member 2022-12-31 0000887225 kep:KhnpSpainS.l.Member 2022-12-31 0000887225 kep:KepcoForMaintenanceCompanyMember 2022-12-31 0000887225 kep:KospoTrumbullLlcMember 2022-12-31 0000887225 kep:LsgHydroPowerLimitedMember 2022-12-31 0000887225 kep:EwpAustraliaPty.LtdMember 2022-12-31 0000887225 kep:ColumboolaSolarFarmHoldCoPty.Ltd.Member 2022-12-31 0000887225 kep:DigitalInnovationGrowthFundMember 2022-12-31 0000887225 kep:JWindFirstLlcMember 2022-12-31 0000887225 kep:EWPAmericaMember 2022-12-31 0000887225 kep:KOWEPOAustraliaMember 2022-12-31 0000887225 kep:PTKOMIPOPembangkitanJawaBaliMember 2022-12-31 0000887225 kep:KSTElectricPowerCompanyMember 2022-12-31 0000887225 kep:KEPCOBylongAustraliaMember 2022-12-31 0000887225 kep:GyeonggiGreenEnergyMember 2022-12-31 0000887225 kep:KEPCONetherlandsS3BVMember 2022-12-31 0000887225 kep:KEPCOHoldingsdeMexicoMember 2022-12-31 0000887225 kep:KEPCOAustraliaMember 2022-12-31 0000887225 kep:GyeongjuWindPowerMember 2022-12-31 0000887225 kep:KOSPOAustraliaMember 2022-12-31 0000887225 kep:KOMIPOAustraliaMember 2022-12-31 0000887225 kep:KEPCONeimengguInternationalMember 2022-12-31 0000887225 kep:EWPBarbados1SRLMember 2022-12-31 0000887225 kep:KEPCOMiddleEastHoldingCompanyMember 2022-12-31 0000887225 kep:KOWEPOInternationalCorporationMember 2022-12-31 0000887225 kep:PTTanggamusElectricPowerMember 2022-12-31 0000887225 kep:KOSEPAustraliaMember 2022-12-31 0000887225 kep:KoreaWaterburyUraniumLimitedPartnershipMember 2022-12-31 0000887225 kep:KEPCOEnergyServiceCompanyMember 2022-12-31 0000887225 kep:QatranaElectricPowerCompanyMember 2022-12-31 0000887225 kep:KNFCanadaEnergyLimitedMember 2022-12-31 0000887225 kep:KEPCOShanxiInternationalMember 2022-12-31 0000887225 kep:KEPCONetherlandsBVMember 2022-12-31 0000887225 kep:KOMIPOGlobalPteMember 2022-12-31 0000887225 kep:KHNPCanadaEnergyMember 2022-12-31 0000887225 kep:PTCirebonPowerServiceMember 2022-12-31 0000887225 kep:KOSPOJordanMember 2022-12-31 0000887225 kep:KEPCONetherlandsJ3BVMember 2022-12-31 0000887225 kep:KOMIPOAmericaMember 2022-12-31 0000887225 kep:PTEWPIndonesiaMember 2022-12-31 0000887225 kep:GlobalOnePioneerBVMember 2022-12-31 0000887225 kep:KoreaOffshoreWindPowerMember 2022-12-31 0000887225 kep:GlobalEnergyPioneerBVMember 2022-12-31 0000887225 kep:KOWEPOBylongMember 2022-12-31 0000887225 kep:SolarSchoolPlantMember 2022-12-31 0000887225 kep:SEGreenEnergyMember 2022-12-31 0000887225 kep:KEPCOCSCMember 2022-12-31 0000887225 kep:KOLATSpAMember 2022-12-31 0000887225 kep:KEPCOCaliforniaLLCMember 2022-12-31 0000887225 kep:KEPCOMojaveHoldingsLLCMember 2022-12-31 0000887225 kep:MangilaoInvestmentMember 2022-12-31 0000887225 kep:KEPCOLGCNSMangilaoSolarMember 2022-12-31 0000887225 kep:NambuUSAMember 2022-12-31 0000887225 kep:TamraOffshoreWindPowerMember 2022-12-31 0000887225 kep:KOAKPowerLimitedMember 2022-12-31 0000887225 kep:IncheonFuelCellCo.Ltd.Member 2022-12-31 0000887225 kep:KOENServiceCo.Ltd.Member 2022-12-31 0000887225 kep:KOMIPOServiceCo.Ltd.Member 2022-12-31 0000887225 kep:EWPServiceCo.Ltd.Member 2022-12-31 0000887225 kep:KNFPartnersMember 2022-12-31 0000887225 kep:KOSPOUSAMember 2022-12-31 0000887225 kep:KepcoHoldingCompanyMember 2022-12-31 0000887225 kep:KepcoForPowerCompanyMember 2022-12-31 0000887225 kep:KomipoIberianSolarGroupS.l.u.Member 2022-12-31 0000887225 kep:KoenBioCo.Ltd.Member 2022-12-31 0000887225 kep:JeongamWindPowerMember 2022-12-31 0000887225 kep:ChangjukWindPowerMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:DerivativeAssetsApplyingHedgeAccountingCategoryMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember ifrs-full:FinancialAssetsAtAmortisedCostMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:FinancialAssetsAtFairValueMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember ifrs-full:FinancialAssetsAtFairValueMember 2022-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember 2022-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMember 2022-12-31 0000887225 ifrs-full:HedgingInstrumentsMember 2022-12-31 0000887225 kep:OtherLoansMember 2022-12-31 0000887225 kep:LoansHousingMember 2022-12-31 0000887225 kep:LoansTuitionMember 2022-12-31 0000887225 kep:ValuationAllowanceAdjustmentsMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember 2022-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2022-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember 2022-12-31 0000887225 ifrs-full:CorporateLoansMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:ShortTermFinancialInstrumentsMember 2022-12-31 0000887225 ifrs-full:CorporateLoansMember 2022-12-31 0000887225 kep:OtherFinancialAssetsMember 2022-12-31 0000887225 ifrs-full:CorporateLoansMember kep:PresentValueDiscountMember 2022-12-31 0000887225 ifrs-full:CorporateLoansMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:ComputerSoftwareMember kep:OracleLicenseForSdisIntegratedDbMember 2022-12-31 0000887225 ifrs-full:MiningRightsMember kep:MiningRightOfBylongMineMember 2022-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:SejongHaengbogdosiSharingChargeMember 2022-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:RightUseElectricityGasSupplyFacilityCommunityDistrictSongdoMember 2022-12-31 0000887225 kep:OccupancyAndUseOfPublicWatersMember ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:GreenhouseGasEmissionsRightsMember 2022-12-31 0000887225 ifrs-full:ServiceConcessionRightsMember ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember kep:ContributionsToARPNRCDCMember 2022-12-31 0000887225 kep:OwnedByGovernmentMember 2022-12-31 0000887225 kep:OwnedByOthersMember 2022-12-31 0000887225 kep:TradeAndOtherReceivablesMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-12-31 0000887225 ifrs-full:LoansAndReceivablesCategoryMember 2022-12-31 0000887225 kep:CashAndCashEquivalentsMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-12-31 0000887225 kep:NonDesignatedMember 2022-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 kep:LongtermshorttermFinancialInstrumentsMember 2022-12-31 0000887225 ifrs-full:FinancialGuaranteeContractsMember 2022-12-31 0000887225 ifrs-full:FloatingInterestRateMember 2022-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember 2022-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember 2022-12-31 0000887225 ifrs-full:Level2OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 ifrs-full:AtFairValueMember 2022-12-31 0000887225 ifrs-full:Level1OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 kep:LitigationAsTheDefendantMember 2022-12-31 0000887225 kep:LitigationAsThePlaintiffMember 2022-12-31 0000887225 kep:CannotBePresentlyDeterminedMaturityMember 2022-12-31 0000887225 ifrs-full:InterestRateSwapContractMember 2022-12-31 0000887225 ifrs-full:InterestRateSwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 ifrs-full:CurrencySwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 ifrs-full:CurrencySwapContractMember 2022-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentMember ifrs-full:ForwardContractMember 2022-12-31 0000887225 ifrs-full:InterestRateSwapContractMember kep:DesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 ifrs-full:CurrencySwapContractMember kep:DesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 ifrs-full:OptionContractMember kep:NotDesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 ifrs-full:LandMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 ifrs-full:CarryingAmountMember 2022-12-31 0000887225 ifrs-full:LandMember ifrs-full:CarryingAmountMember 2022-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:CarryingAmountMember 2022-12-31 0000887225 kep:SystemStabilizationEssEquipmentHamyangSsType1Member 2022-12-31 0000887225 kep:BoryeongNewComplexUnit1ConstructionProjectMember 2022-12-31 0000887225 kep:ConstructionOfGimpoCombinedHeatAndPowerPlantMember 2022-12-31 0000887225 kep:PurchaseOfSteamTurbineHrsgAndPowerBlockOfGimpoCombinedHeatAndPowerPlantMember 2022-12-31 0000887225 kep:ServiceOfDesigningTaeanUnits910Member 2022-12-31 0000887225 kep:Other36ContractsMember 2022-12-31 0000887225 kep:SystemStabilizationEssEquipmentYeongcheonSsType1Member 2022-12-31 0000887225 kep:PurchaseOfGis362kv6300a63kaType18WolsungSyMember 2022-12-31 0000887225 kep:PurchaseOfCablePvc1c2000sq5862mAndOthersBaekunGwangyanghangMember 2022-12-31 0000887225 kep:PurchaseOfEquipmentsForTheConstructionProjectOfBoryeongIndoorCoalStorageYardMember 2022-12-31 0000887225 kep:PurchaseOfGasTurbinesSteamTurbinesAndAccessoriesForGumiNaturalGasPowerPlantMember 2022-12-31 0000887225 kep:PurchaseOfMainMachineForBoryeongNewComplexUnit1Member 2022-12-31 0000887225 kep:PurchaseOfHeatRecoveryBoilerAndAccessoriesForGumiNaturalGasPowerPlantMember 2022-12-31 0000887225 kep:PurchaseOfGasTurbineAndTurbineEquipmentOfGimpoCombinedHeatAndPowerPlantMember 2022-12-31 0000887225 kep:PurchaseOfGis362kv6300a63kaType19ShinyangsanSsMember 2022-12-31 0000887225 kep:ConstructionOfShinhanulUnits12Member 2022-12-31 0000887225 kep:PurchaseOfCableFrCncoW1c325sq672300mUnitPriceContractMember 2022-12-31 0000887225 kep:PurchaseOfMainMachineForJejuLngCombinedMember 2022-12-31 0000887225 kep:PurchaseOfCableTrCnceWAl1c400sq2175300mUnitPriceContractMember 2022-12-31 0000887225 kep:ConstructionOfSaeulUnits34Member 2022-12-31 0000887225 kep:ConcretePole10mGeneralPurpose350kgf126948EaAndFiveOtherEquipmentsUnitPriceContractMember 2022-12-31 0000887225 kep:PurchaseOfCableTrCnceW1c600sq377000mUnitPriceContractMember 2022-12-31 0000887225 kep:PurchaseOfCablePvc1c2000sq87732mAndOthersEulwangboonkiMember 2022-12-31 0000887225 kep:PurchaseOfCableTrCnceW1c325sq1342000mUnitPriceContractMember 2022-12-31 0000887225 kep:PurchaseOfCablePvc1c2500sq100548mAndOthersKyunginConstructionMember 2022-12-31 0000887225 kep:PurchaseOfGis362kv6300a63ka25cbMigeumSsMember 2022-12-31 0000887225 kep:PurchaseofcablePVC1C2500SQ103374MandothersBukdangjinShintangjungMember 2022-12-31 0000887225 kep:PurchaseofGIS362KV6300A63KA23CBYoungseoSSMember 2022-12-31 0000887225 kep:PurchaseofGIS362KV6300A63KA27CBKwangyangSSMember 2022-12-31 0000887225 kep:ConstructionOfShinhanulUnits34Member 2022-12-31 0000887225 kep:PurchaseofcablePVC1C2000SQ153000MandothersShinBupyungYoungseoMember 2022-12-31 0000887225 kep:PurchaseOfCablePvc1c2500sq57868mAndOthersGodukSeoansungMember 2022-12-31 0000887225 kep:SystemStabilizationEssEquipmentBubukSsType1Member 2022-12-31 0000887225 kep:SystemStabilizationEssEquipmentShinnamwonSsType1Member 2022-12-31 0000887225 kep:ConcretePole10mGeneralPurpose500kgf111000EaAndFourOtherEquipmentsMember 2022-12-31 0000887225 kep:AdvancedEtypeLowVoltageElectronicWatthourMeter1311552EaMember 2022-12-31 0000887225 kep:SystemStabilizationEssEquipmentYesanSsType1Member 2022-12-31 0000887225 kep:PurchaseofcoalhandlingmachineforconstructionofSamcheokunits12Member 2022-12-31 0000887225 kep:PurchaseOfPhase2PowerGenerationFacilityForYeongwolFuelCellsMember 2022-12-31 0000887225 kep:PurchaseOfFuelCellPowerGenerationFacilitiesForTheFifthStageOfShinincheonHeadquartersMember 2022-12-31 0000887225 kep:PurchaseMainEquipmentNamjejuMember 2022-12-31 0000887225 kep:PurchaseOfMainEquipmentForShinsejongCombinedThermalPowerPlantMember 2022-12-31 0000887225 kep:InstallationOfNaturalGasSupplyFacilityAtGumiNaturalGasPowerPlantMember 2022-12-31 0000887225 kep:ConstructionOfGumiNaturalGasPowerPlantMember 2022-12-31 0000887225 kep:PurchaseOfHadongThermalPowerIndoorCarboniferousPlantMember 2022-12-31 0000887225 ifrs-full:DerivativesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMember 2022-12-31 0000887225 kep:OtherFinancialAssetsAtFairValueThroughProfitOrLossMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-12-31 0000887225 kep:BeneficiaryCertificateMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-12-31 0000887225 ifrs-full:OtherEquitySecuritiesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-12-31 0000887225 ifrs-full:LoansToGovernmentMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:LoansToGovernmentMember 2022-12-31 0000887225 kep:FinancialAssetsAtAmortisedCostOthersMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:FinancialAssetsAtAmortisedCostOthersMember 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalShortTermBorrowings4Member 2022-12-31 0000887225 kep:ForeignShortTermBorrowings1Member 2022-12-31 0000887225 kep:ForeignShortTermBorrowings3Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:ForeignShortTermBorrowings3Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:KoreaGasCorporationMember 2022-12-31 0000887225 kep:GoseongGreenPowerMember 2022-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:KWNuclearComponentsMember 2022-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2022-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2022-12-31 0000887225 kep:GeumsungsanWindPowerMember 2022-12-31 0000887225 kep:SeokmunEnergyMember 2022-12-31 0000887225 kep:NaepoGreenEnergyMember 2022-12-31 0000887225 kep:ChuncheonEnergyMember 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.Member 2022-12-31 0000887225 kep:PyeongchangWindPowerMember 2022-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2022-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2022-12-31 0000887225 kep:DangjinEcoPowerMember 2022-12-31 0000887225 kep:BusanIndustrialSolarPowerMember 2022-12-31 0000887225 kep:YeonggwangWindPowerMember 2022-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2022-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2022-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2022-12-31 0000887225 kep:CheongnaEnergyMember 2022-12-31 0000887225 kep:TwentySixJointVenturesOverseasMember 2022-12-31 0000887225 kep:DaeryunPowerMember 2022-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2022-12-31 0000887225 kep:NoeulGreenEnergyMember 2022-12-31 0000887225 kep:GangwonWindPowerMember 2022-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2022-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2022-12-31 0000887225 kep:KNHSolarMember 2022-12-31 0000887225 kep:YTNMember 2022-12-31 0000887225 kep:DongbuHighwaySolarMember 2022-12-31 0000887225 kep:KostureMember 2022-12-31 0000887225 kep:KAPESMember 2022-12-31 0000887225 kep:EightAssociatesOverseasMember 2022-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2022-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2022-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2022-12-31 0000887225 kep:SeobuHighwaySolarMember 2022-12-31 0000887225 kep:SPowerMember 2022-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2022-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2022-12-31 0000887225 kep:DummyMember 2022-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2022-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2022-12-31 0000887225 kep:BusanGreenEnergyMember 2022-12-31 0000887225 kep:GangneungEcoPowerMember 2022-12-31 0000887225 kep:HyundaiGreenPowerMember 2022-12-31 0000887225 kep:KoreaPowerExchangeMember 2022-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2022-12-31 0000887225 kep:LongTermFinancialInstrumentsCategoryMember 2022-12-31 0000887225 kep:LongTermFinancialInstrumentsMember 2022-12-31 0000887225 kep:OtherSubsidiariesMember 2022-12-31 0000887225 kep:TaebaekWindPowerMember 2022-12-31 0000887225 kep:PNDSolarMember 2022-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2022-12-31 0000887225 kep:HonamWindPowerMember 2022-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2022-12-31 0000887225 kep:DaeguPhotovoltaicMember 2022-12-31 0000887225 kep:GoesanSolarParkMember 2022-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2022-12-31 0000887225 kep:CheongjuEcoParkMember 2022-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2022-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2022-12-31 0000887225 kep:BitsolarEnergyMember 2022-12-31 0000887225 kep:ForeignLongTermBorrowings12Member 2022-12-31 0000887225 kep:ForeignLongtermBorrowings13Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:ForeignLongtermBorrowings13Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:ForeignLongtermBorrowings14Member 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:ForeignLongTermBorrowings4Member 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:ForeignLongTermBorrowings4Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings1Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings6Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings8Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings9Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings10Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings16Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings19Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings24Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings26Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings26Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings27Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings27Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:ForeignLongTermBorrowings7Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings8Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings9Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:ForeignLongTermBorrowings9Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:ForeignLongTermBorrowings11Member 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy96Member 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy96Member 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy97Member 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy97Member 2022-12-31 0000887225 kep:Fy18bMember ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:Fy18bMember ifrs-full:TopOfRangeMember 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy19cMember 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy19cMember 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy19eMember 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy19eMember 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy22cMember 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy22cMember 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy22fMember 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy22fMember 2022-12-31 0000887225 kep:Fy19bMember 2022-12-31 0000887225 kep:Fy15Member 2022-12-31 0000887225 kep:Fy17bMember 2022-12-31 0000887225 kep:Fy22aMember 2022-12-31 0000887225 kep:Fy22bMember 2022-12-31 0000887225 kep:Fy22dMember 2022-12-31 0000887225 kep:Fy20cMember 2022-12-31 0000887225 kep:Fy21bMember 2022-12-31 0000887225 kep:Fy21cMember 2022-12-31 0000887225 kep:Fy21dMember 2022-12-31 0000887225 kep:Fy20dMember 2022-12-31 0000887225 kep:Fy20aMember 2022-12-31 0000887225 kep:Fy18aMember 2022-12-31 0000887225 kep:Fy19aMember 2022-12-31 0000887225 kep:Fy20bMember 2022-12-31 0000887225 kep:Fy17cMember 2022-12-31 0000887225 kep:Fy21aMember 2022-12-31 0000887225 kep:Fy22eMember 2022-12-31 0000887225 kep:Fy22gMember 2022-12-31 0000887225 kep:Fy04Member 2022-12-31 0000887225 kep:Fy14Member 2022-12-31 0000887225 kep:Fy17aMember 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:LocalShortTermBorrowings2Member 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:LocalShortTermBorrowings2Member 2022-12-31 0000887225 kep:LocalShortTermBorrowings3Member 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:LocalBankOverdraft1Member 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:LocalBankOverdraft1Member 2022-12-31 0000887225 kep:ShortTermFinancialInstrumentsCategoryMember 2022-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember 2022-12-31 0000887225 kep:GwangyangGreenEnergyMember 2022-12-31 0000887225 kep:NineAssociatesOverseasMember 2022-12-31 0000887225 kep:TronixMember 2022-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2022-12-31 0000887225 kep:BitgoelEcoEnergyMember 2022-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2022-12-31 0000887225 kep:GunsanLandSolarMember 2022-12-31 0000887225 kep:SolaseadoSolarPowerMember 2022-12-31 0000887225 kep:KoreaDevelopmentBankMember 2022-12-31 0000887225 kep:GunsanBioEnergyMember 2022-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicMember 2022-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2022-12-31 0000887225 kep:ExpenseOfIssuanceMember 2022-12-31 0000887225 kep:KoreaSoutheastPowerMember kep:SecondBondTypeHybridBondMember 2022-12-31 0000887225 ifrs-full:LandMember ifrs-full:NoncurrentAssetsHeldForSaleMember 2022-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:NoncurrentAssetsHeldForSaleMember 2022-12-31 0000887225 ifrs-full:NoncurrentAssetsHeldForSaleMember 2022-12-31 0000887225 kep:StructuresMember ifrs-full:NoncurrentAssetsHeldForSaleMember 2022-12-31 0000887225 kep:LoansRelatedPartiesMember 2022-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2022-12-31 0000887225 kep:ShinhanBNPPPrivateInvestmentTrustEastWestSunlightDreamMember 2022-12-31 0000887225 kep:CheongnaEnergyMember 2022-12-31 0000887225 kep:DangjinEcoPowerMember 2022-12-31 0000887225 kep:CAESLLCMember 2022-12-31 0000887225 kep:PyeongchangWindPowerMember 2022-12-31 0000887225 kep:EumseongEcoParkMember 2022-12-31 0000887225 kep:SongsanGreenEnergyMember 2022-12-31 0000887225 kep:DEEnergiaSpAMember 2022-12-31 0000887225 kep:StavroHoldingIIABMember 2022-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2022-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2022-12-31 0000887225 kep:PTBaritoWahanaTenagaMember 2022-12-31 0000887225 kep:KASINVESTMENTIILLCMember 2022-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember 2022-12-31 0000887225 kep:SolaseadoSolarPowerMember 2022-12-31 0000887225 kep:CheongjuEcoParkCoLtdMember 2022-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2022-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2022-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingS.lMember 2022-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2022-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2022-12-31 0000887225 kep:NaepoGreenEnergyMember 2022-12-31 0000887225 kep:EnergycoCoLtdFormerlyEnergycoLlcMember 2022-12-31 0000887225 kep:GuadalupeSolarSpaMember 2022-12-31 0000887225 kep:OmisanWindPowerMember 2022-12-31 0000887225 kep:WaterburyLakeUraniumLPMember 2022-12-31 0000887225 kep:ASMBGInvesticiiADMember 2022-12-31 0000887225 kep:KVHoldingsMember 2022-12-31 0000887225 kep:ShuweihatAsiaPowerInvestmentBVMember 2022-12-31 0000887225 kep:KEPCOUhdeMember 2022-12-31 0000887225 kep:ShuweihatAsiaOperationMaintenanceCompanyMember 2022-12-31 0000887225 kep:OneEnergyAsiaLimitedMember 2022-12-31 0000887225 kep:BitsolarEnergyMember 2022-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2022-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2022-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2022-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2022-12-31 0000887225 kep:GoheungNewEnergyCoLtdMember 2022-12-31 0000887225 kep:GunsanLandSolarCoLtdMember 2022-12-31 0000887225 kep:CapmanLynxScaSicarMember 2022-12-31 0000887225 kep:RESTechnologyADMember 2022-12-31 0000887225 kep:DatangKEPCOChaoyangRenewablePowerMember 2022-12-31 0000887225 kep:JamaicaPublicServiceMember 2022-12-31 0000887225 kep:DatangChifengRenewablePowerMember 2022-12-31 0000887225 kep:RabighOperationMaintenanceMember 2022-12-31 0000887225 kep:MOMENTUMMember 2022-12-31 0000887225 kep:KAPESMember 2022-12-31 0000887225 kep:KIAMCOKOWEPOBannertonHoldCoPtyLtdMember 2022-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2022-12-31 0000887225 kep:REAstoria2LandCoLLCMember 2022-12-31 0000887225 kep:KelarSAMember 2022-12-31 0000887225 kep:PTTanjungPowerIndonesiaMember 2022-12-31 0000887225 kep:REPioneerHoldingsLLCMember 2022-12-31 0000887225 kep:BarakahOneCompanyMember 2022-12-31 0000887225 kep:KEPCOSPCPowerCorporationMember 2022-12-31 0000887225 kep:GansuDatangYumenWindPowerMember 2022-12-31 0000887225 kep:LaurelSpAMember 2022-12-31 0000887225 kep:REBarrenRidgeLandCoLLCMember 2022-12-31 0000887225 kep:ChileSolarJVSpAMember 2022-12-31 0000887225 kep:REHolidayHoldingsLLCMember 2022-12-31 0000887225 kep:REBarrenRidge1HoldingsLLCMember 2022-12-31 0000887225 kep:DaehanWindPowerPSCMember 2022-12-31 0000887225 kep:SouthJamaicaPowerCompanyLimitedMember 2022-12-31 0000887225 kep:NghiSon2PowerMember 2022-12-31 0000887225 kep:IncheonNewPowerMember 2022-12-31 0000887225 kep:YeonggwangWindPowerMember 2022-12-31 0000887225 kep:NawahEnergyMember 2022-12-31 0000887225 kep:SeokmunEnergyMember 2022-12-31 0000887225 kep:ChesterSolarVSpAMember 2022-12-31 0000887225 kep:DiegoDeAlmagroSolarSpAMember 2022-12-31 0000887225 kep:ChesterSolarIVSpAMember 2022-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2022-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2022-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2022-12-31 0000887225 kep:RabighElectricityMember 2022-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2022-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:ChuncheonEnergyMember 2022-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2022-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2022-12-31 0000887225 kep:HonamWindPowerMember 2022-12-31 0000887225 kep:AmmanAsiaElectricPowerMember 2022-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member 2022-12-31 0000887225 kep:SeungmunGreenEnergyMember 2022-12-31 0000887225 kep:SpowerChileSpaMember 2022-12-31 0000887225 kep:TrumbullAssetManagementLlcMember 2022-12-31 0000887225 kep:PungbackWindFarmCorporationMember 2022-12-31 0000887225 kep:HasamiWindFarmCorporationMember 2022-12-31 0000887225 kep:KWNuclearComponentsMember 2022-12-31 0000887225 kep:ChangwonNuriEnergyMember 2022-12-31 0000887225 kep:PulauIndahOAndMSdnBhdMember 2022-12-31 0000887225 kep:GeumsungsanWindPowerCoLtdMember 2022-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2022-12-31 0000887225 kep:KASINVESTMENTILLCMember 2022-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2022-12-31 0000887225 kep:HORUSSOLARSADECVMember 2022-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember 2022-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISSDECVMember 2022-12-31 0000887225 kep:SolarPhilippinesCalataganCorporationMember 2022-12-31 0000887225 kep:JaeunResidentWindPowerPlantCoLtdMember 2022-12-31 0000887225 kep:ChesterSolarISpAMember 2022-12-31 0000887225 kep:ChungsongmeonBongSanWindPowerCoLtdMember 2022-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2022-12-31 0000887225 kep:GoDeokCleanEnergyCoLtdMember 2022-12-31 0000887225 kep:O2BGlobalCoLtdMember 2022-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratoryMember 2022-12-31 0000887225 kep:SaemangeumSebitPowerPlantCo.Ltd.Member 2022-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2022-12-31 0000887225 kep:HaeparangEnergyCo.Ltd.Member 2022-12-31 0000887225 kep:DongbuHighwaySolarMember 2022-12-31 0000887225 kep:ChuncheonGreenEnergyCo.Ltd.Member 2022-12-31 0000887225 kep:KoreaEnergyDataCoLtdMember 2022-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicCoLtdMember 2022-12-31 0000887225 kep:YuDangSolarCoLtdMember 2022-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2022-12-31 0000887225 kep:SEPCoLtdMember 2022-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2022-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2022-12-31 0000887225 kep:SureDataLabCoLtdMember 2022-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2022-12-31 0000887225 kep:TronixCoLtdMember 2022-12-31 0000887225 kep:IndeckNilesAssetManagementLLCMember 2022-12-31 0000887225 kep:HankookElectricPowerInformationCoLtdMember 2022-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2022-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2022-12-31 0000887225 kep:GreenRadiationMember 2022-12-31 0000887225 kep:Pt.CirebonEnergiPrasaranaMember 2022-12-31 0000887225 kep:PlatformnMember 2022-12-31 0000887225 kep:BoulderSolarMember 2022-12-31 0000887225 kep:YangguFloatingPhotovoltaicPowerPlantIncMember 2022-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2022-12-31 0000887225 kep:EnvironmentAndEnergyMember 2022-12-31 0000887225 kep:AceMember 2022-12-31 0000887225 kep:IndeckNilesDevelopmentLLCMember 2022-12-31 0000887225 kep:StnCo.Ltd.FormerlyStructureTestNetworkCo.Ltd.Member 2022-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2022-12-31 0000887225 kep:RecsInnovationCo.Ltd.FormerlyWangSanEngineering.Co.Ltd.Member 2022-12-31 0000887225 kep:ScEgMember 2022-12-31 0000887225 kep:KostureCoLtdMember 2022-12-31 0000887225 kep:YeomsubongWindPowerCo.Ltd.Member 2022-12-31 0000887225 kep:GGuruCoLtdMember 2022-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2022-12-31 0000887225 kep:GoesanSolarParkCoLtdMember 2022-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2022-12-31 0000887225 kep:Ud4mMember 2022-12-31 0000887225 kep:DaewonGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2022-12-31 0000887225 kep:GangneungSacheonFuelCellCoLtdMember 2022-12-31 0000887225 kep:SeobuHighwaySolarMember 2022-12-31 0000887225 kep:AnjwaSmartFarmSolarCityCoLtdMember 2022-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember 2022-12-31 0000887225 kep:KoreaPowerExchangeMember 2022-12-31 0000887225 kep:YTNMember 2022-12-31 0000887225 kep:TaebaekWindPowerMember 2022-12-31 0000887225 kep:GangwonWindPowerMember 2022-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2022-12-31 0000887225 kep:GoseongGreenPowerMember 2022-12-31 0000887225 kep:KNOCNigerianEastOilMember 2022-12-31 0000887225 kep:GemengInternationalEnergyMember 2022-12-31 0000887225 kep:PTCirebonElectricPowerMember 2022-12-31 0000887225 kep:KNOCNigerianWestOilMember 2022-12-31 0000887225 kep:KNHSolarMember 2022-12-31 0000887225 kep:HyundaiGreenPowerMember 2022-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2022-12-31 0000887225 kep:ITRCoLtdMember 2022-12-31 0000887225 kep:PNDSolarMember 2022-12-31 0000887225 kep:KoreaGasCorporationMember 2022-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2022-12-31 0000887225 kep:PTMutiaraJawaMember 2022-12-31 0000887225 kep:JinbhuvishPowerGenerationPvtMember 2022-12-31 0000887225 kep:SPCPowerCorporationMember 2022-12-31 0000887225 kep:DaeryunPowerMember 2022-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2022-12-31 0000887225 kep:GunsanBioEnergyMember 2022-12-31 0000887225 kep:GwangyangGreenEnergyMember 2022-12-31 0000887225 kep:HansuwonKnpCoLtdFormerlyKoreaNuclearPartnersCoLtdMember 2022-12-31 0000887225 kep:YaksuESSLtdMember 2022-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimiteMember 2022-12-31 0000887225 kep:DaegucleanEnergyMember 2022-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2022-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2022-12-31 0000887225 kep:PioneerGasPowerMember 2022-12-31 0000887225 kep:DaeguPhotovoltaicMember 2022-12-31 0000887225 kep:PTWampuElectricPowerMember 2022-12-31 0000887225 kep:SPowerMember 2022-12-31 0000887225 kep:KoreaElectricPowerCorporationFundMember 2022-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2022-12-31 0000887225 kep:EurasiaEnergyHoldingsMember 2022-12-31 0000887225 kep:XePianXeNamnoyPowerMember 2022-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2022-12-31 0000887225 kep:NoeulGreenEnergyMember 2022-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2022-12-31 0000887225 kep:PTBayanResourcesTBKMember 2022-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2022-12-31 0000887225 kep:BusanGreenEnergyMember 2022-12-31 0000887225 kep:DongducheonDreamPowerMember 2022-12-31 0000887225 kep:SamcheokEcoMaterialsCo.LimitedMember 2022-12-31 0000887225 kep:GangneungEcoPowerMember 2022-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2022-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2022-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2022-12-31 0000887225 kep:PlatformnMember 2022-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2022-12-31 0000887225 kep:AnjwaSmartFarmSolarCityMember 2022-12-31 0000887225 kep:KEPCOUhdeMember 2022-12-31 0000887225 kep:ForeignLongtermBorrowings15Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:ForeignLongtermBorrowings15Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings20Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings20Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:ForeignLongTermBorrowings5Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings5Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings22Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings11Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings11Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:LocalLongTermBorrowings4Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings4Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 ifrs-full:CountryOfDomicileMember 2022-12-31 0000887225 ifrs-full:ForeignCountriesMember 2022-12-31 0000887225 kep:LocalLongTermBorrowings2Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings3Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings4Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings5Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings13Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings14Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings15Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings17Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings18Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings7Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings11Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings12Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings27Member 2022-12-31 0000887225 kep:LocalLongTermBorrowingsMember 2022-12-31 0000887225 kep:ForeignLongTermBorrowings1Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings2Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings3Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings4Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings5Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings6Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings9Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowings10Member 2022-12-31 0000887225 kep:ForeignLongtermBorrowings13Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings20Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings21Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings23Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings25Member 2022-12-31 0000887225 kep:LocalLongTermBorrowings26Member 2022-12-31 0000887225 kep:ForeignLongtermBorrowings15Member 2022-12-31 0000887225 kep:ForeignLongtermBorrowings16Member 2022-12-31 0000887225 kep:ForeignLongTermBorrowingsMember 2022-12-31 0000887225 kep:OtherNoncurrentAssetsMember 2022-12-31 0000887225 kep:NonCurrentFinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-12-31 0000887225 kep:ElectricityBonds1Member 2022-12-31 0000887225 kep:CorporateBondsMember 2022-12-31 0000887225 kep:CorporateBonds1Member 2022-12-31 0000887225 kep:LocalDebtSecuritiesMember 2022-12-31 0000887225 kep:Fy96Member 2022-12-31 0000887225 kep:Fy19cMember 2022-12-31 0000887225 kep:Fy19dMember 2022-12-31 0000887225 kep:Fy19eMember 2022-12-31 0000887225 kep:Fy18bMember 2022-12-31 0000887225 kep:Fy97Member 2022-12-31 0000887225 kep:Fy22fMember 2022-12-31 0000887225 kep:ForeignDebtSecuritiesMember 2022-12-31 0000887225 kep:Fy22cMember 2022-12-31 0000887225 kep:TransmissionAndDistributionMember ifrs-full:OperatingSegmentsMember 2022-12-31 0000887225 kep:ElectricPowerGenerationNuclearMember ifrs-full:OperatingSegmentsMember 2022-12-31 0000887225 kep:ElectricPowerGenerationNonNuclearMember ifrs-full:OperatingSegmentsMember 2022-12-31 0000887225 ifrs-full:OperatingSegmentsMember 2022-12-31 0000887225 kep:DeferredTaxesAdjustmentMember 2022-12-31 0000887225 ifrs-full:EliminationOfIntersegmentAmountsMember 2022-12-31 0000887225 kep:OthersAdjustmentMember 2022-12-31 0000887225 ifrs-full:MaterialReconcilingItemsMember 2022-12-31 0000887225 kep:PlantMaintenanceEngineeringServiceMember ifrs-full:OperatingSegmentsMember 2022-12-31 0000887225 ifrs-full:AllOtherSegmentsMember ifrs-full:OperatingSegmentsMember 2022-12-31 0000887225 kep:EquityMethodAdjustmentMember 2022-12-31 0000887225 kep:ChesterSolarIVSpAMember 2022-12-31 0000887225 kep:KAPESMember 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2022-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2022-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2022-12-31 0000887225 kep:IncheonNewPowerMember 2022-12-31 0000887225 kep:NghiSon2PowerMember 2022-12-31 0000887225 kep:BarakahOneCompanyMember 2022-12-31 0000887225 kep:NaepoGreenEnergyMember 2022-12-31 0000887225 kep:MiraeEngineeringCo.LtdMember 2022-12-31 0000887225 kep:WhitecleanFoodsCo.LtdMember 2022-12-31 0000887225 kep:ChaegimEnvironmentDevelopmentCo.LtdMember 2022-12-31 0000887225 kep:DaesungStainCo.LtdMember 2022-12-31 0000887225 kep:TaesanCo.LtdMember 2022-12-31 0000887225 kep:KShipbuildingCo.Ltd.Member 2022-12-31 0000887225 kep:FinePowerexCo.LtdMember 2022-12-31 0000887225 kep:DaeheungEngineeringCo.LtdMember 2022-12-31 0000887225 kep:EtapolCo.LtdMember 2022-12-31 0000887225 kep:DongyangR.p.f.IndustrialCo.LtdMember 2022-12-31 0000887225 kep:JicoCo.LtdMember 2022-12-31 0000887225 kep:CommonComputerCo.LtdMember 2022-12-31 0000887225 kep:YoongwonInternationalCo.LtdMember 2022-12-31 0000887225 kep:YuilEngineeringCo.LtdMember 2022-12-31 0000887225 kep:CheonwooE.p.sCo.LtdMember 2022-12-31 0000887225 kep:InformationcommunicationFinancialCooperativeCo.LtdMember 2022-12-31 0000887225 kep:J.iSteelCo.LtdMember 2022-12-31 0000887225 kep:G.mFoodsCo.LtdMember 2022-12-31 0000887225 kep:MecCo.LtdMember 2022-12-31 0000887225 kep:WooriAsconCo.LtdMember 2022-12-31 0000887225 kep:HntCo.LtdMember 2022-12-31 0000887225 kep:MacroadCo.LtdMember 2022-12-31 0000887225 kep:EunsungIndustrialCo.LtdMember 2022-12-31 0000887225 kep:SangjinCo.LtdMember 2022-12-31 0000887225 kep:NewTechCo.LtdMember 2022-12-31 0000887225 kep:KoreaRemiconCo.LtdMember 2022-12-31 0000887225 kep:KoaTechCo.LtdMember 2022-12-31 0000887225 kep:ElectricContractorsFinancialCooperativeCo.LtdMember 2022-12-31 0000887225 kep:MsTechCo.LtdMember 2022-12-31 0000887225 kep:MichangCableCo.LtdMember 2022-12-31 0000887225 kep:DaejuSteelCo.LtdMember 2022-12-31 0000887225 kep:SegeonCo.LtdMember 2022-12-31 0000887225 kep:TopisCo.LtdMember 2022-12-31 0000887225 kep:AvohCeramicbathCo.LtdMember 2022-12-31 0000887225 kep:KpeCo.LtdMember 2022-12-31 0000887225 kep:CoffeenieCo.LtdMember 2022-12-31 0000887225 kep:MediPharmaPlanCo.LtdMember 2022-12-31 0000887225 kep:GlTechCo.LtdMember 2022-12-31 0000887225 kep:TaejinCo.LtdMember 2022-12-31 0000887225 kep:DongbangfarmsCo.LtdMember 2022-12-31 0000887225 kep:SungdoPackCo.LtdMember 2022-12-31 0000887225 kep:WoongjinEnergyCo.LtdMember 2022-12-31 0000887225 kep:CheonhaeCo.LtdMember 2022-12-31 0000887225 kep:IksanguwonCo.LtdMember 2022-12-31 0000887225 kep:DaeyeonecoCo.LtdMember 2022-12-31 0000887225 kep:WecanGlobalInc.Co.LtdMember 2022-12-31 0000887225 kep:HyundaiGlassCo.LtdMember 2022-12-31 0000887225 kep:HyesungCablecommunicationIncMember 2022-12-31 0000887225 kep:DongShinHydrauliesCo.LtdMember 2022-12-31 0000887225 kep:JinwooTextileCo.LtdMember 2022-12-31 0000887225 kep:SkeCableCo.LtdMember 2022-12-31 0000887225 kep:HiKoreaCo.LtdMember 2022-12-31 0000887225 kep:MyungilMetalCo.LtdMember 2022-12-31 0000887225 kep:CicTechCo.LtdMember 2022-12-31 0000887225 kep:FoureverCo.LtdMember 2022-12-31 0000887225 kep:DaeshinEcmCo.LtdMember 2022-12-31 0000887225 kep:DiTechCo.LtdMember 2022-12-31 0000887225 kep:MideumeuljuneunnamuCo.LtdMember 2022-12-31 0000887225 kep:JingkangResourcesCo.LtdMember 2022-12-31 0000887225 kep:UiCo.LtdMember 2022-12-31 0000887225 kep:OranoExpansionMember 2022-12-31 0000887225 kep:KamadaKoreaCo.LtdMember 2022-12-31 0000887225 kep:ShinwonCo.LtdMember 2022-12-31 0000887225 kep:SangsinCo.LtdMember 2022-12-31 0000887225 kep:FosysCo.LtdMember 2022-12-31 0000887225 kep:JiansConstructionCo.LtdMember 2022-12-31 0000887225 kep:SeilTextileCo.LtdMember 2022-12-31 0000887225 kep:DaeoCo.LtdMember 2022-12-31 0000887225 kep:JslCo.LtdMember 2022-12-31 0000887225 kep:HansAdCo.LtdMember 2022-12-31 0000887225 kep:TsntCo.Ltd.Member 2022-12-31 0000887225 kep:HaesungMetalCo.LtdMember 2022-12-31 0000887225 kep:IlshinTechCo.LtdMember 2022-12-31 0000887225 kep:EwonArtCo.LtdMember 2022-12-31 0000887225 kep:EslinCo.LtdMember 2022-12-31 0000887225 kep:SukwonCo.LtdMember 2022-12-31 0000887225 kep:SimaCo.LtdMember 2022-12-31 0000887225 kep:AsptCo.LtdMember 2022-12-31 0000887225 kep:DuckwonIndustrialCo.LtdMember 2022-12-31 0000887225 kep:LbkCo.LtdMember 2022-12-31 0000887225 kep:GbPrecisionCo.LtdMember 2022-12-31 0000887225 kep:SteelFocusCo.LtdMember 2022-12-31 0000887225 kep:GreencarbonCo.LtdMember 2022-12-31 0000887225 kep:DhTradingCo.LtdMember 2022-12-31 0000887225 kep:SunkooCo.LtdMember 2022-12-31 0000887225 kep:WorldOneCo.LtdMember 2022-12-31 0000887225 kep:YewonCo.LtdMember 2022-12-31 0000887225 kep:DyntexKoreaCo.LtdMember 2022-12-31 0000887225 kep:GhTechCo.LtdMember 2022-12-31 0000887225 kep:MagtecCo.LtdMember 2022-12-31 0000887225 kep:SamkumIndustryCo.LtdMember 2022-12-31 0000887225 kep:HandonCo.LtdMember 2022-12-31 0000887225 kep:BokwangCo.LtdMember 2022-12-31 0000887225 kep:LoftGardenCo.LtdMember 2022-12-31 0000887225 kep:ShinsungTechCo.LtdMember 2022-12-31 0000887225 kep:DongInIndustryCo.LtdMember 2022-12-31 0000887225 kep:YsmCo.LtdMember 2022-12-31 0000887225 kep:MiretechCoLtdMember 2022-12-31 0000887225 kep:EunSungEnterpriseCo.LtdMember 2022-12-31 0000887225 kep:WooyangHCCoLtdMember 2022-12-31 0000887225 kep:SMHi-techCoLtdMember 2022-12-31 0000887225 kep:SamkwangChemicalCoLtdMember 2022-12-31 0000887225 kep:SamjooHightechCoLtdMember 2022-12-31 0000887225 kep:ShinseungChemicalIndustyCoLtdMember 2022-12-31 0000887225 kep:KJAlloyCoLtdMember 2022-12-31 0000887225 kep:DongSeoElectronicsCoLtdMember 2022-12-31 0000887225 kep:DaewooDisplayCoLtdMember 2022-12-31 0000887225 kep:NTSCoLtdMember 2022-12-31 0000887225 kep:AIDCOLTDMember 2022-12-31 0000887225 kep:JaewooCoLtdMember 2022-12-31 0000887225 kep:TheYeonrijiCoLtdMember 2022-12-31 0000887225 kep:BellieDoughnutsCoLtdMember 2022-12-31 0000887225 kep:KyungPyoIndustryCoLtdMember 2022-12-31 0000887225 kep:DoosungHeavyIndustriesCoLtdMember 2022-12-31 0000887225 kep:ChangwonEcofriendlyFarmingCorporationMember 2022-12-31 0000887225 kep:KumoHitechCoLtdMember 2022-12-31 0000887225 kep:FlusysCoLtdMember 2022-12-31 0000887225 kep:SewonBusCoLtdMember 2022-12-31 0000887225 kep:AIRTECHInformationCommunicationCoLtdMember 2022-12-31 0000887225 kep:KiscomCoLtdMember 2022-12-31 0000887225 kep:FishWorldMember 2022-12-31 0000887225 kep:SejinHightechCoLtdMember 2022-12-31 0000887225 kep:ShinyoungTextilesCoLtdMember 2022-12-31 0000887225 kep:IlwooSteelCoLtdMember 2022-12-31 0000887225 kep:Dong-unTechCoLtdMember 2022-12-31 0000887225 kep:EanskoreaCoLtdMember 2022-12-31 0000887225 kep:YoungdongseafoodCoLtdMember 2022-12-31 0000887225 kep:AgencoreCo.LtdMember 2022-12-31 0000887225 kep:PuruenEnvironmentCoLtdMember 2022-12-31 0000887225 kep:SuperoneCoLtdMember 2022-12-31 0000887225 kep:MillenniumPNTCoLtdMember 2022-12-31 0000887225 kep:KMLCCoLtdMember 2022-12-31 0000887225 kep:SeinfoodCoLtdMember 2022-12-31 0000887225 kep:IZUKOREACoLtdMember 2022-12-31 0000887225 kep:KPLCircuitCoLtdMember 2022-12-31 0000887225 kep:YoungSanHeavyIndustriesCoLtdMember 2022-12-31 0000887225 kep:DaeMyungCoLtdMember 2022-12-31 0000887225 kep:SamsungNonferrousMetalCoLtdMember 2022-12-31 0000887225 kep:DaewhaFuelPumpIndLtdMember 2022-12-31 0000887225 kep:ChangWonEngineeringCoLtdMember 2022-12-31 0000887225 kep:SamsungSilupCoLtdMember 2022-12-31 0000887225 kep:KukexIncMember 2022-12-31 0000887225 kep:YoungshinPlusCo.Ltd.Member 2022-12-31 0000887225 kep:TaeSungEco-TechCoLtdMember 2022-12-31 0000887225 kep:SIPCoLtdMember 2022-12-31 0000887225 kep:SSETCoLtdMember 2022-12-31 0000887225 kep:DaejiProductCoLtdMember 2022-12-31 0000887225 kep:ClizenCoLtdMember 2022-12-31 0000887225 kep:DawonYuhwaCoLtdMember 2022-12-31 0000887225 kep:SewonPMTechCoLtdMember 2022-12-31 0000887225 kep:EwonMaterialsCoLtdMember 2022-12-31 0000887225 kep:GNChemCoLtdMember 2022-12-31 0000887225 kep:WooyangFrozenFoodsCoLtdMember 2022-12-31 0000887225 kep:NanomicCoLtdMember 2022-12-31 0000887225 kep:NanomicartCoLtdMember 2022-12-31 0000887225 kep:SamchungwonCoLtdMember 2022-12-31 0000887225 kep:TaejinHiechCoLtdMember 2022-12-31 0000887225 kep:DongdoCNPCoLtdMember 2022-12-31 0000887225 kep:HanMiFlexibleCoLtdMember 2022-12-31 0000887225 kep:SITCoLtdMember 2022-12-31 0000887225 kep:E-WonSolutechCoLtdMember 2022-12-31 0000887225 kep:RoadSolarCoLtdMember 2022-12-31 0000887225 kep:JeongpumCoLtdMember 2022-12-31 0000887225 kep:YuchangIndustryCoLtdMember 2022-12-31 0000887225 kep:AmanexCoLtdMember 2022-12-31 0000887225 kep:KoreaSteelPowerCoLtdMember 2022-12-31 0000887225 kep:HyunwooWinstarCoLtdMember 2022-12-31 0000887225 kep:SungchangTechCoLtdMember 2022-12-31 0000887225 kep:CaffeBeneCoLtdMember 2022-12-31 0000887225 kep:ShinjinInternationalCorpMember 2022-12-31 0000887225 kep:Dae-ALeisureCoLtdMember 2022-12-31 0000887225 kep:OgokbaekkwaCoLtdMember 2022-12-31 0000887225 kep:JinhungPackagingCoLtdMember 2022-12-31 0000887225 kep:DonglimEngCoLtdMember 2022-12-31 0000887225 kep:DaeBangIndustryCoLtdMember 2022-12-31 0000887225 kep:HeadoneCoLtdMember 2022-12-31 0000887225 kep:SamwonBioTechCoLtdMember 2022-12-31 0000887225 kep:AddiesDirectCoLtdMember 2022-12-31 0000887225 kep:WorldCnMIncMember 2022-12-31 0000887225 kep:SangjiCoLtdMember 2022-12-31 0000887225 kep:SetHoldingMember 2022-12-31 0000887225 kep:KyeonggwangTechCo.ltdMember 2022-12-31 0000887225 kep:TaegwangPcCo.LtdMember 2022-12-31 0000887225 kep:AronFlyingShipCo.LtdMember 2022-12-31 0000887225 kep:DaedongCo.LtdMember 2022-12-31 0000887225 kep:SamhongMachinery.EmcCo.LtdMember 2022-12-31 0000887225 kep:GaoneInternationalCo.LtdMember 2022-12-31 0000887225 kep:JjTechCo.Member 2022-12-31 0000887225 kep:SamwangCo.LtdMember 2022-12-31 0000887225 kep:SekwangPrecisionCo.LtdMember 2022-12-31 0000887225 kep:SnopaCo.LtdMember 2022-12-31 0000887225 kep:HanaItmInc.Member 2022-12-31 0000887225 kep:CkIndustryCo.LtdMember 2022-12-31 0000887225 kep:StsGlobalCo.LtdMember 2022-12-31 0000887225 kep:TaeyoungPrecisionCo.LtdMember 2022-12-31 0000887225 kep:MinjinCo.LtdMember 2022-12-31 0000887225 kep:YmTechCo.LtdMember 2022-12-31 0000887225 kep:MsPrecisionCo.LtdMember 2022-12-31 0000887225 kep:JbmCo.LtdMember 2022-12-31 0000887225 kep:YurimCnfCo.LtdMember 2022-12-31 0000887225 kep:GogangAluminumCo.LtdMember 2022-12-31 0000887225 kep:NyTechCo.LtdMember 2022-12-31 0000887225 kep:SamjinPlacoCo.LtdMember 2022-12-31 0000887225 kep:DongyangPratechCo.LtdMember 2022-12-31 0000887225 kep:DaekwangForgingCo.LtdMember 2022-12-31 0000887225 kep:DailyshotCo.LtdMember 2022-12-31 0000887225 kep:AlohaFactoryCo.LtdMember 2022-12-31 0000887225 kep:ShinHeungPrecisionCo.LtdMember 2022-12-31 0000887225 kep:DaejooEgCo.LtdMember 2022-12-31 0000887225 kep:CcEngCo.LtdMember 2022-12-31 0000887225 kep:JungwooMetalSolutionCo.LtdMember 2022-12-31 0000887225 kep:GuseulCo.LtdMember 2022-12-31 0000887225 kep:SamhyupCo.LtdMember 2022-12-31 0000887225 kep:SkdKoreaCo.LtdMember 2022-12-31 0000887225 kep:ThesunCo.LtdMember 2022-12-31 0000887225 kep:JunginDistributionCo.LtdMember 2022-12-31 0000887225 kep:DaeyangHydroCo.LtdMember 2022-12-31 0000887225 kep:EbadomCo.LtdMember 2022-12-31 0000887225 kep:ThermoTecCo.LtdMember 2022-12-31 0000887225 kep:SeokjinEtCo.Ltd.Member 2022-12-31 0000887225 kep:ChounghwaPreciseCo.LtdMember 2022-12-31 0000887225 kep:DaewoongAndTechnologyCo.LtdMember 2022-12-31 0000887225 kep:MediquitousCo.LtdMember 2022-12-31 0000887225 kep:MsSteelIndustrialCo.LtdMember 2022-12-31 0000887225 kep:SfcInternationalCo.LtdMember 2022-12-31 0000887225 kep:ShieldBoardCo.LtdMember 2022-12-31 0000887225 kep:DongbangMetalCo.LtdMember 2022-12-31 0000887225 kep:KoreaOceanMachineryTechnologyCo.ltd.Member 2022-12-31 0000887225 kep:TaekwangPaperBoardCo.LtdMember 2022-12-31 0000887225 kep:JeuvisCo.LtdMember 2022-12-31 0000887225 kep:YTechCo.LtdMember 2022-12-31 0000887225 kep:SangmooSteelCo.LtdMember 2022-12-31 0000887225 kep:HurimBiocellMember 2022-12-31 0000887225 kep:KoreaTrecisionMember 2022-12-31 0000887225 kep:AceIntegrationMember 2022-12-31 0000887225 kep:HyoDongDevelopmentMember 2022-12-31 0000887225 kep:ChunWonDevelopmentMember 2022-12-31 0000887225 kep:SunjinPowerTechMember 2022-12-31 0000887225 kep:KoreaMineralsMember 2022-12-31 0000887225 kep:DauningMember 2022-12-31 0000887225 kep:ForceTECMember 2022-12-31 0000887225 kep:JoHyunMember 2022-12-31 0000887225 kep:SeongJiIndustrialMember 2022-12-31 0000887225 kep:KCMember 2022-12-31 0000887225 kep:DooriwonFoodSystemMember 2022-12-31 0000887225 kep:SungKwangMember 2022-12-31 0000887225 kep:HyungjiEsquireMember 2022-12-31 0000887225 kep:WoojooEnvironmentIndMember 2022-12-31 0000887225 kep:FutechMoldMember 2022-12-31 0000887225 kep:KwangSungIndustryMember 2022-12-31 0000887225 kep:YoungSungMember 2022-12-31 0000887225 kep:BiwangIndustryMember 2022-12-31 0000887225 kep:WoobangConstructionMember 2022-12-31 0000887225 kep:SeenBusinessAndTechnologyCoLtdMember 2022-12-31 0000887225 kep:MoradoMember 2022-12-31 0000887225 kep:MyungSungTexMember 2022-12-31 0000887225 kep:YuilIndustrialElectronicsMember 2022-12-31 0000887225 kep:WoojinIndustryMember 2022-12-31 0000887225 kep:SmartPowerMember 2022-12-31 0000887225 kep:SinkwangIndustryMember 2022-12-31 0000887225 kep:BumyangConstructionMember 2022-12-31 0000887225 kep:NamkwangEngineeringConstructionMember 2022-12-31 0000887225 kep:STXHeavyIndustriesMember 2022-12-31 0000887225 kep:PANoceanMember 2022-12-31 0000887225 kep:ELCOMTECMember 2022-12-31 0000887225 kep:JoongangPlatecMember 2022-12-31 0000887225 kep:CodesCombineMember 2022-12-31 0000887225 kep:IhsungCNICoLtdMember 2022-12-31 0000887225 kep:SAMBOAUTOMember 2022-12-31 0000887225 kep:MoboMember 2022-12-31 0000887225 kep:SanbonDepartmentStoreMember 2022-12-31 0000887225 kep:MijuSteelMfgMember 2022-12-31 0000887225 kep:DaeKwangSemiconductorMember 2022-12-31 0000887225 kep:NewasiaCoLtdFormerlyAJSCoLtdMember 2022-12-31 0000887225 kep:MoonkyungSilicaMember 2022-12-31 0000887225 kep:AltronJeonjuCo.Ltd.Member 2022-12-31 0000887225 kep:KoreaDistrictHeatingMember 2022-12-31 0000887225 kep:KGMobilityCompanyLimitedMember 2022-12-31 0000887225 kep:VissemElectronicsCo.LtdMember 2022-12-31 0000887225 kep:KoreaLineMember 2022-12-31 0000887225 kep:SeyangMember 2022-12-31 0000887225 kep:IlsukMember 2022-12-31 0000887225 kep:IlrimNanoTecMember 2022-12-31 0000887225 kep:JoongangDevelopmentMember 2022-12-31 0000887225 kep:ZyleDaewooMotorSalesMember 2022-12-31 0000887225 kep:DALIMSpecialVehicleMember 2022-12-31 0000887225 kep:MSEMember 2022-12-31 0000887225 kep:SeungriEnterpriseMember 2022-12-31 0000887225 kep:ShinEPCMember 2022-12-31 0000887225 kep:EjungAdMember 2022-12-31 0000887225 kep:DaewooDevelopmentMember 2022-12-31 0000887225 kep:NFTMember 2022-12-31 0000887225 kep:HyundaitechMember 2022-12-31 0000887225 kep:PtotronicsMember 2022-12-31 0000887225 kep:DasanMaterialMember 2022-12-31 0000887225 kep:LmatCo.Ltd.Member 2022-12-31 0000887225 kep:ChoiganggujoCo.Ltd.Member 2022-12-31 0000887225 kep:UktaeInd.Co.Ltd.Member 2022-12-31 0000887225 kep:JungmunCoLtdMember 2022-12-31 0000887225 kep:AndongTradingCorporationCoLtdMember 2022-12-31 0000887225 kep:NineBCo.Ltd.Member 2022-12-31 0000887225 kep:IpsBioCo.Ltd.Member 2022-12-31 0000887225 kep:LeSoleilKhnpLlcMember 2022-12-31 0000887225 kep:IhsungCniCo.LtdMember 2022-12-31 0000887225 kep:HRoboticsCoLtdMember 2022-12-31 0000887225 kep:JMTechCoLtdMember 2022-12-31 0000887225 kep:SGCEnergyCoLtdMember 2022-12-31 0000887225 kep:GoodTcellsCoLtdMember 2022-12-31 0000887225 kep:HaenaraeAgriculturalCorpMember 2022-12-31 0000887225 kep:VornechCo.Ltd.Member 2022-12-31 0000887225 kep:SaeheemangCo.LtdMember 2022-12-31 0000887225 kep:KoreaEngineerManufacturingCo.Ltd.Member 2022-12-31 0000887225 kep:GuseongCo.Ltd.Member 2022-12-31 0000887225 kep:YujinEcCo.Ltd.Member 2022-12-31 0000887225 kep:HakbongPrecisionCo.Ltd.Member 2022-12-31 0000887225 kep:HosungsteelCo.Ltd.Member 2022-12-31 0000887225 kep:DaeilCo.Ltd.Member 2022-12-31 0000887225 kep:K2MotorsCo.Ltd.Member 2022-12-31 0000887225 kep:GentakKoreaCo.Ltd.Member 2022-12-31 0000887225 kep:JfcCo.LtdMember 2022-12-31 0000887225 kep:WoosungIBCoLtdMember 2022-12-31 0000887225 kep:SungkyeongCoLtdMember 2022-12-31 0000887225 kep:GeumhanCoLtdMember 2022-12-31 0000887225 kep:DonghwaTCACoLtdMember 2022-12-31 0000887225 kep:GTToolingCoLtdMember 2022-12-31 0000887225 kep:AvajarCoLtdMember 2022-12-31 0000887225 kep:GlobalTheOneofKoreaCoLtdMember 2022-12-31 0000887225 kep:CSCorporationCoLtdMember 2022-12-31 0000887225 kep:WooriIndustryCoLtdMember 2022-12-31 0000887225 kep:CocoFoodCoLtdMember 2022-12-31 0000887225 kep:SHCoLtdMember 2022-12-31 0000887225 kep:GetronCoLtdMember 2022-12-31 0000887225 kep:DCCastechCoLtdMember 2022-12-31 0000887225 kep:ChoheungPackingCoLtdMember 2022-12-31 0000887225 kep:ShinseiTradingMember 2022-12-31 0000887225 kep:GreenAlchemyMember 2022-12-31 0000887225 kep:YouoneTBMEngineeringConstructionMember 2022-12-31 0000887225 kep:TaejungIndustriesMember 2022-12-31 0000887225 kep:EnertecCoLtdMember 2022-12-31 0000887225 kep:SemistMember 2022-12-31 0000887225 kep:MansuCoLtdMember 2022-12-31 0000887225 kep:WongwangDoorCorpMember 2022-12-31 0000887225 kep:SGShinsungEngineeringandConstructionMember 2022-12-31 0000887225 kep:SamdoIndustryElectricMember 2022-12-31 0000887225 kep:KmLeatechCo.Ltd.Member 2022-12-31 0000887225 kep:DynamicMember 2022-12-31 0000887225 kep:TKCoLtdMember 2022-12-31 0000887225 kep:SungkwangCoLtdMember 2022-12-31 0000887225 kep:SewonCeramicCoLtdMember 2022-12-31 0000887225 kep:EILightingCoLtdMember 2022-12-31 0000887225 kep:BuyoungPanjiCoLtdMember 2022-12-31 0000887225 kep:WenexCoLtdMember 2022-12-31 0000887225 kep:SimileAluminiumCoLtdMember 2022-12-31 0000887225 kep:HankookPiagetCoLtdMember 2022-12-31 0000887225 kep:MezzanineIPackCoLtdMember 2022-12-31 0000887225 kep:MSMCoLtdMember 2022-12-31 0000887225 kep:LtopCoLtdMember 2022-12-31 0000887225 kep:KTTWCoLtdMember 2022-12-31 0000887225 kep:SulimCoLtdMember 2022-12-31 0000887225 kep:NewkoCoLtdMember 2022-12-31 0000887225 kep:DdpopstyleCoLtdMember 2022-12-31 0000887225 kep:CAPKoreaCoLtdMember 2022-12-31 0000887225 kep:PizzakoreaCoLtdMember 2022-12-31 0000887225 kep:MokganCoLtdMember 2022-12-31 0000887225 kep:GeumdaniCoLtdMember 2022-12-31 0000887225 kep:TeamKoreaCoLtdMember 2022-12-31 0000887225 kep:ChandownFoodCoLtdMember 2022-12-31 0000887225 kep:DaeyoungCoLtdMember 2022-12-31 0000887225 kep:SsangyongYoungweolPlantServiceEngineeringCoLtdMember 2022-12-31 0000887225 kep:ShinkwangEngineeringMember 2022-12-31 0000887225 kep:YooseungCoLtdMember 2022-12-31 0000887225 kep:ArariCoLtdMember 2022-12-31 0000887225 kep:ChoyangTechCoLtdMember 2022-12-31 0000887225 kep:InternationalPaintKoreaCoLtdMember 2022-12-31 0000887225 kep:EkCookwareCoLtdMember 2022-12-31 0000887225 kep:FinemetalCoLtdMember 2022-12-31 0000887225 kep:SteellifeCoLtdMember 2022-12-31 0000887225 kep:AjinKSBCoLtdMember 2022-12-31 0000887225 kep:TaeyanggasteelCoLtdMember 2022-12-31 0000887225 kep:HightechMnpCoLtdMember 2022-12-31 0000887225 kep:DongsungMulsanCoLtdMember 2022-12-31 0000887225 kep:RMKCoLtdMember 2022-12-31 0000887225 kep:DesignBeyondCo.LtdMember 2022-12-31 0000887225 kep:DecoeCo.LtdMember 2022-12-31 0000887225 kep:IrefarmCo.LtdMember 2022-12-31 0000887225 kep:MiraeIndustryCo.Ltd.Member 2022-12-31 0000887225 kep:WoojinFormtechCo.Ltd.Member 2022-12-31 0000887225 kep:MetalLinkInc.Co.Ltd.Member 2022-12-31 0000887225 kep:DaishinLogisticsCo.Ltd.Member 2022-12-31 0000887225 kep:WowTechCo.LtdMember 2022-12-31 0000887225 kep:JinsungEngineeringCo.LtdMember 2022-12-31 0000887225 kep:PoongLimIndustrialCo.Ltd.Member 2022-12-31 0000887225 kep:DaeSungGeotechCo.LtdMember 2022-12-31 0000887225 kep:SeohanFoodCo.Ltd.Member 2022-12-31 0000887225 kep:OwonEgCo.LtdMember 2022-12-31 0000887225 kep:YoungheungIndustryCo.Ltd.Member 2022-12-31 0000887225 kep:HyundaiTechCo.LtdMember 2022-12-31 0000887225 kep:NamhaeEcCo.LtdMember 2022-12-31 0000887225 kep:SinwaJkCo.LtdMember 2022-12-31 0000887225 kep:PipetecKoreaCo.LtdMember 2022-12-31 0000887225 kep:WorldPowerTechCo.LtdMember 2022-12-31 0000887225 kep:ClTechCo.Ltd.Member 2022-12-31 0000887225 kep:PbmAutoCo.Ltd.Member 2022-12-31 0000887225 kep:DaehyeonRecycleCo.LtdMember 2022-12-31 0000887225 kep:SungjinTechCo.Ltd.Member 2022-12-31 0000887225 kep:YonghoIndustryCo.LtdMember 2022-12-31 0000887225 kep:SungjinChemicalCo.Ltd.Member 2022-12-31 0000887225 kep:KcIndustryCo.LtdMember 2022-12-31 0000887225 kep:SungkwangTimberMember 2022-12-31 0000887225 kep:SamgongDevelopmentMember 2022-12-31 0000887225 kep:PyungsanSiCo.Ltd.Member 2022-12-31 0000887225 kep:AoneAlformCo.LtdMember 2022-12-31 0000887225 kep:IMHWAMember 2022-12-31 0000887225 kep:PTAdaroEnergyTbkMember 2022-12-31 0000887225 kep:DenisonMinesCorpMember 2022-12-31 0000887225 kep:EMnICoLtdMember 2022-12-31 0000887225 kep:FissionUraniumMember 2022-12-31 0000887225 kep:VitzosysCoLtdMember 2022-12-31 0000887225 kep:SangSanginIndustryCoLtdMember 2022-12-31 0000887225 kep:SungwonMember 2022-12-31 0000887225 kep:HwanYoungSteelMember 2022-12-31 0000887225 kep:IntellectualDiscoveryCo.Ltd.Member 2022-12-31 0000887225 kep:KSRemiconMember 2022-12-31 0000887225 kep:KyungDongMember 2022-12-31 0000887225 kep:BCONMember 2022-12-31 0000887225 kep:AceIntiAgriculturalMember 2022-12-31 0000887225 kep:NajinSteelMember 2022-12-31 0000887225 kep:JMCHeavyIndustriesMember 2022-12-31 0000887225 kep:ShinPyungMember 2022-12-31 0000887225 kep:KwangSungMember 2022-12-31 0000887225 kep:SamsungTechMember 2022-12-31 0000887225 kep:SevenvalleyJCMember 2022-12-31 0000887225 kep:HanYoungTechnologyMember 2022-12-31 0000887225 kep:YounilMetalMember 2022-12-31 0000887225 kep:ShinheungpetrolMember 2022-12-31 0000887225 kep:SeyangPrecisionIndMember 2022-12-31 0000887225 kep:KendaePrintingMember 2022-12-31 0000887225 kep:JOTechMember 2022-12-31 0000887225 kep:LKIndustryMember 2022-12-31 0000887225 kep:MirecoMember 2022-12-31 0000887225 kep:ElephantFriendsMember 2022-12-31 0000887225 kep:SungLimIndustrialMember 2022-12-31 0000887225 kep:MyungMember 2022-12-31 0000887225 kep:SolvusMember 2022-12-31 0000887225 kep:BeerYeastKoreaIncMember 2022-12-31 0000887225 kep:ListedEquitySecuritiesMember 2022-12-31 0000887225 kep:UnlistedEquitySecuritiesMember 2022-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2022-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2022-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2022-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2022-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2022-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2022-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2022-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2022-12-31 0000887225 kep:ConstructionContractsMember 2022-12-31 0000887225 kep:OwnedByGovernmentMember kep:KoreanDevelopmentBankMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 kep:Ud4mCoLtdMember 2022-12-31 0000887225 kep:YaksuessCoLtdMember 2022-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2022-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2022-12-31 0000887225 kep:KepcouhdeInc.Member 2022-12-31 0000887225 kep:DangjinEcoPowerCoLtdNewlyMember 2022-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingSLMember 2022-12-31 0000887225 kep:EnergycoLLCMember 2022-12-31 0000887225 kep:Platformn.Co.LtdMember 2022-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember 2022-12-31 0000887225 kep:PulauIndahOmSdnBhdMember 2022-12-31 0000887225 kep:UnbilledRevenueMember 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyOneMember kep:ThirdPlannedPeriodMember 2022-12-31 0000887225 kep:ThirdPlannedPeriodMember 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFiveMember kep:ThirdPlannedPeriodMember 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFourMember kep:ThirdPlannedPeriodMember 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyThreeMember kep:ThirdPlannedPeriodMember 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyTwoMember kep:ThirdPlannedPeriodMember 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects11Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects10Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects14Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects13Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects12Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects3Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects8Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects7Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects6Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects5Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects4Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects9Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects2Member 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects1Member 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember ifrs-full:TradeReceivablesMember 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember kep:OtherReceivablesMember 2022-12-31 0000887225 kep:OtherReceivablesMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:TradeReceivablesMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:TradeReceivablesMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:OtherReceivablesMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:OtherReceivablesMember 2022-12-31 0000887225 ifrs-full:TradeReceivablesMember 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:OtherReceivablesOthersMember 2022-12-31 0000887225 kep:OtherReceivablesOthersMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:NonTradeReceivablesMember 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember kep:NonTradeReceivablesMember 2022-12-31 0000887225 kep:NonTradeReceivablesMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:AccruedIncomeReceivableMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:DepositsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:DepositsMember 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember kep:OtherReceivablesOthersMember 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember ifrs-full:LeaseReceivablesMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:LeaseReceivablesMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:LeaseReceivablesMember 2022-12-31 0000887225 kep:DepositsMember 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember kep:DepositsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:OtherReceivablesOthersMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:NonTradeReceivablesMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:AccruedIncomeReceivableMember 2022-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember kep:AccruedIncomeReceivableMember 2022-12-31 0000887225 ifrs-full:LeaseReceivablesMember 2022-12-31 0000887225 kep:AccruedIncomeReceivableMember 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2022-12-31 0000887225 kep:PulauIndahOmSdn.BhdMember ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:TrumbullAssetManagementLlcMember ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:TaebaekGuinemiWindPowerMember ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2022-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:ShuweihatAsiaOperationMaintenanceCompanyMember ifrs-full:BottomOfRangeMember 2022-12-31 0000887225 kep:WaterburyLakeUraniumLPMember ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:NawahEnergyMember ifrs-full:TopOfRangeMember 2022-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember kep:NotLaterThanTwoMonthsMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember ifrs-full:LaterThanOneYearMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanFourMonthsMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember kep:LaterThanFourMonthsAndNotLaterThanOneYearMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember kep:NotLaterThanTwoMonthsMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember ifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsNeitherPastDueNorImpairedMember ifrs-full:TradeReceivablesMember 2022-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember ifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember 2022-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanFourMonthsMember 2022-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember ifrs-full:LaterThanOneYearMember 2022-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember kep:LaterThanFourMonthsAndNotLaterThanOneYearMember 2022-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsNeitherPastDueNorImpairedMember 2022-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember 2022-12-31 0000887225 kep:CashAndCashEquivalentsMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 kep:DerivativeFinancialInstrumentsAssetsMember ifrs-full:AtFairValueMember kep:DesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 kep:LongTermFinancialInstrumentsCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 ifrs-full:AtFairValueMember kep:NonDesignatedMember kep:DerivativeFinancialInstrumentsAssetsMember 2022-12-31 0000887225 ifrs-full:LoansAndReceivablesCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 ifrs-full:TradeReceivablesMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 kep:ShortTermFinancialInstrumentsCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 kep:SecuredBorrowingsMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 kep:UnsecuredBondMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 ifrs-full:LeaseLiabilitiesMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 kep:BankOverdraftMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 kep:DerivativeFinancialInstrumentsLiabilitiesMember ifrs-full:AtFairValueMember kep:NonDesignatedMember 2022-12-31 0000887225 kep:DerivativeFinancialInstrumentsLiabilitiesMember ifrs-full:AtFairValueMember kep:DesignatedAsHedgingInstrumentMember 2022-12-31 0000887225 kep:UnsecuredBorrowingsMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 kep:TradeAndOtherPayablesMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2022-12-31 0000887225 kep:LocalShortTermBorrowings2Member 2022-12-31 0000887225 kep:LocalBankOverdraft1Member 2022-12-31 0000887225 kep:ForeignShortTermBorrowings3Member 2022-12-31 0000887225 kep:LocalShortTermBorrowings1Member 2022-12-31 0000887225 kep:ForeignShortTermBorrowings2Member 2022-12-31 0000887225 kep:ArbitrationWithWestingHouseElectricCompanyLlcToKoreanCommercialArbitrationBoardMember 2022-12-31 0000887225 kep:HybridBondsMember 2022-12-31 0000887225 kep:KoreaGasCorporationMember 2022-12-31 0000887225 kep:OtherLongtermAndShorttermFinancialInstrumentsMember kep:OtherFinancialAssetsMember 2022-12-31 0000887225 kep:LongtermDepositsMember kep:OtherFinancialAssetsMember 2022-12-31 0000887225 kep:CDMember kep:OtherFinancialAssetsMember 2022-12-31 0000887225 kep:ProvisionsForEmployeeBenefitsMember 2022-12-31 0000887225 ifrs-full:LegalProceedingsProvisionMember 2022-12-31 0000887225 kep:PowerPlantRegionalSupportProgramProvisionsMember 2022-12-31 0000887225 kep:OtherRecoveryProvisionsMember 2022-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember 2022-12-31 0000887225 kep:SpentFuelRecoveryProvisionsMember 2022-12-31 0000887225 kep:WasteRecoveryProvisionsMember 2022-12-31 0000887225 kep:PcbsRecoveryProvisionsMember 2022-12-31 0000887225 ifrs-full:MiscellaneousOtherProvisionsMember 2022-12-31 0000887225 kep:TransmissionRegionalSupportProgramProvisionsMember 2022-12-31 0000887225 ifrs-full:FinancialGuaranteeContractsMember 2022-12-31 0000887225 kep:ProvisionsForRpsMember 2022-12-31 0000887225 kep:ProvisionsForGreenhouseGasEmissionsObligationsMember 2022-12-31 0000887225 ifrs-full:ActuarialAssumptionOfDiscountRatesMember 2022-12-31 0000887225 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember 2022-12-31 0000887225 kep:FinanceLeaseReceivablesMember 2022-12-31 0000887225 ifrs-full:OrdinarySharesMember 2023-12-31 0000887225 ifrs-full:CurrencyRiskMember 2023-12-31 0000887225 kep:LsgHydroPowerLimitedMember 2023-12-31 0000887225 kep:SolarvaderCoLtdMember 2023-12-31 0000887225 kep:YeongYangCorporationCo.Ltd.Member 2023-12-31 0000887225 kep:YeongYangInnovationCoLtdMember 2023-12-31 0000887225 kep:KepcoForMaintenanceCompanyMember 2023-12-31 0000887225 kep:KepcoHoldingCompanyMember 2023-12-31 0000887225 kep:JWindFirstLlcMember 2023-12-31 0000887225 kep:DigitalInnovationGrowthFundMember 2023-12-31 0000887225 kep:ChileSolarJVSpAMember 2023-12-31 0000887225 kep:KEPCOKPSSouthAfricaPtyLtdMember 2023-12-31 0000887225 kep:KSOLARSHINANCoLtdMember 2023-12-31 0000887225 kep:HaenanumEnergyFundMember 2023-12-31 0000887225 kep:PajuEcoenergyMember 2023-12-31 0000887225 kep:GuamUkuduPowerLLCMember 2023-12-31 0000887225 kep:KPSPartnersCoLtdMember 2023-12-31 0000887225 kep:KEPCOECServiceCoLtdMember 2023-12-31 0000887225 kep:KhnpChileSpaMember 2023-12-31 0000887225 kep:MohaSolarCoLtdMember 2023-12-31 0000887225 kep:OgiriSolarPowerCoLtdMember 2023-12-31 0000887225 kep:KHNPUSALLCMember 2023-12-31 0000887225 kep:YeongYangApollonPhotovoltaicCo.Ltd.Member 2023-12-31 0000887225 kep:KOMIPOVanphongPowerServiceLLCMember 2023-12-31 0000887225 kep:EnergyInnovationFundIMember 2023-12-31 0000887225 kep:KospoTrumbullLlcMember 2023-12-31 0000887225 kep:ChangjukWindPowerMember 2023-12-31 0000887225 kep:KaPowerLimitedMember 2023-12-31 0000887225 kep:WesternPowerChanggiSolarCoLtdMember 2023-12-31 0000887225 kep:EwpAustraliaPty.LtdMember 2023-12-31 0000887225 kep:ColumboolaSolarFarmHoldCoPty.Ltd.Member 2023-12-31 0000887225 kep:YeongdeokSunriseWindPowerCo.Ltd.Member 2023-12-31 0000887225 kep:KowepoEuropeB.v.Member 2023-12-31 0000887225 kep:JeongamWindPowerMember 2023-12-31 0000887225 kep:YeongYangHorusPhotovoltaicCoLtdMember 2023-12-31 0000887225 kep:KoenBioCo.Ltd.Member 2023-12-31 0000887225 kep:KomipoIberianSolarGroupS.l.u.Member 2023-12-31 0000887225 kep:YeongYangSolarManagementCoLtdMember 2023-12-31 0000887225 kep:KowepoHoldingLimitedMember 2023-12-31 0000887225 kep:KEPCONetherlandsS3BVMember 2023-12-31 0000887225 kep:EWPAmericaMember 2023-12-31 0000887225 kep:KEPCOMiddleEastHoldingCompanyMember 2023-12-31 0000887225 kep:KEPCOBylongAustraliaMember 2023-12-31 0000887225 kep:KEPCOHoldingsdeMexicoMember 2023-12-31 0000887225 kep:KEPCOPlantServiceEngineeringMember 2023-12-31 0000887225 kep:KEPCOKDNMember 2023-12-31 0000887225 kep:KEPCOPhilippinesCorporationMember 2023-12-31 0000887225 kep:KOMIPOGlobalPteMember 2023-12-31 0000887225 kep:KoreaHydroNuclearPowerMember 2023-12-31 0000887225 kep:KoreaSoutheastPowerMember 2023-12-31 0000887225 kep:KEPCOInternationalPhilippinesMember 2023-12-31 0000887225 kep:KEPCOInternationalHongKongMember 2023-12-31 0000887225 kep:KEPCOPhilippinesHoldingsMember 2023-12-31 0000887225 kep:KEPCOIlijanCorporationMember 2023-12-31 0000887225 kep:KEPCOShanxiInternationalMember 2023-12-31 0000887225 kep:GyeongjuWindPowerMember 2023-12-31 0000887225 kep:QatranaElectricPowerCompanyMember 2023-12-31 0000887225 kep:KSTElectricPowerCompanyMember 2023-12-31 0000887225 kep:KOWEPOInternationalCorporationMember 2023-12-31 0000887225 kep:GyeonggiGreenEnergyMember 2023-12-31 0000887225 kep:KEPCOAustraliaMember 2023-12-31 0000887225 kep:KOWEPOAustraliaMember 2023-12-31 0000887225 kep:PTTanggamusElectricPowerMember 2023-12-31 0000887225 kep:KOSPOAustraliaMember 2023-12-31 0000887225 kep:KoreaWaterburyUraniumLimitedPartnershipMember 2023-12-31 0000887225 kep:PTKOMIPOPembangkitanJawaBaliMember 2023-12-31 0000887225 kep:KNFCanadaEnergyLimitedMember 2023-12-31 0000887225 kep:KOSEPAustraliaMember 2023-12-31 0000887225 kep:KOMIPOAustraliaMember 2023-12-31 0000887225 kep:KHNPCanadaEnergyMember 2023-12-31 0000887225 kep:KEPCOEnergyServiceCompanyMember 2023-12-31 0000887225 kep:PTCirebonPowerServiceMember 2023-12-31 0000887225 kep:KOSPOJordanMember 2023-12-31 0000887225 kep:EWPBarbados1SRLMember 2023-12-31 0000887225 kep:KOMIPOAmericaMember 2023-12-31 0000887225 kep:KEPCONetherlandsJ3BVMember 2023-12-31 0000887225 kep:KoreaOffshoreWindPowerMember 2023-12-31 0000887225 kep:KEPCOGansuInternationalMember 2023-12-31 0000887225 kep:KEPCONeimengguInternationalMember 2023-12-31 0000887225 kep:KEPCONetherlandsBVMember 2023-12-31 0000887225 kep:PTEWPIndonesiaMember 2023-12-31 0000887225 kep:KoreaMidlandPowerMember 2023-12-31 0000887225 kep:KoreaSouthernPowerMember 2023-12-31 0000887225 kep:KEPCOEngineeringConstructionCompanyMember 2023-12-31 0000887225 kep:KoreaWesternPowerMember 2023-12-31 0000887225 kep:KoreaEastWestPowerMember 2023-12-31 0000887225 kep:KEPCONuclearFuelMember 2023-12-31 0000887225 kep:KOSPOChileSpAMember 2023-12-31 0000887225 kep:PTKOWEPOSumselOperationandMaintenanceServicesMember 2023-12-31 0000887225 kep:GlobalEnergyPioneerBVMember 2023-12-31 0000887225 kep:GlobalOnePioneerBVMember 2023-12-31 0000887225 kep:KEPCOEnergySolutionMember 2023-12-31 0000887225 kep:SolarSchoolPlantMember 2023-12-31 0000887225 kep:KOMIPOBylongMember 2023-12-31 0000887225 kep:JejuHanlimOffshoreWindCoMember 2023-12-31 0000887225 kep:PTSiborpaEcoPowerMember 2023-12-31 0000887225 kep:PTKoreaEnergyIndonesiaMember 2023-12-31 0000887225 kep:TamraOffshoreWindPowerMember 2023-12-31 0000887225 kep:KOAKPowerLimitedMember 2023-12-31 0000887225 kep:KOENServiceCo.Ltd.Member 2023-12-31 0000887225 kep:KOMIPOServiceCo.Ltd.Member 2023-12-31 0000887225 kep:EWPServiceCo.Ltd.Member 2023-12-31 0000887225 kep:KNFPartnersMember 2023-12-31 0000887225 kep:KOSPOUSAMember 2023-12-31 0000887225 kep:NambuUSAMember 2023-12-31 0000887225 kep:FirstkeepersMember 2023-12-31 0000887225 kep:KOSPOBylongMember 2023-12-31 0000887225 kep:EWPBylongMember 2023-12-31 0000887225 kep:KOWEPOLaoInternationalMember 2023-12-31 0000887225 kep:IncheonFuelCellCo.Ltd.Member 2023-12-31 0000887225 kep:KOENBylongMember 2023-12-31 0000887225 kep:EnergyNewIndustrySpecializedInvestmentPrivateInvestmentTrustMember 2023-12-31 0000887225 kep:KOSPOPowerServicesLimitadaMember 2023-12-31 0000887225 kep:KOSPOYoungnamPowerMember 2023-12-31 0000887225 kep:FujeijWindPowerCompanyMember 2023-12-31 0000887225 kep:HeeMangSunlightPowerMember 2023-12-31 0000887225 kep:MangilaoIntermediateHoldingsMember 2023-12-31 0000887225 kep:PT.KOMIPOEnergyIndonesiaMember 2023-12-31 0000887225 kep:KOWEPOServiceCo.Ltd.Member 2023-12-31 0000887225 kep:KOSPOServiceCo.LtdMember 2023-12-31 0000887225 kep:KOMIPOEuropeBVMember 2023-12-31 0000887225 kep:ChitoseSolarPowerPlantMember 2023-12-31 0000887225 kep:KEPCOCSCMember 2023-12-31 0000887225 kep:KOLATSpAMember 2023-12-31 0000887225 kep:KEPCOCaliforniaLLCMember 2023-12-31 0000887225 kep:KEPCOMojaveHoldingsLLCMember 2023-12-31 0000887225 kep:KEPCOMCSMember 2023-12-31 0000887225 kep:SecutecMember 2023-12-31 0000887225 kep:KEPCOLGCNSMangilaoHoldingsMember 2023-12-31 0000887225 kep:MangilaoInvestmentMember 2023-12-31 0000887225 kep:KEPCOLGCNSMangilaoSolarMember 2023-12-31 0000887225 kep:KOWEPOBylongMember 2023-12-31 0000887225 kep:KEPCOFMSMember 2023-12-31 0000887225 kep:SEGreenEnergyMember 2023-12-31 0000887225 kep:MiraPowerLimitedMember 2023-12-31 0000887225 kep:KOSEPMaterialMember 2023-12-31 0000887225 kep:CommerceandIndustryEnergyMember 2023-12-31 0000887225 kep:KEPCOKPSPhilippinesCorpMember 2023-12-31 0000887225 ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember ifrs-full:FinancialAssetsAtFairValueMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:FinancialAssetsAtFairValueMember 2023-12-31 0000887225 kep:DerivativeAssetsApplyingHedgeAccountingCategoryMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember ifrs-full:FinancialAssetsAtAmortisedCostMember 2023-12-31 0000887225 ifrs-full:HedgingInstrumentsMember 2023-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMember 2023-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 kep:LoansHousingMember 2023-12-31 0000887225 kep:OtherLoansMember 2023-12-31 0000887225 kep:LoansTuitionMember 2023-12-31 0000887225 kep:ValuationAllowanceAdjustmentsMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember 2023-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2023-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember 2023-12-31 0000887225 ifrs-full:CorporateLoansMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:CorporateLoansMember 2023-12-31 0000887225 ifrs-full:CorporateLoansMember kep:PresentValueDiscountMember 2023-12-31 0000887225 kep:ShortTermFinancialInstrumentsMember 2023-12-31 0000887225 kep:OtherFinancialAssetsMember 2023-12-31 0000887225 ifrs-full:CorporateLoansMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:S4HANAERPlicenseMember ifrs-full:ComputerSoftwareMember 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:OccupancyAndUseOfPublicWatersMember 2023-12-31 0000887225 kep:GreenhouseGasEmissionsRightsMember ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:ServiceConcessionRightsMember ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 kep:ContributionsToARPNRCDCMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-12-31 0000887225 kep:RightUseElectricityGasSupplyFacilityCommunityDistrictSongdoMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-12-31 0000887225 ifrs-full:MiningRightsMember kep:MiningRightOfBylongMineMember 2023-12-31 0000887225 kep:SejongHaengbogdosiSharingChargeMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-12-31 0000887225 kep:OwnedByOthersMember 2023-12-31 0000887225 kep:OwnedByGovernmentMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 ifrs-full:FinancialGuaranteeContractsMember 2023-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:LoansAndReceivablesCategoryMember 2023-12-31 0000887225 kep:CashAndCashEquivalentsMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-12-31 0000887225 kep:NonDesignatedMember 2023-12-31 0000887225 kep:LongtermshorttermFinancialInstrumentsMember 2023-12-31 0000887225 kep:TradeAndOtherReceivablesMember 2023-12-31 0000887225 ifrs-full:FloatingInterestRateMember 2023-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember 2023-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember 2023-12-31 0000887225 ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2023-12-31 0000887225 ifrs-full:Level2OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2023-12-31 0000887225 ifrs-full:AtFairValueMember 2023-12-31 0000887225 ifrs-full:Level1OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2023-12-31 0000887225 kep:LitigationAsTheDefendantMember 2023-12-31 0000887225 kep:LitigationAsThePlaintiffMember 2023-12-31 0000887225 kep:CannotBePresentlyDeterminedMaturityMember 2023-12-31 0000887225 ifrs-full:CurrencySwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:CurrencySwapContractMember 2023-12-31 0000887225 ifrs-full:ForwardContractMember kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:CurrencySwapContractMember kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:InterestRateSwapContractMember 2023-12-31 0000887225 ifrs-full:OptionContractMember kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:InterestRateSwapContractMember kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:InterestRateSwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:LandMember ifrs-full:AtFairValueMember 2023-12-31 0000887225 ifrs-full:CarryingAmountMember 2023-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:CarryingAmountMember 2023-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:AtFairValueMember 2023-12-31 0000887225 ifrs-full:LandMember ifrs-full:CarryingAmountMember 2023-12-31 0000887225 kep:SystemStabilizationEssEquipmentHamyangSsType1Member 2023-12-31 0000887225 kep:BoryeongNewComplexUnit1ConstructionProjectMember 2023-12-31 0000887225 kep:Other36ContractsMember 2023-12-31 0000887225 kep:SystemStabilizationEssEquipmentYeongcheonSsType1Member 2023-12-31 0000887225 kep:SystemStabilizationEssEquipmentShinnamwonSsType1Member 2023-12-31 0000887225 kep:PurchaseOfCablePvc1c2000sq87732mAndOthersEulwangboonkiMember 2023-12-31 0000887225 kep:ConstructionOfSaeulUnits34Member 2023-12-31 0000887225 kep:PurchaseOfCableTrCnceWAl1c400sq2175300mUnitPriceContractMember 2023-12-31 0000887225 kep:PurchaseOfGasTurbineAndTurbineEquipmentOfGimpoCombinedHeatAndPowerPlantMember 2023-12-31 0000887225 kep:ServiceOfDesigningTaeanUnits910Member 2023-12-31 0000887225 kep:PurchaseOfMainMachineForBoryeongNewComplexUnit1Member 2023-12-31 0000887225 kep:PurchaseOfEquipmentsForTheConstructionProjectOfBoryeongIndoorCoalStorageYardMember 2023-12-31 0000887225 kep:PurchaseOfCableTrCnceW1c600sq377000mUnitPriceContractMember 2023-12-31 0000887225 kep:PurchaseOfMainMachineForJejuLngCombinedMember 2023-12-31 0000887225 kep:PurchaseOfHeatRecoveryBoilerAndAccessoriesForGumiNaturalGasPowerPlantMember 2023-12-31 0000887225 kep:PurchaseOfSteamTurbineHrsgAndPowerBlockOfGimpoCombinedHeatAndPowerPlantMember 2023-12-31 0000887225 kep:PurchaseofGIS362KV6300A63KA23CBYoungseoSSMember 2023-12-31 0000887225 kep:PurchaseOfCablePvc1c2500sq100548mAndOthersKyunginConstructionMember 2023-12-31 0000887225 kep:PurchaseOfGis362kv6300a63kaType19ShinyangsanSsMember 2023-12-31 0000887225 kep:PurchaseOfGasTurbinesSteamTurbinesAndAccessoriesForGumiNaturalGasPowerPlantMember 2023-12-31 0000887225 kep:PurchaseOfCablePvc1c2500sq57868mAndOthersGodukSeoansungMember 2023-12-31 0000887225 kep:PurchaseOfGis362kv6300a63kaType18WolsungSyMember 2023-12-31 0000887225 kep:PurchaseOfCablePvc1c2000sq5862mAndOthersBaekunGwangyanghangMember 2023-12-31 0000887225 kep:ConcretePole10mGeneralPurpose350kgf126948EaAndFiveOtherEquipmentsUnitPriceContractMember 2023-12-31 0000887225 kep:PurchaseOfCableFrCncoW1c325sq672300mUnitPriceContractMember 2023-12-31 0000887225 kep:PurchaseOfCableTrCnceW1c325sq1342000mUnitPriceContractMember 2023-12-31 0000887225 kep:PurchaseOfGis362kv6300a63ka25cbMigeumSsMember 2023-12-31 0000887225 kep:ConstructionOfGimpoCombinedHeatAndPowerPlantMember 2023-12-31 0000887225 kep:PurchaseofGIS362KV6300A63KA27CBKwangyangSSMember 2023-12-31 0000887225 kep:PurchaseofcablePVC1C2000SQ153000MandothersShinBupyungYoungseoMember 2023-12-31 0000887225 kep:ConstructionOfShinhanulUnits34Member 2023-12-31 0000887225 kep:SystemStabilizationEssEquipmentBubukSsType1Member 2023-12-31 0000887225 kep:ConcretePole10mGeneralPurpose500kgf111000EaAndFourOtherEquipmentsMember 2023-12-31 0000887225 kep:ConstructionOfShinhanulUnits12Member 2023-12-31 0000887225 kep:SystemStabilizationEssEquipmentYesanSsType1Member 2023-12-31 0000887225 kep:AdvancedEtypeLowVoltageElectronicWatthourMeter1311552EaMember 2023-12-31 0000887225 kep:PurchaseofcablePVC1C2500SQ103374MandothersBukdangjinShintangjungMember 2023-12-31 0000887225 kep:PurchaseOfHadongThermalPowerIndoorCarboniferousPlantMember 2023-12-31 0000887225 kep:PurchaseOfPhase2PowerGenerationFacilityForYeongwolFuelCellsMember 2023-12-31 0000887225 kep:PurchaseOfFuelCellPowerGenerationFacilitiesForTheFifthStageOfShinincheonHeadquartersMember 2023-12-31 0000887225 kep:PurchaseMainEquipmentNamjejuMember 2023-12-31 0000887225 kep:PurchaseOfMainEquipmentForShinsejongCombinedThermalPowerPlantMember 2023-12-31 0000887225 kep:InstallationOfNaturalGasSupplyFacilityAtGumiNaturalGasPowerPlantMember 2023-12-31 0000887225 kep:ConstructionOfGumiNaturalGasPowerPlantMember 2023-12-31 0000887225 kep:PurchaseofcoalhandlingmachineforconstructionofSamcheokunits12Member 2023-12-31 0000887225 kep:ForeignInvestorsMember 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:GovernmentOfTheRepublicOfKoreaMember 2023-12-31 0000887225 kep:OtherShareholdersMember 2023-12-31 0000887225 kep:BeneficiaryCertificateMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 ifrs-full:DerivativesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossDesignatedUponInitialRecognitionCategoryMember 2023-12-31 0000887225 ifrs-full:OtherEquitySecuritiesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 kep:OtherFinancialAssetsAtFairValueThroughProfitOrLossMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:FinancialAssetsAtAmortisedCostOthersMember 2023-12-31 0000887225 kep:FinancialAssetsAtAmortisedCostOthersMember 2023-12-31 0000887225 ifrs-full:LoansToGovernmentMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LoansToGovernmentMember 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignShortTermBorrowings1Member 2023-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:KoreaGasCorporationMember 2023-12-31 0000887225 kep:GoseongGreenPowerMember 2023-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:CheongjuEcoParkMember 2023-12-31 0000887225 kep:SeokmunEnergyMember 2023-12-31 0000887225 kep:NaepoGreenEnergyMember 2023-12-31 0000887225 kep:ChuncheonEnergyMember 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.Member 2023-12-31 0000887225 kep:PyeongchangWindPowerMember 2023-12-31 0000887225 kep:KEPCOLebanonSARLMember 2023-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2023-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2023-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2023-12-31 0000887225 kep:GeumsungsanWindPowerMember 2023-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2023-12-31 0000887225 kep:DangjinEcoPowerMember 2023-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2023-12-31 0000887225 kep:BusanIndustrialSolarPowerMember 2023-12-31 0000887225 kep:YeonggwangWindPowerMember 2023-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2023-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2023-12-31 0000887225 kep:CheongnaEnergyMember 2023-12-31 0000887225 kep:TwentySixJointVenturesOverseasMember 2023-12-31 0000887225 kep:DaeryunPowerMember 2023-12-31 0000887225 kep:GangneungEcoPowerMember 2023-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2023-12-31 0000887225 kep:NoeulGreenEnergyMember 2023-12-31 0000887225 kep:GangwonWindPowerMember 2023-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2023-12-31 0000887225 kep:KNHSolarMember 2023-12-31 0000887225 kep:YTNMember 2023-12-31 0000887225 kep:DongbuHighwaySolarMember 2023-12-31 0000887225 kep:SeobuHighwaySolarMember 2023-12-31 0000887225 kep:KAPESMember 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2023-12-31 0000887225 kep:SPowerMember 2023-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2023-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2023-12-31 0000887225 kep:DummyMember 2023-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2023-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2023-12-31 0000887225 kep:BusanGreenEnergyMember 2023-12-31 0000887225 kep:HyundaiGreenPowerMember 2023-12-31 0000887225 kep:KoreaPowerExchangeMember 2023-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2023-12-31 0000887225 kep:GwangyangGreenEnergyMember 2023-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2023-12-31 0000887225 kep:LongTermFinancialInstrumentsCategoryMember 2023-12-31 0000887225 kep:LongTermFinancialInstrumentsMember 2023-12-31 0000887225 kep:OtherSubsidiariesMember 2023-12-31 0000887225 kep:KoreaSoutheastPowerMember kep:SecondBondTypeHybridBondMember 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers1Member 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers9Member 2023-12-31 0000887225 kep:TradeReceivableAndOthers2Member 2023-12-31 0000887225 kep:TradeReceivableAndOthers1Member 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers6Member 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers7Member 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers8Member 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers4Member 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers5Member 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers3Member 2023-12-31 0000887225 kep:FinanceLeaseReceivableAndPropertyPlantAndEquipmentAndOthers2Member 2023-12-31 0000887225 kep:FinanceLeaseReceivableAndPropertyPlantAndEquipmentAndOthersMember 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers2Member 2023-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2023-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2023-12-31 0000887225 kep:BitgoelEcoEnergyMember 2023-12-31 0000887225 kep:HonamWindPowerMember 2023-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2023-12-31 0000887225 kep:PNDSolarMember 2023-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2023-12-31 0000887225 kep:YaksuESSLtdMember 2023-12-31 0000887225 kep:GoesanSolarParkMember 2023-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2023-12-31 0000887225 kep:DaeguPhotovoltaicMember 2023-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2023-12-31 0000887225 kep:EnergycoCoMember 2023-12-31 0000887225 kep:BitsolarEnergyMember 2023-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2023-12-31 0000887225 kep:TaebaekWindPowerMember 2023-12-31 0000887225 kep:LimitAmountAvailableForCard1Member 2023-12-31 0000887225 ifrs-full:LoanCommitmentsMember 2023-12-31 0000887225 kep:GeneralLoanMember 2023-12-31 0000887225 kep:PaymentGuarantee2Member 2023-12-31 0000887225 kep:CertificationOfBidding1Member 2023-12-31 0000887225 kep:OtherCommitments1Member 2023-12-31 0000887225 kep:PaymentGuaranteeMember 2023-12-31 0000887225 kep:PaymentGuarantee3Member 2023-12-31 0000887225 kep:PerformanceGuarantee2Member 2023-12-31 0000887225 kep:PerformanceGuarantee4Member 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondOthers3Member 2023-12-31 0000887225 kep:CertificationOfPaymentOnPayablesFromForeignCountryMember 2023-12-31 0000887225 kep:OtherCommitments2Member 2023-12-31 0000887225 kep:OtherCommitments3Member 2023-12-31 0000887225 kep:SecuredLoanOfCreditSalesMember 2023-12-31 0000887225 kep:LoanCommitments2Member 2023-12-31 0000887225 kep:LimitAmountAvailableForCPMember 2023-12-31 0000887225 kep:TradeFinanceMember 2023-12-31 0000887225 kep:PerformanceGuarantee3Member 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondOthers4Member 2023-12-31 0000887225 kep:EquityBridgeLoanGuarantee1Member 2023-12-31 0000887225 kep:InclusiveCredit2Member 2023-12-31 0000887225 kep:PerformanceGuaranteeMember 2023-12-31 0000887225 kep:PerformanceGuarantee5Member 2023-12-31 0000887225 kep:PerformanceGuarantee6Member 2023-12-31 0000887225 kep:PerformanceGuarantee7Member 2023-12-31 0000887225 kep:CertificationBidding2Member 2023-12-31 0000887225 kep:CommitmentsOnBankOverdraftMember 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondAndOthers1Member 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondOthers2Member 2023-12-31 0000887225 kep:InclusiveCredit1Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings19Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings11Member 2023-12-31 0000887225 kep:ForeignLongtermBorrowings13Member 2023-12-31 0000887225 kep:ForeignLongtermBorrowings15Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings1Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings6Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings8Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings9Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings17Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings23Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings23Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings26Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings28Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings28Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings29Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings29Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings6Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings6Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings7Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings8Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings8Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings10Member 2023-12-31 0000887225 kep:Fy04Member 2023-12-31 0000887225 kep:Fy17aMember 2023-12-31 0000887225 kep:Fy18aMember 2023-12-31 0000887225 kep:Fy19aMember 2023-12-31 0000887225 kep:Fy20bMember 2023-12-31 0000887225 kep:Fy17cMember 2023-12-31 0000887225 kep:Fy20aMember 2023-12-31 0000887225 kep:Fy22bMember 2023-12-31 0000887225 kep:Fy22dMember 2023-12-31 0000887225 kep:Fy22eMember 2023-12-31 0000887225 kep:Fy17bMember 2023-12-31 0000887225 kep:Fy22aMember 2023-12-31 0000887225 kep:ElectricityBonds1Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:ElectricityBonds1Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:CorporateBondsMember ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:CorporateBondsMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy96Member 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy96Member 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy97Member 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy97Member 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy19cMember 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy19cMember 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy19eMember 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy19eMember 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy22cMember 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy22cMember 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy22fMember 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy22fMember 2023-12-31 0000887225 kep:CorporateBonds1Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:CorporateBonds1Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:Fy19bMember 2023-12-31 0000887225 kep:Fy21aMember 2023-12-31 0000887225 kep:Fy21bMember 2023-12-31 0000887225 kep:Fy21cMember 2023-12-31 0000887225 kep:Fy20dMember 2023-12-31 0000887225 kep:Fy14Member 2023-12-31 0000887225 kep:Fy23cMember 2023-12-31 0000887225 kep:Fy23dMember 2023-12-31 0000887225 kep:Fy23eMember 2023-12-31 0000887225 kep:Fy20cMember 2023-12-31 0000887225 kep:Fy21dMember 2023-12-31 0000887225 kep:Fy15Member 2023-12-31 0000887225 kep:Fy22gMember 2023-12-31 0000887225 kep:Fy23aMember 2023-12-31 0000887225 kep:Fy23bMember 2023-12-31 0000887225 kep:LocalBankOverdraft1Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalBankOverdraft1Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalBankOverdraft1Member 2023-12-31 0000887225 kep:LocalShortTermBorrowings3Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalShortTermBorrowings2Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalShortTermBorrowings2Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalShortTermBorrowings4Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ShortTermFinancialInstrumentsCategoryMember 2023-12-31 0000887225 kep:GoDeokCleanEnergyCoLtdMember 2023-12-31 0000887225 kep:YangyangSuriWindPowerCoLtdMember 2023-12-31 0000887225 kep:NineAssociatesOverseasMember 2023-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2023-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2023-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2023-12-31 0000887225 kep:KWNuclearComponentsMember 2023-12-31 0000887225 kep:GunsanLandSolarMember 2023-12-31 0000887225 kep:SolaseadoSolarPowerMember 2023-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember 2023-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2023-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2023-12-31 0000887225 kep:ExpenseOfIssuanceMember 2023-12-31 0000887225 ifrs-full:LandMember ifrs-full:NoncurrentAssetsHeldForSaleMember 2023-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:NoncurrentAssetsHeldForSaleMember 2023-12-31 0000887225 ifrs-full:NoncurrentAssetsHeldForSaleMember 2023-12-31 0000887225 kep:StructuresMember ifrs-full:NoncurrentAssetsHeldForSaleMember 2023-12-31 0000887225 kep:LoansRelatedPartiesMember 2023-12-31 0000887225 kep:CheongjuEcoParkCoLtdMember 2023-12-31 0000887225 kep:GeumsungsanWindPowerCoLtdMember 2023-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2023-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingS.lMember 2023-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2023-12-31 0000887225 kep:EumseongEcoParkMember 2023-12-31 0000887225 kep:ChangwonNuriEnergyMember 2023-12-31 0000887225 kep:DEEnergiaSpAMember 2023-12-31 0000887225 kep:DangjinEcoPowerMember 2023-12-31 0000887225 kep:StavroHoldingIIABMember 2023-12-31 0000887225 kep:SpowerChileSpaMember 2023-12-31 0000887225 kep:SeungmunGreenEnergyMember 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member 2023-12-31 0000887225 kep:REBarrenRidgeLandCoLLCMember 2023-12-31 0000887225 kep:REPioneerHoldingsLLCMember 2023-12-31 0000887225 kep:REBarrenRidge1HoldingsLLCMember 2023-12-31 0000887225 kep:REHolidayHoldingsLLCMember 2023-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2023-12-31 0000887225 kep:SolarPhilippinesCalataganCorporationMember 2023-12-31 0000887225 kep:ChesterSolarISpAMember 2023-12-31 0000887225 kep:LaurelSpAMember 2023-12-31 0000887225 kep:DiegoDeAlmagroSolarSpAMember 2023-12-31 0000887225 kep:REAstoria2LandCoLLCMember 2023-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:ChungsongmeonBongSanWindPowerCoLtdMember 2023-12-31 0000887225 kep:KIAMCOKOWEPOBannertonHoldCoPtyLtdMember 2023-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2023-12-31 0000887225 kep:SouthJamaicaPowerCompanyLimitedMember 2023-12-31 0000887225 kep:NawahEnergyMember 2023-12-31 0000887225 kep:MOMENTUMMember 2023-12-31 0000887225 kep:SeokmunEnergyMember 2023-12-31 0000887225 kep:RESTechnologyADMember 2023-12-31 0000887225 kep:ShuweihatAsiaOperationMaintenanceCompanyMember 2023-12-31 0000887225 kep:WaterburyLakeUraniumLPMember 2023-12-31 0000887225 kep:ASMBGInvesticiiADMember 2023-12-31 0000887225 kep:KelarSAMember 2023-12-31 0000887225 kep:KAPESMember 2023-12-31 0000887225 kep:RabighOperationMaintenanceMember 2023-12-31 0000887225 kep:KEPCOSPCPowerCorporationMember 2023-12-31 0000887225 kep:AmmanAsiaElectricPowerMember 2023-12-31 0000887225 kep:ShuweihatAsiaPowerInvestmentBVMember 2023-12-31 0000887225 kep:HonamWindPowerMember 2023-12-31 0000887225 kep:NghiSon2PowerMember 2023-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2023-12-31 0000887225 kep:IncheonNewPowerMember 2023-12-31 0000887225 kep:RabighElectricityMember 2023-12-31 0000887225 kep:DatangKEPCOChaoyangRenewablePowerMember 2023-12-31 0000887225 kep:KVHoldingsMember 2023-12-31 0000887225 kep:GansuDatangYumenWindPowerMember 2023-12-31 0000887225 kep:DatangChifengRenewablePowerMember 2023-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2023-12-31 0000887225 kep:ChuncheonEnergyMember 2023-12-31 0000887225 kep:KWNuclearComponentsMember 2023-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2023-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2023-12-31 0000887225 kep:JamaicaPublicServiceMember 2023-12-31 0000887225 kep:DaehanWindPowerPSCMember 2023-12-31 0000887225 kep:YeonggwangWindPowerMember 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2023-12-31 0000887225 kep:BarakahOneCompanyMember 2023-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2023-12-31 0000887225 kep:PTTanjungPowerIndonesiaMember 2023-12-31 0000887225 kep:ChesterSolarVSpAMember 2023-12-31 0000887225 kep:ChesterSolarIVSpAMember 2023-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2023-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISSDECVMember 2023-12-31 0000887225 kep:FairhavenEnergyStorageLlcMember 2023-12-31 0000887225 kep:WadiNoorSolarPowerCompanySaocMember 2023-12-31 0000887225 kep:NamyangjuCombinedHeatAndPowerCoLtdMember 2023-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2023-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2023-12-31 0000887225 kep:JaeunResidentWindPowerPlantCoLtdMember 2023-12-31 0000887225 kep:ShinhanBNPPPrivateInvestmentTrustEastWestSunlightDreamMember 2023-12-31 0000887225 kep:PTBaritoWahanaTenagaMember 2023-12-31 0000887225 kep:BitsolarEnergyMember 2023-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2023-12-31 0000887225 kep:CheongnaEnergyMember 2023-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2023-12-31 0000887225 kep:OneEnergyAsiaLimitedMember 2023-12-31 0000887225 kep:KASINVESTMENTIILLCMember 2023-12-31 0000887225 kep:KASINVESTMENTILLCMember 2023-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember 2023-12-31 0000887225 kep:PungbackWindFarmCorporationMember 2023-12-31 0000887225 kep:TrumbullAssetManagementLlcMember 2023-12-31 0000887225 kep:PyeongchangWindPowerMember 2023-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2023-12-31 0000887225 kep:GunsanLandSolarCoLtdMember 2023-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2023-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2023-12-31 0000887225 kep:GoheungNewEnergyCoLtdMember 2023-12-31 0000887225 kep:CapmanLynxScaSicarMember 2023-12-31 0000887225 kep:HadongEfactoryCoLtdMember 2023-12-31 0000887225 kep:JeongeupGreenPowerCoLtdMember 2023-12-31 0000887225 kep:KumyangEcoParkCoLtdMember 2023-12-31 0000887225 kep:JeonjuBioGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:TaebaekWindPowerCoLtdMember 2023-12-31 0000887225 kep:KepcoForPowerCompanyMember 2023-12-31 0000887225 kep:YangyangSuriWindPowerCoLtdMember 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2023-12-31 0000887225 kep:GuadalupeSolarSpaMember 2023-12-31 0000887225 kep:OmisanWindPowerMember 2023-12-31 0000887225 kep:PulauIndahOAndMSdnBhdMember 2023-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2023-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2023-12-31 0000887225 kep:NaepoGreenEnergyMember 2023-12-31 0000887225 kep:CAESLLCMember 2023-12-31 0000887225 kep:EnergycoCoLtdFormerlyEnergycoLlcMember 2023-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2023-12-31 0000887225 kep:SolaseadoSolarPowerMember 2023-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember 2023-12-31 0000887225 kep:HORUSSOLARSADECVMember 2023-12-31 0000887225 kep:PowerEmbeddedMember 2023-12-31 0000887225 kep:ChangwonSgEnergyCoLtdMember 2023-12-31 0000887225 kep:DonpyungTechnologyCoLtdMember 2023-12-31 0000887225 kep:HorangEnergyIncMember 2023-12-31 0000887225 kep:HoenggyeRenewableEnergyCoLtdMember 2023-12-31 0000887225 kep:HamanGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:SongsanGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratoryMember 2023-12-31 0000887225 kep:GreenRadiationMember 2023-12-31 0000887225 kep:YangguFloatingPhotovoltaicPowerPlantIncMember 2023-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2023-12-31 0000887225 kep:EnvironmentAndEnergyMember 2023-12-31 0000887225 kep:AceMember 2023-12-31 0000887225 kep:RecsInnovationCo.Ltd.FormerlyWangSanEngineering.Co.Ltd.Member 2023-12-31 0000887225 kep:EcoMotionCoLtdMember 2023-12-31 0000887225 kep:GoDeokCleanEnergyCoLtdMember 2023-12-31 0000887225 kep:O2BGlobalCoLtdMember 2023-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2023-12-31 0000887225 kep:SEPCoLtdMember 2023-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2023-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2023-12-31 0000887225 kep:HankookElectricPowerInformationCoLtdMember 2023-12-31 0000887225 kep:TronixCoLtdMember 2023-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2023-12-31 0000887225 kep:SureDataLabCoLtdMember 2023-12-31 0000887225 kep:AnjwaSmartFarmSolarCityCoLtdMember 2023-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember 2023-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:Ud4mMember 2023-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2023-12-31 0000887225 kep:GoesanSolarParkCoLtdMember 2023-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2023-12-31 0000887225 kep:GGuruCoLtdMember 2023-12-31 0000887225 kep:YeomsubongWindPowerCo.Ltd.Member 2023-12-31 0000887225 kep:KostureCoLtdMember 2023-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2023-12-31 0000887225 kep:GangneungSacheonFuelCellCoLtdMember 2023-12-31 0000887225 kep:ChuncheonGreenEnergyCo.Ltd.Member 2023-12-31 0000887225 kep:HaeparangEnergyCo.Ltd.Member 2023-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2023-12-31 0000887225 kep:SaemangeumSebitPowerPlantCo.Ltd.Member 2023-12-31 0000887225 kep:Pt.CirebonEnergiPrasaranaMember 2023-12-31 0000887225 kep:PlatformnMember 2023-12-31 0000887225 kep:BoulderSolarMember 2023-12-31 0000887225 kep:YuDangSolarCoLtdMember 2023-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicCoLtdMember 2023-12-31 0000887225 kep:KoreaEnergyDataCoLtdMember 2023-12-31 0000887225 kep:SeobuHighwaySolarMember 2023-12-31 0000887225 kep:DongbuHighwaySolarMember 2023-12-31 0000887225 kep:GemengInternationalEnergyMember 2023-12-31 0000887225 kep:KNOCNigerianEastOilMember 2023-12-31 0000887225 kep:KoreaPowerExchangeMember 2023-12-31 0000887225 kep:GangwonWindPowerMember 2023-12-31 0000887225 kep:XePianXeNamnoyPowerMember 2023-12-31 0000887225 kep:DongducheonDreamPowerMember 2023-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2023-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2023-12-31 0000887225 kep:KNOCNigerianWestOilMember 2023-12-31 0000887225 kep:KNHSolarMember 2023-12-31 0000887225 kep:NoeulGreenEnergyMember 2023-12-31 0000887225 kep:SPowerMember 2023-12-31 0000887225 kep:BusanGreenEnergyMember 2023-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2023-12-31 0000887225 kep:GangneungEcoPowerMember 2023-12-31 0000887225 kep:SamcheokEcoMaterialsCo.LimitedMember 2023-12-31 0000887225 kep:KoreaGasCorporationMember 2023-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2023-12-31 0000887225 kep:JinbhuvishPowerGenerationPvtMember 2023-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2023-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2023-12-31 0000887225 kep:GoseongGreenPowerMember 2023-12-31 0000887225 kep:PTMutiaraJawaMember 2023-12-31 0000887225 kep:HyundaiGreenPowerMember 2023-12-31 0000887225 kep:KoreaElectricPowerCorporationFundMember 2023-12-31 0000887225 kep:DaeguPhotovoltaicMember 2023-12-31 0000887225 kep:HansuwonKnpCoLtdFormerlyKoreaNuclearPartnersCoLtdMember 2023-12-31 0000887225 kep:PioneerGasPowerMember 2023-12-31 0000887225 kep:DaeryunPowerMember 2023-12-31 0000887225 kep:PTCirebonElectricPowerMember 2023-12-31 0000887225 kep:PTWampuElectricPowerMember 2023-12-31 0000887225 kep:SPCPowerCorporationMember 2023-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2023-12-31 0000887225 kep:YTNMember 2023-12-31 0000887225 kep:PTBayanResourcesTBKMember 2023-12-31 0000887225 kep:GwangyangGreenEnergyMember 2023-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimiteMember 2023-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2023-12-31 0000887225 kep:PNDSolarMember 2023-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2023-12-31 0000887225 kep:DaegucleanEnergyMember 2023-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2023-12-31 0000887225 kep:YaksuESSLtdMember 2023-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2023-12-31 0000887225 kep:StnCo.Ltd.FormerlyStructureTestNetworkCo.Ltd.Member 2023-12-31 0000887225 kep:IndeckNilesDevelopmentLLCMember 2023-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2023-12-31 0000887225 kep:IndeckNilesAssetManagementLLCMember 2023-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2023-12-31 0000887225 kep:ITRCoLtdMember 2023-12-31 0000887225 kep:AnjwaSmartFarmSolarCityMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings4Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings11Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings19Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings19Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings2Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings2Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings3Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings3Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings4Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings4Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings5Member 2023-12-31 0000887225 kep:ForeignLongtermBorrowings14Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:ForeignLongtermBorrowings14Member ifrs-full:TopOfRangeMember 2023-12-31 0000887225 ifrs-full:CountryOfDomicileMember 2023-12-31 0000887225 ifrs-full:ForeignCountriesMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings1Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings2Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings8Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings9Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings3Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings4Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowings6Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings2Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings3Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings5Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings7Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings10Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings12Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings13Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings14Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings15Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings16Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings18Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings20Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings21Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings22Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings23Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings24Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings25Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings27Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings28Member 2023-12-31 0000887225 kep:LocalLongTermBorrowings29Member 2023-12-31 0000887225 kep:LocalLongTermBorrowingsMember 2023-12-31 0000887225 kep:ForeignLongTermBorrowings12Member 2023-12-31 0000887225 kep:ForeignLongtermBorrowings14Member 2023-12-31 0000887225 kep:ForeignLongTermBorrowingsMember 2023-12-31 0000887225 kep:OtherNoncurrentAssetsMember 2023-12-31 0000887225 kep:NonCurrentFinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 kep:Fy22cMember 2023-12-31 0000887225 kep:ElectricityBonds1Member 2023-12-31 0000887225 kep:CorporateBondsMember 2023-12-31 0000887225 kep:CorporateBonds1Member 2023-12-31 0000887225 kep:LocalDebtSecuritiesMember 2023-12-31 0000887225 kep:Fy22fMember 2023-12-31 0000887225 kep:Fy19cMember 2023-12-31 0000887225 kep:Fy19dMember 2023-12-31 0000887225 kep:Fy19eMember 2023-12-31 0000887225 kep:Fy96Member 2023-12-31 0000887225 kep:Fy97Member 2023-12-31 0000887225 kep:ForeignDebtSecuritiesMember 2023-12-31 0000887225 ifrs-full:AllOtherSegmentsMember ifrs-full:OperatingSegmentsMember 2023-12-31 0000887225 kep:ElectricPowerGenerationNonNuclearMember ifrs-full:OperatingSegmentsMember 2023-12-31 0000887225 kep:TransmissionAndDistributionMember ifrs-full:OperatingSegmentsMember 2023-12-31 0000887225 kep:ElectricPowerGenerationNuclearMember ifrs-full:OperatingSegmentsMember 2023-12-31 0000887225 kep:OthersAdjustmentMember 2023-12-31 0000887225 ifrs-full:MaterialReconcilingItemsMember 2023-12-31 0000887225 kep:DeferredTaxesAdjustmentMember 2023-12-31 0000887225 ifrs-full:EliminationOfIntersegmentAmountsMember 2023-12-31 0000887225 kep:PlantMaintenanceEngineeringServiceMember ifrs-full:OperatingSegmentsMember 2023-12-31 0000887225 ifrs-full:OperatingSegmentsMember 2023-12-31 0000887225 kep:EquityMethodAdjustmentMember 2023-12-31 0000887225 kep:BarakahOneCompanyMember 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2023-12-31 0000887225 kep:GunsanBioEnergyMember 2023-12-31 0000887225 kep:NaepoGreenEnergyMember 2023-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2023-12-31 0000887225 kep:EurasiaEnergyHoldingsMember 2023-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2023-12-31 0000887225 kep:ChesterSolarIVSpAMember 2023-12-31 0000887225 kep:NghiSon2PowerMember 2023-12-31 0000887225 kep:IncheonNewPowerMember 2023-12-31 0000887225 kep:KAPESMember 2023-12-31 0000887225 kep:PoongLimIndustrialCo.Ltd.Member 2023-12-31 0000887225 kep:DaeSungGeotechCo.LtdMember 2023-12-31 0000887225 kep:ShinHeungPrecisionCo.LtdMember 2023-12-31 0000887225 kep:TaegwangPcCo.LtdMember 2023-12-31 0000887225 kep:KyeonggwangTechCo.ltdMember 2023-12-31 0000887225 kep:AltronJeonjuCo.Ltd.Member 2023-12-31 0000887225 kep:SkdKoreaCoLtdMember 2023-12-31 0000887225 kep:MoohanEnterpriseCoLtdMember 2023-12-31 0000887225 kep:ValueInvestKoreaCoLtdMember 2023-12-31 0000887225 kep:BeomjuCoLtdMember 2023-12-31 0000887225 kep:CaIndustriesCoLtdMember 2023-12-31 0000887225 kep:VehicleSystemCoLtdMember 2023-12-31 0000887225 kep:ChSolutionCoLtdMember 2023-12-31 0000887225 kep:HNTCoLtdOneMember 2023-12-31 0000887225 kep:SunquenCoLtdMember 2023-12-31 0000887225 kep:HapdongCoLtdMember 2023-12-31 0000887225 kep:ShabathCoLtdMember 2023-12-31 0000887225 kep:WooriElecCoLtdMember 2023-12-31 0000887225 kep:DongyangSpecialCastingCoLtdMember 2023-12-31 0000887225 kep:DycCoLtdMember 2023-12-31 0000887225 kep:HaegangIndustryCoLtdMember 2023-12-31 0000887225 kep:DaoneCoLtdMember 2023-12-31 0000887225 kep:YeowoonCoLtdMember 2023-12-31 0000887225 kep:EvertrueCoLtdMember 2023-12-31 0000887225 kep:BlackMaterialsCoLtdMember 2023-12-31 0000887225 kep:KShipbuildingCoLtdMember 2023-12-31 0000887225 kep:SeohanFoodCoLtdMember 2023-12-31 0000887225 kep:AndongTradingCorporationCoLtdMember 2023-12-31 0000887225 kep:RMKCoLtdMember 2023-12-31 0000887225 kep:ShinjinInternationalCorporationCoLtdMember 2023-12-31 0000887225 kep:AsanWoodMember 2023-12-31 0000887225 kep:SeilTextileCo.LtdMember 2023-12-31 0000887225 kep:JslCo.LtdMember 2023-12-31 0000887225 kep:ThreeiPowergenIncMember 2023-12-31 0000887225 kep:PTKedapSayaaqMember 2023-12-31 0000887225 kep:MediquitousCoLtdMember 2023-12-31 0000887225 kep:YoungdongseafoodCoLtdMember 2023-12-31 0000887225 kep:HyunwooWinstarCoLtdMember 2023-12-31 0000887225 kep:SungchangTechCoLtdMember 2023-12-31 0000887225 kep:MonitCoLtdMember 2023-12-31 0000887225 kep:EnersysCoLtdMember 2023-12-31 0000887225 kep:KalmanCoLtdMember 2023-12-31 0000887225 kep:HimetCorporationCoLtdMember 2023-12-31 0000887225 kep:WonilImageMakerIncMember 2023-12-31 0000887225 kep:Ohbaksa.comCoLtdMember 2023-12-31 0000887225 kep:HanyangElectricCoLtdMember 2023-12-31 0000887225 kep:GeumchangSyntheticFiberCoLtdMember 2023-12-31 0000887225 kep:SungMinFisheryCoLtdMember 2023-12-31 0000887225 kep:DreamfactCoLtdMember 2023-12-31 0000887225 kep:DonyworldCoLtdMember 2023-12-31 0000887225 kep:DongsuhCompaniesIncMember 2023-12-31 0000887225 kep:DondodamCoLtdMember 2023-12-31 0000887225 kep:VisionFoodCoLtdMember 2023-12-31 0000887225 kep:AoneMetalCoLtdMember 2023-12-31 0000887225 kep:EcoplusCoLtdMember 2023-12-31 0000887225 kep:LibechenCoLtdMember 2023-12-31 0000887225 kep:HonginCoLtdMember 2023-12-31 0000887225 kep:BolimCoLtdMember 2023-12-31 0000887225 kep:NeoLifeCoLtdMember 2023-12-31 0000887225 kep:DaehongIndustryCoLtdMember 2023-12-31 0000887225 kep:TengCoLtdMember 2023-12-31 0000887225 kep:BadanuriMember 2023-12-31 0000887225 kep:DaeyoungCoLtd1Member 2023-12-31 0000887225 kep:KiSooPrecisionCoLtdMember 2023-12-31 0000887225 kep:DngvMember 2023-12-31 0000887225 kep:BjKoreaMember 2023-12-31 0000887225 kep:RsCoLtdMember 2023-12-31 0000887225 kep:DaekyoungCoLtdMember 2023-12-31 0000887225 kep:GunsanBioEnergyMember 2023-12-31 0000887225 kep:DynamicMember 2023-12-31 0000887225 kep:KmLeatechCo.Ltd.Member 2023-12-31 0000887225 kep:ChoyangTechCoLtdMember 2023-12-31 0000887225 kep:SewonCeramicCoLtdMember 2023-12-31 0000887225 kep:EILightingCoLtdMember 2023-12-31 0000887225 kep:InternationalPaintKoreaCoLtdMember 2023-12-31 0000887225 kep:TKCoLtdMember 2023-12-31 0000887225 kep:SungkwangCoLtdMember 2023-12-31 0000887225 kep:GlobalTheOneofKoreaCoLtdMember 2023-12-31 0000887225 kep:CSCorporationCoLtdMember 2023-12-31 0000887225 kep:YooseungCoLtdMember 2023-12-31 0000887225 kep:ArariCoLtdMember 2023-12-31 0000887225 kep:AjinKSBCoLtdMember 2023-12-31 0000887225 kep:BuyoungPanjiCoLtdMember 2023-12-31 0000887225 kep:SuperoneCoLtdMember 2023-12-31 0000887225 kep:WorldCnMIncMember 2023-12-31 0000887225 kep:DaewhaFuelPumpIndLtdMember 2023-12-31 0000887225 kep:SteellifeCoLtdMember 2023-12-31 0000887225 kep:CAPKoreaCoLtdMember 2023-12-31 0000887225 kep:WooriIndustryCoLtdMember 2023-12-31 0000887225 kep:SulimCoLtdMember 2023-12-31 0000887225 kep:GeumhanCoLtdMember 2023-12-31 0000887225 kep:WenexCoLtdMember 2023-12-31 0000887225 kep:DaeyoungCoLtdMember 2023-12-31 0000887225 kep:GetronCoLtdMember 2023-12-31 0000887225 kep:JungmunCoLtdMember 2023-12-31 0000887225 kep:SHCoLtdMember 2023-12-31 0000887225 kep:LeSoleilKhnpLlcMember 2023-12-31 0000887225 kep:IpsBioCo.Ltd.Member 2023-12-31 0000887225 kep:NineBCo.Ltd.Member 2023-12-31 0000887225 kep:SsangyongYoungweolPlantServiceEngineeringCoLtdMember 2023-12-31 0000887225 kep:SGCEnergyCoLtdMember 2023-12-31 0000887225 kep:JMTechCoLtdMember 2023-12-31 0000887225 kep:HRoboticsCoLtdMember 2023-12-31 0000887225 kep:IhsungCniCo.LtdMember 2023-12-31 0000887225 kep:GoodTcellsCoLtdMember 2023-12-31 0000887225 kep:PipetecKoreaCo.LtdMember 2023-12-31 0000887225 kep:HyundaiTechCo.LtdMember 2023-12-31 0000887225 kep:ChoiganggujoCo.Ltd.Member 2023-12-31 0000887225 kep:DaehyeonRecycleCo.LtdMember 2023-12-31 0000887225 kep:DaeilCo.Ltd.Member 2023-12-31 0000887225 kep:HosungsteelCo.Ltd.Member 2023-12-31 0000887225 kep:JfcCo.LtdMember 2023-12-31 0000887225 kep:UktaeInd.Co.Ltd.Member 2023-12-31 0000887225 kep:MetalLinkInc.Co.Ltd.Member 2023-12-31 0000887225 kep:SunkooCo.LtdMember 2023-12-31 0000887225 kep:SangsinCo.LtdMember 2023-12-31 0000887225 kep:FosysCo.LtdMember 2023-12-31 0000887225 kep:JiansConstructionCo.LtdMember 2023-12-31 0000887225 kep:KamadaKoreaCo.LtdMember 2023-12-31 0000887225 kep:SteelFocusCo.LtdMember 2023-12-31 0000887225 kep:EwonArtCo.LtdMember 2023-12-31 0000887225 kep:DiTechCo.LtdMember 2023-12-31 0000887225 kep:HansAdCo.LtdMember 2023-12-31 0000887225 kep:ChaegimEnvironmentDevelopmentCo.LtdMember 2023-12-31 0000887225 kep:CicTechCo.LtdMember 2023-12-31 0000887225 kep:MyungilMetalCo.LtdMember 2023-12-31 0000887225 kep:OranoExpansionMember 2023-12-31 0000887225 kep:EslinCo.LtdMember 2023-12-31 0000887225 kep:JingkangResourcesCo.LtdMember 2023-12-31 0000887225 kep:GbPrecisionCo.LtdMember 2023-12-31 0000887225 kep:GreencarbonCo.LtdMember 2023-12-31 0000887225 kep:DhTradingCo.LtdMember 2023-12-31 0000887225 kep:DaeshinEcmCo.LtdMember 2023-12-31 0000887225 kep:FoureverCo.LtdMember 2023-12-31 0000887225 kep:SimaCo.LtdMember 2023-12-31 0000887225 kep:LbkCo.LtdMember 2023-12-31 0000887225 kep:DuckwonIndustrialCo.LtdMember 2023-12-31 0000887225 kep:AsptCo.LtdMember 2023-12-31 0000887225 kep:IrefarmCo.LtdMember 2023-12-31 0000887225 kep:DecoeCo.LtdMember 2023-12-31 0000887225 kep:DesignBeyondCo.LtdMember 2023-12-31 0000887225 kep:HaenaraeAgriculturalCorpMember 2023-12-31 0000887225 kep:GuseongCo.Ltd.Member 2023-12-31 0000887225 kep:VornechCo.Ltd.Member 2023-12-31 0000887225 kep:SaeheemangCo.LtdMember 2023-12-31 0000887225 kep:WoojinFormtechCo.Ltd.Member 2023-12-31 0000887225 kep:K2MotorsCo.Ltd.Member 2023-12-31 0000887225 kep:GentakKoreaCo.Ltd.Member 2023-12-31 0000887225 kep:SungjinChemicalCo.Ltd.Member 2023-12-31 0000887225 kep:LmatCo.Ltd.Member 2023-12-31 0000887225 kep:DaishinLogisticsCo.Ltd.Member 2023-12-31 0000887225 kep:WorldPowerTechCo.LtdMember 2023-12-31 0000887225 kep:ClTechCo.Ltd.Member 2023-12-31 0000887225 kep:PbmAutoCo.Ltd.Member 2023-12-31 0000887225 kep:MiraeIndustryCo.Ltd.Member 2023-12-31 0000887225 kep:WowTechCo.LtdMember 2023-12-31 0000887225 kep:SungjinTechCo.Ltd.Member 2023-12-31 0000887225 kep:JinsungEngineeringCo.LtdMember 2023-12-31 0000887225 kep:YujinEcCo.Ltd.Member 2023-12-31 0000887225 kep:YonghoIndustryCo.LtdMember 2023-12-31 0000887225 kep:KoreaEngineerManufacturingCo.Ltd.Member 2023-12-31 0000887225 kep:SinwaJkCo.LtdMember 2023-12-31 0000887225 kep:OwonEgCo.LtdMember 2023-12-31 0000887225 kep:HaesungMetalCo.LtdMember 2023-12-31 0000887225 kep:G.mFoodsCo.LtdMember 2023-12-31 0000887225 kep:IlshinTechCo.LtdMember 2023-12-31 0000887225 kep:MichangCableCo.LtdMember 2023-12-31 0000887225 kep:SukwonCo.LtdMember 2023-12-31 0000887225 kep:DaeyeonecoCo.LtdMember 2023-12-31 0000887225 kep:TopisCo.LtdMember 2023-12-31 0000887225 kep:TaeyoungPrecisionCo.LtdMember 2023-12-31 0000887225 kep:BdiCoLtdMember 2023-12-31 0000887225 kep:LKIndustryMember 2023-12-31 0000887225 kep:MirecoMember 2023-12-31 0000887225 kep:KcIndustryCo.LtdMember 2023-12-31 0000887225 kep:SangSanginIndustryCoLtdMember 2023-12-31 0000887225 kep:VitzosysCoLtdMember 2023-12-31 0000887225 kep:DaewooDevelopmentMember 2023-12-31 0000887225 kep:SeungriEnterpriseMember 2023-12-31 0000887225 kep:MSEMember 2023-12-31 0000887225 kep:DALIMSpecialVehicleMember 2023-12-31 0000887225 kep:FishWorldMember 2023-12-31 0000887225 kep:BellieDoughnutsCoLtdMember 2023-12-31 0000887225 kep:SejinHightechCoLtdMember 2023-12-31 0000887225 kep:MansuCoLtdMember 2023-12-31 0000887225 kep:Dae-ALeisureCoLtdMember 2023-12-31 0000887225 kep:EwonMaterialsCoLtdMember 2023-12-31 0000887225 kep:ChangWonEngineeringCoLtdMember 2023-12-31 0000887225 kep:SamsungSilupCoLtdMember 2023-12-31 0000887225 kep:KukexIncMember 2023-12-31 0000887225 kep:YoungshinPlusCo.Ltd.Member 2023-12-31 0000887225 kep:TaeSungEco-TechCoLtdMember 2023-12-31 0000887225 kep:SamchungwonCoLtdMember 2023-12-31 0000887225 kep:SSETCoLtdMember 2023-12-31 0000887225 kep:DaejiProductCoLtdMember 2023-12-31 0000887225 kep:DawonYuhwaCoLtdMember 2023-12-31 0000887225 kep:SewonPMTechCoLtdMember 2023-12-31 0000887225 kep:E-WonSolutechCoLtdMember 2023-12-31 0000887225 kep:RoadSolarCoLtdMember 2023-12-31 0000887225 kep:WooyangFrozenFoodsCoLtdMember 2023-12-31 0000887225 kep:NanomicCoLtdMember 2023-12-31 0000887225 kep:HeadoneCoLtdMember 2023-12-31 0000887225 kep:SamwonBioTechCoLtdMember 2023-12-31 0000887225 kep:TaejinHiechCoLtdMember 2023-12-31 0000887225 kep:CaffeBeneCoLtdMember 2023-12-31 0000887225 kep:JinhungPackagingCoLtdMember 2023-12-31 0000887225 kep:DongdoCNPCoLtdMember 2023-12-31 0000887225 kep:HanMiFlexibleCoLtdMember 2023-12-31 0000887225 kep:SITCoLtdMember 2023-12-31 0000887225 kep:MillenniumPNTCoLtdMember 2023-12-31 0000887225 kep:KMLCCoLtdMember 2023-12-31 0000887225 kep:SeinfoodCoLtdMember 2023-12-31 0000887225 kep:DonglimEngCoLtdMember 2023-12-31 0000887225 kep:SIPCoLtdMember 2023-12-31 0000887225 kep:IZUKOREACoLtdMember 2023-12-31 0000887225 kep:KPLCircuitCoLtdMember 2023-12-31 0000887225 kep:YoungSanHeavyIndustriesCoLtdMember 2023-12-31 0000887225 kep:DaeMyungCoLtdMember 2023-12-31 0000887225 kep:SamsungNonferrousMetalCoLtdMember 2023-12-31 0000887225 kep:AronFlyingShipCo.LtdMember 2023-12-31 0000887225 kep:InoPlatechCo.ltdMember 2023-12-31 0000887225 kep:DaebonTechCoLtdMember 2023-12-31 0000887225 kep:TaejungIndustriesMember 2023-12-31 0000887225 kep:EnertecCoLtdMember 2023-12-31 0000887225 kep:SemistMember 2023-12-31 0000887225 kep:SewonBusCoLtdMember 2023-12-31 0000887225 kep:SGShinsungEngineeringandConstructionMember 2023-12-31 0000887225 kep:SamdoIndustryElectricMember 2023-12-31 0000887225 kep:ShinseiTradingMember 2023-12-31 0000887225 kep:GreenAlchemyMember 2023-12-31 0000887225 kep:ShinseungChemicalIndustyCoLtdMember 2023-12-31 0000887225 kep:KJAlloyCoLtdMember 2023-12-31 0000887225 kep:PuruenEnvironmentCoLtdMember 2023-12-31 0000887225 kep:MiretechCoLtdMember 2023-12-31 0000887225 kep:EunSungEnterpriseCo.LtdMember 2023-12-31 0000887225 kep:JaewooCoLtdMember 2023-12-31 0000887225 kep:TheYeonrijiCoLtdMember 2023-12-31 0000887225 kep:WooyangHCCoLtdMember 2023-12-31 0000887225 kep:SMHi-techCoLtdMember 2023-12-31 0000887225 kep:SamkwangChemicalCoLtdMember 2023-12-31 0000887225 kep:SamjooHightechCoLtdMember 2023-12-31 0000887225 kep:KumoHitechCoLtdMember 2023-12-31 0000887225 kep:FlusysCoLtdMember 2023-12-31 0000887225 kep:DongSeoElectronicsCoLtdMember 2023-12-31 0000887225 kep:DaewooDisplayCoLtdMember 2023-12-31 0000887225 kep:NTSCoLtdMember 2023-12-31 0000887225 kep:AIDCOLTDMember 2023-12-31 0000887225 kep:ShinyoungTextilesCoLtdMember 2023-12-31 0000887225 kep:IlwooSteelCoLtdMember 2023-12-31 0000887225 kep:Dong-unTechCoLtdMember 2023-12-31 0000887225 kep:KyungPyoIndustryCoLtdMember 2023-12-31 0000887225 kep:DoosungHeavyIndustriesCoLtdMember 2023-12-31 0000887225 kep:ChangwonEcofriendlyFarmingCorporationMember 2023-12-31 0000887225 kep:SangjiCoLtdMember 2023-12-31 0000887225 kep:SetHoldingMember 2023-12-31 0000887225 kep:ChoheungPackingCoLtdMember 2023-12-31 0000887225 kep:JeongpumCoLtdMember 2023-12-31 0000887225 kep:YuchangIndustryCoLtdMember 2023-12-31 0000887225 kep:WongwangDoorCorpMember 2023-12-31 0000887225 kep:AmanexCoLtdMember 2023-12-31 0000887225 kep:KoreaSteelPowerCoLtdMember 2023-12-31 0000887225 kep:EanskoreaCoLtdMember 2023-12-31 0000887225 kep:HankookPiagetCoLtdMember 2023-12-31 0000887225 kep:MezzanineIPackCoLtdMember 2023-12-31 0000887225 kep:GeumdaniCoLtdMember 2023-12-31 0000887225 kep:SungkyeongCoLtdMember 2023-12-31 0000887225 kep:TeamKoreaCoLtdMember 2023-12-31 0000887225 kep:DdpopstyleCoLtdMember 2023-12-31 0000887225 kep:WoosungIBCoLtdMember 2023-12-31 0000887225 kep:GTToolingCoLtdMember 2023-12-31 0000887225 kep:EkCookwareCoLtdMember 2023-12-31 0000887225 kep:FinemetalCoLtdMember 2023-12-31 0000887225 kep:KTTWCoLtdMember 2023-12-31 0000887225 kep:PizzakoreaCoLtdMember 2023-12-31 0000887225 kep:DongsungMulsanCoLtdMember 2023-12-31 0000887225 kep:NewkoCoLtdMember 2023-12-31 0000887225 kep:SimileAluminiumCoLtdMember 2023-12-31 0000887225 kep:MokganCoLtdMember 2023-12-31 0000887225 kep:LtopCoLtdMember 2023-12-31 0000887225 kep:MSMCoLtdMember 2023-12-31 0000887225 kep:AvajarCoLtdMember 2023-12-31 0000887225 kep:CocoFoodCoLtdMember 2023-12-31 0000887225 kep:DonghwaTCACoLtdMember 2023-12-31 0000887225 kep:ShinkwangEngineeringMember 2023-12-31 0000887225 kep:ElephantFriendsMember 2023-12-31 0000887225 kep:KyungDongMember 2023-12-31 0000887225 kep:BCONMember 2023-12-31 0000887225 kep:AceIntiAgriculturalMember 2023-12-31 0000887225 kep:BeerYeastKoreaIncMember 2023-12-31 0000887225 kep:HurimBiocellMember 2023-12-31 0000887225 kep:HyungjiEsquireMember 2023-12-31 0000887225 kep:WoojooEnvironmentIndMember 2023-12-31 0000887225 kep:FutechMoldMember 2023-12-31 0000887225 kep:KwangSungIndustryMember 2023-12-31 0000887225 kep:YoungSungMember 2023-12-31 0000887225 kep:BiwangIndustryMember 2023-12-31 0000887225 kep:WoobangConstructionMember 2023-12-31 0000887225 kep:SeenBusinessAndTechnologyCoLtdMember 2023-12-31 0000887225 kep:MoradoMember 2023-12-31 0000887225 kep:DaeoCo.LtdMember 2023-12-31 0000887225 kep:ShinsungTechCo.LtdMember 2023-12-31 0000887225 kep:MiraeEngineeringCo.LtdMember 2023-12-31 0000887225 kep:GhTechCo.LtdMember 2023-12-31 0000887225 kep:SamkumIndustryCo.LtdMember 2023-12-31 0000887225 kep:HandonCo.LtdMember 2023-12-31 0000887225 kep:DyntexKoreaCo.LtdMember 2023-12-31 0000887225 kep:DaesungStainCo.LtdMember 2023-12-31 0000887225 kep:UiCo.LtdMember 2023-12-31 0000887225 kep:BokwangCo.LtdMember 2023-12-31 0000887225 kep:LoftGardenCo.LtdMember 2023-12-31 0000887225 kep:YsmCo.LtdMember 2023-12-31 0000887225 kep:TsntCo.Ltd.Member 2023-12-31 0000887225 kep:WorldOneCo.LtdMember 2023-12-31 0000887225 kep:YewonCo.LtdMember 2023-12-31 0000887225 kep:JMCHeavyIndustriesMember 2023-12-31 0000887225 kep:NajinSteelMember 2023-12-31 0000887225 kep:SinkwangIndustryMember 2023-12-31 0000887225 kep:WoojinIndustryMember 2023-12-31 0000887225 kep:YuilIndustrialElectronicsMember 2023-12-31 0000887225 kep:MyungSungTexMember 2023-12-31 0000887225 kep:PyungsanSiCo.Ltd.Member 2023-12-31 0000887225 kep:SamgongDevelopmentMember 2023-12-31 0000887225 kep:SungkwangTimberMember 2023-12-31 0000887225 kep:SolvusMember 2023-12-31 0000887225 kep:ShinEPCMember 2023-12-31 0000887225 kep:EjungAdMember 2023-12-31 0000887225 kep:MyungMember 2023-12-31 0000887225 kep:IMHWAMember 2023-12-31 0000887225 kep:AoneAlformCo.LtdMember 2023-12-31 0000887225 kep:NewasiaCoLtdFormerlyAJSCoLtdMember 2023-12-31 0000887225 kep:ZyleDaewooMotorSalesMember 2023-12-31 0000887225 kep:JoongangDevelopmentMember 2023-12-31 0000887225 kep:IlrimNanoTecMember 2023-12-31 0000887225 kep:IlsukMember 2023-12-31 0000887225 kep:SeyangMember 2023-12-31 0000887225 kep:IhsungCNICoLtdMember 2023-12-31 0000887225 kep:VissemElectronicsCo.LtdMember 2023-12-31 0000887225 kep:KGMobilityCompanyLimitedMember 2023-12-31 0000887225 kep:KoreaDistrictHeatingMember 2023-12-31 0000887225 kep:MoonkyungSilicaMember 2023-12-31 0000887225 kep:SungwonMember 2023-12-31 0000887225 kep:DaeKwangSemiconductorMember 2023-12-31 0000887225 kep:MijuSteelMfgMember 2023-12-31 0000887225 kep:SanbonDepartmentStoreMember 2023-12-31 0000887225 kep:MoboMember 2023-12-31 0000887225 kep:SAMBOAUTOMember 2023-12-31 0000887225 kep:PTAdaroEnergyTbkMember 2023-12-31 0000887225 kep:CodesCombineMember 2023-12-31 0000887225 kep:JoongangPlatecMember 2023-12-31 0000887225 kep:KSRemiconMember 2023-12-31 0000887225 kep:HwanYoungSteelMember 2023-12-31 0000887225 kep:FinePowerexCo.LtdMember 2023-12-31 0000887225 kep:CommonComputerCo.LtdMember 2023-12-31 0000887225 kep:SangjinCo.LtdMember 2023-12-31 0000887225 kep:NewTechCo.LtdMember 2023-12-31 0000887225 kep:SungdoPackCo.LtdMember 2023-12-31 0000887225 kep:KoreaRemiconCo.LtdMember 2023-12-31 0000887225 kep:IksanguwonCo.LtdMember 2023-12-31 0000887225 kep:SegeonCo.LtdMember 2023-12-31 0000887225 kep:HntCo.LtdMember 2023-12-31 0000887225 kep:WoongjinEnergyCo.LtdMember 2023-12-31 0000887225 kep:J.iSteelCo.LtdMember 2023-12-31 0000887225 kep:TaejinCo.LtdMember 2023-12-31 0000887225 kep:MacroadCo.LtdMember 2023-12-31 0000887225 kep:EunsungIndustrialCo.LtdMember 2023-12-31 0000887225 kep:KpeCo.LtdMember 2023-12-31 0000887225 kep:DongbangfarmsCo.LtdMember 2023-12-31 0000887225 kep:DongShinHydrauliesCo.LtdMember 2023-12-31 0000887225 kep:CheonwooE.p.sCo.LtdMember 2023-12-31 0000887225 kep:MsTechCo.LtdMember 2023-12-31 0000887225 kep:CoffeenieCo.LtdMember 2023-12-31 0000887225 kep:MediPharmaPlanCo.LtdMember 2023-12-31 0000887225 kep:WooriAsconCo.LtdMember 2023-12-31 0000887225 kep:HyesungCablecommunicationIncMember 2023-12-31 0000887225 kep:DaejuSteelCo.LtdMember 2023-12-31 0000887225 kep:WhitecleanFoodsCo.LtdMember 2023-12-31 0000887225 kep:MecCo.LtdMember 2023-12-31 0000887225 kep:WecanGlobalInc.Co.LtdMember 2023-12-31 0000887225 kep:HyundaiGlassCo.LtdMember 2023-12-31 0000887225 kep:KoaTechCo.LtdMember 2023-12-31 0000887225 kep:ShinPyungMember 2023-12-31 0000887225 kep:KwangSungMember 2023-12-31 0000887225 kep:SunjinPowerTechMember 2023-12-31 0000887225 kep:KoreaMineralsMember 2023-12-31 0000887225 kep:DauningMember 2023-12-31 0000887225 kep:KCMember 2023-12-31 0000887225 kep:DooriwonFoodSystemMember 2023-12-31 0000887225 kep:SungKwangMember 2023-12-31 0000887225 kep:AceIntegrationMember 2023-12-31 0000887225 kep:HyoDongDevelopmentMember 2023-12-31 0000887225 kep:ChunWonDevelopmentMember 2023-12-31 0000887225 kep:SungLimIndustrialMember 2023-12-31 0000887225 kep:SamsungTechMember 2023-12-31 0000887225 kep:ShinheungpetrolMember 2023-12-31 0000887225 kep:SeyangPrecisionIndMember 2023-12-31 0000887225 kep:JoHyunMember 2023-12-31 0000887225 kep:SeongJiIndustrialMember 2023-12-31 0000887225 kep:KoreaTrecisionMember 2023-12-31 0000887225 kep:KendaePrintingMember 2023-12-31 0000887225 kep:JOTechMember 2023-12-31 0000887225 kep:SevenvalleyJCMember 2023-12-31 0000887225 kep:HanYoungTechnologyMember 2023-12-31 0000887225 kep:NFTMember 2023-12-31 0000887225 kep:HyundaitechMember 2023-12-31 0000887225 kep:PtotronicsMember 2023-12-31 0000887225 kep:YounilMetalMember 2023-12-31 0000887225 kep:DasanMaterialMember 2023-12-31 0000887225 kep:DaejooEgCo.LtdMember 2023-12-31 0000887225 kep:ShieldBoardCo.LtdMember 2023-12-31 0000887225 kep:JeuvisCo.LtdMember 2023-12-31 0000887225 kep:SamwangCo.LtdMember 2023-12-31 0000887225 kep:DongbangMetalCo.LtdMember 2023-12-31 0000887225 kep:NyTechCo.LtdMember 2023-12-31 0000887225 kep:MsSteelIndustrialCo.LtdMember 2023-12-31 0000887225 kep:SnopaCo.LtdMember 2023-12-31 0000887225 kep:HanaItmInc.Member 2023-12-31 0000887225 kep:SeokjinEtCo.Ltd.Member 2023-12-31 0000887225 kep:TaesanCo.LtdMember 2023-12-31 0000887225 kep:YuilEngineeringCo.LtdMember 2023-12-31 0000887225 kep:ChounghwaPreciseCo.LtdMember 2023-12-31 0000887225 kep:DaewoongAndTechnologyCo.LtdMember 2023-12-31 0000887225 kep:JjTechCo.Member 2023-12-31 0000887225 kep:ThermoTecCo.LtdMember 2023-12-31 0000887225 kep:SamhongMachinery.EmcCo.LtdMember 2023-12-31 0000887225 kep:AgencoreCo.LtdMember 2023-12-31 0000887225 kep:ThesunCo.LtdMember 2023-12-31 0000887225 kep:JunginDistributionCo.LtdMember 2023-12-31 0000887225 kep:SangmooSteelCo.LtdMember 2023-12-31 0000887225 kep:SamjinPlacoCo.LtdMember 2023-12-31 0000887225 kep:DongyangPratechCo.LtdMember 2023-12-31 0000887225 kep:GaoneInternationalCo.LtdMember 2023-12-31 0000887225 kep:GuseulCo.LtdMember 2023-12-31 0000887225 kep:YurimCnfCo.LtdMember 2023-12-31 0000887225 kep:DaeyangHydroCo.LtdMember 2023-12-31 0000887225 kep:YmTechCo.LtdMember 2023-12-31 0000887225 kep:MsPrecisionCo.LtdMember 2023-12-31 0000887225 kep:JungwooMetalSolutionCo.LtdMember 2023-12-31 0000887225 kep:JbmCo.LtdMember 2023-12-31 0000887225 kep:GogangAluminumCo.LtdMember 2023-12-31 0000887225 kep:SkeCableCo.LtdMember 2023-12-31 0000887225 kep:HiKoreaCo.LtdMember 2023-12-31 0000887225 kep:DaeheungEngineeringCo.LtdMember 2023-12-31 0000887225 kep:EtapolCo.LtdMember 2023-12-31 0000887225 kep:YoongwonInternationalCo.LtdMember 2023-12-31 0000887225 kep:AvohCeramicbathCo.LtdMember 2023-12-31 0000887225 kep:DongyangR.p.f.IndustrialCo.LtdMember 2023-12-31 0000887225 kep:SfcInternationalCo.LtdMember 2023-12-31 0000887225 kep:CcEngCo.LtdMember 2023-12-31 0000887225 kep:AlohaFactoryCo.LtdMember 2023-12-31 0000887225 kep:DailyshotCo.LtdMember 2023-12-31 0000887225 kep:TaekwangPaperBoardCo.LtdMember 2023-12-31 0000887225 kep:StsGlobalCo.LtdMember 2023-12-31 0000887225 kep:YTechCo.LtdMember 2023-12-31 0000887225 kep:SamhyupCo.LtdMember 2023-12-31 0000887225 kep:FissionUraniumMember 2023-12-31 0000887225 kep:EMnICoLtdMember 2023-12-31 0000887225 kep:DenisonMinesCorpMember 2023-12-31 0000887225 kep:KoreaLineMember 2023-12-31 0000887225 kep:ELCOMTECMember 2023-12-31 0000887225 kep:PANoceanMember 2023-12-31 0000887225 kep:STXHeavyIndustriesMember 2023-12-31 0000887225 kep:NamkwangEngineeringConstructionMember 2023-12-31 0000887225 kep:BumyangConstructionMember 2023-12-31 0000887225 kep:ListedEquitySecuritiesMember 2023-12-31 0000887225 kep:UnlistedEquitySecuritiesMember 2023-12-31 0000887225 ifrs-full:DebtSecuritiesMember 2023-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2023-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2023-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanFiveYearsMember kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanFiveYearsMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2023-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2023-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentTradingMember kep:NetSettlementMember 2023-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember kep:GrossSettlementMember 2023-12-31 0000887225 kep:ConstructionContractsMember 2023-12-31 0000887225 kep:CurrencyForwardContracts16Member 2023-12-31 0000887225 kep:CurrencyForwardContracts17Member 2023-12-31 0000887225 kep:CurrencyForwardContracts18Member 2023-12-31 0000887225 kep:CurrencyForwardContracts19Member 2023-12-31 0000887225 kep:CurrencyForwardContracts20Member 2023-12-31 0000887225 kep:CurrencyForwardContracts21Member 2023-12-31 0000887225 kep:CurrencyForwardContracts22Member 2023-12-31 0000887225 kep:CurrencyForwardContracts25Member 2023-12-31 0000887225 kep:CurrencyForwardContracts26Member 2023-12-31 0000887225 kep:CurrencyForwardContracts27Member 2023-12-31 0000887225 kep:CurrencyForwardContracts24Member 2023-12-31 0000887225 kep:CurrencyForwardContracts23Member 2023-12-31 0000887225 kep:CurrencyForwardContracts12Member 2023-12-31 0000887225 kep:CurrencyForwardContracts11Member 2023-12-31 0000887225 kep:CurrencyForwardContracts10Member 2023-12-31 0000887225 kep:CurrencyForwardContracts9Member 2023-12-31 0000887225 kep:CurrencyForwardContracts8Member 2023-12-31 0000887225 kep:CurrencyForwardContracts7Member 2023-12-31 0000887225 kep:CurrencyForwardContracts6Member 2023-12-31 0000887225 kep:CurrencyForwardContracts43Member 2023-12-31 0000887225 kep:CurrencyForwardContracts44Member 2023-12-31 0000887225 kep:CurrencyForwardContracts45Member 2023-12-31 0000887225 kep:CurrencyForwardContracts54Member 2023-12-31 0000887225 kep:CurrencyForwardContracts55Member 2023-12-31 0000887225 kep:CurrencyForwardContracts56Member 2023-12-31 0000887225 kep:CurrencyForwardContracts57Member 2023-12-31 0000887225 kep:CurrencyForwardContracts58Member 2023-12-31 0000887225 kep:CurrencyForwardContracts46Member 2023-12-31 0000887225 kep:CurrencyForwardContracts47Member 2023-12-31 0000887225 kep:CurrencyForwardContracts48Member 2023-12-31 0000887225 kep:CurrencyForwardContracts49Member 2023-12-31 0000887225 kep:CurrencyForwardContracts50Member 2023-12-31 0000887225 kep:CurrencyForwardContracts51Member 2023-12-31 0000887225 kep:CurrencyForwardContracts52Member 2023-12-31 0000887225 kep:CurrencyForwardContracts53Member 2023-12-31 0000887225 kep:CurrencyForwardContracts1Member 2023-12-31 0000887225 kep:CurrencyForwardContracts2Member 2023-12-31 0000887225 kep:CurrencyForwardContracts3Member 2023-12-31 0000887225 kep:CurrencyForwardContracts4Member 2023-12-31 0000887225 kep:CurrencyForwardContracts5Member 2023-12-31 0000887225 kep:CurrencyForwardContracts13Member 2023-12-31 0000887225 kep:CurrencyForwardContracts14Member 2023-12-31 0000887225 kep:CurrencyForwardContracts15Member 2023-12-31 0000887225 kep:CurrencyForwardContracts28Member 2023-12-31 0000887225 kep:CurrencyForwardContracts29Member 2023-12-31 0000887225 kep:CurrencyForwardContracts30Member 2023-12-31 0000887225 kep:CurrencyForwardContracts31Member 2023-12-31 0000887225 kep:CurrencyForwardContracts32Member 2023-12-31 0000887225 kep:CurrencyForwardContracts33Member 2023-12-31 0000887225 kep:CurrencyForwardContracts34Member 2023-12-31 0000887225 kep:CurrencyForwardContracts35Member 2023-12-31 0000887225 kep:CurrencyForwardContracts36Member 2023-12-31 0000887225 kep:CurrencyForwardContracts37Member 2023-12-31 0000887225 kep:CurrencyForwardContracts38Member 2023-12-31 0000887225 kep:CurrencyForwardContracts39Member 2023-12-31 0000887225 kep:CurrencyForwardContracts40Member 2023-12-31 0000887225 kep:CurrencyForwardContracts41Member 2023-12-31 0000887225 kep:CurrencyForwardContracts42Member 2023-12-31 0000887225 kep:CurrencySwapContracts25Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts32Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts10Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts4Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts5Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts6Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts3Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts2Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts12Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts7Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts9Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts11Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts8Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts17Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts27Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts19Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts14Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts29Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts33Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts35Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts24Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts23Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts15Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts22Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts34Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts31Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts26Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts21Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts1Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts28Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts18Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts30Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts20Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts13Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts16Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts57Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentMember kep:CurrencySwapContracts56Member 2023-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentMember kep:CurrencySwapContracts55Member 2023-12-31 0000887225 kep:CurrencySwapContracts54Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts53Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts52Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts51Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts50Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts49Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentMember kep:CurrencySwapContracts48Member 2023-12-31 0000887225 kep:CurrencySwapContracts47Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts46Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts22Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts21Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts6Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts3Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts5Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts10Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts7Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts13Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts9Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts12Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts14Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts11Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts8Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts27Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts28Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts29Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts30Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts31Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts32Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts33Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts34Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts35Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts36Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts37Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts38Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts39Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts40Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts45Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts44Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:Currencyswapcontracts43Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts4Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts2Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts1Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts23Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts20Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts19Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts26Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts17Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts24Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts18Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts25Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts15Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts16Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts41Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:CurrencySwapContracts42Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:OwnedByGovernmentMember kep:KoreanDevelopmentBankMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract10Member 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract11Member 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract12Member 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract13Member 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract14Member 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract15Member 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract4Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract5Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract6Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract7Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract8Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract9Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract16Member 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract17Member 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract18Member 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract19Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyForwardContract3Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyForwardContract2Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyForwardContract1Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract3Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract2Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract1Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:InterestRateSwapContracts21Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts22Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts23Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts24Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts25Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts26Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts27Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts28Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts29Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts30Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts31Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts32Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentMember kep:InterestRateSwapContracts33Member 2023-12-31 0000887225 kep:InterestRateSwapContracts34Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts1Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts2Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts3Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts4Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts5Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts6Member kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts1Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts2Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts3Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts4Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts5Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts6Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts7Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts8Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts9Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts10Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts11Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts12Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts13Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts14Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts15Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts16Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts17Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts18Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts19Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InterestRateSwapContracts20Member kep:NotDesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:InternationalFinanceCorporationMember 2023-12-31 0000887225 kep:KoreaEnergyAgencyMember 2023-12-31 0000887225 kep:GangneungMember 2023-12-31 0000887225 kep:GaesongIndustrialComplexMember 2023-12-31 0000887225 kep:HeeMangSunlightPowerCo.LtdMember 2023-12-31 0000887225 kep:WooriSpotPefMember kep:GemengInternationalEnergyMember 2023-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2023-12-31 0000887225 kep:DaewonGreenEnergyCoLtdMember 2023-12-31 0000887225 kep:Ud4mCoLtdMember 2023-12-31 0000887225 kep:ScEgMember 2023-12-31 0000887225 kep:YaksuessCoLtdMember 2023-12-31 0000887225 kep:TaebaekWindPowerMember 2023-12-31 0000887225 kep:DangjinEcoPowerCoLtdNewlyMember 2023-12-31 0000887225 kep:EnergycoLLCMember 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2023-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingSLMember 2023-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember 2023-12-31 0000887225 kep:SeungmunGreenEnergyMember 2023-12-31 0000887225 kep:SpowerChileSpaMember 2023-12-31 0000887225 kep:TrumbullAssetManagementLlcMember 2023-12-31 0000887225 kep:PungbackWindFarmCorporationMember 2023-12-31 0000887225 kep:ChangwonNuriEnergyMember 2023-12-31 0000887225 kep:EumseongEcoParkMember 2023-12-31 0000887225 kep:Platformn.Co.LtdMember 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member 2023-12-31 0000887225 kep:PulauIndahOmSdnBhdMember 2023-12-31 0000887225 kep:UnbilledRevenueMember 2023-12-31 0000887225 kep:CashCashEquivalents2Member 2023-12-31 0000887225 kep:CashAndCashEquivalents1Member 2023-12-31 0000887225 kep:CashAndCashEquivalentsMember 2023-12-31 0000887225 kep:CashCashEquivalents3Member 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyOneMember kep:ThirdPlannedPeriodMember 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyTwoMember kep:ThirdPlannedPeriodMember 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyThreeMember kep:ThirdPlannedPeriodMember 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFourMember kep:ThirdPlannedPeriodMember 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFiveMember kep:ThirdPlannedPeriodMember 2023-12-31 0000887225 kep:ThirdPlannedPeriodMember 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects8Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects7Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects6Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects5Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects11Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects10Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects9Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects2Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects14Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects1Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects13Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects12Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects4Member 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects3Member 2023-12-31 0000887225 kep:PtPerusahaanListrikNegaraMember kep:OperationMaintenanceProjectInIndonesiaSiborpaMember 2023-12-31 0000887225 kep:PtPerushanListrikNegaraMember 2023-12-31 0000887225 kep:MorganStanleyCapitalGroupIncMember 2023-12-31 0000887225 kep:MorganStanleyRenewablesIncMember 2023-12-31 0000887225 kep:KOMIPOVanphongPowerServiceLLCMember 2023-12-31 0000887225 kep:RbcCommunityInvestmentsImpactRenewablesHoldCoOneLlcMember kep:ConchoValleyEnergyLlcMember 2023-12-31 0000887225 kep:MicrosoftThroughKookminBankMember 2023-12-31 0000887225 kep:AxiaPowerHoldingsB.vMember 2023-12-31 0000887225 kep:Pt.CirebonElectroPowerMember 2023-12-31 0000887225 kep:KSTElectricPowerCompanySAPIdeCVMember 2023-12-31 0000887225 kep:GuamUkuduPowerLLCMember ifrs-full:ConstructionInProgressMember 2023-12-31 0000887225 kep:ExportImportBankOfKoreabnpParibasAndIngBankMember kep:PtBsEnergyAndPtNusantaraHydroAlamMember 2023-12-31 0000887225 kep:Pt.CirebonElectroPowerMember kep:NongyupBankMember kep:MizuhoBankMember 2023-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember kep:OtherReceivablesMember 2023-12-31 0000887225 kep:OtherReceivablesMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:TradeReceivablesMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:TradeReceivablesMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:OtherReceivablesMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:OtherReceivablesMember 2023-12-31 0000887225 ifrs-full:TradeReceivablesMember 2023-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember ifrs-full:TradeReceivablesMember 2023-12-31 0000887225 kep:AdjustmentOfPresentValueDiscountMember 2023-12-31 0000887225 ifrs-full:LeaseReceivablesMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LeaseReceivablesMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:LeaseReceivablesMember kep:AdjustmentOfPresentValueDiscountMember 2023-12-31 0000887225 kep:OtherReceivablesOthersMember kep:AdjustmentOfPresentValueDiscountMember 2023-12-31 0000887225 kep:OtherReceivablesOthersMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:OtherReceivablesOthersMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LeaseReceivablesMember 2023-12-31 0000887225 kep:NonTradeReceivablesMember kep:AdjustmentOfPresentValueDiscountMember 2023-12-31 0000887225 kep:NonTradeReceivablesMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:NonTradeReceivablesMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:DepositsMember 2023-12-31 0000887225 kep:DepositsMember kep:AdjustmentOfPresentValueDiscountMember 2023-12-31 0000887225 kep:OtherReceivablesOthersMember 2023-12-31 0000887225 kep:DepositsMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:NonTradeReceivablesMember 2023-12-31 0000887225 kep:AccruedIncomeReceivableMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:DepositsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:AccruedIncomeReceivableMember 2023-12-31 0000887225 kep:AccruedIncomeReceivableMember kep:AdjustmentOfPresentValueDiscountMember 2023-12-31 0000887225 kep:AccruedIncomeReceivableMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:ITRCoLtdMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:EnergyInfraAssetManagementMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:KepcoForPowerCompanyMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:TaebaekWindPowerMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:JeongeupGreenPowerCoLtdMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:NamyangjuCombinedHeatAndPowerCoLtdMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2023-12-31 0000887225 kep:PulauIndahOmSdn.BhdMember ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:TrumbullAssetManagementLlcMember ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:TaebaekGuinemiWindPowerMember ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:NawahEnergyMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:SPCPowerCorporationMember 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2023-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:ShuweihatAsiaOperationMaintenanceCompanyMember ifrs-full:BottomOfRangeMember 2023-12-31 0000887225 kep:WaterburyLakeUraniumLPMember ifrs-full:TopOfRangeMember 2023-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember 2023-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember kep:NotLaterThanTwoMonthsMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember ifrs-full:LaterThanOneYearMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember kep:LaterThanFourMonthsAndNotLaterThanOneYearMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember kep:NotLaterThanTwoMonthsMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember ifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsImpairedMember ifrs-full:TradeReceivablesMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanFourMonthsMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsNeitherPastDueNorImpairedMember ifrs-full:TradeReceivablesMember 2023-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember ifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember 2023-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember kep:LaterThanFourMonthsAndNotLaterThanOneYearMember 2023-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember ifrs-full:LaterThanOneYearMember 2023-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsImpairedMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanFourMonthsMember 2023-12-31 0000887225 kep:OtherReceivablesMember ifrs-full:FinancialAssetsNeitherPastDueNorImpairedMember 2023-12-31 0000887225 kep:ShortTermFinancialInstrumentsCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 kep:DerivativeFinancialInstrumentsAssetsMember ifrs-full:AtFairValueMember kep:NonDesignatedMember 2023-12-31 0000887225 kep:DerivativeFinancialInstrumentsAssetsMember ifrs-full:AtFairValueMember kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 ifrs-full:TradeReceivablesMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:AtFairValueMember 2023-12-31 0000887225 kep:CashAndCashEquivalentsMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 ifrs-full:LoansAndReceivablesCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember ifrs-full:AtFairValueMember 2023-12-31 0000887225 kep:LongTermFinancialInstrumentsCategoryMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 kep:DerivativeFinancialInstrumentsLiabilitiesMember ifrs-full:AtFairValueMember kep:DesignatedAsHedgingInstrumentMember 2023-12-31 0000887225 kep:SecuredBorrowingsMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 ifrs-full:LeaseLiabilitiesMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 kep:BankOverdraftMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 kep:UnsecuredBondMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 kep:DerivativeFinancialInstrumentsLiabilitiesMember ifrs-full:AtFairValueMember kep:NonDesignatedMember 2023-12-31 0000887225 kep:UnsecuredBorrowingsMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 kep:TradeAndOtherPayablesMember ifrs-full:NotMeasuredAtFairValueInStatementOfFinancialPositionButForWhichFairValueIsDisclosedMember 2023-12-31 0000887225 kep:LocalShortTermBorrowings4Member 2023-12-31 0000887225 kep:LocalShortTermBorrowings3Member 2023-12-31 0000887225 kep:LocalShortTermBorrowings2Member 2023-12-31 0000887225 kep:LocalShortTermBorrowings1Member 2023-12-31 0000887225 kep:ForeignShortTermBorrowings2Member 2023-12-31 0000887225 kep:PTBankKBBukopinMember 2023-12-31 0000887225 kep:RbcCommunityInvestmentsImpactRenewablesHoldCoOneLlcMember 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:NinetyNineMegawattPhotovoltaicPowerGenerationFacilityMember kep:GunsanLandSolarMember 2023-12-31 0000887225 kep:NinetyNineMegawattPhotovoltaicPowerGenerationFacilityMember kep:GunsanLandSolarMember 2023-12-31 0000887225 kep:HaetbyotgilSunlightCompanyLimitedMember 2023-12-31 0000887225 kep:HybridBondsMember 2023-12-31 0000887225 kep:SixOneSevenOneOneNuriRiYeongiMyeonSeojongMember 2023-12-31 0000887225 kep:KoreaGasCorporationMember 2023-12-31 0000887225 kep:OtherLongtermAndShorttermFinancialInstrumentsMember kep:OtherFinancialAssetsMember 2023-12-31 0000887225 kep:LongtermDepositsMember kep:OtherFinancialAssetsMember 2023-12-31 0000887225 kep:CDMember kep:OtherFinancialAssetsMember 2023-12-31 0000887225 kep:LoansBorrowedForOperationsOneMember 2023-12-31 0000887225 kep:LoansBorrowedForOperationsTwoMember 2023-12-31 0000887225 kep:SeventyEightOneCorporateBondMember 2023-12-31 0000887225 kep:SeventyEightTwoCorporateBondMember 2023-12-31 0000887225 kep:SeventyEightThreeCorporateBondMember 2023-12-31 0000887225 kep:SeventySevenThreeCorporateBondMember 2023-12-31 0000887225 kep:SeventySevenTwoCorporateBondMember 2023-12-31 0000887225 kep:SeventySevenOneCorporateBondMember 2023-12-31 0000887225 kep:SeventyTwoTwoCorporateBondMember 2023-12-31 0000887225 kep:SeventyTwoOneCorporateBondMember 2023-12-31 0000887225 kep:SixtyThreeCorporateBondMember 2023-12-31 0000887225 kep:SixtyOneCorporateBondMember 2023-12-31 0000887225 kep:SixtyOneThreeCorporateBondMember 2023-12-31 0000887225 kep:SixtyOneTwoCorporateBondMember 2023-12-31 0000887225 kep:SixtyOneOneCorporateBondMember 2023-12-31 0000887225 kep:FortySevenOneCorporateBondMember 2023-12-31 0000887225 kep:FortySevenTwoCorporateBondMember 2023-12-31 0000887225 kep:SixtyTwoCorporateBondMember 2023-12-31 0000887225 kep:LoansBorrowedForOperationsFiveMember 2023-12-31 0000887225 kep:FYTwentyFourGlobalFifteenthMember 2023-12-31 0000887225 kep:LoansBorrowedForOperationsThreeMember 2023-12-31 0000887225 kep:LoansBorrowedForOperationsFourMember 2023-12-31 0000887225 kep:ProvisionsForEmployeeBenefitsMember 2023-12-31 0000887225 ifrs-full:LegalProceedingsProvisionMember 2023-12-31 0000887225 kep:PowerPlantRegionalSupportProgramProvisionsMember 2023-12-31 0000887225 kep:OtherRecoveryProvisionsMember 2023-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember 2023-12-31 0000887225 kep:SpentFuelRecoveryProvisionsMember 2023-12-31 0000887225 kep:WasteRecoveryProvisionsMember 2023-12-31 0000887225 kep:PcbsRecoveryProvisionsMember 2023-12-31 0000887225 kep:ProvisionsForGreenhouseGasEmissionsObligationsMember 2023-12-31 0000887225 ifrs-full:MiscellaneousOtherProvisionsMember 2023-12-31 0000887225 kep:TransmissionRegionalSupportProgramProvisionsMember 2023-12-31 0000887225 ifrs-full:FinancialGuaranteeContractsMember 2023-12-31 0000887225 kep:ProvisionsForRpsMember 2023-12-31 0000887225 ifrs-full:ActuarialAssumptionOfDiscountRatesMember 2023-12-31 0000887225 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember 2023-12-31 0000887225 kep:FinanceLeaseReceivablesMember 2023-12-31 0000887225 kep:KEPCOEngineeringConstructionCompanyMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOPlantServiceEngineeringMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOIlijanCorporationMember 2021-01-01 2021-12-31 0000887225 kep:KEPCONetherlandsBVMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOPhilippinesCorporationMember 2021-01-01 2021-12-31 0000887225 kep:EwpAmericaInc.Member 2021-01-01 2021-12-31 0000887225 kep:KepcoEnergySolutionCo.Ltd.Member 2021-01-01 2021-12-31 0000887225 kep:KepcoSolarCo.Ltd.Member 2021-01-01 2021-12-31 0000887225 kep:KEPCOKPSPhilippinesCorpMember 2021-01-01 2021-12-31 0000887225 kep:KOSPOJordanMember 2021-01-01 2021-12-31 0000887225 kep:KoreaEastWestPowerMember 2021-01-01 2021-12-31 0000887225 ifrs-full:SubsidiariesMember 2021-01-01 2021-12-31 0000887225 kep:PTEWPIndonesiaMember 2021-01-01 2021-12-31 0000887225 kep:PTCirebonPowerServiceMember 2021-01-01 2021-12-31 0000887225 kep:ChitoseSolarPowerPlantMember 2021-01-01 2021-12-31 0000887225 kep:KEPCONetherlandsS3BVMember 2021-01-01 2021-12-31 0000887225 kep:TamraOffshoreWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:KoreaHydroNuclearPowerMember 2021-01-01 2021-12-31 0000887225 kep:FujeijWindPowerCompanyMember 2021-01-01 2021-12-31 0000887225 kep:KoreaMidlandPowerMember 2021-01-01 2021-12-31 0000887225 kep:KoreaSoutheastPowerMember 2021-01-01 2021-12-31 0000887225 kep:QatranaElectricPowerCompanyMember 2021-01-01 2021-12-31 0000887225 kep:KOSPOAustraliaMember 2021-01-01 2021-12-31 0000887225 kep:KOSPOPowerServicesLimitadaMember 2021-01-01 2021-12-31 0000887225 kep:KomipoGlobalPteLtdMember 2021-01-01 2021-12-31 0000887225 kep:KSTElectricPowerCompanySAPIdeCVMember 2021-01-01 2021-12-31 0000887225 kep:KepcoNeimengguInternationalLtdMember 2021-01-01 2021-12-31 0000887225 kep:KepcoMcsCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:KoreaSouthernPowerMember 2021-01-01 2021-12-31 0000887225 kep:KoreaWesternPowerMember 2021-01-01 2021-12-31 0000887225 kep:KospoAustraliaPtyLtdMember 2021-01-01 2021-12-31 0000887225 kep:ChangjukWindPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:EWPBarbados1SRLMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOEnergyServiceCompanyMember 2021-01-01 2021-12-31 0000887225 kep:ChileSolarJVSpAMember 2021-01-01 2021-12-31 0000887225 kep:GyeongjuWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:KEPCONetherlandsJ3BVMember 2021-01-01 2021-12-31 0000887225 kep:PTKOMIPOPembangkitanJawaBaliMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOInternationalHongKongMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOPhilippinesHoldingsMember 2021-01-01 2021-12-31 0000887225 kep:KEPCONuclearFuelMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOKDNMember 2021-01-01 2021-12-31 0000887225 kep:KOWEPOLaoInternationalMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CostOfSalesMember 2021-01-01 2021-12-31 0000887225 ifrs-full:SellingGeneralAndAdministrativeExpenseMember 2021-01-01 2021-12-31 0000887225 ifrs-full:IssuedCapitalMember 2021-01-01 2021-12-31 0000887225 ifrs-full:RetainedEarningsMember 2021-01-01 2021-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2021-01-01 2021-12-31 0000887225 ifrs-full:EquityAttributableToOwnersOfParentMember 2021-01-01 2021-12-31 0000887225 ifrs-full:NoncontrollingInterestsMember 2021-01-01 2021-12-31 0000887225 kep:PlantMaintenanceEngineeringServiceMember ifrs-full:OperatingSegmentsMember 2021-01-01 2021-12-31 0000887225 kep:TransmissionAndDistributionMember ifrs-full:OperatingSegmentsMember 2021-01-01 2021-12-31 0000887225 kep:ElectricPowerGenerationNuclearMember ifrs-full:OperatingSegmentsMember 2021-01-01 2021-12-31 0000887225 kep:ElectricPowerGenerationNonNuclearMember ifrs-full:OperatingSegmentsMember 2021-01-01 2021-12-31 0000887225 ifrs-full:AllOtherSegmentsMember ifrs-full:OperatingSegmentsMember 2021-01-01 2021-12-31 0000887225 ifrs-full:MaterialReconcilingItemsMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ForwardContractMember kep:NotDesignatedAsHedgingInstrumentMember 2021-01-01 2021-12-31 0000887225 ifrs-full:InterestRateSwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2021-01-01 2021-12-31 0000887225 ifrs-full:InterestRateSwapContractMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CurrencySwapContractMember 2021-01-01 2021-12-31 0000887225 ifrs-full:OptionContractMember kep:NotDesignatedAsHedgingInstrumentMember 2021-01-01 2021-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember ifrs-full:InterestRateSwapContractMember 2021-01-01 2021-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember ifrs-full:CurrencySwapContractMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CurrencySwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2021-01-01 2021-12-31 0000887225 kep:ChuncheonEnergyMember 2021-01-01 2021-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:YeonggwangWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:SamYangPhotovoltaicPowerMember 2021-01-01 2021-12-31 0000887225 kep:PyeongchangWindPowerCoLtdOneMember 2021-01-01 2021-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:GangneungSacheonFuelCellMember 2021-01-01 2021-12-31 0000887225 kep:ElevenAssociatesOverseasMember 2021-01-01 2021-12-31 0000887225 kep:KostureMember 2021-01-01 2021-12-31 0000887225 kep:KEPCOUhdeMember 2021-01-01 2021-12-31 0000887225 kep:YuDangSolarCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:Ud4mMember 2021-01-01 2021-12-31 0000887225 kep:DongbuHighwaySolarMember 2021-01-01 2021-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:SeobuHighwaySolarMember 2021-01-01 2021-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2021-01-01 2021-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2021-01-01 2021-12-31 0000887225 kep:GoDeokCleanEnergyCoLtd.Member 2021-01-01 2021-12-31 0000887225 kep:GoheungNewEnergyMember 2021-01-01 2021-12-31 0000887225 kep:NaepoGreenEnergyMember 2021-01-01 2021-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:BusanGreenEnergyMember 2021-01-01 2021-12-31 0000887225 kep:KNHSolarMember 2021-01-01 2021-12-31 0000887225 kep:ChangjukWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:ChuncheonGreenEnergyMember 2021-01-01 2021-12-31 0000887225 kep:GoseongGreenPowerMember 2021-01-01 2021-12-31 0000887225 kep:PyeongchangWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:DaeryunPowerMember 2021-01-01 2021-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:DummyMember 2021-01-01 2021-12-31 0000887225 kep:YTNMember 2021-01-01 2021-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2021-01-01 2021-12-31 0000887225 kep:KoreaElectricVehicleChargeServiceMember 2021-01-01 2021-12-31 0000887225 kep:KoreaGasCorporationMember 2021-01-01 2021-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2021-01-01 2021-12-31 0000887225 kep:GwangyangGreenEnergyMember 2021-01-01 2021-12-31 0000887225 kep:DaeguPhotovoltaicMember 2021-01-01 2021-12-31 0000887225 kep:GunsanBioEnergyMember 2021-01-01 2021-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2021-01-01 2021-12-31 0000887225 kep:YangyangSuriWindPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:BitgoelEcoEnergyMember 2021-01-01 2021-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:SolaseadoSolarPowerMember 2021-01-01 2021-12-31 0000887225 kep:HonamWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2021-01-01 2021-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicMember 2021-01-01 2021-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2021-01-01 2021-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2021-01-01 2021-12-31 0000887225 kep:CheongjuEcoParkMember 2021-01-01 2021-12-31 0000887225 kep:EnergycoCoMember 2021-01-01 2021-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:KoreaDevelopmentBankMember 2021-01-01 2021-12-31 0000887225 kep:EumseongEcoParkMember 2021-01-01 2021-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:GeumsungsanWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:OmisanWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:GunsanLandSolarMember 2021-01-01 2021-12-31 0000887225 kep:HankookElectricPowerInformationMember 2021-01-01 2021-12-31 0000887225 kep:SuredatalabMember 2021-01-01 2021-12-31 0000887225 kep:AnjwaSmartFarmSolarCityMember 2021-01-01 2021-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2021-01-01 2021-12-31 0000887225 kep:FortyOneAssociatesOverseasMember 2021-01-01 2021-12-31 0000887225 kep:DangjinEcoPowerMember 2021-01-01 2021-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2021-01-01 2021-12-31 0000887225 kep:ChungsongmeonBongsanWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:BitsolarEnergyMember 2021-01-01 2021-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2021-01-01 2021-12-31 0000887225 kep:NoeulGreenEnergyMember 2021-01-01 2021-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:GangwonWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2021-01-01 2021-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember 2021-01-01 2021-12-31 0000887225 kep:PNDSolarMember 2021-01-01 2021-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 ifrs-full:TradeReceivablesMember 2021-01-01 2021-12-31 0000887225 kep:OtherReceivablesMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ForeignCountriesMember kep:HeatSupplyMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:ElectricityDistributionMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:ElectricityDistributionMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ForeignCountriesMember kep:OthersMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CountryOfDomicileMember kep:HeatSupplyMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CountryOfDomicileMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ForeignCountriesMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CountryOfDomicileMember kep:OthersMember 2021-01-01 2021-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.Member 2021-01-01 2021-12-31 0000887225 kep:SeokmunEnergyMember 2021-01-01 2021-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:KoreaPowerExchangeMember 2021-01-01 2021-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2021-01-01 2021-12-31 0000887225 kep:TaebaekWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:ItrMember 2021-01-01 2021-12-31 0000887225 kep:StnCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:SPowerMember 2021-01-01 2021-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2021-01-01 2021-12-31 0000887225 kep:KWNuclearComponentsMember 2021-01-01 2021-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2021-01-01 2021-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CorporateLoansMember 2021-01-01 2021-12-31 0000887225 kep:OtherFinancialAssetsCategoryMember 2021-01-01 2021-12-31 0000887225 kep:LongTermFinancialInstrumentsCategoryMember 2021-01-01 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2021-01-01 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember 2021-01-01 2021-12-31 0000887225 ifrs-full:TradeReceivablesMember 2021-01-01 2021-12-31 0000887225 kep:ShortTermFinancialInstrumentsCategoryMember 2021-01-01 2021-12-31 0000887225 kep:CashAndCashEquivalentsMember 2021-01-01 2021-12-31 0000887225 ifrs-full:LoansAndReceivablesCategoryMember 2021-01-01 2021-12-31 0000887225 kep:GangneungEcoPowerMember 2021-01-01 2021-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMember 2021-01-01 2021-12-31 0000887225 kep:JeongamWindPowerMember 2021-01-01 2021-12-31 0000887225 kep:HyundaiGreenPowerMember 2021-01-01 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2021-01-01 2021-12-31 0000887225 kep:DerivativeAssetsApplyingHedgeAccountingCategoryMember 2021-01-01 2021-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember 2021-01-01 2021-12-31 0000887225 kep:DerivativeLiabilitiesapplyinghedgeaccountingCategoryMember 2021-01-01 2021-12-31 0000887225 kep:KAPESMember 2021-01-01 2021-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2021-01-01 2021-12-31 0000887225 kep:OtherSubsidiariesMember 2021-01-01 2021-12-31 0000887225 kep:IncheonNewPowerMember 2021-01-01 2021-12-31 0000887225 kep:SpowerChileSpaMember 2021-01-01 2021-12-31 0000887225 kep:PlatformnMember 2021-01-01 2021-12-31 0000887225 kep:CheongnaEnergyMember 2021-01-01 2021-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2021-01-01 2021-12-31 0000887225 kep:GGuruMember 2021-01-01 2021-12-31 0000887225 kep:YaksuESSLtdMember 2021-01-01 2021-12-31 0000887225 kep:GoesanSolarParkMember 2021-01-01 2021-12-31 0000887225 ifrs-full:OperatingSegmentsMember 2021-01-01 2021-12-31 0000887225 kep:WangSiangEngineeringMember 2021-01-01 2021-12-31 0000887225 kep:GreenRadiationCoLimitedMember 2021-01-01 2021-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:PerformanceObligationsSatisfiedAtPointInTimeMember 2021-01-01 2021-12-31 0000887225 ifrs-full:PerformanceObligationsSatisfiedOverTimeMember ifrs-full:CountryOfDomicileMember 2021-01-01 2021-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:PerformanceObligationsSatisfiedAtPointInTimeMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:PerformanceObligationsSatisfiedOverTimeMember 2021-01-01 2021-12-31 0000887225 kep:OtherGainsLossesMember 2021-01-01 2021-12-31 0000887225 ifrs-full:TopOfRangeMember 2021-01-01 2021-12-31 0000887225 ifrs-full:BottomOfRangeMember 2021-01-01 2021-12-31 0000887225 kep:ConstructionInProcessAndOthersMember 2021-01-01 2021-12-31 0000887225 ifrs-full:OrdinarySharesMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2021-01-01 2021-12-31 0000887225 ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember 2021-01-01 2021-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2021-01-01 2021-12-31 0000887225 kep:InventoriesMember 2021-01-01 2021-12-31 0000887225 kep:AccrualsMember 2021-01-01 2021-12-31 0000887225 ifrs-full:LongtermBorrowingsMember 2021-01-01 2021-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2021-01-01 2021-12-31 0000887225 kep:ConstructionInProgressAndOthersMember 2021-01-01 2021-12-31 0000887225 kep:KOSPOAustraliaMember 2022-01-01 2022-12-31 0000887225 kep:ChangjukWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:KepcoForPowerCompanyMember 2022-01-01 2022-12-31 0000887225 kep:ColumboolaSolarFarmHoldCoPty.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:EwpAustraliaPty.LtdMember 2022-01-01 2022-12-31 0000887225 kep:UiCarbonneutralityFundMember 2022-01-01 2022-12-31 0000887225 kep:ConchoValleySolarLlcMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOCSCMember 2022-01-01 2022-12-31 0000887225 kep:KOAKPowerLimitedMember 2022-01-01 2022-12-31 0000887225 kep:KospoTrumbullLlcMember 2022-01-01 2022-12-31 0000887225 kep:KepcoForMaintenanceCompanyMember 2022-01-01 2022-12-31 0000887225 kep:KepcoHoldingCompanyMember 2022-01-01 2022-12-31 0000887225 kep:JWindFirstLlcMember 2022-01-01 2022-12-31 0000887225 kep:DigitalInnovationGrowthFundMember 2022-01-01 2022-12-31 0000887225 kep:WesternPowerChanggiSolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KaPowerLimitedMember 2022-01-01 2022-12-31 0000887225 kep:KhnpSpainS.l.Member 2022-01-01 2022-12-31 0000887225 kep:YeongdeokSunriseWindPowerCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:MagnaEnergyNewIndustrialFundMember 2022-01-01 2022-12-31 0000887225 kep:KPSPartnersCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOECServiceCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:MohaSolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:OgiriSolarPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KSOLARSHINANCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GuamUkuduPowerLLCMember 2022-01-01 2022-12-31 0000887225 kep:PajuEcoenergyMember 2022-01-01 2022-12-31 0000887225 kep:HaenanumEnergyFundMember 2022-01-01 2022-12-31 0000887225 kep:KOMIPOEuropeBVMember 2022-01-01 2022-12-31 0000887225 kep:MangilaoIntermediateHoldingsMember 2022-01-01 2022-12-31 0000887225 kep:SEGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:SecutecMember 2022-01-01 2022-12-31 0000887225 kep:FirstkeepersMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOFMSMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOMCSMember 2022-01-01 2022-12-31 0000887225 kep:TamraOffshoreWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:NambuUSAMember 2022-01-01 2022-12-31 0000887225 kep:KOSPOUSAMember 2022-01-01 2022-12-31 0000887225 kep:KNFPartnersMember 2022-01-01 2022-12-31 0000887225 kep:PT.KOMIPOEnergyIndonesiaMember 2022-01-01 2022-12-31 0000887225 kep:EWPServiceCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KOSPOServiceCo.LtdMember 2022-01-01 2022-12-31 0000887225 kep:KOWEPOServiceCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KOMIPOServiceCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KOENServiceCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KHNPUSALLCMember 2022-01-01 2022-12-31 0000887225 kep:KOMIPOVanphongPowerServiceLLCMember 2022-01-01 2022-12-31 0000887225 kep:EnergyInnovationFundIMember 2022-01-01 2022-12-31 0000887225 kep:KhnpChileSpaMember 2022-01-01 2022-12-31 0000887225 kep:YeongYangApollonPhotovoltaicCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:YeongYangCorporationCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:SolarvaderCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:YeongYangInnovationCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:YeongYangHorusPhotovoltaicCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:YeongYangSolarManagementCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:LsgHydroPowerLimitedMember 2022-01-01 2022-12-31 0000887225 kep:KoenBioCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KomipoEnergySolutionAmericaLlcMember 2022-01-01 2022-12-31 0000887225 kep:ElaraInvestmentHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:ElaraEquityHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:ElaraClassBHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:ElaraClassBMemberLlcMember 2022-01-01 2022-12-31 0000887225 kep:ElaraDevelopmentHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:KomipoDevelopmentLlcFormerlyElaraDevelopmentLlcMember 2022-01-01 2022-12-31 0000887225 kep:ElaraEnergyHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:ElaraEnergyProjectLlcMember 2022-01-01 2022-12-31 0000887225 kep:KomipoIberianSolarGroupS.l.u.Member 2022-01-01 2022-12-31 0000887225 kep:JeongamWindPowerCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KowepoEuropeB.v.Member 2022-01-01 2022-12-31 0000887225 kep:CvsEquityHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:CvsClassBHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:CvsDevelopmentHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:CvsDevelopmentLlcMember 2022-01-01 2022-12-31 0000887225 kep:CvsClassBMemberLlcMember 2022-01-01 2022-12-31 0000887225 kep:CvsEnergyHoldingsLlcMember 2022-01-01 2022-12-31 0000887225 kep:ConchoValleyEnergyLlcMember 2022-01-01 2022-12-31 0000887225 kep:FairhavenESSLLCMember 2022-01-01 2022-12-31 0000887225 kep:EWPESSHoldingsLLCMember 2022-01-01 2022-12-31 0000887225 kep:ColumboolaSolarFarmFinCoPtyLtdMember 2022-01-01 2022-12-31 0000887225 kep:ColumboolaSolarFarmOpTrustMember 2022-01-01 2022-12-31 0000887225 kep:ColumboolaSolarFarmNomineesPtyLtdMember 2022-01-01 2022-12-31 0000887225 kep:KowepoHoldingLimitedMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOKPSSouthAfricaPtyLtdMember 2022-01-01 2022-12-31 0000887225 kep:ChileSolarJVSpAMember 2022-01-01 2022-12-31 0000887225 kep:KOMIPOAustraliaMember 2022-01-01 2022-12-31 0000887225 kep:KOWEPOAustraliaMember 2022-01-01 2022-12-31 0000887225 kep:KHNPCanadaEnergyMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOBylongAustraliaMember 2022-01-01 2022-12-31 0000887225 kep:KOWEPOInternationalCorporationMember 2022-01-01 2022-12-31 0000887225 kep:KOSPOJordanMember 2022-01-01 2022-12-31 0000887225 kep:EWPAmericaMember 2022-01-01 2022-12-31 0000887225 kep:EWPRenewableMember 2022-01-01 2022-12-31 0000887225 kep:BSKENewIndustryFundXMember 2022-01-01 2022-12-31 0000887225 kep:PTKoreaEnergyIndonesiaMember 2022-01-01 2022-12-31 0000887225 kep:KOLATSpAMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOCaliforniaLLCMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOMojaveHoldingsLLCMember 2022-01-01 2022-12-31 0000887225 kep:IncheonFuelCellCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KNFCanadaEnergyLimitedMember 2022-01-01 2022-12-31 0000887225 kep:EWPBarbados1SRLMember 2022-01-01 2022-12-31 0000887225 kep:CaliforniaPowerHoldingsMember 2022-01-01 2022-12-31 0000887225 kep:SonghyunENewIndustryFundMember 2022-01-01 2022-12-31 0000887225 kep:ENewIndustryLBFundMember 2022-01-01 2022-12-31 0000887225 kep:BSKENewIndustryFundVIIMember 2022-01-01 2022-12-31 0000887225 kep:PTSiborpaEcoPowerMember 2022-01-01 2022-12-31 0000887225 kep:JejuHanlimOffshoreWindCoMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOLGCNSMangilaoSolarMember 2022-01-01 2022-12-31 0000887225 kep:MangilaoInvestmentMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOLGCNSMangilaoHoldingsMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOUSMember 2022-01-01 2022-12-31 0000887225 kep:KOWEPOLaoInternationalMember 2022-01-01 2022-12-31 0000887225 kep:EWPBylongMember 2022-01-01 2022-12-31 0000887225 kep:KOSPOBylongMember 2022-01-01 2022-12-31 0000887225 kep:KOWEPOBylongMember 2022-01-01 2022-12-31 0000887225 kep:KOMIPOBylongMember 2022-01-01 2022-12-31 0000887225 kep:KOENBylongMember 2022-01-01 2022-12-31 0000887225 kep:EnergyNewIndustrySpecializedInvestmentPrivateInvestmentTrustMember 2022-01-01 2022-12-31 0000887225 kep:KOSPOPowerServicesLimitadaMember 2022-01-01 2022-12-31 0000887225 kep:SolarSchoolPlantMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOEnergySolutionMember 2022-01-01 2022-12-31 0000887225 kep:ChitoseSolarPowerPlantMember 2022-01-01 2022-12-31 0000887225 kep:KOSPOYoungnamPowerMember 2022-01-01 2022-12-31 0000887225 kep:FujeijWindPowerCompanyMember 2022-01-01 2022-12-31 0000887225 kep:HeeMangSunlightPowerMember 2022-01-01 2022-12-31 0000887225 kep:PTKOWEPOSumselOperationandMaintenanceServicesMember 2022-01-01 2022-12-31 0000887225 kep:KOSPOChileSpAMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOKPSPhilippinesCorpMember 2022-01-01 2022-12-31 0000887225 kep:CommerceandIndustryEnergyMember 2022-01-01 2022-12-31 0000887225 kep:KOSEPMaterialMember 2022-01-01 2022-12-31 0000887225 kep:MiraPowerLimitedMember 2022-01-01 2022-12-31 0000887225 kep:GlobalEnergyPioneerBVMember 2022-01-01 2022-12-31 0000887225 kep:GlobalOnePioneerBVMember 2022-01-01 2022-12-31 0000887225 kep:KoreaOffshoreWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:KEPCONetherlandsJ3BVMember 2022-01-01 2022-12-31 0000887225 kep:PTEWPIndonesiaMember 2022-01-01 2022-12-31 0000887225 kep:KOMIPOAmericaMember 2022-01-01 2022-12-31 0000887225 kep:GyeongjuWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:PTTanggamusElectricPowerMember 2022-01-01 2022-12-31 0000887225 kep:GyeonggiGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:PTCirebonPowerServiceMember 2022-01-01 2022-12-31 0000887225 kep:PTKOMIPOPembangkitanJawaBaliMember 2022-01-01 2022-12-31 0000887225 kep:KEPCONetherlandsS3BVMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOEnergyServiceCompanyMember 2022-01-01 2022-12-31 0000887225 kep:KSTElectricPowerCompanyMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOHoldingsdeMexicoMember 2022-01-01 2022-12-31 0000887225 kep:KoreaWaterburyUraniumLimitedPartnershipMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOInternationalHongKongMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOInternationalPhilippinesMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOGansuInternationalMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOPhilippinesHoldingsMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOPhilippinesCorporationMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOIlijanCorporationMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOLebanonSARLMember 2022-01-01 2022-12-31 0000887225 kep:KEPCONeimengguInternationalMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOShanxiInternationalMember 2022-01-01 2022-12-31 0000887225 kep:KOMIPOGlobalPteMember 2022-01-01 2022-12-31 0000887225 kep:KEPCONetherlandsBVMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOAustraliaMember 2022-01-01 2022-12-31 0000887225 kep:KOSEPAustraliaMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOKDNMember 2022-01-01 2022-12-31 0000887225 kep:KEPCONuclearFuelMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOPlantServiceEngineeringMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOEngineeringConstructionCompanyMember 2022-01-01 2022-12-31 0000887225 kep:KoreaEastWestPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaSouthernPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaWesternPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaMidlandPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaSoutheastPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaHydroNuclearPowerMember 2022-01-01 2022-12-31 0000887225 kep:QatranaElectricPowerCompanyMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOMiddleEastHoldingCompanyMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ComputerSoftwareMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:OtherIntangibleAssetsMember 2022-01-01 2022-12-31 0000887225 kep:GreenhouseGasEmissionsRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:IntangibleAssetsMember 2022-01-01 2022-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:ComputerSoftwareMember 2022-01-01 2022-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:OtherIntangibleAssetsMember 2022-01-01 2022-12-31 0000887225 kep:LeaseAgreementsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MiningRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:EwpAmericaInc.Member 2022-01-01 2022-12-31 0000887225 kep:KepcoEnergySolutionCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KepcoSolarCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 ifrs-full:SubsidiariesMember 2022-01-01 2022-12-31 0000887225 kep:KomipoGlobalPteLtdMember 2022-01-01 2022-12-31 0000887225 kep:KSTElectricPowerCompanySAPIdeCVMember 2022-01-01 2022-12-31 0000887225 kep:KepcoNeimengguInternationalLtdMember 2022-01-01 2022-12-31 0000887225 kep:KepcoMcsCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KospoAustraliaPtyLtdMember 2022-01-01 2022-12-31 0000887225 kep:ChangjukWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:Fy17aMember 2022-01-01 2022-12-31 0000887225 kep:Fy14Member 2022-01-01 2022-12-31 0000887225 kep:Fy17bMember 2022-01-01 2022-12-31 0000887225 kep:Fy15Member 2022-01-01 2022-12-31 0000887225 kep:Fy17cMember 2022-01-01 2022-12-31 0000887225 kep:Fy04Member 2022-01-01 2022-12-31 0000887225 kep:Fy22fMember 2022-01-01 2022-12-31 0000887225 kep:Fy20cMember 2022-01-01 2022-12-31 0000887225 kep:Fy97Member 2022-01-01 2022-12-31 0000887225 kep:Fy18bMember 2022-01-01 2022-12-31 0000887225 kep:Fy19cMember 2022-01-01 2022-12-31 0000887225 kep:Fy19eMember 2022-01-01 2022-12-31 0000887225 kep:Fy20bMember 2022-01-01 2022-12-31 0000887225 kep:Fy96Member 2022-01-01 2022-12-31 0000887225 kep:Fy20dMember 2022-01-01 2022-12-31 0000887225 kep:Fy21dMember 2022-01-01 2022-12-31 0000887225 kep:Fy22aMember 2022-01-01 2022-12-31 0000887225 kep:Fy22bMember 2022-01-01 2022-12-31 0000887225 kep:Fy22cMember 2022-01-01 2022-12-31 0000887225 kep:Fy22dMember 2022-01-01 2022-12-31 0000887225 kep:Fy22eMember 2022-01-01 2022-12-31 0000887225 kep:Fy18aMember 2022-01-01 2022-12-31 0000887225 kep:Fy19dMember 2022-01-01 2022-12-31 0000887225 kep:Fy19aMember 2022-01-01 2022-12-31 0000887225 kep:Fy20aMember 2022-01-01 2022-12-31 0000887225 kep:Fy19bMember 2022-01-01 2022-12-31 0000887225 kep:Fy22gMember 2022-01-01 2022-12-31 0000887225 kep:Fy21cMember 2022-01-01 2022-12-31 0000887225 kep:Fy21bMember 2022-01-01 2022-12-31 0000887225 kep:Fy21aMember 2022-01-01 2022-12-31 0000887225 kep:TransmissionRegionalSupportProgramProvisionsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialGuaranteeContractsMember 2022-01-01 2022-12-31 0000887225 kep:ProvisionsForRpsMember 2022-01-01 2022-12-31 0000887225 kep:ProvisionsForGreenhouseGasEmissionsObligationsMember 2022-01-01 2022-12-31 0000887225 kep:OtherRecoveryProvisionsMember 2022-01-01 2022-12-31 0000887225 kep:PowerPlantRegionalSupportProgramProvisionsMember 2022-01-01 2022-12-31 0000887225 kep:WasteRecoveryProvisionsMember 2022-01-01 2022-12-31 0000887225 kep:SpentFuelRecoveryProvisionsMember 2022-01-01 2022-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LegalProceedingsProvisionMember 2022-01-01 2022-12-31 0000887225 kep:ProvisionsForEmployeeBenefitsMember 2022-01-01 2022-12-31 0000887225 kep:PcbsRecoveryProvisionsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MiscellaneousOtherProvisionsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:SellingGeneralAndAdministrativeExpenseMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CostOfSalesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:PresentValueOfDefinedBenefitObligationMember 2022-01-01 2022-12-31 0000887225 kep:SpentFuelMember 2022-01-01 2022-12-31 0000887225 kep:RadioactiveWasteMember 2022-01-01 2022-12-31 0000887225 kep:IncreaseDecreaseOfIncomeBeforeIncomeTaxMember 2022-01-01 2022-12-31 0000887225 kep:ShareholdersEquityMember 2022-01-01 2022-12-31 0000887225 ifrs-full:NoncontrollingInterestsMember 2022-01-01 2022-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:EquityAttributableToOwnersOfParentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:IssuedCapitalMember 2022-01-01 2022-12-31 0000887225 ifrs-full:RetainedEarningsMember 2022-01-01 2022-12-31 0000887225 kep:ElectricPowerGenerationNuclearMember ifrs-full:OperatingSegmentsMember 2022-01-01 2022-12-31 0000887225 kep:TransmissionAndDistributionMember ifrs-full:OperatingSegmentsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MaterialReconcilingItemsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:AllOtherSegmentsMember ifrs-full:OperatingSegmentsMember 2022-01-01 2022-12-31 0000887225 kep:PlantMaintenanceEngineeringServiceMember ifrs-full:OperatingSegmentsMember 2022-01-01 2022-12-31 0000887225 kep:ElectricPowerGenerationNonNuclearMember ifrs-full:OperatingSegmentsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ForwardContractMember kep:NotDesignatedAsHedgingInstrumentMember 2022-01-01 2022-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember ifrs-full:InterestRateSwapContractMember 2022-01-01 2022-12-31 0000887225 ifrs-full:InterestRateSwapContractMember 2022-01-01 2022-12-31 0000887225 ifrs-full:InterestRateSwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CurrencySwapContractMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OptionContractMember kep:NotDesignatedAsHedgingInstrumentMember 2022-01-01 2022-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember ifrs-full:CurrencySwapContractMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CurrencySwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2022-01-01 2022-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ChuncheonGreenEnergyCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:YeomsubongWindPowerCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:AnjwaSmartFarmSolarCityCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SureDataLabCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SEPCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:HankookElectricPowerInformationCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:TronixCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:O2BGlobalCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GGuruCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:Ud4mMember 2022-01-01 2022-12-31 0000887225 kep:KoreaEnergyDataCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:PlatformnMember 2022-01-01 2022-12-31 0000887225 kep:GreenRadiationMember 2022-01-01 2022-12-31 0000887225 kep:BoulderSolarMember 2022-01-01 2022-12-31 0000887225 kep:Pt.CirebonEnergiPrasaranaMember 2022-01-01 2022-12-31 0000887225 kep:HaeparangEnergyCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:SaemangeumSebitPowerPlantCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2022-01-01 2022-12-31 0000887225 kep:KostureCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DaewonGreenEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:IndeckNilesDevelopmentLLCMember 2022-01-01 2022-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:IndeckNilesAssetManagementLLCMember 2022-01-01 2022-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2022-01-01 2022-12-31 0000887225 kep:StnCo.Ltd.FormerlyStructureTestNetworkCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:SeobuHighwaySolarMember 2022-01-01 2022-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GangneungSacheonFuelCellCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DongbuHighwaySolarMember 2022-01-01 2022-12-31 0000887225 kep:YuDangSolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2022-01-01 2022-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GoDeokCleanEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GoesanSolarParkCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2022-01-01 2022-12-31 0000887225 kep:YangguFloatingPhotovoltaicPowerPlantIncMember 2022-01-01 2022-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratoryMember 2022-01-01 2022-12-31 0000887225 kep:ScEgMember 2022-01-01 2022-12-31 0000887225 kep:RecsInnovationCo.Ltd.FormerlyWangSanEngineering.Co.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:AceMember 2022-01-01 2022-12-31 0000887225 kep:EnvironmentAndEnergyMember 2022-01-01 2022-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2022-01-01 2022-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KNHSolarMember 2022-01-01 2022-12-31 0000887225 kep:KNOCNigerianWestOilMember 2022-01-01 2022-12-31 0000887225 kep:KNOCNigerianEastOilMember 2022-01-01 2022-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:YTNMember 2022-01-01 2022-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2022-01-01 2022-12-31 0000887225 kep:HyundaiGreenPowerMember 2022-01-01 2022-12-31 0000887225 kep:TaebaekWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:PNDSolarMember 2022-01-01 2022-12-31 0000887225 kep:KoreaPowerExchangeMember 2022-01-01 2022-12-31 0000887225 kep:PioneerGasPowerMember 2022-01-01 2022-12-31 0000887225 kep:XePianXeNamnoyPowerMember 2022-01-01 2022-12-31 0000887225 kep:GemengInternationalEnergyMember 2022-01-01 2022-12-31 0000887225 kep:DaeryunPowerMember 2022-01-01 2022-12-31 0000887225 kep:SPCPowerCorporationMember 2022-01-01 2022-12-31 0000887225 kep:PTCirebonElectricPowerMember 2022-01-01 2022-12-31 0000887225 kep:GangneungEcoPowerMember 2022-01-01 2022-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2022-01-01 2022-12-31 0000887225 kep:PTWampuElectricPowerMember 2022-01-01 2022-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimiteMember 2022-01-01 2022-12-31 0000887225 kep:YaksuESSLtdMember 2022-01-01 2022-12-31 0000887225 kep:DaegucleanEnergyMember 2022-01-01 2022-12-31 0000887225 kep:GangwonWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:PTMutiaraJawaMember 2022-01-01 2022-12-31 0000887225 kep:DaeguPhotovoltaicMember 2022-01-01 2022-12-31 0000887225 kep:GoseongGreenPowerMember 2022-01-01 2022-12-31 0000887225 kep:GwangyangGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:KoreaElectricPowerCorporationFundMember 2022-01-01 2022-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2022-01-01 2022-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GunsanBioEnergyMember 2022-01-01 2022-12-31 0000887225 kep:HansuwonKnpCoLtdFormerlyKoreaNuclearPartnersCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KoreaGasCorporationMember 2022-01-01 2022-12-31 0000887225 kep:SPowerMember 2022-01-01 2022-12-31 0000887225 kep:DongducheonDreamPowerMember 2022-01-01 2022-12-31 0000887225 kep:PTBayanResourcesTBKMember 2022-01-01 2022-12-31 0000887225 kep:SamcheokEcoMaterialsCo.LimitedMember 2022-01-01 2022-12-31 0000887225 kep:JinbhuvishPowerGenerationPvtMember 2022-01-01 2022-12-31 0000887225 kep:EurasiaEnergyHoldingsMember 2022-01-01 2022-12-31 0000887225 kep:NoeulGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:BusanGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ITRCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOSPCPowerCorporationMember 2022-01-01 2022-12-31 0000887225 kep:GansuDatangYumenWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOUhdeMember 2022-01-01 2022-12-31 0000887225 kep:WaterburyLakeUraniumLPMember 2022-01-01 2022-12-31 0000887225 kep:ShuweihatAsiaPowerInvestmentBVMember 2022-01-01 2022-12-31 0000887225 kep:ASMBGInvesticiiADMember 2022-01-01 2022-12-31 0000887225 kep:KVHoldingsMember 2022-01-01 2022-12-31 0000887225 kep:MOMENTUMMember 2022-01-01 2022-12-31 0000887225 kep:KAPESMember 2022-01-01 2022-12-31 0000887225 kep:GoheungNewEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DEEnergiaSpAMember 2022-01-01 2022-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2022-01-01 2022-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2022-01-01 2022-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2022-01-01 2022-12-31 0000887225 kep:GeumsungsanWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SolaseadoSolarPowerMember 2022-01-01 2022-12-31 0000887225 kep:StavroHoldingIIABMember 2022-01-01 2022-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember 2022-01-01 2022-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISSDECVMember 2022-01-01 2022-12-31 0000887225 kep:HORUSSOLARSADECVMember 2022-01-01 2022-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DangjinEcoPowerMember 2022-01-01 2022-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ChesterSolarISpAMember 2022-01-01 2022-12-31 0000887225 kep:ChungsongmeonBongSanWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember 2022-01-01 2022-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:SeungmunGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:SpowerChileSpaMember 2022-01-01 2022-12-31 0000887225 kep:TrumbullAssetManagementLlcMember 2022-01-01 2022-12-31 0000887225 kep:PungbackWindFarmCorporationMember 2022-01-01 2022-12-31 0000887225 kep:HasamiWindFarmCorporationMember 2022-01-01 2022-12-31 0000887225 kep:ChileSolarJVSpAMember 2022-01-01 2022-12-31 0000887225 kep:RabighElectricityMember 2022-01-01 2022-12-31 0000887225 kep:DatangChifengRenewablePowerMember 2022-01-01 2022-12-31 0000887225 kep:KWNuclearComponentsMember 2022-01-01 2022-12-31 0000887225 kep:RabighOperationMaintenanceMember 2022-01-01 2022-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2022-01-01 2022-12-31 0000887225 kep:HonamWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2022-01-01 2022-12-31 0000887225 kep:AmmanAsiaElectricPowerMember 2022-01-01 2022-12-31 0000887225 kep:SouthJamaicaPowerCompanyLimitedMember 2022-01-01 2022-12-31 0000887225 kep:BarakahOneCompanyMember 2022-01-01 2022-12-31 0000887225 kep:NghiSon2PowerMember 2022-01-01 2022-12-31 0000887225 kep:REPioneerHoldingsLLCMember 2022-01-01 2022-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2022-01-01 2022-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2022-01-01 2022-12-31 0000887225 kep:ChesterSolarIVSpAMember 2022-01-01 2022-12-31 0000887225 kep:REHolidayHoldingsLLCMember 2022-01-01 2022-12-31 0000887225 kep:DatangKEPCOChaoyangRenewablePowerMember 2022-01-01 2022-12-31 0000887225 kep:JamaicaPublicServiceMember 2022-01-01 2022-12-31 0000887225 kep:PTTanjungPowerIndonesiaMember 2022-01-01 2022-12-31 0000887225 kep:NawahEnergyMember 2022-01-01 2022-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:RESTechnologyADMember 2022-01-01 2022-12-31 0000887225 kep:ShuweihatAsiaOperationMaintenanceCompanyMember 2022-01-01 2022-12-31 0000887225 kep:SeokmunEnergyMember 2022-01-01 2022-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2022-01-01 2022-12-31 0000887225 kep:ChesterSolarVSpAMember 2022-01-01 2022-12-31 0000887225 kep:ChuncheonEnergyMember 2022-01-01 2022-12-31 0000887225 kep:IncheonNewPowerMember 2022-01-01 2022-12-31 0000887225 kep:DaehanWindPowerPSCMember 2022-01-01 2022-12-31 0000887225 kep:REBarrenRidge1HoldingsLLCMember 2022-01-01 2022-12-31 0000887225 kep:YeonggwangWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:DiegoDeAlmagroSolarSpAMember 2022-01-01 2022-12-31 0000887225 kep:REAstoria2LandCoLLCMember 2022-01-01 2022-12-31 0000887225 kep:KelarSAMember 2022-01-01 2022-12-31 0000887225 kep:KIAMCOKOWEPOBannertonHoldCoPtyLtdMember 2022-01-01 2022-12-31 0000887225 kep:LaurelSpAMember 2022-01-01 2022-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:REBarrenRidgeLandCoLLCMember 2022-01-01 2022-12-31 0000887225 kep:ChangwonNuriEnergyMember 2022-01-01 2022-12-31 0000887225 kep:KASINVESTMENTILLCMember 2022-01-01 2022-12-31 0000887225 kep:NaepoGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:KASINVESTMENTIILLCMember 2022-01-01 2022-12-31 0000887225 kep:OneEnergyAsiaLimitedMember 2022-01-01 2022-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GuadalupeSolarSpaMember 2022-01-01 2022-12-31 0000887225 kep:EnergycoCoLtdFormerlyEnergycoLlcMember 2022-01-01 2022-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:CAESLLCMember 2022-01-01 2022-12-31 0000887225 kep:BitsolarEnergyMember 2022-01-01 2022-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2022-01-01 2022-12-31 0000887225 kep:PulauIndahOAndMSdnBhdMember 2022-01-01 2022-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingS.lMember 2022-01-01 2022-12-31 0000887225 kep:OmisanWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:CheongnaEnergyMember 2022-01-01 2022-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ShinhanBNPPPrivateInvestmentTrustEastWestSunlightDreamMember 2022-01-01 2022-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:PTBaritoWahanaTenagaMember 2022-01-01 2022-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2022-01-01 2022-12-31 0000887225 kep:SolarPhilippinesCalataganCorporationMember 2022-01-01 2022-12-31 0000887225 kep:JaeunResidentWindPowerPlantCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:PyeongchangWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:EumseongEcoParkMember 2022-01-01 2022-12-31 0000887225 kep:SongsanGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2022-01-01 2022-12-31 0000887225 kep:CapmanLynxScaSicarMember 2022-01-01 2022-12-31 0000887225 kep:GunsanLandSolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:CheongjuEcoParkCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ChuncheonEnergyMember 2022-01-01 2022-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:YeonggwangWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:SamYangPhotovoltaicPowerMember 2022-01-01 2022-12-31 0000887225 kep:PyeongchangWindPowerCoLtdOneMember 2022-01-01 2022-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GangneungSacheonFuelCellMember 2022-01-01 2022-12-31 0000887225 kep:ElevenAssociatesOverseasMember 2022-01-01 2022-12-31 0000887225 kep:KostureMember 2022-01-01 2022-12-31 0000887225 kep:YuDangSolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GoDeokCleanEnergyCoLtd.Member 2022-01-01 2022-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KEPCOUhdeMember 2022-01-01 2022-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:HankookElectricPowerInformationMember 2022-01-01 2022-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2022-01-01 2022-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2022-01-01 2022-12-31 0000887225 kep:SeobuHighwaySolarMember 2022-01-01 2022-12-31 0000887225 kep:GoheungNewEnergyMember 2022-01-01 2022-12-31 0000887225 kep:NaepoGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GangwonWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2022-01-01 2022-12-31 0000887225 kep:PNDSolarMember 2022-01-01 2022-12-31 0000887225 kep:GoseongGreenPowerMember 2022-01-01 2022-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:ChuncheonGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:ChangjukWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:DaeryunPowerMember 2022-01-01 2022-12-31 0000887225 kep:PyeongchangWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DummyMember 2022-01-01 2022-12-31 0000887225 kep:KoreaGasCorporationMember 2022-01-01 2022-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2022-01-01 2022-12-31 0000887225 kep:YTNMember 2022-01-01 2022-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:BusanGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:KNHSolarMember 2022-01-01 2022-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2022-01-01 2022-12-31 0000887225 kep:GunsanBioEnergyMember 2022-01-01 2022-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2022-01-01 2022-12-31 0000887225 kep:KoreaElectricVehicleChargeServiceMember 2022-01-01 2022-12-31 0000887225 kep:GwangyangGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2022-01-01 2022-12-31 0000887225 kep:NoeulGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:BitgoelEcoEnergyMember 2022-01-01 2022-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:BitsolarEnergyMember 2022-01-01 2022-12-31 0000887225 kep:HonamWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:SuredatalabMember 2022-01-01 2022-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2022-01-01 2022-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicMember 2022-01-01 2022-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DongbuHighwaySolarMember 2022-01-01 2022-12-31 0000887225 kep:Ud4mMember 2022-01-01 2022-12-31 0000887225 kep:YangyangSuriWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:CheongjuEcoParkMember 2022-01-01 2022-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2022-01-01 2022-12-31 0000887225 kep:EnergycoCoMember 2022-01-01 2022-12-31 0000887225 kep:SolaseadoSolarPowerMember 2022-01-01 2022-12-31 0000887225 kep:EumseongEcoParkMember 2022-01-01 2022-12-31 0000887225 kep:KoreaDevelopmentBankMember 2022-01-01 2022-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GeumsungsanWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:OmisanWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:AnjwaSmartFarmSolarCityMember 2022-01-01 2022-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2022-01-01 2022-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2022-01-01 2022-12-31 0000887225 kep:GunsanLandSolarMember 2022-01-01 2022-12-31 0000887225 kep:FortyOneAssociatesOverseasMember 2022-01-01 2022-12-31 0000887225 kep:DangjinEcoPowerMember 2022-01-01 2022-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2022-01-01 2022-12-31 0000887225 kep:ChungsongmeonBongsanWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember 2022-01-01 2022-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DaeguPhotovoltaicMember 2022-01-01 2022-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings11Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings14Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings15Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings16Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings17Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings18Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings19Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings21Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings22Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings23Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings24Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings25Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings26Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings27Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings3Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings5Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings1Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings2Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings6Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings7Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings8Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings9Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings10Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings3Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings4Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings5Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings6Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings7Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings8Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings9Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings10Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings11Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings12Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongtermBorrowings13Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongtermBorrowings14Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongtermBorrowings15Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongtermBorrowings16Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings20Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings12Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings13Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings1Member 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings2Member 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings4Member 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings3Member 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings2Member 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings1Member 2022-01-01 2022-12-31 0000887225 kep:ForeignShortTermBorrowings2Member 2022-01-01 2022-12-31 0000887225 kep:ForeignShortTermBorrowings3Member 2022-01-01 2022-12-31 0000887225 kep:LocalBankOverdraft1Member 2022-01-01 2022-12-31 0000887225 kep:ForeignShortTermBorrowings1Member 2022-01-01 2022-12-31 0000887225 ifrs-full:TradeReceivablesMember 2022-01-01 2022-12-31 0000887225 kep:OtherReceivablesMember 2022-01-01 2022-12-31 0000887225 kep:OtherFinancialAssetsAtFairValueThroughProfitOrLossMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:DerivativesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OtherEquitySecuritiesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-01-01 2022-12-31 0000887225 kep:BeneficiaryCertificateMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ForeignCountriesMember kep:HeatSupplyMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ForeignCountriesMember kep:OthersMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:ElectricityDistributionMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:ElectricityDistributionMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CountryOfDomicileMember kep:HeatSupplyMember 2022-01-01 2022-12-31 0000887225 kep:OthersMember ifrs-full:CountryOfDomicileMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ForeignCountriesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CountryOfDomicileMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ComputerSoftwareMember kep:OracleLicenseForSdisIntegratedDbMember 2022-01-01 2022-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:SejongHaengbogdosiSharingChargeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ServiceConcessionRightsMember ifrs-full:OtherIntangibleAssetsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:OccupancyAndUseOfPublicWatersMember 2022-01-01 2022-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:RightUseElectricityGasSupplyFacilityCommunityDistrictSongdoMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember kep:ContributionsToARPNRCDCMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2022-01-01 2022-12-31 0000887225 ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember kep:UnlistedSecuritiesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember ifrs-full:DebtSecuritiesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:OtherCapitalSurplusMember 2022-01-01 2022-12-31 0000887225 kep:OtherCapitalSurplusOtherThanGainsonDisposalOfTreasuryStocksMember 2022-01-01 2022-12-31 0000887225 ifrs-full:TreasurySharesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LeaseLiabilitiesMember 2022-01-01 2022-12-31 0000887225 kep:BorrowingsAndDebtSecuritiesMember 2022-01-01 2022-12-31 0000887225 kep:DeferredRevenueMember 2022-01-01 2022-12-31 0000887225 ifrs-full:PropertyPlantAndEquipmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CashFlowHedgesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:InvestmentsAccountedForUsingEquityMethodMember 2022-01-01 2022-12-31 0000887225 ifrs-full:IntangibleAssetsOtherThanGoodwillMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:UnusedTaxCreditsMember 2022-01-01 2022-12-31 0000887225 kep:OtherFinancialLiabilitiesMember 2022-01-01 2022-12-31 0000887225 kep:SpecialDeductionForPropertyPlantAndEquipmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:UnusedTaxLossesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:NetDefinedBenefitLiabilityAssetMember 2022-01-01 2022-12-31 0000887225 kep:UnusedTaxLossesAndUnusedTaxCreditsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OtherProvisionsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LeaseReceivablesMember 2022-01-01 2022-12-31 0000887225 kep:GainsLossesOnForeignExchangeTranslationMember 2022-01-01 2022-12-31 0000887225 kep:ExcessDonationLimitMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-01-01 2022-12-31 0000887225 kep:AccruedIncomeReceivableMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OtherTemporaryDifferencesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:TemporaryDifferenceMember 2022-01-01 2022-12-31 0000887225 kep:DoubtfulMember 2022-01-01 2022-12-31 0000887225 ifrs-full:AllowanceForCreditLossesMember 2022-01-01 2022-12-31 0000887225 kep:CorporateBondMember 2022-01-01 2022-12-31 0000887225 kep:ListedAndUnlistedEquitySecurtiesMember 2022-01-01 2022-12-31 0000887225 kep:NonCurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-01-01 2022-12-31 0000887225 kep:ListedEquitySecuritiesMember 2022-01-01 2022-12-31 0000887225 kep:UnlistedEquitySecuritiesMember 2022-01-01 2022-12-31 0000887225 kep:CurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings4Member 2022-01-01 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:SeokmunEnergyMember 2022-01-01 2022-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2022-01-01 2022-12-31 0000887225 kep:StnCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SPowerMember 2022-01-01 2022-12-31 0000887225 kep:ItrMember 2022-01-01 2022-12-31 0000887225 kep:KoreaPowerExchangeMember 2022-01-01 2022-12-31 0000887225 kep:TaebaekWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2022-01-01 2022-12-31 0000887225 kep:KWNuclearComponentsMember 2022-01-01 2022-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2022-01-01 2022-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2022-01-01 2022-12-31 0000887225 ifrs-full:PlanAssetsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CorporateLoansMember 2022-01-01 2022-12-31 0000887225 ifrs-full:SeparateMember 2022-01-01 2022-12-31 0000887225 kep:FinanceLeaseReceivablesMember 2022-01-01 2022-12-31 0000887225 kep:JeongamWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:BuildingsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MachineryMember kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LandMember kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:StructuresMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 kep:StructuresMember kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:VehiclesMember kep:GovernmentGrantsAdjustmentsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ShipsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MachineryMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-01-01 2022-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:VehiclesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-01-01 2022-12-31 0000887225 kep:OtherFinancialAssetsCategoryMember 2022-01-01 2022-12-31 0000887225 kep:CashAndCashEquivalentsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LoansAndReceivablesCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember 2022-01-01 2022-12-31 0000887225 kep:ShortTermFinancialInstrumentsCategoryMember 2022-01-01 2022-12-31 0000887225 kep:LongTermFinancialInstrumentsCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:TradeReceivablesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OtherAssetsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BuildingsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LandMember 2022-01-01 2022-12-31 0000887225 kep:StructuresMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MachineryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:VehiclesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ShipsMember 2022-01-01 2022-12-31 0000887225 kep:Fy96Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy96Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy97Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy97Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy18bMember ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy18bMember ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy19cMember 2022-01-01 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy19cMember 2022-01-01 2022-12-31 0000887225 kep:Fy22cMember ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy22cMember ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy22fMember ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:Fy22fMember ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:GangneungEcoPowerMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMember 2022-01-01 2022-12-31 0000887225 kep:JeongamWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:HyundaiGreenPowerMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings18Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings4Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:ForeignLongTermBorrowings4Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:ForeignLongtermBorrowings13Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:ForeignLongtermBorrowings13Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings20Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings20Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings12Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings12Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings13Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings13Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:LocalLongTermBorrowings4Member 2022-01-01 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:LocalLongTermBorrowings4Member 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings1Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings1Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings11Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings11Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings26Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings26Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings27Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings27Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalLongTermBorrowings18Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:DerivativeAssetsApplyingHedgeAccountingCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember 2022-01-01 2022-12-31 0000887225 kep:DerivativeLiabilitiesapplyinghedgeaccountingCategoryMember 2022-01-01 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-01-01 2022-12-31 0000887225 kep:SharesInOtherComprehensiveIncomeLossOfInvestmentsInAssociatesAndJointVenturesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ReserveOfCashFlowHedgesMember 2022-01-01 2022-12-31 0000887225 kep:KAPESMember 2022-01-01 2022-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2022-01-01 2022-12-31 0000887225 ifrs-full:AccumulatedOtherComprehensiveIncomeMember 2022-01-01 2022-12-31 0000887225 kep:OtherSubsidiariesMember 2022-01-01 2022-12-31 0000887225 kep:IncheonNewPowerMember 2022-01-01 2022-12-31 0000887225 kep:SpowerChileSpaMember 2022-01-01 2022-12-31 0000887225 kep:CheongnaEnergyMember 2022-01-01 2022-12-31 0000887225 kep:PlatformnMember 2022-01-01 2022-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:GGuruMember 2022-01-01 2022-12-31 0000887225 kep:YaksuESSLtdMember 2022-01-01 2022-12-31 0000887225 kep:GoesanSolarParkMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OperatingSegmentsMember 2022-01-01 2022-12-31 0000887225 kep:WangSiangEngineeringMember 2022-01-01 2022-12-31 0000887225 kep:GreenRadiationCoLimitedMember 2022-01-01 2022-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2022-01-01 2022-12-31 0000887225 kep:KAPESMember 2022-01-01 2022-12-31 0000887225 kep:IncheonNewPowerMember 2022-01-01 2022-12-31 0000887225 kep:NaepoGreenEnergyMember 2022-01-01 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:ChesterSolarIVSpAMember 2022-01-01 2022-12-31 0000887225 kep:BarakahOneCompanyMember 2022-01-01 2022-12-31 0000887225 kep:NghiSon2PowerMember 2022-01-01 2022-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2022-01-01 2022-12-31 0000887225 kep:OthersAdjustmentMember 2022-01-01 2022-12-31 0000887225 kep:DeferredTaxesAdjustmentMember 2022-01-01 2022-12-31 0000887225 kep:EquityMethodAdjustmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:EliminationOfIntersegmentAmountsMember 2022-01-01 2022-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:PerformanceObligationsSatisfiedOverTimeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:PerformanceObligationsSatisfiedAtPointInTimeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:PerformanceObligationsSatisfiedAtPointInTimeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:PerformanceObligationsSatisfiedOverTimeMember 2022-01-01 2022-12-31 0000887225 kep:OtherGainsLossesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember 2022-01-01 2022-12-31 0000887225 ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:KNOCNigerianEastOilMember 2022-01-01 2022-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2022-01-01 2022-12-31 0000887225 kep:DongducheonDreamPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaElectricPowerCorporationFundMember ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember 2022-01-01 2022-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:YeomsubongWindPowerCo.Ltd.Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:SaemangeumSebitPowerPlantCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 kep:EnvironmentAndEnergyMember ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:TaebaekGuinemiWindPowerMember 2022-01-01 2022-12-31 0000887225 ifrs-full:TopOfRangeMember kep:GangwonWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaPowerExchangeMember 2022-01-01 2022-12-31 0000887225 kep:ConstructionInProcessAndOthersMember 2022-01-01 2022-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratory.Co.LtdMember 2022-01-01 2022-12-31 0000887225 kep:BoulderSolarIiiLlcMember 2022-01-01 2022-12-31 0000887225 kep:Platformn.Co.LtdMember 2022-01-01 2022-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2022-01-01 2022-12-31 0000887225 kep:ChangjukWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:KoreaElectricVehicleChargingServiceMember 2022-01-01 2022-12-31 0000887225 kep:PyeongchangWindPowerMember 2022-01-01 2022-12-31 0000887225 kep:DongbuHighwaySolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:DigitalInnovationGrowthFundMember 2022-01-01 2022-12-31 0000887225 kep:KPGEIncMember 2022-01-01 2022-12-31 0000887225 kep:GreenRadiationCo.LtdMember 2022-01-01 2022-12-31 0000887225 kep:SeobuHighwaySolarCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:Ud4mCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:SamYangPhotovoltaicPowerCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingSLMember 2022-01-01 2022-12-31 0000887225 kep:PulauIndahOmSdnBhdMember 2022-01-01 2022-12-31 0000887225 kep:DangjinEcoPowerCoLtdNewlyMember 2022-01-01 2022-12-31 0000887225 kep:YaksuessCoLtdMember 2022-01-01 2022-12-31 0000887225 kep:KepcouhdeInc.Member 2022-01-01 2022-12-31 0000887225 kep:EnergycoLLCMember 2022-01-01 2022-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2022-01-01 2022-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OrdinarySharesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2022-01-01 2022-12-31 0000887225 kep:InventoriesMember 2022-01-01 2022-12-31 0000887225 kep:AccrualsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LongtermBorrowingsMember 2022-01-01 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyOneMember kep:ThirdPlannedPeriodMember 2022-01-01 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyTwoMember kep:ThirdPlannedPeriodMember 2022-01-01 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyThreeMember kep:ThirdPlannedPeriodMember 2022-01-01 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFourMember kep:ThirdPlannedPeriodMember 2022-01-01 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFiveMember kep:ThirdPlannedPeriodMember 2022-01-01 2022-12-31 0000887225 kep:ThirdPlannedPeriodMember 2022-01-01 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OfficeEquipmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:LandMember 2022-01-01 2022-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2022-01-01 2022-12-31 0000887225 ifrs-full:InvestmentPropertyMember 2022-01-01 2022-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2022-01-01 2022-12-31 0000887225 kep:CashMember 2022-01-01 2022-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-01-01 2022-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-01-01 2022-12-31 0000887225 ifrs-full:VehiclesMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MachineryMember 2022-01-01 2022-12-31 0000887225 kep:StructuresMember 2022-01-01 2022-12-31 0000887225 ifrs-full:BuildingsMember 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects10Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects1Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects2Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects9Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects3Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects5Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects6Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects7Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects13Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects8Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects4Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects12Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects14Member 2022-01-01 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects11Member 2022-01-01 2022-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings2Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalShortTermBorrowings2Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:ForeignShortTermBorrowings3Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:ForeignShortTermBorrowings3Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalBankOverdraft1Member ifrs-full:BottomOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:LocalBankOverdraft1Member ifrs-full:TopOfRangeMember 2022-01-01 2022-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2022-01-01 2022-12-31 0000887225 ifrs-full:PropertyPlantAndEquipmentProceedsBeforeIntendedUseMember 2022-01-01 2022-12-31 0000887225 kep:PropertyPlantAndEquipmentCostsBeforeIntendedUseMember 2022-01-01 2022-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2022-01-01 2022-12-31 0000887225 ifrs-full:MiningRightsMember kep:MiningRightOfBylongMineMember 2022-01-01 2022-12-31 0000887225 kep:ConstructionInProgressAndOthersMember 2022-01-01 2022-12-31 0000887225 kep:PcbsRecoveryProvisionsMember kep:InflationRateMember 2022-01-01 2022-12-31 0000887225 kep:SpentFuelMember kep:InflationRateMember 2022-01-01 2022-12-31 0000887225 kep:SpentFuelMember ifrs-full:DiscountRateMeasurementInputMember 2022-01-01 2022-12-31 0000887225 kep:RadioactiveWasteMember kep:InflationRateMember 2022-01-01 2022-12-31 0000887225 kep:RadioactiveWasteMember ifrs-full:DiscountRateMeasurementInputMember 2022-01-01 2022-12-31 0000887225 kep:PcbsRecoveryProvisionsMember ifrs-full:DiscountRateMeasurementInputMember 2022-01-01 2022-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember ifrs-full:DiscountRateMeasurementInputMember 2022-01-01 2022-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember kep:InflationRateMember 2022-01-01 2022-12-31 0000887225 kep:KOSEPAustraliaMember 2023-01-01 2023-12-31 0000887225 kep:KOMIPOAustraliaMember 2023-01-01 2023-12-31 0000887225 kep:KOWEPOAustraliaMember 2023-01-01 2023-12-31 0000887225 kep:IncheonFuelCellCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KEPCOMojaveHoldingsLLCMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOCaliforniaLLCMember 2023-01-01 2023-12-31 0000887225 kep:KOLATSpAMember 2023-01-01 2023-12-31 0000887225 kep:PTKoreaEnergyIndonesiaMember 2023-01-01 2023-12-31 0000887225 kep:BSKENewIndustryFundXMember 2023-01-01 2023-12-31 0000887225 kep:SonghyunENewIndustryFundMember 2023-01-01 2023-12-31 0000887225 kep:ENewIndustryLBFundMember 2023-01-01 2023-12-31 0000887225 kep:BSKENewIndustryFundVIIMember 2023-01-01 2023-12-31 0000887225 kep:PTSiborpaEcoPowerMember 2023-01-01 2023-12-31 0000887225 kep:JejuHanlimOffshoreWindCoMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOLGCNSMangilaoSolarMember 2023-01-01 2023-12-31 0000887225 kep:MangilaoInvestmentMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOLGCNSMangilaoHoldingsMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOUSMember 2023-01-01 2023-12-31 0000887225 kep:FairhavenESSLLCMember 2023-01-01 2023-12-31 0000887225 kep:EWPESSHoldingsLLCMember 2023-01-01 2023-12-31 0000887225 kep:ColumboolaSolarFarmFinCoPtyLtdMember 2023-01-01 2023-12-31 0000887225 kep:ColumboolaSolarFarmOpTrustMember 2023-01-01 2023-12-31 0000887225 kep:KowepoHoldingLimitedMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOKPSSouthAfricaPtyLtdMember 2023-01-01 2023-12-31 0000887225 kep:ChileSolarJVSpAMember 2023-01-01 2023-12-31 0000887225 kep:KospoTrumbullLlcMember 2023-01-01 2023-12-31 0000887225 kep:KepcoForMaintenanceCompanyMember 2023-01-01 2023-12-31 0000887225 kep:KepcoHoldingCompanyMember 2023-01-01 2023-12-31 0000887225 kep:JWindFirstLlcMember 2023-01-01 2023-12-31 0000887225 kep:DigitalInnovationGrowthFundMember 2023-01-01 2023-12-31 0000887225 kep:WesternPowerChanggiSolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KaPowerLimitedMember 2023-01-01 2023-12-31 0000887225 kep:KhnpSpainS.l.Member 2023-01-01 2023-12-31 0000887225 kep:YeongdeokSunriseWindPowerCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:ColumboolaSolarFarmNomineesPtyLtdMember 2023-01-01 2023-12-31 0000887225 kep:MagnaEnergyNewIndustrialFundMember 2023-01-01 2023-12-31 0000887225 kep:ChangjukWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:KepcoForPowerCompanyMember 2023-01-01 2023-12-31 0000887225 kep:ColumboolaSolarFarmHoldCoPty.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:EwpAustraliaPty.LtdMember 2023-01-01 2023-12-31 0000887225 kep:UiCarbonneutralityFundMember 2023-01-01 2023-12-31 0000887225 kep:ConchoValleySolarLlcMember 2023-01-01 2023-12-31 0000887225 kep:ConchoValleyEnergyLlcMember 2023-01-01 2023-12-31 0000887225 kep:CvsEnergyHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:CvsClassBMemberLlcMember 2023-01-01 2023-12-31 0000887225 kep:CvsDevelopmentLlcMember 2023-01-01 2023-12-31 0000887225 kep:CvsDevelopmentHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:CvsClassBHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:CvsEquityHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:KowepoEuropeB.v.Member 2023-01-01 2023-12-31 0000887225 kep:JeongamWindPowerCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KomipoIberianSolarGroupS.l.u.Member 2023-01-01 2023-12-31 0000887225 kep:ElaraEnergyProjectLlcMember 2023-01-01 2023-12-31 0000887225 kep:ElaraEnergyHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:YeongYangApollonPhotovoltaicCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KhnpChileSpaMember 2023-01-01 2023-12-31 0000887225 kep:EnergyInnovationFundIMember 2023-01-01 2023-12-31 0000887225 kep:KOMIPOVanphongPowerServiceLLCMember 2023-01-01 2023-12-31 0000887225 kep:KHNPUSALLCMember 2023-01-01 2023-12-31 0000887225 kep:OgiriSolarPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:MohaSolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOECServiceCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KPSPartnersCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KSOLARSHINANCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GuamUkuduPowerLLCMember 2023-01-01 2023-12-31 0000887225 kep:PajuEcoenergyMember 2023-01-01 2023-12-31 0000887225 kep:HaenanumEnergyFundMember 2023-01-01 2023-12-31 0000887225 kep:KOMIPOEuropeBVMember 2023-01-01 2023-12-31 0000887225 kep:KOAKPowerLimitedMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOCSCMember 2023-01-01 2023-12-31 0000887225 kep:MangilaoIntermediateHoldingsMember 2023-01-01 2023-12-31 0000887225 kep:SEGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:SecutecMember 2023-01-01 2023-12-31 0000887225 kep:FirstkeepersMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOFMSMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOMCSMember 2023-01-01 2023-12-31 0000887225 kep:TamraOffshoreWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:NambuUSAMember 2023-01-01 2023-12-31 0000887225 kep:KOSPOUSAMember 2023-01-01 2023-12-31 0000887225 kep:KNFPartnersMember 2023-01-01 2023-12-31 0000887225 kep:PT.KOMIPOEnergyIndonesiaMember 2023-01-01 2023-12-31 0000887225 kep:EWPServiceCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KOSPOServiceCo.LtdMember 2023-01-01 2023-12-31 0000887225 kep:KOWEPOServiceCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KOMIPOServiceCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KOENServiceCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KomipoDevelopmentLlcFormerlyElaraDevelopmentLlcMember 2023-01-01 2023-12-31 0000887225 kep:ElaraDevelopmentHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:ElaraClassBMemberLlcMember 2023-01-01 2023-12-31 0000887225 kep:ElaraClassBHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:ElaraEquityHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:ElaraInvestmentHoldingsLlcMember 2023-01-01 2023-12-31 0000887225 kep:KomipoEnergySolutionAmericaLlcMember 2023-01-01 2023-12-31 0000887225 kep:KoenBioCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:LsgHydroPowerLimitedMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOAustraliaMember 2023-01-01 2023-12-31 0000887225 kep:KEPCONetherlandsBVMember 2023-01-01 2023-12-31 0000887225 kep:KOMIPOGlobalPteMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOShanxiInternationalMember 2023-01-01 2023-12-31 0000887225 kep:KEPCONeimengguInternationalMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOLebanonSARLMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOIlijanCorporationMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOPhilippinesCorporationMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOPhilippinesHoldingsMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOGansuInternationalMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOInternationalPhilippinesMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOInternationalHongKongMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOKDNMember 2023-01-01 2023-12-31 0000887225 kep:KEPCONuclearFuelMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOPlantServiceEngineeringMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOEngineeringConstructionCompanyMember 2023-01-01 2023-12-31 0000887225 kep:KoreaEastWestPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaSouthernPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaWesternPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaMidlandPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaSoutheastPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaHydroNuclearPowerMember 2023-01-01 2023-12-31 0000887225 kep:MiraPowerLimitedMember 2023-01-01 2023-12-31 0000887225 kep:KOSEPMaterialMember 2023-01-01 2023-12-31 0000887225 kep:CommerceandIndustryEnergyMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOKPSPhilippinesCorpMember 2023-01-01 2023-12-31 0000887225 kep:KOSPOChileSpAMember 2023-01-01 2023-12-31 0000887225 kep:PTKOWEPOSumselOperationandMaintenanceServicesMember 2023-01-01 2023-12-31 0000887225 kep:HeeMangSunlightPowerMember 2023-01-01 2023-12-31 0000887225 kep:FujeijWindPowerCompanyMember 2023-01-01 2023-12-31 0000887225 kep:KOSPOYoungnamPowerMember 2023-01-01 2023-12-31 0000887225 kep:ChitoseSolarPowerPlantMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOEnergySolutionMember 2023-01-01 2023-12-31 0000887225 kep:SolarSchoolPlantMember 2023-01-01 2023-12-31 0000887225 kep:KOWEPOLaoInternationalMember 2023-01-01 2023-12-31 0000887225 kep:EWPBylongMember 2023-01-01 2023-12-31 0000887225 kep:KOSPOBylongMember 2023-01-01 2023-12-31 0000887225 kep:KOWEPOBylongMember 2023-01-01 2023-12-31 0000887225 kep:KOMIPOBylongMember 2023-01-01 2023-12-31 0000887225 kep:KOENBylongMember 2023-01-01 2023-12-31 0000887225 kep:EnergyNewIndustrySpecializedInvestmentPrivateInvestmentTrustMember 2023-01-01 2023-12-31 0000887225 kep:KOSPOPowerServicesLimitadaMember 2023-01-01 2023-12-31 0000887225 kep:KOSPOAustraliaMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOMiddleEastHoldingCompanyMember 2023-01-01 2023-12-31 0000887225 kep:QatranaElectricPowerCompanyMember 2023-01-01 2023-12-31 0000887225 kep:KHNPCanadaEnergyMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOBylongAustraliaMember 2023-01-01 2023-12-31 0000887225 kep:KoreaWaterburyUraniumLimitedPartnershipMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOHoldingsdeMexicoMember 2023-01-01 2023-12-31 0000887225 kep:KSTElectricPowerCompanyMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOEnergyServiceCompanyMember 2023-01-01 2023-12-31 0000887225 kep:KEPCONetherlandsS3BVMember 2023-01-01 2023-12-31 0000887225 kep:PTKOMIPOPembangkitanJawaBaliMember 2023-01-01 2023-12-31 0000887225 kep:PTCirebonPowerServiceMember 2023-01-01 2023-12-31 0000887225 kep:KOWEPOInternationalCorporationMember 2023-01-01 2023-12-31 0000887225 kep:KOSPOJordanMember 2023-01-01 2023-12-31 0000887225 kep:EWPAmericaMember 2023-01-01 2023-12-31 0000887225 kep:EWPRenewableMember 2023-01-01 2023-12-31 0000887225 kep:KNFCanadaEnergyLimitedMember 2023-01-01 2023-12-31 0000887225 kep:EWPBarbados1SRLMember 2023-01-01 2023-12-31 0000887225 kep:CaliforniaPowerHoldingsMember 2023-01-01 2023-12-31 0000887225 kep:GyeonggiGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:PTTanggamusElectricPowerMember 2023-01-01 2023-12-31 0000887225 kep:GyeongjuWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:KOMIPOAmericaMember 2023-01-01 2023-12-31 0000887225 kep:PTEWPIndonesiaMember 2023-01-01 2023-12-31 0000887225 kep:KEPCONetherlandsJ3BVMember 2023-01-01 2023-12-31 0000887225 kep:KoreaOffshoreWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:GlobalOnePioneerBVMember 2023-01-01 2023-12-31 0000887225 kep:GlobalEnergyPioneerBVMember 2023-01-01 2023-12-31 0000887225 kep:YeongYangSolarManagementCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongYangHorusPhotovoltaicCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongYangInnovationCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SolarvaderCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongYangCorporationCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 ifrs-full:MiningRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-01-01 2023-12-31 0000887225 kep:LeaseAgreementsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:ComputerSoftwareMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:IntangibleAssetsMember 2023-01-01 2023-12-31 0000887225 kep:GreenhouseGasEmissionsRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:OtherIntangibleAssetsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ComputerSoftwareMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:EwpAmericaInc.Member 2023-01-01 2023-12-31 0000887225 kep:KepcoEnergySolutionCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KepcoSolarCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 ifrs-full:SubsidiariesMember 2023-01-01 2023-12-31 0000887225 kep:KSTElectricPowerCompanySAPIdeCVMember 2023-01-01 2023-12-31 0000887225 kep:KepcoNeimengguInternationalLtdMember 2023-01-01 2023-12-31 0000887225 kep:KepcoMcsCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KomipoGlobalPteLtdMember 2023-01-01 2023-12-31 0000887225 kep:KospoAustraliaPtyLtdMember 2023-01-01 2023-12-31 0000887225 kep:ChangjukWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:ElectricityBonds1Member 2023-01-01 2023-12-31 0000887225 kep:CorporateBondsMember 2023-01-01 2023-12-31 0000887225 kep:CorporateBonds1Member 2023-01-01 2023-12-31 0000887225 kep:Fy22dMember 2023-01-01 2023-12-31 0000887225 kep:Fy04Member 2023-01-01 2023-12-31 0000887225 kep:Fy19eMember 2023-01-01 2023-12-31 0000887225 kep:Fy18aMember 2023-01-01 2023-12-31 0000887225 kep:Fy22fMember 2023-01-01 2023-12-31 0000887225 kep:Fy22eMember 2023-01-01 2023-12-31 0000887225 kep:Fy17aMember 2023-01-01 2023-12-31 0000887225 kep:Fy19dMember 2023-01-01 2023-12-31 0000887225 kep:Fy20aMember 2023-01-01 2023-12-31 0000887225 kep:Fy22gMember 2023-01-01 2023-12-31 0000887225 kep:Fy21dMember 2023-01-01 2023-12-31 0000887225 kep:Fy21bMember 2023-01-01 2023-12-31 0000887225 kep:Fy22aMember 2023-01-01 2023-12-31 0000887225 kep:Fy19cMember 2023-01-01 2023-12-31 0000887225 kep:Fy17cMember 2023-01-01 2023-12-31 0000887225 kep:Fy15Member 2023-01-01 2023-12-31 0000887225 kep:Fy17bMember 2023-01-01 2023-12-31 0000887225 kep:Fy14Member 2023-01-01 2023-12-31 0000887225 kep:Fy23aMember 2023-01-01 2023-12-31 0000887225 kep:Fy20bMember 2023-01-01 2023-12-31 0000887225 kep:Fy19aMember 2023-01-01 2023-12-31 0000887225 kep:Fy19bMember 2023-01-01 2023-12-31 0000887225 kep:Fy21cMember 2023-01-01 2023-12-31 0000887225 kep:Fy20cMember 2023-01-01 2023-12-31 0000887225 kep:Fy23eMember 2023-01-01 2023-12-31 0000887225 kep:Fy23dMember 2023-01-01 2023-12-31 0000887225 kep:Fy23cMember 2023-01-01 2023-12-31 0000887225 kep:Fy23bMember 2023-01-01 2023-12-31 0000887225 kep:Fy96Member 2023-01-01 2023-12-31 0000887225 kep:Fy20dMember 2023-01-01 2023-12-31 0000887225 kep:Fy21aMember 2023-01-01 2023-12-31 0000887225 kep:Fy22cMember 2023-01-01 2023-12-31 0000887225 kep:Fy22bMember 2023-01-01 2023-12-31 0000887225 kep:Fy97Member 2023-01-01 2023-12-31 0000887225 kep:ProvisionsForEmployeeBenefitsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LegalProceedingsProvisionMember 2023-01-01 2023-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember 2023-01-01 2023-12-31 0000887225 kep:SpentFuelRecoveryProvisionsMember 2023-01-01 2023-12-31 0000887225 kep:WasteRecoveryProvisionsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MiscellaneousOtherProvisionsMember 2023-01-01 2023-12-31 0000887225 kep:PcbsRecoveryProvisionsMember 2023-01-01 2023-12-31 0000887225 kep:PowerPlantRegionalSupportProgramProvisionsMember 2023-01-01 2023-12-31 0000887225 kep:OtherRecoveryProvisionsMember 2023-01-01 2023-12-31 0000887225 kep:ProvisionsForGreenhouseGasEmissionsObligationsMember 2023-01-01 2023-12-31 0000887225 kep:ProvisionsForRpsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialGuaranteeContractsMember 2023-01-01 2023-12-31 0000887225 kep:TransmissionRegionalSupportProgramProvisionsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CostOfSalesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:SellingGeneralAndAdministrativeExpenseMember 2023-01-01 2023-12-31 0000887225 ifrs-full:PresentValueOfDefinedBenefitObligationMember 2023-01-01 2023-12-31 0000887225 kep:KoreaSoutheastPowerMember kep:SecondBondTypeHybridBondMember 2023-01-01 2023-12-31 0000887225 kep:SpentFuelMember 2023-01-01 2023-12-31 0000887225 kep:RadioactiveWasteMember 2023-01-01 2023-12-31 0000887225 kep:IncreaseDecreaseOfIncomeBeforeIncomeTaxMember 2023-01-01 2023-12-31 0000887225 kep:ShareholdersEquityMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested52Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested51Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested50Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested49Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested48Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantees3Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested47Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested46Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees11Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees10Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested44Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested43Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested42Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested41Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested40Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvestedEightySixMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvestedEightSevenMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvestedEightEightMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedmoneyInvested89Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested90Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested91Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested92Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested93Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested74Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested75Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested76Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested77Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested78Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested79Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested80Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested81Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested82Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvestedEightyThreeMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvestedEightyFourMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvestedEightyFiveMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested54Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested63Member 2023-01-01 2023-12-31 0000887225 kep:OtherGuarantees1Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteeEightMember 2023-01-01 2023-12-31 0000887225 kep:Collateralizedmoneyinvested32Member 2023-01-01 2023-12-31 0000887225 kep:Collateralizedmoneyinvested33Member 2023-01-01 2023-12-31 0000887225 kep:Collateralizedmoneyinvested34Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested35Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested36Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested39Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested38Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested37Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested29Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested28Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested94Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested67Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested68Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested69Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested70Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested71Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested72Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested73Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFunding22Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantees4Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested55Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested56Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested57Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested58Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested59Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested60Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested61Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested62Member 2023-01-01 2023-12-31 0000887225 kep:DebtGuarantees4Member 2023-01-01 2023-12-31 0000887225 kep:DebtGuarantees5Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested64Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested65Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested66Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested53Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested9Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested10Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested11Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested12Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested13Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested14Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested15Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested16Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested17Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested18Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested20Member 2023-01-01 2023-12-31 0000887225 kep:LoanPaymentGuaranteeMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested21Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested22Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested24Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested25Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested26Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested27Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees3Member 2023-01-01 2023-12-31 0000887225 kep:Performanceguarantees4Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees5Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees6Member 2023-01-01 2023-12-31 0000887225 kep:OtherPerformanceGuaranteesOneMember 2023-01-01 2023-12-31 0000887225 kep:OtherPerformanceGuarantees2Member 2023-01-01 2023-12-31 0000887225 kep:OtherPerformanceGuarantees3Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees7Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested1Member 2023-01-01 2023-12-31 0000887225 kep:DebtGuarantees2Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested23Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested6Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested7Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested8Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested101Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantees6Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested97Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested98Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested99Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested100Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantees7Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested95Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested96Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees1Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteesAndOthers1Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteesAndOthers2Member 2023-01-01 2023-12-31 0000887225 kep:DebtGuarantees1Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees2Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested19Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested2Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested3Member 2023-01-01 2023-12-31 0000887225 kep:performanceGuaranteesAndOthers4Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested4Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested5Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:FacilityLoan1Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:SyndicatedLoanMember 2023-01-01 2023-12-31 0000887225 kep:EBLMember kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:OperatingFundsMember kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:OtherLoan1Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:ConcentrateMember 2023-01-01 2023-12-31 0000887225 kep:ConversionMember 2023-01-01 2023-12-31 0000887225 kep:EnrichmentMember 2023-01-01 2023-12-31 0000887225 kep:InclusiveCredit1Member 2023-01-01 2023-12-31 0000887225 kep:EquityBridgeLoanGuarantee1Member 2023-01-01 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondAndOthers1Member 2023-01-01 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondOthers2Member 2023-01-01 2023-12-31 0000887225 kep:CommitmentsOnBankOverdraftMember 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantee3Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuaranteeMember 2023-01-01 2023-12-31 0000887225 kep:LoanCommitments2Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantee2Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantee4Member 2023-01-01 2023-12-31 0000887225 kep:CertificationBidding2Member 2023-01-01 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondOthers4Member 2023-01-01 2023-12-31 0000887225 kep:LimitAmountAvailableForCPMember 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteeMember 2023-01-01 2023-12-31 0000887225 kep:CertificationOfBidding1Member 2023-01-01 2023-12-31 0000887225 kep:LimitAmountAvailableForCard1Member 2023-01-01 2023-12-31 0000887225 ifrs-full:LoanCommitmentsMember 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantee5Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantee6Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantee7Member 2023-01-01 2023-12-31 0000887225 kep:GeneralLoanMember 2023-01-01 2023-12-31 0000887225 kep:InclusiveCredit2Member 2023-01-01 2023-12-31 0000887225 kep:CertificationOfPaymentOnPayablesFromForeignCountryMember 2023-01-01 2023-12-31 0000887225 kep:TradeFinanceMember 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantee2Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantee3Member 2023-01-01 2023-12-31 0000887225 kep:AdvancePaymentBondWarrantyBondRetentionBondOthers3Member 2023-01-01 2023-12-31 0000887225 kep:OtherCommitments2Member 2023-01-01 2023-12-31 0000887225 kep:OtherCommitments3Member 2023-01-01 2023-12-31 0000887225 kep:SecuredLoanOfCreditSalesMember 2023-01-01 2023-12-31 0000887225 kep:OtherCommitments1Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers6Member 2023-01-01 2023-12-31 0000887225 kep:CashCashEquivalents3Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers7Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers8Member 2023-01-01 2023-12-31 0000887225 kep:TradeReceivableAndOthers1Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers9Member 2023-01-01 2023-12-31 0000887225 kep:TradeReceivableAndOthers2Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers1Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers2Member 2023-01-01 2023-12-31 0000887225 kep:CashAndCashEquivalentsMember 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers3Member 2023-01-01 2023-12-31 0000887225 kep:CashAndCashEquivalents1Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentAndOthers4Member 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantEquipmentOthers5Member 2023-01-01 2023-12-31 0000887225 kep:FinanceLeaseReceivableAndPropertyPlantAndEquipmentAndOthersMember 2023-01-01 2023-12-31 0000887225 kep:FinanceLeaseReceivableAndPropertyPlantAndEquipmentAndOthers2Member 2023-01-01 2023-12-31 0000887225 kep:CashCashEquivalents2Member 2023-01-01 2023-12-31 0000887225 ifrs-full:IssuedCapitalMember 2023-01-01 2023-12-31 0000887225 ifrs-full:RetainedEarningsMember 2023-01-01 2023-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:EquityAttributableToOwnersOfParentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:NoncontrollingInterestsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MaterialReconcilingItemsMember 2023-01-01 2023-12-31 0000887225 kep:PlantMaintenanceEngineeringServiceMember ifrs-full:OperatingSegmentsMember 2023-01-01 2023-12-31 0000887225 kep:TransmissionAndDistributionMember ifrs-full:OperatingSegmentsMember 2023-01-01 2023-12-31 0000887225 kep:ElectricPowerGenerationNuclearMember ifrs-full:OperatingSegmentsMember 2023-01-01 2023-12-31 0000887225 kep:ElectricPowerGenerationNonNuclearMember ifrs-full:OperatingSegmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:AllOtherSegmentsMember ifrs-full:OperatingSegmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OptionContractMember kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:NotDesignatedAsHedgingInstrumentMember ifrs-full:ForwardContractMember 2023-01-01 2023-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember ifrs-full:InterestRateSwapContractMember 2023-01-01 2023-12-31 0000887225 ifrs-full:InterestRateSwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:InterestRateSwapContractMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CurrencySwapContractMember 2023-01-01 2023-12-31 0000887225 kep:DesignatedAsHedgingInstrumentMember ifrs-full:CurrencySwapContractMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CurrencySwapContractMember kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts43Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts44Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts45Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts55Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts56Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts57Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts58Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts7Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts22Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts23Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts24Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts25Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts26Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts27Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts28Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts29Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts30Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts31Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts32Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts33Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts34Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts35Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts36Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts37Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts38Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts39Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts40Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts41Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts42Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts46Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts47Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts1Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts2Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts3Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts4Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts5Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts6Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts48Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts49Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts50Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts51Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts52Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts53Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts54Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts8Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts9Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts10Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts11Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts12Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts13Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts14Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts15Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts16Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts17Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts18Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts19Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts20Member 2023-01-01 2023-12-31 0000887225 kep:CurrencyForwardContracts21Member 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts33Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts32Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts31Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts30Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts29Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts28Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts27Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts26Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts25Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts24Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts23Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts22Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts21Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts34Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts1Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts2Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts3Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts4Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts5Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts6Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts7Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts8Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts9Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts10Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts2Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts1Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts20Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts19Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts18Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts17Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts16Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts15Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts14Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts13Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts12Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts11Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts6Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts5Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts4Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts3Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:YangguFloatingPhotovoltaicPowerPlantIncMember 2023-01-01 2023-12-31 0000887225 kep:DongbuHighwaySolarMember 2023-01-01 2023-12-31 0000887225 kep:SeobuHighwaySolarMember 2023-01-01 2023-12-31 0000887225 kep:HaeparangEnergyCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:Pt.CirebonEnergiPrasaranaMember 2023-01-01 2023-12-31 0000887225 kep:AnjwaSmartFarmSolarCityCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeomsubongWindPowerCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:ChuncheonGreenEnergyCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2023-01-01 2023-12-31 0000887225 kep:YuDangSolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GangneungSacheonFuelCellCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GoesanSolarParkCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GoDeokCleanEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:BoulderSolarMember 2023-01-01 2023-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KostureCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2023-01-01 2023-12-31 0000887225 kep:SaemangeumSebitPowerPlantCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:SureDataLabCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SEPCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:HankookElectricPowerInformationCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:TronixCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:O2BGlobalCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GGuruCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:Ud4mMember 2023-01-01 2023-12-31 0000887225 kep:KoreaEnergyDataCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:PlatformnMember 2023-01-01 2023-12-31 0000887225 kep:GreenRadiationMember 2023-01-01 2023-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratoryMember 2023-01-01 2023-12-31 0000887225 kep:EcoMotionCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:RecsInnovationCo.Ltd.FormerlyWangSanEngineering.Co.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:AceMember 2023-01-01 2023-12-31 0000887225 kep:EnvironmentAndEnergyMember 2023-01-01 2023-12-31 0000887225 kep:PowerEmbeddedMember 2023-01-01 2023-12-31 0000887225 kep:ChangwonSgEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:DonpyungTechnologyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:HorangEnergyIncMember 2023-01-01 2023-12-31 0000887225 kep:HoenggyeRenewableEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:HamanGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SongsanGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2023-01-01 2023-12-31 0000887225 kep:DaeguPhotovoltaicMember 2023-01-01 2023-12-31 0000887225 kep:HansuwonKnpCoLtdFormerlyKoreaNuclearPartnersCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:PTMutiaraJawaMember 2023-01-01 2023-12-31 0000887225 kep:GoseongGreenPowerMember 2023-01-01 2023-12-31 0000887225 kep:BusanGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:SPowerMember 2023-01-01 2023-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:HyundaiGreenPowerMember 2023-01-01 2023-12-31 0000887225 kep:DongducheonDreamPowerMember 2023-01-01 2023-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2023-01-01 2023-12-31 0000887225 kep:JinbhuvishPowerGenerationPvtMember 2023-01-01 2023-12-31 0000887225 kep:XePianXeNamnoyPowerMember 2023-01-01 2023-12-31 0000887225 kep:NoeulGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2023-01-01 2023-12-31 0000887225 kep:YTNMember 2023-01-01 2023-12-31 0000887225 kep:GangwonWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2023-01-01 2023-12-31 0000887225 kep:KoreaElectricPowerCorporationFundMember 2023-01-01 2023-12-31 0000887225 kep:KNHSolarMember 2023-01-01 2023-12-31 0000887225 kep:KNOCNigerianWestOilMember 2023-01-01 2023-12-31 0000887225 kep:KoreaPowerExchangeMember 2023-01-01 2023-12-31 0000887225 kep:YaksuESSLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GwangyangGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimiteMember 2023-01-01 2023-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:PNDSolarMember 2023-01-01 2023-12-31 0000887225 kep:DaegucleanEnergyMember 2023-01-01 2023-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2023-01-01 2023-12-31 0000887225 kep:IndeckNilesAssetManagementLLCMember 2023-01-01 2023-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:IndeckNilesDevelopmentLLCMember 2023-01-01 2023-12-31 0000887225 kep:StnCo.Ltd.FormerlyStructureTestNetworkCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:ITRCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:PTBayanResourcesTBKMember 2023-01-01 2023-12-31 0000887225 kep:GemengInternationalEnergyMember 2023-01-01 2023-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2023-01-01 2023-12-31 0000887225 kep:GangneungEcoPowerMember 2023-01-01 2023-12-31 0000887225 kep:SamcheokEcoMaterialsCo.LimitedMember 2023-01-01 2023-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SPCPowerCorporationMember 2023-01-01 2023-12-31 0000887225 kep:KNOCNigerianEastOilMember 2023-01-01 2023-12-31 0000887225 kep:PTWampuElectricPowerMember 2023-01-01 2023-12-31 0000887225 kep:DaeryunPowerMember 2023-01-01 2023-12-31 0000887225 kep:PTCirebonElectricPowerMember 2023-01-01 2023-12-31 0000887225 kep:PioneerGasPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaGasCorporationMember 2023-01-01 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2023-01-01 2023-12-31 0000887225 kep:KelarSAMember 2023-01-01 2023-12-31 0000887225 kep:RabighOperationMaintenanceMember 2023-01-01 2023-12-31 0000887225 kep:RESTechnologyADMember 2023-01-01 2023-12-31 0000887225 kep:ASMBGInvesticiiADMember 2023-01-01 2023-12-31 0000887225 kep:ShuweihatAsiaOperationMaintenanceCompanyMember 2023-01-01 2023-12-31 0000887225 kep:ShuweihatAsiaPowerInvestmentBVMember 2023-01-01 2023-12-31 0000887225 kep:KWNuclearComponentsMember 2023-01-01 2023-12-31 0000887225 kep:PTTanjungPowerIndonesiaMember 2023-01-01 2023-12-31 0000887225 kep:HonamWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:RabighElectricityMember 2023-01-01 2023-12-31 0000887225 kep:DatangKEPCOChaoyangRenewablePowerMember 2023-01-01 2023-12-31 0000887225 kep:KVHoldingsMember 2023-01-01 2023-12-31 0000887225 kep:YeonggwangWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2023-01-01 2023-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2023-01-01 2023-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2023-01-01 2023-12-31 0000887225 kep:JamaicaPublicServiceMember 2023-01-01 2023-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:ChesterSolarVSpAMember 2023-01-01 2023-12-31 0000887225 kep:SeokmunEnergyMember 2023-01-01 2023-12-31 0000887225 kep:DaehanWindPowerPSCMember 2023-01-01 2023-12-31 0000887225 kep:ChuncheonEnergyMember 2023-01-01 2023-12-31 0000887225 kep:AmmanAsiaElectricPowerMember 2023-01-01 2023-12-31 0000887225 kep:NghiSon2PowerMember 2023-01-01 2023-12-31 0000887225 kep:DatangChifengRenewablePowerMember 2023-01-01 2023-12-31 0000887225 kep:GansuDatangYumenWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:BarakahOneCompanyMember 2023-01-01 2023-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2023-01-01 2023-12-31 0000887225 kep:WaterburyLakeUraniumLPMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOSPCPowerCorporationMember 2023-01-01 2023-12-31 0000887225 kep:MOMENTUMMember 2023-01-01 2023-12-31 0000887225 kep:KAPESMember 2023-01-01 2023-12-31 0000887225 kep:NawahEnergyMember 2023-01-01 2023-12-31 0000887225 kep:IncheonNewPowerMember 2023-01-01 2023-12-31 0000887225 kep:ChesterSolarIVSpAMember 2023-01-01 2023-12-31 0000887225 kep:GoheungNewEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:CapmanLynxScaSicarMember 2023-01-01 2023-12-31 0000887225 kep:CheongjuEcoParkCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GeumsungsanWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2023-01-01 2023-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2023-01-01 2023-12-31 0000887225 kep:PyeongchangWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:TrumbullAssetManagementLlcMember 2023-01-01 2023-12-31 0000887225 kep:PungbackWindFarmCorporationMember 2023-01-01 2023-12-31 0000887225 kep:ChangwonNuriEnergyMember 2023-01-01 2023-12-31 0000887225 kep:EumseongEcoParkMember 2023-01-01 2023-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2023-01-01 2023-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2023-01-01 2023-12-31 0000887225 kep:GunsanLandSolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:SeungmunGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:SpowerChileSpaMember 2023-01-01 2023-12-31 0000887225 kep:PulauIndahOAndMSdnBhdMember 2023-01-01 2023-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingS.lMember 2023-01-01 2023-12-31 0000887225 kep:CheongnaEnergyMember 2023-01-01 2023-12-31 0000887225 kep:PTBaritoWahanaTenagaMember 2023-01-01 2023-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2023-01-01 2023-12-31 0000887225 kep:BitsolarEnergyMember 2023-01-01 2023-12-31 0000887225 kep:GuadalupeSolarSpaMember 2023-01-01 2023-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:OneEnergyAsiaLimitedMember 2023-01-01 2023-12-31 0000887225 kep:REBarrenRidge1HoldingsLLCMember 2023-01-01 2023-12-31 0000887225 kep:REBarrenRidgeLandCoLLCMember 2023-01-01 2023-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:FairhavenEnergyStorageLlcMember 2023-01-01 2023-12-31 0000887225 kep:WadiNoorSolarPowerCompanySaocMember 2023-01-01 2023-12-31 0000887225 kep:NamyangjuCombinedHeatAndPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:HadongEfactoryCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:JeongeupGreenPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KumyangEcoParkCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:JeonjuBioGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:TaebaekWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KepcoForPowerCompanyMember 2023-01-01 2023-12-31 0000887225 kep:YangyangSuriWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:REHolidayHoldingsLLCMember 2023-01-01 2023-12-31 0000887225 kep:DiegoDeAlmagroSolarSpAMember 2023-01-01 2023-12-31 0000887225 kep:REPioneerHoldingsLLCMember 2023-01-01 2023-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:ChesterSolarISpAMember 2023-01-01 2023-12-31 0000887225 kep:SolarPhilippinesCalataganCorporationMember 2023-01-01 2023-12-31 0000887225 kep:KIAMCOKOWEPOBannertonHoldCoPtyLtdMember 2023-01-01 2023-12-31 0000887225 kep:LaurelSpAMember 2023-01-01 2023-12-31 0000887225 kep:SouthJamaicaPowerCompanyLimitedMember 2023-01-01 2023-12-31 0000887225 kep:REAstoria2LandCoLLCMember 2023-01-01 2023-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:ChungsongmeonBongSanWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KASINVESTMENTILLCMember 2023-01-01 2023-12-31 0000887225 kep:KASINVESTMENTIILLCMember 2023-01-01 2023-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2023-01-01 2023-12-31 0000887225 kep:OmisanWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:NaepoGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:EnergycoCoLtdFormerlyEnergycoLlcMember 2023-01-01 2023-12-31 0000887225 kep:JaeunResidentWindPowerPlantCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:DEEnergiaSpAMember 2023-01-01 2023-12-31 0000887225 kep:CAESLLCMember 2023-01-01 2023-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISSDECVMember 2023-01-01 2023-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SolaseadoSolarPowerMember 2023-01-01 2023-12-31 0000887225 kep:StavroHoldingIIABMember 2023-01-01 2023-12-31 0000887225 kep:DangjinEcoPowerMember 2023-01-01 2023-12-31 0000887225 kep:ShinhanBNPPPrivateInvestmentTrustEastWestSunlightDreamMember 2023-01-01 2023-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember 2023-01-01 2023-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember 2023-01-01 2023-12-31 0000887225 kep:HORUSSOLARSADECVMember 2023-01-01 2023-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:ChuncheonEnergyMember 2023-01-01 2023-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:YeonggwangWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:SamYangPhotovoltaicPowerMember 2023-01-01 2023-12-31 0000887225 kep:PyeongchangWindPowerCoLtdOneMember 2023-01-01 2023-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GangneungSacheonFuelCellMember 2023-01-01 2023-12-31 0000887225 kep:ElevenAssociatesOverseasMember 2023-01-01 2023-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GoDeokCleanEnergyCoLtd.Member 2023-01-01 2023-12-31 0000887225 kep:Ud4mMember 2023-01-01 2023-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicMember 2023-01-01 2023-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KostureMember 2023-01-01 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2023-01-01 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2023-01-01 2023-12-31 0000887225 kep:YuDangSolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GoheungNewEnergyMember 2023-01-01 2023-12-31 0000887225 kep:DongbuHighwaySolarMember 2023-01-01 2023-12-31 0000887225 kep:SeobuHighwaySolarMember 2023-01-01 2023-12-31 0000887225 kep:NaepoGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:DaeryunPowerMember 2023-01-01 2023-12-31 0000887225 kep:ChuncheonGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:KNHSolarMember 2023-01-01 2023-12-31 0000887225 kep:ChangjukWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaElectricVehicleChargeServiceMember 2023-01-01 2023-12-31 0000887225 kep:GangwonWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2023-01-01 2023-12-31 0000887225 kep:GoseongGreenPowerMember 2023-01-01 2023-12-31 0000887225 kep:GwangyangGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:PNDSolarMember 2023-01-01 2023-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KoreaGasCorporationMember 2023-01-01 2023-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2023-01-01 2023-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YTNMember 2023-01-01 2023-12-31 0000887225 kep:GunsanBioEnergyMember 2023-01-01 2023-12-31 0000887225 kep:BusanGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:PyeongchangWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:BitgoelEcoEnergyMember 2023-01-01 2023-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:BitsolarEnergyMember 2023-01-01 2023-12-31 0000887225 kep:HonamWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:HankookElectricPowerInformationMember 2023-01-01 2023-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2023-01-01 2023-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2023-01-01 2023-12-31 0000887225 kep:YangyangSuriWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2023-01-01 2023-12-31 0000887225 kep:DummyMember 2023-01-01 2023-12-31 0000887225 kep:SolaseadoSolarPowerMember 2023-01-01 2023-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2023-01-01 2023-12-31 0000887225 kep:GeumsungsanWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SuredatalabMember 2023-01-01 2023-12-31 0000887225 kep:AnjwaSmartFarmSolarCityMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOUhdeMember 2023-01-01 2023-12-31 0000887225 kep:GunsanLandSolarMember 2023-01-01 2023-12-31 0000887225 kep:CheongjuEcoParkMember 2023-01-01 2023-12-31 0000887225 kep:EumseongEcoParkMember 2023-01-01 2023-12-31 0000887225 kep:FortyOneAssociatesOverseasMember 2023-01-01 2023-12-31 0000887225 kep:EnergycoCoMember 2023-01-01 2023-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2023-01-01 2023-12-31 0000887225 kep:ChungsongmeonBongsanWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:DangjinEcoPowerMember 2023-01-01 2023-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:OmisanWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember 2023-01-01 2023-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2023-01-01 2023-12-31 0000887225 kep:NoeulGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2023-01-01 2023-12-31 0000887225 kep:DaeguPhotovoltaicMember 2023-01-01 2023-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:GunsanBioEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:KEPCOLebanonSARLMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOLebanonSARLMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:CapmanLynxScaSicarMember ifrs-full:AccumulatedImpairmentMember 2023-01-01 2023-12-31 0000887225 kep:GunsanBioEnergyCoLtdMember ifrs-full:AccumulatedImpairmentMember 2023-01-01 2023-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingS.lMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:CapmanLynxScaSicarMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:SpowerChileSpaMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:NghiSon2PowerMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:GuadalupeSolarSpaMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:DEEnergiaSpAMember 2023-01-01 2023-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:KelarSAMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:PtCirebonEnergiPrasaranaMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:KnocNigerianEastWestOilCo.Ltd.Member ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:KnocNigerianEastWestOilCo.Ltd.Member ifrs-full:AccumulatedImpairmentMember 2023-01-01 2023-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:YangyangWindPowerCoLtdMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:BitsolarEnergyMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:DaehanWindPowerPSCMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:HORUSSOLARSADECVMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:SolaseadoSolarPowerMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISADECVMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:DaejungOffshoreWindPowerMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 kep:XePianXeNamnoyPowerMember ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:PTWampuElectricPowerMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts50Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts51Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts52Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts53Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts54Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts55Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts56Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts1Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts2Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts3Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts4Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts5Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts6Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts7Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts8Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts9Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts10Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts11Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts12Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts13Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts14Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts15Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts16Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts17Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts18Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts19Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts20Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts21Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts22Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts23Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts24Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts25Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts26Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts27Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts28Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts29Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts30Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts31Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts32Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts33Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts34Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts35Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts36Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts37Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts38Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts39Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts40Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts41Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts42Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:Currencyswapcontracts43Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts44Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts45Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts57Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts49Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts48Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts47Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts46Member kep:NotDesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts1Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts2Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts3Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts4Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts5Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts6Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts7Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts8Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts9Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts10Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts11Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts12Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts13Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts14Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts15Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts16Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts17Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts18Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts19Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts20Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts21Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts22Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts23Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts24Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts25Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts26Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts27Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts28Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts29Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts30Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts31Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts32Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts33Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts34Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:CurrencySwapContracts35Member kep:DesignatedAsHedgingInstrumentMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings4Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings18Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings17Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings16Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings15Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings14Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings13Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings12Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings11Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings10Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings9Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings8Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings7Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings6Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings5Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings1Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings2Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings5Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings6Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings8Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings9Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings10Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings11Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings12Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongtermBorrowings13Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongtermBorrowings14Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongtermBorrowings15Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings7Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings3Member 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings4Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings1Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings2Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings3Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings19Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings20Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings21Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings22Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings23Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings24Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings25Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings26Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings27Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings28Member 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings29Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract13Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract16Member 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract8Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract9Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract7Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract5Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract1Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract18Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract17Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract14Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract15Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract12Member 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract4Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract3Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract6Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:CrossCurrencyInterestRateContract2Member kep:KoreaDevelopmentBankMember 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract10Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract11Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyInterestRateContract19Member 2023-01-01 2023-12-31 0000887225 ifrs-full:MiningRightsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2023-01-01 2023-12-31 0000887225 kep:LeaseholdRightsMember 2023-01-01 2023-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings1Member 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings4Member 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings3Member 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings2Member 2023-01-01 2023-12-31 0000887225 kep:ForeignShortTermBorrowings2Member 2023-01-01 2023-12-31 0000887225 kep:ForeignShortTermBorrowings1Member 2023-01-01 2023-12-31 0000887225 kep:LocalBankOverdraft1Member 2023-01-01 2023-12-31 0000887225 ifrs-full:TradeReceivablesMember 2023-01-01 2023-12-31 0000887225 kep:OtherReceivablesMember 2023-01-01 2023-12-31 0000887225 kep:OtherFinancialAssetsAtFairValueThroughProfitOrLossMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:DerivativesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherEquitySecuritiesMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 kep:BeneficiaryCertificateMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CountryOfDomicileMember kep:OthersMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ForeignCountriesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ForeignCountriesMember kep:OthersMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:ElectricityDistributionMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ForeignCountriesMember kep:HeatSupplyMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CountryOfDomicileMember kep:HeatSupplyMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CountryOfDomicileMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:ElectricityDistributionMember 2023-01-01 2023-12-31 0000887225 kep:SejongHaengbogdosiSharingChargeMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-01-01 2023-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:RightUseElectricityGasSupplyFacilityCommunityDistrictSongdoMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:OccupancyAndUseOfPublicWatersMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember ifrs-full:ServiceConcessionRightsMember 2023-01-01 2023-12-31 0000887225 kep:ContributionsToARPNRCDCMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-01-01 2023-12-31 0000887225 kep:S4HANAERPlicenseMember ifrs-full:ComputerSoftwareMember 2023-01-01 2023-12-31 0000887225 ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember kep:UnlistedSecuritiesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember ifrs-full:DebtSecuritiesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 kep:OtherCapitalSurplusMember 2023-01-01 2023-12-31 0000887225 kep:OtherCapitalSurplusOtherThanGainsonDisposalOfTreasuryStocksMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TreasurySharesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LeaseLiabilitiesMember 2023-01-01 2023-12-31 0000887225 kep:BorrowingsAndDebtSecuritiesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:AllowanceForCreditLossesMember 2023-01-01 2023-12-31 0000887225 kep:GainsLossesOnForeignExchangeTranslationMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherProvisionsMember 2023-01-01 2023-12-31 0000887225 kep:DeferredRevenueMember 2023-01-01 2023-12-31 0000887225 kep:OtherFinancialLiabilitiesMember 2023-01-01 2023-12-31 0000887225 kep:DoubtfulMember 2023-01-01 2023-12-31 0000887225 kep:SpecialDeductionForPropertyPlantAndEquipmentMember 2023-01-01 2023-12-31 0000887225 kep:AccruedIncomeReceivableMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:NetDefinedBenefitLiabilityAssetMember 2023-01-01 2023-12-31 0000887225 ifrs-full:PropertyPlantAndEquipmentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:InvestmentsAccountedForUsingEquityMethodMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LeaseReceivablesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:IntangibleAssetsOtherThanGoodwillMember 2023-01-01 2023-12-31 0000887225 ifrs-full:UnusedTaxCreditsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherTemporaryDifferencesMember 2023-01-01 2023-12-31 0000887225 kep:UnusedTaxLossesAndUnusedTaxCreditsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:UnusedTaxLossesMember 2023-01-01 2023-12-31 0000887225 kep:ExcessDonationLimitMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TemporaryDifferenceMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CashFlowHedgesMember 2023-01-01 2023-12-31 0000887225 kep:CorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:ListedEquitySecuritiesMember 2023-01-01 2023-12-31 0000887225 kep:CurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-01-01 2023-12-31 0000887225 kep:ListedAndUnlistedEquitySecurtiesMember 2023-01-01 2023-12-31 0000887225 kep:UnlistedEquitySecuritiesMember 2023-01-01 2023-12-31 0000887225 kep:NonCurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ShipsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2023-01-01 2023-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember 2023-01-01 2023-12-31 0000887225 kep:LoadedHeavyWaterMember 2023-01-01 2023-12-31 0000887225 ifrs-full:VehiclesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MachineryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FixturesAndFittingsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BuildingsMember 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyForwardContract1Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyForwardContract3Member 2023-01-01 2023-12-31 0000887225 kep:KoreaDevelopmentBankMember kep:CrossCurrencyForwardContract2Member 2023-01-01 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:SeokmunEnergyMember 2023-01-01 2023-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2023-01-01 2023-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2023-01-01 2023-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2023-01-01 2023-12-31 0000887225 kep:SPowerMember 2023-01-01 2023-12-31 0000887225 kep:TaebaekWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaPowerExchangeMember 2023-01-01 2023-12-31 0000887225 kep:ItrMember 2023-01-01 2023-12-31 0000887225 kep:StnCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2023-01-01 2023-12-31 0000887225 kep:KWNuclearComponentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:NotLaterThanOneYearMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LaterThanThreeYearsMember 2023-01-01 2023-12-31 0000887225 kep:BusinessReservePaymentGuaranteeMember 2023-01-01 2023-12-31 0000887225 ifrs-full:PlanAssetsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CorporateLoansMember 2023-01-01 2023-12-31 0000887225 ifrs-full:SeparateMember 2023-01-01 2023-12-31 0000887225 kep:FinanceLeaseReceivablesMember 2023-01-01 2023-12-31 0000887225 kep:JeongamWindPowerMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BuildingsMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MachineryMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:StructuresMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:VehiclesMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ShipsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LandMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 kep:StructuresMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:GovernmentGrantsAdjustmentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MachineryMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-01-01 2023-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:VehiclesMember 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFunding21Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding16Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding17Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFunding19Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFunding20Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantees5Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFunding23Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFundingAndOthers1Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteesAndGuaranteesForSupplementalFunding2Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteesAndGuaranteesForSupplementalFunding1Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees13Member 2023-01-01 2023-12-31 0000887225 kep:Guaranteesforsupplementalfunding2Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesforSupplementalFunding3Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesforSupplementalFunding4Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesforSupplementalFunding5Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesforSupplementalFunding6Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesforSupplementalFunding7Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesforSupplementalFunding8Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuarantees12Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested45Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantees2Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuarantees1Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteeNineMember 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteesGuaranteesSupplementalFundingMember 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding14Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding13Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding12Member 2023-01-01 2023-12-31 0000887225 kep:PaymentGuaranteesMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedLoansMember 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested31Member 2023-01-01 2023-12-31 0000887225 kep:CollateralizedMoneyInvested30Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding11Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding10Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFunding18Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesSupplementalFunding9Member 2023-01-01 2023-12-31 0000887225 kep:PerformanceGuaranteesAndOthers3Member 2023-01-01 2023-12-31 0000887225 kep:OtherPerformanceGuaranteeFourMember 2023-01-01 2023-12-31 0000887225 kep:OtherPerformanceGuarantees5Member 2023-01-01 2023-12-31 0000887225 kep:Guaranteesforsupplementalfunding1Member 2023-01-01 2023-12-31 0000887225 kep:ImpoundingBonusGuaranteesMember 2023-01-01 2023-12-31 0000887225 kep:DebtGuarantees3Member 2023-01-01 2023-12-31 0000887225 kep:GuaranteesForSupplementalFunding24Member 2023-01-01 2023-12-31 0000887225 kep:OtherFinancialAssetsCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TradeReceivablesMember 2023-01-01 2023-12-31 0000887225 kep:LongTermFinancialInstrumentsCategoryMember 2023-01-01 2023-12-31 0000887225 kep:ShortTermFinancialInstrumentsCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LoansAndReceivablesCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember 2023-01-01 2023-12-31 0000887225 kep:CashAndCashEquivalentsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MachineryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:VehiclesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ShipsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherAssetsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BuildingsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LandMember 2023-01-01 2023-12-31 0000887225 kep:StructuresMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy96Member 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy96Member 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy97Member 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy97Member 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy19cMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy19cMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy22cMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy22cMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:Fy22fMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:Fy22fMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:CorporateBondsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember kep:ElectricityBonds1Member 2023-01-01 2023-12-31 0000887225 kep:GangneungEcoPowerMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMember 2023-01-01 2023-12-31 0000887225 kep:JeongamWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:HyundaiGreenPowerMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-01-01 2023-12-31 0000887225 kep:FYTwentyFourGlobalFifteenthMember 2023-01-01 2023-12-31 0000887225 kep:SeventySevenThreeCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SeventySevenOneCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SeventySevenTwoCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SixtyOneTwoCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SixtyTwoCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SixtyThreeCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SixtyOneThreeCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SixtyOneCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SixtyOneOneCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SeventyTwoOneCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SeventyEightOneCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SeventyEightTwoCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SeventyEightThreeCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:SeventyTwoTwoCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:FortySevenOneCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:FortySevenTwoCorporateBondMember 2023-01-01 2023-12-31 0000887225 kep:LoansBorrowedForOperationsTwoMember 2023-01-01 2023-12-31 0000887225 kep:LoansBorrowedForOperationsFiveMember 2023-01-01 2023-12-31 0000887225 kep:LoansBorrowedForOperationsOneMember 2023-01-01 2023-12-31 0000887225 kep:LoansBorrowedForOperationsThreeMember 2023-01-01 2023-12-31 0000887225 kep:LoansBorrowedForOperationsFourMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings29Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings29Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings28Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings28Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings24Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings24Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings23Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings23Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings22Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings21Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings20Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings20Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings4Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings4Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings12Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:ForeignLongTermBorrowings12Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings1Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings1Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings2Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings11Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings11Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings5Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings14Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings19Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalLongTermBorrowings19Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:DerivativeAssetsApplyingHedgeAccountingCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember 2023-01-01 2023-12-31 0000887225 kep:DerivativeLiabilitiesapplyinghedgeaccountingCategoryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-01-01 2023-12-31 0000887225 kep:SharesInOtherComprehensiveIncomeLossOfInvestmentsInAssociatesAndJointVenturesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ReserveOfCashFlowHedgesMember 2023-01-01 2023-12-31 0000887225 kep:KAPESMember 2023-01-01 2023-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2023-01-01 2023-12-31 0000887225 ifrs-full:AccumulatedOtherComprehensiveIncomeMember 2023-01-01 2023-12-31 0000887225 kep:OtherSubsidiariesMember 2023-01-01 2023-12-31 0000887225 kep:IncheonNewPowerMember 2023-01-01 2023-12-31 0000887225 kep:SpowerChileSpaMember 2023-01-01 2023-12-31 0000887225 kep:CheongnaEnergyMember 2023-01-01 2023-12-31 0000887225 kep:PlatformnMember 2023-01-01 2023-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:GGuruMember 2023-01-01 2023-12-31 0000887225 kep:YaksuESSLtdMember 2023-01-01 2023-12-31 0000887225 kep:GoesanSolarParkMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OperatingSegmentsMember 2023-01-01 2023-12-31 0000887225 kep:WangSiangEngineeringMember 2023-01-01 2023-12-31 0000887225 kep:GreenRadiationCoLimitedMember 2023-01-01 2023-12-31 0000887225 kep:GunsanBioEnergyMember 2023-01-01 2023-12-31 0000887225 kep:EurasiaEnergyHoldingsMember 2023-01-01 2023-12-31 0000887225 kep:KAPESMember 2023-01-01 2023-12-31 0000887225 kep:ChesterSolarIVSpAMember 2023-01-01 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:BarakahOneCompanyMember 2023-01-01 2023-12-31 0000887225 kep:NghiSon2PowerMember 2023-01-01 2023-12-31 0000887225 kep:IncheonNewPowerMember 2023-01-01 2023-12-31 0000887225 kep:NaepoGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2023-01-01 2023-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2023-01-01 2023-12-31 0000887225 kep:DeferredTaxesAdjustmentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:EliminationOfIntersegmentAmountsMember 2023-01-01 2023-12-31 0000887225 kep:OthersAdjustmentMember 2023-01-01 2023-12-31 0000887225 kep:EquityMethodAdjustmentMember 2023-01-01 2023-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OrdinarySharesMember 2023-01-01 2023-12-31 0000887225 dei:AdrMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:PerformanceObligationsSatisfiedOverTimeMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:PerformanceObligationsSatisfiedAtPointInTimeMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CountryOfDomicileMember ifrs-full:PerformanceObligationsSatisfiedOverTimeMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ForeignCountriesMember ifrs-full:PerformanceObligationsSatisfiedAtPointInTimeMember 2023-01-01 2023-12-31 0000887225 kep:OtherGainsLossesMember 2023-01-01 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember 2023-01-01 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember 2023-01-01 2023-12-31 0000887225 kep:ToSellFinancialAssetsMember kep:SolelyPaymentsOfPrincipalAndInterestMember 2023-01-01 2023-12-31 0000887225 kep:ContractualCashFlowsMember kep:SolelyPaymentsOfPrincipalAndInterestMember 2023-01-01 2023-12-31 0000887225 kep:SolelyPaymentsOfPrincipalAndInterestMember kep:ContractualCashFlowsAndFinancialAssetsMember 2023-01-01 2023-12-31 0000887225 kep:ContractualCashFlowsAndFinancialAssetsMember kep:OtherThanSPPIMember 2023-01-01 2023-12-31 0000887225 kep:KookminBankMember kep:ConchoValleyEnergyLlcMember 2023-01-01 2023-12-31 0000887225 kep:OrdinaryWagesAndUnpaidWagesMember 2023-01-01 2023-12-31 0000887225 kep:GangneungMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:KepxePianXeNamnoyPowerMember 2023-01-01 2023-12-31 0000887225 kep:ImpairmentLossMember kep:NaepoGreenEnergyCo.LtdMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherProvisionsMember 2023-01-01 2023-12-31 0000887225 kep:AcquisitionCostOfTheSecuritiesMember 2023-01-01 2023-12-31 0000887225 kep:DerivativeLiabilitiesMember 2023-01-01 2023-12-31 0000887225 kep:HeeMangSunlightPowerCo.LtdMember 2023-01-01 2023-12-31 0000887225 kep:SaemangeumSebitPowerPlantCo.Ltd.Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:EnvironmentAndEnergyMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:SamcheokEcoMaterialsMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:DongducheonDreamPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaElectricPowerCorporationFundMember ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:Ud4mCoLtdMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:GangwonWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:KoreaPowerExchangeMember 2023-01-01 2023-12-31 0000887225 kep:KNOCNigerianEastOilMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:WooriSpotPefMember kep:GemengInternationalEnergyMember 2023-01-01 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember kep:TimePeriodThreeMember 2023-01-01 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember kep:TimePeriodTwoMember 2023-01-01 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember kep:TimePeriodOneMember 2023-01-01 2023-12-31 0000887225 kep:ConstructionInProcessAndOthersMember 2023-01-01 2023-12-31 0000887225 kep:JordanElectricPowerCompanyMember kep:PowerPurchaseAgreementMember 2023-01-01 2023-12-31 0000887225 kep:FujeijWindPowerPlantMember kep:PowerPurchaseAgreementMember 2023-01-01 2023-12-31 0000887225 kep:PowerPurchaseAgreementMember ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:PowerPurchaseAgreementMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:FederalElectricityCommissionMember kep:PowerPurchaseAgreementMember 2023-01-01 2023-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2023-01-01 2023-12-31 0000887225 dei:BusinessContactMember 2023-01-01 2023-12-31 0000887225 kep:ScEgMember 2023-01-01 2023-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratory.Co.LtdMember 2023-01-01 2023-12-31 0000887225 kep:BoulderSolarIiiLlcMember 2023-01-01 2023-12-31 0000887225 kep:Platformn.Co.LtdMember 2023-01-01 2023-12-31 0000887225 kep:GreenRadiationCo.LtdMember 2023-01-01 2023-12-31 0000887225 kep:SeobuHighwaySolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:Ud4mCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:DongbuHighwaySolarCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:TaebaekWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2023-01-01 2023-12-31 0000887225 kep:DangjinEcoPowerCoLtdNewlyMember 2023-01-01 2023-12-31 0000887225 kep:ChileSolarJVSpAMember 2023-01-01 2023-12-31 0000887225 kep:TaebaekWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingSLMember 2023-01-01 2023-12-31 0000887225 kep:PulauIndahOmSdnBhdMember 2023-01-01 2023-12-31 0000887225 kep:SongsanGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:HasamiWindFarmCorporationMember 2023-01-01 2023-12-31 0000887225 kep:KEPCOUhdeMember 2023-01-01 2023-12-31 0000887225 kep:DaewonGreenEnergyCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:YaksuessCoLtdMember 2023-01-01 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsMember 2023-01-01 2023-12-31 0000887225 kep:EnergycoLLCMember 2023-01-01 2023-12-31 0000887225 kep:SeungmunGreenEnergyMember 2023-01-01 2023-12-31 0000887225 kep:SpowerChileSpaMember 2023-01-01 2023-12-31 0000887225 kep:TrumbullAssetManagementLlcMember 2023-01-01 2023-12-31 0000887225 kep:PungbackWindFarmCorporationMember 2023-01-01 2023-12-31 0000887225 kep:ChangwonNuriEnergyMember 2023-01-01 2023-12-31 0000887225 kep:EumseongEcoParkMember 2023-01-01 2023-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember 2023-01-01 2023-12-31 0000887225 kep:InvestmentPropertiesMember ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:InvestmentPropertiesMember ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2023-01-01 2023-12-31 0000887225 kep:InventoriesMember 2023-01-01 2023-12-31 0000887225 kep:AccrualsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LongtermBorrowingsMember 2023-01-01 2023-12-31 0000887225 kep:ConstructionContractsMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts25Member kep:NotDesignatedAsHedgingInstrumentMember kep:FirstFiveYearsMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts25Member kep:NotDesignatedAsHedgingInstrumentMember kep:ThereafterMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts26Member kep:NotDesignatedAsHedgingInstrumentMember kep:FirstFiveYearsMember 2023-01-01 2023-12-31 0000887225 kep:InterestRateSwapContracts26Member kep:NotDesignatedAsHedgingInstrumentMember kep:ThereafterMember 2023-01-01 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFiveMember kep:ThirdPlannedPeriodMember 2023-01-01 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFourMember kep:ThirdPlannedPeriodMember 2023-01-01 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyThreeMember kep:ThirdPlannedPeriodMember 2023-01-01 2023-12-31 0000887225 kep:PeriodTwoThousandAndTwentyTwoMember kep:ThirdPlannedPeriodMember 2023-01-01 2023-12-31 0000887225 kep:ThirdPlannedPeriodMember 2023-01-01 2023-12-31 0000887225 kep:CashMember 2023-01-01 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:InvestmentPropertyMember 2023-01-01 2023-12-31 0000887225 ifrs-full:BuildingsMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MachineryMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OfficeEquipmentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:LandMember 2023-01-01 2023-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2023-01-01 2023-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2023-01-01 2023-12-31 0000887225 kep:StructuresMember 2023-01-01 2023-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2023-01-01 2023-12-31 0000887225 ifrs-full:VehiclesMember 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects3Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects1Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects4Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects12Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects13Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects14Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects2Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects9Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects10Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects11Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects5Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects6Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects7Member 2023-01-01 2023-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects8Member 2023-01-01 2023-12-31 0000887225 kep:ChitoseSolarPowerPlantLLCMember 2023-01-01 2023-12-31 0000887225 kep:MangilaoIntermediateHoldingsLLCMember 2023-01-01 2023-12-31 0000887225 kep:ShareholdersAgreementsMember kep:JeongamWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:ShareholdersAgreementsMember kep:ChangjukWindPowerMember 2023-01-01 2023-12-31 0000887225 kep:ShareholdersAgreementsMember kep:ColumboolaSolarFarmHoldCoPty.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KoreaOffshoreWindPowerCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:GyeongjuWindPowerCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:KoreaWesternPowerMember kep:TaeanIGCCGasRefineryMember 2023-01-01 2023-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2023-01-01 2023-12-31 0000887225 kep:SPCPowerCorporationMember 2023-01-01 2023-12-31 0000887225 kep:KapesIncMember kep:DefectGuaranteesMember 2023-01-01 2023-12-31 0000887225 kep:KapesIncMember kep:PerformanceGuaranteesMember 2023-01-01 2023-12-31 0000887225 kep:KapesIncMember kep:AdvancePaymentGuaranteeMember 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings1Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings2Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalShortTermBorrowings2Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalBankOverdraft1Member ifrs-full:BottomOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:LocalBankOverdraft1Member ifrs-full:TopOfRangeMember 2023-01-01 2023-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2023-01-01 2023-12-31 0000887225 kep:FairhavenEnergyStorageLlcMember 2023-01-01 2023-12-31 0000887225 kep:HitachiEnergySwedenFieldArbitrationCaseInRelationToConstructionProjectsMember 2023-01-01 2023-12-31 0000887225 kep:CommercialArbitrationExpensesPaymentJindoJejuHighVoltageDirectCurrentConnectionContractProjectMember 2023-01-01 2023-12-31 0000887225 ifrs-full:TopOfRangeMember kep:PillarTwoModelRulesMember 2023-01-01 2023-12-31 0000887225 kep:NinetyNineMegawattPhotovoltaicPowerGenerationFacilityMember kep:GunsanLandSolarMember 2023-01-01 2023-12-31 0000887225 ifrs-full:PropertyPlantAndEquipmentProceedsBeforeIntendedUseMember 2023-01-01 2023-12-31 0000887225 kep:PropertyPlantAndEquipmentCostsBeforeIntendedUseMember 2023-01-01 2023-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2023-01-01 2023-12-31 0000887225 ifrs-full:MiningRightsMember kep:MiningRightOfBylongMineMember 2023-01-01 2023-12-31 0000887225 kep:ConstructionInProgressAndOthersMember 2023-01-01 2023-12-31 0000887225 kep:SpentFuelMember ifrs-full:DiscountRateMeasurementInputMember 2023-01-01 2023-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember kep:InflationRateMember 2023-01-01 2023-12-31 0000887225 kep:PcbsRecoveryProvisionsMember ifrs-full:DiscountRateMeasurementInputMember 2023-01-01 2023-12-31 0000887225 kep:RadioactiveWasteMember kep:InflationRateMember 2023-01-01 2023-12-31 0000887225 kep:RadioactiveWasteMember ifrs-full:DiscountRateMeasurementInputMember 2023-01-01 2023-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember ifrs-full:DiscountRateMeasurementInputMember 2023-01-01 2023-12-31 0000887225 kep:PcbsRecoveryProvisionsMember kep:InflationRateMember 2023-01-01 2023-12-31 0000887225 kep:SpentFuelMember kep:InflationRateMember 2023-01-01 2023-12-31 0000887225 ifrs-full:OrdinarySharesMember 2021-12-31 0000887225 kep:OtherSubsidiariesMember 2021-12-31 0000887225 kep:KEPCOEngineeringConstructionCompanyMember 2021-12-31 0000887225 kep:KEPCOPlantServiceEngineeringMember 2021-12-31 0000887225 kep:KEPCOIlijanCorporationMember 2021-12-31 0000887225 ifrs-full:CountryOfDomicileMember 2021-12-31 0000887225 ifrs-full:ForeignCountriesMember 2021-12-31 0000887225 kep:YTNMember 2024-02-15 0000887225 ifrs-full:DisposalOfMajorSubsidiaryMember 2024-02-15 0000887225 ifrs-full:EnteringIntoSignificantCommitmentsOrContingentLiabilitiesMember 2024-02-23 0000887225 ifrs-full:NoncurrentAssetsHeldForSaleMember 2022-04-13 0000887225 ifrs-full:CorporateLoansMember 2020-12-31 0000887225 ifrs-full:IssuedCapitalMember 2020-12-31 0000887225 ifrs-full:RetainedEarningsMember 2020-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2020-12-31 0000887225 ifrs-full:EquityAttributableToOwnersOfParentMember 2020-12-31 0000887225 ifrs-full:NoncontrollingInterestsMember 2020-12-31 0000887225 ifrs-full:TradeReceivablesMember 2020-12-31 0000887225 kep:OtherReceivablesMember 2020-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2021-12-31 0000887225 ifrs-full:IssuedCapitalMember 2021-12-31 0000887225 ifrs-full:EquityAttributableToOwnersOfParentMember 2021-12-31 0000887225 ifrs-full:RetainedEarningsMember 2021-12-31 0000887225 ifrs-full:NoncontrollingInterestsMember 2021-12-31 0000887225 ifrs-full:CorporateLoansMember 2021-12-31 0000887225 ifrs-full:TradeReceivablesMember 2021-12-31 0000887225 kep:OtherReceivablesMember 2021-12-31 0000887225 ifrs-full:SeparateMember 2021-12-31 0000887225 ifrs-full:VehiclesMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:StructuresMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 ifrs-full:MachineryMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:StructuresMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:VehiclesMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:LandMember 2021-12-31 0000887225 ifrs-full:LandMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 ifrs-full:ShipsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:MachineryMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 ifrs-full:RightofuseAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:BuildingsMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2021-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 kep:IntangibleAssetsMember 2021-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:LeaseAgreementsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2021-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:MiningRightsMember 2021-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:ComputerSoftwareMember 2021-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:OtherIntangibleAssetsMember 2021-12-31 0000887225 kep:GreenhouseGasEmissionsRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2021-12-31 0000887225 ifrs-full:ComputerSoftwareMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:TransmissionRegionalSupportProgramProvisionsMember 2021-12-31 0000887225 kep:PowerPlantRegionalSupportProgramProvisionsMember 2021-12-31 0000887225 kep:OtherRecoveryProvisionsMember 2021-12-31 0000887225 ifrs-full:MiscellaneousOtherProvisionsMember 2021-12-31 0000887225 ifrs-full:FinancialGuaranteeContractsMember 2021-12-31 0000887225 kep:ProvisionsForRpsMember 2021-12-31 0000887225 kep:ProvisionsForGreenhouseGasEmissionsObligationsMember 2021-12-31 0000887225 kep:PcbsRecoveryProvisionsMember 2021-12-31 0000887225 kep:WasteRecoveryProvisionsMember 2021-12-31 0000887225 kep:SpentFuelRecoveryProvisionsMember 2021-12-31 0000887225 kep:ProvisionsForNuclearPlantsRestorationMember 2021-12-31 0000887225 ifrs-full:LegalProceedingsProvisionMember 2021-12-31 0000887225 kep:ProvisionsForEmployeeBenefitsMember 2021-12-31 0000887225 ifrs-full:PresentValueOfDefinedBenefitObligationMember 2021-12-31 0000887225 ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember kep:UnlistedSecuritiesMember 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember ifrs-full:DebtSecuritiesMember 2021-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2021-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2021-12-31 0000887225 kep:SharesInOtherComprehensiveIncomeLossOfInvestmentsInAssociatesAndJointVenturesMember 2021-12-31 0000887225 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 2021-12-31 0000887225 ifrs-full:ReserveOfCashFlowHedgesMember 2021-12-31 0000887225 ifrs-full:AccumulatedOtherComprehensiveIncomeMember 2021-12-31 0000887225 ifrs-full:TreasurySharesMember 2021-12-31 0000887225 kep:OtherCapitalSurplusOtherThanGainsonDisposalOfTreasuryStocksMember 2021-12-31 0000887225 kep:OtherCapitalSurplusMember 2021-12-31 0000887225 kep:DeferredRevenueMember 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2021-12-31 0000887225 ifrs-full:OtherTemporaryDifferencesMember 2021-12-31 0000887225 kep:OtherFinancialLiabilitiesMember 2021-12-31 0000887225 kep:GainsLossesOnForeignExchangeTranslationMember 2021-12-31 0000887225 ifrs-full:UnusedTaxLossesMember 2021-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2021-12-31 0000887225 kep:DoubtfulMember 2021-12-31 0000887225 kep:UnusedTaxLossesAndUnusedTaxCreditsMember 2021-12-31 0000887225 ifrs-full:TemporaryDifferenceMember 2021-12-31 0000887225 ifrs-full:InvestmentsAccountedForUsingEquityMethodMember 2021-12-31 0000887225 ifrs-full:OtherProvisionsMember 2021-12-31 0000887225 kep:AccruedIncomeReceivableMember 2021-12-31 0000887225 kep:SpecialDeductionForPropertyPlantAndEquipmentMember 2021-12-31 0000887225 ifrs-full:LeaseReceivablesMember 2021-12-31 0000887225 ifrs-full:PropertyPlantAndEquipmentMember 2021-12-31 0000887225 ifrs-full:IntangibleAssetsOtherThanGoodwillMember 2021-12-31 0000887225 ifrs-full:CashFlowHedgesMember 2021-12-31 0000887225 ifrs-full:NetDefinedBenefitLiabilityAssetMember 2021-12-31 0000887225 ifrs-full:AllowanceForCreditLossesMember 2021-12-31 0000887225 ifrs-full:UnusedTaxCreditsMember 2021-12-31 0000887225 kep:ExcessDonationLimitMember 2021-12-31 0000887225 kep:StructuresMember 2021-12-31 0000887225 ifrs-full:BuildingsMember 2021-12-31 0000887225 ifrs-full:LandMember 2021-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2021-12-31 0000887225 ifrs-full:OtherAssetsMember 2021-12-31 0000887225 ifrs-full:MachineryMember 2021-12-31 0000887225 ifrs-full:VehiclesMember 2021-12-31 0000887225 ifrs-full:ShipsMember 2021-12-31 0000887225 kep:CurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2021-12-31 0000887225 kep:ListedAndUnlistedEquitySecurtiesMember 2021-12-31 0000887225 kep:ListedEquitySecuritiesMember 2021-12-31 0000887225 kep:UnlistedEquitySecuritiesMember 2021-12-31 0000887225 kep:CorporateBondMember 2021-12-31 0000887225 kep:NonCurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2021-12-31 0000887225 ifrs-full:LeaseLiabilitiesMember 2021-12-31 0000887225 kep:BorrowingsAndDebtSecuritiesMember 2021-12-31 0000887225 ifrs-full:PlanAssetsMember 2021-12-31 0000887225 kep:FinanceLeaseReceivablesMember 2021-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:ComputerSoftwareMember 2022-12-31 0000887225 ifrs-full:MiningRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:ComputerSoftwareMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 kep:GreenhouseGasEmissionsRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember kep:LeaseAgreementsMember 2022-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:IntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MiningRightsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:LeaseAgreementsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:MiningRightsMember 2022-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:LeaseAgreementsMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:GreenhouseGasEmissionsRightsMember 2022-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:IntangibleAssetsMember 2022-12-31 0000887225 kep:GreenhouseGasEmissionsRightsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:GreenhouseGasEmissionsRightsMember 2022-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:IntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:GreenhouseGasEmissionsRightsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:GreenhouseGasEmissionsRightsMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:IntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:IntangibleAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-12-31 0000887225 ifrs-full:MiningRightsMember 2022-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2022-12-31 0000887225 kep:LeaseAgreementsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:MiningRightsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:LeaseAgreementsMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:LeaseAgreementsMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:MiningRightsMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2022-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:ComputerSoftwareMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:ComputerSoftwareMember 2022-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:ComputerSoftwareMember 2022-12-31 0000887225 ifrs-full:EquityAttributableToOwnersOfParentMember 2022-12-31 0000887225 ifrs-full:NoncontrollingInterestsMember 2022-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2022-12-31 0000887225 ifrs-full:RetainedEarningsMember 2022-12-31 0000887225 ifrs-full:IssuedCapitalMember 2022-12-31 0000887225 ifrs-full:CorporateLoansMember 2022-12-31 0000887225 kep:OtherReceivablesMember 2022-12-31 0000887225 ifrs-full:TradeReceivablesMember 2022-12-31 0000887225 kep:DeferredRevenueMember 2022-12-31 0000887225 kep:AccruedIncomeReceivableMember 2022-12-31 0000887225 ifrs-full:InvestmentsAccountedForUsingEquityMethodMember 2022-12-31 0000887225 ifrs-full:PropertyPlantAndEquipmentMember 2022-12-31 0000887225 ifrs-full:LeaseReceivablesMember 2022-12-31 0000887225 ifrs-full:IntangibleAssetsOtherThanGoodwillMember 2022-12-31 0000887225 kep:SpecialDeductionForPropertyPlantAndEquipmentMember 2022-12-31 0000887225 ifrs-full:UnusedTaxLossesMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-12-31 0000887225 ifrs-full:OtherProvisionsMember 2022-12-31 0000887225 kep:OtherFinancialLiabilitiesMember 2022-12-31 0000887225 kep:GainsLossesOnForeignExchangeTranslationMember 2022-12-31 0000887225 ifrs-full:AllowanceForCreditLossesMember 2022-12-31 0000887225 kep:ExcessDonationLimitMember 2022-12-31 0000887225 ifrs-full:OtherTemporaryDifferencesMember 2022-12-31 0000887225 kep:UnusedTaxLossesAndUnusedTaxCreditsMember 2022-12-31 0000887225 ifrs-full:UnusedTaxCreditsMember 2022-12-31 0000887225 ifrs-full:NetDefinedBenefitLiabilityAssetMember 2022-12-31 0000887225 ifrs-full:TemporaryDifferenceMember 2022-12-31 0000887225 kep:DoubtfulMember 2022-12-31 0000887225 ifrs-full:CashFlowHedgesMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2022-12-31 0000887225 ifrs-full:OfficeEquipmentMember 2021-12-31 0000887225 kep:ToolsDiesAndMoldsMember 2021-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2021-12-31 0000887225 kep:CashMember 2021-12-31 0000887225 ifrs-full:InvestmentPropertyMember 2021-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2021-12-31 0000887225 ifrs-full:LandMember 2021-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2021-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2021-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember 2021-12-31 0000887225 ifrs-full:VehiclesMember 2021-12-31 0000887225 ifrs-full:MachineryMember 2021-12-31 0000887225 kep:StructuresMember 2021-12-31 0000887225 ifrs-full:BuildingsMember 2021-12-31 0000887225 ifrs-full:BuildingsMember 2022-12-31 0000887225 ifrs-full:MachineryMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:BuildingsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:BuildingsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:StructuresMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:RightofuseAssetsMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:ShipsMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:VehiclesMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:OtherAssetsMember 2022-12-31 0000887225 ifrs-full:ShipsMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:VehiclesMember 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:VehiclesMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:OtherAssetsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:RightofuseAssetsMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:StructuresMember 2022-12-31 0000887225 kep:StructuresMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:MachineryMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MachineryMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:ShipsMember 2022-12-31 0000887225 ifrs-full:OtherAssetsMember 2022-12-31 0000887225 kep:ListedAndUnlistedEquitySecurtiesMember 2022-12-31 0000887225 kep:CurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-12-31 0000887225 kep:NonCurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-12-31 0000887225 kep:CorporateBondMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:StructuresMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:StructuresMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:MachineryMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:VehiclesMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:FixturesAndFittingsAndOfficeEquipmentMember 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2022-12-31 0000887225 ifrs-full:VehiclesMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:ShipsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:LandMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:MachineryMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:BuildingsMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2022-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember 2022-12-31 0000887225 ifrs-full:ShipsMember 2022-12-31 0000887225 ifrs-full:VehiclesMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:VehiclesMember 2022-12-31 0000887225 ifrs-full:ShipsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 kep:StructuresMember 2022-12-31 0000887225 ifrs-full:VehiclesMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:FixturesAndFittingsAndOfficeEquipmentMember 2022-12-31 0000887225 ifrs-full:ShipsMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:ShipsMember 2022-12-31 0000887225 ifrs-full:MachineryMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:ToolsDiesAndMoldsMember 2022-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:StructuresMember 2022-12-31 0000887225 ifrs-full:ShipsMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 ifrs-full:MachineryMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:MachineryMember 2022-12-31 0000887225 kep:StructuresMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:VehiclesMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:MachineryMember 2022-12-31 0000887225 kep:StructuresMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:RightofuseAssetsMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:BuildingsMember 2022-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:BuildingsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:RightofuseAssetsMember 2022-12-31 0000887225 ifrs-full:LandMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:LandMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:LandMember 2022-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember kep:GovernmentGrantsAdjustmentsMember 2022-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:RightofuseAssetsMember 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember 2022-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:ConstructionInProgressMember 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:RetirementsPropertyPlantAndEquipmentMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2022-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 kep:BorrowingsAndDebtSecuritiesMember 2022-12-31 0000887225 ifrs-full:LeaseLiabilitiesMember 2022-12-31 0000887225 ifrs-full:SeparateMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember 2021-12-31 0000887225 ifrs-full:GrossCarryingAmountMember 2021-12-31 0000887225 kep:EnvironmentAndEnergyMember 2021-12-31 0000887225 kep:SaemangeumSebitPowerPlantCo.Ltd.Member 2021-12-31 0000887225 kep:SuwonNewPowerCoLtdMember 2021-12-31 0000887225 kep:GwangbaekSolarPowerInvestmentCoLtdMember 2021-12-31 0000887225 kep:GoDeokCleanEnergyCoLtdMember 2021-12-31 0000887225 kep:SureDataLabCoLtdMember 2021-12-31 0000887225 kep:KPGEIncMember 2021-12-31 0000887225 kep:SEPCoLtdMember 2021-12-31 0000887225 kep:IndeckNilesDevelopmentLLCMember 2021-12-31 0000887225 kep:IndeckNilesAssetManagementLLCMember 2021-12-31 0000887225 kep:YuDangSolarCoLtdMember 2021-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember 2021-12-31 0000887225 kep:SeoroseoroSunnyPowerPlantCoLtdMember 2021-12-31 0000887225 kep:HanwhaCorporation-linkedSunlightPowerSpecialPrivateEquityInvestmentTrustNo1Member 2021-12-31 0000887225 kep:JejuGimnyeongWindPowerCoLtdMember 2021-12-31 0000887225 kep:SantiagoSolarPowerSpaMember 2021-12-31 0000887225 kep:YangguFloatingPhotovoltaicPowerPlantIncMember 2021-12-31 0000887225 kep:ScEgMember 2021-12-31 0000887225 kep:BoulderSolarIiiLlcMember 2021-12-31 0000887225 kep:Platformn.Co.LtdMember 2021-12-31 0000887225 kep:TronixCoLtdMember 2021-12-31 0000887225 kep:GoesanSolarParkCoLtdMember 2021-12-31 0000887225 kep:MuanSolarParkCoLtdMember 2021-12-31 0000887225 kep:AceMember 2021-12-31 0000887225 kep:RecsInnovationCo.Ltd.FormerlyWangSanEngineering.Co.Ltd.Member 2021-12-31 0000887225 kep:GreenRadiationCo.LtdMember 2021-12-31 0000887225 kep:HankookElectricPowerInformationCoLtdMember 2021-12-31 0000887225 kep:Ud4mCoLtdMember 2021-12-31 0000887225 kep:YeomsubongWindPowerCo.Ltd.Member 2021-12-31 0000887225 kep:DigitalInnovationGrowthFundMember 2021-12-31 0000887225 kep:HaeparangEnergyCo.Ltd.Member 2021-12-31 0000887225 kep:SeobuHighwaySolarCoLtdMember 2021-12-31 0000887225 kep:TaebaekGadeoksanWindPowerCoLtdMember 2021-12-31 0000887225 kep:DaewonGreenEnergyCoLtdMember 2021-12-31 0000887225 kep:GGuruCoLtdMember 2021-12-31 0000887225 kep:ChuncheonGreenEnergyCo.Ltd.Member 2021-12-31 0000887225 kep:KoreaEnergyDataCoLtdMember 2021-12-31 0000887225 kep:GangneungSacheonFuelCellCoLtdMember 2021-12-31 0000887225 kep:KostureCoLtdMember 2021-12-31 0000887225 kep:DongbuHighwaySolarCoLtdMember 2021-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2021-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratory.Co.LtdMember 2021-12-31 0000887225 kep:GreenEnergyElectricityGenerationCoLtdMember 2021-12-31 0000887225 kep:JinbhuvishPowerGenerationPvtMember 2021-12-31 0000887225 kep:Pt.CirebonEnergiPrasaranaMember 2021-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember 2021-12-31 0000887225 kep:AnjwaSmartFarmSolarCityCoLtdMember 2021-12-31 0000887225 kep:YeongyangWindPowerCorporationIiMember 2021-12-31 0000887225 kep:MuanSunshineSolarPowerPlantCoLtdMember 2021-12-31 0000887225 kep:SaemangeumHeemangPhotovoltaicCoLtdMember 2021-12-31 0000887225 kep:StnCo.Ltd.FormerlyStructureTestNetworkCo.Ltd.Member 2021-12-31 0000887225 kep:O2BGlobalCoLtdMember 2021-12-31 0000887225 kep:KoreaEnergySolutionsCoLtdMember 2021-12-31 0000887225 kep:KNHSolarMember 2021-12-31 0000887225 kep:SPCPowerCorporationMember 2021-12-31 0000887225 kep:PTBayanResourcesTBKMember 2021-12-31 0000887225 kep:SPowerMember 2021-12-31 0000887225 kep:PTCirebonElectricPowerMember 2021-12-31 0000887225 kep:PioneerGasPowerMember 2021-12-31 0000887225 kep:PTMutiaraJawaMember 2021-12-31 0000887225 kep:GoseongGreenPowerMember 2021-12-31 0000887225 kep:GangneungEcoPowerMember 2021-12-31 0000887225 kep:PyeongchangWindPowerMember 2021-12-31 0000887225 kep:GunsanBioEnergyMember 2021-12-31 0000887225 kep:NoeulGreenEnergyMember 2021-12-31 0000887225 kep:KNOCNigerianEastOilMember 2021-12-31 0000887225 kep:KNOCNigerianWestOilMember 2021-12-31 0000887225 kep:EurasiaEnergyHoldingsMember 2021-12-31 0000887225 kep:ITRCoLtdMember 2021-12-31 0000887225 kep:HyundaiEcoEnergyCoLtdMember 2021-12-31 0000887225 kep:KoreaPowerExchangeMember 2021-12-31 0000887225 kep:ShinPyeongtaekPowerMember 2021-12-31 0000887225 kep:YaksuESSLtdMember 2021-12-31 0000887225 kep:GwangyangGreenEnergyMember 2021-12-31 0000887225 kep:KoreaElectricVehicleChargingServiceMember 2021-12-31 0000887225 kep:GSDonghaeElectricPowerMember 2021-12-31 0000887225 kep:HaengBokDoSiPhotovoltaicPowerCoLtdMember 2021-12-31 0000887225 kep:SamcheokEcoMaterialsMember 2021-12-31 0000887225 kep:PNDSolarMember 2021-12-31 0000887225 kep:DaejungOffshoreWindPowerMember 2021-12-31 0000887225 kep:EnergyInfraAssetManagementMember 2021-12-31 0000887225 kep:BusanGreenEnergyMember 2021-12-31 0000887225 kep:KoreaElectricPowerCorporationFundMember 2021-12-31 0000887225 kep:DaeguPhotovoltaicMember 2021-12-31 0000887225 kep:YTNMember 2021-12-31 0000887225 kep:HyundaiGreenPowerMember 2021-12-31 0000887225 kep:GangwonWindPowerMember 2021-12-31 0000887225 kep:KoreaElectricPowerIndustrialDevelopmentMember 2021-12-31 0000887225 kep:KoreaGasCorporationMember 2021-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimiteMember 2021-12-31 0000887225 kep:DaegucleanEnergyMember 2021-12-31 0000887225 kep:DongducheonDreamPowerMember 2021-12-31 0000887225 kep:TaebaekWindPowerMember 2021-12-31 0000887225 kep:HansuwonKnpCoLtdFormerlyKoreaNuclearPartnersCoLtdMember 2021-12-31 0000887225 kep:YeongGwangYaksuWindElectricCoLtdMember 2021-12-31 0000887225 kep:GemengInternationalEnergyMember 2021-12-31 0000887225 kep:PTWampuElectricPowerMember 2021-12-31 0000887225 kep:XePianXeNamnoyPowerMember 2021-12-31 0000887225 kep:DaeryunPowerMember 2021-12-31 0000887225 kep:ChangjukWindPowerMember 2021-12-31 0000887225 kep:TaebackGuinemiWindPowerMember 2021-12-31 0000887225 kep:KPGEIncMember 2022-12-31 0000887225 kep:SeobuHighwaySolarCoLtdMember 2022-12-31 0000887225 kep:BoulderSolarIiiLlcMember 2022-12-31 0000887225 kep:GreenRadiationCo.LtdMember 2022-12-31 0000887225 kep:PyeongchangWindPowerMember 2022-12-31 0000887225 kep:KoreaElectricVehicleChargingServiceMember 2022-12-31 0000887225 kep:ChangjukWindPowerMember 2022-12-31 0000887225 kep:DongbuHighwaySolarCoLtdMember 2022-12-31 0000887225 kep:DigitalInnovationGrowthFundMember 2022-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratory.Co.LtdMember 2022-12-31 0000887225 kep:BitsolarEnergyMember 2021-12-31 0000887225 kep:PulauIndahOmSdnBhdMember 2021-12-31 0000887225 kep:GuraeResidentPowerCoLtdMember 2021-12-31 0000887225 kep:PrimeSwedishHoldingAbMember 2021-12-31 0000887225 kep:PyeongchangWindPowerMember 2021-12-31 0000887225 kep:EumseongEcoParkMember 2021-12-31 0000887225 kep:SongsanGreenEnergyMember 2021-12-31 0000887225 kep:DangjinEcoPowerCoLtdNewlyMember 2021-12-31 0000887225 kep:HaemodumSolarCoLtdMember 2021-12-31 0000887225 kep:ChungsongmeonBongSanWindPowerCoLtdMember 2021-12-31 0000887225 kep:JaeunResidentWindPowerPlantCoLtdMember 2021-12-31 0000887225 kep:DEEnergiaSpAMember 2021-12-31 0000887225 kep:NHAmundiGlobalInfrastructureInvestmentPrivateInvestmentTrust21Member 2021-12-31 0000887225 kep:YeongamSolarPowerCoLtdMember 2021-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember 2021-12-31 0000887225 kep:SolaseadoSolarPowerMember 2021-12-31 0000887225 kep:StavroHoldingIIABMember 2021-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISSDECVMember 2021-12-31 0000887225 kep:ShinhanBNPPPrivateInvestmentTrustEastWestSunlightDreamMember 2021-12-31 0000887225 kep:GunsanLandSolarCoLtdMember 2021-12-31 0000887225 kep:PTBaritoWahanaTenagaMember 2021-12-31 0000887225 kep:CAESLLCMember 2021-12-31 0000887225 kep:BoimCombinedHeatAndPowerGenerationCo.Ltd.FormerlyDayoneEnergyCo.Ltd.Member 2021-12-31 0000887225 kep:NaepoGreenEnergyMember 2021-12-31 0000887225 kep:SamYangPhotovoltaicPowerCoLtdMember 2021-12-31 0000887225 kep:SamsuWindPowerCoLtdMember 2021-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember 2021-12-31 0000887225 kep:EnergycoCoLtdFormerlyEnergycoLlcMember 2021-12-31 0000887225 kep:BusanIndustrialSolarPowerCoLtdMember 2021-12-31 0000887225 kep:HapcheonFloatingPhotovoltaicPowerPlantIncMember 2021-12-31 0000887225 kep:CapmanLynxScaSicarMember 2021-12-31 0000887225 kep:InternationalOffshorePowerTransmissionHoldingCompanyLimitedMember 2021-12-31 0000887225 kep:HORUSSOLARSADECVMember 2021-12-31 0000887225 kep:KepcoKpsCarabaoCorpMember 2021-12-31 0000887225 kep:YeongwolEcoWindCoLtdMember 2021-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingSLMember 2021-12-31 0000887225 kep:GeumsungsanWindPowerCoLtdMember 2021-12-31 0000887225 kep:GoheungNewEnergyCoLtdMember 2021-12-31 0000887225 kep:OneEnergyAsiaLimitedMember 2021-12-31 0000887225 kep:KASINVESTMENTILLCMember 2021-12-31 0000887225 kep:SeobusamboHighwayPhotovoltaicsCo.Ltd.Member 2021-12-31 0000887225 kep:SpowerChileSpaMember 2021-12-31 0000887225 kep:SeungmunGreenEnergyMember 2021-12-31 0000887225 kep:HasamiWindFarmCorporationMember 2021-12-31 0000887225 kep:PungbackWindFarmCorporationMember 2021-12-31 0000887225 kep:TrumbullAssetManagementLlcMember 2021-12-31 0000887225 kep:ChangwonNuriEnergyMember 2021-12-31 0000887225 kep:YangyangWindPowerCoLtdMember 2021-12-31 0000887225 kep:KASINVESTMENTIILLCMember 2021-12-31 0000887225 kep:CheongnaEnergyMember 2021-12-31 0000887225 kep:EnelXMidlandPhotovoltaicLlcMember 2021-12-31 0000887225 kep:OmisanWindPowerMember 2021-12-31 0000887225 kep:CheongjuEcoParkCoLtdMember 2021-12-31 0000887225 kep:GuadalupeSolarSpaMember 2021-12-31 0000887225 kep:KWNuclearComponentsMember 2021-12-31 0000887225 kep:BusanShinhoSolarPowerMember 2021-12-31 0000887225 kep:ChuncheonEnergyMember 2021-12-31 0000887225 kep:RabighElectricityMember 2021-12-31 0000887225 kep:PTTanjungPowerIndonesiaMember 2021-12-31 0000887225 kep:KoreaPowerEngineeringServiceMember 2021-12-31 0000887225 kep:MOMENTUMMember 2021-12-31 0000887225 kep:Cheong-SongNoraesanWindPowerCoLtdMember 2021-12-31 0000887225 kep:REAstoria2LandCoLLCMember 2021-12-31 0000887225 kep:SouthJamaicaPowerCompanyLimitedMember 2021-12-31 0000887225 kep:ExpresswaySolarlightPowerGenerationMember 2021-12-31 0000887225 kep:JamaicaPublicServiceMember 2021-12-31 0000887225 kep:RabighOperationMaintenanceMember 2021-12-31 0000887225 kep:GlobalTradeOfPowerSystemMember 2021-12-31 0000887225 kep:LaurelSpAMember 2021-12-31 0000887225 kep:KEPCOUhdeMember 2021-12-31 0000887225 kep:BarakahOneCompanyMember 2021-12-31 0000887225 kep:YeonggwangWindPowerMember 2021-12-31 0000887225 kep:ChesterSolarIVSpAMember 2021-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember 2021-12-31 0000887225 kep:REHolidayHoldingsLLCMember 2021-12-31 0000887225 kep:WaterburyLakeUraniumLPMember 2021-12-31 0000887225 kep:ShuweihatAsiaOperationMaintenanceCompanyMember 2021-12-31 0000887225 kep:ASMBGInvesticiiADMember 2021-12-31 0000887225 kep:ShuweihatAsiaPowerInvestmentBVMember 2021-12-31 0000887225 kep:DatangKEPCOChaoyangRenewablePowerMember 2021-12-31 0000887225 kep:DatangChifengRenewablePowerMember 2021-12-31 0000887225 kep:GansuDatangYumenWindPowerMember 2021-12-31 0000887225 kep:IncheonNewPowerMember 2021-12-31 0000887225 kep:YeonggwangbaeksuWindPowerMember 2021-12-31 0000887225 kep:DaehanWindPowerPSCMember 2021-12-31 0000887225 kep:SeokmunEnergyMember 2021-12-31 0000887225 kep:NghiSon2PowerMember 2021-12-31 0000887225 kep:HonamWindPowerMember 2021-12-31 0000887225 kep:AmmanAsiaElectricPowerMember 2021-12-31 0000887225 kep:KAPESMember 2021-12-31 0000887225 kep:KIAMCOKOWEPOBannertonHoldCoPtyLtdMember 2021-12-31 0000887225 kep:SolarPhilippinesCalataganCorporationMember 2021-12-31 0000887225 kep:SaemangeumSolarPowerCoLtdMember 2021-12-31 0000887225 kep:DiegoDeAlmagroSolarSpAMember 2021-12-31 0000887225 kep:REBarrenRidge1HoldingsLLCMember 2021-12-31 0000887225 kep:KelarSAMember 2021-12-31 0000887225 kep:REBarrenRidgeLandCoLLCMember 2021-12-31 0000887225 kep:ChesterSolarISpAMember 2021-12-31 0000887225 kep:NawahEnergyMember 2021-12-31 0000887225 kep:ChesterSolarVSpAMember 2021-12-31 0000887225 kep:REPioneerHoldingsLLCMember 2021-12-31 0000887225 kep:RESTechnologyADMember 2021-12-31 0000887225 kep:KEPCOSPCPowerCorporationMember 2021-12-31 0000887225 kep:KVHoldingsMember 2021-12-31 0000887225 kep:DaeguGreenPowerJointVenturesMember 2021-12-31 0000887225 kep:ChileSolarJVSpAMember 2021-12-31 0000887225 kep:SamYangPhotovoltaicPowerCoLtdMember 2022-12-31 0000887225 kep:PeriodTwoThousandAndTwentyOneMember kep:ThirdPlannedPeriodMember 2021-12-31 0000887225 kep:PeriodTwoThousandAndTwentyTwoMember kep:ThirdPlannedPeriodMember 2021-12-31 0000887225 kep:PeriodTwoThousandAndTwentyThreeMember kep:ThirdPlannedPeriodMember 2021-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFourMember kep:ThirdPlannedPeriodMember 2021-12-31 0000887225 kep:PeriodTwoThousandAndTwentyFiveMember kep:ThirdPlannedPeriodMember 2021-12-31 0000887225 kep:ThirdPlannedPeriodMember 2021-12-31 0000887225 ifrs-full:BuildingsMember 2022-12-31 0000887225 kep:StructuresMember 2022-12-31 0000887225 ifrs-full:MachineryMember 2022-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2022-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2022-12-31 0000887225 ifrs-full:VehiclesMember 2022-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember 2022-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2022-12-31 0000887225 kep:CashMember 2022-12-31 0000887225 ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:InvestmentPropertyMember 2022-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2022-12-31 0000887225 kep:ToolsDiesAndMoldsMember 2022-12-31 0000887225 ifrs-full:OfficeEquipmentMember 2022-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects1Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects2Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects9Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects10Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects11Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects12Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects13Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects14Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects4Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects5Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects6Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects7Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects8Member 2021-12-31 0000887225 kep:GovernmentGrantsForSpecificBusinessProjects3Member 2021-12-31 0000887225 ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember kep:UnlistedSecuritiesMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember 2022-12-31 0000887225 ifrs-full:DebtSecuritiesMember ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-12-31 0000887225 ifrs-full:BuildingsMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:BuildingsMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:BuildingsMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:BuildingsMember 2022-12-31 0000887225 ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:LandMember 2022-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:LandMember 2022-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2022-12-31 0000887225 kep:OtherCapitalSurplusMember 2022-12-31 0000887225 kep:OtherCapitalSurplusOtherThanGainsonDisposalOfTreasuryStocksMember 2022-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember kep:OtherCapitalSurplusMember 2022-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember ifrs-full:AccumulatedOtherComprehensiveIncomeMember 2022-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember ifrs-full:OtherEquityInterestMember 2022-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2022-12-31 0000887225 ifrs-full:TreasurySharesMember 2022-12-31 0000887225 ifrs-full:AccumulatedOtherComprehensiveIncomeMember 2022-12-31 0000887225 kep:SharesInOtherComprehensiveIncomeLossOfInvestmentsInAssociatesAndJointVenturesMember 2022-12-31 0000887225 ifrs-full:ReserveOfCashFlowHedgesMember 2022-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2022-12-31 0000887225 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 2022-12-31 0000887225 ifrs-full:StatutoryReserveMember 2022-12-31 0000887225 kep:ChangesInOtherEquityMember 2022-12-31 0000887225 ifrs-full:OtherEquityInterestMember 2022-12-31 0000887225 kep:FinanceLeaseReceivablesMember 2022-12-31 0000887225 ifrs-full:PresentValueOfDefinedBenefitObligationMember 2022-12-31 0000887225 ifrs-full:PlanAssetsMember 2022-12-31 0000887225 kep:SyndicatedLoanMember kep:KoreaDevelopmentBankMember 2022-12-31 0000887225 kep:EBLMember kep:KoreaDevelopmentBankMember 2022-12-31 0000887225 kep:OperatingFundsMember kep:KoreaDevelopmentBankMember 2022-12-31 0000887225 kep:FacilityLoan1Member kep:KoreaDevelopmentBankMember 2022-12-31 0000887225 kep:OtherLoan1Member kep:KoreaDevelopmentBankMember 2022-12-31 0000887225 kep:SpowerChileSpaMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:CapmanLynxScaSicarMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingS.lMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:NghiSon2PowerMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:GuadalupeSolarSpaMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:GunsanBioEnergyCoLtdMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:GunsanBioEnergyCoLtdMember 2022-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:KEPCOLebanonSARLMember 2022-12-31 0000887225 kep:KEPCOLebanonSARLMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:CapmanLynxScaSicarMember ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:YangyangWindPowerCoLtdMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:PtCirebonEnergiPrasaranaMember 2022-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:KnocNigerianEastWestOilCo.Ltd.Member ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:KnocNigerianEastWestOilCo.Ltd.Member ifrs-full:AccumulatedImpairmentMember 2022-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:DaejungOffshoreWindPowerMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:PTWampuElectricPowerMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:HORUSSOLARSADECVMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:SolaseadoSolarPowerMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:BitsolarEnergyMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:KelarSAMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISADECVMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:XePianXeNamnoyPowerMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:DEEnergiaSpAMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:DaehanWindPowerPSCMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember ifrs-full:GrossCarryingAmountMember 2022-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember kep:GreenhouseGasEmissionsRightsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:ComputerSoftwareMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:MiningRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 kep:IntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 kep:LeaseAgreementsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:ComputerSoftwareMember 2023-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:MiningRightsMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:ComputerSoftwareMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:ComputerSoftwareMember 2023-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-12-31 0000887225 ifrs-full:CopyrightsPatentsAndOtherIndustrialPropertyRightsServiceAndOperatingRightsMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:MiningRightsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:MiningRightsMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:ComputerSoftwareMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-12-31 0000887225 kep:LeaseAgreementsMember 2023-12-31 0000887225 ifrs-full:MiningRightsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:IntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:LeaseAgreementsMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:LeaseAgreementsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MiningRightsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:LeaseAgreementsMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:GreenhouseGasEmissionsRightsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-12-31 0000887225 kep:UsageRightsOfDonatedAssetsAndOtherMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:LeaseAgreementsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:GreenhouseGasEmissionsRightsMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:IntangibleAssetsMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember kep:IntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-12-31 0000887225 kep:GreenhouseGasEmissionsRightsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:IntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 kep:AcquisitionRelatedCostsMember ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember kep:GreenhouseGasEmissionsRightsMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:GreenhouseGasEmissionsRightsMember 2023-12-31 0000887225 kep:SyndicatedLoanMember kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:EBLMember kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:OperatingFundsMember kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:FacilityLoan1Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:OtherLoan1Member kep:KoreaDevelopmentBankMember 2023-12-31 0000887225 kep:DaehanWindPowerPSCMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:DEEnergiaSpAMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:HORUSSOLARSADECVMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:BitsolarEnergyMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:PTWampuElectricPowerMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:XePianXeNamnoyPowerMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:BigeumResidentPhotovoltaicPowerMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:DaejungOffshoreWindPowerMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:BitgoelEcoEnergyCoLtdMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:KelarSAMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:SolaseadoSolarPowerMember 2023-12-31 0000887225 kep:SaemangeumSebitPowerPlantMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:SUNMEXRENOVABLESSADECVMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:DaesanGreenEnergyCoLtdMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:YangyangWindPowerCoLtdMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:PtCirebonEnergiPrasaranaMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:NepalWaterEnergyDevelopmentCompanyPrivateLimitedMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:KnocNigerianEastWestOilCo.Ltd.Member ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:KnocNigerianEastWestOilCo.Ltd.Member ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:RECURSOSSOLARESPVDEMEXICOIISADECVMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:ForesightIberianSolarGroupHoldingS.lMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:NghiSon2PowerMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:CapmanLynxScaSicarMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:GuadalupeSolarSpaMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:SpowerChileSpaMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:PulauIndahPowerPlantSdnBhdMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:GunsanBioEnergyCoLtdMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:CapmanLynxScaSicarMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:KEPCOLebanonSARLMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:KEPCOLebanonSARLMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:GunsanBioEnergyCoLtdMember 2023-12-31 0000887225 ifrs-full:IssuedCapitalMember 2023-12-31 0000887225 ifrs-full:RetainedEarningsMember 2023-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2023-12-31 0000887225 ifrs-full:NoncontrollingInterestsMember 2023-12-31 0000887225 ifrs-full:EquityAttributableToOwnersOfParentMember 2023-12-31 0000887225 ifrs-full:CorporateLoansMember 2023-12-31 0000887225 ifrs-full:TradeReceivablesMember 2023-12-31 0000887225 kep:OtherReceivablesMember 2023-12-31 0000887225 ifrs-full:CashFlowHedgesMember 2023-12-31 0000887225 ifrs-full:NetDefinedBenefitLiabilityAssetMember 2023-12-31 0000887225 kep:GainsLossesOnForeignExchangeTranslationMember 2023-12-31 0000887225 ifrs-full:AllowanceForCreditLossesMember 2023-12-31 0000887225 kep:SpecialDeductionForPropertyPlantAndEquipmentMember 2023-12-31 0000887225 kep:DoubtfulMember 2023-12-31 0000887225 kep:OtherFinancialLiabilitiesMember 2023-12-31 0000887225 kep:DeferredRevenueMember 2023-12-31 0000887225 ifrs-full:OtherProvisionsMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-12-31 0000887225 ifrs-full:InvestmentsAccountedForUsingEquityMethodMember 2023-12-31 0000887225 ifrs-full:LeaseReceivablesMember 2023-12-31 0000887225 ifrs-full:IntangibleAssetsOtherThanGoodwillMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 kep:ExcessDonationLimitMember 2023-12-31 0000887225 ifrs-full:UnusedTaxLossesMember 2023-12-31 0000887225 kep:AccruedIncomeReceivableMember 2023-12-31 0000887225 kep:UnusedTaxLossesAndUnusedTaxCreditsMember 2023-12-31 0000887225 ifrs-full:PropertyPlantAndEquipmentMember 2023-12-31 0000887225 ifrs-full:OtherTemporaryDifferencesMember 2023-12-31 0000887225 ifrs-full:TemporaryDifferenceMember 2023-12-31 0000887225 ifrs-full:UnusedTaxCreditsMember 2023-12-31 0000887225 ifrs-full:MachineryMember 2023-12-31 0000887225 ifrs-full:LandMember 2023-12-31 0000887225 ifrs-full:ShipsMember 2023-12-31 0000887225 ifrs-full:VehiclesMember 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2023-12-31 0000887225 ifrs-full:OtherAssetsMember 2023-12-31 0000887225 kep:StructuresMember 2023-12-31 0000887225 ifrs-full:BuildingsMember 2023-12-31 0000887225 ifrs-full:VehiclesMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:OtherAssetsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:LandMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:LandMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 kep:StructuresMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:StructuresMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:MachineryMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:MachineryMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:ShipsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:VehiclesMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:OtherAssetsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 ifrs-full:ShipsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember ifrs-full:GrossCarryingAmountMember 2023-12-31 0000887225 kep:CurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-12-31 0000887225 kep:ListedAndUnlistedEquitySecurtiesMember 2023-12-31 0000887225 kep:CorporateBondMember 2023-12-31 0000887225 kep:NonCurrentFinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:FixturesAndFittingsAndOfficeEquipmentMember 2023-12-31 0000887225 ifrs-full:ShipsMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:ShipsMember 2023-12-31 0000887225 ifrs-full:MachineryMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:ToolsDiesAndMoldsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:StructuresMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:StructuresMember 2023-12-31 0000887225 ifrs-full:ShipsMember kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 ifrs-full:MachineryMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:MachineryMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:RightofuseAssetsMember 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember 2023-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:ConstructionInProgressMember 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2023-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember kep:RetirementsPropertyPlantAndEquipmentMember 2023-12-31 0000887225 ifrs-full:ShipsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:VehiclesMember kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 ifrs-full:MachineryMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 kep:StructuresMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:VehiclesMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:MachineryMember kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:FixturesAndFittingsAndOfficeEquipmentMember 2023-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:BuildingsMember kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 ifrs-full:LandMember kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 kep:CarryingAmountOtherThanGovernmentGrantsMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 kep:StructuresMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:BuildingsMember 2023-12-31 0000887225 ifrs-full:LandMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember 2023-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember 2023-12-31 0000887225 ifrs-full:AccumulatedImpairmentMember kep:ToolsDiesAndMoldsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:OtherPropertyPlantAndEquipmentMember 2023-12-31 0000887225 ifrs-full:VehiclesMember 2023-12-31 0000887225 ifrs-full:OtherPropertyPlantAndEquipmentMember 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2023-12-31 0000887225 kep:FixturesAndFittingsAndOfficeEquipmentMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:ShipsMember 2023-12-31 0000887225 ifrs-full:VehiclesMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:VehiclesMember 2023-12-31 0000887225 ifrs-full:ShipsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 kep:StructuresMember 2023-12-31 0000887225 ifrs-full:VehiclesMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:MachineryMember 2023-12-31 0000887225 kep:StructuresMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember kep:RetirementsPropertyPlantAndEquipmentMember 2023-12-31 0000887225 ifrs-full:RightofuseAssetsMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:BuildingsMember 2023-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:BuildingsMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:RightofuseAssetsMember 2023-12-31 0000887225 ifrs-full:LandMember ifrs-full:AccumulatedImpairmentMember 2023-12-31 0000887225 ifrs-full:LandMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:LandMember 2023-12-31 0000887225 kep:RetirementsPropertyPlantAndEquipmentMember ifrs-full:AccumulatedDepreciationAndAmortisationMember 2023-12-31 0000887225 ifrs-full:LeaseLiabilitiesMember 2023-12-31 0000887225 kep:BorrowingsAndDebtSecuritiesMember 2023-12-31 0000887225 ifrs-full:SeparateMember 2023-12-31 0000887225 kep:HoenggyeRenewableEnergyCoLtdMember 2022-12-31 0000887225 kep:HamanGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:SongsanGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:PowerEmbeddedMember 2022-12-31 0000887225 kep:ChangwonSgEnergyCoLtdMember 2022-12-31 0000887225 kep:DonpyungTechnologyCoLtdMember 2022-12-31 0000887225 kep:HorangEnergyIncMember 2022-12-31 0000887225 kep:KPEGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:DongbuHighwaySolarCoLtdMember 2023-12-31 0000887225 kep:NamjeongsusangSolarPowerOperationCoLtdMember 2023-12-31 0000887225 kep:SeobuHighwaySolarCoLtdMember 2023-12-31 0000887225 kep:TaebaekWindPowerMember 2023-12-31 0000887225 kep:GreenRadiationCo.LtdMember 2023-12-31 0000887225 kep:FutureConvergenceTechnologyLaboratory.Co.LtdMember 2023-12-31 0000887225 kep:BoulderSolarIiiLlcMember 2023-12-31 0000887225 kep:YangyangSuriWindPowerCoLtdMember 2022-12-31 0000887225 kep:KepcoForPowerCompanyMember 2022-12-31 0000887225 kep:TaebaekWindPowerMember 2022-12-31 0000887225 kep:JeonjuBioGreenEnergyCoLtdMember 2022-12-31 0000887225 kep:KumyangEcoParkCoLtdMember 2022-12-31 0000887225 kep:JeongeupGreenPowerCoLtdMember 2022-12-31 0000887225 kep:HadongEfactoryCoLtdMember 2022-12-31 0000887225 kep:NamyangjuCombinedHeatAndPowerCoLtdMember 2022-12-31 0000887225 kep:WadiNoorSolarPowerCompanySaocMember 2022-12-31 0000887225 kep:FairhavenEnergyStorageLlcMember 2022-12-31 0000887225 kep:SongsanGreenEnergyMember 2023-12-31 0000887225 kep:HasamiWindFarmCorporationMember 2023-12-31 0000887225 kep:KEPCOUhdeMember 2023-12-31 0000887225 kep:ChileSolarJVSpAMember 2023-12-31 0000887225 ifrs-full:MachineryMember 2023-12-31 0000887225 ifrs-full:InvestmentPropertyMember 2023-12-31 0000887225 ifrs-full:OfficeEquipmentMember 2023-12-31 0000887225 ifrs-full:OtherIntangibleAssetsMember 2023-12-31 0000887225 ifrs-full:CapitalisedDevelopmentExpenditureMember 2023-12-31 0000887225 ifrs-full:IntangibleAssetsUnderDevelopmentMember 2023-12-31 0000887225 ifrs-full:ComputerSoftwareMember 2023-12-31 0000887225 kep:StructuresMember 2023-12-31 0000887225 ifrs-full:LandMember 2023-12-31 0000887225 kep:CashMember 2023-12-31 0000887225 kep:ToolsDiesAndMoldsMember 2023-12-31 0000887225 ifrs-full:VehiclesMember 2023-12-31 0000887225 ifrs-full:ConstructionInProgressMember 2023-12-31 0000887225 ifrs-full:BuildingsMember 2023-12-31 0000887225 ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2023-12-31 0000887225 ifrs-full:AtFairValueMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember kep:UnlistedSecuritiesMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember ifrs-full:Level3OfFairValueHierarchyMember ifrs-full:AtFairValueMember ifrs-full:DebtSecuritiesMember 2023-12-31 0000887225 ifrs-full:LandMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:BuildingsMember kep:CarryingAmountOtherThanGovernmentGrantsMember 2023-12-31 0000887225 ifrs-full:LandMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:LandMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:LandMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:LandMember 2023-12-31 0000887225 ifrs-full:GrossCarryingAmountMember ifrs-full:BuildingsMember 2023-12-31 0000887225 kep:GovernmentGrantsAdjustmentsMember ifrs-full:BuildingsMember 2023-12-31 0000887225 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:BuildingsMember 2023-12-31 0000887225 ifrs-full:BuildingsMember 2023-12-31 0000887225 kep:OtherCapitalSurplusOtherThanGainsonDisposalOfTreasuryStocksMember 2023-12-31 0000887225 ifrs-full:TreasurySharesMember 2023-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember kep:OtherCapitalSurplusMember 2023-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember ifrs-full:AccumulatedOtherComprehensiveIncomeMember 2023-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember ifrs-full:OtherEquityInterestMember 2023-12-31 0000887225 kep:OtherComponentsOfEquityAttributableToOwnersOfParentMember 2023-12-31 0000887225 kep:OtherCapitalSurplusMember 2023-12-31 0000887225 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 2023-12-31 0000887225 kep:SharesInOtherComprehensiveIncomeLossOfInvestmentsInAssociatesAndJointVenturesMember 2023-12-31 0000887225 ifrs-full:ReserveOfCashFlowHedgesMember 2023-12-31 0000887225 ifrs-full:AccumulatedOtherComprehensiveIncomeMember 2023-12-31 0000887225 ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMember 2023-12-31 0000887225 ifrs-full:StatutoryReserveMember 2023-12-31 0000887225 kep:ChangesInOtherEquityMember 2023-12-31 0000887225 ifrs-full:OtherEquityInterestMember 2023-12-31 0000887225 kep:FinanceLeaseReceivablesMember 2023-12-31 0000887225 ifrs-full:PresentValueOfDefinedBenefitObligationMember 2023-12-31 0000887225 ifrs-full:PlanAssetsMember 2023-12-31 iso4217:KRW xbrli:shares iso4217:AED iso4217:SGD iso4217:IDR iso4217:HKD iso4217:ZAR iso4217:THB iso4217:RUB iso4217:AUD iso4217:BDT iso4217:BWP iso4217:CZK iso4217:EUR iso4217:JOD iso4217:MMK iso4217:GBP iso4217:KZT iso4217:MYR iso4217:JPY iso4217:PKR iso4217:USD iso4217:UYU iso4217:SEK iso4217:VND iso4217:INR iso4217:PHP iso4217:SAR iso4217:CAD iso4217:MGA iso4217:CHF iso4217:EGP xbrli:pure utr:Year iso4217:MXN iso4217:OMR utr:kT utr:t iso4217:KRW xbrli:shares
As filed with the Securities and Exchange Commission on April 30, 2024
 
 
 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
 
 
Form
20-F
 
 
(Mark One)
 
REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR (g) OF THE SECURITIES EXCHANGE ACT OF 1934
OR
 
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2023
OR
 
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
OR
 
SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
Date of event requiring this shell company report
For the transition period from     to    
Commission File
Number
:
001-13372
 
 
KOREA ELECTRIC POWER CORPORATION
(Exact name of registrant as specified in its charter)
 
N/A
 
The Republic of Korea
(Translation of registrant’s name into English)
 
(Jurisdiction of incorporation or organization)
 
 
55
Jeollyeok-ro
,
Naju-si,
Jeollanam-do, 58322,
Korea
(Address of principal executive offices)
 
 
Hwayun Kim, +82 61 345 4218,
kim0430@kepco.co.kr,
+82 61 345 4299
55
Jeollyeok-ro
,
Naju-si,
Jeollanam-do, 58322,
Korea
(Name, telephone,
e-mail
and/or facsimile number and address of company contact person)
 
 
Securities registered or to be registered pursuant to Section 12(b) of the Act:
 
Title of each class:
 
Trading Symbol(s):
 
Name of each exchange on which registered:
Common stock, par value Won 5,000 per share
 
KEP
 
New York Stock Exchange*
American depositary shares, each representing
one-half
of share of common stock
 
KEP
 
New York Stock Exchange
 
*
Not for trading, but only in connection with the listing of American depositary shares on the New York Stock Exchange, pursuant to the requirements of the Securities and Exchange Commission.
 
 
Securities registered or to be registered pursuant to Section 12(g) of the Act:
None
Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act:
One Hundred Year 7.95%
Zero-to-Full
Debentures, due April 1, 2096
6% Debentures due December 1, 2026
7% Debentures due February 1, 2027
6
3
4
% Debentures due August 1, 2027
 
 
Indicate the number of outstanding shares of each of the issuer’s classes of capital or common stock as of the
close
of the period covered by the annual report:
641,964,077 shares of common stock, par value of Won 5,000 per share
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.  Yes ☑ No ☐
If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934. Yes ☐ No ☑
Note—Checking the box above will not relieve any registrant required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 from their obligations under those Sections.
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports) and (2) has been subject to such filing requirements for the past 90 days: Yes ☑ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation
S-T
(§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files):  Yes ☑ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a
non-accelerated
filer, or an emerging growth company. See definition of “large accelerated filer”, “accelerated filer”, and “emerging growth company” in Rule
12b-2
of the Exchange Act.
Large accelerated filer ☑     Accelerated filer ☐     
Non-accelerated
filer ☐      Emerging Growth Company 
If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards† provided pursuant to Section 13(a) of the Exchange Act. ☐
† The term “new or revised financial accounting standard” refers to any update issued
by
the Financial Accounting Standards Board to its Accounting Standards Codification after April 5, 2012.
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. 
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. Yes ☐ No 
Indicate by check mark whether any of those error corrections are restatements that required a
recovery
analysis of incentive based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to
§240.10D-1(b). Yes ☐ 
No ☑
Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:
U.S. GAAP ☐    International Financial Reporting Standards as issued by the
International
Accounting Standards Board  ☑    Other ☐
If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow. Item 17 ☐ Item 18 ☐
If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule
12b-2
of the Exchange Act). Yes ☐ No 
 
(APPLICABLE ONLY TO ISSUERS INVOLVED IN BANKRUPTCY PROCEEDINGS DURING THE PAST FIVE YEARS)
Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court. Yes ☐ No ☐
 
 
 


Table of Contents

TABLE OF CONTENTS

 

     Page 

PART I

   3 

ITEM 1.

 IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS   3 

ITEM 2.

 OFFER STATISTICS AND EXPECTED TIMETABLE   3 

ITEM 3.

 KEY INFORMATION   3 
 Item 3.A.  [Reserved]   3 
 Item 3.B.  Capitalization and Indebtedness   3 
 Item 3.C.  Reasons for the Offer and Use of Proceeds   3 
 Item 3.D.  Risk Factors   3 

ITEM 4.

 INFORMATION ON THE COMPANY    33 
 Item 4.A.  History and Development of the Company   33 
 Item 4.B.  Business Overview   34 
 Item 4.C.  Organizational Structure   91 
 Item 4.D.  Property, Plant and Equipment   98 

ITEM 4A.

 UNRESOLVED STAFF COMMENTS   98 

ITEM 5.

 OPERATING AND FINANCIAL REVIEW AND PROSPECTS   98 
 Item 5.A.  Operating Results   99 
 Item 5.B.  Liquidity and Capital Resources   107 
 Item 5.C.  Research and Development, Patents and Licenses, etc.   115 
 Item 5.D.  Trend Information   115 
 Item 5.E.  Critical Accounting Estimates   115 

ITEM 6.

 DIRECTORS, SENIOR MANAGEMENT AND EMPLOYEES    116 
 Item 6.A.  Directors and Senior Management   116 
 Item 6.B.  Compensation   121 
 Item 6.C.  Board Practices   122 
 Item 6.D.  Employees   122 
 Item 6.E.  Share Ownership   123 
 Item 6.F.  Disclosure of a Registrant’s Action to Recover Erroneously Awarded Compensation   123 

ITEM 7.

 MAJOR SHAREHOLDERS AND RELATED PARTY TRANSACTIONS    123 
 Item 7.A.  Major Shareholders   123 
 Item 7.B.  Related Party Transactions   124 
 Item 7.C.  Interests of Experts and Counsel   124 

ITEM 8.

 FINANCIAL INFORMATION    124 
 Item 8.A.  Consolidated Statements and Other Financial Information   124 
 Item 8.B.  Significant Changes   127 

ITEM 9.

 THE OFFER AND LISTING    127 
 Item 9.A.  Offer and Listing Details   127 
 Item 9.B.  Plan of Distribution   130 
 Item 9.C.  Markets   130 
 Item 9.D.  Selling Shareholders   133 
 Item 9.E.  Dilution   133 
 Item 9.F.  Expenses of the Issue   133 

ITEM 10.

 ADDITIONAL INFORMATION    133 
 Item 10.A.  Share Capital   133 
 Item 10.B.  Memorandum and Articles of Incorporation   133 
 Item 10.C.  Material Contracts   141 
 Item 10.D.  Exchange Controls   141 
 Item 10.E.  Taxation   147 
 Item 10.F.  Dividends and Paying Agents   160 

 

i


Table of Contents
     Page 
 Item 10.G.  Statements by Experts   160 
 Item 10.H.  Documents on Display   160 
 Item 10.I.  Subsidiary Information   160 
 Item 10.J.  Annual Report to Security Holders   160 

ITEM 11.

 QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK   160 

ITEM 12.

 DESCRIPTION OF SECURITIES OTHER THAN EQUITY SECURITIES    166 
 Item 12.A.  Debt Securities   166 
 Item 12.B.  Warrants and Rights   166 
 Item 12.C.  Other Securities   166 
 Item 12.D.  American Depositary Shares   166 

PART II

   168 

ITEM 13.

 DEFAULTS, DIVIDEND ARREARAGES AND DELINQUENCIES   168 

ITEM 14.

 MATERIAL MODIFICATIONS TO THE RIGHTS OF SECURITY HOLDERS AND USE OF PROCEEDS   168 

ITEM 15.

 CONTROLS AND PROCEDURES   168 

ITEM 16.

 [RESERVED]   169 

ITEM 16A.

 AUDIT COMMITTEE FINANCIAL EXPERT   169 

ITEM 16B.

 CODE OF ETHICS   169 

ITEM 16C.

 PRINCIPAL ACCOUNTANT FEES AND SERVICES   169 

ITEM 16D.

 EXEMPTIONS FROM THE LISTING STANDARDS FOR AUDIT COMMITTEE   170 

ITEM 16E.

 PURCHASES OF EQUITY SECURITIES BY THE ISSUER AND AFFILIATED PURCHASERS   170 

ITEM 16F.

 CHANGE IN REGISTRANT’S CERTIFYING ACCOUNTANT   170 

ITEM 16G.

 CORPORATE GOVERNANCE   170 

ITEM 16H.

 MINE SAFETY DISCLOSURE   178 

ITEM 16I.

 DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS.   178 

ITEM 16J.

 INSIDER TRADING POLICIES.   178 

ITEM 16K.

 

CYBERSECURITY.

   178 

PART III

   180 

ITEM 17.

 

FINANCIAL STATEMENTS

   180 

ITEM 18.

 

FINANCIAL STATEMENTS

   180 

ITEM 19.

 

EXHIBITS

   180 

INDEX OF EXHIBITS

   181 

INDEX TO FINANCIAL STATEMENTS

   F-1 

 

ii


Table of Contents

CERTAIN DEFINED TERMS AND CONVENTIONS

All references to “Korea” or the “Republic” in this annual report on Form 20-F, or this annual report, are references to the Republic of Korea. All references to the “Government” in this annual report are references to the government of the Republic of Korea. All references to “we,” “us,” “our,” “ours,” the “Company” or “KEPCO” in this annual report are references to Korea Electric Power Corporation and, as the context may require, its subsidiaries, and the possessive thereof, as applicable. All references to “the Ministry of Trade, Industry and Energy” and “the Ministry of Economy and Finance” include the respective predecessors thereof. All references to “tons” are to metric tons, equal to 1,000 kilograms, or 2,204.6 pounds. Any discrepancies in any table between totals and the sums of the amounts listed are due to rounding. All references to “IFRS” in this annual report are references to the International Financial Reporting Standards as issued by the International Accounting Standard Board. Unless otherwise stated, all of our financial information presented in this annual report has been prepared on a consolidated basis and in accordance with IFRS.

In addition, in this annual report, all references to:

 

  

“EWP” are to Korea East-West Power Co., Ltd.,

 

  

“KHNP” are to Korea Hydro & Nuclear Power Co., Ltd.,

 

  

“KOMIPO” are to Korea Midland Power Co., Ltd.,

 

  

“KOSEP” are to Korea South-East Power Co., Ltd.,

 

  

“KOSPO” are to Korea Southern Power Co., Ltd., and

 

  

“KOWEPO” are to Korea Western Power Co., Ltd.,

each of which is our wholly-owned generation subsidiary.

FORWARD-LOOKING STATEMENTS

This annual report includes “forward-looking statements” (as defined in Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934), including statements regarding our expectations and projections for future operating performance and business prospects. The words “believe,” “expect,” “anticipate,” “estimate,” “project” and similar words used in connection with any discussion of our future operation or financial performance identify forward-looking statements. In addition, all statements other than statements of historical facts included in this annual report are forward-looking statements. Although we believe that the expectations reflected in such forward-looking statements are reasonable, we can give no assurance that such expectations will prove to be correct. We caution you not to place undue reliance on the forward-looking statements, which speak only as of the date of this annual report.

This annual report discloses, under the caption Item 3.D. “Risk Factors” and elsewhere, important factors that could cause actual results to differ materially from our expectations (“Cautionary Statements”). All subsequent written and oral forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by the Cautionary Statements.

CURRENCY TRANSLATIONS AND EXCHANGE RATES

In this annual report, unless otherwise indicated, all references to “Won,” “KRW” or “W” are to the currency of Korea, all references to “U.S. dollars,” “Dollars,” “USD”, “$” or “US$” are to the currency of the United States of America; all references to “Euro”, “€” or “EUR” are references to the currency of the European Union; all references to “Yen”, “¥” or “JPY” are references to the currency of Japan; all references to “A$” or

 

1


Table of Contents

“AUD” are to the currency of Australia; all references to “HK$” or “HKD” are to the currency of Hong Kong; all references to “Fr.” or “CHF” are to the currency of Switzerland; all references to “kr” or “SEK” are to the currency of Sweden. Unless otherwise indicated, all translations from Won to U.S. dollars were made at Won 1,291.0 to US$1.00, which was the Noon Buying Rate of the Federal Reserve Board (the “Noon Buying Rate”) in effect as of December 29, 2023, which rates are available on the H.10 statistical release of the Federal Reserve Board. On April 19, 2024, the Noon Buying Rate was Won 1,376.7 to US$1.00. The exchange rate between the U.S. dollar and Korean Won may be highly volatile from time to time and no representation is made that the Won or U.S. dollar amounts referred to in this annual report could have been or could be converted into U.S. dollars or Won, as the case may be, at any particular rate or at all.

The following table sets forth, for the periods and dates indicated, certain information concerning the Noon Buying Rate in Won per US$1.00.

 

Year Ended December 31,

  At End
of
Period
   Average(1)   High   Low 
   (Won per US$1.00) 

2019

   1,155.5    1,165.8    1,220.7    1,111.8 

2020

   1,086.1    1,180.6    1,267.3    1,081.9 

2021

   1,188.6    1,144.9    1,198.7    1,081.6 

2022

   1,260.2    1,291.8    1,440.5    1,187.0 

2023

   1,291.0    1,306.8    1,362.9    1,220.3 

October

   1,351.0    1,351.5    1,362.9    1,338.2 

November

   1,290.0    1,308.2    1,356.9    1,289.3 

December

   1,291.0    1,304.4    1,325.3    1,288.5 

2024 (through April 19)

   1,376.7    1,336.3    1,393.9    1,300.5 

January

   1,337.7    1,323.3    1,344.2    1,300.5 

February

   1,336.2    1,331.3    1,337.3    1,321.9 

March

   1,347.1    1,331.7    1,348.6    1,310.8 

April (through April 19)

   1,376.7    1,363.8    1,393.9    1,346.9 

 

Source: Federal Reserve Board

Note:

 

(1)

The average rates for annual and interim periods were calculated by taking the simple average of the Noon Buying Rates on the last day of each month during the relevant period. The average rates for the monthly periods (or a portion thereof) were calculated by taking the simple average of the daily Noon Buying Rates during the relevant month (or a portion thereof).

 

2


Table of Contents

PART I

 

ITEM 1.

IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS

Not applicable.

 

ITEM 2.

OFFER STATISTICS AND EXPECTED TIMETABLE

Not applicable.

 

ITEM 3.

KEY INFORMATION

 

Item 3.A.

[Reserved]

 

Item 3.B.

Capitalization and Indebtedness

Not applicable.

 

Item 3.C.

Reasons for the Offer and Use of Proceeds

Not applicable.

 

Item 3.D.

Risk Factors

Our business and operations are subject to various risks, many of which are beyond our control. If any of the risks described below actually occurs, our business, financial condition or results of operations could be seriously harmed. Such risks fall primarily under the categories below:

Risks relating to KEPCO primarily include:

 

  

increases in fuel prices which may not be passed on to customers;

 

  

Governmental policies that may affect the industry or our operations;

 

  

capacity expansion plans based on projections of long-term supply and demand of electricity proving to be inadequate against actual supply and demand;

 

  

being subject to various environmental legislations, regulations and Government initiatives;

 

  

incurrence of additional indebtedness;

 

  

the movement of Won against other currencies;

 

  

risks associated with new business strategies and overseas expansion opportunities;

 

  

an increase in electricity generated by and/or sourced from independent power producers eroding our market position;

 

  

labor unrest and increases in labor cost;

 

  

risks associated with the operation of nuclear power generation facilities;

 

  

difficulties in the construction and operation of our facilities due to opposition from civic groups and uncertainties in maintaining permits and licenses;

 

  

risk management policies and procedures failing to be effective, including but not limited to failing to prevent losses in our debt and foreign currency positions;

 

  

limited amount and scope of insurance coverage;

 

3


Table of Contents
  

inability to raise share capital without the Government’s participation;

 

  

claims by current or previous employees for unpaid wages;

 

  

attacks on physical security and cybersecurity; and

 

  

Russia-related dealings.

Risks relating to Korea and Global Economy primarily include:

 

  

unfavorable financial and economic conditions in Korea;

 

  

tensions with North Korea;

 

  

being subject to Korean corporate governance and disclosure standards; and

 

  

risks associated with enforcing a foreign judgment against us.

Risks relating to Our American Depositary Shares (ADSs) primarily include:

 

  

restrictions on withdrawal and deposit of common shares under the depositary facility;

 

  

ownership of our shares being restricted under Korean law;

 

  

no preemptive rights in certain circumstances;

 

  

being affected by the volatility of the Korean securities market;

 

  

dividend payments being affected by fluctuations in the exchange rate; and

 

  

restriction on the depositary bank from converting and remitting dividends under emergency circumstances.

Risks Relating to KEPCO

Increases in fuel prices may adversely affect our results of operations and profitability as we may not be able to pass on the increased cost to customers at a sufficient level or at all or on a timely basis.

In 2023, fuel costs constituted 30.1% of our cost of sales, and the ratio of fuel costs to our sales was 30.8%. Our generation subsidiaries purchase substantially all of the fuel that they use (except for anthracite coal) from suppliers outside Korea at prices determined in part by prevailing market prices in currencies other than Won. For example, most of the bituminous coal requirements (which accounted for approximately 38.0% of our fuel requirements in 2023 in terms of electricity output) are imported principally from Australia, Indonesia, Russia and, to a lesser extent, South Africa and others, which accounted for approximately 22.2%, 27.4%, 21.3%, 9.3% and 19.9%, respectively, of the annual bituminous coal requirements of our generation subsidiaries in 2023. Approximately 93.9% of the bituminous coal requirements of our generation subsidiaries in 2023 were purchased under long-term contracts and the remaining 6.1% from the spot market. Pursuant to the terms of our long-term supply contracts, prices are adjusted periodically based on prevailing market conditions. In addition, our generation subsidiaries purchase a significant portion of their fuel requirements under contracts with limited duration. See Item 4.B. “Business Overview—Fuel Sources and Requirements.”

The prices of our main fuel types, namely, bituminous coal, oil and liquefied natural gas (LNG), fluctuate, sometimes significantly, in tandem with their international market prices. For example, the average weekly spot price of “free on board” Newcastle coal 5500 NAR (Net As Received) published on Korea Mineral Resource Information Service by Korea Mine Rehabilitation and Mineral Resources Corporation decreased from US$179.13 per ton in 2022 to US$106.38 per ton in 2023 and decreased to US$89.36 per ton as of April 5, 2024. The prices of oil and LNG are substantially dependent on the price of crude oil, and according to Bloomberg (Bloomberg Ticker: PGCRDUBA), the average daily spot price of Dubai crude oil decreased from US$97.03 per barrel in 2022 to US$81.93 per barrel in 2023 and increased to US$91.71 per barrel as of April 5, 2024.

 

4


Table of Contents

Furthermore, because the prices of LNG are dependent on the price of crude oil, an increase in such fuel prices can result in an increase in the prices of LNG, which, in turn, affect the cost of purchasing electricity from independent power producers. We cannot assure you that fuel prices will remain stable or will not significantly increase in the remainder of 2024 or thereafter. In addition, following the International Maritime Organization’s regulation referred to as IMO 2020 that regulates sulfur content of ships’ fuel oil, IMO 2023 was mandated from January 1, 2023. IMO 2023 regulates energy efficiency and carbon emissions of ships by setting specific indices that all ships are required to comply with. While we have seen mixed reactions in the market, there is a likelihood that installation of energy saving devices or modification of ships to improve their carbon emissions level may increase as the regulation strengthens. Such trends may significantly increase the operating cost of the shipping lines and the increased costs are expected to be passed onto customers like us via higher freight rates. If fuel prices increase substantially in the future within a short span of time, our generation subsidiaries may be unable to secure adequate fuel supplies at prices commercially acceptable to them. In addition, any significant interruption or delay in the supply of fuel, bituminous coal in particular, from any of their suppliers may cause our generation subsidiaries to purchase fuel on the spot market at prices higher than the prices available under existing supply contracts, which would result in an increase in fuel costs.

As of January 1, 2021, we implemented a new cost pass-through tariff system to reinforce the correlation between the costs we incur and the tariff we charge to our customers and to enhance transparency by separately billing fuel costs and climate/environment related costs. Previously, the electricity tariff consisted of two main components: (i) the base charge (the “Base Charge”) and (ii) the usage charge (the “Usage Charge”) based on the amount of electricity consumed by end-users. Under the new tariff system, there are new components to the tariff called the fuel cost adjusted charge (the “Fuel Cost Adjusted Charge”) and the climate/environment related charge (the “Climate/Environment Related Charge”). In principle, the Fuel Cost Adjusted Charge is calculated on a quarterly basis, and the formula for calculating the amount of the Fuel Cost Adjusted Charge is multiplying (i) the unit price of the Fuel Cost Adjusted Charge (the “Unit Price of the Fuel Cost Adjusted Charge”), which is the difference between a base fuel cost (the “Base Fuel Cost”) and an actual fuel cost (the “Actual Fuel Cost”) and (ii) the amount of electricity consumed. The Base Fuel Cost is the past twelve-month average fuel price of bituminous coal, LNG and Bunker C oil as posted by the Korea Customs Service. The twelve-month average fuel price is measured by taking the average of monthly fuel prices from twelve months in between thirteen and one month prior to the time a new Base Fuel Cost becomes effective. To illustrate, the Base Fuel Cost effective from 2023 is the average of the fuel prices from December 2021 to November 2022. The Base Fuel Cost can be adjusted upon the revision of the electricity tariff as a whole as described in the penultimate paragraph of this risk factor. On the other hand, the Actual Fuel Cost is the past three-month average fuel price of the same fuels we use to measure the Base Fuel Cost. The past three-month average fuel price is measured by taking the average of monthly fuel prices from three months in between four and one month prior to the time the Fuel Cost Adjusted Charge is updated. To illustrate, for the first quarter of 2024, we used the fuel costs for September, October and November 2023 to calculate the three-month average fuel price.

The quarterly-adjusted Fuel Cost Adjusted Charge has built-in limits in view of price stability and other public policy considerations. First, there is a limit on any change in the Unit Price of the Fuel Cost Adjusted Charge to be no less than Won ±1 per kilowatt-hour. In other words, any change less than Won ±1 per kilowatt-hour will not be reflected. However, such limit does not apply if it is the first quarter during which the Base Fuel Cost has been newly updated. Second, the Unit Price of the Fuel Cost Adjusted Charge that exceeds Won ±5 per kilowatt-hour will not be reflected. In other words, the maximum adjustment that can be incorporated to the Unit Price of the Fuel Cost Adjusted Charge is equal to Won ±5 per kilowatt-hour from the Base Fuel Cost that is in effect. For example, in the third quarter of 2023, the Unit Price of the Fuel Cost Adjusted Charge was Won 10.2 per kilowatt-hour, meaning the Actual Fuel Cost was higher than the Base Fuel Cost by Won 10.2 per kilowatt-hour, but after being subjected to the limit of Won ±5 per kilowatt-hour, the Unit Price of the Fuel Cost Adjusted Charge came out to be Won 5.0 per kilowatt-hour.

However, our ability to pass on fuel and other cost increases to our customers may be limited due to the regulation of the Government on the rates we charge for the electricity we sell to our customers. In addition to

 

5


Table of Contents

the built-in limits described in the preceding paragraph, the new tariff system gives discretion to the Government to not wholly or partially adjust the quarterly Fuel Cost Adjusted Charge in case of extenuating circumstances, as determined by the Government. For example, in the second and third quarter of 2021, although the Unit Price of the Fuel Cost Adjusted Charge was Won –0.2 and Won 0.0 per kilowatt-hour respectively, the Government notified us to keep it at the same Won –3.0 per kilowatt-hour as the first quarter of 2021. In the fourth quarter of 2021, we increased the Unit Price of the Fuel Cost Adjusted Charge to Won 0.0 per kilowatt-hour. In the first and second quarters of 2022, although the Unit Price of the Fuel Cost Adjusted Charge as calculated should have been Won 3.0 per kilowatt-hour as the quarterly limit of Won ±3 per kilowatt-hour had existed back then, the Government notified us to keep it at the same Won 0.0 per kilowatt-hour as the fourth quarter of 2021. The Government cited different policy reasons for withholding the application of the quarterly Fuel Cost Adjusted Charge in the past, but one of the more consistent reasons has been alleviating the hardship caused by the prolonged economic effects of COVID-19 pandemic. As the quarterly limit of Won ±3 per kilowatt-hour was repealed in the third quarter of 2022 and with the approval by the Government, we ultimately increased the Unit Price of the Fuel Cost Adjusted Charge to Won 5.0 per kilowatt-hour in the third quarter of 2022, which was the maximum incremental amount allowed in 2022 under the limit. From then to the second quarter of 2024, the same Won 5.0 per kilowatt-hour increment has been applied to the Unit Price of the Fuel Cost Adjusted Charge. Even though the incremental amounts as calculated by our formula were Won -1.8, Won -4.0 and Won -2.5 per kilowatt-hour in the fourth quarter of 2023 and in the first and second quarters of 2024, respectively, the Government notified us to keep it at the same Won 5.0 per kilowatt-hour, taking into consideration our financial conditions and the fact that a substantial amount of the Fuel Cost Adjusted Charge that should have been reflected in previous years has not previously been reflected in the electricity tariff.

Also, because the Fuel Cost Adjusted Charge takes into account the fuel prices posted by Korea Customs Service, there may still be a mismatch in value between the actual prices the domestic generation companies pay for their fuels in the open market and the adjustment that can be made through the Fuel Cost Adjusted Charge. The domestic generation companies include not only our generation subsidiaries but also independent power producers that are not affiliated with us and we do not have access to fuel costs incurred by the independent power producers. As such, we use fuel prices posted by Korea Customs Service, which are easily accessible to our customers, for calculating the Fuel Cost Adjusted Charge.

Due to the likelihood of the Actual Fuel Cost being substantially over the built-in limits of the new tariff system and the Government’s discretion not to wholly or partially adjust the quarterly Fuel Cost Adjusted Charge in case of extenuating circumstances, there may be certain portions of the fuel costs that cannot be charged to our customers, even though those portions should have been included in the Fuel Cost Adjusted Charge. In such cases, we may accumulate such portions and reflect them in what is called the total comprehensive cost (the “Total Comprehensive Cost”), which is a variable we use to calculate the Base Charge and the Usage Charge of the tariff. The Total Comprehensive Cost, submitted yearly to the Government for its review by us, is calculated using the relevant costs according to our settled accounts from the previous year and the proposed budget for the upcoming year. Under the Total Comprehensive Cost approach, the Base Charge and the Usage Charge are established at levels that would enable us to recover fair operating costs as well as fair investment return on the capital used in our operations. For further information on fair operating costs and fair investment return, please see Item 4.B. “Business Overview—Sales and Customers—Electricity Rates.” The Base Charge and the Usage Charge that are derived from the Total Comprehensive Cost need to be approved by the Government before they can be revised. The Government may, from time to time, consider different policy objectives to regulate the time and magnitude of such revision of the Base Charge and the Usage Charge of the electricity tariff. Therefore, changes in the fuel costs may not be timely or fully reflected even through the Usage Charge of the tariff where they would typically be reflected. Recently, to reflect the rise in the Base Fuel Cost, the Usage Charge needed to increase by Won 9.8 per kilowatt-hour from January 2022. With the approval by the Government, we increased the Usage Charge by Won 4.9 per kilowatt-hour on April 1, 2022 and October 1, 2022 respectively, which resulted in a total increase of Won 9.8 per kilowatt-hour. Such increases were spread out into two rounds to relieve people’s hardship including the prolonged effects of COVID-19 pandemic. In addition, in October 2022, we increased the Usage Charge of the tariff by Won 7.0 to Won 11.7 per kilowatt-hour on industrial and

 

6


Table of Contents

commercial consumers and by Won 2.5 per kilowatt-hour on all other consumers, reflecting additional accumulated fuel cost rises. In 2023, with the approval of the Government, we increased the Usage Charge by Won 11.4 and Won 8.0 per kilowatt-hour in January and May 2023, respectively, to reflect a portion of the increase in the Base Fuel Cost. Also, we increased the Usage Charge of the tariff by Won 6.7 to Won 13.5 per kilowatt-hour for large-scale industrial consumers in November 2023 to reflect additional accumulated fuel cost rises. In its economic policy direction statement for 2023, the Government announced its plans to gradually increase the tariff in order to address our cumulative deficit by 2026. However, there is no assurance on whether such plans will be realized. In its economic policy direction statement for 2024, the Government announced its policy to freeze utility rates, including the tariff, during the first half of 2024.

Overall, despite the new tariff system, we may not be able to adjust our tariff in accordance with such system due to the reasons we described in this risk factor. If fuel prices increase rapidly and substantially and the current level of electricity tariff is not increased to a level sufficient to offset the impact of high fuel prices or not adjusted responsive to fuel price movements, our profit margins will be adversely affected. Our business, financial condition, results of operations and cash flows may be adversely affected. For example, as the fuel prices have increased rapidly in the last several years, we have experienced substantial operating and net losses and may continue to experience them if the electricity tariff is not increased to a level sufficient to cover such increase in fuel prices. For instance, in 2023, we incurred operating and net losses of Won 4,245 billion and Won 4,716 billion respectively due to a rise in fuel prices among other reasons.

The Government may adopt policy measures to substantially restructure the Korean electric power industry or our operational structure, which may have a material adverse effect on our business, operations and profitability.

From time to time, the Government considers various policy initiatives to foster efficiency in the Korean electric power industry and at times have adopted policy measures that have substantially modified our business and operations. For example, in January 1999, with the aim of introducing greater competition in the Korean electric power industry and thereby improving its efficiency, the Government announced a restructuring plan for the Korean electric power industry, or the Restructuring Plan. For a detailed description of the Restructuring Plan, see Item 4.B. “Business Overview—Restructuring of the Electric Power Industry in Korea.” As part of this initiative, in April 2001 the Government established the Korea Power Exchange to enable the sale and purchase of electricity through a competitive bidding process, established the Korea Electricity Commission to ensure fair competition in the Korean electric power industry, and, in order to promote competition in electricity generation, split off our electricity generation business to form one nuclear generation company and five non-nuclear generation companies, in each case, to be wholly owned by us. In 2002, the Government introduced a plan to privatize one of our five non-nuclear generation subsidiaries, but this plan was suspended indefinitely in 2004 due to prevailing market conditions and other policy considerations.

In August 2010, the Ministry of Trade, Industry and Energy announced the Proposal for the Improvement in the Structure of the Electric Power Industry, which was designed to promote responsible management by and improve operational efficiency of Government-affiliated electricity companies by fostering competition among them. Pursuant to this proposal, while our six generation subsidiaries continued to be our wholly-owned subsidiaries, in January 2011 the six generation subsidiaries were officially designated as “market-oriented public enterprises” (same as us) under the Act on the Management of Public Institutions, whereupon the President of Korea appoints the president and the standing director who is to become a member of the audit committee of each such subsidiary; the selection of non-standing directors of each such subsidiary is subject to approval by the Minister of the Ministry of Economy and Finance; the president of each such subsidiary is required to enter into a management contract directly with the Minister of the Ministry of Trade, Industry and Energy; and the Committee for Management of Public Institutions (which is comprised largely of Government officials and those recommended by Government officials) conducts performance evaluation of such subsidiaries. Previously, our president appointed the president and the statutory auditor of each such subsidiary; the selection of non-standing directors of each such subsidiary was subject to approval by our president; the president of each such subsidiary

 

7


Table of Contents

entered into a management contract with our president; and our evaluation committee conducted performance evaluation of such subsidiaries. As a result of these changes, our six generation subsidiaries took on additional operational responsibilities and management autonomy with respect to construction and management of generation units and procurement of fuel, while we as the parent company continued to oversee and coordinate, among others, finances, corporate governance, overseas businesses, including nuclear export technology and overseas resource development, that jointly affect us and our generation subsidiaries. See also Item 16.G. “Corporate Governance—The Act on the Management of Public Institutions—Applications of the Act on Our Generation Subsidiaries.”

In June 2016, the Government announced the Proposal for Adjustment of Functions of Public Institutions (Energy Sector) for the purpose of streamlining the operations of Government-affiliated energy companies by discouraging them from engaging in overlapping or similar businesses with each other, reducing non-core assets and activities and improving management and operational efficiency. The initiatives contemplated in this proposal that would affect us and our generation subsidiaries include the following: (i) the generation companies should take on greater responsibilities in overseas resource exploration and production projects as these involve procurement of fuels necessary for electricity generation while fostering cooperation among each other through closer coordination, (ii) KHNP should take a greater role in export of nuclear technology, and (iii) the current system of retail sale of electricity to end-users should be liberalized to encourage more competition. In accordance therewith, we transferred a substantial portion of our assets and liabilities in our overseas resource business to our generation subsidiaries as of December 31, 2016. In addition, pursuant to this Proposal, we considered a sale in the public market of a minority of our shares in our five non-nuclear generation subsidiaries, KEPCO KDN and KHNP. However, the planned sales have been put on hold, primarily due to prevailing market conditions. In any event, we plan to maintain a controlling stake in each of these subsidiaries.

Other than as set forth above, we are not aware of any specific plans by the Government to resume the implementation of the Restructuring Plan or otherwise change the current structure of the electric power industry or the operations of us or our generation subsidiaries materially in the near future. However, for reasons relating to changes in policy considerations, socio-political, economic and market conditions and/or other factors, the Government may resume the implementation of the Restructuring Plan or initiate other steps that may change the structure of the Korean electric power industry or the operations of us or our generation subsidiaries materially. Any such measures may have a negative effect on our business, results of operations and financial condition. In addition, the Government, which beneficially owns a majority of our shares and exercises significant control over our business and operations, may from time to time pursue policy initiatives that could directly or indirectly impact our business and operations, and such initiatives may vary from the interest and objectives of our other shareholders.

The Government may adopt policy measures that affect the tariff rates in order to ease the burden on certain consumers, which may burden us financially.

Previously, there have been several adjustments to the existing tariff rates for certain consumers in order to ease the burden of electricity tariff on them. But these adjustments may be independent from fuel price movements and our business, results of operations, financial condition and profitability may suffer as a result. For example, effective on January 1, 2017, the progressive rate structure applicable to the residential sector, which applies a gradient of increasing tariff rates for heavier electricity usage, was changed from a six-tiered structure with the highest rate being no more than 11.7 times the lowest rate (which gradient system has been in place since 2005) into a three-tiered structure with the highest rate being no more than three times the lowest rate, in order to reflect the changes in the pattern of electricity consumption and reduce the electricity charges payable by consumers. Additionally, a new tariff structure was implemented to encourage energy saving by offering rate discounts to residential consumers that voluntarily reduce electricity consumption while charging special high rates to residential consumers with heavy electricity consumption during peak usage periods in the summer and the winter. Further, during July and August 2018, the residential electricity charges were reduced by temporarily relaxing the application of the then tariff structure and offering higher rate discounts to economically or otherwise disadvantaged customers to ease the burden on households that have significantly increased their use

 

8


Table of Contents

of air conditioners during a heatwave. Subsequently, a joint task force team, consisting of industry experts, scholars and Government officials, was formed, which announced a proposal for amending the tariff structure aimed to lower electricity rates for households during the summer. As a result, in July 2019, the residential electricity tariff rate system was amended to expand the usage ceiling for the first two tiers of rates (from 200 kilowatts to 300 kilowatts for the first tier and from 400 kilowatts to 450 kilowatts for the second tier) applied during July and August each year. With the implementation of the new tariff system as of September 1, 2021, the residents were given a new benefit to opt for a new schedule of residential tariff, which is an option we have already been providing to our industrial and commercial customers. The new schedule is called a seasonal and hourly tariff and it allows residents to be charged under a monthly Base Charge plus increments depending on time, day and season. Each household may also choose to stay under the current tariff schedule which in contrast is a progressive schedule with seasonal adjustments. Our plan is to provide this option to households in Jeju Province in Korea first as many of these households are equipped with the Advanced Metering Infrastructure (“AMI”) already and review rolling it out to the rest of the country depending on the penetration rate of the AMI in each region.

On the other hand, there are also policy measures that have been repealed. For example, the rate discounts offered to residential consumers who voluntarily reduced electricity consumption and those offered to traditional wet markets were abolished in December 2019. The rate discounts for electric vehicles have been terminated in June 2022 and the rate discounts for households that use less than 200 kilowatt-hours were phased out to 50% in July 2021 and was terminated in July 2022. We also discontinued the 50% discount offered to customers who installed a renewable energy generator for their own industrial and general uses in 2020 while only maintaining it for customers who are unable to sell their electricity in the market because of their small generation capacities (less than 10 kilowatts). The discount for such customers ended in December 2023. Despite these, there can be no assurance that the current and future adjustments in electricity tariff rates and rate discounts will not have an adverse impact on our business, results of operations, financial condition and profitability. See Item 4.B. “Business Overview—Sales and Customers—Electricity Rates” for more information on electricity tariff charged to our consumers.

Our capacity expansion plans, which are principally based on projections on long-term supply and demand of electricity in Korea, may prove to be inadequate.

We and our generation subsidiaries make plans for expanding or upgrading our generation capacity and transmission infrastructure based on the Basic Plan Relating to the Long-Term Supply and Demand of Electricity, or the Basic Plan, which is generally revised and announced every two years by the Government. In January 2023, the Government announced the Tenth Basic Plan which is effective for the period from 2023 to 2036. The Tenth Basic Plan focuses on (i) establishing practical and balanced mixture of power sources and (ii) optimizing nuclear power sources while minimizing coal-fired power sources and developing eco-friendly power sources. The Tenth Basic Plan includes the following specific measures: (i) construction of nuclear power plants, Shin-Hanul #3 and 4, would resume and operation of ten other nuclear generation units including Kori #2 may continue beyond their original retirement dates in or before 2030 subject to KHNP’s intention and only upon the Nuclear Safety and Security Commission (“NSSC”)’s approval following a satisfactory safety evaluation; as a result, nuclear generation capacities will increase from 26.1 gigawatts in 2023 to 31.7 gigawatts by 2036, (ii) 28 decrepit coal-fired power plants with total capacity of 14.1 gigawatts will be retired and converted into using LNG instead, decreasing coal generation capacities from 40.2 gigawatts in 2023 to 27.1 gigawatts by 2036 and expanding LNG generation capacities from 43.5 gigawatts in 2023 to 64.6 gigawatts by 2036 as a consequence, (iii) domestic renewable energy generation capacity is projected to expand from 32.8 gigawatts in 2023 to 108.3 gigawatts by 2036, and (iv) carbon-free power sources such as hydrogen-LNG and ammonia-coal blended combustion will be utilized to achieve 2050 carbon neutrality. The introduction of such carbon-free power sources can minimize stranded assets, i.e., assets that have become obsolete or non-performing, by recycling existing coal-fired power plants and system facilities connected thereto. Hydrogen and ammonia-blended power generation is expected to reach 47.4 terawatt-hour in 2036, accounting for 7.1% of the total annual power generation.

 

9


Table of Contents

In June 2019, the Ministry of Trade, Industry and Energy adopted the Third Basic National Energy Plan following consultations with representatives from civic groups, the energy industry and academia. The Third Basic National Energy Plan, which is a comprehensive plan that covers the entire spectrum of energy industries in Korea, covers the period from 2019 to 2040. The Third Basic National Energy Plan is consistent with the First and the Second Basic National Energy Plans in terms of the general policy direction and aims to promote sustainable growth and improvement of people’s quality of life by converting to renewable energy. Specifically, it establishes the following five key tasks: (i) strengthening management of energy demand from various sectors, such as commerce and transportation, and promoting a rational electricity tariff system to improve the national energy consumption efficiency by 38% and reduce the energy demand by 18.6% by 2040; (ii) converting to clean and safe energy through gradual reduction of nuclear power generation and decisive reduction of coal power generation by prohibiting construction of new coal-fired power plants and increasing the proportion of renewable energy sources to approximately 35% by 2040; (iii) expanding the power distribution in areas near those with demands for renewable energy and fuel cells and strengthening the roles and responsibilities of local governments; (iv) fostering the growth of the future energy industries (including renewable energy, hydrogen fuel and other efficient sources of energy linked to technology), promoting the value-add for traditional energy industries and maintaining a core energy ecosystem for nuclear power plants; and (v) improving the energy, gas and heat market systems to facilitate the national energy conversion and building platforms based on big data to foster creation of new energy industries.

In July 2022, the Government announced the draft direction of the new Government’s energy policy that sets forth the following five principles: first, redefining a feasible and rational energy mix; second, establishing strong resource and energy security; third, improving efficiency of energy demand and restructuring the energy market based on market principles; fourth, promoting the development and export of new energy businesses; and finally, strengthening energy welfare and the applicability of relevant policies. Through this policy direction, we expect to promote balanced development in nuclear power, renewable energy, and hydrogen energy nationwide, which will decrease the proportion of energy generated from fossil fuels.

However, we cannot assure that the Tenth Basic Plan, the Third Basic National Energy Plans, or their respective successor plans will successfully achieve their intended goals, the foremost of which is to ensure, through carefully calibrated capacity expansion and other means, balanced overall electricity supply and demand in Korea to end users while promoting efficiency and environmental friendliness in the consumption and production of electricity. If there is significant variance between the projected electricity supply and demand considered in planning our capacity expansions and the actual electricity supply and demand, or if these plans otherwise fail to meet their intended goals or have other unintended consequences, this may result in inefficient use of our working capital, and undue financing costs on the part of us and our generation subsidiaries, among others, which may have a material adverse effect on our results of operations, financial condition and cash flows.

From time to time, we may experience temporary power shortages or circumstances bordering on power shortages due to factors beyond our control, such as extreme weather conditions. Such circumstances may lead to increased end-user complaints and greater public scrutiny, which may in turn require us to modify our capacity expansion plans, and if we were to substantially modify our capacity plans, this might result in additional capital expenditures and, as a result, have a material adverse effect on our results of operations, financial condition and cash flows.

Although the Government makes significant efforts to encourage conservation of electricity, including through demand management programs, there is no assurance that such efforts will have the desired effect of substantially reducing the demand for electricity or improving efficient use thereof. See Item 4.B. “Business Overview— Sales and Customers.”

 

10


Table of Contents

We are subject to various environmental legislations, regulations and related Government initiatives, including in relation to climate change and carbon neutrality, which could cause significant compliance costs and operational liabilities.

We are subject to national, local and overseas environmental laws and regulations, including increasing pressure to reduce emission of carbon dioxide from our electricity generation. Our operations could expose us to the risk of substantial liability relating to environmental, health and safety issues, such as those resulting from the discharge of pollutants and carbon dioxide into the environment and the handling, storage and disposal of hazardous materials. We may be responsible for the investigation and remediation of environmental conditions at current or former operational sites. We may also be subject to related liabilities (including liabilities for environmental damage, third-party property damage or personal injury) resulting from lawsuits brought by the Government or private litigants. In the course of our operations, hazardous wastes may be generated, disposed of or treated at third-party-owned or -operated sites. If those sites become contaminated, we could also be held responsible for the cost of investigation and remediation of such sites for any related liabilities, as well as for civil or criminal fines or penalties.

We intend to fully comply with our environmental obligations. However, our environmental measures, including the use of, or replacement with, environment-friendly but more expensive parts and equipment and budgeting capital expenditures for the installation or modification of such facilities, may result in increased operating costs and liquidity requirement. The actual cost of installation, replacement, modification and/or operation of such equipment and related liquidity requirement may depend on a variety of factors that are beyond our control. There is no assurance that we will continue to be in material compliance with legal or regulatory requirements or satisfy social norms and expectations in the future in relation to the environment, including in respect of climate change.

In recent years, the Government has introduced and implemented a number of new measures designed to reduce greenhouse gas emission, minimize environmental damage and spur related business opportunities. Some key examples of such Government initiatives pertinent to our and our generation subsidiaries’ operations are as follows:

 

  

Greenhouse Gas Emission Trading System, Related Emission Reduction Targets and the Greenhouse Gas Reduction Roadmap.

 

 ¡  

In accordance with the Act on Allocation and Trading of Greenhouse Gas Emission Allowances enacted in March 2013, the Government implemented a greenhouse gas emission trading system under which the Government will allocate the amount of permitted greenhouse gas emission to companies by industry and a company whose business emits more carbon than the permitted amount is required to purchase the right to emit more carbon through the Korea Exchange. The categories of allowances traded include the Korean Allowance Unit (KAU), which is the emissions allowance allocated to applicable companies by the Government; Korean Credit Unit (KCU), which is a tradable unit converted from external carbon offset certifications including the Korean Offset Credit; and Korean Offset Credit (KOC), which is the verified carbon offset credit obtained by companies for reducing carbon emissions through absorption or otherwise. The greenhouse gas emission trading system is expected to be implemented in three stages. During the first phase (2015 to 2017), the Government gradually has set up and conducted a test run of the trading system to ensure its smooth operation, allocating the greenhouse gas emission allowances free of charge. In July 2018, the Government released the allocation plan for the second phase (2018 to 2020), during which 97% of the greenhouse gas emission allowances were allocated free of charge, with 3% allocated through an auction. During the third phase (2021 to 2025), the Government expanded the scale of the system with aggressive greenhouse gas emission reduction targets and allocating 10% of the greenhouse gas emission allowances through an auction.

 

 ¡  

In connection with the Climate Change Response Initiatives and the 2030 National Greenhouse Gas Reduction Roadmap announced by the Government in December 2016, the Government

 

11


Table of Contents
 

subsequently announced the Long-term Low Greenhouse Gas Emission Development Strategies, which presents a long-term vision and national strategy for achieving carbon neutrality in 2050, and the Nationally Determined Contributions (“NDC”), which sets forth the greenhouse gas reduction targets by 2030. According to the Enforcement Decree of the Framework Act on Carbon Neutrality and Green Growth to Cope with Climate Crisis established in March 2022 and the latest figures of NDC announced by the Government in October 2021, the national target emission level in 2030 was 436.6 million tons and represents 40% reduction as compared to 2018. The target emission level for the Transformation sector (electricity and heating) as a whole which we are the part of was 149.9 million tons and represents 44.4% reduction as compared to 2018. Following the National Basic Plan for Carbon Neutrality & Green Growth established in April 2023, the Government has mandated annual sector-specific greenhouse gas reduction targets for the next 20 years from 2023 to 2042 and measures to achieve such targets to be formulated and implemented every five years. In terms of the NDC, the national target emission level remained unchanged but the latest target emission level in 2030 of the Transformation sector increased to 145.9 million tons, which represents 45.9% reduction compared to 2018. We cannot assure you that the reduction target will not be further raised in the future.

 

 ¡  

Adhering to such emission and greenhouse gas reduction requirement may result in significant additional compliance costs. For example, the daily market price of the Korean Allowance Units (KAU), one of the categories of allowance traded on the Korea Exchange and allocated to applicable companies by the Government, was Won 8,640 per ton in early 2015, and the price has increased continuously thereafter, reaching its peak price at Won 42,500 per ton on April 2, 2020. Since then, the price has decreased and, as of the March 31, 2024, the price has been formed around Won 8,130 per ton. We cannot predict how the price of the KAUs will fluctuate over time, and such volatility may adversely affect our results of operation, financial condition and cash flows.

 

  

Obligatory and Voluntary Regulation of Coal-Fired Generation Units. As a measure to address the high level of particulate matter pollution, in October 2018, the Government introduced a pilot regulation to lower the output of 35 coal-fired generation units to approximately 80% of their capacity that emit more than a certain amount of particulate matter. The regulation was formally implemented in January 2019, targeting 40 coal-fired power plants with high emissions of particulate matter. From March to June 2019, the scope expanded to cover 60 units in total. From November 2019, the Government pursued a reduction of coal-fired generation units in order to implement the Special Measures to Respond to the High Concentration Period (December to March) of Particulate Matter. We plan to continue to participate in the effort to reduce the particulate matter emissions from coal-fired generation units, not only during the winter but also during the spring. For example, from December 2023 to March 2024, up to 15 coal-fired generation units were shut down, with a maximum of 47 coal-fired generation units subject to a cap of 80% on the output within the remaining reserve capacity range. Additionally, the Government adjusted the schedule to close down two decrepit coal-fired generation units (Boryeong #1 and #2), which were shut down in December 2020. Also, other coal-fired generation units, Samcheonpo #1 and #2 were shut down in May 2021 and Honam #1 and #2 units in December 2021. According to the Tenth Basic Plan announced in January 2023, the total coal-fired power plant capacity in 2036 will decrease to 27.1 gigawatts from 40.2 gigawatts in 2023, and its percentage of total power generation capacity will decrease to 11.3% in 2036 from 27.1% in 2023. In 2022 and 2023, our generation subsidiaries introduced a voluntary regulation to lower the output of coal-fired generation units, suspending the operations and imposing a cap of 80% on the output of some coal-fired generation units. While such measures may be subject to change, we expect to incur significant costs of complying with such measures, including in connection with more stringent particulate matter pollution regulations, retrofitting and overall replacement of environmental facilities.

 

  

Coal and LNG Consumption Taxes. In January 2014, largely based on policy considerations of tax equity among different fuel types as well as environmental concerns, the Ministry of Economy and

 

12


Table of Contents
 

Finance announced that, effective July 1, 2014, consumption tax will apply to bituminous coal, which previously was not subject to consumption tax unlike other fuel types such as LNG or bunker oil. Pursuant to the amended Individual Consumption Tax Act effective as of April 1, 2019, which involved an increase of the unit tax rate for coal by Won 10 per kilogram across the board, the base tax rate (which is subject to certain adjustments) is Won 46 per kilogram for bituminous coal; however, due to concerns on the potential adverse effect on industrial activities, the applicable tax rate is applied differently based on the net heat generation amount. The currently applicable tax rate for bituminous coal is Won 43 per kilogram for net heat generation of less than 5,000 kilocalories, Won 46 per kilogram for net heat generation of 5,000 to 5,500 kilocalories and Won 49 per kilogram for net heat generation of 5,500 kilocalories or more. In contrast, the consumption tax and surcharge on importation of LNG decreased by Won 48 and Won 20.4 per kilogram, respectively, which came into effect in April 2019. The currently applicable consumption tax rate and surcharge on importation of LNG are Won 12 and Won 3.8 per kilogram, respectively. However, following rapid increases in the price of LNG and bituminous coal, in order to mitigate the adverse impact of price increases in the global energy market and manage the inflation rate, the applicable individual consumption tax rates for coal and LNG have been temporarily decreased. From August 2022 to June 2024, the relevant individual consumption tax rate for coal and LNG decreased by 15%. The individual consumption tax rate for LNG decreased from Won 12 per kilogram to Won 10.2 per kilogram, and the individual consumption tax rate for bituminous coal for net heat generation of 5,000 to 5,500 kilocalories decreased from Won 46 per kilogram to Won 39.1 per kilogram (for net heat generation of less than 5,000 kilocalories, the rate decreased from Won 43 per kilogram to Won 36.5 per kilogram, and for net heat generation of 5,500 kilocalories or more, the rate decreased from Won 49 per kilogram to Won 41.6 per kilogram). Notwithstanding the recent trend, we expect any future increase in tax rates may adversely affect our overall fuel costs and power purchase cost.

 

  

Renewable Portfolio Standard. Under this program, each of our generation subsidiaries is required to generate a specified percentage of total electricity to be generated by such generation subsidiary in a given year in the form of renewable energy or, in case of a shortfall, purchase a corresponding amount of a Renewable Energy Certificate (a form of renewable energy credit) from other generation companies whose renewable energy generation surpass such percentage. The target percentage was 7.0% in 2020, 9.0% in 2021, 12.5% in 2022 and 13.0% in 2023. In 2022, all six of our generation subsidiaries met the target through renewable energy generation and/or the purchase of a Renewable Energy Certificate. Compliance by our generation subsidiaries of the 2023 target is currently under evaluation, and if any generation subsidiary is found to have failed to meet the target for 2023 or for subsequent years, such generation subsidiary may become subject to fines. From October 2021, an amendment to the Act on the Promotion of the Development, Use, and Diffusion of New and Renewable Energy raised the upper limit of the target percentage even higher to 25% from the previous threshold of 10%. The Enforcement Decree of the Act on the Promotion of the Development, Use, and Diffusion of New and Renewable Energy was amended and became effective on January 4, 2022 to gradually increase the annual upper limit of target percentage to 14.5% in 2023, 17.0% in 2024, 20.5% in 2025 in order to raise the upper limit of target percentage to 25% in 2026. However, as the Tenth Basic Plan decreased the target percentage of domestic renewable energy generation from 30.2% to 21.6% in 2030, in May 2023, the Enforcement Decree was amended to gradually increase the annual upper limit of target percentages to 13.0% in 2023, 13.5% in 2024, 14.0% in 2025 and 15.0% in 2026. Even though the recent amendment will delay the target dates, the proposed target percentages may result in additional expenses for our generation subsidiaries.

 

   2024  2025  2026  2027  2028 

Target Percentage under Renewable Portfolio Standard

   13.5  14.0  15.0  17.0  19.0

 

  

Renewable Energy Expansion Plan. In December 2017, the Ministry of Trade, Industry and Energy announced the Renewable Energy 3020 Plan, an initiative to increase the generation and use of renewable energy on a nationwide basis. According to the plan, the Government planned to increase

 

13


Table of Contents
 

the required percentage of total electricity to be generated from renewable energy sources from 7% in 2016 to 20% by 2030 and the domestic renewable energy generation capacity to 72.7 gigawatts by 2030 through the expansion of solar and wind power generation capacities to 46.5 gigawatts and 19.3 gigawatts, respectively. According to the Tenth Basic Plan announced in January 2023, the Government has set national targets of 108.3 gigawatts in renewable energy generation capacity in 2036, with the goal of increasing the percentage of total electricity to be generated from renewable energy sources to 30.6% by 2036.

 

  

New Energy Industry Fund. In January 2016, the Ministry of Trade, Industry and Energy announced an initiative to promote the new energy industry by creating the New Energy Industry Fund, which is made up of funds sponsored by Government-affiliated energy companies. We contributed Won 500 billion to the funds in 2016. The purpose of these funds is to invest in substantially all frontiers of the new energy industry, including renewable energy, energy storage systems, electric vehicles, small-sized self-sustaining electricity generation grids known as “micro-grids,” among others, as well as invest in start-up companies, ventures, small to medium-sized enterprise and project businesses that engage in these businesses but have not previously attracted sufficient capital from the private sector.

 

  

Environmental and safety considerations in electricity supply and demand planning. In March 2017, the Electric Utility Act was amended to the effect that starting in June 2017, future national planning for electricity supply and demand in Korea should consider the environmental and safety impacts of such planning. Accordingly, the costs related to environmental and safety impacts, such as the desulfurization costs, have been reflected in the variable cost of generating electricity of each generation unit since August 2019. In December 2019, the Regulation on the Operation of the Electricity Market was revised to reflect the cost of trading greenhouse gas emission allowances in the variable cost of generating electricity of each generation unit and the revision was implemented in January 2022.

 

  

Renewable Energy 100. In line with the spread of Renewable Energy 100 (“RE100”), a global campaign by companies around the world to cover 100% of their electricity use with renewable energy by 2050, the Government introduced its own version of RE100 that allows companies and other consumers to choose energy sources from which their electricity is generated. In order for a domestic company to participate in RE100, it may purchase renewable energy through us in a competitive bidding process and be issued with a certificate of use of renewable energy, which we refer to as the Green Premium system, or enter into a power purchase agreement (“PPA”) either with a renewable energy generator through us as an intermediary (“third-party PPA”) or with a renewable energy generator directly such that the generator will supply electricity to the company without going through the existing electricity market (“direct PPA”). The relevant legislation for the direct PPA was enacted in the National Assembly in March 2021 and has been in force since October 2021. The Ministry of Trade, Industry and Energy finalized and announced detailed guideline for direct PPA in September 2022. As of March 31, 2024, there are seven third-party PPA of total contracted capacity of 16 megawatts and 16 direct-PPA of total contracted capacity of 35.8 megawatts, which are effective under the related law and guideline. If there is an expansion in the use of direct PPA, it may adversely affect our market share in electricity sales.

 

  

2050 Carbon-Neutrality Declaration. In response to the Paris Agreement and the United Nations Framework Convention on Climate Change (“UNFCCC”)’s goal to comprehensively replace fossil fuels and achieve global net-zero emission by 2050, the Korean national assembly has passed a non-binding resolution on September 24, 2020 to establish a special committee on climate change and urge the Government to meet its 2030 carbon reduction goal and bolster its efforts to achieve carbon neutrality by 2050. On November 27, 2020, the Government officially announced the Government’s commitment to implement policies in all areas of the industry to achieve Korea’s carbon neutrality by 2050. On December 10, 2020, the Government followed up with broad 2050 carbon neutrality development strategies. In May 2021, the Government launched a carbon neutrality committee which issued a preliminary draft of the carbon neutrality scenario in August 2021. After going through the

 

14


Table of Contents
 

process of collecting opinions from the consultative bodies in various sectors and citizen participation groups, the committee deliberated and finalized the 2050 carbon neutrality scenarios in October 2021. According to the two scenarios that have been finalized, both of them will aim to achieve net-zero domestic carbon dioxide emissions by 2050. Scenario A will completely suspend thermal power generation, while scenario B will actively utilize technologies such as carbon capture, utilization and storage (“CCUS”) while allowing some thermal power generation to continue. If any specific regulation or policy affecting our business is announced or implemented, we may experience an increased regulatory scrutiny over carbon dioxide emission from our electricity generation activities and related projects overseas. We and our generation subsidiaries announced the 2050 Carbon-Neutrality Vision in November 2021 and will further invest in various renewable energy power generation projects, new business opportunities and core technology development with a goal of entirely replacing domestic coal power generation by 2050. In the process of pursuing such, our business strategy and investment plan may change from time to time and it may result in additional costs to us, including, among other things, increased production costs, additional taxes, reduced emission allowances or additional restrictions on production or operations, particularly as they may relate to our power generation business. In addition, the achievement of carbon neutrality by 2050 may be delayed or made impossible due to unexpected changes in policies or power market conditions including a major shift in the supply and demand of electricity.

 

  

Hydrogen Energy Related Legislations. Pursuant to the Hydrogen Economy Promotion and Hydrogen Safety Management Act as amended in February 2024 and its Enforcement Decree enacted in November 2023, the Minister of Trade, Industry and Energy designated KEPCO and other entities under Community Energy System to purchase hydrogen-generated electricity. Under such Act, we are required to enter into contracts with hydrogen generators that are selected through competitive bidding process. The bidding market is comprised of general hydrogen market and clean hydrogen power generation market, as categorized based on the type of fuel used. In consideration of the current ecosystem in which fuel cells are used, the general hydrogen power generation market is open to all kinds of hydrogen plants including plants using extracted or by-product hydrogen. On the other hand, the clean hydrogen power generation market is a market where only generators using clean hydrogen plants can participate. Clean hydrogen is categorized into carbon-free hydrogen, low-carbon hydrogen, and low-carbon hydrogen compounds (including ammonia) according to greenhouse gas emissions in the production and import procedure of hydrogen. The system for certifying clean hydrogen plants is based on criteria, such as the amount of carbon dioxide emissions, set by relevant enforcement ordinances. The Government notified the bidding volume for the period from 2023 to 2025 in accordance with the Tenth Basic Plan, as shown in the table below.

 

   Year of bidding market commencement 
  2023   2024   2025 
  Year of
commercial
operation

commencement
   Volume
(GWh)
   Year of
commercial
operation
commencement
   Volume
(GWh)
   Year of
commercial
operation
commencement
   Volume
(GWh)
 

General hydrogen market

   2025    1,300    2026    1,300    2027    1,300 

Clean hydrogen market

           2027    3,500    2028    3,000 

The amount of hydrogen-generated electricity to be purchased by us is determined by the Minister of Trade, Industry and Energy after taking into consideration the Basic Plan Relating to the Long-Term Supply and Demand of Electricity and Hydrogen Economy Implementation Basic Plan and it shall be determined by multiplying (i) the total amount to be purchased in the current year by (ii) the percentage of our purchase out of the total purchased amount in the year immediately preceding the year when the bidding market for the current year has been set up. Effectively, it will mean there will be a three-year lag between the time periods in (i) and (ii). The Minister shall allow us to reflect the cost arising from the purchase of hydrogen energy into the electricity tariff pursuant to the Act.

 

15


Table of Contents

Complying with these Government initiatives and operating programs in furtherance thereof has involved and will likely continue to involve significant costs and resources on our part, which may adversely affect our results of operation, financial condition and cash flows. We expect our future compliance costs may increase as the requirements under Government initiatives and operating programs continue to become more rigorous. We may not be able to pass on the increased cost to customers at a sufficient level or at all or on a timely basis. Further, we and our generation subsidiaries could also become subject to substantial fines and other forms of penalties for non-compliance. Even without such financial losses, increased public awareness and adverse publicity about potential impacts on climate change or environmental harm from us or our industry could harm our reputation or otherwise impact the Company adversely. In recent years, investors have also begun to show increased interest about sustainability and climate change as it relates to their investment decisions.

According to the new tariff system which came into effect on January 1, 2021, the Government introduced an additional component to the tariff called the Climate/Environment Related Charge. Previously, our climate and environment costs were embedded in the Usage Charge component of the tariff and our consumers could not discern the exact magnitude of such costs. By separating it out as an independent component, we intend to provide more information and transparency to our customers while having the flexibility to adjust it in alignment with the underlying costs. The Climate/Environment Related Charge for the coming year is calculated by multiplying (i) our total estimated costs of complying with the Renewable Portfolio Standard program, the Greenhouse Gas Emission Trading System and the coal-fired generation reduction program for the current year, and then dividing it by the electricity sales projected for the coming year (the “Climate/Environment Related Base Rate”), and (ii) the amount of electricity consumed. The value of the Climate/Environment Related Base Rate for 2023 was Won 9.0 per kilowatt-hour, which has been maintained up to the date of this annual report. Even though the Climate/Environment Related Charge is planned to be adjusted every year by reflecting the change in climate and environment-related costs, the Government may change the date of adjustment in consideration of different policy objectives. Therefore, there is no guarantee that the Climate/Environment Related Charge will be regularly updated, even though our climate and environment-related costs will likely increase each year. If there are discrepancies between our costs and the Climate/Environment Related Charge, we may accumulate such discrepancies and reflect them in our Total Comprehensive Cost. However, the electricity rate based on the Total Comprehensive Cost needs to be approved by the Government to be revised. There is no assurance that, particularly given the wide-ranging policy priorities of the Government, it will in fact raise the electricity rate to a level sufficient to fully cover additional costs associated with implementing and operating programs as described in this risk factor and do so on a timely basis or at all. If the Government does not do so or provide us and our generation subsidiaries with other forms of assistance to offset the costs involved, our results of operation, financial condition and cash flows may be materially and adversely affected.

See Item 4.B. “Business Overview—Environmental, Social and Governance Programs.”

We may require a substantial amount of additional indebtedness to refinance existing debt and for future capital expenditures.

We anticipate that a substantial amount of additional indebtedness will be required in the coming years in order to refinance existing debt, make capital expenditures for construction of generation plants and other facilities and/or make acquisitions, invest in renewable energy and the “new energy industry” projects and fund our overseas businesses. In 2021, 2022 and 2023, our capital expenditures in relation to the foregoing amounted to Won 13,964 billion, Won 13,886 billion and Won 15,518 billion, respectively, and our budgeted capital expenditures for 2024, 2025 and 2026 amount to Won 18,257 billion, Won 19,881 billion and Won 19,484 billion, respectively.

Furthermore, as fuel prices surge, our cost of purchasing electricity from domestic generation companies through the Korea Power Exchange may increase significantly. If we fail to recoup more tariff from our customers to account for such electricity sales-related costs, our debt may further increase.

 

16


Table of Contents

As we experienced net losses for the last three years as global energy prices increased significantly and the power purchase costs increased accordingly, we issued more debt securities than before to meet increased working capital needs. On December 28, 2022, the National Assembly of Korea passed an amendment to Article 16 of KEPCO Act, which increased our debt ceiling as represented by the total outstanding debt securities on a separate basis to be no greater than five times (or six times if the Minister of the Ministry of Trade, Industry and Energy approves that it is urgently required to resolve a business crisis) the sum of our share capital and reserves updated at the end of each year. Such share capital and reserves are calculated on a separate basis under the KEPCO Act. Before such amendment, our debt ceiling was two times the sum of our share capital and reserves. Such increase in debt ceiling will be effective until December 31, 2027 and we may make use of the new debt ceiling to issue more debt securities to cover our losses, refinance existing debt and finance new capital expenditures. However, if the sum of our share capital and reserves decreases (including as a result of continued significant net losses), our debt ceiling will decrease as well and there will be no assurance that we can meet our funding requirements for capital or operational expenditures or debt repayment obligations. If we cannot meet such requirements, it could have a material adverse impact on our business, results of operations and financial condition.

While we are not currently experiencing material difficulties in procuring long-term and short-term borrowings, there is no assurance that we will continue to be able to do so, particularly given the potential risk of increasing financial losses and the adverse business environment as discussed above. We expect that a portion of our long-term debt will need to be paid or refinanced through foreign currency-denominated borrowings and capital raising in international capital markets. Such financing may not be available on terms commercially acceptable to us or at all, especially if the global financial markets experience significant turbulence or a substantial reduction in liquidity or due to other factors beyond our control. If we are unable to obtain financing on commercially acceptable terms on a timely basis, or at all, we may be unable to meet our funding requirements for capital expenditures or debt repayment obligations, which could have a material adverse impact on our business, results of operations and financial condition.

We and our generation subsidiaries have undertaken various programs to reduce debt and improve the overall financial health. For further information, see Item 4.B. “Business Overview—Financial Stabilization Plan and Related Activities.” Despite our best efforts, however, for reasons beyond our control, including macroeconomic environments, government regulations and market forces (such as international market prices for our fuels), we cannot assure whether we or our generation subsidiaries will be able to successfully reduce debt burdens or otherwise improve our financial health to a level that would be optimal for our capital structure. If we or our generation subsidiaries fail to do so or the measures taken by us or our generation subsidiaries to reduce debt levels or improve financial health have unintended adverse consequences, such developments may have an adverse effect on our business, results of operations and financial condition.

The movement of Won against the U.S. dollar and other currencies may have a material adverse effect on us.

The Won has fluctuated significantly against major currencies from time to time. Even slight depreciation of Won against U.S. dollar and other foreign currencies may result in a material increase in the cost of fuel and equipment purchased by us from overseas since the prices for substantially all of the fuel materials and a significant portion of the equipment we purchase are denominated in currencies other than Won, generally in U.S. dollar.

Changes in foreign exchange rates may also impact the cost of servicing our foreign currency-denominated debt. As of December 31, 2023, 14.8% of our long-term debt (including the current portion but excluding original issue discounts and premium) without taking into consideration of swap transactions, was denominated in foreign currencies, principally U.S. dollar. In addition, even if we make payments in Won for certain fuel materials and equipment, some of these fuel materials may originate from other countries and their prices may be affected accordingly by the exchange rates between the Won and foreign currencies, especially the U.S. dollar. Since the substantial majority of our revenues are denominated in Won, we must generally obtain foreign

 

17


Table of Contents

currencies through foreign currency-denominated financings or from foreign currency exchange markets to make such purchases or service such debt. As a result, any significant depreciation of Won against the U.S. dollar or other major foreign currencies will have a material adverse effect on our profitability and results of operations.

We may not be successful in implementing new business strategies.

In 2023, we established medium to long-term business strategies for the years from 2024 to 2028. We plan to (i) address our financial conditions by implementing all-round management innovation to achieve early stabilization, (ii) strengthen the stability of our power supply capabilities, which is central to our core business, (iii) develop a future growth engine to reduce dependence on electricity rates, and (iv) lay the groundwork for sustainable management throughout the energy industry ecosystem. To achieve such plans, we also developed 16 strategic initiatives, including implementing measures to improve our financial conditions.

Due to their inherent uncertainties, such new and expanded strategic initiatives expose us to a number of risks and challenges, including the following:

 

  

there may be restrictions on business diversification due to various regulations that we and our subsidiaries must comply with;

 

  

new and expanded business activities may require unanticipated capital expenditures, although our revenue may not be sufficient to cover such expenditures;

 

  

if domestic and foreign competitions intensify due to a limited pool of professionals and core technology to pursue new businesses, we may lose competitiveness;

 

  

new and expanded business activities may result in less growth or profit than we currently anticipate, and there can be no assurance that such business activities will become profitable at the level we desire or at all;

 

  

certain of our new and expanded businesses, particularly in the areas of renewable energy, require substantial Government subsidies to become profitable, and such subsidies may be substantially reduced or entirely discontinued;

 

  

we may fail to identify and enter into new business opportunities in a timely fashion, putting us at a disadvantage vis-à-vis competitors; and

 

  

we may need to hire or retrain personnel to supervise and conduct the relevant business activities.

As part of our business strategy, we may also seek, evaluate or engage in potential acquisitions, joint ventures, strategic alliances, restructurings, combinations, rationalizations, divestments or other similar opportunities. The prospects of these initiatives are uncertain, and there can be no assurance that we will be able to successfully implement or grow new ventures, and these ventures may prove more difficult or costly than what we originally anticipated. In addition, we regularly review the profitability and growth potential of our existing and new businesses. As a result of such review, we may decide to exit from or to reduce the resources that we allocate to new or existing ventures in the future. There is a risk that these ventures may not achieve profitability or operational efficiencies to the extent originally anticipated, and we may fail to recover investments or expenditures that we have already made. Any of the foregoing may have a material adverse effect on our reputation, business, results of operations, financial condition and cash flows.

We plan to pursue overseas expansion opportunities that may subject us to different or greater risks than those associated with our domestic operations.

While our operations have been primarily based in Korea, we and our generation subsidiaries are actively expanding our overseas operations on a selective basis. In particular, we and our generation subsidiaries have been expanding and plan to further expand the construction and operation of renewable energy power plants, transmission and distribution.

 

18


Table of Contents

Overseas operations involve risks that are different from those we face in our domestic operations, including:

 

  

challenges of complying with multiple foreign laws and regulatory requirements, including tax laws and laws regulating our operations and investments;

 

  

volatility of overseas economic conditions, including fluctuations in foreign currency exchange rates;

 

  

difficulties in enforcing creditors’ rights in foreign jurisdictions;

 

  

risk of expropriation and exercise of sovereign immunity where the counterparty is a foreign government;

 

  

difficulties in establishing, staffing and managing foreign operations;

 

  

differing labor regulations;

 

  

political and economic instability, natural calamities, war and terrorism;

 

  

lack of familiarity with local markets and rules of competition;

 

  

changes in applicable laws and regulations in Korea that affect foreign operations;

 

  

obstacles to the repatriation of earnings and cash; and

 

  

environmental regulations and public complaints regarding greenhouse gas emitting facilities, particularly overseas coal-fired power plants.

Any failure by us to recognize or respond to these differences may adversely affect the success of our operations in those markets, which in turn could materially and adversely affect our businesses and results of operations.

Furthermore, while we seek to enter into overseas business opportunities in a prudent manner, some of our new international business ventures carry inherent risks that are different from our traditional business of electricity power generation, transmission and distribution. While the overseas businesses in the aggregate currently do not comprise a material portion of our overall business, the actual revenues and profitability from and investments and expenditures into such ventures may be substantially different from what we plan or anticipate and may have a material adverse impact on our overall businesses, results of operations, financial conditions and cash flows.

An increase in electricity generated by and/or sourced from independent power producers may erode our market position and hurt our business, growth prospects, revenues and profitability.

As of December 31, 2023, we and our generation subsidiaries owned approximately 57.6% of the total electricity generation capacity in Korea (excluding plants generating electricity for private or emergency use). New entrants to the electricity business will erode our market share and create significant competition, which could have a material adverse impact on our financial condition and results of operations.

In particular, we compete with independent power producers with respect to electricity generation. The independent power producers accounted for 33.4% of total power generation in 2023 and 42.4% of total generation capacity as of December 31, 2023. As of December 31, 2023, there were 35 independent power producers in Korean electricity market, excluding 6,184 renewable energy producers. Since 2013, private enterprises are permitted to own and operate coal-fired power plants in Korea as the Ministry of Trade, Industry and Energy approved plans for independent power producers to construct coal-fired power plants under the Sixth Basic Plan announced in February 2013. Under the Tenth Basic Plan announced in January 2023, three coal-fired power plants are planned to be constructed by independent power producers by 2024. One of the three coal-fired power plants planned for construction was completed in 2023, and two are expected to be completed in 2024. While it remains to be seen whether construction of these generation units will be completed as scheduled, if these units were to be completed as scheduled and/or independent power producers are permitted to build

 

19


Table of Contents

additional generation capacity (whether coal-fired or not), our market share in Korea may decrease, which may have a material adverse effect on our results of operations and financial condition.

In addition, under the Community Energy System adopted by the Government in 2004, a minimal amount of electricity is supplied directly to consumers on a localized basis by independent power producers outside the cost-based pool system. Such system is used by our generation subsidiaries and most independent power producers to distribute electricity nationwide. The purpose of this system is to geographically decentralize electricity supply and thereby reduce transmission losses and improve the efficiency of energy use. These entities do not supply electricity on a national level but are licensed to supply electricity on a limited basis to their respective districts under the Community Energy System. As of March 31, 2024, the aggregate generation capacity of suppliers participating in the Community Energy System amounted to less than 2% of that of our generation subsidiaries in the aggregate. We currently do not expect the Community Energy System to be widely adopted, especially in light of the significant level of capital expenditure required for such direct supply. However, if the Community Energy System is widely adopted, it may erode our currently dominant market position in the generation and distribution of electricity in Korea and may have a material adverse effect on our business, results of operations and financial condition.

While we are currently the dominant market player in the electricity distribution in Korea, we cannot assure you that our market dominance will not face potential erosion in the future. For example, in June 2016, the Government announced the Proposal for Adjustment of Functions of Public Institutions (Energy Sector), which contemplated a gradual opening of the electricity trading market to the private sector. Although the proposal was withdrawn after a year of deliberation, a number of economists and civic groups are continuing to demand for the liberalization of the electricity trading market. It is difficult to predict whether and in what direction the liberalization of the electricity trading market will happen in the future, and such event may result in substantial reduction of our market share in electricity distribution in Korea, which would have a material adverse effect on our business, results of operation and cash flows.

See also Item 4.B. “Business Overview—Competition.”

Labor unrest or increases in labor cost may adversely affect our operations.

We and each of our generation subsidiaries have separate labor unions. As of December 31, 2023, approximately 74.1% of our and our generation subsidiaries’ employees in the aggregate were members of these labor unions. Since a six-week labor strike in 2002 by union members of our generation subsidiaries in response to a proposed privatization of one of our generation subsidiaries, there has been no material labor dispute. However, we cannot assure you that there will not be a major labor strike or other material disruptions of operations by the labor unions of us and our generation subsidiaries if the Government resumes privatization or other restructuring initiatives or for other reasons, which may adversely affect our business and results of operations.

Furthermore, the Government, as part of a response to low fertility amidst an aging population in Korea and to make the lives of workers more stable, has pledged to reduce the number of non-permanent workers and increase the employment of permanent workers, in part by transitioning from non-permanent to permanent positions in the public sector. We have completed transitioning temporary workers to permanent workers at the end of 2019. Our generation subsidiaries have partially completed transitioning of non-permanent workers to permanent positions by hiring them for an indefinite period or establishing subsidiaries and hiring them through such subsidiaries. Our thermal generation subsidiaries plan to form a labor-management consultative body to transition the in-house subcontracted workers for the fuel and environmental facilities to permanent positions. Although the Government guidelines suggest that we transition the non-permanent workers to permanent positions within our existing budget for the related business, we cannot assure you that this will not result in increased costs for us or our generation subsidiaries and have an adverse impact on us or our generation subsidiaries’ financial condition and results of operations.

 

20


Table of Contents

Additionally, domestic and international policy changes may affect our relationship with our employees, such as the Government’s ratification of nine of the ten essential conventions of International Labor Organization and potential reformation of the public employee wage structure. We cannot assure you that such policy changes will not negatively affect our relationship with our employees, which may in turn adversely affect our business and results of operations.

Operation of nuclear power generation facilities inherently involves numerous hazards and risks, any of which could result in a material loss of revenues or increased expenses.

Through KHNP, we currently operate 25 nuclear-fuel generation units, among which Kori #2 has been shut down since April 8, 2023. KHNP submitted a safety evaluation report to the NSSC in April 2022 to seek approval for an extension of the life of Kori #2.

Operation of nuclear power plants is subject to certain hazards, including environmental hazards such as leaks, ruptures and discharge of toxic and radioactive substances and materials. These hazards can cause personal injuries or loss of life, severe damage to or destruction of property and natural resources, pollution or other environmental damage, clean-up responsibilities, regulatory investigation and penalties and suspension of operations. Nuclear power has a stable and relatively inexpensive cost structure (which is least costly among the fuel types used by our generation subsidiaries) and is the second largest source of Korea’s electricity supply, accounting for 30.7% of electricity generated in Korea in 2023. Due to significantly lower unit fuel costs compared to those for thermal power plants, our nuclear power plants are generally operated at full capacity with only routine shutdowns for fuel replacement and maintenance, with limited exceptions.

From time to time, our nuclear generation units may experience unexpected shutdowns or maintenance-related stoppage. For example, following an earthquake in the vicinity in September 2016, four nuclear generation units at the Wolsong site were shut down for approximately three months as part of a preventive and safety assurance program although these units were not directly affected by the earthquake. Any prolonged or substantial breakdown, failure or suspension of operation of a nuclear unit could result in a material loss of revenues, an increase in fuel costs related to the use of alternative power sources, additional repair and maintenance costs, greater risk of litigation and increased social and political hostility to the use of nuclear power, any of which could have a material adverse impact on our financial condition and results of operations.

In order to prevent damages to the nuclear facilities such as a result of the tsunami and earthquake in March 2011 in Japan, KHNP prepared a comprehensive safety improvement plan including, but are not limited to, installing additional automatic shut-down systems for earthquakes, extending coastal barriers for seismic waves, procuring mobile power generators and storage batteries, installing passive hydrogen removers at nuclear facilities and improving the radiology emergency medical system. All follow-up measures are expected to be finalized by December 2024. KHNP also developed 10 additional supplementary safety measures by analysis of overseas plants and its current operations and implemented all such measures in 2023. However, there is no assurance that the adoption and implementation of additional safety measures will not be required, the adoption and/or implementation of which may be costly and have a material adverse impact on our financial condition and results of operations.

In January 2023, the Government announced the Tenth Basic Plan which focuses on, among other things, optimizing nuclear power sources while minimizing coal-fired power sources and developing eco-friendly power sources. Accordingly, construction of nuclear generation units in a planning stage (Shin-Hanul #3 and 4) would resume and operation of ten other nuclear generation units including Kori #2 may continue beyond their original retirement dates in or before 2030 subject to KHNP’s intention and only upon the NSSC’s approval following a satisfactory safety evaluation. As for new nuclear plants under construction, the construction of Shin-Hanul #2 will be completed in April 2024 following Shin-Hanul #1 which commenced its commercial operation in December 2022, while construction of Saeul #3 and #4 (formerly named as Shin-Kori #5 and #6) is expected to be completed in 2024 and 2025 respectively. We cannot assure you that there will not be new challenges by civic

 

21


Table of Contents

groups or changes in the Government’s policies that may interfere with the construction of these new nuclear units in the future. We may experience a loss of revenues and an increase in fuel costs (as nuclear fuel is the cheapest compared to coal, LNG or oil) as a result of such challenges, which could adversely affect our results of operation and financial condition. For example, in September 2023, a group of 40 Korean nationals brought a lawsuit against the Ministry of Trade, Industry and Energy to rescind the approval for the Shin-Hanul #3 and 4. In November 2023, we applied to participate in the lawsuit as a stakeholder, and the first trial is currently in progress at the Seoul Administrative Court.

As mentioned above, there are ten other nuclear generation units whose life under their initial operating license will expire by 2030 including Kori #2 which has been shut down since April 8, 2023. Under the Tenth Basic Plan, we aim to continue their operation after such expirations, but we may find it difficult to have the life of those nuclear units extended. In April 2022, KHNP submitted a safety evaluation report to the NSSC to seek approval for an extension of the life of Kori #2, which shut down in April 2023. In September 2022, KHNP also submitted a safety evaluation report to the NSSC to seek approval for an extension of the lives of Kori #3 and Kori #4, which are scheduled to shut down in September 2024 and August 2025, respectively. As future procedures will be carried out in accordance with relevant laws and regulations, it is uncertain at this time whether such extension of life will be granted. The failure to extend the life of these units would result in a loss of revenues from such units and the increase in our overall fuel costs (as nuclear fuel is cheaper compared to coal, LNG or oil), which could adversely affect our results of operation and financial condition. In addition, heightened concerns regarding the safety of operating nuclear generation units could impede with our ability to operating them for an extended period of time or at all. For example, the nuclear power plant at Wolsong #1 unit began operations in 1982 and ended its operations in 2012 pursuant to its 30-year operating license. In February 2015, the NSSC evaluated the safety of operating Wolsong #1 unit and approved its extended operation until November 2022. However, a civic group filed a lawsuit to annul such decision, and in February 2017, the Seoul Administrative Court ruled against the NSSC. The NSSC appealed this decision, and the civic group filed an injunction to suspend the operation of the Wolsong #1 unit. The civic group’s injunction was denied in July 2017. KHNP, which operated the unit pursuant to the NSSC’s initial decision, has joined this lawsuit.

In addition, the current scheme for the construction and operation of nuclear generation units may be altered in the future and we cannot assure you that the current or future policies will not have an adverse impact on our or our generation subsidiaries’ financial condition and results of operations. In the past, in keeping with previous Eighth and Ninth Basic Plans to decrease the reliance on nuclear power sources, on June 15, 2018, the board of directors of KHNP decided to (i) retire Wolsong #1 unit earlier than planned due to comprehensive evaluation of the economic viability and regional sentiment of its continuing operation and (ii) discontinue the construction of Chunji #1 and #2 as well as Daejin #1 and #2 units. On December 24, 2019, the NSSC approved the permanent shutdown of Wolsong #1 unit. From the beginning of 2018 to the end of 2019, impairment loss in connection with the property, plant and equipment of Wolsong #1 unit accrued to Won 572,216 million and reversal of impairment loss was Won 16,693 million. From the beginning of 2018 to the end of 2019, impairment loss in connection with the property, plant and equipment of Chunji #1 and #2 as well as Daejin #1 and #2 units amounted to Won 38,886 million. From the beginning of 2018 to the end of 2019, impairment loss in connection with the property, plant and equipment of Shin-Hanul #3 and #4 units accrued to Won 134,736 million. However, as the Tenth Basic Plan announced in January 2023 aims to restart the construction of Shin-Hanul #3 and #4, we recognized the reversal of all the accrued impairment losses related to the Shin-Hanul #3 and #4. The Government revised the Enforcement Decree of the Electricity Business Act in June 2021 and enacted a notice that will allow KHNP to be compensated for reasonable costs incurred in relation to the phase-out of nuclear power plants in accordance with the Government’s energy transition policy. KHNP applied for such compensation related to Wolsong #1 in June 2022. However, even if KHNP may apply for such compensation, there is no guarantee that it will cover the entire cost as the scope of such compensation has not been specifically determined yet. If KHNP cannot recoup its total cost, it may have an adverse impact on our financial condition.

 

22


Table of Contents

The construction and operation of our generation, transmission and distribution facilities involve difficulties, such as opposition from civic groups and uncertainties in maintaining permits and licenses, which may have an adverse effect on us.

From time to time, we encounter social and political opposition against construction and operation of our generation facilities (particularly nuclear units) and, to a lesser extent, our transmission and distribution facilities. For example, we recently experienced intense opposition from local residents and civic groups to the construction of transmission lines in the Milyang area, which we resolved through various compensatory and other support programs. Such opposition delayed the completion of the project. Although we and the Government have undertaken various community programs to address concerns of residents in areas near our facilities, civic and community opposition could result in delayed construction or relocation of our planned facilities. In addition, our generation, transmission and distribution facilities generally require permits and licenses from the Government before we can operate them. For example, our nuclear power plants are operated under licenses for a fixed duration of time and such licenses can only be extended upon an approval by the NSSC following a satisfactory safety evaluation. Even in the case of a satisfactory safety evaluation and following approval, a civic or other group may file a lawsuit to challenge such evaluation and approval and apply for an injunction to prevent us from operating our facilities. Such civic and community opposition and the uncertainties in maintaining permits and licenses for our facilities could give rise to a material adverse impact on our business and results of operations.

Our risk management policies and procedures may not be fully effective at all times.

In the course of our operations, we must manage a number of risks, such as regulatory risks, market risks and operational risks. Although we devote significant resources to developing and improving our risk management policies and procedures and expect to continue to do so in the future, our risk management practices may not be fully effective at all times in eliminating or mitigating risk exposures in all market environments or against all types of risk, including risks that are unidentified or unanticipated, such as natural disasters or employee misconduct. For example, on May 18, 2021, the Gwangju District Prosecutor’s Office indicted KHNP and one of its employees for falsely reporting the results of the investigation on welding defects in the reactor head penetration pipe to the Nuclear Safety Committee. On December 15, 2022, the Gwangju District Court acquitted KHNP and its employee. The prosecutor appealed the case and it is currently being adjudicated at the Gwangju District Court. To prevent similar incidents from occurring again, KHNP is working to improve its risk monitoring and management system. For additional information, see Item 4.B. “Business Overview— Nuclear Safety.”

In April 2019, a forest fire broke out in Goseong in Gangwon Province, about 210 kilometers from Seoul, causing damages to nearby towns, covering approximately 1,260 hectares. The National Forensic Service has investigated the cause of the fire and has determined that the fire seems to have been started by an electrical arc from our utility pole’s wire, which broke as a result of a strong wind. Based on this finding, the Police Department of Goseong conducted follow-up investigations and issued a recommendation to prosecute seven employees of KEPCO in connection with the fire. In January 2023, the Seoul High Court acquitted the employees. The prosecutors have appealed to the Supreme Court and the case is underway, the results of which may have a material adverse effect on us, our reputation and our operating results. In the meantime, we have settled the civil case with fire victims with the payment of Won 81.6 billion. In addition, we are compensating the victims by providing a number of services, such as free supply of electricity. We are also implementing measures to prevent future fires that may result from an electrical arc, including a special maintenance program to be enforced during a dry season between March and May. Also, we implemented operational measures such as tailored operation of protective devices and suspension of operation during periods of low loads and plan to change power facility designs to reflect regional and seasonal characteristics, all of which are intended to help prevent similar incidents from happening in the future. Despite our efforts, however, such incidents may occur again, and we cannot assure you that they will not have any material adverse effect on us, our reputation and our operating results

 

23


Table of Contents

Furthermore, our operational activities like the generation of electricity involve inherent operating risks that may result in accidents involving serious injury or loss of life, environmental damage or property damage. Even though we plan to prioritize on-site safety management by engaging in communications with different stakeholders and investing more in safe environment, there is no guarantee that there will not be future accidents due to our inherent operating risks.

The Serious Accident Punishment Act (the “SAPA”) was enacted on January 26, 2021 and took effect on January 27, 2022. The SAPA imposes criminal liability on individuals and entities responsible for “serious accidents”. Under SAPA, the term “serious accident” encompasses not only accidents at industrial sites (e.g., at factories or construction sites), but also “public” disasters caused by defects in the design, manufacture, installation and management of products, product ingredients or public facilities/transportation. The SAPA imposes criminal liability against (i) business owners or executives (as defined by the law) who fail to ensure the safety of their business operations and (ii) businesses or institutions who fail their supervisory duties. In case of willful misconduct or gross negligence, the SAPA also imposes punitive damages of up to five times the actual damages. The SAPA also impacts the impending class action and punitive damages legislation, since a serious accident could very well trigger liability under all three laws. For instance, if a serious accident leads to injury or death, and involves 50 or more claimants with a common question of law or fact, this would trigger a potential class action, punitive damages and criminal penalties under the SAPA. As such, the risks faced by companies and senior management under SAPA are amplified by the new class action/punitive damages system, and vice versa. Although we have analyzed the potential impacts on us of the SAPA and aligned our policies, internal regulations and manuals in preparation for the implement of the SAPA prior to the enactment of the SAPA, there is no guarantee that the SAPA would not adversely affect our business, financial condition and result of operations given that the SAPA is not yet tested by way of final rulings of the court.

We believe we and our subsidiaries are in compliance in all material respects with internal compliance policies and procedures and all other additional safety measures initiated internally or required by regulatory and governmental agencies. Under the SAPA, businesses may avoid punishment if it is found that they duly performed their duties to ensure the safety and health of the participants in their business operations. However, we cannot assure you that, despite all precautionary and preventative measures undertaken by us, these measures will prove to be fully effective at all times against all the risks we face or that an incident that could cause harm to our reputation and operation will not happen in the future, including due to factors beyond our control.

Our risk management procedures may not prevent losses in debt and foreign currency positions.

We manage interest rate exposure for our debt instruments by limiting our variable rate debt exposure as a percentage of our total debt and closely monitoring the movements in market interest rates. We also actively manage currency exchange rate exposure for our foreign currency-denominated liabilities by measuring the potential loss using risk analysis software and entering into currency swap contracts to hedge such exposure when the possible loss reaches a certain risk limit, as well as holding periodic foreign exchange risk management committee meetings. To the extent we have unhedged positions or our hedging and other risk management procedures do not work as planned as a result of changes in global macroeconomic environment and/or other factors, our results of operations and financial condition may be adversely affected.

The amount and scope of coverage of our insurance are limited.

Substantial liability may result from the operations of our nuclear generation units, the use and handling of nuclear fuel and possible radioactive emissions associated with such nuclear fuel. KHNP carries insurance for its generation units and nuclear fuel transportation, and we believe that the level of insurance is generally adequate and is in compliance with relevant laws and regulations. In addition, KHNP is the beneficiary of Government indemnity that covers damages which the insurance cannot cover. However, such insurance is limited in terms of amount and scope of coverage and does not cover all types or amounts of losses which could arise in connection

 

24


Table of Contents

with the ownership and operation of nuclear plants. Accordingly, material adverse financial consequences could result from a serious accident or a natural disaster to the extent it is neither insured nor covered by the government indemnity.

In addition, our non-nuclear generation subsidiaries carry insurance covering certain risks, including fire, in respect of their key assets, including buildings and equipment located at their respective power plants, construction-in-progress and imported fuel and procurement in transit. Such insurance and indemnity, however, cover only a portion of the assets that these generation subsidiaries own and operate and do not cover all types or amounts of loss that could arise in connection with the ownership and operation of these power plants. In addition, our generation subsidiaries are not permitted to self-insure, and accordingly have not self-insured, against risks of their uninsured assets or business. Accordingly, material adverse financial consequences could result from a serious accident to the extent it is uninsured.

In addition, because neither we nor our non-nuclear generation subsidiaries carry any insurance against terrorist attacks, an act of terrorism would result in significant financial losses. See Item 4.B. “Business Overview—Insurance.”

We may not be able to raise share capital in the future without the participation of the Government.

Under applicable laws, the Government is required to directly or indirectly own at least 51% of our issued capital stock. As of December 31, 2023, the Government, directly and through Korea Development Bank (a statutory banking institution wholly owned by the Government), owned 51.1% of our issued capital stock. Accordingly, without changes in the existing Korean law, it may be difficult or impossible for us to undertake, without the participation of the Government, any equity financing in the future.

We may be exposed to potential claims made by current or previous employees for unpaid wages for the past three years under the expanded scope of ordinary wages and become subject to additional labor costs arising from the broader interpretation of ordinary wages under such decision.

Under the Labor Standards Act, an employee is legally entitled to “ordinary wages.” Under the guidelines previously issued by the Ministry of Employment and Labor, ordinary wages include base salary and certain fixed monthly allowances for work performed overtime during night shifts and holidays. Prior to the Supreme Court of Korea decision described below, many companies in Korea had typically interpreted these guidelines as excluding from the scope of ordinary wages fixed bonuses that are paid other than on a monthly basis, namely on a bi-monthly, quarterly or semi-annual basis, although such interpretation had been a subject of controversy and had been overruled in a few court cases.

In December 2013, the Supreme Court of Korea ruled that regular bonuses fall under the category of ordinary wages on the condition that those bonuses are paid regularly and uniformly, and that any agreement which excludes such regular bonuses from ordinary wage is invalid. One of the key rulings provides that bonuses that are given to employees (i) on a regular and continuous basis and (ii) calculated according to the actual number of days worked (iii) that are not incentive-based must be included in the calculation of “ordinary wages.” The Supreme Court further ruled that in spite of invalidity of such agreements, employees shall not retroactively claim additional wages incurred due to such court decision, in case that such claims bring to employees unexpected benefits which substantially exceeds the wage level agreed by employers and employees and cause an unpredicted increase in expenditures for their company, which would lead the company to material managerial difficulty or would be a threat to the existence of the company. In that case, the claim is not acceptable since it is unjust and is in breach of the principle of good faith. However, in December 2021, the Supreme Court ruled that the claim of workers for additional wages should not be easily rejected for the reason of good faith if there is a possibility of overcoming business difficulties in the future.

As a result of such ruling by the Supreme Court of Korea, we and our subsidiaries became subject to a number of lawsuits filed by various industry-wide and company-specific labor unions based on claims that

 

25


Table of Contents

ordinary wage had been paid without including certain items that should have been included as ordinary wage. In July 2016, the court ruled against us, and in accordance with the court’s ruling, in August 2016 we paid Won 55.1 billion to the employees for three years of back pay plus interest. As of December 31, 2023, our subsidiaries set aside an aggregate amount of Won 39.2 billion to cover any potential future payments of additional ordinary wage in relation to the related lawsuits. We cannot presently assure you that the court will not rule against our subsidiaries in these lawsuits, or that the foregoing reserve amount will be sufficient to cover the amounts payable under the court rulings.

Furthermore, the issue of determining which labor costs should be additionally included as part of ordinary wages has not been fully resolved by the courts reviewing the lawsuits to which our subsidiaries are a party and other ordinary wage lawsuits filed against other companies. For instance, there are several cases pending review of the Supreme Court of Korea on whether the bonuses conditional to employee’s current employment status should be included as part of ordinary wages. The Supreme Court, in 2013, had ruled that such conditional bonuses are not a part of ordinary wages, yet there were several lower court cases challenging the Court’s interpretation. Although there was a case of the Supreme Court on November 2022 where it ceased the trial and dismissed the appeal against the lower court case challenging the Court’s interpretation, it is not clear from the above case whether the Supreme Court changed its previous interpretation, and there has been no Supreme Court case to clarify the Court’s interpretation since then. If the Supreme Court changes its previous interpretation in its review of the currently pending cases, it is expected to be followed by a series of lawsuits asking for additional payments of the ordinary wages. Due to such uncertainty, we cannot presently assure you that there will not be additional lawsuits in relation to ordinary wages and that we or our subsidiaries may not become liable for greater amount of damages as a result of these lawsuits. Furthermore, court decisions or labor legislations expanding the definition of ordinary wages may prospectively increase the labor costs of us and our subsidiaries. As a result, there can be no assurance that the above-described lawsuits and circumstances will not have a material adverse effect on our results of operations. See Item 8.A. “Consolidated Statements and Other Financial Information – Legal Proceedings.”

We are subject to physical security and cybersecurity risks.

Risks from cybersecurity and physical threats to energy infrastructures are increasing. Threat actors, including sophisticated nation-state actors, continue to seek to exploit potential vulnerabilities in the electric and natural gas utility industry, grid infrastructure, and other energy infrastructures, and attacks and disruptions, both physical, cyber, and hybrid targeting physical and cyber assets, are becoming increasingly sophisticated and dynamic. Several Governmental agencies have warned of increased risks related to physical attacks, ransomware attacks and cybersecurity threats related to the energy sector and its supply chains, and that the risks may escalate during periods of heightened geopolitical tensions. Continued implementation of advanced digital technologies increases the potential magnitude of impact such attacks may have. In addition, the rapid evolution and increased adoption of artificial intelligence technologies may intensify our cybersecurity risks.

A security breach of our physical assets or information systems or those of our competitors, vendors, business partners and interconnected entities could materially impact us by, among other things, impairing the availability of electricity produced and distributed by us and/or the reliability of transmission and distribution systems, damaging grid infrastructure, interrupting critical business functions, impairing the availability of vendor services and materials that we rely on to maintain our operations, or by leading to the theft or inappropriate release of certain types of information, including critical infrastructure information, system data and architecture, sensitive customer, vendor, or employee data, or other confidential data. Our reliance on vendors to provide services and equipment increases the risk to assets, systems, and data.

In December 2014, KHNP became subject to a cybersecurity attack. Hackers hacked into the computer network of former KHNP employees and threatened to shut down some of KHNP’s nuclear plants. Even though this incident ended without jeopardizing our nuclear operation in any material respect and none of the stolen

 

26


Table of Contents

information was material to our nuclear operation or the national nuclear policy, as such attacks continue to increase in sophistication and frequency, we may be subject to a material breach or material disruption in the future.

If a significant physical or cybersecurity breach or disruption were to occur, our reputation could be negatively affected, customer confidence in us could be diminished and we could be subject to legal claims, regulatory exposure, loss of revenues, increased costs including for infrastructure repairs, or operations shutdown, all of which could materially affect our financial condition and materially damage its business reputation. Moreover, the amount and scope of insurance maintained against losses resulting from any such security breaches or disruptions may not be sufficient to cover losses or otherwise adequately compensate for any disruptions to business that could result from such breaches or disruptions. The continued increase in Governmental requirements related to cybersecurity and evolving threat actor-capabilities could require changes to current measures taken by us or to our business operations and could adversely affect our consolidated financial statements.

For our cybersecurity management policies, see Item 4.B. “Business Overview—Cybersecurity” and Item 16.K. “Cybersecurity.”

We engage in Russia-related dealings, including purchasing fuel supply, goods and services from Russia and Russian companies, and we may be adversely impacted in a material manner by sanctions concerning Russia imposed by the United States and other jurisdictions.

In 2023, we met 21.3% of our bituminous coal requirements from coals that originated from Russia. Additionally, we also purchased uranium and conversion and enrichment services of uranium concentrates from Russian suppliers and also purchase Russian origin LNG. In 2023, the total value of all goods and services originated or purchased from Russia was approximately US$2.1 billion.

United States, among other jurisdictions, adopted and maintains economic sanctions and export/import controls against Russia. U.S. Office of Foreign Assets Control’s (“OFAC”) sanctions block the property of certain designated individuals and entities, target certain sectors of the Russian economy, including the energy sector, and prohibit certain transactions by U.S. persons with certain targeted persons in targeted sectors of the Russian economy.

Since February 2022, the United States, the European Union, the United Kingdom, and other countries have imposed a host of additional economic sanctions on Russia, Belarus, and certain related persons in response to Russia’s military activities in Ukraine. OFAC now maintains comprehensive, territory-wide sanctions on Crimea, the self-described Donetsk People’s Republic (“DNR”) and Luhansk People’s Republic (“LNR”) in Ukraine, generally prohibiting any dealings by U.S. persons with these regions. OFAC also has blocking sanctions on certain major Russian financial institutions and their affiliates, Russian oligarchs and persons active in the energy, banking and finance sectors (along with their family members) and Russian government officials, and debt and equity restrictions on certain Russian state-owned enterprises. The U.S. government imposed extensive export controls on all dual-use items destined to Russia, including technology and software, as well as certain commercial items. The U.S. government also imposed a ban on importation into the U.S. of Russian crude oil, certain petroleum products, LNG, and coal, and OFAC now prohibits all new investments in Russia by U.S. persons, wherever located. Non-U.S. persons that engage in certain prohibited transactions concerning Russia or with certain sanctioned Russian persons or entities may be subject to sanctions if any such dealings or transactions involve a nexus to U.S. jurisdiction, and they may also be subject to secondary sanctions for providing material support to Russian entities or individuals subject to certain blocking sanctions and certain other sanctionable transactions or activities. Additionally, the European Union, United Kingdom, and Switzerland, among other jurisdictions, have imposed a ban on the importation of coal and certain other solid fossil fuels. Korea also announced export controls on certain non-strategic items for shipment to Russia or Belarus. Other countries, including Japan, have announced plans to phase out Russian coal imports in the future.

 

27


Table of Contents

Further sanctions by the U.S., Korea, and other jurisdictions including the European Union, Switzerland, and the United Kingdom may also be forthcoming.

We source Russian fuel products from counterparties in a number of these jurisdictions, including the European Union, Japan, and Switzerland and sanctions that have been or will be imposed by these and other jurisdictions may require us to restrict or modify our operations. While the U.S. and other countries’ sanctions measures announced to date do not amount to a comprehensive embargo against Russia and Russian persons, it is not possible to predict with a reasonable degree of certainty how developments in Russia and Ukraine may impact our Russia-related business dealings, including but not limited to our purchase of fuel sources from Russia, such as bituminous coal, uranium, uranium concentrates conversion and enrichment services, and LNG or with regard to other business with Russian counterparties.

While we do not believe that our dealings related to Russia violate applicable economic sanctions, our ongoing dealings related to Russia expose us to risk. Imposition of sanctions on parties we are dealing with or planning to deal with (directly or indirectly), including suppliers of fuel sources, may require us to terminate our relationships with them and substitute them with alternative parties in order to comply with applicable sanctions. There is no guarantee that we will be able to procure contractual terms with the alternative parties that are better or at least similar to our current terms. In addition, the current and future sanctions against Russia-related business dealings may cause the global prices of fuels including coal, uranium, and LNG to rise as the overall fuel supply will be curbed. Also, we may not be able to pursue other business with Russian counterparties. Our failure to comply with applicable economic sanctions or export or import controls affecting Russia or Russian companies may result in administrative, civil, or criminal penalties. Such events may have a material adverse effect on our reputation, business, results of operations, financial condition and cash flows.

Risks Relating to Korea and the Global Economy

Unfavorable financial and economic conditions in Korea and globally may have a material adverse impact on us.

We are incorporated in Korea, where most of our assets are located and most of our income is generated. As a result, we are subject to political, economic, legal and regulatory risks specific to Korea, and our business, results of operations and financial condition are substantially dependent on the Korean consumers’ demand for electricity, which are largely dependent on developments relating to the Korean economy. As the Korean economy is, in turn, highly dependent on the health and direction of the global economy, the prices of our securities may be adversely affected by investors’ reactions to developments in other countries. In addition, due to the ongoing volatility in the global financial markets, the value of the Won relative to the U.S. dollar has also fluctuated significantly in recent years, which also may adversely affect our financial condition and results of operations.

Factors that determine economic and business cycles in the Korean or global economy are for the most part beyond our control and inherently uncertain. In light of the high level of dependence on the global economy, any of the foregoing developments could have a material adverse effect on the Korean economy and financial markets and on our business and profitability.

More specifically, factors that could have an adverse impact on Korea’s economy include, among others:

 

  

ongoing inflation brought on by expansionary monetary policies during COVID-19 pandemic and global supply chain disruptions as affected by geopolitical conflicts in Russia, Ukraine, Israel and other Middle Eastern states;

 

  

increase in base rates by central banks around the world to mitigate inflation and ensuing volatility in foreign currency reserve levels, commodity prices (including oil, LNG and other fuel prices), exchange rates (particularly against the U.S. dollar), interest rates, stock market prices and inflows and outflows of foreign capital, either directly, into the stock markets, through derivatives or otherwise;

 

28


Table of Contents
  

difficulties in the financial sectors in the United States, Europe, China and elsewhere and increased sovereign default risks in certain countries and the resulting adverse effects on the global financial markets;

 

  

adverse developments in the economies of countries and regions to which Korea exports goods and services (such as the United States, Europe, China and Japan), or in emerging market economies in Asia or elsewhere that could result in a loss of confidence in the Korean economy, including potentially as a result of the Brexit;

 

  

potential escalation of the ongoing trade war between the U.S. and China as each country introduces tariffs on goods traded with the other;

 

  

social and labor unrest or declining consumer confidence or spending resulting from lay-offs, increasing unemployment and lower levels of income;

 

  

uncertainty and volatility in the market prices of Korean real estate;

 

  

a decrease in tax revenues and a substantial increase in the Government’s expenditures for unemployment compensation and other social programs that together could lead to an increased Government budget deficit;

 

  

political uncertainty, including as a result of increasing strife among or within political parties in Korea, and political gridlock within the Government or in the legislature, which prevents or disrupts timely and effective policy making to the detriment of Korean economy, as well as the impeachment and indictment of the former president following a series of scandals and social unrest, which also involved the investigation of several leading Korean conglomerates and arrest of their leaders on charges of bribery and other possible misconduct;

 

  

deterioration in economic or diplomatic relations between Korea and its trading partners or allies, including deterioration resulting from territorial or trade disputes or disagreements in foreign policy, including as a result of any potential renegotiation of free trade agreements;

 

  

increases in social expenditures to support the aging population in Korea or decreases in economic productivity due to declining population size in Korea;

 

  

any other development that has a material adverse effect in the global economy, such as an act of war, the spread of terrorism or a breakout of an epidemic such as SARS, avian flu, swine flu, Middle East Respiratory Syndrome, Ebola or Zika virus, or natural disasters, earthquakes and tsunamis and the related disruptions in the relevant economies with global repercussions;

 

  

hostilities involving oil-producing countries in the Middle East and elsewhere and any material disruption in the supply of oil or a material increase in the price of oil resulting from such hostilities; and

 

  

an increase in the level of tensions or an outbreak of hostilities in the Korean peninsula or between North Korea and the United States.

Any future deterioration of the Korean economy could have an adverse effect on our business, financial condition and results of operations.

Tensions with North Korea could have an adverse effect on us and the market value of our shares.

Relations between Korea and North Korea have been tense throughout Korea’s modern history. The level of tension between the two Koreas has fluctuated and may increase abruptly as a result of current and future events. In particular, there continues to be uncertainty regarding the long-term stability of North Korea’s political leadership since the succession of Kim Jong-un to power following the death of his father in December 2011, which has raised concerns with respect to the political and economic future of the region.

 

29


Table of Contents

There continues to be heightened security tension in the region stemming from North Korea’s hostile military and diplomatic actions, including in respect of its nuclear weapons and long-range missile programs. Recently, North Korea fired artillery shells in maritime buffer zones in November 2019 as well as from October 2022 to December 2022 and shots on a guard post of Korea in May 2020 In September 2022, North Korea legislated five conditions under which it would launch a preemptive nuclear strike. In December 2022, five North Korean drones violated Korean airspace, one of which returned to the North but the rest disappeared. In November 2022 and from February 2023 to April 2023, North Korea conducted test launches of intercontinental ballistic missiles to East Sea. In September 2023, North Korea amended constitution declaring itself to be a nuclear weapons state.

North Korea’s economy also faces severe challenges, including severe inflation and food shortages, which may further aggravate social and political tensions within North Korea. In addition, reunification of Korea and North Korea could occur in the future, which would entail significant economic commitment and expenditure by Korea that may outweigh any resulting economic benefits of reunification.

There can be no assurance that the level of tension on the Korean peninsula will not escalate in the future or that the political regime in North Korea may not suddenly collapse. Any further increase in tension or uncertainty relating to the military, political or economic stability in the Korean peninsula, including a breakdown of diplomatic negotiations over the North Korean nuclear program, occurrence of military hostilities, heightened concerns about the stability of North Korea’s political leadership or its actual collapse, a leadership crisis, a breakdown of high-level contacts or accelerated reunification could have a material adverse effect on our business, financial condition and results of operations, as well as the price of our common shares and our American depositary shares.

We are generally subject to Korean corporate governance and disclosure standards, which differ in significant respects from those in other countries.

Companies in Korea, including us, are subject to corporate governance standards applicable to Korean public companies which differ in many respects from standards applicable in other countries, including the United States. As a reporting company registered with the Securities and Exchange Commission and listed on the New York Stock Exchange, we are, and will continue to be, subject to certain corporate governance standards as mandated by the Sarbanes-Oxley Act of 2002, as amended. However, foreign private issuers, including us, are exempt from certain corporate governance standards required under the Sarbanes-Oxley Act or the rules of the New York Stock Exchange. We and our generation subsidiaries are also subject to a number of special laws and regulations to Government-controlled entities, including the Act on the Management of Public Institutions. For a description of significant differences in corporate governance standards, see Item 16.G. “Corporate Governance.” There may also be less publicly available information about Korean companies, such as us, than is regularly made available by public or non-public companies in other countries. Such differences in corporate governance standards and less public information could result in less than satisfactory corporate governance practices or disclosure to investors in certain countries.

You may not be able to enforce a judgment of a foreign court against us.

We are a corporation with limited liability organized under the laws of Korea. Substantially all of our directors and officers and other persons named in this annual report reside in Korea, and all or a significant portion of the assets of our directors and officers and other persons named in this annual report and substantially all of our assets are located in Korea. As a result, it may not be possible for holders of the American depository shares to affect service of process within the United States, or to enforce against them or us in the United States judgments obtained in United States courts based on the civil liability provisions of the federal securities laws of the United States. There is doubt as to the enforceability in Korea, either in original actions or in actions for enforcement of judgments of United States courts, of civil liabilities predicated on the United States federal securities laws.

 

30


Table of Contents

Risks Relating to Our American Depositary Shares (ADSs)

There are restrictions on withdrawal and deposit of common shares under the depositary facility.

Under the deposit agreement, holders of shares of our common stock may deposit those shares with the depositary bank’s custodian in Korea and obtain American depositary shares, and holders of American depositary shares may surrender American depositary shares to the depositary bank and receive shares of our common stock. However, under current Korean laws and regulations, the depositary bank is required to obtain our prior consent for the number of shares to be deposited in any given proposed deposit which exceeds the difference between (i) the aggregate number of shares deposited by us for the issuance of American depositary shares (including deposits in connection with the initial and all subsequent offerings of American depositary shares and stock dividends or other distributions related to these American depositary shares) and (ii) the number of shares on deposit with the depositary bank at the time of such proposed deposit. We have consented to the deposit of outstanding shares of common stock as long as the number of American depositary shares outstanding at any time does not exceed 80,153,810 shares. As a result, if you surrender American depositary shares and withdraw shares of common stock, you may not be able to deposit the shares again to obtain American depositary shares.

Ownership of our shares is restricted under Korean law.

Under the Financial Investment Services and Capital Markets Act, with certain exceptions, a foreign investor may acquire shares of a Korean company without being subject to any single or aggregate foreign investment ceiling. As one such exception, certain designated public corporations, such as us, are subject to a 40% ceiling on acquisitions of shares by foreigners in the aggregate. The Financial Services Commission may impose other restrictions as it deems necessary for the protection of investors and the stabilization of the Korean securities and derivatives market.

In addition to the aggregate foreign investment ceiling set out under the Financial Investment Services and Capital Markets Act, our Articles of Incorporation set a 3% ceiling on acquisition by a single investor (whether domestic or foreign) of the shares of our common stock. Any person (with certain exceptions) who holds our issued and outstanding shares in excess of such 3% ceiling cannot exercise voting rights with respect to our shares exceeding such limit.

The ceiling on aggregate investment by foreign investors applicable to us may be exceeded in certain limited circumstances, including as a result of acquisition of:

 

  

shares by a capitalization or stock dividends of reserves;

 

  

shares from paid-in capital increases created by the exercise of shareholders’ rights; or

 

  

shares by merger, inheritance or bequest.

A foreign investor who has acquired our shares in excess of any ceiling described above may not exercise his voting rights with respect to our shares exceeding such limit and the Financial Services Commission may take necessary corrective action against him.

Holders of our ADSs will not have preemptive rights in certain circumstances.

The Korean Commercial Act and our Articles of Incorporation require us, with some exceptions, to offer shareholders the right to subscribe for new shares in proportion to their existing ownership percentage whenever new shares are issued. If we offer any rights to subscribe for additional shares of our common stock or any rights of any other nature, the depositary bank, after consultation with us, may make the rights available to you or use reasonable efforts to dispose of the rights on your behalf and make the net proceeds available to you. The depositary bank, however, is not required to make available to you any rights to purchase any additional shares unless it deems that doing so is lawful and feasible and:

 

  

a registration statement filed by us under the U.S. Securities Act of 1933, as amended, is in effect with respect to those shares; or

 

31


Table of Contents
  

the offering and sale of those shares is exempt from or is not subject to the registration requirements of the U.S. Securities Act.

We are under no obligation to file any registration statement with the U.S. Securities and Exchange Commission in relation to the registration rights. If a registration statement is required for you to exercise preemptive rights but is not filed by us, you will not be able to exercise your preemptive rights for additional shares and you will suffer dilution of your equity interest in us.

The market value of your investment in our ADSs may fluctuate due to the volatility of the Korean securities market.

Our common stock is listed on the KRX KOSPI Division of the Korea Exchange, which has a smaller market capitalization and is more volatile than the securities markets in the United States and many European countries. The market value of ADSs may fluctuate in response to the fluctuation of the trading price of shares of our common stock on the Stock Market Division of the Korea Exchange. The Stock Market Division of the Korea Exchange has experienced substantial fluctuations in the prices and volumes of sales of listed securities and the Stock Market Division of the Korea Exchange has prescribed a fixed range in which share prices are permitted to move on a daily basis. Like other securities markets, including those in developed markets, the Korean securities market has experienced problems including market manipulation, insider trading and settlement failures. The recurrence of these or similar problems could have a material adverse effect on the market price and liquidity of the securities of Korean companies, including our common stock and ADSs, in both the domestic and the international markets.

The Korean government has the ability to exert substantial influence over many aspects of the private sector business community, and in the past has exerted that influence from time to time. For example, the Korean government has promoted mergers to reduce what it considers excess capacity in a particular industry and has also encouraged private companies to publicly offer their securities. Similar actions in the future could have the effect of depressing or boosting the Korean securities market, whether or not intended to do so. Accordingly, actual or perceived actions or inactions by the Korean government may cause sudden movements in the market prices of the securities of Korean companies in the future, which may affect the market price and liquidity of our common stock and ADSs.

Your dividend payments and the amount you may realize in connection with a sale of your ADSs will be affected by fluctuations in the exchange rate between the U.S. dollar and the Won.

Investors who purchase the American depositary shares will be required to pay for them in U.S. dollars. Our outstanding shares are listed on the Korea Exchange and are quoted and traded in Won. Cash dividends, if any, in respect of the shares represented by the American depositary shares will be paid to the depositary bank in Won and then converted by the depositary bank into U.S. dollars, subject to certain conditions. Accordingly, fluctuations in the exchange rate between the Won and the U.S. dollar will affect, among other things, the amounts a registered holder or beneficial owner of the American depositary shares will receive from the depositary bank in respect of dividends, the U.S. dollar value of the proceeds which a holder or owner would receive upon sale in Korea of the shares obtained upon surrender of American depositary shares and the secondary market price of the American depositary shares.

If the Government deems that certain emergency circumstances are likely to occur, it may restrict the depositary bank from converting and remitting dividends in U.S. dollars.

Under the Foreign Exchange Transaction Act, if the Government deems that certain emergency circumstances are likely to occur, it may impose restrictions such as requiring foreign investors to obtain prior Government approval for the acquisition of Korean securities or for the repatriation of interest or dividends arising from Korean securities or sales proceeds from disposition of such securities. These emergency circumstances include any or all of the following:

 

  

sudden fluctuations in interest rates or exchange rates;

 

32


Table of Contents
  

extreme difficulty in stabilizing the balance of payments; and

 

  

a substantial disturbance in the Korean financial and capital markets.

The depositary bank may not be able to secure such prior approval from the Government for the payment of dividends to foreign investors when the Government deems that there are emergency circumstances in the Korean financial markets.

 

ITEM 4.

INFORMATION ON THE COMPANY

 

Item 4.A.

History and Development of the Company

General Information

Our legal and corporate name is Korea Electric Power Corporation. We were established by the Government on December 31, 1981 as a statutory juridical corporation in Korea under the Korea Electric Power Corporation Act (the “KEPCO Act”) as the successor to Korea Electric Company. Our registered office is located at 55 Jeollyeok-ro, Naju-si, Jeollanam-do, 58322, Korea, and our telephone number is 82-61-345-4213. Our website address is www.kepco.co.kr.

Our agent in the United States is Korea Electric Power Corporation, North America Office, located at 7th Floor, Parker Plaza, 400 Kelby Street, Fort Lee, NJ 07024.

The Korean electric utility industry traces its origin to the establishment of the first electric utility company in Korea in 1898. On July 1, 1961, the industry was reorganized by the merger of Korea Electric Power Company, Seoul Electric Company and South Korea Electric Company, which resulted in the formation of Korea Electric Company. From 1976 to 1981, the Government acquired the private minority shareholdings in Korea Electric Company. After the Government acquired all the remaining shares of Korea Electric Company, Korea Electric Company was dissolved, and we were incorporated in 1981 and assumed the assets and liabilities of Korea Electric Company. We ceased to be wholly owned by the Government in 1989 when the Government sold 21% of our common stock. As of December 31, 2023, the Government maintained 51.1% ownership in aggregate of our common shares by direct holdings and indirect holdings through Korea Development Bank, a statutory banking institution wholly owned by the Government.

Under relevant laws of Korea, the Government is required to own, directly or indirectly, at least 51% of our capital. Direct or indirect ownership of more than 50% of our outstanding common voting stock enables the Government to control the approval of certain corporate matters relating to us that require a shareholders’ resolution, including approval of dividends. The rights of the Government and Korea Development Bank as holders of our common stock are exercised by the Ministry of Trade, Industry and Energy, based on the Government’s ownership of our common stock and a proxy received from Korea Development Bank, in consultation with the Ministry of Economy and Finance.

We operate under the general supervision of the Ministry of Trade, Industry and Energy. The Ministry of Trade, Industry and Energy, in consultation with the Ministry of Economy and Finance, is responsible for approving, subject to review by the Korea Electricity Commission, the electricity rates we charge our customers. See Item 4.B. “Business Overview—Sales and Customers—Electricity Rates.” We furnish reports to officials of the Ministry of Trade, Industry and Energy, the Ministry of Economy and Finance and other Government agencies and regularly consult with such officials on matters relating to our business and affairs. See Item 4.B. “Business Overview—Regulation.” Our non-standing directors, who comprise a majority of our board of directors, must be appointed by the Ministry of Economy and Finance following the review and resolution of the Committee for Management of Public Institutions (which is established by law and chaired by the Minister of the Ministry of Economy and Finance and whose members consist of Government officials and others appointed by the President of Korea based on recommendation by the Minister of the Ministry of Economy and Finance) from

 

33


Table of Contents

a pool of candidates recommended by the director nomination committee. Our president and standing directors who concurrently serve as members of our audit committee must be appointed by the President of Korea upon the motion of the Minister of the Ministry of Trade, Industry and Energy (in the case of our president) and the Minister of the Ministry of Economy and Finance (in the case of our standing director who concurrently serves as a member of the audit committee) and following the nomination by our director nomination committee, the review and resolution of the Committee for Management of Public Institutions and an approval at the general meeting of shareholders. See Item 6.A. “Directors and Senior Management—Board of Directors” and Item 16.G. “Corporate Governance—The Act on the Management of Public Institutions.”

 

Item 4.B.

Business Overview

Introduction

We are an integrated electric utility company engaged in the transmission and distribution of substantially all of the electricity in Korea. Through our six wholly-owned generation subsidiaries, we also generate the substantial majority of electricity produced in Korea. As of December 31, 2023, we and our generation subsidiaries owned approximately 57.6% of the total electricity generation capacity in Korea (excluding plants generating electricity primarily for private or emergency use). In 2023, we sold to our customers 545,966 gigawatt-hours of electricity. We purchase electricity principally from our generation subsidiaries and, to a lesser extent, from independent power producers. Of the 543,973 gigawatt-hours of electricity we purchased in 2023, 32.5% was generated by KHNP, our wholly-owned nuclear and hydroelectric power generation subsidiary, 35.9% was generated by our wholly-owned five non-nuclear generation subsidiaries and 31.7% was generated by independent power producers that trade electricity to us through the cost-based pool system of power trading (excluding independent power producers that supply electricity under power purchase agreements with us). Our five non-nuclear generation subsidiaries are KOSEP, KOMIPO, KOWEPO, KOSPO and EWP, each of which is wholly owned by us and is incorporated in Korea. We derive substantially all of our revenues and profit from Korea, and substantially all of our assets are located in Korea.

In 2023, we had sales of Won 87,476 billion and net loss of Won 4,716 billion, compared to sales of Won 70,546 billion and net loss of Won 24,429 billion in 2022.

Our revenues are closely tied to demand for electricity in Korea. Demand for electricity in Korea increased at a compounded average growth rate of 1.2% per annum from 2019 to 2023, compared to the real gross domestic product, or GDP, which increased at a compounded average growth rate of 1.8% during the same period, according to the Bank of Korea. In 2023, the GDP increased by 1.4%, while the demand for electricity in Korea decreased by 0.4% compared to 2022.

Strategy

We established our 2035 medium to long-term strategy to leap forward as a global integrated energy platform company that leads changes in the industrial ecosystem. We plan to achieve it by pursuing the following eight strategic initiatives. Through this, we aim to provide better value to various stakeholders including but not limited to our country, customers and society. More specifically, our goal for the country is to contribute to the achievement of national policy goals for energy transition such as establishing the foundation for carbon neutrality. Our goal for the customers is to expand clean energy supply by enhancing digital-based customer interaction and renewable energy transactions. Our goal for the society is to create a future-oriented energy market by developing and commercializing carbon-neutral technology through collaboration with major stakeholders. Our eight strategic initiatives to achieve such goals are:

 

  

Establish power grid system which could further contribute to achieving carbon neutrality. We plan to contribute to achieving carbon neutrality in 2050 with power grid innovation. We aim to secure grid capability for connecting renewable energy units by preemptively constructing power facilities based on forecast and further enhance grid stability with intelligent and advanced grid system.

 

34


Table of Contents
  

Expand clean energy and promote strategic demand response. We plan to establish a foundation for expanding renewable energy by cooperating with our subsidiaries and independent power producers. Also, we aim to improve demand-side energy efficiency by collaborating with demand management business operators.

 

  

Lead future energy market and improve sales competitiveness. We plan to create reliable and resilient electricity system to achieve competency in future electricity market. We will also strive to expand our customized services through digital technologies and power data and establish reasonable and sustainable cost-based tariff system.

 

  

Lead platform-based new businesses. We plan to expand charging infrastructure and foster transition into electric vehicles. We also aim to improve energy efficiency by boosting operation of dispersed energy resources in a form of energy platform business.

 

  

Transform overseas business portfolio to focus on eco-friendly projects and core competencies. We plan to end our overseas coal-fired generation projects and switch substantial amount of our overseas business portfolio into eco-friendly projects. We aim to improve our competency and profitability by strengthening our overseas business capacity.

 

  

Secure future technologies and build a research and development (“R&D”) ecosystem. We plan to secure core technologies necessary for achieving carbon neutrality with aggressive R&D investment. In addition, we aim to introduce an R&D system based on collaboration among industry, university and research institutes to establish a foundation for technological innovation and enhance our R&D capability.

 

  

Promote digitalization in overall supply chain. We will strengthen work efficiency and stability by introducing the latest digital technology and infrastructure to our business environment and develop a business model with new customer services based on data platforms.

 

  

Establish a highly reliable and highly efficient management system with respect to human beings and environment. We plan to establish a comprehensive ESG management system that promotes environment, safety and coexistence. Also, we aim to enhance our financial stability by pursuing management efficiency and stable profit structure.

Government Ownership and Our Interactions with the Government

The KEPCO Act requires that the Government own at least 51% of our capital stock. Direct or indirect ownership of more than 50% of our outstanding common voting stock enables the Government to control the approval of certain corporate matters which require a shareholders’ resolution, including approval of dividends. The rights of the Government and Korea Development Bank as holders of our common stock are exercised by the Ministry of Trade, Industry and Energy in consultation with the Ministry of Economy and Finance. We are currently not aware of any plans of the Government to cease to own, directly or indirectly, at least 51% of our outstanding common stock.

We play an important role in the implementation of the Government’s national energy policy, which is established in consultation with us, among other parties. As an entity formed to serve public policy goals of the Government, we seek to maintain a fair level of profitability and strengthen our capital base in order to support the growth of our business in the long term.

The Government, through its various policy initiatives for the Korean energy industry as well as direct and indirect supervision of us and our industry, plays an important role in our business and operations. Most importantly, the electricity tariff rates we charge to our customers are regulated by the Government taking into account, among others, our needs to recover the fair operating costs, make capital investments and recoup a fair return on capital invested by us, as well as the Government’s overall policy considerations, such as inflation. See Item 4.B. “Business Overview—Sales and Customers—Electricity Rates.”

 

35


Table of Contents

In addition, pursuant to the Basic Plan determined by the Government, we and our generation subsidiaries have made, and plan to make, substantial expenditures for the construction of generation plants and other facilities to meet demand for electric power. See Item 5.B. “Liquidity and Capital Resources—Capital Requirements.”

Restructuring of the Electric Power Industry in Korea

On January 21, 1999, the Ministry of Trade, Industry and Energy published the Restructuring Plan. The overall objectives of the Restructuring Plan consisted of: (i) introducing competition and thereby increasing efficiency in the Korean electric power industry, (ii) ensuring a long-term, inexpensive and stable electricity supply, and (iii) promoting consumer convenience through the expansion of consumer choice.

The following provides further details relating to the Restructuring Plan.

Phase I

During Phase I, which served as a preparatory stage for Phase II and lasted from the announcement of the Restructuring Plan in January 1999 until April 2001, we undertook steps to split our generation business units off into one wholly-owned nuclear generation subsidiary (namely, KHNP) and five wholly-owned non-nuclear generation subsidiaries (namely, KOSEP, KOMIPO, KOWEPO, KOSPO and EWP), each with its own management structure, assets and liabilities. These steps were completed upon approval at our shareholders’ meeting in April 2001.

The Government’s principal objectives in the split-off of the generation units into separate subsidiaries were to: (i) introduce competition and thereby increase efficiency in the electricity generation industry in Korea, and (ii) ensure a stable supply of electricity in Korea.

Following the implementation of Phase I, we have substantial monopoly with respect to the transmission and distribution of electricity in Korea.

While our ownership percentage of our generation subsidiaries will depend on further adjustments to the Restructuring Plan to be adopted by the Government, we plan to retain 100% ownership of our transmission and distribution business.

Phase II

At the outset of Phase II in April 2001, the Government introduced a cost-based competitive bidding pool system under which we purchase power from our generation subsidiaries and other independent power producers for transmission and distribution to customers. For a further description of this system, see “—Purchase of Electricity—Cost-based Pool System” below.

Pursuant to the Electric Utility Act amended in December 2000, the Government established the Korea Power Exchange in April 2001. The primary function of the Korea Power Exchange is to deal with the sale of electricity and implement regulations governing the electricity market to allow for electricity distribution through a competitive bidding process. The Government also established the Korea Electricity Commission in April 2001 to regulate the Korean electric power industry and ensure fair competition among industry participants. To facilitate this goal, the Korea Power Exchange established the Electricity Market Rules relating to the operation of the bidding pool system. To amend the Electricity Market Rules, the Korea Power Exchange must have the proposed amendment reviewed by the Korea Electricity Commission and then obtain the approval of the Ministry of Trade, Industry and Energy.

The Korea Electricity Commission’s main functions include implementation of standards and measures necessary for electricity market operation and review of matters relating to licensing participants in the Korean

 

36


Table of Contents

electric power industry. The Korea Electricity Commission also acts as an arbitrator in tariff-related disputes among participants in the Korean electric power industry and investigates illegal or deceptive activities of the industry participants.

Privatization of Generation Subsidiaries

In April 2002, the Ministry of Trade, Industry and Energy released the basic privatization plan for five of our generation subsidiaries other than KHNP. Pursuant to this plan, we commenced the process of selling our equity interest in KOSEP in 2002. According to the original plan, this process was, in principle, to take the form of a sale of management control, potentially supplemented by an initial public offering as a way of broadening the investor base. In November 2003, KOSEP submitted its application to the Korea Exchange for a preliminary screening review, which was approved in December 2003. However, in June 2004, KOSEP made a request to the Korea Exchange to delay its stock listing due to unfavorable stock market conditions at that time.

In accordance with the Proposal for Adjustment of Functions of Public Institutions (Energy Sector) announced by the Government in June 2016, we considered a sale in the public market of a minority of our shares in our five non-nuclear generation subsidiaries, KEPCO KDN and KHNP gradually. However, the planned sales have been put on hold, primarily due to prevailing market conditions. In any event, we plan to maintain a controlling stake in each of these subsidiaries.

Suspension of the Plan to Form and Privatize Distribution Subsidiaries

In 2003, the Government established a Tripartite Commission consisting of representatives of the Government, leading businesses and labor unions in Korea to deliberate on ways to introduce competition in electricity distribution, such as by forming and privatizing new distribution subsidiaries. In 2004, the Tripartite Commission recommended not pursuing such privatization initiatives but instead creating independent business divisions within us to improve operational efficiency through internal competition. Following the adoption of such recommendation by the Government in 2004 and further studies by Korea Development Institute, in 2006 we created nine “strategic business units” (which, together with our other business units, were subsequently restructured into 14 such units in February 2012) that have a greater degree of autonomy with respect to management, financial accounting and performance evaluation while having a common focus on increasing profitability.

Initiatives to Improve the Structure of Electricity Generation

In August 2010, the Ministry of Trade, Industry and Energy announced the Proposal for Improvement in the Structure of the Electric Power Industry in order to resolve uncertainty related to restructuring plans for the electric power industry and maintain competitiveness of the electric power industry. Key initiatives of the proposal included the following: (i) maintain the current structure of having six generation subsidiaries and designate the six generation subsidiaries as market-oriented public enterprises under the Act on the Management of Public Institutions in order to foster competition among the generation subsidiaries and promote efficiency in their operations, (ii) clarify the scope of the business of us and the six generation subsidiaries (namely, that we shall manage the financial structure and governance of the six generation subsidiaries and nuclear power plant and overseas resources development projects, while the six generation subsidiaries will have greater autonomy with respect to construction and management of generation units and procurement of fuel), (iii) create a nuclear power export business unit to systematically enhance our capabilities to win projects involving the construction and operation of nuclear power plants overseas, (iv) further rationalize the electricity tariff by adopting a fuel-cost based tariff system in 2011 and a voltage-based tariff system in a subsequent year, and (v) create separate accounting systems for electricity generation, transmission, distribution and sales with the aim of introducing competition in electricity sales in the intermediate future. The fuel-cost based tariff system went into effect on July 1, 2011 but the Ministry of Trade, Industry and Energy issued a hold order on July 29, 2011 and subsequently informed us it needs to be reassessed in light of the circumstances.

 

37


Table of Contents

In January 2011, the Ministry of Economy and Finance created a “joint cooperation unit” consisting of officers and employees selected from the five thermal power generation subsidiaries in order to reduce inefficiencies in areas such as fuel transportation, inventories, materials and equipment and construction, etc. and allow the thermal power generation subsidiaries to continue utilizing the benefits of economy of scale after split off of our generation business units into separate subsidiaries. The purpose of the joint cooperation unit was to give greater autonomy to the generation subsidiaries with regard to power plant construction and management and fuel procurements, and thereby enhance efficiency in operating power plants. The main functions of the joint cooperation unit are as follows: (i) maintain inventories of bituminous coal through volume exchanges and joint purchases, (ii) reduce shipping and demurrage expenses through joint operation and distribution of dedicated vessels, (iii) reduce costs by sharing information on generation material inventories and (iv) sharing human resources among the five thermal power generation subsidiaries for construction projects, among other things.

Furthermore, in January 2011 the six generation subsidiaries were officially designated as “market-oriented public enterprises,” whereupon the President of Korea appoints the president and the statutory auditor of each such subsidiary; the selection of non-standing directors of each such subsidiary is subject to approval by the Minister of the Ministry of Economy and Finance; the president of each such subsidiary is required to enter into a management contract directly with the Minister of the Ministry of Trade, Industry and Energy; and the Public Enterprise Management Evaluation Team which is established by the Committee for Management of Public Institutions conducts performance evaluation of such subsidiaries. Previously, our president appointed the president and the statutory auditor of each such subsidiary; the selection of non-standing directors of each such subsidiary was subject to approval by our president; the president of each such subsidiary entered into a management contract with our president; and our evaluation committee conducted performance evaluation of such subsidiaries. For further details of the impact of the designation of our generation subsidiaries as “market-oriented public enterprises,” see Item 16.G. “Corporate Governance – The Act on the Management of Public Institutions.”

Proposal for Adjustment of Functions of Public Institutions (Energy Sector)

In June 2016, the Government announced the Proposal for Adjustment of Functions of Public Institutions (Energy Sector) for the purpose of streamlining the operations of Government-affiliated energy companies by discouraging them from engaging in overlapping or similar businesses with each other, reducing non-core assets and activities and improving management and operational efficiency. The initiatives contemplated in this proposal that would affect us and our generation subsidiaries include the following: (i) the generation companies should take on greater responsibilities in overseas resource exploration and production projects as these involve procurement of fuels necessary for electricity generation while fostering cooperation among each other through closer coordination, (ii) KHNP should take a greater role in export of nuclear technology, and (iii) the current system of retail sale of electricity to end-users should be liberalized to encourage more competition. In accordance therewith, we transferred a substantial portion of our assets and liabilities in our overseas resource business to our generation subsidiaries as of December 31, 2016. In addition, this Proposal contemplated selling a minority stake in our generation subsidiaries and KEPCO KDN, but the planned sales have been put on hold, as discussed above in “ –Privatization of Generation Subsidiaries.”

Proposed Amendment for Direct Participation in Renewable Energy

An amendment to the Electric Utility Act is underway that will enable us to directly participate in the development of renewable power generation. Under the current Electric Utility Act, a single business entity cannot participate in two or more types of electric businesses. Notwithstanding the foregoing, our power generation subsidiaries are allowed to directly participate in the development of renewable power generation and we may also do so by forming new entities to participate in such development. The proposed amendment allows a market-type public institution like ourselves to directly participate in renewable power generation business to a limited degree. The amendment bill proposed in July 2020 is currently pending deliberation by the Korean National Assembly, but its future remains unclear. If the bill passes, we intend to pursue renewable power generation projects such as large-scale offshore wind power.

 

38


Table of Contents

Purchase of Electricity

Cost-based Pool System

Since April 2001, the purchase and sale of electricity in Korea is required to be made through the Korea Power Exchange, which is a statutory not-for-profit organization established under the Electric Utility Act with responsibilities for setting the price of electricity, handling the trading and collecting relevant data for the electricity market in Korea. The suppliers of electricity in Korean electricity market consist of our six generation subsidiaries, which were split-off from us in April 2001, and independent power producers, which numbered 35 (excluding 6,184 renewable energy producers) as of December 31, 2023. We distribute electricity purchased through the Korea Power Exchange to end users.

Our Relationship with the Korea Power Exchange

The key features of our relationships with the Korea Power Exchange include the following: (i) we and our six generation subsidiaries are member corporations of the Korea Power Exchange and collectively own 100% of its share capital, (ii) three of the 11 members of the board of directors of the Korea Power Exchange are currently our or our subsidiaries’ employees, and (iii) one of our employees is currently a member in three of the key committees of the Korea Power Exchange that are responsible for evaluating the costs of producing electricity, making rules for the Korea Power Exchange and gathering and disclosing information relating to the Korean electricity market.

Notwithstanding the foregoing relationships, however, we do not have control over the Korea Power Exchange or its policies since, among others, (i) the Korea Power Exchange, its personnel, policies, operations and finances are closely supervised and controlled by the Government, namely through the Ministry of Trade, Industry and Energy, and are subject to a host of laws and regulations, including, among others, the Electric Utility Act and the Act on the Management of Public Institutions, as well as the Articles of Incorporation of the Korea Power Exchange, (ii) we are entitled to elect no more than one-third of the Korea Power Exchange directors and our representatives represent only a minority of its board of directors and committees (with the other members being comprised of representatives of the Ministry of Trade, Industry and Energy, employees of the Korea Power Exchange, businesspersons and/or scholars), and (iii) the role of our representatives in the policy making process for the Korea Power Exchange is primarily advisory based on their technical expertise derived from their employment at us or our generation subsidiaries. Consistent with this view, the Finance Supervisory Service issued a ruling in 2005 that stated that we are not deemed to have significant influence or control over the decision-making process of the Korea Power Exchange relating to its business or financial affairs.

Pricing Factors

The price of electricity in the Korean electricity market is determined principally based on the cost of generating electricity using a system known as the “cost-based pool” system. Under the cost-based pool system, the price of electricity has two principal components, namely the marginal price (representing the variable cost of generating electricity) and the capacity price (representing the fixed cost of generating electricity).

Under the merit order system, the electricity purchase allocation, the system marginal price (as described below) and the final allocation adjustment are automatically determined based on an objective formula. The variable cost (including the adjusted coefficient as described below) and the capacity price are determined in advance of trading by the Cost Evaluation Committee, which is comprised of representatives from the Ministry of Trade, Industry and Energy, the Korea Power Exchange, us, generation companies, scholars and researchers (the “Cost Evaluation Committee”). Accordingly, a supplier of electricity cannot exercise control over the merit order system or its operations to such supplier’s strategic advantage.

 

39


Table of Contents

Marginal Price

The primary purpose of the marginal price is to compensate the generation companies for fuel costs, which represents the principal component of the variable costs of generating electricity. We currently refer such marginal price as the “system marginal price.”

The system marginal price represents, in effect, the marginal price of electricity at a given hour at which the projected demand for electricity and the projected supply of electricity for such hour intersect, as determined by the merit order system, which is a system used by the Korea Power Exchange to allocate which generation units will supply electricity for which hour and at what price. To elaborate, the projected demand for electricity for a given hour is determined by the Korea Power Exchange based on a forecast made one day prior to trading, and such forecast takes into account, among others, historical statistics relating to demand for electricity nationwide by day and by hour, season and on-peak-hour versus off-peak hour demand analysis. The projected supply of electricity at a given hour is determined as the aggregate of the available capacity of all generation units that have submitted bids to supply electricity for such hour. These bids are submitted to the Korea Power Exchange one day prior to trading. On September 1, 2022, the trading system was further developed to facilitate optimal decisions on market prices and allow plans for generating power to be made with more sophistication, by taking into account thermal constraints, power transmission constraints and reserving power from the stage of making the generation plan.

Under the merit order system, the generation unit with the lowest variable cost of generating electricity among all the generation units that have submitted a bid for a given hour is first awarded a purchase order for electricity up to the available capacity of such unit as indicated in its bid. The generation unit with the next lowest variable cost is then awarded a purchase order up to its available capacity in its bid, and so forth, until the projected demand for electricity for such hour is met. We refer to the variable cost of the generation unit that is the last to receive the purchase order for such hour as the system marginal price, which also represents the highest price at which electricity can be supplied at a given hour based on the demand and supply for such hour. Generation units whose variable costs exceed the system marginal price for a given hour do not receive purchase orders to supply electricity for such hour. The variable cost of each generation unit is determined by the Cost Evaluation Committee on a monthly basis and reflected in the following month based on the fuel costs two months prior to such determination. The purpose of the merit order system is to encourage generation units to reduce its electricity generation costs by making its generation process more efficient, sourcing fuels from most cost-effective sources or adopting other cost savings programs.

The final allocation of electricity supply is further adjusted on the basis of other factors, including the proximity of a generation unit to the geographical area to which power is being supplied, network and fuel constraints and the amount of power loss. This adjustment mechanism is designed to adjust for transmission losses in order to improve overall cost-efficiency in the transmission of electricity to end-users.

The price of electricity at which our generation subsidiaries sell electricity to us is determined using the following formula:

Variable cost + [System marginal price – Variable cost] * Adjusted coefficient

An adjusted coefficient applies in principle to all generation units operated by our generation subsidiaries and the coal-fired generation units operated by independent power producers. The adjusted coefficient applicable to the generation units operated by our generation subsidiaries is determined based on considerations of, among others, electricity tariff rates and the relative fair returns on investment in respect of us compared to our generation subsidiaries. The purpose of the adjusted coefficient here is to prevent electricity trading from resulting in undue imbalances as to the relative financial results among generation subsidiaries as well as between us (as the purchaser of electricity) and our generation subsidiaries (as sellers of electricity). Such imbalances may arise from excessive profit taking by base load generators (on account of their inherently

 

40


Table of Contents

cheaper fuel cost structure compared to non-base load generators) as well as from fluctuations in fuel prices (it being the case that during times of rapid and substantial rises in fuel costs which are not offset by corresponding rises in electricity tariff rates charged by us to end-users, on a non-consolidated basis our profitability will decline compared to that our generation subsidiaries since our generation subsidiaries are entitled to sell electricity to us at cost plus a guaranteed margin). In comparison, the adjusted coefficient applicable to the coal-fired generation units operated by independent power producers is determined to enable such independent power producers to recover the total costs of building and operating such units.

The adjusted coefficient is determined by the Cost Evaluation Committee in principle on an annual basis, although in exceptional cases driven by external or structural factors such as rapid and substantial changes in fuel costs, adjustments to electricity tariff rates or changes in the electricity pricing structure, the adjusted coefficient may be adjusted on a quarterly basis.

Capacity Price

In addition to payment in respect of the variable cost of generating electricity, generation units receive payment in the form of capacity price, the purpose of which is to compensate them for the fixed costs of constructing generation facilities, provide incentives for construction of new generation units and maintain reliability of the nationwide electricity transmission network.

The capacity price is determined by the Cost Evaluation Committee as a function of the following factors: (i) reference capacity price, (ii) reserve capacity factor, (iii) time-of-the-day capacity coefficient and (iv) performance capacity factor introduced since June 2022 instead of fuel switching factor which was effective since October 2016. The time-of-the-day capacity coefficient are determined annually before the end of December for the subsequent twelve-month period. The reference capacity price, reserve capacity factor and the fuel switching factor are determined annually before the end of June for the subsequent twelve-month period.

The reference capacity price refers to the Won amount per kilowatt-hour payable annually for annualized available capacity indicated in the bids submitted the day before trading (provided that such capacity is actually available on the relevant day of trading), and is determined based on the construction costs and maintenance costs of a standard generation unit and related transmission access facilities, and a base rate for loading electricity. Prior to October 2016, the same reference capacity price applied uniformly to all generation units. Since October 2016, the reference capacity price applies differentially to each generation unit depending on the start year of its commercial operation. Also, since December 2022, we have reduced margins from the reference capacity price applied to all generation units reflecting the reserve capacity. Accordingly, the reference capacity price currently ranges from Won 10.65 to 13.59 per kilowatt-hour.

The reserve capacity factor relates to the requirement to maintain a standard capacity reserve margin around 13% in order to prevent excessive capacity build-up as well as induce optimal capacity investment at the regional level. The capacity reserve margin is the ratio of peak demand to the total available capacity. Under this system, generation units in a region where available capacity is insufficient to meet demand for electricity as evidenced by failing to meet the standard capacity reserve margin receive increased capacity price. Conversely, generation units in a region where available capacity exceeds demand for electricity as evidenced by exceeding the standard capacity reserve margin receive reduced capacity price. Since October 2016, the reserve capacity factor also factors in the transmission loss per generation unit in order to favor transmission of electricity from a nearby generation unit.

The time-of-the-day capacity coefficient allows hourly and seasonal adjustments in order to incentivize our generation subsidiaries to operate their generation facilities at full capacity during periods of highest demand. For example, the capacity price paid differs depending on whether the relevant hour is an “on-peak” hour, a “mid-peak” hour or an “off-peak” hour (the capacity price being highest for the on-peak hours and lowest for the off-peak hours) and the capacity price paid is highest during the months of January, July and August when electricity usage is highest due to weather conditions.

 

41


Table of Contents

The fuel switching factor, which was introduced in October 2016 to promote environmental sensitivities to climate change, has been changed into the performance capacity factor since June 2022 to comply with the market trend that differentially compensates the capacity price for the contribution to electricity system and operational flexibility of generation units. In addition, in January 2022, the environmental contribution factor was excluded from the fuel switching factor and instead reflected in the unit thermal cost of each generation unit in order to effectively respond to the greenhouse gas reduction.

Other than subject to the aforementioned variations, the same capacity pricing mechanism applies to all generation units regardless of fuel types used.

In the Ninth Basic Plan, the government announced its plans to introduce real-time electricity trading market and supplementary service market, which have been upgraded to ensure appropriate valuation and compensation for supplementary energy sources and responses to volatility of renewable energy. Supplementary energy sources refer to power generators independent of us. The reorganization of the market system has been gradually implemented, starting with the implementation of a trading system reflecting constraints and reserves of electricity system in September 2022. In August 2023, we presented the design of the trading system, which would introduce real-time electricity trading market through which supplementary services can be traded. The new trading system is expected to be tested in Jeju Province in June 2024. Upon implementation of the new trading system, renewable energy generators exceeding one megawatt (mandatory for three megawatts) would be able to participate in market bidding.

Vesting Contract System

In May 2014, the Electric Utility Act was amended to introduce a “vesting contract” system in determining the price and quantity of electricity to be sold and purchased between the purchaser of electricity (namely, us) and the sellers of electricity (namely, our generation subsidiaries and independent power producers). Under the vesting contract system, electricity generators using base load fuels (such as nuclear, coal, hydro and by-product gas) at a particular generation unit were to be required to enter into a contract with the purchaser of electricity (namely, us), which specifies, among other things, the quantity of electricity to be generated and sold at a particular generation unit and the price at which such electricity is sold, subject to certain adjustments.

The vesting contract system was introduced principally to prevent excessive profit-taking by low-cost producers of electricity using base load fuels (such as nuclear, coal, hydro and by-product gas) by replacing the adjusted coefficient as the basis for determining the guaranteed return to generation companies, as well as to enhance the stability of electricity supply by requiring long-term contractual arrangements for the purchase and sale of electricity and promote cost savings, productivity enhancements and operational efficiency by providing incentives and penalties depending on the degree to which the generation companies could supply electricity at costs below the contracted electricity prices.

In order to minimize undue shock to the electricity trading market in Korea, the vesting contract system was to be implemented in phases starting with by-product gas-based electricity in 2015, which accounted for 0.2% of electricity purchased by us in 2023. The vesting contract system for other base load fuels ended in 2020 and there are no active contracts remaining for such fuels as of the end of 2023. However, in light of the current state of electricity supply, including an increase in generation capacity relative to peak usage, reduced fuel costs following a decline in oil prices and greater environmental concerns related to coal-fired electricity generation, we are currently in discussion with the Government to potentially extend the vesting contract system to nuclear-based electricity.

 

42


Table of Contents

Power Trading Results

The results of power trading, as effected through the Korea Power Exchange, for us and our generation subsidiaries and independent power producers in 2023 are as follows:

 

   

Items

 Volume
(Gigawatt
hours)
  Percentage
of Total
Volume
(%)
  Sales to
KEPCO(2)
(in
billions of
Won)
  Percentage
of Total
Sales (%)
  Unit Price
(Won/kWh)
 

Generation Companies

  KHNP  176,568   32.5   10,578   14.1   59.91 
  KOSEP  38,422   7.1   5,698   7.6   148.3 
  KOMIPO  45,099   8.3   7,468   9.9   165.6 
  KOWEPO  39,514   7.3   6,701   8.9   169.58 
  KOSPO  38,081   7   7,250   9.7   190.38 
  EWP  34,047   6.3   5,440   7.2   159.78 
  Others (1)  172,242   31.7   31,978   42.6   185.66 
   

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 
  

Total

  543,973   100.0   75,113   100.0   138.08 
   

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 

Energy Sources

  Nuclear  171,461   31.5   9,447   12.6   55.1 
  Bituminous coal  177,021   32.5   25,002   33.3   141.24 
  Anthracite coal  1,679   0.3   282   0.4   168.19 
  Oil  643   0.1   236   0.3   367.41 
  LNG/Combined-cycle  153,326   28.2   33,004   43.9   215.25 
  Renewables  30,645   5.6   5,339   7.1   174.23 
  Hydro  2,982   0.5   502   0.7   168.51 
  Pumped storage  3,773   0.7   910   1.2   241.15 
  Others  2,443   0.4   391   0.5   160.05 
   

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 
  

Total

  543,973   100.0   75,113   100.0   138.08 
   

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 

Load

  Base load  350,161   64.4   34,731   46.2   99.19 
  Non-base load  193,812   35.6   40,382   53.8   208.36 
   

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 
  

Total

  543,973   100.0   75,113   100.0   138.08 
   

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 

 

Notes:

 

(1)

Others represent independent power producers that trade electricity through the cost-based pool system of power trading (excluding independent power producers that supply electricity under power purchase agreements with us).

(2)

Based on the payment made by us through Korea Power Exchange.

Power Purchased from Independent Power Producers under Power Purchase Agreements

In 2023, we purchased an aggregate of 21,932 gigawatt hours of electricity generated by independent power producers under existing power purchase agreements. These independent power producers had an aggregate generation capacity of 16,699 megawatts as of December 31, 2023.

Power Generation

As of December 31, 2023, we and our generation subsidiaries had a total of 794 generation units, including nuclear, thermal, hydroelectric and internal combustion units, representing total installed generation capacity of 83,235 megawatts. Our thermal units produce electricity using steam turbine generators fired by coal, oil and LNG. Our internal combustion units use oil or diesel-fired gas turbines and our combined-cycle units are primarily LNG-fired. We also purchase power from several generation plants not owned by our generation subsidiaries.

 

43


Table of Contents

The table below sets forth as of and for the year ended December 31, 2023 the number of units, installed capacity and the average capacity factor for each type of generating facilities owned by us and our generation subsidiaries.

 

   Number
of Units
   Installed
Capacity (1)
   Average Capacity
Factor (2)
 
       (Megawatts)   (%) 

Nuclear

   25    24,650    81.8 

Thermal:

      

Coal

   53    32,559    52.9 

LNG

   4    1,400    7.2 

Total thermal

   57    33,959    51.0 
  

 

 

   

 

 

   

 

 

 

Internal combustion

   210    136    32.7 

Combined-cycle(3)

   119    17,002    30.9 

Integrated gasification combined cycle(4)

   2    346    32.9 

Hydroelectric(5)

   59    5,350    10.9 

Wind

   17    189    11.5 

Solar

   260    365    11.7 

Fuel cell

   36    483    69.3 

Bio

   8    745    51.5 

Others(6)

   1    10    72.8 
  

 

 

   

 

 

   

 

 

 

Total

   794    83,235    53.7 
  

 

 

   

 

 

   

 

 

 

 

Notes:

(1)

Installed capacity represents the level of output that may be sustained continuously without significant risk of damage to plant and equipment.

(2)

Average capacity factor represents the total number of kilowatt-hours of electricity generated in the indicated period divided by the total number of kilowatt-hours that would have been generated if the generation units were continuously operated at installed capacity, expressed as a percentage.

(3)

Involves generation through gas and oil.

(4)

Involves generation through coal and gasified coal.

(5)

Includes generation through pumped storage.

(6)

Includes waste-to-energy.

The expected useful life of a unit, assuming no substantial renovation, is approximately as follows: nuclear, over 40 years; thermal, over 30 years; internal combustion, over 25 years; and hydroelectric, over 55 years. Substantial renovation can extend the useful life of thermal units by up to 20 years.

We seek to achieve efficient use of fuels and diversification of generation capacity by fuel type. In the past, we relied principally upon oil-fired thermal generation units for electricity generation. The high average age of our oil-fired thermal units is attributable to our reliance on oil-fired thermal units as the primary means of electricity generation until mid-1970s. Since then, we have diversified our fuel sources and constructed relatively few oil-fired thermal units compared to units of other fuel types.

Since the oil shock in 1974, however, Korea’s power development plans have emphasized the construction of nuclear generation units. While nuclear units are more expensive to construct than thermal generation units of comparable capacity, nuclear fuel is less expensive than fossil fuels in terms of electricity output per unit cost. However, efficient operation of nuclear units requires that such plants be run continuously at relatively constant energy output levels. As it is impractical to store large quantities of electrical energy, we seek to maintain nuclear power production capacity at approximately the level at which demand for electricity is continuously stable. During those times when actual demand exceeds the usual level of electricity supply from nuclear power, we rely on units fired by fossil fuels and hydroelectric units, which can be started and shut down more quickly and efficiently than nuclear units, to meet the excess demand. Bituminous coal has been the least expensive thermal

 

44


Table of Contents

fuel per kilowatt-hour of electricity produced, and therefore our use of bituminous coal for generation takes the largest portion in excess of the stable demand level, except for meeting short-term surges in demand which require rapid start-up and shutdown. Thermal units fired by LNG, hydroelectric units and internal combustion units are the most efficient types of units for rapid start-ups and shutdowns, and therefore we use such units principally to meet short-term surges in demand. Anthracite coal is a less efficient fuel source than bituminous coal in terms of electricity output per unit cost.

Our generation subsidiaries have constructed and operated thermal and internal combustion units in order to help meet power demand. Subject to market conditions, our generation subsidiaries plan to continue to add additional thermal (other than coal-fired) and internal combustion units. These units generally take less time to complete construction than nuclear units.

The table below sets forth, for the periods indicated, the amount of electricity generated by facilities linked to our grid system and the amount of power used or lost in connection with transmission and distribution.

 

   2019   2020   2021   2022   2023   % of 2023
Gross
Generation (1)
 
   (in gigawatt hours, except percentages) 

Electricity generated by us and our generation subsidiaries:

            

Nuclear

   145,910    160,184    158,015    176,054    180,494    30.7 

Coal

   211,785    178,808    172,419    164,271    150,855    25.7 

Oil

   1,842    1,504    1,494    352    —     0.0 

LNG

   —     587    1,177    1,377    878    0.1 

Internal combustion

   579    405    491    570    390    0.1 

Combined-cycle

   39,049    41,446    53,609    52,243    45,949    7.8 

Hydro

   4,477    4,501    4,762    5,043    5,089    0.9 

Wind

   192    202    195    219    190    0.0 

Solar

   209    236    493    354    373    0.1 

Fuel cells

   1,036    1,528    1,993    2,470    2,932    0.5 

Others

   3,991    5,121    5,725    5,488    4,420    0.8 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total generation by us and our generation subsidiaries

   409,070    394,522    400,373    408,441    391,570    66.6 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Electricity generated by IPPs:

            

Thermal

   124,128    123,856    140,983    142,992    149,092    25.4 

Hydro, other renewable and others

   29,842    33,784    35,453    42,967    47,384    8.0 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total generation by IPPs

   153,970    157,640    176,436    185,959    196,476    33.4 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Gross generation

   563,040    552,162    576,809    594,400    588,046    100.0 

Auxiliary use(2)

   21,573    21,135    21,254    22,081    20,976    3.6 

Pumped-storage(3)

   4,588    4,352    4,856    4,912    4,924    0.8 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total net generation(4)

   536,879    526,675    550,699    567,407    562,146    95.6 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Transmission and distribution losses(5)

   19,000    18,610    19,424    20,020    19,813    3.5 

 

IPPs = Independent power producers

Notes:

 

(1)

Unless otherwise indicated, percentages are based on gross generation.

(2)

Auxiliary use represents electricity consumed by generation units in the course of generation.

(3)

Pumped storage represents electricity consumed during low demand periods in order to store water which is utilized to generate hydroelectric power during peak demand periods.

 

45


Table of Contents
(4)

Total net generation represents gross generation minus auxiliary and pumped-storage use.

(5)

Transmission and distribution losses rate represents total transmission and distribution losses divided by total net generation.

The table below sets forth our total capacity at the time of peak usage, and peak and average loads during, the indicated periods.

 

   2019   2020   2021   2022   2023 
          
   (Megawatts) 

Total capacity

   121,147    127,819    131,330    137,938    142,567 

Peak load

   90,314    89,091    91,141    94,509    93,615 

Average load

   64,274    62,860    65,835    67,854    67,129 

Korea Hydro & Nuclear Power Co., Ltd.

We commenced nuclear power generation activities in 1978 when our first nuclear generation unit, Kori #1, began commercial operation. On April 2, 2001, all of our nuclear and hydroelectric power generation assets and liabilities were transferred to KHNP.

At KHNP’s five power plant complexes, Kori, Saeul, Wolsong, Hanbit and Hanul (each complex located in Busan, Ulsan, Gyeongju, Yonggwang and Ulchin, respectively), it operates 25 nuclear generation units, among which Kori #2 has been shut down since April 8, 2023. KHNP submitted a safety evaluation report to the NSSC in April 2022 to seek approval for an extension of the life of Kori #2. KHNP also operates 53 hydroelectric generation units including 16 pumped storage hydro generation units as well as 55 solar generation units and one wind generation unit as of December 31, 2023.

The table below sets forth the number of units and installed capacity as of December 31, 2023 and the average capacity factor by types of generation units in 2023 including Kori #2.

 

   Number of Units   Installed Capacity (1)   Average Capacity
Factor (2)
 
       (Megawatts)   (%) 

Nuclear

   25    24,650    81.8 

Hydroelectric

   53    5307.5    10.8 

Solar

   55    77.55    14.4 

Wind

   1    0.75    0 
  

 

 

   

 

 

   

Total

   134    30,035.8    26.75 
  

 

 

   

 

 

   

 

Notes:

 

(1)

Installed capacity represents the level of output that may be sustained continuously without significant risk of damage to plant and equipment.

(2)

Average capacity factor represents the total number of kilowatt-hours of electricity generated in the indicated period divided by the total number of kilowatt-hours that would have been generated if the generation units were continuously operated at installed capacity, expressed as a percentage.

KHNP commenced commercial operation of Saeul #1 (formerly named as Shin-Kori #3), with a 1,400 megawatt capacity, in December 2016, and Saeul #2 (formerly named as Shin-Kori #4) began commercial operations on August 2019. In December 2022, the commercial operation of Shin-Hanul #1 has begun. KHNP is currently building three additional nuclear generation units, two at Saeul and one at Shin-Hanul complexes, each with a 1,400 megawatts capacity. KHNP expects to complete these units between 2024 and 2025. In June 2018, the board of directors of KHNP decided to retire Wolsong #1 unit earlier than planned due to comprehensive evaluation of the unit’s economic viability and regional sentiment of its continuing operation. The initial phase of

 

46


Table of Contents

the decommissioning of Kori #1, which primarily involves safety inspections and the removal of spent nuclear fuels, has begun after its permanent shutdown in June 2017. In April 2022, KHNP submitted a safety evaluation report to the NSSC to seek approval for an extension of the life of Kori #2, which has been shut down since April 8, 2023.

Nuclear

The table below sets forth certain information with respect to the nuclear generation units of KHNP as of December 31, 2023.

 

Unit(4)

 Reactor Type
(1)
  

Reactor Design (2)

 

Turbine
and
Generation
(3)

 Commencement
of Operations
  Installed
Capacity
  Average
Capacity
Factor
 
            (Megawatts)  (%) 

Kori #2

  PWR  W GEC  1983   650   99.7 

Kori #3

  PWR  W GEC, Hitachi  1985   950   67.9 

Kori #4

  PWR  W GEC, Hitachi  1986   950   47.0 

Shin-Kori #1

  PWR  D, KEPCO E&C, W D, GE  2011   1,000   100.2 

Shin-Kori #2

  PWR  D, KEPCO E&C, W D, GE  2012   1,000   100.2 

Saeul #1

  PWR  D, KEPCO E&C, W D, GE  2016   1,400   73.7 

Saeul #2

  PWR  D, KEPCO E&C, W D, GE  2019   1,400   99.1 

Wolsong #2

  PHWR  AECL, H, K H, GE  1997   700   86.5 

Wolsong #3

  PHWR  AECL, H H, GE  1998   700   87.0 

Wolsong #4

  PHWR  AECL, H H, GE  1999   700   89.0 

Shin-Wolsong #1

  PWR  D, KEPCO E&C, W D, GE  2012   1,000   84.9 

Shin-Wolsong #2

  PWR  D, KEPCO E&C, W D, GE  2015   1,000   99.4 

Hanbit #1

  PWR  W W, D  1986   950   91.6 

Hanbit #2

  PWR  W W, D  1987   950   67.8 

Hanbit #3

  PWR  H, CE, K H, GE  1995   1,000   100.7 

Hanbit #4

  PWR  H, CE, K H, GE  1996   1,000   100.6 

Hanbit #5

  PWR  D, CE, W, KEPCO E&C D, GE  2002   1,000   16.0 

Hanbit #6

  PWR  D, CE, W, KEPCO E&C D, GE  2002   1,000   84.7 

Hanul #1

  PWR  F A  1988   950   74.5 

Hanul #2

  PWR  F A  1989   950   66.9 

Hanul #3

  PWR  H, CE, K H, GE  1998   1,000   78.5 

Hanul #4

  PWR  H, CE, K H, GE  1999   1,000   70.0 

Hanul #5

  PWR  D, KEPCO E&C, W D, GE  2004   1,000   85.0 

Hanul #6

  PWR  D, KEPCO E&C, W D, GE  2005   1,000   82.9 

Shin-Hanul #1

  PWR  D, KEPCO E&C, W D, GE  2022   1,400   101.8 
     

 

 

  

 

 

 

Total nuclear

      24,650   81.8 
     

 

 

  

 

 

 

 

Notes:

 

(1)

“PWR” means pressurized light water reactor; “PHWR” means pressurized heavy water reactor.

(2)

“W” means Westinghouse Electric Corporation (U.S.A.); “D” means Doosan Heavy Industries & Construction Co., Ltd.; “KEPCO E&C” means KEPCO Engineering & Construction Co., Inc.; “AECL” means Atomic Energy of Canada Limited (Canada); “H” means Hanjung; “K” means Korea Atomic Energy Research Institute; “CE” means Combustion Engineering (U.S.A.); “F” means Framatome (France).

(3)

“GEC” means General Electric Company (U.K.); “W” means Westinghouse Electric Corporation (U.S.A.); “A” means Alstom (France); “H” means Hanjung; “GE” means General Electric (U.S.A.); “D” means Doosan Heavy Industries & Construction Co., Ltd.; “Hitachi” means Hitachi Ltd. (Japan).

 

47


Table of Contents
(4)

Kori #1 was permanently shut down on June 18, 2017. On December 24, 2019, the NSSC approved the permanent shutdown of Wolsong #1. Saeul #1 and 2 were formerly named as Shin-Kori #3 and 4. Shin-Hanul #1 commenced its operation on December 7, 2022. Kori #2 has been shut down since April 8, 2023 and KHNP submitted a safety evaluation report to the NSSC in April 2022 to seek approval for an extension of its life.

Under extended-cycle operations, nuclear units can be run continuously for periods longer than the conventional twelve-month period between scheduled shutdowns for refueling and maintenance. Since 1987, we have adopted the mode of extended-cycle operations for all of our pressurized light water reactor units and plan to use it for our newly constructed units. The duration of shutdown for fuel replacement, maintenance and the evaluation period for approval to start after maintenance was 1,530.0 days in the aggregate in 2023. In addition, KHNP’s nuclear units experienced an average of 0.04 unplanned shutdowns per unit in 2023. In the ordinary course of operations, KHNP’s nuclear units routinely experience damage and wear and tear, which are repaired during routine shutdown periods or during unplanned temporary suspensions of operations. No significant damage has occurred in any of KHNP’s nuclear reactors, and no significant nuclear exposure or release incidents have occurred at any of KHNP’s nuclear facilities since the first nuclear plant commenced operation in 1978.

Hydroelectric

The table below sets forth certain information relating to KHNP’s pumped-storage and hydroelectric business units, including the installed capacity as of December 31, 2023 and the average capacity factor in 2023.

 

Location of Unit

  Number
of Units
   Classification   Year
Built
   Installed
Capacity
   Average
Capacity
Factor
 
               (Megawatts)   (%) 

Hwacheon

   4    Dam waterway    1944    108.0    20.3 

Chuncheon

   2    Dam    1965    62.28    21.5 

Euiam

   2    Dam    1967    48.0    31.4 

Cheongpyung

   4    Dam    1943    140.1    23.6 

Paldang

   4    Dam    1973    120.0    36.1 

Chilbo (Seomjingang)

   3    Basin deviation    1945    35.4    24.5 

Boseonggang

   2    Basin deviation    1937    4.5    43.1 

Kwoesan

   2    Dam    1957    2.8    23.7 

Anheung (GangLim)

   3    Dam waterway    1978    0.5    33 

Kangreung

   2    Basin deviation    1991    82.0    0 

Topyeong

   1    Dam    2011    0.045    0 

Muju

   1    Dam    2003    0.4    20.8 

Sancheong

   2    Dam    2001    0.995    50.6 

Yangyang

   2    Dam    2005    1.4    35.4 

Yangyang

   1    Dam    2020    0.15    70.6 

Yecheon

   1    Dam    2011    0.9    25.1 

Yecheon (Mini)

   1    Dam    2018    0.025    77 

Cheongpeoung

   2    Pumped Storage    1980    400.0    8.2 

Samrangjin

   2    Pumped Storage    1985    600.0    10.6 

Muju

   2    Pumped Storage    1995    600.0    9.8 

Sancheong

   2    Pumped Storage    2001    700.0    12.5 

Yangyang

   4    Pumped Storage    2006    1,000.0    6.8 

Cheongsong

   2    Pumped Storage    2006    600.0    11.7 

Yecheon

   2    Pumped Storage    2011    800.0    6.4 
  

 

 

       

 

 

   

 

 

 

Total

   53        5,307.5    10.8 
  

 

 

       

 

 

   

 

 

 

 

48


Table of Contents

Solar/Wind

The table below sets forth certain information, including the installed capacity as of December 31, 2023 and the average capacity factor in 2023, of the solar and wind power units of KHNP.

 

Location of Unit

  

Classification

  Year
Built
   Installed Capacity   Average Capacity
Factor
 
          (Megawatts)   (%) 

Yonggwang

  Solar   2008-2021    21.56    14.3 

Yecheon

  Solar   2012    2.01    13.6 

Kori

  Wind   2008    0.75    0 

Busan

  Solar   2017-2022    7.69    16.3 

Gapyeong

  Solar   2017-2022    0.96    12.9 

Chuncheon

  Solar   2021    0.10    13 

Cheongsong

  Solar   2018-2021    4.49    16.2 

Kwoesan

  Solar   2018    0.25    13.7 

Boseonggang

  Solar   2018    1.99    12.1 

Samrangjin

  Solar   2019    2.77    14.7 

Yeoncheon

  Solar   2020    1.00    12.8 

Jeju

  Solar   2020-2021    14.08    13.7 

Gyeongju

  Solar   2020-2022    12.64    14.3 

Ulsan

  Solar   2023    3.99    15.8 

Sancheong

  Solar   2023    3.02    11.5 

Asan

  Solar   2023    1    15.6 
      

 

 

   

Total

       78.3    14.4 
      

 

 

   

There has been a growing supply of renewable energy such as solar and wind power. However, as such sources of power are susceptible to weather, there has been a growing demand for more stable renewable energy such as pumped storage hydro generation, which allows for prompt on-and-off transition. Since the last construction in 2011 of Yecheon pumped storage unit, KHNP is currently in the process of building five new pumped storage units which are expected to have an aggregate generation capacity of 3.7 gigawatts. KHNP is expecting to complete construction of the new pumped storage units before 2036.

Korea South-East Power Co., Ltd.

The table below sets forth, by fuel type, the weighted average age and installed capacity as of December 31, 2023 and the average capacity factor and average fuel cost per kilowatt in 2023 based upon the net amount of electricity generated, of KOSEP.

 

   Weighted
Average Age
of Units
   Installed
Capacity
   Average
Capacity
Factor
   Average Fuel
Cost per kWh
 
   (Years)   (Megawatts)   (%)   (Won) 

Bituminous:

        

Samcheonpo #3, 4, 5, 6

   28.2    2,120.0    60.73    146.04 

Yeongheung #1, 2, 3, 4, 5, 6

   14.7    5,080.0    49.83    131.27 

Yeosu # 1, 2

   9.8    668.6    54.53    170.71 

Combined cycle and internal Combustion:

        

Bundang gas turbine #1,2,3,4,5,6,7,8; steam turbine #1, 2

   30.0    922.1    28.76    324.54 

Hydro, Solar and other renewable energy

     573.0    50.74    299.51 
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

   23.7    9,363.7    50.12    164.52 
  

 

 

   

 

 

   

 

 

   

 

 

 

 

49


Table of Contents

Korea Midland Power Co., Ltd.

The table below sets forth, by fuel type, the weighted average age and installed capacity as of December 31, 2023 and the average capacity factor and average fuel cost per kilowatt in 2023 based upon the net amount of electricity generated, of KOMIPO.

 

   Weighted
Average Age
of Units
   Installed
Capacity
   Average
Capacity
Factor
   Average Fuel
Cost per kWh
 
   (Years)   (Megawatts)   (%)   (Won) 

Bituminous:

        

Boryeong #3, 4, 5, 6, 7, 8

   25    3,050.0    59.9    98.57 

Shin Boryeong #1, 2

   6.5    2,038.0    65.6    90.71 

Shin Seocheon #1

   2.6    1,018.0    39.5    105.76 

Combined-cycle and internal combustion:

        

Boryeong gas turbine #1, 2, 3, 4, 5, 6; steam
turbine #1, 2, 3

   24.8    1,350.0    8.1    232.78 

Incheon gas turbine #1, 2, 3, 4, 5, 6; steam
turbine #1, 2, 3

   14.9    1,462.5    35.0    217.17 

Seoul gas turbine #1, 2; steam turbine #1, 2

   4.4    738.4    68.6    153.64 

Jeju gas turbine #1, 2; steam turbine #1, 2

   5.5    228.7    60.7    210.94 

Sejong gas turbine #1, 2; steam turbine #1

   10.2    530.4    81.2    144.36 

Jeju Internal Combustion Engine #1,2

   16.6    80.0    14.2    249.96 

Bio Oil:

        

Jeju #2, 3

   23.5    150.0    50.3    416.07 

Wind:

        

Yangyang #1, 2

   17.6    3.0    3.22    40.63 

Sejong Maebongsan Wind

   17.5    8.8    0    —  

Jeju Sangmyung Wind

   7.5    21.0    17.0    2.93 

Combined heat and power:

        

Wonju #1

   8.7    10.0    72.8    141.99 

Hydroelectric:

        

Boryeong

   14.9    7.5    17.4    0.73 

Shin Boryeong

   7.3    5.0    37.8    —  

Shin Seocheon

   2.6    2.6    3.89    —  

Photovoltaic (“PV”) power and fuel cell generation:

        

Boryeong (PV) site

   7.5    3.1    13.4    25.98 

Shin Boryeong (PV) site

   5.9    4.0    13.7    —  

Seocheon (PV) site

   5.9    3.9    12.6    —  

Jeju (PV) site

   6.8    4.3    11.8    —  

Seoul (PV) site

   12.4    1.3    13.9    6.61 

Sejong (PV) site

   6.1    0.3    13.6    —  

Yeosu (PV) site

   11.8    2.2    14.1    —  

Incheon (PV) site

   6.2    1.6    13.2    —  

Shin Boryeong (fuel cell) site

   6.2    7.5    81.0    —  

Incheon (fuel cell) site

   3.9    31.7    89.0    271.46 

Seoul (fuel cell) site

   3.3    6.0    80.5    178.12 

Sejong (fuel cell) site

   3.9    5.3    80.5    227.68 
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

   15.1    10,755.1    50.2    128.99 
  

 

 

   

 

 

   

 

 

   

 

 

 

 

50


Table of Contents

Korea Western Power Co., Ltd.

The table below sets forth, by fuel type, the weighted average age and installed capacity as of December 31, 2023 and the average capacity factor and average fuel cost per kilowatt in 2023 based upon the net amount of electricity generated, of KOWEPO.

 

   Weighted
Average Age
of Units
   Installed
Capacity
   Average
Capacity
Factor
   Average Fuel
Cost per kWh
 
   (Years)   (Megawatts)   (%)   (Won) 

Bituminous:

        

Taean #1, 2, 3, 4, 5, 6, 7, 8, 9, 10

   20.1    6,100.0    52.7    93.6 

LNG-fired:

        

Pyeongtaek #1, 2, 3, 4(1)

   42.1    1,400.0    7.2    273.62 

Combined cycle:

        

Pyeongtaek #2

   9.2    868.5    62.4    190.86 

Gunsan

   13.6    718.4    15.9    227.68 

West Incheon

   31.1    1,800.0    22.3    224.86 

Combined heat:

        

Gimpo

   0.4    350.5    29.7    139.46 

Hydroelectric:

        

Taean

   9.5    7.2    16.4    —  

Solar:

        

Taean

   8.5    17.2    10.0    —  

Pyeongtaek

   6.7    3.8    12.3    —  

West Incheon

   6.3    1.2    12.5    —  

Gunsan

   9.8    1.0    15.1    —  

Samryangjin

   15.7    3.0    12.5    —  

Sejong City

   11.7    5.0    12.0    —  

Gyeonggi-do

   10.9    2.5    12.1    —  

Yeongam

   11.1    13.3    13.3    —  

Goheung

   4.7    1.0    12.9    —  

Fuel Cell:

        

West Incheon 1

   8.5    16.6    11.0    177.44 

West Incheon 2

   3.6    60.3    54.5    215.70 

Cheonan Cheongsu

   4.0    5.3    85.6    214.07 

Hwaseong Namyang

   2.6    20.2    92.2    215.58 

Gyeonggi Uiwang

   2.5    9.9    92.6    157.48 

Daejeon Hakha

   2.1    6.2    91.4    233.31 

Icheon Gwango

   1.2    9.6    97.0    152.07 

Iksan

   1.7    15.0    94.4    185.21 

Gwangju Gwangsan

   1.0    8.4    95.1    173.26 

Hwaseong Namyang 2

   0.9    19.8    91.2    202.87 

Gyeonggi Gwangju

   0.9    9.6    93.7    150.68 

Mungyeong 1

   0.1    15.0    50.3    128.48 

Daegu Suseong

   0.2    3.0    13.4    173.26 

Wind Power:

        

Hwasun

   8.2    16.0    16.1    —  

Jangheung

   2.3    18.0    11.6    —  

Integrated gasification combined cycle:

        

Taean

   7.4    346.3    32.9    88.94 
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

   13.3    11,871.8    39.94    126.61 
  

 

 

   

 

 

   

 

 

   

 

 

 

 

51


Table of Contents

 

Notes:

 

(1)

Pyeongtaek #1, 2, 3 and 4 were converted into LNG-fired power plant in February 2020.

Korea Southern Power Co., Ltd.

The table below sets forth, by fuel type, the weighted average age and installed capacity as of December 31, 2023 and the average capacity factor and average fuel cost per kilowatt in 2023 based upon the net amount of electricity generated, of KOSPO.

 

   Weighted
Average Age
of Units
   Installed
Capacity
   Average
Capacity
Factor
   Average Fuel
Cost per kWh
 
   (Years)   (Megawatts)   (%)   (Won) 

Bituminous:

        

Hadong #1, 2, 3, 4, 5, 6, 7, 8

   22.3    4,000    48.2    102.48 

Samcheok #1, 2

   6.8    2,044    49.5    92.10 

Combined cycle:

        

Shin Incheon #1, 2, 3, 4

   26.5    1,800    23.0    203.53 

Busan #1, 2, 3, 4

   20.2    1,800    39.7    195.86 

Yeongwol #1

   13.2    848    6.8    202.40 

Hallim

   26.5    105    22.9    239.11 

Andong #1

   9.8    362    46.5    193.60 

Nam Jeju #1

   3.1    146    21.6    282.72 

Bio Oil:

        

Nam Jeju #1, 2

   17.0    200    56.6    352.07 

Wind power:

        

Hankyung

   18.0    21    15.9    2.14 

Seongsan

   14.0    20    21.9    1.27 

Solar

   6.6    38    13.2    0.65 

Small Hydropower

   9.7    3    36.6    0.02 

Fuel Cell

   3.5    109    78.1    211.64 
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

   17.8    11,496    39.65    138.83 
  

 

 

   

 

 

   

 

 

   

 

 

 

 

52


Table of Contents

Korea East-West Power Co., Ltd.

The table below sets forth, by fuel type, the weighted average age and installed capacity as of December 31, 2023 and the average capacity factor and average fuel cost per kilowatt in 2023 based upon the net amount of electricity generated, of EWP.

 

   Weighted
Average Age
of Units
   Installed
Capacity
   Average
Capacity
Factor
   Average Fuel
Cost per kWh
 
   (Years)   (Megawatts)   (%)   (Won) 

Bituminous:

        

Dangjin #1, 2, 3, 4, 5, 6, 7, 8, 9, 10

   16.0    6,040    51.43    95.8 

Anthracite:

        

Donghae #1, 2

   24.8    400    53.54    115.7 

Combined cycle:

        

Ulsan gas turbine #1, 2, 3, 4, 5, 6, 7, 8; steam turbine #1, 2, 3, 4

   20.0    2,072    27.06    208.5 

Ilsan gas turbine #1, 2, 3, 4, 5, 6; steam turbine #1, 2

   29.8    900    16.78    292.5 

Mini hydro, Photovoltaic, Fuel Cell, Wind-Power, Biomass:

   5.0    167    47.84    129.5 
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

   18.3    9,579    42.93    120.76 
  

 

 

   

 

 

   

 

 

   

 

 

 

Power Plant Remodeling and Recommissioning

Our generation subsidiaries supplement power generation capacity through remodeling or recommissioning of thermal units. Recommissioning includes installation of anti-pollution devices, modification of control systems and overall rehabilitation of existing equipment. The following table shows recent remodeling and recommissioning initiatives by our generation subsidiaries.

 

Power Plant

  

Capacity

  

Completed (Year)

  

Extension

  

Company

Taean #1 - 10

  

6,100 MW

(500 MW×8,

1,050 MW×2)

  

EP (1) upgrade (#5, 2009)

EP upgrade (#6, 2010)

EP upgrade (#2, 2016)

EP upgrade (#1, 2017)

EP upgrade (#3, 4, 2018)

SCR (2) upgrade (#2, 4, 7, 2016)

SCR upgrade (#1, 8, 2017)

SCR upgrade (#3, 5, 6, 2018)

FGD (5) upgrade (#1, 2017)

FGD upgrade (#2, 3, 4, 2018)

SCR upgrade(#7, 2022)

SCR upgrade(#8, 2023)

  Anti-pollution  KOWEPO

Pyeongtaek #1- 4

  

1,400 MW

(350 MW×4)

  Steam turbine upgrade (#2, 3, 2014)  10-year performance-
improvement
  KOWEPO

Boryeong #3 - 6

  

2,050 MW

(#3: 550 , #4~6: 500×3)

  

Retrofit (#3, 2019)

Retrofit (#4, 2023)

Conversion into LNG-fired plant (#5, 6, scheduled to be completed in 2026)

  

Lifetime extension

Conversion into LNG-fired Plant

  KOMIPO

Boryeong #7, 8

  

1,000 MW

(500 MW×2)

  

EP upgrade (#7, 2025)

EP upgrade (#8, 2026)

  Performance-
improvement
  KOMIPO

 

53


Table of Contents

Yeosu #1, 2

  

668.6MW

(#1:340, #2:328.6MW)

  

Boiler Type Change

(CFBC (3):#1:2016, #2:2011)

  30 years  KOSEP

Samcheonpo #5, 6

  

1,000 MW

(500 MW ×2)

  

EP upgrade (2016 ~ 2017),

FGD, SCR, WESP(6) installation

(2019~2021)

  Anti-pollution  KOSEP

Yeongheung #1, 2

  

1,600 MW

(800 MW ×2)

  EP, FGD, SCR Upgrade (2022~2025)  Anti-pollution  KOSEP

Yeongdong #1. 2

  

325 MW

(#1:125, #2:200 MW)

  

Boiler, Hybrid SCR & EP, Draft System Retrofit

(Biomass (4) #1: 2017, #2: 2020)

  Renewable energy  KOSEP

Dangjin #1 - 4

  

2,000MW

(500MW×4)

  FGD, EP, SCR upgrade (2022)  Performance-
improvement
  EWP

Dangjin #5 - 8

  

2,000MW

(500MW×4)

  FGD, EP, SCR upgrade (2024)  Performance-
improvement
  EWP

Dangjin #9 - 10

  

2,040MW

(1,020MW×2)

  FGD, EP, SCR upgrade (2026)  Performance-
improvement
  EWP

Donghae #1, 2

  

400 MW

(200 MW×2)

  FGD (2022)  Anti-pollution & modification of control systems  EWP

Hadong #1 - 8

  

4,000 MW

(500 MW×8)

  

SCR Upgrade (#5. 2016)

SCR Upgrade (#2,3,5. 2017)

SCR Upgrade (#1,4,6,7. 2018)

SCR Upgrade (#8. 2019)

FGD Upgrade (#6, 2018)

FGD Upgrade (#2, 3, 2019)

FGD Upgrade (#4 2020)

FGD Upgrade (#5 2021)

  Anti-pollution  KOSPO

Samcheok #1 - 2

  

2,044 MW

(1,022 MW×2)

  

SCR Upgrade (#1 2018)

SCR Upgrade (#2 2023)

  Anti-pollution  KOSPO

 

Notes:

 

(1)

“EP” means an electrostatic precipitation system.

(2)

“SCR” means a selective catalytic reduction system.

(3)

“CFBC” means a circulating fluidized bed combustion system.

(4)

“Biomass” means wood pallet powered plant.

(5)

“FGD” means flue-gas desulfurization designed to remove sulfur oxides.

(6)

“WESP” means wet electrostatic precipitator.

Transmission and Distribution

We currently transmit and distribute substantially all of the electricity in Korea.

As of December 31, 2023, our transmission system consisted of 35,596 circuit kilometers of lines of 765 kilovolts and others including high-voltage direct current lines, and we had 900 substations with aggregate installed transformer capacity of 353,166 megavolt-amperes.

As of December 31, 2023, our distribution system consisted of 143,349 megavolt-amperes of transformer capacity and 10,178,243 units of support with a total line length of 542,567 circuit kilometers.

 

54


Table of Contents

We make substantial investments in our transmission and distribution systems to minimize power interruptions and improve efficiency. Our current projects principally focus on increasing capabilities of the existing power networks and reducing our transmission and distribution loss, which was 3.5% of our gross generation in 2023. To cope with increasing damages to large-scale transmission and distribution facilities, we plan to reinforce stability of our transmission and distribution facilities through stricter design and material specifications. In addition, we also plan to expand underground transmission and distribution facilities to meet customer demand for more environment-friendly facilities. In order to reduce the interruption time in power distribution, which is an indicator of the quality of electricity transmission, we also continue to invest in automation of electricity transmission and development of new transmission technologies, among others.

Some of the facilities we own and use in our distribution system use rights of way and other concessions granted by municipal and local authorities in areas where our facilities are located. These concessions are generally renewed upon expiration.

New Energy Industry Projects

Certain of our new energy industry projects are described below.

Advanced Metering Infrastructure

In July 2012, the Government implemented a master plan to build out a smart grid, which includes the Advanced Metering Infrastructure (“AMI”) roadmap. In August 2018 and February 2023, the Government updated the master plan to focus on building electricity market ecosystem and constructing smart energy consuming structure focused on energy efficiency. In accordance with such plan, we are in the process of installing “smart meters” and related communication networks and operating systems as part of the “smart grid” initiative in an effort to enhance efficiency in the power electricity industry and alleviate growing energy shortage concerns. Our goal is to complete such installation for all of the households in Korea. Smart meters refer to digital meters that record, on a real-time basis, electricity consumption within a household so that consumers will have a price-based incentive to enhance efficiency in their electricity usage. As of December 31, 2023, we have established data communication network that enables smart meters for 17.4 million households and we plan to establish it for 2.6 million additional households by 2024 and remaining 2.5 million households in new replacement cycle starting from 2025. We have spent Won 1,159 billion on the AMI project as of the end of 2023 and expect to spend an additional Won 128 billion, bringing the total cost to approximately Won 1.3 trillion.

Smart Grids

Smart grids refer to next-generation networks for electricity distribution that integrate information technology into existing power grids with the aim of enabling two-way real time exchange of information between electricity suppliers and consumers for optimal efficiency in electricity use. As part of our overall business strategy, we are currently developing and implementing smart grids based on advanced information technology in order to promote more efficient allocation and use of electricity by consumers. We expect that such technology will improve efficiency and reduce electricity loss over the course of electricity transmission and distribution. We also expect that the smart grid initiative will significantly increase efficient energy consumption by providing real-time data to customers, which would in turn help to reduce greenhouse gas emission and decrease Korea’s reliance on foreign energy sources.

In addition, we collaborated with the Seoul Metropolitan Government with the goal of realizing a carbon-neutral city by conducting a project to build an energy integration platform and providing energy-related services to all parts of Seoul from December 2020 to December 2022. Based on our experience with the Seoul Metropolitan Government’s project, we will create a platform that supports regional energy planning in order to support and lead the national energy planning scheme.

 

55


Table of Contents

Energy Storage Systems

In October 2013, as part of an endeavor to create new markets for energy demand management applications using information and communication technology, we established a business plan to roll out energy storage systems for frequency regulation nationwide. These systems involve the establishment and operation of batteries and transformers with large-sized charge and discharge capabilities adjacent to substations to transmit electricity stably with regulated frequencies and optimize the efficiency of the substation operation. This system allows full conversion of reserve capacity for frequency regulation at existing low-cost generators into electricity storage and, if operated in sizable scale, offers opportunities for substantial cost savings in purchase of electricity.

In December 2014, we conducted a pilot project for this initiative by installing a total of 52 megawatt energy storage systems at the Seo-Anseong substation and the Shin-Yongin substation. In July 2015, these substations began to commercially operate energy storage systems. With the commencement of an energy storage system in Yeong-Ju substation in December 2023, the total capacity of our energy storage systems reached 482 megawatts in 2023.

Electric Vehicle Charging Infrastructure

In order to promote the use of environment-friendly electric vehicles, we began constructing infrastructures for electric vehicles in 2009. Since 2016, we have installed electric vehicle charging stations throughout public space and residential building complexes. In 2017, we created a platform for businesses in the electric vehicle charging industry by charging for the service and making the infrastructures available to the market. We have installed 10,640 high and low speed electric vehicle charging stations by the end of 2023 and plan to expand such stations in line with the Government policy to popularize electric vehicles. We plan to continue fostering businesses and revitalizing the electronic vehicle charging market by developing the current infrastructure and providing new services.

In January 2016, the Ministry of Trade, Industry and Energy announced an initiative to promote the new energy industry by creating the New Energy Industry Fund. For further details, see “—Capital Investment Program.”

Fuel Sources and Requirements

Nuclear

Uranium, the principal fuel source for nuclear power, accounted for 39.5%, 43.1% and 46.1% of the fuel requirements for electricity generation by us and our generation subsidiaries in terms of electricity generated in 2021, 2022 and 2023, respectively.

All uranium ore concentrates used by KHNP are imported from, and conversion and enrichment of such concentrates are provided by, sources outside Korea and are paid for with currencies other than Won, primarily U.S. dollars.

In order to ensure a stable supply, KHNP enters into medium and long-term contracts with various suppliers and supplements such supplies with purchases in spot markets. In 2023, KHNP purchased approximately 4,017 tons of its uranium concentrate requirement under both long-term and spot supply contracts with suppliers in Canada, France, the United Kingdom, Switzerland, Australia, Germany, and Uzbekistan. Under the long-term supply contracts, the purchase prices of uranium concentrates are adjusted annually based on base prices and spot market prices prevailing at the time of actual delivery. The conversion and enrichment services of uranium concentrates are provided by suppliers in France, Canada, Japan, the United Kingdom, the United States, and Switzerland. The uranium concentrates will then be further processed by a Korean company before they are ready for use. Except for certain fixed contract prices, contract prices for processing of uranium are adjusted annually in accordance with the general rate of inflation. KHNP intends to obtain its uranium requirements in the future, in part, through purchases under medium to long-term contracts and, in part, through spot market purchases.

 

56


Table of Contents

Coal

Bituminous coal accounted for 42.6%, 39.8% and 38.0% of the fuel requirements for electricity generation by us and our generation subsidiaries in 2021, 2022 and 2023, respectively, and anthracite coal accounted for 0.5%, 0.5% and 0.5% of our fuel requirements for electricity generation in terms of electricity generated in 2021, 2022 and 2023, respectively.

In 2023, our generation subsidiaries purchased approximately 59.4 million tons of bituminous coal, of which approximately 27.4%, 22.2%, 21.3%, 9.3% and 19.9% were imported from Indonesia, Australia, Russia, South Africa and others, respectively. Approximately 93.9% of the bituminous coal requirements of our generation subsidiaries in 2023 were purchased under long-term contracts with the remaining 6.1% purchased in the spot market. Some of our long-term contracts relate to specific generating plants and extend through the end of the projected useful lives of such plants, subject in some cases to periodic renewal. Pursuant to the terms of our long-term supply contracts, prices are adjusted periodically based on market conditions. The average cost of bituminous coal per ton purchased under such contracts amounted to Won 103,893, Won 231,643 and Won 177,376 in 2021, 2022 and 2023, respectively.

In 2023, our generation subsidiaries purchased approximately 1 million tons of anthracite coal. The prices for anthracite coal under such contracts are set by the Government. The average cost of anthracite coal per ton purchased under such contracts was Won 155,826, Won 224,827 and Won 182,527 in 2021, 2022 and 2023, respectively.

Oil

Oil accounted for 0.4%, 0.1% and 0.02% of the fuel requirements for electricity generation by us and our generation subsidiaries in terms of electricity generated in 2021, 2022 and 2023, respectively.

In 2023, our generation subsidiaries purchased approximately and 4.26 million barrels of fuel oil, substantial portion of which was purchased from domestic refiners through competitive open bidding. Purchase prices are based on the spot market price in Singapore. The average cost of oil per barrel was Won 127,644 and Won 215,729 and Won 191,452 in 2021, 2022 and 2023, respectively.

LNG

LNG accounted for 13.7%, 13.1% and 12.0% of the fuel requirements for electricity generation by us and our generation subsidiaries in terms of electricity generated in 2021, 2022 and 2023, respectively. In 2023, for use in electricity generation we purchased approximately 5.97 million tons of LNG from Korea Gas Corporation, a Government-controlled entity in which we currently own a 20.47% equity interest (excluding treasury shares). In 2023, we purchased a substantial portion of our LNG requirements for use in power generation from Korea Gas Corporation. Under the terms of the LNG contract with Korea Gas Corporation, all of our five non-nuclear generation subsidiaries jointly and severally agreed to purchase a total of 7.06 million tons of LNG in 2023, subject to an automatic price adjustment annually based on a pre-determined formula if the actual purchased amount exceeds or falls short of the contracted amount. We believe the quantities of LNG provided under such contract will be adequate to meet the needs of our generation subsidiaries for LNG for the next several years. The LNG supply contracts between our generation subsidiaries and Korea Gas Corporation generally have a term of 20 years and provide for minimum purchase requirements for our generation subsidiaries, the specific terms of which are subject to negotiation between Korea Gas Corporation and our generation subsidiaries and approval by the Government. The average cost per ton of LNG was Won 724,682, Won 1,552,647 and Won 1,391,146, in 2021, 2022 and 2023, respectively. Korea Gas Corporation implemented a new individual tariffs formula, whereby the domestic power plants can negotiate lower prices directly with Korea Gas Corporation. The new formula applies to domestic power plants whose current contracts with Korea Gas Corporation expire after January 2022 and also to new power plants commencing operations from January 2022. Meanwhile, KOMIPO

 

57


Table of Contents

procures LNG directly through a contract with a brokerage firm, in addition to the amount supplied by Korea Gas Corporation. In 2023, the total amount of KOMIPO’s direct LNG procurement was 0.9 million tons, with 32%, 15%, 13%, 6% and 34% of the total imported from Malaysia, Australia, Russia, United States and other countries, respectively.

Hydroelectric

Hydroelectric power generation, including pumped storage, accounted for 1.2%, 1.2% and 1.3%, of the fuel requirements for electricity generation by us and our generation subsidiaries in terms of electricity generated in 2021, 2022 and 2023, respectively. The availability of water for hydroelectric power depends on rainfall and competing uses for available water supplies, including residential, commercial, industrial and agricultural consumption. Pumped storage enables us to increase the available supply of water for use during periods of peak electricity demand.

Sales and Customers

Our sales depend principally on the level of demand for electricity in Korea and the rates we charge for the electricity we sell to the end-users.

Demand for electricity in Korea grew at a compounded average rate of 1.2% per annum for the five years ended December 31, 2023. According to the Bank of Korea, the compounded growth rate for GDP was approximately 1.8% per annum for the same period. The GDP growth rate was approximately 4.0%, 2.6% and 1.4%, during 2021, 2022 and 2023, respectively.

The table below sets forth, for the periods indicated, the annual rate of growth in Korea’s GDP and the annual rate of growth in electricity demand (measured by total annual electricity consumption) on a year-on-year basis.

 

   2019  2020  2021  2022  2023 

Growth in GDP

   2.0  (1.0)%   4.0  2.6  1.4

Growth in electricity consumption

   (1.1)%   (2.2)%   4.7  2.7  (0.4)% 

Electricity demand in Korea varies within each year for a variety of reasons other than the general growth in GDP demand. Electricity demand tends to be higher during daylight hours due to heightened commercial and industrial activities and electronic appliance use. Due to the use of air conditioning during the summer and heating during the winter, electricity demand is higher during these two seasons than the spring or the fall. Variation in weather conditions may also cause significant variation in electricity demand.

We do not use any marketing channels, including any special sales methods, to sell electricity to our customers, other than to install electricity meters on-site and take monthly readings of such meters, based upon which invoices are sent to our customers.

 

58


Table of Contents

Demand by the Type of Usage

The table below sets forth consumption of electric power, and growth of such consumption on a year-on-year basis, by the type of usage (in gigawatt hours) for the periods indicated.

 

  2019
(GWh)
  YoY
growth
(%)
  2020
(GWh)
  YoY
growth
(%)
  2021
(GWh)
  YoY
growth
(%)
  2022
(GWh)
  YoY
growth
(%)
  2023
(GWh)
  YoY
growth
(%)
  % of
Total
2023
 

Residential

  72,639   (0.4  76,303   5.0   79,915   4.7   80,996   1.4   82,348   1.7   15.1 

Commercial

  116,227   (0.6  113,639   (2.2  119,550   5.2   127,193   6.4   130,844   2.9   24.0 

Educational

  8,561   (1.4  7,515   (12.2  8,423   12.1   9,074   7.7   9,232   1.7   1.7 

Industrial

  289,240   (1.3  278,660   (3.7  291,333   4.5   296,036   1.6   290,555   (1.9  53.2 

Agricultural

  18,882   2.0   19,029   0.8   20,603   8.3   21,420   4.0   20,763   (3.1  3.8 

Street lighting

  3,571   (0.3  3,507   (1.8  3,445   (1.8  3,424   (0.6  3,399   (0.7  0.6 

Overnight Power

  11,379   (9.4  10,616   (6.7  10,162   (4.3  9,790   (3.7  8,825   (9.9  1.6 
 

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 

Total

  520,499   (1.1  509,270   (2.2  533,431   4.7   547,933   2.7   545,966   (0.4  100.0 
 

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

  

 

 

 

The industrial sector represents the largest segment of electricity consumption in Korea. Demand for electricity from the industrial sector was 290,555 gigawatt hours in 2023, representing 1.9% decrease from 2022, largely due to decreases in export and industrial demand. Demand for electricity from the commercial sector depends largely on the level and scope of commercial activities in Korea. Demand for electricity from the commercial sector increased to 130,844 gigawatt hours in 2023, representing 2.9% increase from 2022, largely due to an increase in levels of private consumption, particularly in the hotel and restaurant industries as COVID-19 preventive measures have been lifted. Demand for electricity from the residential sector is largely dependent on population growth and use of heaters, air conditioners and other electronic appliances. Demand for electricity from the residential sector increased to 82,348 gigawatt hours in 2023, representing 1.7% increase compared to 2022, largely due to an increase in the number of customers and increased use of air conditioners and other electronic appliances resulting from higher than usual temperatures during the summer months.

Demand Management

Our ability to provide adequate supply of electricity is principally measured by the facility reserve margin and the supply reserve margin. The facility reserve margin represents the difference between the peak usage during a year and the installed capacity at the time of such peak usage, expressed as a percentage of such peak usage. The supply reserve margin represents the difference between the peak usage in a year and the available capacity at the time of such peak usage, expressed as a percentage of such peak usage. The following table sets forth our facility reserve margin and supply reserve margin for the periods indicated.

 

   2019  2020  2021  2022  2023 

Facility reserve margin

   36.2  43.5  44.1  46.0  52.3

Supply reserve margin

   6.7  9.9  10.5  11.8  11.4

In addition, in accordance with the delegating regulations of the Energy Use Rationalization Act, the Ministry of Trade, Industry and Energy designated us as a pilot operator for the Energy Efficiency Resource Standards (“EERS”) in 2018. To promote the development of energy-efficient technologies and practices, EERS sets energy savings targets for energy suppliers to pursue in proportion to their energy sales, requiring that, in 2024, we save as much as 0.2% of our 2022 electricity sales by reducing our customers’ consumption. In accordance with the EERS regulations, we plan to increase our savings target to 1% of annual electricity sales by 2031. The EERS pilot project is expected to be converted into an actual project in 2025 pursuant to the revision of the Energy Use Rationalization Act in 2024.

Electricity Rates

The Electric Utility Act and the Price Stabilization Act of 1975, each as amended from time to time, prescribe the procedures for the approval and establishment of rates charged for the electricity we sell. We

 

59


Table of Contents

submit our proposals for revisions of rates or changes in the rate structure to the Ministry of Trade, Industry and Energy. The Ministry of Trade, Industry and Energy then reviews these proposals and, following consultation with the Ministry of Economy and Finance and review by the Korea Electricity Commission, makes the final decision.

Under the Electric Utility Act and the Price Stabilization Act, electricity rates are established at the same level as the total comprehensive cost (the “Total Comprehensive Cost”) that would enable us to recover our fair operating costs as well as receive a fair investment return on capital used in our operations. The fair operating costs are defined as the sum of our operating expenses attributable to our electricity supply, our adjusted income taxes and some of non-operational profit or loss.

The fair investment return on capital used in our operations represents an amount equal to the rate base multiplied by the rate of return.

The rate base is currently equal to the sum of:

 

  

net utility plant in service (which is equal to utility plant minus accumulated depreciation minus revaluation reserve);

 

  

the portion of working capital which is equal to the appropriate level of operating costs minus depreciation and other non-cash charges while taking into account the actual time of cost recovery; and

 

  

the portion of construction-in-progress which is charged from our retained earnings.

The amounts used for the variables in the rates are those projected by us for the periods to be covered by the rate approval.

For the purpose of determining the fair rate of return, the rate base is divided into two components in proportion to our total equity and our total debt. The rate of return permitted in relation to the debt component of the rate base is set at a level designed to approximate the weighted average interest cost on all types of borrowing for the periods covered by the rate approval. The rate of return permitted in relation to the equity component of the rate base is set by applying the capital asset pricing model which takes account of the risk-free rate, the return on the Korea Stock Price Index, KOSPI, and the correlation of the stock price of our company with KOSPI. In 2022, the approved rate of return on the debt component of the rate base was 1.77% while the approved rate of return on the equity component of the rate base was 6.62%. As a result of such approved rates of returns, the fair rate of return in 2022 was determined to be 4.06%. The fair rate of return for 2023 has not yet been determined.

The Electric Utility Act and the Price Stabilization Act do not specify a basis for determining the reasonableness of our operating expenses or any other items (other than the level of the fair investment return) for the purposes of the rate calculation. However, the Government exercises substantial control over our budgeting and other financial and operating decisions.

In addition to the calculations described above, a variety of other factors are considered in setting overall tariff levels. These other factors include consumer welfare, our projected capital requirements, the effect of electricity tariff on inflation in Korea and the effect of tariff on demand for electricity.

From time to time, our actual rate of return on invested capital may differ significantly from the fair rate of return on invested capital assumed for the purposes of electricity tariff approvals, for reasons, among others, related to movements in fuel prices, exchange rates and demand for electricity that differ from what is assumed for determining our fair rate of return. For example, between 1987 and 1990, the actual rate of return was above the fair rate of return due to declining fuel costs and rising demand for electricity at a rate not anticipated for purposes of determining our fair rate of return. Similarly, depreciation of the Won against the U.S. dollar accounted for our actual rates of return being lower than the fair rate of return for the period from 1996 to 2000.

 

60


Table of Contents

For the period between 2006 and 2013, our actual rates of return were lower than the fair rate of return largely due to a general increase in fuel costs and additional facility investment costs incurred, the effects of which were not offset by timely increases in our tariff rates. Between 2014 and 2016, however, largely due to a decrease in fuel costs reflective of the drop in oil prices, our actual rate of return has surpassed the fair rate of return; however, substantially all of the resulting excess has been used to fund capital expenditure and repair and maintenance, and make investments in renewable energy and other environmental programs.

Partly in response to the variance between our actual rates of return and the fair rates of return, the Government from time to time increases the electricity tariff rates, but there typically is a significant time lag for the tariff increases as such increases requires a series of deliberation processes and administrative procedures and the Government also has to consider other policy considerations, such as the inflationary effect of overall tariff increases and the efficiency of energy use from sector-specific tariff increases.

As of January 1, 2021, we implemented a new tariff system to reinforce the correlation between the costs we incur and the tariff we charge to our customers, among other changes. The new tariff system consists of three main changes.

First, we implemented a new cost pass-through tariff system to reinforce the correlation between the costs we incur and the tariff we charge to our customers and to enhance transparency by separately billing fuel costs and climate/environment related costs. Previously, the electricity tariff consisted of two main components: (i) the base charge (the “Base Charge”) and (ii) the usage charge (the “Usage Charge”) based on the amount of electricity consumed by end-users. Under the new tariff system, there are new components to the tariff called the fuel cost adjusted charge (the “Fuel Cost Adjusted Charge”) and the climate/environment related charge (the “Climate/Environment Related Charge”). In principle, the Fuel Cost Adjusted Charge is calculated on a quarterly basis, and the formula for calculating the amount of the Fuel Cost Adjusted Charge is multiplying (i) the unit price of the Fuel Cost Adjusted Charge (the “Unit Price of the Fuel Cost Adjusted Charge”), which is the difference between a base fuel cost (the “Base Fuel Cost”) and an actual fuel cost (the “Actual Fuel Cost”) and (ii) the amount of electricity consumed. The Base Fuel Cost is the past twelve-month average fuel price of bituminous coal, LNG and Bunker C oil as posted by the Korea Customs Service. The twelve-month average fuel price is measured by taking the average of monthly fuel prices from twelve months in between thirteen and one month prior to the time a new Base Fuel Cost becomes effective. . To illustrate, the Base Fuel Cost effective from 2023 is the average of the fuel prices from December 2021 to November 2022. The Base Fuel Cost can be adjusted upon the revision of the electricity tariff as a whole. On the other hand, the Actual Fuel Cost is the past three-month average fuel price of the same fuels we use to measure the Base Fuel Cost. The past three-month average fuel price is measured by taking the average of monthly fuel prices from three months in between four and one month prior to the time the Fuel Cost Adjusted Charge is updated. To illustrate, for the first quarter of 2024, we used the fuel costs for September, October and November 2023 to calculate the three-month average fuel price.

The quarterly-adjusted Fuel Cost Adjusted Charge has built-in limits in view of price stability and other public policy considerations. First, there is a limit on any change in the Unit Price of the Fuel Cost Adjusted Charge to be no less than Won ±1 per kilowatt-hour. In other words, any change less than Won ±1 per kilowatt-hour will not be reflected. However, such limit does not apply if it is the first quarter during which the Base Fuel Cost has been newly updated. Second, the Unit Price of the Fuel Cost Adjusted Charge that exceeds Won ±5 per kilowatt-hour will not be reflected. In other words, the maximum adjustment that can be incorporated to the Unit Price of the Fuel Cost Adjusted Charge is equal to Won ±5 per kilowatt-hour from the Base Fuel Cost that is in effect. For example, in the third quarter of 2023, the Unit Price of the Fuel Cost Adjusted Charge was Won 10.2 per kilowatt-hour, meaning the Actual Fuel Cost was higher than the Base Fuel Cost by Won 10.2 per kilowatt-hour, but after being subjected to the limit of Won ±5 per kilowatt-hour, the Unit Price of the Fuel Cost Adjusted Charge came out to be Won 5.0 per kilowatt-hour.

However, our ability to pass on fuel and other cost increases to our customers may be limited due to the regulation of the Government on the rates we charge for the electricity we sell to our customers. In addition to

 

61


Table of Contents

the built-in limits described in the preceding paragraph, the new tariff system gives discretion to the Government to not wholly or partially adjust the quarterly Fuel Cost Adjusted Charge in case of extenuating circumstances, as determined by the Government. For example, in the second and third quarter of 2021, although the Unit Price of the Fuel Cost Adjusted Charge was Won –0.2 and Won 0.0 per kilowatt-hour respectively, the Government notified us to keep it at the same Won –3.0 per kilowatt-hour as the first quarter of 2021. In the fourth quarter of 2021, we increased the Unit Price of the Fuel Cost Adjusted Charge from Won –3.0 to Won 0.0 per kilowatt-hour. In the first and second quarters of 2022, although the Unit Price of the Fuel Cost Adjusted Charge as calculated should have been Won 3.0 per kilowatt-hour as the quarterly limit of Won ±3 per kilowatt-hour had existed back then, the Government notified us to keep it at the same Won 0.0 per kilowatt-hour as the fourth quarter of 2021. The Government cited different policy reasons for withholding the application of the quarterly Fuel Cost Adjusted Charge in the past, but one of the more consistent reasons has been alleviating the hardship caused by the prolonged economic effects of COVID-19 pandemic. As the quarterly limit of Won ±3 per kilowatt-hour was repealed in the third quarter of 2022 and with the approval by the Government, we ultimately increased the Unit Price of the Fuel Cost Adjusted Charge to Won 5.0 per kilowatt-hour in the third quarter of 2022, which was the maximum incremental amount allowed in 2022 under the limit. From then to the second quarter of 2024, the same Won 5.0 per kilowatt-hour increment has been applied to the Unit Price of the Fuel Cost Adjusted Charge. Even though the incremental amounts as calculated by our formula were Won -1.8, Won -4.0 and Won -2.5 per kilowatt-hour in the fourth quarter of 2023 and in the first and second quarters of 2024, respectively, the Government notified us to keep it at the same Won 5.0 per kilowatt-hour., taking into consideration our financial conditions and the fact that a substantial amount of the Fuel Cost Adjusted Charge that should have been reflected in previous years has not previously been reflected in the electricity tariff.

Also, because the Fuel Cost Adjusted Charge takes into account the fuel prices posted by Korea Customs Service, there may still be a mismatch in value between the actual prices the domestic generation companies pay for their fuels in the open market and the adjustment that can be made through the Fuel Cost Adjusted Charge. The domestic generation companies include not only our generation subsidiaries but also independent power producers that are not affiliated with us and we do not have access to fuel costs incurred by the independent power producers. As such, we use fuel prices posted by Korea Customs Service, which are easily accessible to our customers, for calculating the Fuel Cost Adjusted Charge.

Due to the likelihood of the Actual Fuel Cost being substantially over the built-in limits of the new tariff system and the Government’s discretion not to wholly or partially adjust the quarterly Fuel Cost Adjusted Charge in case of extenuating circumstances, there may be certain portions of the fuel costs that cannot be charged to our customers, even though those portions should have been included in the Fuel Cost Adjusted Charge. In such cases, we may accumulate such portions and reflect them in the Total Comprehensive Cost, which we use to calculate the Base Charge and the Usage Charge of the tariff. The Base Charge and the Usage Charge that are derived from the Total Comprehensive Cost need to be approved by the Government before they can be revised. The Government may, from time to time, consider different policy objectives to regulate the time and magnitude of such revision of the Base Charge and the Usage Charge of the electricity tariff. Therefore, changes in the fuel costs may not be timely or fully reflected even through the Usage Charge of the tariff where they would typically be reflected. Recently, to reflect the rise in the Base Fuel Cost, the Usage Charge needed to increase by Won 9.8 per kilowatt-hour from January 2022. With the approval by the Government, we increased the Usage Charge by Won 4.9 per kilowatt-hour on April 1, 2022 and October 1, 2022 respectively, which resulted in a total increase of Won 9.8 per kilowatt-hour. Such increases were spread out into two rounds to relieve people’s hardship including the prolonged effects of COVID-19 pandemic. In addition, in October 2022, we increased the Usage Charge of the tariff by Won 7.0 to Won 11.7 per kilowatt-hour on industrial and commercial consumers and by Won 2.5 per kilowatt-hour on all other consumers, reflecting additional accumulated fuel cost rises. In 2023, with the approval of the Government, we increased the Usage Charge by Won 11.4 and Won 8.0 per kilowatt-hour in January and May 2023, respectively, to reflect a portion of the increase in the Base Fuel Cost. Also, we increased the Usage Charge of the tariff from Won 6.7 to Won 13.5 per kilowatt-hour for large-scale industrial consumers in November 2023 to reflect additional accumulated fuel cost rises. In its economic policy direction statement for 2023, the Government announced its plans to gradually increase the tariff in order to address our cumulative

 

62


Table of Contents

deficit by 2026. However, there is no assurance on whether such plans will be realized. In its economic policy direction statement for 2024, the Government announced its policy to freeze utility rates, including the tariff, during the first half of 2024.

Also, the new tariff system introduced an additional component to the tariff called a climate/environment related charge (the “Climate/Environment Related Charge”). Previously, our climate and environment costs were embedded in the Usage Charge component of the tariff and our consumers could not discern the exact magnitude of such costs. By separating it out as an independent component, we intend to provide more information and transparency to our customers while having the flexibility to adjust it in alignment with the underlying costs. The Climate/Environment Related Charge for the coming year is calculated by multiplying (i) our total estimated costs of complying with the Renewable Portfolio Standard program, the Greenhouse Gas Emission Trading System and the coal-fired generation reduction program for the current year, and then dividing it by the electricity sales projected for the coming year (the “Climate/Environment Related Base Rate”), and (ii) the amount of electricity consumed. The value of the Climate/Environment Related Base Rate for 2023 was Won 9.0 per kilowatt-hour, which has been maintained up to the date of this annual report. Even though the Climate/Environment Related Charge is planned to be adjusted every year by reflecting the change in climate and environment-related costs but the Government may change the date of adjustment in consideration of different policy objectives. If there are discrepancies between our costs and the Climate/Environment Related Charge, we may accumulate such discrepancies and reflect them in our Total Comprehensive Cost. However, the electricity rate based on the Total Comprehensive Cost needs to be approved by the Government to be revised.

The tariff rates we charge for electricity vary among the different classes of consumers, which principally consist of industrial, commercial, residential, educational and agricultural consumers. The tariff also varies depending upon the voltage used, the season, the time of usage, the rate option selected by the user and, in the residential sector, the amount of electricity used per household, as well as other factors. For example, we adjust for seasonal tariff variations by applying higher rates when demand tends to rise such as during the months of June, July and August (when the demand tends to rise due to increased use of air conditioning) and November, December, January and February (when demand tends to rise due to increased use of heating), which reflects the policy of the Korean government to cope with the rise in electricity demand during peak seasons by encouraging a more efficient use of electricity by customers. In addition, we provide discounts on tariff rates to certain users such as low income households.

Our current tariff schedule reflecting the adjustments outlined above and effective from April 1, 2024 is summarized below by the type of usage:

 

  

Industrial. The monthly Base Charge varies from Won 5,550 per kilowatt to Won 9,810 per kilowatt depending on the type of contract, the voltage used and the rate option. The energy Usage Charge varies from Won 79.5 per kilowatt-hour to Won 242.9 per kilowatt-hour depending on the type of contract, the voltage used, the season, the time of day and the rate option.

 

  

Commercial. The monthly Base Charge varies from Won 6,160 per kilowatt to Won 9,810 per kilowatt depending on the type of contract, the voltage used and the rate option. The energy Usage Charge varies from Won 8.35 per kilowatt-hour to Won 229.4 per kilowatt-hour depending on the type of contract, the voltage used, the season, the time of day and the rate option.

 

  

Residential. The monthly Base Charge varies from Won 730 for electricity usage of less than 200 kilowatt-hours to Won 7,300 for electricity usage in excess of 400 kilowatt-hours. During the months of July and August each year, the usage ceiling for the first two tiers of rates increased from 200 kilowatts to 300 kilowatts for the first tier and from 400 kilowatts to 450 kilowatts for the second tier. Residential tariff also includes an energy Usage Charge ranging from Won 105.0 to Won 307.3 per kilowatt-hour for electricity usage depending on the amount of usage and voltage. During the peak usage periods during summer and winter, namely the months of July and August and December to February, a higher energy Usage Charge of Won 736.2 per kilowatt-hour applies to residential

 

63


Table of Contents
 

consumers whose monthly electricity consumption exceeds 1,000 kilowatts hour. In accordance with the new tariff system, residents may also opt for our new seasonal and hourly tariff schedule as an alternative. Under the new schedule, the monthly Base Charge is Won 4,310 per kilowatt. The Usage Charge varies from Won 125.8 per kilowatt-hour to Won 220.5 per kilowatt-hour depending on season and time of the day.

 

  

Educational. The monthly Base Charge varies from Won 5,230 per kilowatt to Won 6,980 per kilowatt depending on the voltage used and the rate option. The energy Usage Charge varies from Won 70.5 per kilowatt-hour to Won 187.1 per kilowatt-hour depending on the voltage used, the season and the rate option.

 

  

Agricultural. The monthly Base Charge varies from Won 360 per kilowatt to Won 1,210 per kilowatt depending on the type of usage. The energy Usage Charge varies from Won 41.9 per kilowatt-hour to Won 62.2 per kilowatt-hour depending on the type of contract, the voltage used and the season.

 

  

Street-lighting. The monthly Base Charge is Won 6,290 per kilowatt and the energy Usage Charge is Won 112.6 per kilowatt-hour. For electricity capacity of less than 1 kilowatt or for places where the installation of the electricity meter is difficult, a fixed rate of Won 47.2 per watt applies, with the minimum monthly charge of Won 1,220.

In 2001, as part of implementing the Restructuring Plan, the Ministry of Trade, Industry and Energy established the Electric Power Industry Basis Fund to enable the Government to take over certain public services previously performed by us. In 2023, 3.7% of the tariff we collected from our customers was transferred to this fund prior to recognizing our sales revenue.

Power Development Strategy

We and our generation subsidiaries make plans for expanding or upgrading our generation capacity based on the Basic Plan, which is generally revised and announced every two years by the Government. In January 2023, the Government announced the Tenth Basic Plan which is effective for the period from 2023 to 2036. The Tenth Basic Plan focuses on (i) establishing practical and balanced mixture of power sources and (ii) optimizing nuclear power sources while minimizing coal-fired power sources and developing eco-friendly power sources. The Tenth Basic Plan includes the following specific measures: (i) construction of nuclear power plants Shin-Hanul #3 and 4 would resume and operation of ten other nuclear generation units including Kori #2 may continue beyond their original retirement dates in or before 2030 subject to KHNP’s intention and only upon the NSSC’s approval following a satisfactory safety evaluation; as a result, nuclear generation capacities will increase from 26.1 gigawatts in 2023 to 31.7 gigawatts by 2036, (ii) 28 decrepit coal-fired power plants of which capacities are 14.1 gigawatts, will be retired and converted into using LNG instead, decreasing coal generation capacities from 40.2 gigawatts in 2023 to 27.1 gigawatts by 2036 and expanding LNG generation capacities from 43.5 gigawatts in 2023 to 64.6 gigawatts by 2036 as a consequence, (iii) domestic renewable energy generation capacity will be expanded from 32.8 gigawatts in 2023 to 108.3 gigawatts by 2036 with a practical forecasts, and (iv) carbon-free power sources such as hydrogen-LNG and ammonia-coal blended combustion will be utilized to achieve 2050 carbon neutrality. The introduction of such carbon-free power sources can minimize stranded assets i.e., assets that have become obsolete or non-performing, by recycling existing coal-fired power plants and system facilities connected thereto. Hydrogen and ammonia-blended power generation is expected to reach 47.4 terawatt-hour in 2036, accounting for 7.1% of the total annual power generation.

In June 2019, the Ministry of Trade, Industry and Energy adopted the Third Basic National Energy Plan following consultations with representatives from civic groups, the energy industry and academia. The Third Basic National Energy Plan, which is a comprehensive plan that covers the entire spectrum of energy industries in Korea, covers the period from 2019 to 2040. The Third Basic National Energy Plan is consistent with the First and the Second Basic National Energy Plans in terms of the general policy direction and aims to promote sustainable growth and improvement of people’s quality of life by converting to renewable energy. Specifically,

 

64


Table of Contents

it establishes the following five key tasks: (i) strengthening management of energy demand from various sectors, such as commerce and transportation, and promoting a rational electricity tariff system to improve the national energy consumption efficiency by 38% and reduce the energy demand by 18.6% by 2040; (ii) converting to clean and safe energy through gradual reduction of nuclear power generation and decisive reduction of coal power generation by prohibiting construction of new coal-fired power plants and increasing the proportion of renewable energy sources to approximately 35% by 2040; (iii) expanding the power distribution in areas near those with demands for renewable energy and fuel cells and strengthening the roles and responsibilities of local governments; (iv) fostering the growth of the future energy industries (including renewable energy, hydrogen fuel and other efficient sources of energy linked to technology), promoting the value-add for traditional energy industries and maintaining a core energy ecosystem for nuclear power plants; and (v) improving the energy, gas and heat market systems to facilitate the national energy conversion and building platforms based on big data to foster creation of new energy industries.

In July 2022, the Government announced the draft direction of energy policy that sets forth the following five fundamental basis: first, redefining a feasible and rational energy mix; second, establishing strong resource and energy security; third, improving efficiency of energy demand and restructuring the energy market based on market principles; fourth, promoting the development and export of new energy businesses; and finally, strengthening energy welfare and the applicability of relevant policies. Through this policy direction, we hope to promote balanced development in nuclear power, renewable energy, and hydrogen energy nationwide, which will decrease the proportion of energy generated from fossil fuels.

In May 2023, we established the Tenth Long-Term Power System Planning with the goals of securing grid capacity to meet the national energy mix plan, building flexible power grids that can respond to future uncertainties and constructing facilities in a timely manner. Also, on December 4, 2023, the Government announced the power system innovation to expand carbon-free power and ensure efficient power supply by closely collaborating with us. The plan focuses on reducing the construction period of the power grid by 30%, decreasing the construction scale of transmission lines by 10% and doubling power system flexibility.

We cannot assure that the Tenth Basic Plan, the Third Basic National Energy Plan or the respective plans to be subsequently adopted will successfully achieve their intended goals, the foremost of which is to ensure, through carefully calibrated capacity expansion and other means, balanced overall electricity supply and demand in Korea at to end users while promoting efficiency and environmental friendliness in the consumption and production of electricity. If there is significant variance between the projected electricity supply and demand considered in planning our capacity expansions and the actual electricity supply and demand or if these plans otherwise fail to meet their intended goals or have other unintended consequences, this may result in inefficient use of our working capital, mispricing of electricity and undue financing costs on the part of us and our generation subsidiaries, among others, which may have a material adverse effect on our results of operations, financial condition and cash flows.

Capital Investment Program

The table below sets forth, for each of the years ended December 31, 2021, 2022 and 2023, the amounts of capital expenditures for the construction of generation, transmission and distribution facilities.

 

2021

  2022  2023 
(In billions of Won) 
W13,964  W13,886  W15,518 

 

65


Table of Contents

The table below sets forth the currently estimated installed capacity for new or expanded generation units to be completed by our generation subsidiaries in each year from 2024 to 2027 based on the Tenth Basic Plan, as amended.

 

Year

  Number of Units  Type of Units  Total Installed Capacity 
         (Megawatts) 

2024

  2
  Nuclear power
   
2,800
 
  1  LNG-combined   597 
  14  Renewables   242 

2025

  1
  Nuclear power
   
1,400
 
  2  LNG-combined   1,062 
  6  Renewables   170 

2026

  4
  LNG-combined
   
1,500
 
  8  Renewables   130 

2027

  4
  LNG-combined
   
2,061
 
  4  Renewables   100 

As part of our capital investment program, we also intend to add new transmission lines and substations, continue to replace overhead lines with underground cables and improve the existing transmission and distribution systems.

The actual number and capacity of generation units and transmission and distribution facilities we construct and the timing of such construction are subject to change depending upon a variety of factors, including, among others, changes in the Basic Plan, demand growth projections, availability and cost of financing, changes in fuel prices and availability of fuel, ability to acquire necessary plant sites, environmental considerations and community opposition.

The table below sets forth, for the period from 2024 to 2026, the budgeted amounts of capital expenditures pursuant to our capital investment program, which primarily consist of budgets for the construction of generation, transmission and distribution facilities and, to a lesser extent, renewable energy generation and new energy industry projects. The budgeted amounts may vary from the actual amounts of capital expenditures for a variety of reasons, including, among others, the implementation of the Tenth Basic Plan currently in place, changes in the number of units to be constructed, the actual timing of such construction, changes in rates of exchange between the Won and foreign currencies and changes in interest rates.

 

   2024   2025   2026   Total 
   (in billions of Won) 

Generation(1):

        

Nuclear

  W4,228   W 4,233   W 4,311   W 12,773 

Thermal

   3,689    4,637    4,093    12,419 

Renewables and others

   691    684    855    2,230 
  

 

 

   

 

 

   

 

 

   

 

 

 

Sub-total

   8,609    9,554    9,259    27,422 
  

 

 

   

 

 

   

 

 

   

 

 

 

Transmission and Distribution:

        

Transmission

   4,603    5,305    4,933    14,842 

Distribution

   3,664    3,581    3,683    10,929 
  

 

 

   

 

 

   

 

 

   

 

 

 

Sub-total

   8,267    8,887    8,617    25,771 
  

 

 

   

 

 

   

 

 

   

 

 

 

Others(2)

   1,381    1,441    1,608    4,429 
  

 

 

   

 

 

   

 

 

   

 

 

 

Total

  W 18,257   W 19,881   W 19,484   W 57,621 
  

 

 

   

 

 

   

 

 

   

 

 

 

 

66


Table of Contents

 

Notes:

 

(1)

The budgeted amounts for our generation facilities are based on the Ninth Basic Plan, as amended.

(2)

Principally consists of investments in telecommunications and new energy industry projects, among others.

In January 2016, the Ministry of Trade, Industry and Energy announced an initiative to promote the new energy industry by creating the New Energy Industry Fund, which is made up of funds sponsored by Government-affiliated energy companies. We contributed Won 500 billion to the funds in 2016. The purpose of these funds is to invest in substantially all frontiers of the new energy industry, including renewable energy, energy storage systems, electric vehicles, small-sized self-sustaining electricity generation grids known as “micro-grids”, among others, as well as invest in start-up companies, ventures, small to medium-sized enterprise and project businesses that engage in these businesses but have not previously attracted sufficient capital from the private sector.

Furthermore, as a measure to address the high level of particulate matter pollution, in October 2018, the Government introduced a pilot regulation to lower the output of 35 coal-fired generation units to approximately 80% of their capacity that emit more than a certain amount of particulate matter. The regulation was formally implemented in January 2019, targeting 40 coal-fired power plants with high emissions of particulate matter. From March to June 2019, the scope expanded to cover 60 units in total. In addition, coal-fired generation units originally scheduled for preventive maintenance during the second half of 2019 were required to undertake such maintenance earlier in the spring of 2019. In November 2019, the Government pursued a reduction of coal-fired generation units in order to implement the Special Measures to Respond to the High Concentration Period (December to March) of Particulate Matter. We plan to continue to participate in the effort to reduce the particulate matter emissions from coal-fired generation units, not only during the winter but also during the spring. For example, from December 2023 to March 2024, up to 15 coal-fired generation units were shut down, with a maximum of 47 coal-fired generation units subject to a cap of 80% on the output within the remaining reserve capacity range. Additionally, the Government adjusted the schedule to close down two decrepit coal-fired generation units (Boryeong #1 and #2), which were shut down in December 2020. Also, other coal-fired generation units, Samcheonpo #1 and #2, were shut down in May 2021 and Honam #1 and #2 units in December 2021. According to the Tenth Basic Plan announced in December 2022, the total coal-fired power plant capacity in 2036 will decrease to 27.1 gigawatts from 40.2 gigawatts in 2023, and its percentage of total power generation capacity will decrease to 11.3% in 2036 from 27.1% in 2023. While such measures may be subject to change, we expect to incur significant costs of complying with such measures, including in connection with more stringent particulate matter pollution regulations, retrofitting and overall replacement of environmental facilities.

We have financed, and plan to finance in the future, our capital investment programs primarily through net cash provided by our operating activities and financing in the form of debt securities and loans from domestic financial institutions, and to a lesser extent, borrowings from overseas financial institutions. In addition, in order to prepare for potential liquidity shortage, we maintain several credit facilities with financial institutions in the aggregate amounts of Won 10,619 billion and US$1,782 million on a consolidated basis, the full amount of which was available as of December 31, 2023. We, KHNP, KOMIPO and KOWEPO also maintain global medium-term note programs in the aggregate amount of US$21 billion, of which approximately US$11 billion remains currently available for future drawdown. See also Item 5.B. “Liquidity and Capital Resources—Capital Resources.”

Environmental, Social and Governance Programs

With the ESG Promotion Strategy established in 2022, we set the direction and strategic goals to advance the sectoral strategies in each of environment, social, governance to reflect environmental changes and strengthen infrastructure for the achievement of the strategies. To reach the ESG vision and strategic goals, we have identified strategic tasks for each sector of environment, social, governance and will continue to work on them in the future.

 

67


Table of Contents

Environmental Programs

The Environmental Policy Basic Act, the Air Quality Preservation Act, the Water Environment Conservation Act, the Marine Environment Management Act and the Waste Management Act, collectively referred in this annual report as the Environmental Acts, are the major laws of Korea that regulate atmospheric emissions, wastewater, noise and other emissions from our facilities, including power generators and transmission and distribution units. Our existing facilities are currently in material compliance with the requirements of these environmental laws and international agreements, such as the United Nations Framework Convention on Climate Change, the Montreal Protocol on Substances that Deplete the Ozone Layer, the Stockholm Convention on Persistent Organic Pollutants and the Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and Their Disposal. Additionally, we are endeavoring to develop and implement greenhouse gas reduction strategy in line with the new climate regime set forth by the Paris Climate Agreement.

We continuously endeavor to contribute to sustainable growth (whether as an economy, a society or an ecosystem) by actively taking actions that befit our social responsibility as a corporate citizen in the energy industry. For example, in 2005, we became the first public company in Korea to join the United Nations Global Compact, an international voluntary initiative designed to hold a forum for corporations, United Nations agencies, labor and civic groups to promote reforms in economic, environmental and social policies. As part of our involvement with such initiative, we issue an annual report named the “Sustainability Report” to disclose our activities from the perspectives of economy, environment and society, in accordance with the reporting guidelines of the Global Reporting Initiative, the official collaborating center of the United Nations Environment Program that works in cooperation with United Nations Secretary General. We recognize the interest in ESG within the investors’ community and are continuously pursuing safe and clean energy supply and distribution by reducing greenhouse gas emissions and enhancing our ability to respond to climate change, the details of such efforts provided through periodic sustainability reports. In addition, from 2020, we made detailed disclosures on our sustainability reports in accordance with the recommendations of the Task Force on Climate-Related Financial Disclosures (TCFD) and the standards of the Sustainability Accounting Standards Board (SASB) regarding our activities in response to the global climate crisis and our efforts to transition into safe and clean energy sources. Since 2022, we have published an integrated report on the domestic and international sustainable management performance of us and our six generation subsidiaries. In 2023, pursuant to the Dow Jones Sustainability Indices, which measures management performance in terms of contribution to sustainability, we were selected as one of the notable companies in the Asia Pacific region in the global electricity utility sector, marking the 10th consecutive year since 2014 that we have been selected.

In recognition of our efforts and achievements to reduce greenhouse gas emissions in response to global climate change, in May 2013, we obtained the Carbon Trust Standard certification issued by Carbon Trust, a British nonprofit organization with the goal of establishing a sustainable, low carbon economy. In 2015, we obtained recertification from Carbon Trust by satisfying even more rigorous evaluation criteria. We are also a participant of the Carbon Disclosure Project, an international organization that promotes transparency in informational disclosure of carbon management process. From 2016 to 2021 and again in 2023, we were recognized by the Carbon Disclosure Project and received honors in the energy and utility sector.

In October 2020, we stated that we intend to focus on low-carbon and eco-friendly overseas projects, such as new and renewable energy and combined-cycle gas power generation and not pursue new projects in coal-fired power plants. For our overseas coal-fired power plant projects, we intend to sell them in multiple stages by analyzing the conditions of the sale, including the valuation of projects, identification of potential buyers, consultation with stakeholders and prioritization of better deals. We also aim to carry out our combined-cycle gas power generation projects on the condition that they adopt new technologies, such as ammonia or hydrogen co-firing and carbon capture, utilization and storage (CCUS), which can reduce carbon emissions. In the long run, we aim to achieve carbon neutrality by reorganizing our business portfolio to focus on decarbonization, renewable energy and new businesses.

 

68


Table of Contents

We established an Environment, Social and Governance (“ESG”) Committee in our board of directors in December 2020 to reinforce ESG-based management system and to ensure continuous performance in this area. Our ESG Committee is charged with resolving major management issues related to ESG, establishing ESG management strategies and business plans and checking on the overall direction of sustainable management. In addition to the ESG committee, we established an advisory subcommittee within our ESG Committee. The subcommittee coordinates closely with the ESG Committee to strategically address more complicated and diverse ESG issues we are facing. All of our generation subsidiaries also established ESG Committee composed mainly of non-standing directors.

We and our generation subsidiaries declared the carbon-neutrality vision called “ZERO for Green” in November 2021. The slogans for the vision include (i) “Zero Emission” of carbon in the power generation sector through bold transition to carbon-free power sources such as renewable energy and hydrogen; (ii) “Reliable Energy” to ensure stable supply to clean electricity to consumers through preemptive measures and optimal operation of the power grid; and (iii) “On Time” to secure core technology for carbon neutrality in a timely manner by dramatically expanding research and development investment. Also, in December 2021, we and our generation subsidiaries established the Carbon Neutrality Promotion Committee composed of our management and external experts to establish Company-wide strategies for carbon neutrality and to strengthen internal and external communication.

To achieve carbon neutrality by 2050 as announced by the Government, the Transformation sector (electricity and heating), which includes us and accounts for 37.1% of total national greenhouse gas emissions, needs to play a leading role. The Transformation sector, in particular, needs to not only increase the proportion of renewable energy such as wind and solar power, but also support carbon reduction in other sectors such as industry, transportation, and buildings by electrifying energy consumption. As we are on the top of the value chain for the power industry as a whole, we established our role and strategy to achieve carbon-neutrality. We plan to accelerate the timely connection of planned nuclear power plants, expand renewable energy through proactive system development, lead the development of core carbon-neutral technologies, and contribute to the achievement of a carbon-neutrality in the Transformation sector by improving energy efficiency.

Furthermore, we and our generation subsidiaries issued green bonds in 2021, 2022 and 2023, total issuance with the principal amount of US$750 million, US$1,600 million and US$1,500 million, respectively, to expand domestic and overseas renewable energy businesses and renewable energy related facilities.

The table below sets forth the number of emission control equipment installed at thermal power plants by our generation subsidiaries as of December 31, 2023.

 

   KOSEP   KOMIPO   KOWEPO   KOSPO   EWP 

Flue Gas Desulfurization System

   14    13    11    12    10 

Selective Non-catalytic Reduction System

   1    —     1    —     2 

Selective Catalytic Reduction System

   24    25    21    36    24 

Electrostatic Precipitation System

   16    15    10    14    12 

Low NO2 Combustion System

   22    402    27    34    24 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

   77    455    70    96    72 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

In accordance with the Act on Allocation and Trading of Greenhouse Gas Emission Allowances, enacted in March 2013, the Government implemented a greenhouse gas emission trading system under which the Government will allocate the amount of permitted greenhouse gas emission to companies by industry and a company whose business emits more carbon than the permitted amount is required to purchase the right to emit more carbon through the Korea Exchange. The categories of allowances traded include the Korean Allowance Unit (KAU), which is the emissions allowance allocated to applicable companies by the Government; Korean Credit Unit (KCU), which is a tradable unit converted from external carbon offset certifications including the

 

69


Table of Contents

Korean Offset Credit; and Korean Offset Credit (KOC), which is the verified carbon offset credit obtained by companies for reducing carbon emissions through absorption or otherwise. The greenhouse gas emission trading system is expected to be implemented in three stages. During the first phase (2015 to 2017), the Government set up and conducted a test run of the trading system to ensure its smooth operation, allocating the greenhouse gas emission allowances free of charge. In July 2018, the Government released the allocation plan for the second phase (2018 to 2020), during which 97% of the greenhouse gas emission allowances were allocated free of charge, with 3% allocated through an auction. During the third phase (2021 to 2025), the Government expanded the scale of the system with aggressive greenhouse gas emission reduction targets and allocating 10% of the greenhouse gas emission allowances through an auction. In November 2022, the Government announced the plan to improve the greenhouse gas emission trading system, including pre-submission of allowances by the end of each year, which was originally submitted by June of the next year.

In connection with the Climate Change Response Initiatives and the 2030 National Greenhouse Gas Reduction Roadmap announced by the Government in December 2016, the Government subsequently announced the Long-term Low Greenhouse Gas Emission Development Strategies, which presents a long-term vision and national strategy for achieving carbon neutrality in 2050, and the Nationally Determined Contributions (“NDC”), which sets forth the greenhouse gas reduction targets by 2030. According to the Enforcement Decree of the Framework Act on Carbon Neutrality and Green Growth to Cope with Climate Crisis established in March 2022 and the latest figures of NDC announced by the Government in March 2023, the national target level in 2030 was 436.6 million tons and represents 40% reduction as compared to 2018 and the target emission level for the Transformation sector (electricity and heating) as a whole which we are the part of was 145.9 million tons and represents 45.9% reduction as compared to 2018. In October 2021, with an official commitment of the Government to strive to achieve Korea’s carbon neutrality in 2050, the carbon neutrality committee set up by the Government also deliberated and proposed two 2050 carbon neutrality scenarios, all of which aim to achieve net-zero domestic carbon dioxide emissions by 2050. Scenario A will completely suspend thermal power generation, while scenario B will actively utilize technologies such as carbon capture, utilization and storage (CCUS) while allowing some thermal power generation to continue. Following the National Basic Plan for Carbon Neutrality & Green Growth enacted in April 2023, the Government has mandated annual sector-specific greenhouse gas reduction targets for the next 20 years from 2023 to 2042 and measures to achieve such targets to be formulated and implemented every five years. In terms of the NDC, the national target emission level remained unchanged but the latest target emission level in 2030 of Transformation sector increased to 145.9 million tons, which represents 45.9% compared to 2018 emission level.

Adhering to such emission and greenhouse gas reduction requirement may result in significant additional compliance costs. For example, the daily market price of the KAUs traded through the Korea Exchange was Won 8,640 per ton in early 2015, and the price has increased continuously thereafter, reaching its peak price at Won 42,500 per ton on April 2, 2020. Since then, the price has decreased and, as of March 31, 2024, the price has been formed around Won 8,130 per ton.

The table below sets forth the amount of annual emission from all generating facilities of our generation subsidiaries for the periods indicated. The amount of CO2 emissions is expected to decrease in the long-term, principally due to an increased use of LNG on account of the fact that 28 decrepit coal-fired power plants with total capacity of 14.1 gigawatts are scheduled to be retired and converted into LNG-fired power plants before the end of 2036, an increased use of renewable energy and the implementation of the greenhouse gas emission trading system.

 

Year (1)

  SOx
(g/MWh)
   NOx
(g/MWh)
   TSP (2)
(g/MWh)
   CO2
(kg/MWh)
 

2019

   92    118    6    494 

2020

   61    77    4    445 

2021

   57    68    4    437 

2022

   47    58    4    406 

 

70


Table of Contents

 

Notes:

 

(1)

The amounts of annual SOx, NOx and TSP emission for 2021 and 2022 are expected to be determined once the national statistics are confirmed.

(2)

“TSP” means Total Suspended Particles.

For additional information, see Item 3.D. “Risk Factors—Risks Relating to KEPCO—We are subject to various environmental legislations, regulations and related Government initiatives, including in relation to climate change and carbon neutrality, which could cause significant compliance costs and operational liabilities.”

In order to comply with the current and expected environmental standards and address related legal and social concerns, we intend to continue to install additional equipment, make related capital expenditures and undertake several environment-friendly measures to foster community goodwill. For example, under the Persistent Organic Pollutants Management Act enacted in 2007, we are required to remove polychlorinated biphenyl, or PCB, a toxin, from the insulating oil of our transformers by 2025. In addition, when constructing certain large new transmission and distribution facilities, we assess and disclose their environmental impact at the planning stage of such construction, and we consult with local residents, environmental groups and technical experts to generate community support for such projects. We exercise additional caution in cases where such facilities are constructed near ecologically sensitive areas such as wetlands or preservation areas. We also make reasonable efforts to minimize any negative environmental impact, for example, by using more environment-friendly technology and hardware. Additionally, we also undertake measures to minimize losses during the transmission and distribution process by making our power distribution network more energy-efficient in terms of loss of power, as well as to lower consumption of energy, water and other natural resources. Furthermore, we and our subsidiaries acquired the ISO 14001 certification, an environmental management system widely adopted internationally, in 2007 and have made it a high priority to make our electricity generation and distribution more environment-friendly. In 2014, we were awarded the presidential award for environmental contributions as a corporate citizen, after scoring the highest among 102 corporations that competed for the award. In order to encourage the implementation of environment-friendly measures by other corporations and enhance environmental awareness at a social level, we have been disclosing our environment-related activities and achievements to the public through the Environment Information System managed by the Ministry of Environment since 2012.

Our environmental measures, including the use of environment-friendly but more expensive parts and equipment and allocation of capital expenditures for the installation of such facilities, may result in increased operating costs and liquidity requirement. The actual cost of installation and operation of such equipment and related liquidity requirement will depend on a variety of factors which may be beyond our control. There is no assurance that we will continue to be in material compliance with legal or social standards or requirements in the future in relation to the environment.

As part of our medium to long-term strategic initiatives, we plan to take other measures designed to promote the generation and use of environment-friendly or green energy. See Item 4.B. “Business Overview—Strategy.”

Some of our generation facilities are powered by renewable energy sources, such as solar energy, wind power and hydraulic power. While such facilities are currently insignificant as a proportion of our total generation capacity or generation volume of our generation subsidiaries, we expect that the portion will increase in the future, especially since we are required to comply with the Renewable Portfolio Standard program as described below.

 

71


Table of Contents

The following table sets forth the generation capacity and generation volume in 2023 of our generation facilities that are powered by renewable energy sources.

 

   Generation Capacity
(megawatts)
  Generation Volume
(gigawatt-hours)
 

Hydraulic Power(1)

   650   1,306 

Wind Power

   189   190 

Solar Energy

   365   373 

Fuel Cells

   483   2,932 

Others

   1,091   4,356 
  

 

 

  

 

 

 

Subtotal

   2,778   9,156 

As percentage of total(2)

   3.33  2.34

 

Notes:

 

(1)

Excluding generation capacity and volume of pumped storage, which is generally not classified as renewable energy.

(2)

As a percentage of the total generation capacity or total generation volume, as applicable, of us and our generation subsidiaries.

In order to deal with shortage of fuel and other resources and also to comply with various environmental standards, in 2012 the Government adopted the Renewable Portfolio Standard program, which replaced the Renewable Portfolio Agreement which had been in effect from 2006 to 2011. Under this program, each of our generation subsidiaries is required to generate a specified percentage of total electricity to be generated by such generation subsidiary in a given year in the form of renewable energy or, in case of a shortfall, purchase a corresponding amount of a Renewable Energy Certificate (a form of renewable energy credit) from other generation companies whose renewable energy generation surpass such percentage. The target percentages were 7.0% in 2020, 9.0% in 2021, 12.5% in 2022 and 13.0% in 2023. Fines are to be levied on any subsidiary that fails to do so in the prescribed timeline. In 2022, all six of our generation subsidiaries met the target through renewable energy generation and/or the purchase of a Renewable Energy Certificate. Compliance by our generation subsidiaries of the 2023 target is currently under evaluation, and if any generation subsidiary is found to have failed to meet the target for 2023 or for subsequent years, such generation subsidiary may become subject to fines. Additionally, as the target percentage is subject to change, changes to the target percentage may result in additional expenses for our generation subsidiaries. From October 2021, an amendment to the Act on the Promotion of the Development, Use, and Diffusion of New and Renewable Energy became effective to raise the upper limit of the target percentage even higher to 25% from the previous threshold of 10%. In May 2023, the Enforcement Decree of the above law was amended to set out the target percentage to gradually increase the annual upper limit of target percentage to 13.0% in 2023, 13.5% in 2024, 14.0% in 2025 in order to raise the upper limit of target percentage to 15.0% in 2026.

 

   2024  2025  2026  2027  2028 

Target Percentage under Renewable Portfolio Standard

   13.5  14.0  15.0  17.0  19.0

As to how we plan to finance our capital expenditures related to our environmental programs, see “—Capital Investment Program.”

In March 2017, the Electric Utility Act was amended to the effect that starting in June 2017, future national planning for electricity supply and demand in Korea should consider the environmental and safety impacts of such planning, such as desulfurization costs. Accordingly, the costs related to environmental and safety impacts such as the desulfurization costs, have been reflected in our variable cost of generating electricity since August 2019. In December 2019, the Regulation on the Operation of the Electricity Market was revised to reflect the cost of trading greenhouse gas emission allowances in our variable cost of generating electricity and the revision was implemented in January 2022.

 

72


Table of Contents

In line with the spread of RE100, a global campaign by companies around the world to cover 100% of their electricity use with renewable energy by 2050, the Government introduced its own version of RE100 that allows companies and other consumers to choose energy sources from which their electricity is generated. In order for a domestic company to participate in RE100, it needs to enter into either a third-party PPA or a direct PPA, or general and industrial customers may also purchase renewable energy through us in a competitive bidding process and be issued with a certificate of use of renewable energy, which we refer to as the green premium system. On June 21, 2021, the Ministry of Trade, Industry and Energy announced the “Guidelines on Third-Party Power Purchase Agreements for Renewable Energy Generation” that stipulated the method of transaction of renewable energy power among third parties. The relevant legislation for the direct PPA was enacted in the National Assembly in March 2021 and has been in force since October 2021. The Ministry of Trade, Industry and Energy finalized and announced detailed guideline for direct PPA in September 2022. As of March 31, 2024, there are seven third-party PPAs with total contracted capacity of 16 megawatts and 16 direct PPA with total contracted capacity of 35.8 megawatts, which are effective under related law and guideline. If there is an expansion in the use of direct PPA, it may adversely affect our market share in electricity sales. In addition to the PPA, the green premium system started in January 2021 and we, on behalf of Korea Energy Agency, are in charge of managing the bidding for renewable energy, receiving bid prices from winning companies, issuing a certificate of use of renewable energy to companies on a quarterly basis, and receiving fees from Korea Energy Agency for our service.

Following the amendment to the Hydrogen Economy Promotion and Hydrogen Safety Management Act amended in February 2024 and its Enforcement Decree in November 2023, the Minister of Trade, Industry and Energy has designated KEPCO and other entities under Community Energy System to purchase hydrogen-generated electricity. Under such Act, we are required to enter into contracts with hydrogen generators that are selected through competitive bidding process.

The bidding market is comprised of the general hydrogen market and the clean hydrogen power generation market, as categorized based on the type of fuel used. In consideration of the current ecosystem in which fuel cells are used, the general hydrogen power generation market is open to all kinds of hydrogen plants including plants using extracted or by-product hydrogen. On the other hand, the clean hydrogen power generation market is a market where only generators using clean hydrogen plants are allowed to participate. Clean hydrogen is categorized into carbon-free hydrogen, low-carbon hydrogen, and low-carbon hydrogen compounds (including ammonia) according to greenhouse gas emissions in the production and import procedure of hydrogen. The system for certifying clean hydrogen plants will be put in place based on criteria, such as the amount of carbon dioxide emissions, set by relevant enforcement ordinances. The Government notified the bidding volume for the period from 2023 to 2025 in accordance with the Tenth Basic Plan, as shown in the table below.

 

   Year of bidding market commencement 
  2023   2024   2025 
  Year of
commercial
operation

commencement
   Volume
(GWh)
   Year of
commercial
operation
commencement
   Volume
(GWh)
   Year of
commercial
operation
commencement
   Volume
(GWh)
 

General hydrogen market

   2025    1,300    2026    1,300    2027    1,300 

Clean hydrogen market

   —     —     2027    3,500    2028    3,000 

The amount of hydrogen-generated electricity to be purchased by us is determined by the Minister of Trade, Industry and Energy after taking into consideration the Basic Plan Relating to the Long-Term Supply and Demand of Electricity and Hydrogen Economy Implementation Basic Plan and it shall be determined by multiplying (i) the total amount to be purchased in the current year by (ii) the percentage of our purchase out of the total purchased amount in the year immediately preceding the year when the bidding market for the current year has been set up. Effectively, it will mean there will be a three-year lag between the time periods in (i) and (ii). The Minister shall allow us to reflect the cost arising from the purchase of hydrogen energy into the electricity tariff pursuant to the Act.

 

73


Table of Contents

Social Programs

In 2023, our management announced a safety-first management policy. We have strived to reinforce our safety system by increasing the number of safety personnel and improve on-site safety measures by emphasizing safety management to our business partners and workers. Also, we inspected 45,402 power facilities and completed 15,862 reinforcement measures to prepare for unforeseen disasters such as typhoons. In addition, we created educational resources for all age groups and promoted safety day events to instill a culture of safety awareness within our company. We have also conducted company-wide education sessions and events for our management and employees to further our safety-first management and accident prevention initiatives.

Building goodwill with local communities is important to us in light of concerns among the local residents and civic groups in Korea regarding construction and operation of generation units, particularly nuclear generation units. The Act for Supporting the Communities Surrounding Power Plants and the Act on the Compensation and Support for Areas Adjacent to Transmission and Substation Facilities require that the generation companies and the affected local governments carry out various activities up to a certain amount annually to address neighboring community concerns. Pursuant to these Acts, we and our generation subsidiaries, in conjunction with the affected local and municipal governments, undertake various programs, including scholarships and financial assistance to low-income residents.

Under the Act for Compensation and Support for Areas Adjacent to Transmission and Substation Facilities, activities required to be undertaken under the Act are funded partly by the Electric Power Industry Basis Fund (see “—Sales and Customers—Electricity Rates”) and partly by KHNP as part of its budget. KHNP is required to make annual contributions to the affected local communities in an amount equal to Won 0.25 per kilowatt-hour of electricity generated by its nuclear generation units during the one-year period before the immediately preceding fiscal year, Won 5 million per thousand kilowatts of hydroelectric generation capacity and Won 0.5 million per thousand kilowatts of pumped-storage generation capacity. In addition, under Korean tax law, KHNP is required to pay local tax levied on its nuclear generation units in an amount equal to Won 1 (effective January 1, 2015, which reflects an increase from the previous Won 0.5 per kilowatt-hour of their generation volume in the affected areas) and Won 2 per 10 cubic meters of water used for hydroelectric generation.

The Act on the Compensation and Support for Areas Adjacent to Transmission and Substation Facilities, enacted in January 2014 with effect from July 2014, prescribes measures to be taken by power generation or transmission companies with respect to the communities adjacent to transmission and substation facilities. Under this Act, those who own land or houses in the vicinity of transmission lines and substation may claim compensation for damages or compel purchase of such properties by the power generation or transmission companies which are legally obligated in principle to pay for such damages or purchase such properties. In addition, under this Act, residents of communities adjacent to transmission and substation facilities are entitled to subsidies on electricity tariff as well as support for a variety of welfare projects and collective business ventures.

Prior to the construction of a generation unit, our generation subsidiaries perform an environmental impact assessment which is designed to evaluate public hazards, damage to the environment and concerns of local residents. A report reflecting this evaluation and proposing measures to address the problems identified must be submitted to and approved by the Ministry of Trade, Industry and Energy following agreement with related administrative bodies, including the Ministry of Environment prior to the construction of the unit. Our generation subsidiaries are then required to implement the measures reflected in the approved report. Despite these activities, civic community groups may still oppose the construction and operation of generation units (including nuclear units), and such opposition could adversely impact our construction plans for generation units (including nuclear units) and have a material adverse effect on our business, results of operations and cash flow.

Upon relocation of our corporate headquarters in November 2014, we developed and established Bitgaram Energy Valley as a smart energy hub city in Gwangju and Jeollanam-do, to attract and facilitate the growth of start-ups and research institutions related to new energy industries while contributing to the local economy,

 

74


Table of Contents

balanced regional development and job creation. To achieve this goal, through industry-academic cooperation including partnerships with the Korea Institute of Energy Technology and the Korea Institute of Energy Research, we support the R&D efforts of companies, develop new technologies, and publish R&D results. We also seek to create new growth engines by assisting innovative companies with their technology development and commercialization as they enter the global market. As of December 31, 2023, we have signed agreements with 632 companies relating to investments in the Bitgaram Energy Valley, outperforming our target in 2023 of 630 companies. We are currently developing Bitgaram Energy Valley to establish a spontaneous industrial ecosystem, which will contribute to the power industry as well as the national economy.

Additionally, we continue to pursue businesses that promote co-prosperity with small and medium-sized enterprises (SMEs), such as cultivating startups, exploring for cooperative R&D projects with SMEs, and supporting export business. We also strive to strengthen the fundamental self-reliance of SMEs with continuous engagement, through improving their productivity, training specialists and also financial supports. In addition, by operating the ‘SMEs Energy Technology Market’, we are promoting cooperation between energy-related public institutions and SMEs. As of December 31, 2023, we designated 117 “innovation products” to support the early market entry and procurement linkage of technology innovation products developed by the SMEs with superior R&D capabilities.

Governance

We operate a risk management system to prevent possible risks in advance and effectively respond to them. The audit committee under the board of directors conducts audits of accounting and major management tasks and evaluates the operational status of the internal accounting management system. Since 2020, the ESG committee has also been established and operates under the board of directors to manage non-financial risks associated with environment, social, and governance issues.

We operate an ethical management system to meet our management needs and aim to make it systematic and effective. We provide the basic principles of conduct through ethical guidelines such as the Code of Ethics and the Code of Conduct, establish step-by-step strategies for the ethical management of our vision and management policies, and engage in relevant activities. See also Item 16.B. “Code of Ethics.” Also, in December 2023, we established a Compliance Office directly under our CEO, which is an independent organization to operate our risk management system. Our plan is to establish and operate a company-wide internal control system to miniize risks of corruption or misconduct.

See also Item 16.G. “Corporate Governance” for a further description of independence, diversity of our board and other committees thereunder.

Nuclear Safety

KHNP takes nuclear safety as its top priority and continues to focus on ensuring the safe and reliable operation of nuclear power plants. KHNP also focuses on enhancing corporate ethics and transparency in the operation of its plants.

KHNP has a corporate code of ethics and is firmly committed to enhancing nuclear safety, developing new technologies and improving transparency. KHNP has also established the “Statement of Safety Policy for Nuclear Power Plants” to ensure the highest level of nuclear safety. Furthermore, KHNP invests approximately 5% of its total annual sales into research and development for the enhancement of nuclear safety and operational performance.

KHNP implements comprehensive programs to monitor, ensure and improve safety of nuclear power plants. In order to enhance nuclear safety through risk-informed assessment, KHNP conducts probabilistic safety assessments, including for low power-shutdown states, for all its nuclear power plants. In order to systematically

 

75


Table of Contents

verify nuclear safety and identify the potential areas for safety improvements, KHNP performs periodic safety reviews on a 10-year frequency basis for all its operating units. These reviews have been completed for all of our nuclear power plants once or more. In order to enhance nuclear safety and plant performance, KHNP has established a maintenance effectiveness monitoring program based on the maintenance rules issued by the United States Nuclear Regulatory Commission, which covers all of KHNP’s nuclear power plants in commercial operation.

KHNP has developed the Risk Monitoring System for operating nuclear power plants, which it implements in all of its nuclear power plants. The Risk Monitoring System is intended to help ensure nuclear plant safety. In addition, KHNP has developed and implemented the Severe Accident Management Guidelines and is developing the Severe Accident Management Guidelines for Low Power-Shutdown States in order to manage severe accidents for all of its nuclear power plants.

KHNP conducts various activities to enhance nuclear safety such as quality assurance audits and reviews by the KHNP Nuclear Review. KHNP maintains a close relationship with international nuclear organizations in order to enhance nuclear safety. KHNP invites international safety review teams such as the World Association of Nuclear Operators (“WANO”) Peer Review Team to its nuclear plants for purposes of meeting international standards for independent review of its facilities. KHNP actively exchanges relevant operational information and technical expertise with its peers in other countries. For example, KHNP conducted WANO Pre-Startup Peer Reviews for Shin-Hanul #1 unit in 2023. The recommendations and findings from this event were shared with KHNP’s other nuclear plants to implement improvements at such plants. In addition, KHNP conducted the Operational Safety Review Team mission at the International Atomic Energy Agency for Saeul units 1 and 2 (formerly named as Shin-Kori units 3 and 4) in the second half of 2022. The purpose of such application was to ensure that KHNP nuclear generation units reflect the global safety standards.

The average level of radiation dose per unit amounted to a relatively low level of 0.30 man-Sv in 2023, which was substantially lower than the global average of 0.58 man-Sv/year in 2022 as reported in the WANO performance indicator report.

In response to the damage to the nuclear facilities in Japan as a result of the tsunami and earthquake in March 2011, the Government conducted additional safety inspections on nuclear power plants by a group of experts from governmental authorities, civic groups and academia. As a result of such inspections, the Government required KHNP to perform 46 comprehensive safety improvement measures. As of December 31, 2023, KHNP has completed implementation of 45 measures and is currently implementing one last measure. The Government also established the Nuclear Safety & Security Commission in October 2011 for neutral and independent safety appraisals. KHNP developed ten additional measures through benchmarking of overseas cases and internal analysis of current operations. As of December 31, 2023, KHNP has completed implementation of all ten measures.

From time to time, our nuclear generation units may experience unexpected shutdowns. For example, on September 12, 2016, multiple earthquakes including a magnitude 5.8 earthquake hit the city of Gyeongju, a home to KHNP’s headquarters and Wolsong Nuclear Power Plants. Although there was no material safety issues, KHNP had manually stopped the operations of Wolsong #1, #2, #3, and #4 units according to the safety guidelines. All units have resumed their operations on December 5, 2016, with the approval by the Nuclear Power Safety Commission. KHNP finished implementing measures to improve the safety by reinforcing seismic capability of its core facilities and performing stress tests across all its nuclear power plants. In 2018, KHNP finished the implementation of such measures for 24 units and enhanced seismic capability of the core facilities to withstand a magnitude 7.0 earthquake (6.5 before implementation). As for the units under construction, Saeul #3 and 4 (formerly named as Shin-Kori #5 and #6), the core facilities will be able to withstand a magnitude 7.4 earthquake.

Low and intermediate level waste (“LILW”), and spent nuclear fuels (“SNFs”) are stored in temporary storage facilities at each nuclear site of KHNP. The temporary LILW storage facilities at the nuclear sites had

 

76


Table of Contents

been sufficient to accommodate all LILWs produced up to 2015. Korea Radioactive Waste Agency (“KORAD”) completed the construction of a LILW disposal facility in the city of Gyeongju, and government approval for its operations was obtained in December 2014.

In order to increase the storage capacity of temporary storage facilities for SNFs, KHNP has been pursuing various projects, such as installing high-density racks in SNFs pools and building dry storage facilities. Through these activities, we expect that the storage capacity for SNFs in all nuclear power plant sites will be adequate to temporarily accommodate all SNFs produced by the operation of nuclear power plants before the operation of an intermediate storage facility. In December 2021, the Government decided on the national policy for the management of SNFs (Reference: The second master plan for High-Level Radioactive waste management) to secure an intermediate storage and disposal facility. The national policy for the management of SNFs includes a temporary operation plan for on-site SNFs storage facility on nuclear power plants before the operation of the intermediate storage facility.

In 2009, the Radioactive Waste Management Act (“RWMA”) was enacted in order to centralize management of the disposal of SNFs and LILW and enhance the security and efficiency of related management processes. The RWMA designates KORAD to manage the disposal of SNFs and LILW. Pursuant to the RWMA, the Government has established the Radioactive Waste Management Fund. The management expense for LILW is paid when LILW is transferred to KORAD, and the charge for SNFs is paid based on the quantity generated every quarter. LILW-related management costs and charges for SNFs are reviewed by the Ministry of Trade, Industry and Energy every two years.

Three bills relating to the disposal of SNFs were proposed by the National Assembly as of the end of 2023. Currently, the National Assembly Standing Committee is examining the above bills as a merged bill. These three bills include the plan for construction and operation for an intermediate storage facility and a disposal facility, and an on-site SNFs storage facility on nuclear power plants.

In addition, in February 2021, in accordance with the Government’s guidelines for strengthening the safety of nuclear power plants, the period for verifying seismic resilience of major equipment was extended. In light of the fact that forced efforts to shorten the process could endanger the workers, the construction periods of Saeul #3 and #4 (formerly named as Shin-Kori #5 and #6) units have been extended by twelve months and nine months to complete their construction in 2024 and 2025, respectively.

All of KHNP’s nuclear plants are currently in compliance with Korean law and regulations and the safety standards of the IAEA in all material respects. For a description of certain past incidents relating to quality assurance in respect of KHNP, see Item 3.D. “Risk Factors—Risks Relating to KEPCO—Our risk management policies and procedures may not be fully effective at all times.”

Decommissioning

Decommissioning of a nuclear power unit is the process whereby the unit is shut down at the end of its life, the fuel is removed and the unit is eventually dismantled. KHNP renewed the operating license of Kori #1, the first nuclear power plant constructed in Korea, which commenced operation in 1978, for an additional ten years in 2007. At the recommendation of the Ministry of Trade, Industry and Energy, KHNP has decided not to renew the operating license of Kori #1 and the initial phase of decommissioning (namely, safety inspection and removal of spent nuclear fuels) of Kori #1 has begun after its permanent shutdown in June 2017. KHNP retains full financial and operational responsibility for decommissioning its units.

KHNP has accumulated decommissioning costs as a liability since 1983. The decommissioning costs of nuclear facilities are defined by the Radioactive-Waste Management Act, which requires KHNP to credit annual appropriations separately. These costs are estimated based on studies conducted by the relevant committees, and are reviewed by the Ministry of Trade, Industry and Energy every two years. As of December 31, 2023, KHNP

 

77


Table of Contents

was required to accrue Won 26,330 billion for the costs of dismantling and decontaminating existing nuclear power plants, which consisted of dismantling costs of nuclear plants of Won 21,647 billion and decommissioning costs of spent nuclear fuels and radioactive waste of Won 4,683 billion.

Overseas Activities

We are engaged in a number of overseas activities. Such activities help us diversify our revenue streams by leveraging our and our subsidiaries’ operational experience from providing a full range of services from power plant construction to specialized engineering and maintenance services. We are also able to build strategic relationships with countries that are or may become our fuel providers.

We have continuously expanded our overseas projects starting with an oil-fired power plant in Malaya, the Philippines in 1995. As of the end of December 2023, we are engaged in 39 projects in 18 countries across Asia, Middle East, Latin America, North America, Africa and Oceania. The total installed capacity amounts to 28,495 megawatts, comprising of 18,977 megawatts of coal-fired power plants, 5,600 megawatts of nuclear power plant and 3,918 megawatts of renewable energy power plants.

Throughout the years, we have sought to expand our project portfolio to include the construction and operation of conventional thermal generation units, nuclear generation units and renewable energy power plants, transmission and distribution network and mining and development of fuels. While strategically important, we believe that our overseas activities, as currently being conducted, are not in the aggregate significant in terms of scope or amount compared to our domestic activities. In addition, a number of the overseas contracts currently being pursued are based on non-binding memoranda of understanding and the details of such projects may significantly change during the course of negotiating the definitive agreements.

In October 2020, we stated that we intend to focus on low-carbon and eco-friendly overseas projects, such as new and renewable energy and combined-cycle gas power generation and not pursue new projects in coal-fired power plants. For our overseas coal-fired power plant projects, we intend to sell them in multiple stages by analyzing the conditions of the sale, including the valuation of projects, identification of potential buyers, consultation with stakeholders and prioritization of better deals. We also aim to carry out our combined-cycle gas power generation projects on the condition that they adopt new technologies, such as ammonia or hydrogen co-firing and carbon capture, utilization and storage (CCUS), which can reduce carbon emissions. In the long run, we aim to achieve carbon neutrality by reorganizing our business portfolio to focus on decarbonization, renewable energy and new businesses.

Below is a description of our major overseas projects.

Generation Projects

Nuclear Generation Projects

In December 2009, following an international open bidding process, we entered into a prime contract for the original contract amount of US$18.6 billion with the Emirates Nuclear Energy Corporation (“ENEC”), a state-owned nuclear energy provider of the United Arab Emirates (“UAE”), to design and construct four civil nuclear power generation units to be located in Barakah, a region approximately 270 kilometers from Abu Dhabi, for the UAE’s peaceful nuclear energy program. Under the contract, we and our subcontractors, some of which are our subsidiaries, are to perform various duties including, among others, designing and constructing four nuclear power generation units each with a capacity of 1,400 megawatts, supplying nuclear fuel for three fuel cycles including initial loading, with each cycle currently projected to last for approximately 18 months, and providing technical support, training and education related to plant operation. The contract amount of US$18.6 billion was increased to US$19.1 billion as per the amendment signed in November 2017.

On October 20, 2016, in order to foster a long-term strategic partnership and stable management of the units’ post-construction we entered into an investment agreement with ENEC to jointly establish Barakah One

 

78


Table of Contents

PJSC, a special purpose company which will oversee the operation and management of the nuclear power plant currently being constructed in Barakah, UAE. Barakah One PJSC is mainly capitalized with loans in the amount of US$19.6 billion and equity of US$4.7 billion. We have an 18% equity interest in Barakah One PJSC, and also have an 18% equity interest in Nawah Energy Company, a subsidiary of ENEC, which will also be responsible for the operation and maintenance of the Barakah nuclear power plant. On December 20, 2018, the board of directors of KEPCO resolved to invest additional US$380 million in Barakah One PJSC. With the additional investment, KEPCO’s total capital investment amount in Barakah One PJSC is expected to be US$1.28 billion. Actual capital contribution will be made at the time when commercial operation of Unit #4 is commenced. KEPCO’s equity interest in the project is 18%, which remains unchanged. The total project cost of the Barakah nuclear power plant is expected to be approximately US$29.5 billion. Barakah One PJSC successfully achieved the commercial operation of Unit #1, #2 and #3 of Barakah nuclear power plant in April 2021, March 2022 and February 2023 respectively, with an expected plant life span of 60 years. Unit #4 of the UAE nuclear power plant accomplished grid connection within three weeks from the first operation in March 2024. Unit #4 is scheduled to commence commercial operation this year following the final commissioning test, including the upcoming power ascension test.

On August 25, 2022, KHNP signed a contract for the construction of turbine islands in El Dabaa nuclear power plant project in Egypt with Atomstroyexport JSC (“ASE JSC”), a subsidiary of Rosatom. ASE JSC had won an order for El Dabaa project from Egyptian Atomic Energy Agency (NPPA) in 2017 to build a nuclear power plant that consists of four reactors of which capacity is 1,200 megawatts each. KHNP will construct about 80 buildings and structures including turbine islands in four units of El Dabaa and supply equipment. The construction of the project began in 2023 and is planned to be completed in 2029.

On June 27, 2023, KHNP entered into a contract for construction of a tritium removal facility at Cernavoda nuclear power plant site in Romania. The procurer is S.N.NUCLEARELECTRICA S.A., a government owned organization that operates two units of CANDU reactors at Cernavoda. The value of the contract is about 193 million Euros. KHNP will provide engineering (based on the design of the tritium removal facility provided by the client), procurement, construction (EPC) and commissioning services. The term is 50 months and the commencement date is July 23, 2023.

Non-nuclear Generation Projects

We are currently engaged in two major power projects in the Philippines: (i) a minority ownership of SPC Power Corporation, a local utility corporation engaged in independent power generation, electricity distribution and other businesses, and (ii) CFBC Coal Power Plant, a 200-megawatt power plant in Cebu on a build, operate and own basis. The plant construction was completed in May 2011 and it will be operated until 2036. The project cost of the CFBC Coal Power Plant was US$451 million, which was project-financed on a limited recourse basis. To fulfill our responsibility for carbon neutrality, we are currently planning to sell our interests in SPC Power Corporation and the CFBC Coal Power Plant.

In April 2007, we formed a limited partnership with Shanxi International Electricity Group and Deutsche Bank, which was approved by the Chinese government, to develop and operate power projects in Shanxi Province, China. The total capital investment in these projects amounted to US$1.33 billion, of which our capital investment was US$450 million. We expect to participate in the operation of the project for 50 years ending in 2057. The total capacity of these projects is 9,292 megawatts and our equity interest in the partnership is 34%.

In July 2008, a consortium consisting of us and Xenel of Saudi Arabia won the bid to build, own and operate a gas-fired power plant with installed capacity of 373 megawatts in Al Qatrana, near Amman, and we entered into definitive agreements in October 2009. Construction of this project was completed in December 2011, and the plant is currently in operation and will operate until 2035. The total project cost was US$461 million, out of which the consortium made an equity contribution of US$143 million and the remainder was funded by debt financing. We and Xenel own 80:20 equity interests in the project, respectively. As part of

 

79


Table of Contents

the asset rationalization plan for our overseas projects in operation, we are planning to sell a portion of our equity interest in Al Qatrana project.

In December 2008, we formed a consortium with ACWA Power International of Saudi Arabia and submitted a bid for the 1,204-megawatt oil-fired power project in Rabigh, Saudi Arabia. In March 2009, we were selected as the preferred bidder and in July 2009, we entered into a power purchase agreement (“PPA”) with Saudi Electricity Company. Construction of the project was completed in April 2013, and we will participate in the operation of the plant for 20 years. The total project cost was approximately US$2.5 billion. We currently hold a 40.0% equity interest in the joint venture, Rabigh Electricity Company, which operates the project.

In August 2010, we led a consortium and won the bid to build, own and operate the 433-megawatt Norte II gas-fueled combined-cycle electricity generation facility in Chihuahua, Mexico, as ordered by the Commission Federal de Electricidad (“CFE”) of Mexico. The consortium established a special purpose vehicle, KST Electric Power Company (“KST”), to act as the operating entity, and in September 2010, KST entered into a PPA with CFE for 25 years until 2038. The total cost of the project was approximately US$427 million and we hold a 56% equity interest in the consortium. Our wholly-owned subsidiary, KEPCO Energy Service Company, currently manages the operation of the project.

In October 2010, a consortium that we are part of was selected by Abu Dhabi Water & Electricity Authority, a state-run utilities provider in the UAE, as the preferred bidder in an international bidding for the construction and operation of the combined-cycle natural gas-fired electricity generation facility in Shuweihat, UAE with aggregate capacity of 1,600 megawatts. Construction was completed in July 2014 and we will operate the plant until 2039. The total project cost was approximately US$1.4 billion, of which 20% was financed through equity investments by the consortium members and the remaining 80% through debt financing.

In January 2012, a consortium consisting of us, Mitsubishi Corporation and Wartsila Development & Financial Services of Finland was selected by National Electric Power Corporation, a state-run electricity provider in Jordan, to build and operate a 573-megawatt diesel engine power project in Al Manakher. Construction of this project was completed in October 2014 and the plant is currently in operation and will be operated until 2039. The total project cost was approximately US$760 million, of which the consortium made an equity contribution of approximately US$190 million and the remainder was funded by debt financing.

In March 2013, a consortium consisting of us and Marubeni, a Japanese corporation, was selected by the Ministry of Industry and Trade of Vietnam for construction and operation of a 1,200-megawatt coal-fired power plant in Thanh Hoa province, Vietnam. The construction was started in July 2018 and completed in July 2022. The plant is currently in operation and will operate until 2048. The total project cost is approximately US$2.5 billion, of which 24% have been funded by equity contribution and the remaining 76% by debt financing. The share capital of the special purpose entity in charge of this project is US$568 million, and we, Marubeni and Tohoku Power hold 50%, 40% and 10% equity interest in the special purpose entity, respectively.

In November 2019, we entered into an energy conversion agreement comprising of a PPA with the Guam Power Authority for a term of 25 years to construct and operate Ukudu gas-fired power plant in Guam, United States, including a 198-megawatt gas-fired power plant. We and EWP hold 60% and 40% shares in the project, respectively. The total project cost is expected to be approximately US$765 million, and we expect to invest US$92 million for the equity interest. The construction of the project started on May 31, 2022 and the plant is planned to start operating in September 2025. The plant is expected to be operated as a base load generator, replacing old heavy fuel power plants in Guam.

In January 2020, Pulau Indah Power Plant in Malaysia, a special purpose company that we own 25% of the shares, received a Letter of Notification to develop 1,200 megawatts combined-cycle gas-fired power plant from the Energy Commission of Malaysia, the host of the project. The construction started in December 2020 and is expected to be completed by August 2024. The total project cost is expected to be approximately

 

80


Table of Contents

US$805 million, and we expect to invest approximately US$40 million for equity interest. We signed a PPA in August 2020 with Tenaga Nasional Berhad, which will be effective from August 2024 for a period of 21 years.

On June 30, 2020, the board of directors approved our plan to invest US$51 million in the expansion of two coal-fired power plants, Java 9 and Java 10, on the Indonesian island of Java. We will invest together with PT Perusahaan Listrik Negara (“PLN”), an Indonesian state electricity company, and PT Barito Pacific Tbk., an Indonesian company. The total investment will be approximately US$3.39 billion and we, PLN and Barito Pacific will respectively own 15%, 51% and 34% shares in the joint venture. The joint venture will manage the construction of two units of 1,000-megawatt generation capacity. The construction of Java 9 is expected to be completed in the fourth quarter of 2024 and Java 10 is expected to be completed in the first quarter of 2025. The joint venture is a party to a 25-year PPA with PLN.

On October 5, 2020, the board of directors approved our plan to invest US$203 million in the construction of Vung Ang 2 coal-fired power plant in Vietnam in exchange for 40% shares in the project. The new plant will be located in Ha Tinh Province, Vietnam, adjacent to Vung Ang 1 power plant and will consist of two units with 600 megawatts generation capacity each. We started the construction in October 2021 and the power plant is expected to be completed in 2025. Diamond Generating Asia, a subsidiary of Mitsubishi Corporation, a Japanese corporation, is the main sponsor of this project. We will operate this plant together with other co-investors for 25 years.

In September 2022, we entered into an energy conversion agreement with Saudi Aramco with regard to the cogeneration plant at Jafurah, in the Kingdom of Saudi Arabia. Pursuant to the agreement, we will build a cogeneration plant with a capacity of approximately 317 megawatts of electricity generation and 694 kilo pounds per hour of steam output. When the construction is complete, this plant will supply electricity and steam to Jafurah Gas Plant for twenty years. We and Saudi Aramco hold 60% and 40% shares in the project respectively and the total project cost is approximately US$527 million. We started construction in the fourth quarter of 2022 and expect to commence commercial operation in October 2025.

Renewable Energy, Transmission & Distribution Projects

We are currently pursuing overseas projects to increase sales and net profit from renewable energy and grid projects, diversify our businesses and actively address climate change. Specifically, we are looking at offshore wind power market, grid investment projects and large-scale clean development mechanism projects. We plan to expand our projects while aligning to the energy transition trend toward carbon neutrality.

Since 2004, joint ventures between us and China Datang Corporation of the People’s Republic of China have built and operated a number of wind farms in Inner Mongolia, Liaoning and Gansu provinces. We own 40% of these joint ventures, whose equity in the aggregate amount is approximately US$450 million. The projects are funded one-third by equity contributions and two-thirds by debt financing. As of December 31, 2023, the joint venture operates 22 wind farms with a total capacity of 1,017 megawatts and a 7-megawatt photovoltaic power station.

In December 2015, we entered into an agreement with the Ministry of Energy and Mineral Resources of Jordan to build, own and operate a wind farm with installed capacity of 89.1 megawatts in Fujeij in Ma’an Governorate, Jordan. Commercial operations commenced on July 14, 2019. Total project cost of approximately US$181 million was financed 40% by our equity investment and 60% by debt financing. As part of the asset optimization plan for our overseas projects under operation, we are currently planning to sell a portion of our equity interest in Fujeij project.

In June 2015, we entered into a memorandum of understanding with Energy Product (“EP”), a Japanese local developer, to build, own and operate a photovoltaic power station with a capacity of 28 megawatts, together with a 13.7-megawatt-hour energy storage system, in Chitose, Hokkaido Prefecture in Japan. The power station

 

81


Table of Contents

began operating in July 2017. Total project cost is approximately JPY 10.9 billion, of which 20% was financed through 80:20 equity investments by us and EP. In July 2021, our 15.1% equity interest and the entire equity stake of EP was sold to NH-Amundi. As a result, we now hold 65% and NH-Amundi holds 35% of the total equity interest.

In August 2016, we entered into a Purchase and Sale Agreement with Cogentrix Solar Holdings to operate a photovoltaic power station in Colorado, United States, with a capacity of 30 megawatts for 25 years. The total project cost is approximately US$85 million, of which 50.1% was financed through 50.1:49.9 equity investments by us and a private equity fund formed by us and National Pension Service. It was our first foray into the North American power market. The sale of the power plant has been completed in 2022 and the liquidation of the business was completed in the fourth quarter of 2023.

In June 2017, we won a project to build, own and operate a photovoltaic power station with a capacity of 60 megawatts and a 32 megawatt-hour energy storage system in Guam, United States for 25 years. The total project cost was approximately US$186 million, and we financed 23% of the cost through equity investment and held 100% of the equity interest. The remaining 77% was funded through debt and tax equity financing. We have entered into a PPA with Guam Power Authority in August 2018. The construction of the project started in May 2020 and commercial operation commenced in June 2022. The entire volume of electricity generated from the power station will be purchased by Guam Power Authority until 2047.

In December 2023, a consortium led by us was nominated as a preferred bidder for another renewable energy project in Guam. Our consortium will be developing a new photovoltaic power generation station plus a battery energy storage system, with an expected capacity of 132 megawatts and 326 megawatt-hour, respectively. The entire volume of electricity generated from the power station will be purchased by Guam Power Authority for 25 years.

In September 2017, we entered into an agreement with Recurrent Energy to operate 3 solar photovoltaic projects in southern California, United States, with a capacity of 235 megawatts for 34 years. KEPCO partnered with Corporate Partnership Fund, a Korean private equity fund. We invested US$ 38 million in the project.

In October 2018, we entered into a Share Purchase Agreement and Share Subscription Agreement to operate a photovoltaic power station with a capacity of 50 megawatts in Calatagan in the Philippines. We own 38% interest and financed PHP 2.25 billion (approximately US$ 42.8 million) for the project, of which 80% was financed through equity investments and the remaining 20% through debt financing.

In October 2019, KEPCO and Sprott Korea as a consortium entered into a Share Purchase Agreement and Shareholders Agreement with Canadian Solar INC to develop and operate a photovoltaic power station with a capacity of 294 megawatts in Sonora and other states of Mexico for 35 years. We invested US$ 41 million in the project, and the transaction marks KEPCO’s first investment in the solar market in Mexico. The construction of the first power station in Horus, Mexico was completed in November 2020 and operation began in February 2023. Other power stations in Tastiota and El Mayo are expected to start commercial operation in 2024.

In December 2021, a consortium comprising us, Japan’s Kyushu Electric Power Co., Inc. and Électricité de France has been nominated as a successful bidder for the HVDC-VSC subsea transmission system construction and operation project of UAE announced by the Abu Dhabi National Oil Company (“ADNOC”), and clinched the deal through an international tender against numerous competitors. This project will supply power for the offshore production and operations facilities of ADNOC, by constructing and operating for 35 years a subsea transmission system along 2 routes with a total length of 259 kilometers. This mega project is worth US$3.8 billion and is expected to generate a stable profit through a long-term transmission agreement with the procurer for 35 years. The construction of the project was commenced in September 2022.

In August 2023, we entered into an agreement with Ministerio de Energía y Minas to construct and expand three 138/12.5 kilovolts distribution substations in the Dominican Republic. In total, 200 megavolt-ampere of

 

82


Table of Contents

transformation facilities will be constructed at the expected total project cost of US$ 38 million. We will be in charge of design, procurement and construction, and we expect to complete construction of the substations by April 2025.

Exploration and Production Projects

Previously, we were engaged in a bituminous coal mining project in Bylong, Australia. In July 2015, KEPCO Bylong submitted a development application to the State Government of New South Wales (the “NSW”) of Australia. In September 2019, the Independent Planning Commission of the NSW, i.e., the state regulator, refused to accept our development application. After many rounds of legal proceedings, our request for appeal to the High Court of Australia was finally rejected in February 2022. As of December 31, 2023, we have invested approximately KRW 810 billion in the Bylong project and the impairment loss has accrued to approximately KRW 554 billion. We are currently reviewing various alternative plans to minimize our loss.

Our nuclear generation subsidiary, KHNP, is also pursuing development projects for procurements of uranium in countries including Canada, France and Niger.

Our subsidiaries, KOSEP, KOMIPO, KOWEPO, KOSPO and EWP, have been engaged in mining projects in Kalimantan, Indonesia, collectively holding a 20% equity interest in PT Bayan Resources TBK. We are currently working on a plan to sell a portion of our equity interest in such projects.

North Korea

Gaeseong Industrial Complex

Since 2005, we have provided electricity to the industrial complex located in Gaeseong, North Korea, which was established pursuant to an agreement made during the summit meeting of the two Koreas in June 2000. The Gaeseong Industrial Complex is the largest economic project between the two Koreas and is designed to combine Korea’s capital and entrepreneurial expertise with the availability of land and labor of North Korea. In March 2005, we built a 22.9 kilovolt distribution line from Munsan substation in Paju, Gyeonggi-do to the Gaeseong Industrial Complex and became the first to supply electricity to pilot zones such as ShinWon Ebenezer. In April 2006, we started to construct a 154 kilovolt, 16 kilometer transmission line connecting Munsan substation to the Gaeseong Industrial Complex as well as Pyunghwa substation in the complex and began operations in May 2007.

At the end of 2015, we supplied electricity to 254 units, including administrative agencies, support facilities and resident corporations, using a tariff structure identical to that of Korea. However, we suspended power transmission to the Gaeseong Industrial Complex since February 11, 2016 following the Government’s decision to halt operations of the industrial complex to impede North Korea’s utilization of funds from the industrial complex to finance its nuclear and missile programs. On August 14, 2018, we resumed power transmission to the facilities that are part of the Joint Liaison Office between South and North Korea but we suspended it again on June 16, 2020 in compliance with the request by the Ministry of Unification of the Korean Government. It has been reported in the media that the parties have now temporarily closed the Joint Liaison Office in accordance with the request by North Korea to stop the spread of COVID-19 and all KEPCO personnel have withdrawn from the facilities without resuming power transmission since June 16, 2020.

As of December 31, 2023, the book value of our facility located at the Gaeseong Industrial Complex was Won 12.1 billion. For the year ended December 31, 2023, there are no trade receivables related to the companies residing in Gaeseong industrial complex. It is currently uncertain if we can exercise the property rights for our facility in the Gaeseong Industrial Complex. No assurance can be given that we will not experience any material losses as a result of the suspension of this project or failure of the project as a result of a breakdown or escalation of hostilities in the relationship between Korea and North Korea. See Item 3.D. “Risk Factors—Risks Relating to Korea and the Global Economy—Tensions with North Korea could have an adverse effect on us and the market value of our shares.”

 

83


Table of Contents

Insurance

We and our generation subsidiaries carry insurance covering against certain risks, including fire, in respect of key assets, including buildings, equipment, machinery, construction-in-progress and procurement in transit, as well as, in the case of us, directors’ and officers’ liability insurance. We and our generation subsidiaries maintain casualty and liability insurance against risks related to our business to the extent we consider appropriate. Other than KHNP, neither we nor our generation subsidiaries separately insure against terrorist attacks. These insurance and indemnity policies, however, cover only a portion of the assets that we own and operate and do not cover all types or amounts of loss that could arise in connection with the ownership and operation of these assets.

Substantial liability may result from the operations of our nuclear generation units, the use and handling of nuclear fuel and possible radioactive emissions associated with such nuclear fuel. KHNP maintains property and liability insurance against risks of its business to the extent required by the related law and regulations or considered as appropriate and otherwise self-insures against such risks. KHNP carries insurance for its generation units against certain risks, including property damage, nuclear fuel transportation and liability insurance for personal injury and property damage. KHNP carries property damage insurance covering up to US$1 billion per accident for all properties within its plant complexes, which includes property insurance coverage for acts of terrorism up to US$300 million and for breakdown of machinery up to US$300 million. In addition to the insurance on operating nuclear power generation units, KHNP has construction insurance for Saeul #3 and #4 (formerly named as Shin-Kori #5 and #6 and Shin-Hanul #1 and #2. KHNP maintains nuclear liability insurance for personal injury and third-party property damage for coverage of up to 300 million Special Drawing Rights, or SDRs, which amounts to approximately US$402.9 million, at the rate of 1 SDR = US$1.342940 as posted on the Internet homepage of the International Monetary Fund on July 31, 2023 per plant complex, for a total coverage of 1.8 billion SDRs. KHNP is also the beneficiary of a government indemnity with respect to such risks for damage claims of up to Won 300 million SDRs per nuclear plant complex, for a total coverage of 1.8 billion SDRs. Under the Nuclear Damage Compensation Act of 1969, as amended, KHNP is liable only up to 900 million SDRs, per single accident per plant complex; provided that such limitation will not apply where KHNP intentionally causes harm or knowingly fails to prevent the harm from occurring. KHNP will receive the Government’s support, subject to the approval of the National Assembly, if (i) the damages exceed the amount of insurance coverage and (ii) the Government deems such support to be necessary for the purposes of protecting damaged persons and supporting the development of nuclear energy business. KHNP carries insurance for its generation units and nuclear fuel transportation, and we believe that the level of insurance is generally adequate and is in compliance with relevant laws and regulations. In addition, KHNP is the beneficiary of government indemnity which covers a portion of liability in excess of the insurance. However, such insurance is limited in terms of amount and scope of coverage and does not cover all types or amounts of loss which could arise in connection with the ownership and operation of nuclear plants. Accordingly, material adverse financial consequences could result from a serious accident or a natural disaster to the extent it is neither insured nor covered by the government indemnity. See Item 3.D. “Risk Factors—Risks Relating to KEPCO—The amount and scope of coverage of our insurance are limited.”

Competition

As of December 31, 2023, we and our generation subsidiaries owned approximately 57.6% of the total electricity generation capacity in Korea (excluding plants generating electricity for private or emergency use). New entrants to the electricity business will erode our market share and create significant competition, which could have a material adverse impact on our financial condition and results of operations.

In particular, we compete with independent power producers with respect to electricity generation. The independent power producers accounted for 33.4% of total power generation in 2023 and 42.4% of total generation capacity as of December 31, 2023. As of December 31, 2023, there were 35 independent power producers in Korean electricity market, excluding 6,184 renewable energy producers. Since 2013, private enterprises are permitted to own and operate coal-fired power plants in Korea as the Ministry of Trade, Industry

 

84


Table of Contents

and Energy approved plans for independent power producers to construct coal-fired power plants under the Sixth Basic Plan announced in February 2013. Under the Tenth Basic Plan announced in January 2023, three coal-fired power plants are planned to be constructed by independent power producers by 2024. One of the three coal-fired power plants planned for construction was completed in 2023, and two are expected to be completed in 2024. While it remains to be seen whether construction of these generation units will be completed as scheduled, if these units were to be completed as scheduled and/or independent power producers are permitted to build additional generation capacity (whether coal-fired or not), our market share in Korea may decrease.

An amendment to the Electric Utility Act is underway that will enable us to directly participate in the development of renewable power generation. Under the current Electric Utility Act, a single business entity cannot participate in two or more types of electric businesses. Notwithstanding the foregoing, our power generation subsidiaries are allowed to participate in the development of renewable power generation and we may also do so by forming new entities to participate in such development. The proposed amendment allows a market-type public institution like us to participate in renewable power generation business to a limited degree. The amendment bill proposed in July 2020 is currently pending deliberation by the Korean National Assembly, but its future remains unclear. If the bill passes, we intend to pursue renewable power generation projects such as large-scale offshore wind power.

In addition, under the Community Energy System adopted by the Government in 2004, a minimal amount of electricity is supplied directly to consumers on a localized basis by independent power producers outside the cost-based pool system. Such system is used by our generation subsidiaries and most independent power producers to distribute electricity nationwide. The purpose of this system is to geographically decentralize electricity supply and thereby reduce transmission losses and improve the efficiency of energy use. These entities do not supply electricity on a national level but are licensed to supply electricity on a limited basis to their respective districts under the Community Energy System. As of March 31, 2024, the aggregate generation capacity of suppliers participating in the Community Energy System amounted to less than 2% of that of our generation subsidiaries in the aggregate. We currently do not expect the Community Energy System to be widely adopted, especially in light of the significant level of capital expenditure required for such direct supply. However, if the Community Energy System is widely adopted, it may erode our currently dominant market position in the generation and distribution of electricity in Korea and may have a material adverse effect on our business, results of operations and financial condition.

Our market dominance in the electricity distribution in Korea also may face potential erosion in light of the recent Proposal for Adjustment of Functions of Public Institutions (Energy Sector) announced by the Government in June 2016. This proposal contemplates a gradual opening of the electricity trading market to the private sector although no detailed roadmap has been provided for such opening. It is currently premature to predict to what extent, or in what direction, the liberalization of the electricity trading market will happen. Nonetheless, any significant liberalization of the electricity trading market may result in substantial reduction of our market share in electricity distribution in Korea, which would have a material adverse effect on our business, results of operation and cash flows.

The electric power industry, which began its liberalization process with the establishment of our power generation subsidiaries in April 2001, may become further liberalized in accordance with the Restructuring Plan. See Item 4.B. “Business Overview—Restructuring of the Electric Power Industry in Korea.”

In the residential sector, consumers may use natural gas, oil and coal for space and water heating and cooking. However, currently there is no practical substitute for electricity for lighting and other household appliances, which is available on commercially affordable terms.

In the commercial sector, electricity is the dominant energy source for lighting, office equipment and air conditioning. For its other uses, such as space and water heating, natural gas and, to a lesser extent, oil, provide competitive alternatives to electricity.

 

85


Table of Contents

In the industrial sector, electricity is the dominant energy source for a number of industrial applications, including lighting and power for many types of industrial machinery and processes that are available on commercially affordable terms. For other uses, such as heating, electricity competes with oil and natural gas and potentially with gas-fired combined heating and power plants.

Regulation

We are a statutory juridical corporation established under the KEPCO Act for the purpose of ensuring a stable supply of electric power and further contributing toward the sound development of the national economy through facilitating development of electric power resources and carrying out proper and effective operation of the electricity business. The KEPCO Act (including the amendment thereto) prescribes that we engage in the following activities:

 

 1.

development of electric power resources;

 

 2.

generation, transmission, transformation and distribution of electricity and other related business activities;

 

 3.

research and development of technology related to the businesses mentioned in items 1 and 2;

 

 4.

overseas businesses related to the businesses mentioned in items 1 through 3;

 

 5.

investments or contributions related to the businesses mentioned in items 1 through 4;

 

 6.

businesses incidental to items 1 through 5;

 

 7.

development and operation of certain real estate held by us to the extent that:

 

 a.

it is necessary to develop certain real estate held by us due to external factors, such as relocation, consolidation, conversion to indoor or underground facilities or deterioration of our substation or office; or

 

 b.

it is necessary to develop certain real estate held by us to accommodate development of relevant real estate due to such real estate being incorporated into or being adjacent to an area under planned urban development; and

 

 8.

other activities entrusted by the Government.

The KEPCO Act currently requires that our profits be applied in the following order of priority:

 

  

first, to make up any accumulated deficit;

 

  

second, to set aside 20.0% or more of profits as a legal reserve until the accumulated reserve reaches one-half of our capital;

 

  

third, to pay dividends to shareholders;

 

  

fourth, to set aside a reserve for expansion of our business;

 

  

fifth, to set aside a voluntary reserve for the equalization of dividends; and

 

  

sixth, to carry forward surplus profit.

As of December 31, 2023, the legal reserve was Won 1,605 billion and the voluntary reserve was Won 2,812 billion. The voluntary reserve consisted of Won 2,272 billion for investment in social overhead capital, Won 330 billion for research and human development and Won 210 billion for equalizing dividends. For the avoidance of doubt, all such reserves were calculated on a consolidated basis.

As we experienced net losses for the last three years as global energy prices increased significantly and the power purchase costs increased accordingly, we issued more debt securities than before to meet increased

 

86


Table of Contents

working capital requirement. On December 28, 2022, the National Assembly of Korea passed an amendment to Article 16 of KEPCO Act which increased our debt ceiling on total outstanding debt securities on a separate basis to be no greater than five times (or six times if the Minister of the Ministry of Trade, Industry and Energy approves if it is urgently required to resolve a business crisis situation) the sum of our share capital and reserves updated at the end of each year. Such share capital and reserves are calculated on a separate basis under the KEPCO Act. Before such amendment, our debt ceiling was two times the sum of our share capital and reserves. Such increase in debt ceiling will be effective until December 31, 2027 and we may make use of the new debt ceiling to issue more debt securities to cover our losses, refinance existing debt and finance new capital expenditures. However, if the sum of our share capital and reserves decreases (including as a result of continued significant net losses), our debt ceiling will decrease as well and there will be no assurance that we can meet our funding requirements for capital or operational expenditures or debt repayment obligations, which situation could have a material adverse impact on our business, results of operations and financial condition.

We are under the supervision of the Ministry of Trade, Industry and Energy, which has principal supervisory responsibility (in consultation with other Government agencies, such as the Ministry of Economy and Finance, as applicable) over us with respect to the appointments of our directors and our other senior management as well as approval of electricity tariff rate adjustments, among others.

Because the Government owns part of our capital stock, the Government’s Board of Audit and Inspection may audit our books.

The Electric Utility Act requires that licenses be obtained in relation to generation, transmission, distribution and sales of electricity, with limited exceptions. We hold the license to transmit, distribute and sell electricity. Each of our six generation subsidiaries holds an electricity generation license. The Electric Utility Act governs the formulation and approval of electricity rates in Korea. See “—Sales and Customers—Electricity Rates” above. An amendment to the Electric Utility Act is underway that will enable us to directly participate in the development of renewable power generation. Under the current Electric Utility Act, a single business entity cannot participate in two or more types of electric businesses. Notwithstanding the foregoing, our power generation subsidiaries are allowed to directly participate in the development of renewable power generation and we may also do so by forming new entities to participate in such development. The amendment bill proposed in July 2020 is currently pending deliberation by the Korean National Assembly, but its future remains unclear. If the bill passes, we intend to pursue renewable power generation projects such as large-scale offshore wind power.

Our operations are subject to various laws and regulations relating to environmental protection and safety.

Financial Stabilization Plan and Related Activities

In light of the general policy guideline of the Government for public institutions (including us and our generation subsidiaries) to reduce their respective overall debt levels, we and our generation subsidiaries have, in consultation with the Ministry of Trade, Industry and Energy and the Ministry of Economy and Finance, set target debt-to-equity levels every year and undertaken various programs to reduce debt and also strived to improve the overall financial stability.

In 2022, we and our generation subsidiaries have established and implemented a five-year financial stabilization plan in accordance with the guidelines of the Ministry of Economy and Finance. This plan includes sale of assets (sale of non-core assets such as idle properties, investment shares, and overseas coal power plants), business adjustment (adjustment or deferral of investment without affecting stable power supply and safety management), cost reduction through intense low-budget strategies, profit growth through business system improvements, and capital expansion through revaluation of tangible assets like land.

In 2023, we implemented additional measures to accelerate our financial stabilization. The measures included extension of the existing financial stabilization plan, sale of additional assets (including saleable assets

 

87


Table of Contents

in the greater Seoul region and investment shares), lease of office buildings, downsizing of headquarters and business office re-organizations and launching an emergency management innovation committee within our company. Also, we expanded our debt ceiling by interim dividends of Won 3.2 trillion from our subsidiaries in December 2023.

Despite our best efforts, however, for reasons beyond our control, including macroeconomic environments, government regulations and market forces (such as international market prices for our fuels), we cannot assure whether we or our generation subsidiaries will be able to successfully reduce debt burdens or otherwise improve our financial health or to a level that would be optimal for our capital structure. If we or our generation subsidiaries fail to do so or the measures taken by us or our generation subsidiaries to reduce debt levels or improve financial health have unintended adverse consequences, such developments may have an adverse effect on our business, results of operations and financial condition.

Establishment of a University

In order to enhance the competitiveness of the national energy industry, cultivate high-quality talents to revitalize the Bitgaram Energy Valley, and secure a differentiated research platform to create a new energy market, we established a university in Jeollanam-do Province in the southwestern region of Korea in accordance with the Government’s five-year state management plan.

The university, which is called as Korea Institute of Energy Technology (“KENTECH”) is a research and entrepreneurship-oriented university specializing in the energy field and aims to be a small yet robust university with approximately 100 faculty members and 1,000 students. On April 17, 2020, the Ministry of Education authorized us to form a legal entity for the university. The total funding expected through 2025, which is when the university’s organization is expected to be completed, is Won 828.9 billion, excluding the land that was freely endowed to us.

The funding for establishing the university will be jointly borne by us and the central and municipal governments. We plan to cooperate and coordinate with the central and municipal governments through an intra-governmental university establishment and support committee.

For ten years after the commencement of the university in 2022, we expect to receive funding (to be used as expenses for operating the university) from the municipal government in the amount of Won 200 billion. In addition, we expect to receive funding from the central government that is at least in the same amount as we expect to receive from the municipal government. After taking into account the funding from the governments, we anticipate our contribution to the university through 2025 to be approximately Won 500 billion depending on the amount of contribution from the central government.

On August 8, 2019, our board of directors resolved to make an initial contribution of Won 60 billion for the promotion, initial operation and the design of the university campus, and the contribution was made in 2020. On March 24, 2021, a special law was passed in the National Assembly and finally enacted on April 1, 2021, giving an autonomy to the university and laying out the basis for direct financial support from the central and municipal governments. On May 21, 2021, our board resolved to make an additional contribution of Won 64.5 billion to the university and Won 41.3 billion of such contribution was made in December 2021. The remaining contribution of Won 23.2 billion was made by our affiliates. In addition, on July 15, 2022, our and our affiliates’ boards of directors decided to contribute Won 47.9 billion for funding the construction and operation of major campus facilities and completed the contribution in December 2022. In 2023, they decided to contribute additional Won 110.6 billion, of which we contributed Won 70.8 billion and our affiliates contributed the remaining Won 39.8 billion. In February 2024, our board of directors decided to contribute Won 76.6 billion to the university’s operating fund. The final contribution amount will be determined through discussions with the university and the Government.

 

88


Table of Contents

On March 2, 2022, KENTECH held its first entrance ceremony with congratulatory remarks from the President of Korea. In 2024, the university is expected to have a total enrollment of 313 undergraduate students and 132 graduate students.

Currently, we are striving to adjust facility costs and tighten the budget of KENTECH as part of our initiative to improve our financial conditions. In order to minimize potential financial risks, we plan to let the university generate its own profits too, by, for example, attracting development funds and research and development investments and commercializing new technology among other means. Despite our efforts and anticipated funding from the municipal and central governments, we cannot assure you that the magnitude of our expected or actual contribution to the university will not have material adverse effects on our profit margins, results of operations or cash flows.

Proposed Sale and Purchase of Equity Interests

KEPCO Engineering & Construction Co., Inc.

Pursuant to the Third Phase of the Public Institution Reform Plan announced by the Government in August 2008, we conducted the initial public offering of Korea Engineering and Construction Co., Inc., or KEPCO E&C formerly known as Korea Power Engineering Co., Ltd., in December 2009 for gross proceeds to us of Won 165 billion, following which we owned 77.9% of KEPCO E&C’s shares. In furtherance of the Public Institution Reform Plan and to improve our financial profile, we sold our equity interests representing 3.1%, 4.0%, 4.5% and 0.54% of KEPCO E&C shares in November 2011, December 2013, December 2014 and December 2016, respectively, in each case to third party investors. As part of our financial stabilization plan, on June 24, 2022, our board of directors decided additional sale of KEPCO E&C shares. Consequently, we selected three financial advisors on September 15, 2022 and are discussing transaction schedule with them. We sold 14.77% of KEPCO E&C’s shares on December 27, 2023. We currently hold a 51.0% equity interest in KEPCO E&C.

Korea Electric Power Industrial Development Co., Ltd.

In 2003, we privatized Korea Electric Power Industrial Development, or KEPID, formerly our wholly-owned subsidiary, by selling 51.0% of its equity interest to Korea Freedom Federation. Pursuant to the Fifth Phase of the Public Institution Reform Plan announced by the Government in 2009, we sold 20% of the KEPID shares through additional listing. Although we had originally planned to sell the remaining 29% as well, we are currently working on converting KEPID into a public institution to transition its non-permanent employees to permanent employees in light of the Government’s guideline promoting the transition of non-permanent employees to permanent employees in the public sector. Acquisition by us is essential for the designation of KEPID as a public institution by the Government. The Committee for Management of Public Institutions pursuant to the Act on the Management of Public Institutions approved the updated plan on sales of KEPID shares on October 30, 2022. As a result, we and our five subsidiaries are now working on reacquiring the KEPID shares we previously sold.

Cybersecurity

Cybersecurity presents an ever-evolving challenge to the electric power industry, and we and our generation subsidiaries have identified cybersecurity as a key enterprise risk. Our operations require the continuous availability of critical information and operational technology systems, sensitive customer and employee data, and infrastructure information, all of which are targets for malicious actors. In order to effectively respond to such cybersecurity risk, we have established various cybersecurity management systems and cybersecurity threat response solutions and have also implemented other prevention and response measures.

In accordance with laws and regulations, we have established and implemented a cybersecurity management system, which is called “Cybersecurity GRC System,” through which we identify, evaluate and manage cybersecurity risks. Additionally, the National Intelligence Service and the Ministry of Trade, Industry and Energy perform regular audits to identify, evaluate and manage material risks from cybersecurity threats in

 

89


Table of Contents

accordance with the Basic Guidelines for National Information Security and the detailed guidelines for information security issued by the Ministry of Trade, Industry and Energy.

We have formed an Information Security Committee under the supervision of our information security department. The Information Security Committee’s responsibilities include, among others, conducting investigations into cybersecurity incidents and developing preventive strategies. Moreover, we and our generation subsidiaries have jointly established a Cybersecurity Committee, a cybersecurity oversight group comprised of senior management teams of the respective companies, including Chief Information Security Officers, to monitor cybersecurity policies and provide strategic direction for the prevention, detection, mitigation and remediation of cybersecurity risks.

We use contractual terms to impose cybersecurity requirements on third-party service providers for compliance with our cybersecurity policies, including the requirement to immediately inform us of any occurrence of cybersecurity threats during the provision of their service. We and our generation subsidiaries conduct training, policies, technical and procedural controls and mitigation plans to address risks from cybersecurity threats.

In anticipation of the amendment of the Act on Promotion of Information and Communications Network Utilization and Information Protection in January 2020, we designated a Chief Information Security Officer (“CISO”) who is dedicated to cybersecurity management. In late 2020, we reorganized our security management organization to enhance its independence by transferring it from our Safety and Security Department to Co-prosperity and Cooperation Division. All material cybersecurity-related matters are promptly notified to the CISO, who provides updates on security control to the head of the Co-prosperity and Cooperation Division on a weekly basis. Under further amendment to the Act on Promotion of Information and Communications Network Utilization and Information Protection in December 2021, our generation subsidiaries also designated a CISO and reported their designation to the Ministry of Science and ICT of the Government.

Since 2021, we have formed a team in collaboration with the National Intelligence Service and other institutions to participate in the international cybersecurity attack and defense exercise (Locked Shields) hosted by the NATO Cooperative Cyber Defense Centre of Excellence. By participating in this exercise, we are able to enhance our ability to collaborate against cybersecurity attacks on critical infrastructure. In addition, since 2021, for the first time as a public corporation in Korea, we have started hosting annually the Electric Sector Cybersecurity Contest, in which more than 20 organizations, including our generation subsidiaries, universities, and high schools, participate. By hosting this competition, we are bolstering our capacity to respond to cybersecurity attacks on power grids jointly with our generation subsidiaries and attracting skilled information security personnel to join us.

In 2021, we introduced personal information pseudonym processing system. In order to prevent the leakage of personal information, we have also implemented Digital Rights Management (DRM) and personal information detection solution on our computers. To strengthen personal information protection, we assigned a dedicated staff to manage personal information protection in 2022, implemented personal information detection solution used in data transmission between internal and external networks, and established personal information exposure detection system that automatically detects when personal information is present or exposed on an Internet website.

In 2023, we implemented comprehensive measures to address ransomware threats targeting our electric power infrastructure. This included tailored solutions and reinforcement of our ICT system’s backup and recovery capabilities. Furthermore, we established and fully operationalized a backup security control center to ensure continued responses to cybersecurity threats during potential disasters. Collaborating with the Korea Internet & Security Agency, we introduced security enhancement initiatives such as the “Bug Bounty” program. Additionally, we developed and deployed automatic security vulnerability diagnosis software to identify and fix cybersecurity blind spots. Our aim is to establish a robust system that not only prevents cybersecurity threats but also enables swift responses in case of a breach.

 

90


Table of Contents

KHNP is also continuing to strengthen our security management system by maintaining the international security standard, ISO27001, and the Korean standard, Personal Information & Information Security Management System certification. In September 2019, KHNP established an organization dedicated to nuclear control security in accordance with the Government’s strengthened information security regulation. Also, in 2023, KHNP established the Control System Security Section within the Cyber Security Control Center to strengthen cybersecurity response capabilities.

Item 4.C. Organizational Structure

As of December 31, 2023, we have 166 subsidiaries, 99 associates and 111 joint ventures (not including any special purpose entities).

Subsidiaries

Our wholly-owned six generation subsidiaries are KHNP, KOSEP, KOMIPO, KOWEPO, KOSPO and EWP. Our non-generation subsidiaries include KEPCO E&C, KEPCO KPS, KEPCO NF, and KEPCO KDN. For a full list of our subsidiaries, including foreign subsidiaries, and their respective jurisdiction of incorporation, please see Exhibit 8.1 attached to this annual report.

Associates and Joint Ventures

An associate is an entity over which we have significant influence and that is neither a subsidiary nor a joint venture. Significant influence is the power to participate in the financial and operating policy decisions of the investee but does not have control or joint control over those policies. A joint venture is a joint arrangement whereby the parties that have joint control of the arrangement (i.e. joint ventures) have rights to the net assets of the arrangement.

The table below sets forth each of our associates and joint ventures as of December 31, 2023 by name, the percentage of our shareholdings and their principal activities.

 

   Ownership
(%)
   

Principal Activities

Associates:       

Korea Gas Corporation

   20.47   Importing and wholesaling LNG

Korea Electric Power Industrial Development Co., Ltd.

   29.00   Electricity metering and others

YTN Co., Ltd.(1)

   21.43   Broadcasting

Gangwon Wind Power Co., Ltd.(2)

   15.00   Power generation

Hyundai Green Power Co., Ltd.

   29.00   Power generation equipment consignment and operation service

Korea Power Exchange(3)

   100.00   Management of power market and others

Taebaek Guinemi Wind Power Co., Ltd.(29)

   67.25   Power generation

Daeryun Power Co., Ltd.(2)

   6.85   Power generation

KNH Solar Co., Ltd.

   27.00   Power generation

SPC Power Corporation(30)

   38.00   Power generation

Gemeng International Energy Co., Ltd.

   42.00   Power generation

PT. Cirebon Electric Power

   27.50   Power generation

KNOC Nigerian East Oil Co., Ltd.(4)

   14.63   Resources development

KNOC Nigerian West Oil Co., Ltd.(4)

   14.63   Resources development

PT Wampu Electric Power

   46.00   Power generation

PT. Bayan Resources TBK

   20.00   Resources development

S-Power Co., Ltd.

   49.00   Power generation

Pioneer Gas Power Limited

   38.50   Power generation

Xe-Pian Xe-Namnoy Power Co., Ltd.

   25.00   Power generation

 

91


Table of Contents
   Ownership
(%)
   

Principal Activities

Associates:       

PT. Mutiara Jawa

   29.00   Manufacturing and operating floating coal terminal

Samcheok Eco Materials Co., Ltd.(5)

   25.54   Recycling fly ashes

Noeul Green Energy Co., Ltd.

   29.00   Power generation

Goseong Green Power Co., Ltd.

   29.00   Power generation

Gangneung Eco Power Co., Ltd.(2)

   29.00   Power generation

Shin Pyeongtaek Power Co., Ltd.

   40.00   Power generation

Haeng Bok Do Si Photovoltaic Power Co., Ltd.

   28.00   Power generation

Dongducheon Dream Power Co., Ltd.(6)

   33.61   Power generation

Jinbhuvish Power Generation Pvt. Ltd.(2)

   5.16   Power generation

Daejung Offshore Wind Power Co., Ltd.

   46.59   Power generation

GS Donghae Electric Power Co., Ltd.

   34.00   Power generation

Daegu Photovoltaic Co., Ltd.

   29.00   Power generation

Busan Green Energy Co., Ltd.

   29.00   Power generation

Hansuwon KNP Co., Ltd.

   28.98   Electric material agency

Korea Electric Power Corporation Fund(7)

   98.09   Developing electric enterprises

Energy Infra Asset Management Co., Ltd.(2)

   9.90   Asset management

Daegu clean Energy Co., Ltd.

   28.00   Renewable power generation

Yaksu ESS Co., Ltd.

   29.00   Installing ESS related equipment

Nepal Water & Energy Development Company Private Limited(8)

   68.88   Construction and operation of utility plant

Gwangyang Green Energy Co., Ltd.

   20.00   Power generation

PND Solar Co., Ltd.

   29.00   Power generation

Hyundai Eco Energy Co., Ltd.(2)

   19.00   Power generation

YeongGwang Yaksu Wind Electric Co., Ltd.(2)

   9.63   Power generation

Green Energy Electricity Generation Co., Ltd.

   29.00   Power generation

Korea Energy Solutions Co., Ltd.

   20.00   R & D

ITR Co., Ltd.

   10.00   R & D

STN Co., Ltd. (formerly known as Structure test network Co., Ltd.)

   20.00   Technical testing and consulting

Indeck Niles Development, LLC

   50.00   Power generation

Indeck Niles Asset Management, LLC

   33.33   Power generation

Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1

   49.00   Holding company

Suwon New Power Co., Ltd.

   39.90   Power generation

Gwangbaek Solar Power Investment Co., Ltd.

   44.00   Power generation

Go deok Clean Energy Co., Ltd.

   40.00   Fuel cell generation

SureDataLab Co., Ltd.

   23.95   R & D

SEP Co., Ltd.

   21.26   R & D

Hankook Electric Power Information Co., Ltd.(13)

   16.49   R & D

Tronix Co., Ltd.(13)

   12.50   R & D

O2&B Global Co., Ltd.

   20.00   R & D

Muan Sunshine Solar Power Plant Co., Ltd.

   20.00   Power generation

Bigeum Resident Photovoltaic Power Co., Ltd.

   29.90   Power generation

Goesan Solar Park Co., Ltd.

   29.00   Power generation

 

92


Table of Contents
   Ownership
(%)
   

Principal Activities

Associates:       

Saemangeum Heemang Photovoltaic Co., Ltd.

   35.00   Power generation

Bitgoel Eco Energy Co., Ltd.

   49.25   Power generation

Jeju Gimnyeong Wind Power Co., Ltd.

   30.00   Power generation

Seoroseoro Sunny Power Plant Co., Ltd.

   42.58   Power generation

Muan Solar Park Co., Ltd.

   20.00   Power generation

YuDang Solar Co., Ltd.

   20.00   Power generation

Anjwa Smart Farm & Solar City Co., Ltd.

   20.00   Power generation

KPE Green Energy Co., Ltd. (formerly known as Daewon Green Energy Co., Ltd.)

   25.36   Power generation

G.GURU Co., Ltd.

   24.65   R & D

UD4M Co., Ltd.(10)

   12.50   R & D

Dongbu Highway Solar Co., Ltd.

   20.00   Power generation

Seobu Highway Solar Co., Ltd.

   20.00   Power generation

Korea Energy Data Co., Ltd.

   29.37   R & D

Gangneung Sacheon Fuel Cell Co., Ltd.

   41.00   Power generation

Kosture Co., Ltd.(2)

   4.42   Coal recycling business

Taebaek Gadeoksan Wind Power Co., Ltd.

   34.00   Power generation

Chuncheon Green Energy Co., Ltd.

   45.00   Power generation

Yeomsubong Wind Power Co., Ltd.(11)

   29.00   Power generation

Yeongyang Wind Power Corporation II

   30.00   Power generation

Haeparang Energy Co., Ltd.

   25.00   Power generation

Saemangeum Sebit Power Plant Co., Ltd.(12)

   55.14   Power generation

Boulder Solar III, LLC

   30.00   Power generation

PlatformN. Co., Ltd.

   29.58   R & D

PT. Cirebon Energi Prasarana(9)

   10.00   Power generation

Green Radiation Co., Ltd.(13)

   10.00   R & D

Future Convergence Technology Laboratory. Co., Ltd.

   20.12   R & D

SC E&G. Co,. Ltd.

   20.00   R & D

REC’s Innovation Co., Ltd. (formerly known as Wang San Engineering. Co,. Ltd.)(33)

   16.67   R & D

ACE

   20.00   R & D

Environment and Energy Co., Ltd.(13)

   10.54   R & D

Santiago Solar Power SpA

   50.00   Power generation

Yanggu Floating Photovoltaic Power Plant Inc.

   29.00   Power generation

Power Embedded

   23.33   R & D

Changwon SG Energy Co., Ltd.(13)

   18.78   Power generation

Donpyung Technology. Co., Ltd.

   20.00   R & D

HORANG ENERGY Inc.

   40.00   Power generation

Hoenggye Renewable Energy Co., Ltd

   36.12   Power generation

Haman Green Energy Co., Ltd.

   35.00   Power generation

Songsan Green Energy Co., Ltd.(21)

   60.00   Power generation

Joint Ventures:

    

Shuweihat Asia Power Investment B.V.

   49.00   Holding company

Shuweihat Asia Operation & Maintenance Company(14)

   55.00   Maintenance of utility plant

Waterbury Lake Uranium L.P.(15)

   30.65   Resources development

 

93


Table of Contents
   Ownership
(%)
   

Principal Activities

Associates:       

ASM-BG Investicii AD

   50.00   Power generation

RES Technology AD

   50.00   Power generation

KV Holdings, Inc.(30)

   40.00   Power generation

KEPCO SPC Power Corporation(14,30)

   75.20   Construction and operation of utility plant

Gansu Datang Yumen Wind Power Co., Ltd.

   40.00   Power generation

Datang Chifeng Renewable Power Co., Ltd.

   40.00   Power generation

Datang KEPCO Chaoyang Renewable Power Co., Ltd.

   40.00   Power generation

Rabigh Electricity Company

   40.00   Power generation

Rabigh Operation & Maintenance Company Limited

   40.00   Maintenance of utility plant

Jamaica Public Service Company Limited

   40.00   Power generation

KW Nuclear Components Co., Ltd.

   45.00   Manufacturing

Busan Shinho Solar Power Co., Ltd.

   25.00   Power generation

Global Trade Of Power System Co., Ltd.(16)

   29.00   Exporting products and technology of small or medium business by proxy

Expressway Solar-light Power Generation Co., Ltd.(17)

   50.00   Power generation

Amman Asia Electric Power Company(14)

   60.00   Power generation

KAPES, Inc.(14)

   51.00   R & D

Honam Wind Power Co., Ltd.

   29.00   Power generation

Korea Power Engineering Service Co., Ltd.

   29.00   Construction and service

Chun-cheon Energy Co., Ltd.

   29.90   Power generation

Yeonggwangbaeksu Wind Power Co., Ltd.(16)

   15.00   Power generation

Nghi Son 2 Power LLC

   50.00   Power generation

Kelar S.A.(14)

   65.00   Power generation

PT. Tanjung Power Indonesia

   35.00   Power generation

Incheon New Power Co., Ltd.(18)

   29.00   Power generation

Seokmun Energy Co., Ltd.

   29.00   Power generation

Daehan Wind Power PSC

   50.00   Power generation

Barakah One Company(19)

   18.00   Power generation

Nawah Energy Company(19)

   18.00   Operation of utility plant

Momentum

   33.33   International thermonuclear experimental reactor construction management

Daegu Green Power Co., Ltd.(20)

   29.00   Power generation

Yeonggwang Wind Power Co., Ltd.

   46.00   Power generation

Chester Solar IV SpA

   45.00   Power generation

Chester Solar V SpA

   45.00   Power generation

Diego de Almagro Solar SpA

   45.00   Power generation

South Jamaica Power Company Limited

   20.00   Power generation

Daesan Green Energy Co., Ltd.

   35.00   Power generation

RE Holiday Holdings LLC

   50.00   Power generation

RE Pioneer Holdings LLC

   50.00   Power generation

RE Barren Ridge 1 Holdings LLC

   50.00   Power generation

RE Astoria 2 LandCo LLC

   50.00   Power generation

RE Barren Ridge LandCo LLC

   50.00   Power generation

Laurel SpA

   45.00   Power generation

KIAMCO KOWEPO Bannerton Hold Co Pty Ltd.(16)

   12.37   Power generation

Cheong-Song Noraesan Wind Power Co., Ltd.(15)

   29.01   Power generation

 

94


Table of Contents
   Ownership
(%)
   

Principal Activities

Associates:       

Chester Solar I SpA

   45.00   Power generation

Solar Philippines Calatagan Corporation

   38.00   Power generation

Saemangeum Solar Power Co., Ltd.(21)

   81.01   Power generation

Chungsongmeon BongSan wind power Co., Ltd.(16)

   29.00   Power generation

Jaeun Resident Wind Power Plant Co., Ltd.(16)

   29.00   Power generation

DE Energia SpA

   49.00   Power generation

Dangjin Eco Power Co., Ltd.

   34.00   Power generation

Haemodum Solar Co., Ltd.

   49.00   Power generation

Yangyang Wind Power Co., Ltd.

   50.00   Power generation

Horus Solar, S.A. De C.V.(22)

   14.95   Renewable power generation

Recursos Solares PV De Mexico II, S.A. De C.V.(22)

   14.95   Renewable power generation

Sunmex Renovables, S.A. De C.V.(22)

   14.95   Renewable power generation

Stavro Holding II A.B.

   20.00   Holding company

Solaseado Solar Power Co., Ltd.

   39.00   Power generation

Yeongam Solar Power Co., Ltd.(16)

   19.00   Power generation

Samsu Wind Power Co., Ltd.(16)

   19.00   Power generation

Pulau Indah Power Plant Sdn. Bhd.

   25.00   Power generation

NH-Amundi Global Infrastructure Investment Private Investment Trust 21

   29.53   Holding company

Shin-han BNPP Private Investment Trust for East-West Sunlight Dream(14)

   90.00   Holding company

PT Barito Wahana Tenaga

   30.61   Power generation

Cheongna Energy Co., Ltd.(21)

   50.10   Generating and distributing vapor and hot/cold water

Naepo Green Energy Co., Ltd.

   29.20   Power generation

Dayone Energy Co., Ltd.(23)

   30.66   Power generation

OneEnergy Asia Limited

   40.00   Power generation

KAS Investment I LLC(15)

   29.89   Holding company

KAS Investment II LLC(15)

   29.89   Holding company

Energyco Co., Ltd.

   29.00   Power generation

CAES, LLC

   36.00   Holding company

Hapcheon Floating Photovoltaic Power Plant Inc.(16)

   49.00   Power generation

Busan Industrial Solar Power Co., Ltd.

   28.02   Power generation

Bitsolar Energy Co., Ltd.

   27.10   Power generation

Pulau Indah O&M Sdn. Bhd.(24)

   60.00   Power generation

Guadalupe Solar SpA(24)

   60.00   Power generation

Omisan Wind Power Co., Ltd.

   42.00   Power generation

Foresight Iberian Solar Group Holding, S.L.(24)

   75.00   Power generation

Yeongwol Eco Wind Co., Ltd.

   29.00   Power generation

Gurae Resident Power Co., Ltd.

   29.00   Power generation

Cheongju Eco Park Co., Ltd.

   29.00   Power generation

Enel X Midland Photovoltaic, LLC

   20.00   Power generation

Geumsungsan Wind Power Co., Ltd.

   29.00   Power generation

KEPCO KPS CARABAO Corp.(18)

   40.00   Utility plant maintenance

Prime Swedish Holding AB

   45.00   Holding company

Goheung New Energy Co., Ltd.

   46.15   Power generation

Gunsan Land Solar Co., Ltd.(24)

   75.29   Power generation

CapMan Lynx SCA, SICAR

   50.00   Holding company

 

95


Table of Contents
   Ownership
(%)
   

Principal Activities

Associates:       

International Offshore Power Transmission Holding Company Limited

   35.00   Undersea transmission network operation

Pyeongchang Wind Power Co., Ltd.(28)

   58.00   Power generation

Eumseong Eco Park Co., Ltd.

   29.00   Power generation

Changwon Nu-ri Energy Co., Ltd.(15)

   61.00   Fuel cell generation

PungBack Wind Farm Corporation(26)

   32.89   Power generation

Trumbull Asset Management, LLC(27)

   78.00   Holding company

S-Power Chile SpA

   50.00   Power generation

Seungmun Green Energy

   33.00   Power generation

Seobusambo highway photovoltaics Co., Ltd.(25)

   80.00   Power generation

Yangyang Suri Wind Power Co., Ltd.(15)

   29.00   Power generation

KEPCO for Power Company(34)

   60.00   Power generation

Taebaek Wind Power Co., Ltd.(35)

   60.00   Power generation

Jeonju Bio Green Energy Co., Ltd.(24)

   65.00   Power generation

Kumyang Eco Park Co., Ltd.

   29.00   Power generation

Jeongeup Green Power Co., Ltd.(36)

   18.71   Power generation

Hadong E-factory Co., Ltd.(15)

   30.00   Power generation

Namyangju Combined Heat and Power Co., Ltd.(37)

   55.00   Generating and distributing vapor and hot/cold water

Wadi Noor Solar Power Company SAOC

   50.00   Power generation

Fairhaven Energy Storage LLC(31)

   35.00   Power generation

 

Notes:

(1)

We are planning to sell its investments in YTN Co., Ltd. based on the resolution of the Board of Directors on November 23, 2022, but investments in YTN Co., Ltd. are not classified as assets held-for-sale as the group hasn’t started the active selling procedures as of December 31, 2023.

(2)

The effective percentage of ownership is less than 20%. However, we can exercise significant influence by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of our financial and operating policy of the board of directors.

(3)

The effective percentage of ownership is 100%. However, the Government regulates our ability to make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and our other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. We can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.

(4)

The effective percentage of ownership is less than 20%. However, we can exercise significant influence by virtue of its contractual right to appoint one out of four members of the steering committee of the entity. Moreover, we have significant financial transactions, which can affect its significant influence on the entity.

(5)

Although the nominal percentage of ownership is 2.35%, the effective percentage of ownership is 25.54%, considering redeemable convertible preferred stock as a liability component.

(6)

The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred stock into ordinary stock.

(7)

The effective percentage of ownership is more than 50% but we do not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.

(8)

The effective percentage of ownership is more than 50% but we do not hold control over the entity according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.

(9)

The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because we exercise significant influence over the decisions related to finance and operation.

 

96


Table of Contents
(10)

The effective percentage of ownership is 14.29% due to the acquisition of treasury stocks. The effective percentage of ownership is less than 20%. However, we exercise significant influence over the decisions related to finance and operation by virtue of right to nominate directors to the board of directors of the entity.

(11)

The effective percentage of ownership decreased due to the disproportionate paid-in capital increase.

(12)

The effective percentage of ownership decreased due to the disproportionate paid-in capital increase during the year ended December 31, 2023. The effective percentage of ownership is more than 50% but we do not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.

(13)

The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because we exercise significant influence over the entity.

(14)

The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement, all critical financial and operating decisions must be agreed to by all ownership parties and we can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.

(15)

The effective percentage of ownership is less than 50%. However, the entity is classified as a joint venture, because all consent was required to make decisions on related activities.

(16)

According to the shareholders’ agreement, the parties have joint control over all decisions related to finance and operation. Accordingly, the entity is classified as joint ventures.

(17)

The effective percentage of ownership increased due to the disproportionate capital reduction of financial investors during the year ended December 31, 2023.

(18)

The joint arrangement which we have joint control is structured through a separate company. The parties have joint control over the joint arrangement are classified as joint ventures, judging that they have rights to the net assets of the arrangement.

(19)

The effective percentage of ownership is less than 20%. However, decisions in relevant activities must be agreed by ownership parties. Accordingly, the entity is classified as joint ventures.

(20)

Although the nominal percentage of ownership is 29%, the effective percentage of ownership is 54.24%, considering the interest of financial investors as a liability component.

(21)

The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.

(22)

The effective percentage of ownership is more than 20%. However, according to the shareholders’ agreement, decisions related principal operation must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.

(23)

According to the REC’s Innovation Co., Ltd. (formerly known as Wang San Engineering. Co,. Ltd.). Investment Agreement signed in March 2011, we have a commitment to guarantee principal and certain returns on shares of REC’s Innovation Co., Ltd. (formerly known as Wang San Engineering. Co,. Ltd.). held by NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation. Since NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation have put option regarding their share of the entity, we were deemed to have acquired an additional 15.64% stake. As a result, the effective percentage of ownership is 46.3% in the current and prior period. In accordance with shareholders’ agreement signed during the current period, we have joint control with other investors in making important financial and operation decisions, so it has been reclassified from an associate to a joint venture.

(24)

The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.

(25)

Due to the changes in the agreement, we lost its control over the entity. Accordingly, the entity is reclassified to a joint venture from a subsidiary. Although the effective percentage of ownership is more than 50%, decisions in relevant activities must be agreed by all members of the board of directors.

(26)

The effective percentage of ownership is 37%, considering potential common stock.

(27)

The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all members of the board of directors. Accordingly, the entity is classified as a joint venture.

 

97


Table of Contents
(28)

After additional acquisition of the shares, the effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all members of the board of directors. Accordingly, the entity is classified as a joint venture.

(29)

We are planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation, and KV Holdings, Inc. and the timing of and proceeds from such sales transaction is not specified as of December 31, 2023.

(30)

The nominal percentage of ownership is 75.29% and the effective percentage of ownership is 56.91%, as we have an obligation to provide excessive dividend income to Gunsan City when a certain rate of return defined in the shareholders’ agreement is met.

(31)

Although the investment has not yet been paid, commitment to pay 35% of investment in the future has been made.

Item 4.D. Property, Plant and Equipment

Our property consists mainly of power generation, transmission and distribution equipment and facilities in Korea. See Item 4.B. “Business Overview—Power Generation,” “—Transmission and Distribution” and “—Capital Investment Program.” In addition, we own our corporate headquarters building complex at 55 Jeollyeok-ro, Naju-si, Jeollanam-do, 58322, Korea. As of December 31, 2023, the net book value of our property, plant and equipment was Won 179,876 billion. As of December 31, 2023, investment property, which is accounted for separately from our property, plant and equipment, amounted to Won 186 billion. No significant amount of our properties is leased. There are no material encumbrances on our properties, including power generation, transmission and distribution equipment and facilities.

Pursuant to a Government plan announced in 2005, which mandated relocation of the headquarters of select government-invested enterprises from the Seoul metropolitan area to other provinces in Korea as part of an initiative to foster balanced economic growth in the provinces, we, our generation subsidiaries and our certain subsidiaries relocated our respective headquarters to the designated locations during 2014 and 2015. Our headquarters are currently located in Naju in Jeollanam-do, while the headquarters of our six generation subsidiaries and other subsidiaries are various cities outside of Seoul across Korea.

In connection with the relocation of our headquarters, in September 2014 we entered into an agreement to sell the property housing our prior headquarters to a consortium consisting of members of the Hyundai Motor group for Won 10,550 billion through an open bidding. The sale was completed in September 2015.

During 2023, we completed the disposal of 174 properties on a separate basis (including residential properties, storage spaces, and substation lots that are located in Korea) which are not directly related to our operations for an aggregate sale price of approximately Won 31 billion. The book value of such properties amounted to Won 14 billion, representing 0.1% of our total real properties as of December 31, 2023. The foregoing sales reflect our ongoing efforts to improve our financial soundness through related financial stabilization plan and enhance our management efficiency, selling noncore properties that have no direct relations to electricity facilities.

 

ITEM 4A.

UNRESOLVED STAFF COMMENTS

We do not have any unresolved comments from the SEC staff regarding our periodic reports under the Securities Exchange Act of 1934, as amended (the “Exchange Act”).

 

ITEM 5.

OPERATING AND FINANCIAL REVIEW AND PROSPECTS

You should read the following discussion on our operating and financial review and prospects together with our consolidated financial statements and the related notes which appear elsewhere in this annual report. Our results of operations, financial condition and cash flows may materially change from time to time, for reasons including various policy initiatives (including changes to the Restructuring Plan) by the Government in relation to the Korean electric power industry, and accordingly our historical performance may not be indicative of our

 

98


Table of Contents

future performance. See Item 4.B. “Business Overview—Restructuring of the Electric Power Industry in Korea” and Item 3.D. “Risk Factors—Risks Relating to KEPCO—The Government may adopt policy measures to substantially restructure the Korean electric power industry or our operational structure, which may have a material adverse effect on our business, operations and profitability.”

Item 5.A. Operating Results

Overview

We are a predominant market participant in the Korean electric power industry, and our business is heavily regulated by the Government, including with respect to the tariffs we charge to customers for the electricity we sell. In addition, our business requires a high level of capital expenditures for the construction of electricity generation, transmission and distribution facilities and is subject to a number of variable factors, including demand for electricity in Korea and fluctuations in fuel costs, which are in turn impacted by the movements in the exchange rates between the Won and other currencies.

If fuel prices rise substantially and rapidly in the future, such rise may have a material adverse effect on our results of operations and profitability. For example, our net losses in 2021 and 2022 were largely due to sustained rise in fuel costs that were neither timely nor sufficiently offset by a corresponding rise in electricity tariffs that we charge to our customers. Even though the Government from time to time increases the electricity tariff rates, such increase may be insufficient to fully offset the adverse impact from the rises in fuel costs, and since tariff increase typically require lengthy public deliberations in order to be implemented, they often occur with a significant time lag and, as a result, our results of operations and cash flows may suffer. To reinforce the correlation between the costs we incur and the tariff we charge to our customers, we have implemented a new cost pass-through tariff system since January 1, 2021. However, such system also has built-in limits and subject to the Government’s discretion. For more information, please see Item 4.B. “Business Overview—Sales and Customers—Electricity Rates.”

In addition, we expect complying with the Government’s environment-related initiatives and regulations may continue to impose significant costs and resources on us, which may adversely affect our results of operation, financial condition and cash flows. For example, we have recognized Won 548 billion in 2021, Won 387 billion in 2022 and Won 77 billion in 2023 as costs to purchase greenhouse gas emission allowances. Although the costs to purchase greenhouse gas emission allowances have decreased over the past three years, they are largely attributable to the decrease in the market price of the Korean Allowance Units (KAU), which is one of the main greenhouse gas allowances in Korea. As the price of KAUs is determined by the market, there is no guarantee that such price will decrease in the future. Furthermore, as we are required to supply increasing amount of renewable energy, we expect the associated cost will continue to rise.

The results of our operations are largely affected by the following factors:

 

  

demand for electricity;

 

  

electricity rates we charge to our customers;

 

  

fuel costs; and

 

  

the exchange rates of Won against other foreign currencies, in particular the U.S. dollar.

Demand for Electricity

Our sales are largely dependent on the level of demand for electricity in Korea and the rates we charge for the electricity we sell.

Demand for electricity in Korea grew at a compounded average rate of 1.2% per annum for the five years ending on December 31, 2023. According to the Bank of Korea, the compounded growth rate for GDP was approximately 1.8% for the same period. The GDP growth rate was approximately 4.0%, 2.6% and 1.4% during 2021, 2022 and 2023, respectively.

 

99


Table of Contents

The table below sets forth, for the periods indicated, the annual rate of growth in Korea’s GDP and the annual rate of growth in electricity demand (measured by total annual electricity consumption) on a year-on-year basis.

 

   2019  2020  2021  2022  2023 

Growth in GDP

   2.0  (1.0%)   4.0  2.6  1.4

Growth in electricity consumption

   (1.1%)   (2.2%)   4.7  2.7  (0.4)% 

Demand for electricity may be categorized either by the type of its usage or by the type of customers. The following describes the demand for electricity by the type of its usage, namely, industrial, commercial and residential:

 

  

The industrial sector represents the largest segment of electricity consumption in Korea. Demand for electricity from the industrial sector was 290,555 gigawatt hours in 2023, representing a 1.9% decrease from 2022, largely due to decreases in exports and industrial demand.

 

  

Demand for electricity from the commercial sector depends largely on the level and scope of commercial activities in Korea. Demand for electricity from the commercial sector increased to 130,844 gigawatt hours in 2023, representing a 2.9% increase from 2022, largely due to an increase in levels of private consumption, particularly in the hotel and restaurant industries as COVID-19 preventive measures have been lifted.

 

  

Demand for electricity from the residential sector is largely dependent on population growth and use of heaters, air conditioners and other electronic appliances. Demand for electricity from the residential sector increased to 82,348 gigawatt hours in 2023, representing a 1.7% increase compared to 2022, largely due to increase in number of customers and increased use of air conditioners and other electronic appliances resulting from higher than usual temperatures during the summer months. For a discussion on demand by the type of customers, see Item 4.B. “Business Overview—Sales and Customers—Demand by the Type of Usage.”

Since our inception, we have had the predominant market share in terms of electricity generated in Korea. As for electricity we purchase from the market for transmission and distribution to our end-users, our generation subsidiaries accounted for 70.8%, 70.4% and 68.3% in 2021, 2022 and 2023, respectively, while the remainder was accounted for by independent power producers. As for transmission and distribution of electricity, we have historically handled and, expect to continue to handle, substantially all of such activities in Korea.

We expect that we will continue to have a dominant market share in the generation, transmission and distribution of electricity in Korea for the foreseeable future, absent any substantial changes to the Restructuring Plan or other policy initiatives by the Government in relation to the Korean electric power industry, or an unexpected level of market penetration by independent power producers, localized electricity suppliers under the Community Energy System or increases in direct PPA. However, our market dominance in the electricity distribution in Korea may face potential erosion in light of the recent Proposal for Adjustment of Functions of Public Institutions (Energy Sector) announced by the Government in June 2016. This proposal contemplates a gradual opening of the electricity trading market to the private sector although no detailed roadmap has been provided for such opening. It is currently premature to predict to what extent, or in what direction, the liberalization of the electricity trading market will happen. Nonetheless, any significant liberalization of the electricity trading market may result in substantial reduction of our market share in electricity distribution in Korea, which would have a material adverse effect on our business, results of operation and cash flows. See Item 4.B. “Business Overview—Competition.”

Electricity Rates

Under the Electric Utility Act and the Price Stabilization Act, electricity rates are established at the level that would enable us to recover our fair operating costs as well as receive a fair investment return on capital used

 

100


Table of Contents

in our operations. From time to time, our actual rate of return on invested capital may differ significantly from the fair investment return that was assumed for the purposes of electricity tariff approvals, for reasons, among others, related to movements in fuel prices, exchange rates and demand for electricity that differs from what is assumed for determining our fair investment return. As of January 1, 2021, we implemented a new tariff system to reinforce the correlation between the costs we incur and the tariff we charge to our customers, among other changes. However, even under the new system, our ability to pass on fuel and other cost increases to our customers may be limited due to the regulation of the Government on the electricity rates. For further discussion of the fair operating costs, the fair investment return and the new tariff system, see Item 4.B. “Business Overview—Sales and Customers—Electricity Rates.”

Fuel Costs

Our results of operations are also significantly affected by the cost of producing electricity, which is subject to a variety of factors, including, in particular, the cost of fuel.

Cost of fuel in any given year is a function of the volume of fuels consumed and the unit fuel cost for the various types of fuel used for generation of electricity which affects the cost structure for both our generation subsidiaries and independent power producers from whom we purchase electric power. A significant change in the unit fuel costs materially impacts the costs of electricity generated by our generation subsidiaries, which mainly comprise our fuel costs under the cost of sales, as well as, to our knowledge, the costs of electricity generated by the independent power producers that sell their electricity to us (see Item 4.B. “Business Overview—Purchase of Electricity—Cost-based Pool System”), which mainly comprise our purchased power costs under the cost of sales. We are however unable to provide a comparative analysis since the unit fuel cost information for independent power producers and their cost structures are proprietary information.

Fuel costs constituted 30.6%, 34.4% and 30.1% of our cost of sales, and the ratio of fuel costs to our sales was 32.5%, 49.1% and 30.8% in 2021, 2022 and 2023, respectively. Substantially all of the fuel (except for anthracite coal) used by our generation subsidiaries is imported from outside of Korea at prices determined in part by prevailing market prices in currencies other than Won. In addition, our generation subsidiaries purchase a significant portion of their fuel requirements under contracts with limited quantity and duration. Pursuant to the terms of our long-term supply contracts, prices are adjusted from time to time subject to prevailing market conditions. See Item 4.B. “Business Overview—Fuel Sources and Requirements.”

Coal accounted for 43.1%, 40.2% and 38.5% of our fuel requirements in 2021, 2022 and 2023, respectively. Nuclear generation accounted for 39.5%, 43.1% and 46.1% of our fuel requirements in 2021, 2022 and 2023, respectively. LNG accounted for 13.7%, 13.1% and 12.0% of our fuel requirements in 2021, 2022 and 2023, respectively. Oil accounted for 0.4%, 0.1% and 0.02% of our fuel requirements in 2021, 2022 and 2023, respectively. In each case, the fuel requirements are measured by the amount of electricity generated by us and our generation subsidiaries and do not include electricity purchased from independent power producers. In order to ensure stable supplies of fuel materials, our generation subsidiaries enter into medium and long-term contracts with various suppliers and supplement such supplies with fuel materials purchased on spot markets.

The price of bituminous coal, which represents our largest fuel requirement, fluctuates significantly from time to time. In 2023, approximately 93.9% of the bituminous coal requirements of our generation subsidiaries were purchased under long-term contracts and the remaining 6.1% purchased on the spot market. The average weekly spot price of “free on board” Newcastle coal 5500 NAR (Net As Received) published through Korea Mineral Resource Information Service by Korea Mine Rehabilitation and Mineral Resources Corporation decreased from US$179.13 per ton in 2022 to US$106.38 per ton in 2023 and decreased to US$89.36 per ton as of April 5, 2024. If the price of bituminous coal were to sharply rise, our generation subsidiaries may not be able to secure their respective bituminous coal supplies at prices commercially acceptable to them. In addition, any significant interruption or delay in the supply of fuel, bituminous coal in particular, from any of their suppliers could cause our generation subsidiaries to purchase fuel on the spot market at prices higher than contracted, resulting in an increase in fuel cost.

 

101


Table of Contents

From 2021 to 2023, the prices of oil and LNG fluctuated significantly. The prices of oil and LNG are substantially dependent on the price of crude oil, and according to Bloomberg (Bloomberg Ticker: PGCRDUBA), the average daily spot price of Dubai crude oil increased from US$69.01 per barrel in 2021 to US$97.03 per barrel in 2022 and decreased to US$81.93 per barrel in 2023 and increased to US$91.71 per barrel as of April 5, 2024. While there was a significant increase in the price of crude oil recently, there is no guarantee that this trend will continue.

Nuclear power has a stable and relatively low-cost structure and forms a significant portion of electricity supplied in Korea. Due to significantly lower unit fuel costs compared to those for thermal power plants, our nuclear power plants are generally operated at full capacity with only routine shutdowns for fuel replacement and maintenance, with limited exceptions. In case of shortage in electricity generation resulting from stoppages of the nuclear power plants, we seek to make up for such shortage with power generated by our thermal power plants.

Because the Government heavily regulates the rates we charge for the electricity we sell (see Item 4.B. “Business Overview—Sales and Customers—Electricity Rates”), our ability to pass on such cost increases to our customers is limited.

Movements of the Won against the U.S. Dollar and Other Foreign Currencies

Korean Won has fluctuated significantly against major currencies from time to time. For fluctuations in exchange rates, see pages 1-2 of this annual report. In particular, Korean Won underwent substantial fluctuations during the recent global financial crisis, and remains subject to significant volatility. The Noon Buying Rate per one U.S. dollar increased from Won 1,188.6 on December 31, 2021, to Won 1,260.2 on December 31, 2022, to Won 1,291.0 on December 31, 2023, and to Won 1,376.7 as of April 19, 2024. In 2022 and 2023, the Won generally depreciated against the U.S. dollar and other foreign currencies, and such depreciation has resulted in a significant increase in the cost of fuel materials and equipment purchased from overseas as well as the cost of servicing our foreign currency debt. As of December 31, 2023, 14.8% of our long-term debt (including the current portion but excluding original issue discounts and premium) without taking into consideration of swap transactions was denominated in foreign currencies, principally U.S. dollars. The prices for substantially all of the fuel materials and a significant portion of the equipment we purchase are stated in currencies other than Won, generally in U.S. dollars. Since a substantial portion of our revenues is denominated in Won, we must generally obtain foreign currencies through foreign currency-denominated financings or from foreign currency exchange markets to make such purchases or service such debt, fulfill our obligations under existing overseas investments and make new overseas investments. As a result, any significant depreciation of Won against U.S. dollar or other foreign currencies will have a material adverse effect on our profitability and results of operations. See Item 3.D. “Risk Factors—Risks Relating to KEPCO—The movement of Won against the U.S. dollar and other currencies may have a material adverse effect on us.”

Recent Accounting Changes

See Note 2.(5) to our consolidated financial statements included in this annual report for changes in accounting standards. We believe that these new and revised standards have no material impact on our consolidated financial statements.

Material Accounting Policies

See Note 3 to our consolidated financial statements included in this annual report for material accounting policies.

Consolidated Results of Operations

The selected consolidated financial data set forth below as of and for the years ended December 31, 2021, 2022 and 2023 have been derived from our audited consolidated financial statements which have been prepared in accordance with IFRS.

 

102


Table of Contents

You should read the following data with the more detailed information contained in Item 18. “Financial Statements.” Historical results do not necessarily predict future results.

 

   2021  2022  2023  2023 
   (rounded to billions of Won and millions of US$)(1) 

Sales

  W60,012  W 70,546  W87,476  $67,759 

Cost of sales

   63,644   100,904   89,700   69,481 

Gross profit (loss)

   (3,632  (30,358  (2,223  (1,722

Selling and administrative expenses

   2,876   3,009   3,062   2,371 

Other income (expenses), net

   776   883   1,017   788 

Other gains (losses), net

   9   243   23   18 

Operating profit (loss)

   (5,723  (32,241  (4,245  (3,288

Finance income (expenses), net

   (1,843  (2,913  (3,922  (3,038

Profit (loss) related to associates, joint ventures and subsidiaries

   495   1,310   613   475 

Profit (loss) before income tax

   (7,072  (33,844  (7,554  (5,851

Income tax benefit (expense)

   1,856   9,415   2,838   2,198 

Profit (loss) for the period

   (5,216  (24,429  (4,716  (3,653

Other comprehensive income (loss)

   600   1,247   (229  (177

Total comprehensive income (loss)

   (4,616  (23,182  (4,945  (3,830

 

Note:

(1)

The financial information denominated in Won as of and for the year ended December 31, 2023 has been translated into U.S. dollars at the exchange rate of Won 1,291.0 to US$1.00, which was the Noon Buying Rate as of December 31, 2023.

2023 Compared to 2022

In 2023, our consolidated sales, which is principally derived from the sale of electric power, increased by 24.0% to Won 87,476 billion in 2023 from Won 70,546 billion in 2022, primarily due to an increase in the sales of electric power. Our sales of electric power increased by 24.2% to Won 85,940 billion in 2023 from Won 69,184 billion in 2022, primarily due to an increase in the average unit sales price that underlies the tariff charged to our customers. The average unit sales price increased by 26.8% to Won 152.80 per kilowatt-hour in 2023 from Won 120.51 per kilowatt-hour in 2022 as we increased our tariff in coordination with the Government. The volume of electricity sold decreased by 0.4% to 545,966 gigawatt hours in 2023 from 547,933 gigawatt hours in 2022, primarily due to 1.9% decrease in the volume sold to the industrial sector, which represents the largest segment of electricity consumption in Korea. However, such decrease was partially offset by 2.9% increase to 130,844 gigawatt hours in 2023 from 127,193 gigawatt hours in 2022 in the volume sold to the commercial sector and 1.7% increase to 82,348 gigawatt hours in 2023 from 80,996 gigawatt hours in 2022 in the volume sold to the residential sector. The decrease in the volume sold to the industrial sector was primarily due to a decrease in industrial activities such as a decrease in information technology sector exports from Korea. The increase in the volume sold to the commercial sector was primarily due to heightened levels of consumption following the end of the COVID-19 pandemic, which led to an increase in sales volume across major service industries. The increase in the volume sold to the residential sector was primarily due to increased use of air conditioners and other electronic appliances resulting from higher than usual temperatures during the summer months. Also, our sale of construction services increased by 21.3% to Won 785 billion in 2023 from Won 647 billion in 2022 primarily due to an increase in amounts recorded from ongoing construction of our nuclear complex construction projects in the United Arab Emirates.

Our consolidated cost of sales, which is principally derived from the purchase of power from independent power producers, raw materials used and depreciation, decreased by 11.1% to Won 89,700 billion in 2023 from Won 100,904 billion in 2022, primarily due to 8.8% decrease in power purchase and 22.1% decrease in raw material used, which was partially offset by 4.7% increase in depreciation.

 

103


Table of Contents

Power purchase, which accounted for 42.7% and 41.6% of our cost of sales in 2023 and 2022, respectively, decreased by 8.8% to Won 38,304 billion in 2023 from Won 41,985 billion in 2022, primarily due to decreases in the unit price of power purchase. The decreased unit price of power purchase was mainly due to decreased fuel costs.

Raw materials used, which accounted for 30.3% and 34.5% of our cost of sales in 2023 and 2022, respectively, decrease by 22.1% to Won 27,136 billion in 2023 from Won 34,833 billion in 2022, primarily due to decreased fuel costs.

Depreciation expense (which excludes amortization of nuclear fuel charged to fuel costs in the amounts of Won 1,329 billion and Won 1,289 billion in 2023 and 2022, respectively) increased by 4.9% to Won 11,294 billion in 2023 from Won 10,767 billion in 2022, primarily due to additional property, plant and equipment we acquired from the construction of new generation facilities pursuant to our capital investment program.

Other cost of sales decreased by 17.6% to Won 1,568 billion in 2023 from Won 1,903 billion in 2022, primarily due to a decrease in our greenhouse gas emission and related costs. We spent approximately Won 77 billion for greenhouse gas emission allowances in 2023 compared to Won 387 billion in 2022. The decrease in such spending was largely attributable to the decrease in the market price of the Korean Allowance Units (KAU), which is one of the main greenhouse gas allowances in Korea. As the price of KAUs is determined by the market, there is no guarantee that such price will decrease in the future. For further information, please see Item 4.B. “Business Overview—Environmental, Social and Governance Programs.”

As a cumulative result of the foregoing factors, our consolidated gross loss decreased to Won 2,223 billion in 2023 from Won 30,358 billion in 2022, and our consolidated gross margin improved to a loss of 2.5% in 2023 from a loss of 43.0% in 2022. The decrease in our consolidated gross loss and the improvement in consolidated gross margin were largely attributable to 24.0% increase in our consolidated sales, which was primarily due to 26.8% increase in the average unit sales price, as well as a 11.1% decrease in our consolidated cost of sales.

Our consolidated selling and administrative expenses slightly increased by 1.8% to Won 3,062 billion in 2023 from Won 3,009 billion in 2022, primarily due to an increase in commission and bad debt expense.

Our consolidated other income, net of expenses, increased by 15.2% to Won 1,017 billion in 2023 from Won 883 billion in 2022, primarily as a result of an increase in customer-paid facilities for electricity use.

Our consolidated net other gains decreased to Won 23 billion in 2023 from Won 243 billion in 2022, primarily as a result of decrease in gains on disposal of property, plant and equipment, and reversal of impairment losses on property, plant and equipment.

As a cumulative effect of the foregoing factors, our consolidated operating loss decreased to Won 4,245 billion in 2023 from Won 32,241 billion in 2022, and our consolidated operating margin improved to a loss of 4.9% in 2023 from a loss of 45.7% in 2022. This was primarily due to decreased fuel costs as a result of a lower price of LNG and other raw materials and decreased power purchase expenses as a result of a decrease in the unit price of power purchase, which decreased as a result of lower fuel costs.

Our consolidated finance expenses, net, increased by 34.6% to Won 3,922 billion in 2023 from Won 2,913 billion in 2022, primarily as a result of increased interest expenses and losses on the valuation of derivatives.

Our consolidated profit related to associates, joint ventures and subsidiaries decreased by 53.2% to Won 613 billion in 2023 from Won 1,310 billion in 2022, primarily due to our decreased share in profit from Korea Gas Corporation caused by a decrease in LNG price.

As a cumulative effect of the foregoing factors, our consolidated loss before income taxes decreased by 77.7% to Won 7,554 billion in 2023 from Won 33,844 billion in 2022.

 

104


Table of Contents

Our income tax benefit decreased to Won 2,838 billion in 2023 from Won 9,415 billion in 2022, largely as a result of the decrease in deferred tax on tax losses carry-forwards. Our effective tax rate, which represents tax expense as a percentage of profit before income taxes, was not calculated because income tax benefit was recognized in 2023. See Note 41 to our consolidated financial statements included in this annual report.

As a cumulative result of the foregoing factors, our consolidated loss decreased to Won 4,716 billion in 2023 from Won 24,429 billion in 2022. Our consolidated net profit margin also improved from a loss of 5.4% in 2023 from a loss of 34.6% in 2022. Our loss attributable to the owners of the company decreased to Won 4,823 billion in 2023 from Won 24,467 billion in 2022.

We reported consolidated other comprehensive loss of Won 229 billion in 2023 compared to consolidated other comprehensive income of Won 1,247 billion in 2022, largely due to a decrease in the remeasurement of defined benefit liability and share of other comprehensive income of associates and joint ventures, net of tax.

As a cumulative result of the above factors, our consolidated total comprehensive loss decreased to Won 4,945 billion in 2023 from Won 23,182 billion in 2022.

2022 Compared to 2021

In 2022, our consolidated sales, which is principally derived from the sales of electric power, increased by 17.6% to Won 70,546 billion in 2022 from Won 60,012 billion in 2021, primarily reflecting an increase in sales of electric power. Our sales of electric power increased by 17.7% to Won 69,184 billion in 2022 from Won 58,801 billion in 2021, primarily due to increases in both the volume of electricity sold and the average unit sales price. The volume of electricity sold increased by 2.7% to 547,933 gigawatt hours in 2022 from 533,431 gigawatt hours in 2021, primarily due to a 1.6% increase in the volume of electricity sold to the industrial sector which represents the largest segment of electricity consumption in Korea to 296,036 gigawatt hours in 2022 from 291,333 gigawatt hours in 2021, and 6.4% increase in the volume of electricity sold to the commercial sector which represents the second largest segment of electricity consumption in Korea to 127,193 gigawatt hours in 2022 from 119,550 gigawatt hours in 2021, coupled with 1.4% increase in the volume of electricity sold to the residential sector to 80,996 gigawatt hours in 2022 from 79,915 gigawatt hours in 2021. The increase in the volume of electricity sold to the industrial sector was primarily due to an increase of industrial activities such as an increase in annual exports. The increase in the volume of electricity sold to the commercial sector was primarily due to the expansion of consumer expenditure, including on accommodation and restaurant businesses, following the easing of COVID-19 quarantine measures. The volume of electricity sold to the residential sector was increased only slightly because of the base effect of a significant increase in sales during the COVID-19 period. Average unit sales price increased by 11.5% to Won 120.51 per kilowatt-hour in 2022 from Won 108.11 per kilowatt-hour in 2021, primarily due to an increase in each unit sales prices in the commercial and industrial sector. Our sales of construction services decreased by 14.3% to Won 647 billion in 2022 from Won 755 billion in 2021 primarily due to a decrease in sales amount recorded from the ongoing construction of our nuclear complex construction projects in the United Arab Emirates as the construction projects progress over time.

Our consolidated cost of sales, which is principally derived from the purchase of power from independent power producers, raw materials used and depreciation, increased by 58.5% to Won 100,904 billion in 2022 from Won 63,644 billion in 2021, primarily due to 94.2% increase in power purchase, 86.7% increase in raw material used and 4.4% increase in depreciation.

Power purchase, which accounted for 41.6% and 34.0% of our cost of sales in 2022 and 2021, respectively, increased by 94.2% to Won 41,985 billion in 2022 from Won 21,619 billion in 2021, primarily due to increases in both quantity and the unit price of power purchase. The increased unit price of power purchase was mainly due to increased fuel costs.

 

105


Table of Contents

Raw materials used, which accounted for 34.5% and 29.3% of our cost of sales in 2022 and 2021, respectively, increased by 86.7% to Won 34,833 billion in 2022 from Won 18,660 billion in 2021, primarily due to increases in both fuel prices and the volume of electricity generated in response to an increase in power demand.

Depreciation expense (excluding amortization of nuclear fuel charged to fuel costs in the amounts of Won 1,289 billion and Won 1,134 billion in 2022 and 2021, respectively) increased by 3.3% to Won 10,767 billion in 2022 from Won 10,418 billion in 2021, primarily due to an additional property, plant and equipment acquired in relation to the construction of new generation facilities pursuant to our capital investment program.

Other cost of sales decreased by 5.9% to Won 1,903 billion in 2022 from Won 2,023 billion in 2021, primarily due to a decrease in our greenhouse gas emission and related costs. We have spent approximately Won 387 billion for the greenhouse gas emission allowances in 2022 compared to Won 548 billion in 2021. For further information, please see Item 4.B. “Business Overview—Environmental, Social and Governance Programs.”

As a cumulative result of the foregoing factors, our consolidated gross loss increased to Won 30,358 billion in 2022 from Won 3,632 billion in 2021, and our consolidated gross margin deteriorated to a loss of 43.0% in 2022 from a loss of 6.1% in 2021. The increase in our consolidated gross loss and deterioration in consolidated gross margin were largely attributable to 58.5% increase in our consolidated cost of sales (which was mainly due to 94.2% increase in the power purchase costs, 86.7% increase in raw materials used, and 4.4% increase in depreciation expense) which substantially outpaced 17.6% increase in our consolidated sales, which was primarily due to 2.7% increase in the volume of electricity sold and 11.5% increase in the average unit sales price.

Our consolidated selling and administrative expenses slightly increased by 4.6% to Won 3,009 billion in 2022 from Won 2,876 billion in 2021, largely due to an increase in taxes and dues and repairs and maintenance expense.

Our consolidated other income, net of expenses, increased by 13.8% to Won 883 billion in 2022 from Won 776 billion in 2021, mainly as a result of an increase in customer-paid facilities for electricity use.

Our consolidated net other gains increased to Won 243 billion in 2022 from Won 9 billion in 2021, mainly as a result of increase in gains on disposal of property, plant and equipment and gains on foreign currency transactions.

As a cumulative effect of the foregoing factors, our consolidated operating loss increased to Won 32,241 billion in 2022 from Won 5,723 billion in 2021, and our consolidated operating margin deteriorated to a loss of 45.7% in 2022 from a loss of 9.5% in 2021. This was mainly due to increased fuel costs as a result of a higher price of LNG and other raw materials and increased power purchase expenses as a result of increases in power demand and the unit price of power purchase caused by an increase in the system marginal price of electricity, which increased significantly as a result of higher fuel costs.

Our consolidated finance expenses, net, increased by 58.1% to Won 2,913 billion in 2022 from Won 1,843 billion in 2021 primarily as a result of increased interest expense and losses on valuation of derivatives.

Our consolidated profit related to associates, joint ventures and subsidiaries increased by 164.6% to Won 1,310 billion in 2022 from Won 495 billion in 2021, primarily due to an increased share in profit of Korea Gas Corporation led by increased LNG price.

As a cumulative effect of the foregoing factors, we recognized consolidated loss before income taxes of Won 33,844 billion in 2022 compared to consolidated loss before income taxes of Won 7,072 billion in 2021.

 

106


Table of Contents

Our income tax benefit increased to Won 9,415 billion in 2022 from Won 1,856 billion in 2021, largely as a result of the increase in our loss before income taxes. Our effective tax rate, which represents tax expense as a percentage of profit before income taxes, was not calculated because income tax benefit was recognized in 2022. See Note 41 to our consolidated financial statements included in this annual report.

As a cumulative result of the foregoing factors, our consolidated loss increased to Won 24,429 billion in 2022 from Won 5,216 billion in 2021. Our consolidated net profit margin also deteriorated to a loss of 34.6% in 2022 from a loss of 8.7% in 2021. Our loss attributable to the owners of the company increased to Won 24,467 billion in 2022 from Won 5,305 billion in 2021.

Other comprehensive income increased to Won 1,247 billion in 2022 from Won 600 billion in 2021, largely due to an increase in the remeasurement of defined benefit liability and share of other comprehensive income of associates and joint ventures, net of tax.

As a cumulative result of the above factors, our consolidated total comprehensive loss increased to Won 23,182 billion in 2022 from Won 4,616 billion in 2021.

Segment Results

We operate in the following business segments: transmission and distribution, nuclear power generation and thermal power generation and others. The transmission and distribution segment, which is operated by us, the parent company, consists of operations related to the transmission, distribution and sale to end-users of electricity purchased from our generation subsidiaries, as well as from independent power producers. The power generation segment, which is operated by our one nuclear generation subsidiary and five non-nuclear generation subsidiaries, consists of operations related to the generation of electricity sold to the parent company through the Korea Power Exchange. The transmission and distribution segment and the power generation segment together represent our electricity business. The remainder of our operation consists primarily of operations related to the plant maintenance and engineering service and others including mainly overseas businesses. In 2021, 2022 and 2023, the unaffiliated revenues of the power generation segment (representing the six generation subsidiaries) and all our other revenues in the aggregate amounted to only 4.3%, 5.9% and 4.6% of our consolidated revenues, respectively, and the results of operations for our business segments substantially mirror our consolidated results of operations. For further information, see Note 4 of the notes to our consolidated financial statements included in this annual report.

Other

Our operations are materially affected by the policies of or factors relating to the Government. See Item 4.B. “Business Overview—Regulation.”

 

Item 5.B.

Liquidity and Capital Resources

We expect that our capital requirements, capital resources and liquidity position may change in the course of implementing the Restructuring Plan. See Item 4.B. “—Business Overview—Restructuring of the Electric Power Industry in Korea” and Item 3.D. “Risk Factors—Risks Relating to KEPCO—The Government may adopt policy measures to substantially restructure the Korean electric power industry or our operational structure, which may have a material adverse effect on our business, operations and profitability.”

Capital Requirements

We anticipate that the following represent the major sources of our capital requirements in the short-term to intermediate future:

 

  

capital expenditures pursuant to our capital investment program;

 

  

working capital requirements, the largest component of which is fuel purchases;

 

107


Table of Contents
  

payment of principal and interest on our existing debt; and

 

  

overseas investments.

In addition, if there were to occur unanticipated material changes to the Restructuring Plan, the Basic Plan or other major policy initiatives of the Government relating to the electric power industry, or natural disasters, such developments may require a significant amount of additional capital requirements.

Capital Expenditures

We anticipate that capital expenditures will be the most significant use of our funds for the next several years. Our capital expenditures relate primarily to the construction of new generation units, maintenance of existing generation units and expansion of our transmission and distribution systems. Our capital expenditures generally follow budgets established under the Basic Plan, which contains projections relating to the supply and demand of electricity of Korea based on which we plan the construction of additional generation units and transmission systems.

Our total capital expenditures for the construction of generation, transmission and distribution facilities were Won 13,964 billion, Won 13,886 billion and Won 15,518 billion in 2021, 2022 and 2023, respectively, and under our current budgets, are estimated to be approximately Won 18,257 billion, Won 19,881 billion and Won 19,484 billion in 2024, 2025 and 2026, respectively. We plan to finance our capital expenditures primarily through construction grants, issuance of securities in the capital markets and borrowings from financial institutions.

In January 2016, the Ministry of Trade, Industry and Energy announced an initiative to promote the new energy industry by creating the New Energy Industry Fund, which is made up of funds sponsored by Government-affiliated energy companies. We contributed Won 500 billion to the funds in 2016. The purpose of these funds is to invest in substantially all frontiers of the new energy industry, including renewable energy, energy storage systems, electric vehicles, small-sized self-sustaining electricity generation grids known as “micro-grids”, among others, as well as invest in start-up companies, ventures, small to medium-sized enterprise and project businesses that engage in these businesses but have not previously attracted sufficient capital from the private sector.

Furthermore, as part of the Comprehensive Measures against Particulate Matter and the Eighth, Ninth and Tenth Basic Plan, announced by the Government in September 2017, December 2017, December 2020 and January 2023 respectively, the Government set forth the following policy directions relating to coal-fired generation units: (i) 28 decrepit coal-fired generation units shall convert to LNG fuel use by 2036, (ii) in principle, construction of new coal-fired generation units shall not be planned, (iii) coal-fired generation units that are 30 years or older shall temporarily cease operations from December to February of each year from 2020, which has also been done from March to June in 2018 and 2019, (iv) coal-fired generation units shall be put through comprehensive functional and environmental upgrades and (v) coal-fired generation units shall be subject to emission standards that came into effect in January 2019 that are twice as more rigorous than the previous standards. Compliance with such measures is expected to result in significant additional costs.

We also established a research and entrepreneurship-oriented university specializing in the energy field. See Item 4.B. “Business Overview—Establishment of a University.” On August 8, 2019, our board of directors resolved to make an initial contribution of Won 60 billion for the promotion, initial operation and the design of the university campus, and the actual contribution was made in 2020. On May 21, 2021, our board resolved to make an additional contribution of Won 64.5 billion to the university and Won 41.3 billon of such contribution was made in December 2021. The remaining contribution of Won 23.2 billion was made by our affiliates. In addition, on July 15, 2022, our and our affiliates’ boards decided to contribute Won 47.9 billion for funding the construction and operation of major campus facilities and completed the contribution by December 2022. In

 

108


Table of Contents

2023, they decided to contribute additional Won 110.6 billion, of which we contributed Won 70.8 billion and our affiliates contributed the remaining Won 39.8 billion. In February 2024, our board of directors decided to contribute Won 76.6 billion to the university’s operating fund. The final contribution amount will be determined through discussions with the university and the Government.

Fuel Purchases

We require significant funds to finance our operations, principally in relation to the purchase of fuels by our generation subsidiaries for generation of electricity. In 2021, 2022 and 2023, fuel costs constituted 30.6%, 34.4% and 30.1% of our cost of sales and the ratio of fuel costs to our sales was 32.5%, 49.1% and 30.8%, respectively. We plan to fund our fuel purchases primarily with net operating cash, although in cases of rapid increases in fuel prices as is the case from time to time, we may also rely on borrowings from financial institutions and issuance of debt securities in the capital markets.

Repayment of Existing Debt

Payments of principal and interest on indebtedness will require considerable resources. The table below sets forth the scheduled maturities of the outstanding interest-bearing debt (excluding original issue discounts and premium) without taking into consideration of swap transactions of us and our six wholly-owned generation subsidiaries as of December 31, 2023 for each year from 2024 to 2028 and thereafter. As of December 31, 2023, such debt represented 97.3% of our outstanding debt on a consolidated basis.

 

Year ended December 31

  Local
Currency
Borrowings
   Foreign Currency
Borrowings
   Domestic
Debentures
   Foreign
Debentures
   Total(1) 
   (in billions of Won) 

2024

   10,736.8    51.5    23,030.0    1,519.1    35,337.4 

2025

   255.0    —     22,430.0    3,739.4    26,424.4 

2026

   3.2    11.3    14,922.7    4,753.0    19,690.2 

2027

   2,401.6    —     8,831.1    2,621.5    13,854.2 

2028

   2,651.1    —     5,850.0    1,755.1    10,256.2 

Thereafter

   54.6    —     23,262.2    1,326.4    24,643.2 

Total(1)

   16,102.2    62.8    98,326.0    15,714.6    130,205.6 

 

Note:

 

(1)

The figures may not add up to the relevant total numbers due to rounding.

We and our six wholly-owned generation subsidiaries incurred interest charges (including capitalized interest) in relation to our interest-bearing debt of Won 2,337 billion, Won 3,253 billion and Won 5,023 billion, in 2021, 2022 and 2023, respectively. We anticipate that interest charges will increase in future years because of, among other factors, anticipated increases in our long-term debt. See “—Capital Resources” below. The weighted average rates of interest on our and our six wholly-owned generation subsidiaries’ interest-bearing long-term debt and borrowings under existing swap contracts were 2.35%, 3.09% and 3.33% in 2021, 2022 and 2023, respectively.

Overseas Investments

As part of our revenue diversification strategy, we plan to continue to make overseas investments on a selective basis, which will be funded primarily through foreign currency-denominated borrowings and debt securities issuances as well as net operating cash from such projects.

 

109


Table of Contents

Capital Resources

The selected consolidated financial data set forth below as of and for the years ended December 31, 2021, 2022 and 2023 have been derived from our audited consolidated financial statements which have been prepared in accordance with IFRS.

You should read the following data with the more detailed information contained in Item 18. “Financial Statements.” Historical results do not necessarily predict future results.

 

   2021   2022  2023   2023 
   (rounded to billions of Won and millions of US$)(1) 

Net cash provided by (used in) operating activities

  W 4,491   W(23,478 W1,522   $ 1,179 

Long-term debt (excluding current portion)(2)

   66,500    97,946   92,510    71,658 

Current portion of the long-term debt

   11,109    13,839   30,454    23,589 

Total long-term debt(3)

   77,781    111,982   123,163    95,401 

Won-denominated long-term debt

   64,995    95,476   104,964    81,304 

Foreign currency-denominated long-term debt

   12,786    16,506   18,199    14,097 

Other long-term liabilities(4)

   47,565    50,340   48,692    37,716 

Short-term borrowings

   2,921    8,820   10,667    8,263 

Total equity

   65,327    42,000   37,265    28,865 

 

Notes:

 

(1)

The financial information denominated in Won as of and for the year ended December 31, 2022 has been translated into U.S. dollars at the exchange rate of Won 1,291.0 to US$1.00, which was the Noon Buying Rate as of December 31, 2023.

(2)

Long-term debt, net consists of long-term borrowings and debt securities (excluding the current portions but including original issue discounts and premiums) without taking into consideration of swap transactions.

(3)

Total long-term debt (including the current portion but excluding original issue discounts and premium) without taking into consideration of swap transactions.

(4)

Other long-term liabilities consist of total non-current liabilities of our consolidated financial statements included in this annual report minus long-term debt (excluding current portion) of this table.

We have traditionally met our working capital and other capital requirements primarily from net cash provided by operating activities, issuance of debt securities and borrowings from financial institutions. Net cash provided by operating activities is primarily a function of electricity sales and fuel purchases and is also affected by increases and decreases in trade receivables, trade payables and inventory related to electricity sales and fuel purchases. Net cash provided by (or used in, as indicated by the parenthesis) operating activities was Won 4,491 billion, Won (23,478) billion and Won 1,522 billion in 2021, 2022 and 2023, respectively.

As of December 31, 2021, 2022 and 2023, our long-term debt (excluding the current portion but including original issue discounts and premium), without taking into consideration of swap transactions, amounted to Won 66,500 billion, Won 97,946 billion and Won 92,510 billion, respectively, representing 101.8%, 233.2% and 248.2% of equity, respectively, as of such dates. As of December 31, 2021, 2022 and 2023, the current portions of our long-term debt were Won 11,109 billion, Won 13,839 billion and Won 30,454 billion, respectively. As of December 31, 2021, 2022 and 2023, our short-term borrowings amounted to Won 2,921 billion, Won 8,820 billion and Won 10,667 billion, respectively. See Note 23 of the notes to our consolidated financial statements included in this annual report. Total long-term debt (including the current portion but excluding original issue discounts and premium), without taking into consideration of swap transactions, as of December 31, 2023 was Won 123,163 billion, of which Won 104,964 billion was denominated in Won and an equivalent of Won 18,199 billion was denominated in foreign currencies, primarily U.S. dollars. We, KHNP, KOMIPO and KOWEPO also maintain global medium-term note programs in the aggregate amount of US$21 billion, of which approximately US$11 billion remains currently available for future drawdown.

 

110


Table of Contents

As we experienced net losses for the last three years as global energy prices increased significantly and the power purchase costs increased accordingly, we issued more debt securities than before to meet increased working capital requirement. On December 28, 2022, the National Assembly of Korea passed an amendment to Article 16 of KEPCO Act which increased our debt ceiling on total outstanding debt securities on a separate basis to be no greater than five times (or six times if the Minister of the Ministry of Trade, Industry and Energy approves if it is urgently required to resolve a business crisis situation) the sum of our share capital and reserves updated at the end of each year. Such share capital and reserves are calculated on a separate basis under the KEPCO Act. Before such amendment, our debt ceiling was two times the sum of our share capital and reserves. Such increase in debt ceiling will be effective until December 31, 2027 and we may make use of the new debt ceiling to issue more debt securities to cover our losses, refinance existing debt and finance new capital expenditures. However, if the sum of our share capital and reserves decreases (including as a result of continued significant net losses), our debt ceiling will decrease as well and there will be no assurance that we can meet our funding requirements for capital or operational expenditures or debt repayment obligations, which situation could have a material adverse impact on our business, results of operations and financial condition.

Subject to the implementation of our capital expenditure plan and the sale of our interests in our generation subsidiaries and other subsidiaries, our long-term debt may increase or decrease in future years. Until recently, a significant portion of our long-term debt was raised through foreign currency-denominated borrowings. Our foreign currency-denominated long-term debt (including the current portion but excluding original issue discounts and premium), without taking into consideration of swap transactions, amounted to Won 16,506 billion and Won 18,199 billion as of December 31, 2022 and 2023, respectively.

Our ability to incur long-term debt in the future is subject to a variety of factors, many of which are beyond our control, including, the amount of capital that other Korean entities may seek to raise in capital markets. Economic, political and other conditions in Korea may also affect investor demand for our securities and those of other Korean entities. In addition, our ability to incur debt will also be affected by the Government’s policies relating to foreign currency borrowings, the liquidity of the Korean capital markets and our operating results and financial condition. In case of adverse developments in Korea, the price at which such financing may be available may not be acceptable to us.

We incur our short-term borrowings primarily through commercial papers sold to domestic financial institutions. We have not had any material difficulties in obtaining short-term borrowings. In addition, in order to prepare for potential liquidity shortage, we maintain several credit facilities with financial institutions, with Won-denominated facilities amounting to Won 10,619 billion in aggregate and foreign currency-denominated facilities amounting to US$1,782 million in aggregate. The full amount of these facilities was available as of December 31, 2023.

We may raise capital from time to time through the issuance of equity securities. However, there are certain restrictions on our ability to issue equity instrument, including limitations on shareholdings by foreigners. In addition, without changes in the existing KEPCO Act which requires that the Government, directly or pursuant to the Korea Development Bank Act, through Korea Development Bank, own at least 51% of our capital stock, it may be difficult or impossible for us to undertake any equity financing other than sales of treasury stock without the participation of the Government. Even if we are able to conduct equity financing with the participation of the Government, prevailing market conditions may be such that we may not be able conduct equity financing on terms that are commercially acceptable to us. See Item 3.D. “Risk Factors—Risks Relating to Korea and the Global Economy.”

Our total equity decreased by 11.3% from Won 42,000 billion as of December 31, 2022 to Won 37,265 billion as of December 31, 2023, mainly as a result of a decrease in total comprehensive income.

 

111


Table of Contents

Liquidity

The selected consolidated financial data set forth below as of and for the years ended December 31, 2021, 2022 and 2023 have been derived from our audited consolidated financial statements which have been prepared in accordance with IFRS.

You should read the following data with the more detailed information contained in Item 18. “Financial Statements.” Historical results do not necessarily predict future results.

 

   2021  2022  2023  2023 
   (rounded to billions of Won and millions of US$)(1) 

Property, plant and equipment, net

  W173,135  W177,865  W179,876  $139,331 

Current trade and other payables, net

   8,153   11,984   9,090   7,041 

Current financial liabilities, net

   14,037   22,704   41,140   31,867 

Net cash provided by (used in) operating activities

   4,491   (23,478  1,522   1,179 

Net cash used in investing activities

   (12,373  (14,954  (13,074  (10,127

Net cash provided by financing activities

   8,435   38,998   12,662   9,808 

Net working capital (deficit)(2)

   (9,681  (14,768  (31,712  (24,564

 

Notes:

 

(1)

The financial information denominated in Won as of and for the year ended December 31, 2022 has been translated into U.S. dollars at the exchange rate of Won 1,291.0 to US$1.00, which was the Noon Buying Rate as of December 31, 2023.

(2)

Net working capital is defined as current assets minus current liabilities. For the periods indicated, current liabilities exceeded current assets, which resulted in working capital deficit for such periods.

Our liquidity is substantially affected by our acquisition of property, plant and equipment, fuel purchases and schedule of repayment of debt. Our property, plant and equipment increased by 1.1% from Won 177,865 billion as of December 31, 2022 to Won 179,876 billion as of December 31, 2023. As the fuel costs decreased by 22.2% from Won 34,669 billion in 2022 to Won 26,978 billion in 2023, our current trade and other payables also decreased from Won 11,984 billion as of December 31, 2022 to Won 9,090 billion as of December 31, 2023. Our current financial liabilities increased by 81.2% from Won 22,704 billion as of December 31, 2022 to Won 41,140 billion as of December 31, 2023, primarily due to additional debts we incurred.

Our net cash flow from operating activities increased by 106.5% to a net cash inflow of Won 1,522 billion in 2023 from a net cash outflow of Won 23,478 billion in 2022, primarily due to an increase in cash generated from operating activities.

Our net cash flow from investing activities decreased by 12.6% to a net cash outflow of Won 13,074 billion in 2023 from a net cash outflow of Won 14,954 billion in 2022, primarily due to an increase in net cash inflow of financial assets. Such increase reflected the disposal of financial assets under fair value through profit or loss (FVPL) treatment, which we previously acquired for temporary fund management.

Our net cash flow from financing activities decreased by 67.5% to a net cash inflow of Won 12,662 billion in 2023 from a net cash inflow of Won 38,998 billion in 2022, primarily due to a decrease in proceeds from long-term borrowings and debt securities to Won 21,714 billion in 2023 from Won 43,594 billion in 2022. The main reason for such decrease was because we benefited from a decrease in our cost of sales, reducing our financing needs.

Due to the capital-intensive nature of our business as well as significant volatility in fuel prices, from time to time we operate with working capital deficits, and we may have substantial working capital deficits in the future. As of December 31, 2021, 2022 and 2023, we had a working capital deficit of Won 9,681 billion,

 

112


Table of Contents

Won 14,768 billion and Won 31,712 billion, respectively. We have traditionally met our working capital and other capital requirements primarily with net cash provided by operating activities, issuance of debt securities, borrowings from financial institutions and construction grants. We also incur short-term borrowings primarily through commercial papers sold to domestic financial institutions. We have not had any material difficulties in obtaining short-term borrowings. See “—Capital Resources.”

We may face liquidity concerns in the case of sudden and sharp depreciation of the Won against major foreign currencies or depreciation over a sustained period of time. While substantially all of our revenues and our cash and cash equivalents are denominated in Won, we pay for substantially all of our fuel purchases in foreign currencies. Furthermore, as a substantial portion of our long-term debt is denominated in foreign currencies, the payment of principal and interest thereon is made in foreign currencies. In the past, we have incurred foreign currency debt principally due to the limited availability and the high cost of Won-denominated financing in Korea. However, in light of the increasing sophistication of the Korean capital markets and the recent increase in Won liquidity in the Korean financial markets, we plan to reduce the portion of our debt which is denominated in foreign currencies although we intend to continue to raise certain amounts of capital through long-term foreign currency debt for purposes of maintaining diversity in our funding sources as well as paying for overseas investments and fuel procurements in foreign currencies. As of December 31, 2023, 14.8% of our long-term debt (including the current portion but excluding original issue discounts and premium) without taking into consideration of swap transactions was denominated principally in U.S. dollars.

We enter into currency swaps and other hedging arrangements with respect to our foreign currency denominated debt only to a limited extent primarily due to the limited size of the Korean market for such derivative instrument. Such instruments include combined currency and interest rate swap agreements, interest rate swaps and foreign exchange agreements. We do not enter into derivative financial instruments in order to hedge market risk resulting from fluctuations in fuel costs. Our policy is to hold or issue derivative financial instruments for hedging purposes only. See Note 12 of the notes to our consolidated financial statements.

We did not pay any dividends in respect of fiscal year 2021, 2022 and 2023 on a separate basis.

Contractual Obligations

The following summarizes our known contractual obligations on a consolidated basis as of December 31, 2023 and the effect such obligations are expected to have on liquidity and cash flow in future periods. See Note 45.(2) of the notes to our consolidated financial statements included in this annual report for our management of short, medium and long-term funding and liquidity management requirements.

 

In billions of Won    

Contractual Obligations

  Less than
1 Year
   1~2 Years   2~5 Years   More than
5 Years
   Total(3) 

Borrowings and debt securities(1)

  W50,879    29,046    42,421    32,779    155,125 

Lease liabilities

   642    589    1,310    1,695    4,235 

Trade and other payables

   8,477    364    833    589    10,264 

Financial guarantee contracts(2)

   121    2,547    1,645    86    4,399 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total(3)

  W60,119    32,546    46,210    35,148    174,023 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

Notes:

 

(1)

These includes interest payments on the borrowings and debts for the periods indicated.

(2)

This represents the total guarantee amounts associated with the financial guarantee contracts. Financial guarantee liabilities which are recognized as of December 31, 2022 and 2023 are Won 67,240 million and Won 49,992 million, respectively.

(3)

The figures may not add up to the relevant total numbers due to rounding.

 

113


Table of Contents

For a description of our commercial commitments and contingent liabilities, see Note 50 of the notes to our consolidated financial statements included in this annual report.

We entered into a power purchase agreement with GS EPS Co., Ltd. and CGN Yulchon Generation Co., Ltd. respectively, which are non-renewable energy independent power producers that are not part of the Community Energy System, under which we are required to purchase all electricity generated by these companies to the extent such electricity is traded through the Korea Power Exchange. The purchase prices for such electricity are predetermined under the power purchase agreements, subject to annual adjustments. We purchased power from these companies in the amounts of Won 371 billion in 2021, and our agreement with GS EPS Co., Ltd. terminated on March 31, 2021. We purchased power from CGN Yulchon Generation Co., Ltd. in the amounts of Won 551 billion and Won 565 billion in 2022 and 2023, respectively.

We meet our coal requirements primarily through purchases of bituminous coal and anthracite coal under long-term supply contracts with domestic and foreign suppliers. Under these long-term supply contracts, purchase prices are adjusted periodically based on prevailing market conditions. We have entered into several fuel purchase agreements under which we are committed to purchasing minimum quantities of fuel, including approximately 60 to 70 million tons of bituminous coal in 2022.

We also purchase a substantial portion of our LNG requirements from Korea Gas Corporation, a related party. We negotiate annually with Korea Gas Corporation and other suppliers to purchase LNG. We have also entered into long-term transportation contracts with Pan Ocean Co., Ltd. and others.

We import all uranium ore concentrates from sources outside Korea (including the United States, Kazakhstan, Canada, France, the United Kingdom, Switzerland, Australia, Germany, Japan and Uzbekistan) under medium to long-term contracts and purchases in spot markets, and pay for such concentrates with currencies other than Won, primarily U.S. dollars. Contract prices for processing of uranium are generally based on market prices.

The fuel purchase price is typically negotiated near or at time of purchase subject to prevailing market conditions. In 2023, the fuel cost incurred to us was Won 26,978 billion. See Note 49.(2) of the notes to our consolidated financial statements for further details of these contracts.

Under the Long-term Transmission and Substation Plan approved by the Ministry of Trade, Industry and Energy, we are responsible for the construction of all of our power transmission facilities and the maintenance and repair expenses for such facilities. Also, our generation subsidiaries make plans for expanding our generation capacity based on the Basic Plan Relating to the Long-Term Supply and Demand of Electricity, which is generally revised and announced every two years by the Government. For a description of our commitments for acquisition of property, plant and equipment, see Note 49.(1) of the notes to our consolidated financial statements included in this annual report.

Payment guarantee

See Note 50.(2) to our consolidated financial statements included in this annual report for payment guarantees and short-term credit facilities from financial institutions.

Overdraft and Others

See Note 47.(7) to our consolidated financial statements included in this annual report for existing guarantees provided by us to our associates, joint ventures and others.

Other than as described in this annual report and also in Notes 47 and 50 of the notes to our consolidated financial statements included in this annual report, we did not have any other material credit lines and guarantee commitments provided to any third parties as of December 31, 2023.

 

114


Table of Contents
Item 5.C.

Research and Development, Patents and Licenses, etc.

Research and Development

Our five primary objectives for research and development are: (i) management efficiency; (ii) energy supply stability and reduction of system breakdowns, (iii) safety measures and disaster countermeasures, (iv) future power grid development and (v) carbon-neutrality. We have set our research and development activities plan accordingly and are in the process of securing 43 core strategic technologies and 419 individual technologies in furtherance of these objectives.

Our research and development activities plan strives to achieve the following:

 

  

Management efficiency. To develop alternative technologies to minimize new construction of transmission and distribution facilities, adopt advanced asset management system and reduce operational expenses by combining data-network-AI technologies with power systems.

 

  

Energy supply stability and reduction of system breakdowns. To secure stability of energy supply through facility management, breakdown forecasts using real-time data and advanced design criteria for power systems.

 

  

Safety measures and disaster countermeasures. To enhance on-the-field safety with real-time prediction system and new improved equipment and also develop a disaster prediction system to minimize damages and allow for swift recovery in the event a disaster occurs.

 

  

Future power grid development. To increase renewable energy connection capacity by developing large-capacity wires and power grid control technology, as well as to build a distributed network using direct current transmission and improve power grid efficiency by developing micro-grids and environmentally-friendly equipment.

 

  

Carbon-neutrality. To expand renewable energy production through development of offshore wind power, integrated photovoltaic and green hydrogen production technology, as well as pioneer carbon-neutrality by commercializing carbon capture, utilization and storage (CCUS) technology.

In addition, we cooperate closely with several other electric utility companies and research institutes, both foreign and domestic, on various projects to diversify the scope and scale of our research and development activities.

In 2023, consistent with the Government guidelines, we plan to invest approximately 3.45% of our annual estimated net sales on a separate basis in research and development. We and the six generation subsidiaries invested Won 910 billion and Won 889 billion and Won 865 billion in 2021, 2022 and 2023, respectively, and plan to invest Won 1,160 billion in 2024. We and the six generation subsidiaries have 1,372 employees engaged in research and development activities as of December 31, 2023. As a result of our research, we and the six generation subsidiaries have 4,538 registered patents and 5,910 patent applications outstanding in Korea and abroad as of December 31, 2023.

 

Item 5.D.

Trend Information

Trends, uncertainties and events which could have a material impact on our sales, liquidity and capital resources are discussed above in Item 4.B. “Business Overview—Sales and Customers,” Item 5.A. “Operating Results” and Item 5.B. “Liquidity and Capital Resources.”

 

Item 5.E.

Critical Accounting Estimates

See Note 2.(4) to our consolidated financial statements included in this annual report and other sections of our consolidated financial statements referred to thereunder for accounting estimates that have the most significant effect on the amounts recognized in our consolidated financial statements.

 

115


Table of Contents
ITEM 6.

DIRECTORS, SENIOR MANAGEMENT AND EMPLOYEES

 

Item 6.A.

Directors and Senior Management

Board of Directors

Under the KEPCO Act, the Act on the Management of Public Institutions and our Articles of Incorporation, our board of directors, which is required to consist of not more than 15 directors, is vested with the authority over our management. We have seven standing directors (‘sang-im-isa’ in Korean), including the president, and eight non-standing directors (‘bi-sang-im-isa’ in Korean).

Pursuant to the Act on the Management of Public Institutions and our Articles of Incorporation, we have two types of directors: standing directors and non-standing directors. Although the classification of the directors applicable to us as a statutory juridical corporation established under the KEPCO Act is different from the classification under the Korean Commercial Act, which consists of (i) an inside director (‘sa-nae-isa’ in Korean), (ii) an outside director (‘sa-oe-isa’ in Korean) and (iii) other directors who do not serve their directorship positions in full-time capacity but do not qualify as outside directors (‘gita-bi-sang-moo-isa’ in Korean), all of our non-standing directors have been, and are currently appointed from, candidates who satisfy the qualifications of an outside director under the Korean Commercial Act, as the KEPCO Act generally requires us to apply the Korean Commercial Act as applicable.

The Act on the Management of Public Institutions and our Articles of Incorporation require that the number of standing directors, including our president, must be less than one-half of incumbent directors to ensure non-standing directors’ independence from the management and the role of checks and balances. Also, a senior non-standing director appointed by the Ministry of Economy and Finance becomes our chairperson of the board following the review and resolution of the Committee for Management of Public Institutions.

Standing Directors

The standing directors refer to our directors who serve their directorship positions in full-time capacity.

Our president serves as our chief executive officer and represents us and administers our day-to-day business in all matters and bears the responsibility for the management’s performance. Our president is appointed by the President of Korea upon the motion of the Ministry of Trade, Industry and Energy following the nomination by our director nomination committee, the review and resolution of the Committee for Management of Public Institutions pursuant to the Act on the Management of Public Institutions and an approval at the general meeting of our shareholders.

In the event the president acts in violation of law or the Articles of Incorporation, is negligent in his duties, or otherwise is deemed to be significantly impeded in performing his official duties as president, the board of directors may by resolution request the Minister of the Ministry of Trade, Industry and Energy to dismiss or recommend the dismissal of the president.

Our standing director(s) who concurrently serves as a member of the audit committee is appointed through the same appointment process applicable to our president, except that the motion for appointment is made by the Ministry of Economy and Finance instead of the Ministry of Trade, Industry and Energy. Such director is non-executive in that he or she does not participate in the management and meets the requirements of independence set forth in Section 303A.02 of the NYSE Listed Company Manual and Rule 10A-3 under the Exchange Act.

Standing directors other than our president or those who concurrently serve as members of the audit committee are appointed by our president with the approval at the general meeting of our shareholders.

 

116


Table of Contents

The names, titles and outside occupations, if any, of the standing directors as of April 5, 2024 and the respective years in which they took office are set forth below.

 

Name (Gender)

 Age 

Position

 

Outside Occupation

 

Position Held Since

Kim, Dong-Cheol (Male)

 68 President & Chief Executive Officer None September 19, 2023

Jun, Young-Sang (Male)

 59 Comptroller & Auditor General and Member of the Audit Committee (Non-executive) None March 7, 2023

Lee, Jung-Bok (Male)

 60 Corporate Senior Vice President and Chief Business Management Officer None February 27, 2023

Lee, Jun-Ho (Male)

 61 Corporate Senior Vice President and Chief Safety Officer & Chief Operations Officer None February 27, 2023

Oh, Heung-Bok (Male)

 58 Corporate Senior Vice President and Chief Financial & Strategic Planning Officer None February 21, 2024

Seo, Chul-Soo (Male)

 58 Corporate Senior Vice President and Chief Power System Officer None December 11, 2023

Seo, Guen-Bae (Male)

 60 Corporate Senior Vice President and Chief Global & New Business Officer None June 26, 2023

Kim, Dong-cheol has been our President & Chief Executive Officer since September 19, 2023. Prior to his current position, he served as a member of the 17th, 18th, 19th, and 20th National Assembly, Floor Leader of Bareun Mirae Party and People’s Party, Chairperson of Land Infrastructure and Transport Committee of the National Assembly, and Chairperson of Trade, Industry and Energy Committee. Mr. Kim received a B.A. from Seoul National University.

Jun, Young-Sang has been our Standing Director since March 7, 2023. Mr. Jun previously served as a professor of Public Administration at Konkuk University and an operation director at the Korean Association for Public Administration. Mr. Jun received a Ph.D. in Public Administration from Konkuk University.

Lee, Jung-Bok has been our Standing Director since February 27, 2023. Mr. Lee also currently serves as our Corporate Senior Vice President and Chief Business Management Officer and previously served as the Corporate Senior Executive Vice President and Chief Mutual Growth and Management Officer and Vice President and Head of Human Resources Department. Mr. Lee received a B.A. in Sociology from Sungkyunkwan University.

Lee, Jun-Ho has been our Standing Director since February 27, 2023. Mr. Lee also currently serves as our Corporate Senior Vice President and Chief Safety Officer and Chief Operations Officer and previously served as the President and CEO at KEPCO Energy Solution Co., Ltd. and Vice President at KEPCO Nam-Seoul Regional Headquarter. Mr. Lee received a M.B.A. from Korea University.

Oh, Heung-Bok has been our Standing Director since February 21, 2024. Mr. Oh also currently serves as our Corporate Senior Vice President and Chief Financial & Strategic Planning Officer and previously served as the Head of KEPCO Academy, Vice President and Head of Human Resources Department and Vice President at

 

117


Table of Contents

KEPCO Nam-Seoul Regional Headquarter. Mr. Oh received a Ph.D. in Public Administration from Korea University.

Seo, Chul-Soo has been our Standing Director since December 11, 2023. Mr. Seo also currently serves as our Corporate Senior Vice President and Chief Power System Officer and previously served as Vice President and Head of Transmission and Substation Construction Department, Director General of Transmission and Substation Department at KEPCO Daejeon-Sejong-Chungnam Regional Headquarter and Director General of Ulsan Regional Office at KEPCO Busan-Ulsan Regional Headquarter. Mr. Seo received a M.S. in electrical engineering from Chungnam National University.

Seo, Guen-Bae has been our Standing Director since June 26, 2023. Mr. Seo also currently serves as our Corporate Senior Vice President and Chief Global & New Business Officer and previously served as the Executive Vice President and Chief Global Business Division Officer, Vice President and Head of Global Business Development Department, and Director General of Planning and Management Office at KEPCO Busan-Ulsan Regional Headquarter. Mr. Seo received a B.A. in Economics from Seoul National University.

Non-standing Directors

The non-standing directors refer to our directors who do not serve their directorship positions in full-time capacity. The non-standing directors currently do not hold any executive positions with us or our subsidiaries.

Our non-standing directors must be appointed by the Minister of the Ministry of Economy and Finance following the review and resolution of the Committee for Management of Public Institutions from a pool of candidates recommended by the director nomination committee. Our non-standing directors must have ample knowledge and experience in business management and cannot have a dual-role as a public servant other than as a public education officer at a public school. At least one of our non-standing directors must have held his/her office with us for at least three years and either (a) be recommended by the representative of our employees (or the representative of the labor union if there is a labor union comprising the majority of our employees) or (b) obtain consent from the majority of our employees. Our non-standing directors must be approved at the general meeting of our shareholders to become members of our audit committee.

We have reinforced the decision-making power of non-standing directors by requiring both a majority and the chairperson of the board be non-standing directors. Our non-standing directors may request any information necessary to fulfill their duties from our president, and except in special circumstances, our president must comply with such request.

 

118


Table of Contents

The names, titles and outside occupations, if any, of the non-standing directors as of April 5, 2024 and the respective years in which they took office are set forth below.

 

Name (Gender)

 Age 

Position

 

Principal Occupation

 

Position Held Since

Han, Jin-Hyun (Male)

 64 Non-Executive Director, Chairperson of the Board of Directors Adviser of a law firm, Lee & Ko August 30, 2023

Kim, Jae-Shin (Female)

 57 Non-Executive Director, Chairperson of the Audit Committee Certified public accountant of Saedure Accounting Firm July 9, 2021

Kim, Jong-Woon (Male)

 66 Non-Executive Director None August 22, 2022

Kim, Jun-Ki (Male)

 58 Non-Executive Director, Chairperson of the ESG Committee Professor of Public Administration, Seoul National University’s Graduate School of Public Administration May 2, 2023

Park, Chung-Kun (Male)

 59 

Non-Executive Director

(Labor Director)

 None May 2, 2023

Kim, Sung-Eun (Female)

 67 Non-Executive Director, Member of the Audit Committee 

Professor of Advanced Technology

Business, Kyung Hee University

Graduate School

 November 8, 2023

Lee, Sung-Ho (Male)

 60 Non-Executive Director, Member of the ESG Committee Professor of Business Administration, University of Seoul November 8, 2023

Cho, Seong-Jin (Male)

 67 Non-Executive Director None December 4, 2023

Han, Jin-Hyum has been our Non-Standing Director since August 30, 2023. Mr. Han is currently the adviser of a law firm, Lee and Ko. Mr. Han previously served as Vice Minister of the Ministry of Trade, Industry and Energy and the Vice Chairman of Korea International Trade Association. Mr. Han received a B.A. from Chonnam National University, an M.A. from Korea University, and a Ph.D. from Seoul National University of Science and Technology in Economics.

Kim, Jae-Shin has been our Non-Standing Director since July 9, 2021. Ms. Kim currently serves a certified public accountant of Saedure Accounting Firm. Ms. Kim previously served as a Non-Standing Director of the Korean Institute of Certified Public Accountants and the President of women’s association of the Korean Institute of Certified Public Accountants. Ms. Kim received a B.A. and an M.B.A. from Ewha Womans University.

Kim, Jong-Woon has been our Non-Standing Director since August 22, 2022. Mr. Kim previously served as the President of the 6th Naju City Council and a member of the 5th and 6th Naju City Council. Mr. Kim received a B.A. in Public Administration from Gwangju University.

Kim, Jun-Ki has been our Non-Standing Director since May 2, 2023. Mr. Kim is currently a Professor of Public Administration at Seoul National University’s Graduate School of Public Administration and the Director of Institute for Future Strategy. Mr. Kim previously served as the President of Seoul National University’s Graduate School of Public Administration. Mr. Kim received a B.A. from London School of Economics, an M.A. and a Ph.D. in Public Policy from Harvard University in Economics.

Park, Chung-Kun has been our Non-Standing Director since May 2, 2023. Mr. Park is our Labor Director. Mr. Park previously served as the Director of Policy of the Korean National Electrical Workers Union. Mr. Lee

 

119


Table of Contents

received a B.S. in Electric Science from Yeungjin University and a B.A. in Social Welfare Studies from Kyongbuk Science College.

Kim, Sung-Eun has been our Non-Standing Director since November 8, 2023. Ms. Kim is currently a Professor of Advanced Technology Business at Kyung Hee University Graduate School. Ms. Kim received a B.A. in Communication Studies from Ewha Womans University, an M.B.A. from Cornell University, and an M.A. in Business Tax Law Studies from University of Southern California.

Lee, Sung-Ho has been our Non-Standing Director since November 8, 2023. Mr. Lee is currently a Professor of Business Administration at University of Seoul and Vice Chairman of Korean Academic Society of Business Administration. Mr. Lee received a B.A. from Korea University, an M.B.A. from University of Wisconsin, and a Ph.D. from University of Illinois in Business Administration.

Cho, Seong-Jin has been our Non-Standing Director since December 4, 2023. Mr. Cho previously served as a Professor of Energy Science at Kyung Sung University and the Non-Executive Director of Korea Hydro & Nuclear Power Co., Ltd. Mr. Cho received a B.S. in Physics, an M.S. and a Ph.D. in Nuclear Physics from Yonsei University.

Term of Office of Directors

The term of our president is three years, while that of our directors (standing or non-standing, but except for the president) is two years. According to the Act on the Management of Public Institutions, our president’s term cannot be terminated unless it is requested by the President of Korea pursuant to the Act on the Management of Public Institutions or upon an event as specified in our Articles of Incorporation. Under the Korean Commercial Act, if the number of directors is less than the number required under the law or the articles of incorporation, an incumbent director whose term has ended or who has resigned shall nevertheless continue his or her role as a director until a newly appointed director takes office. In such case, our directors may serve as directors beyond two years.

Resolutions of meeting of the Board of Directors

Attendance by a majority of the board members constitutes a voting quorum for our board meetings, and resolutions can be passed by a majority of the board members.

The business address of our directors is 55 Jeollyeok-ro, Naju-si, Jeollanam-do, 58322, Korea.

Audit Committee

Under the Act on the Management of Public Institutions, which took effect as of April 1, 2007, we are designated as a “market-oriented public enterprise” and, as such, are required to establish an audit committee in lieu of the pre-existing board of auditors upon expiration of the term of the last remaining member of the board of auditors. In September 2007, we amended our Articles of Incorporation to establish, in lieu of the pre-existing board of auditors, an audit committee meeting the requirements under the Sarbanes-Oxley Act. Under the Act on the Management of Public Institutions, the Korean Commercial Act and the amended Articles of Incorporation, we are required to maintain an audit committee consisting of three members, of which not less than two members are required to be non-standing directors. In addition, pursuant to certain amendments to the Act on the Management of Public Institutions that became effective as of January 1, 2021, in appointing the standing member of the audit committee, the director nomination committee shall recommend the person who is qualified in any of the followings: (i) a person who is qualified as a certified public accountant or an attorney and has a minimum of three years of experience in work related to such qualification, (ii) a person who has served as an assistant professor or at a higher position for at least three years in areas directly related to audit, investigation and judicial affairs, budget and accounting, investigation, planning and evaluation, etc. (hereinafter referred to as

 

120


Table of Contents

“audit-related works”) at a school under subparagraphs 1 through 5 of Article 2 of the Higher Education Act), (iii) a person who has been in charge of audit-related works for at least three years at a public institution, stock-listed corporation or research institute under Article 9(15)3 of the Financial Investment Services and Capital Markets Act and has experience prescribed by Presidential Decree, (iv) person who has been in charge of audit-related works for at least three years at the state or a local government and has served as a public official at the level prescribed by Presidential Decree, or (v) person with other expertise in accordance with the affairs of the relevant institution and qualified as prescribed by Presidential Decree.

The roles and responsibilities of our audit committee members are to perform the functions of an audit committee meeting the requirements under the Sarbanes-Oxley Act. Our audit committee was established on December 8, 2008.

On April 2, 2021, we amended our Articles of Incorporation to incorporate an amendment to the Commercial Act implemented on December 29, 2020, which requires at least one director who will serve as a member of the audit committee to be appointed separately from other directors at the meeting of shareholders.

On November 7, 2022, we amended our Articles of Incorporation to incorporate an amendment to the Commercial Act enacted on December 29, 2020. To appoint a member of the audit committee, the Articles requires affirmative votes of (i) at least a majority of the voting rights of the shareholders present at the shareholders meeting and (ii) at least one-fourth of the total voting rights issued and outstanding. In accordance with our amended Articles, if our board of directors passes a resolution, shareholders may exercise their votes by electronic means. In the case where electronic votes are allowed, it requires affirmative votes of at least a majority of the voting rights participating in the voting for appointment of a member of the audit committee.

Jun, Young-Sang, a standing director, Kim, Jae-Shin and Kim, Sung-Eun, both non-standing directors, are currently members of our audit committee. All such members of the audit committee are independent within the meaning of the Korea Exchange listing standards, the regulations promulgated under the Korean Commercial Act and the New York Stock Exchange listing standards.

ESG Committee

We established an Environment, Social and Governance (“ESG”) Committee within our board of directors to reinforce ESG-based management system and to ensure consistent performance in this area. The ESG Committee consists of three directors. As of the date of this annual report, our ESG committee consists of two non-standing directors, Kim, Jun-ki and Lee, Seong-ho, and one standing director, Seo, Guen-bae. Our ESG Committee is charged with resolving major management issues related to ESG, establishing ESG management strategies and business plans and checking on the overall direction of sustainable management. In 2023, the ESG Committee met three times, and its major agenda included establishment of 2023 environment management plan, update of KEPCO ESG implementation strategy and publication of a sustainability report.

 

Item 6.B.

Compensation

The aggregate amount of remuneration paid to our standing and non-standing directors consist of (i) salaries and wages paid to standing and non-standing directors, which amounted to Won 1,082 million in aggregate in 2023, and (ii) accrued retirement and severance benefits for standing directors, which amounted to Won 33 million in 2023. Under the Act on the Management of Public Institution, our executive officers consist of the president and the standing and non-standing directors. Standing directors, except the standing director who concurrently serves as a member of our audit committee, take executive positions with our company while the other directors, including non-standing directors, do not. We do not have any other officer who is in charge of a principal business unit, division or function, any other officer who performs a policy making function or any other person who performs similar policy making functions for us.

 

121


Table of Contents
Item 6.C.

Board Practices

Under the Act on the Management of Public Institutions and our Articles of Incorporation, for appointments made after April 1, 2007, the term of office for our president is three years and the term of our office for our directors (whether standing or non-standing but not the president) is two years. Our president and directors may be reappointed for one or more additional terms of one year. In order to be reappointed, the president must be evaluated on the basis of his management performance; a standing director, on the basis of the performance of the duties for which he was elected to perform, or if the standing director has executed an incentive bonus contract, on the basis of his performance under the contract; and a non-standing director, on the basis of his performance of the duties for which he was elected to perform.

Our board currently does not maintain a compensation committee. See Item 16.G. “Corporate Governance.” However, we currently maintain an audit committee meeting the requirements of the Sarbanes-Oxley Act to perform the roles and responsibilities of the compensation committee. Prior to the establishment of the audit committee on December 8, 2008 pursuant to the Act on the Management of Public Institutions, we maintained a board of auditors, which performed the roles and responsibilities required of an audit committee under the Sarbanes-Oxley Act, including the supervision of the financial and accounting audit by the independent registered public accountants.

Our president’s management contract includes benefits upon termination of his employment. The amount for termination benefits payable equals the average value of compensation for one month times the number of years the president is employed by us, provided that the president is only eligible for termination benefits after more than one year of continuous service.

The termination benefits for our standing directors are determined in accordance with our internal regulations for executive compensation. Standing directors are eligible for benefits only upon termination of employment or death following one year of continuous service.

See also Item 16.G. “Corporate Governance” for a further description of our board practices.

 

Item 6.D.

Employees

As of December 31, 2023, we and our generation subsidiaries had a total of 48,696 regular employees, almost all of whom are employed within Korea. Approximately 10.0% of our regular employees (including employees of our generation subsidiaries) are located at our head office.

The following table sets forth the number of and other information relating to our regular employees, not including directors or senior management, as of December 31, 2023.

 

   KEPCO   KHNP   KOSEP   KOMIPO   KOWEPO   KOSPO   EWP   Total 

Regular Employees

                

Administrative

   5,137    1,124    346    438    315    374    342    8,076 

Engineers

   12,453    9,954    2,207    2,203    2,219    2,047    2,037    33,120 

Others

   5,380    1,099    237    227    181    263    113    7,500 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

   22,970    12,177    2,790    2,868    2,715    2,684    2,492    48,696 
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Head Office Employees

   1,769    1,547    302    309    275    314    367    4,883 

% of total

   7.7%    12.7%    10.8%    10.8%    10.1%    11.7%    14.7%    10.0% 

Members of Labor Union

   18,100    8,770    1,958    1,808    1,896    1,783    1,754    36,069 

% of total

   78.8%    72.0%    70.2%    63.0%    69.8%    66.4%    70.4%    74.1% 

We and each of our generation subsidiaries have separate labor unions. Approximately 74.1% of our and our generation subsidiaries’ employees in the aggregate are members of these labor unions, each of which negotiates

 

122


Table of Contents

a collective bargaining agreement for its members each year. Under applicable Korean law, an employee-employer cooperation committee comprised of an equal number of representatives of management and labor (which shall be no less than three and no more than ten representatives from each of management and labor) is required to be established. Accordingly, an employee-employer cooperation committee composed of eight representatives of management and eight representatives of labor has been established at us and at each of our generation subsidiaries. The committee meets periodically to discuss various labor issues.

Since our formation in 1981, our businesses had not been interrupted by any work stoppages or strikes except in early 2002, when employees belonging to our five non-nuclear generation subsidiaries went on strike for six weeks to protest the Government’s decision to privatize such non-nuclear generation subsidiaries according to the Restructuring Plan, which privatization plan has since been suspended indefinitely. See Item 3.D. “Risk Factors—Risks Relating to KEPCO—The Government may adopt policy measures to substantially restructure the Korean electric power industry or our operational structure, which may have a material adverse effect on our business, operations and profitability.”

We believe our relations with our employees are generally good.

Item 6.E. Share Ownership

As of December 31, 2023, none of our directors and members of our administrative, supervisory or management bodies own more than 0.1% of our common stock individually and in aggregate.

Item 6.F. Disclosure of a Registrant’s Action to Recover Erroneously Awarded Compensation

Not applicable.

 

ITEM 7.

MAJOR SHAREHOLDERS AND RELATED PARTY TRANSACTIONS

Item 7.A. Major Shareholders

The following table sets forth certain information relating to certain owners of our capital stock as of December 31, 2023:

 

Title of Class

  

Identity of Person or Group

  Shares Owned   Percentage of
Class (1) (%)
 

Common stock

  

Government

   116,841,794    18.2
  Korea Development Bank (2)   211,235,264    32.9
    

 

 

   

 

 

 
  Subtotal   328,077,058    51.1
  National Pension Service   42,438,945    6.6
  Employee Stock Ownership Association   9,285,715    1.4
  Directors as a group   3,421    0.0
  Public (non-Koreans)    
  

Common shares

   76,825,731    12.0
  

American depositary shares (3)

   10,101,373    1.6
  Public (Koreans)   175,231,834    27.3
    

 

 

   

 

 

 
  Subtotal   313,887,019    48.9
    

 

 

   

 

 

 
  Total   641,964,077    100.0
    

 

 

   

 

 

 

 

Notes:

 

(1)

Percentages are based on issued shares of common stock.

(2)

Korea Development Bank is a Government-controlled entity.

 

123


Table of Contents
(3)

The number for American depositary shares (ADSs) presented in this table is the number of common shares underlying the total outstanding ADSs. The actual number of the total outstanding ADSs, each representing one-half of a common share, is 20,202,746.

All of our shareholders have equal voting rights. See Item 10.B. “Memorandum and Articles of Incorporation—Description of Capital Stock—Voting Rights.”

Item 7.B. Related Party Transactions

We are engaged in a variety of transactions with our affiliates. We have related party transactions with Government-controlled entities such as Korea Gas Corporation, our consolidated subsidiaries and our equity investees. In addition, we engage in related party transactions with Korea Development Bank, one of our major shareholders. See Note 47 of the notes to our consolidated financial statements included in this annual report for a description of transaction and balances with our related parties.

In the past three years, our related party transactions principally consisted of purchases of LNG from Korea Gas Corporation and long-term borrowings from Korea Development Bank. In 2021, 2022 and 2023, we and our generation subsidiaries purchased LNG from Korea Gas Corporation in the aggregate amount of Won 5,647 billion, Won 11,996 billion and Won 8,874 billion, respectively. As of December 31, 2023, we had borrowings from Korea Development Bank in the aggregate amount of Won 326 billion, which had interest rates ranging from 0.50% to 4.94%, CB rate + 0.90%, as well as 1 year KDB rate of + 0.91% for certain operating funds.

We also engage in extensive transactions with our consolidated generation subsidiaries, including the purchase of electricity from them through Korea Power Exchange, sales of electricity to them, payment and receipt of commissions for services and receivables and payables transactions. These are eliminated in the consolidation process. We also provide guarantees for certain of our affiliates. See Note 47.(7) to our consolidated financial statements included in this annual report for payment guarantees. We also have certain relationships with the Korea Power Exchange. See Item 4.B. “Business Overview—Purchase of Electricity—Cost-based Pool System.”

For a further description of our transactions with our affiliates, see Note 47 of the notes to our consolidated financial statements included in this annual report.

Item 7.C. Interests of Experts and Counsel

Not applicable.

 

ITEM 8.

FINANCIAL INFORMATION

Item 8.A. Consolidated Statements and Other Financial Information

See Item 18. “Financial Statements” and our consolidated financial statements included in this annual report.

Legal Proceedings

As of December 31, 2023, we and our subsidiaries were engaged in 666 lawsuits as a defendant and 268 lawsuits as a plaintiff. As of the same date, the total amount of damages claimed against us and our subsidiaries was Won 805 billion, for which we have made a provision of Won 177 billion as of December 31, 2023, and the total amount claimed by us and our subsidiaries was Won 572 billion as of December 31, 2023. While the

 

124


Table of Contents

outcome of any of these lawsuits cannot presently be determined with certainty, our management currently believes that the final results from these lawsuits will not have a material adverse effect on our liquidity, financial position or results of operations.

The following are potentially significant claims pertaining to us and our subsidiaries.

In December 2013, the Supreme Court of Korea ruled that regular bonuses fall under the category of ordinary wages on the condition that those bonuses are paid regularly and uniformly, and that any agreement which excludes such regular bonuses from ordinary wage is invalid. One of the key rulings provides that bonuses that are given to employees (i) on a regular and continuous basis and (ii) calculated according to the actual number of days worked (iii) that are not incentive-based must be included in the calculation of “ordinary wages.” The Supreme Court further ruled that in spite of invalidity of such agreements, employees shall not retroactively claim additional wages incurred due to such court decision, in case that such claims bring to employees unexpected benefits which substantially exceeds the wage level agreed by employers and employees and cause an unpredicted increase in expenditures for their company, which would lead the company to material managerial difficulty or would be a threat to the existence of the company. In that case, the claim is not acceptable since it is unjust and is in breach of the principle of good faith. However, in December 2021, the Supreme Court ruled that the claim of workers for additional wages should not be easily rejected for the reason of good faith if there is a possibility of overcoming business difficulties in the future.

As a result of such ruling by the Supreme Court of Korea, we and our subsidiaries became subject to a number of lawsuits filed by various industry-wide and company-specific labor unions based on claims that ordinary wage had been paid without including certain items that should have been included as ordinary wage. In July 2016, the court ruled against us, and in accordance with the court’s ruling, in August 2016 we paid Won 55.1 billion to the employees for three years of back pay plus interest. As of December 31, 2023, our subsidiaries set aside an aggregate amount of Won 39.2 billion to cover any potential future payments of additional ordinary and wage in relation to the related lawsuits. All cases are currently on-going at various stages of proceedings. We cannot presently assure you that the courts will not ultimately rule against our subsidiaries in these lawsuits, or that the amount of our reserves against these lawsuits will be sufficient to cover the amounts actually payable under court rulings. Any of these developments would adversely affect our results of operations.

Furthermore, the issue of determining which labor costs should be additionally included as part of ordinary wages has not been fully resolved by the courts reviewing the lawsuits to which our subsidiaries are a party and other ordinary wage lawsuits filed against other companies. For instance, there are several cases pending review of the Supreme Court of Korea on whether the bonuses conditional to employee’s current employment status should be included as part of ordinary wages. The Supreme Court, in 2013, had ruled that such conditional bonuses are not a part of ordinary wages, yet there were several lower court cases challenging the Court’s interpretation. Although there was a case of the Supreme Court on November 2022 where it ceased the trial and dismissed the appeal against the lower court case challenging the Court’s interpretation, it is not clear from the above case whether the Supreme Court changed its previous interpretation. If the Supreme Court changes its previous interpretation in its review of the currently pending cases, it is expected to be followed by a series of lawsuits asking for additional payments of the ordinary wages. Due to such uncertainty, we cannot presently assure you that there will not be additional lawsuits in relation to ordinary wages and that we or our subsidiaries may not become liable for greater amount of damages as a result of these lawsuits. Furthermore, court decisions or labor legislations expanding the definition of ordinary wages may prospectively increase the labor costs of us and our subsidiaries. As a result, there can be no assurance that the above-described lawsuits and circumstances will not have a material adverse effect on our results of operations.

From time to time, certain residential customers have filed class action lawsuits against us claiming that electricity tariffs, determined under the progressive rate structure, were excessive. As of December 31, 2023, we were subject to 14 such lawsuits brought by approximately 10,000 plaintiffs with an aggregate claim amount of Won 7.1 billion. As the Supreme Court recognized the legitimacy of the progressive rate structure in March 2023, we won 10 cases of these 14 lawsuits and 4 cases are currently pending as of March 18, 2024.

 

125


Table of Contents

In April 2019, a forest fire broke out in Goseong in Gangwon Province, about 210 kilometers from Seoul, causing damages to nearby towns, covering approximately 1,260 hectares. The National Forensic Service has investigated the cause of the fire and has determined that the fire seems to have been started by an electrical arc from our utility pole’s wire, which broke as a result of a strong wind. Based on this finding, the Police Department of Goseong conducted follow-up investigations and issued a recommendation to prosecute seven employees of KEPCO in connection with the fire. In January 2023, the Seoul High Court acquitted the employees. The prosecutors have appealed to the Supreme Court and a trial is underway, the results of which may have a material adverse effect on us, our reputation and our operating results. In the meantime, we have settled with and completed compensation payment of Won 81.6 billion to victims as of March 31, 2024. In addition, we are compensating the fire victims by providing a number of services, such as free supply of electricity, and implementing measures to prevent future fires that may result from an electrical arc, including a special maintenance program during the dry season between March and May. Also, we implemented operational measures such as tailored operation of protective devices and suspension of operation during periods of low loads. We also plan to change power facility designs to reflect regional and seasonal characteristics, all of which are intended to help prevent similar incidents from happening in the future.

Our generation subsidiaries, currently and from time to time, are involved in lawsuits incidental to the conduct of their business. A significant number of such lawsuits are based on the claim that the construction and operation of the electricity generation units owned by our generation subsidiaries have impaired neighboring fish farms. Our generation subsidiaries normally pay compensation to the members of fishery associations near our power plant complex for expected losses and damages arising from the construction and operation of their power plants in advance. Despite such compensation paid by us, a claim may still be filed against our generation subsidiaries challenging the compensation paid by us.

KEPCO KDN became subject to a lawsuit filed by its labor union on a claim based on the determination of incentives under management evaluation. The claimed amount is Won 237 billion and the first trial is currently in progress.

In September 2023, a group of 40 Korean nationals brought a lawsuit against the Ministry of Trade, Industry and Energy to rescind the approval for the construction of Shin-Hanul nuclear power plant #3 and #4. In November 2023, we applied to participate in the lawsuit as a stakeholder, and the first trial is currently in progress at the Seoul Administrative Court.

The nuclear power plant at Wolsong #1 unit began operations in 1982 and ended its operations in 2012 pursuant to its 30-year operating license. In February 2015, the NSSC evaluated the safety of operating Wolsong #1 unit and approved its extended operation until November 2022. However, on June 15, 2018, the board of directors of KHNP decided to retire Wolsong #1 unit earlier than planned due to comprehensive evaluation of the economic viability and regional sentiment of its continuing operation. On December 24, 2019, the NSSC approved the permanent shutdown of Wolsong #1 unit. The Board of Audit and Inspection of Korea carried out an investigation into whether the shutdown of Wolsong #1 unit was economically feasible and reported that the benefits of continued operations were set unreasonably low compared to the benefits of being immediately shut down, which may have led to the approval of the permanent shutdown of Wolsong #1 unit. According to the results for the investigation on October 20, 2020, KHNP established new guidelines for economic feasibility assessment in December 2021. On June 30, 2021, the Daejeon District Prosecutor’s Office indicted the former CEO of KHNP for his role in approving the early retirement of Wolsong #1 unit, which was the subject of the aforementioned investigation by the Board of Audit Inspection of Korea. The former CEO of KHNP is facing charges of breach of trust and obstruction of business and the case is currently being adjudicated at the Daejeon District Court.

On May 18, 2021, the Gwangju District Prosecutor’s Office indicted KHNP and one of its employees for falsely reporting the results of the investigation on welding defects in the reactor head penetration pipe to the Nuclear Safety Committee. On December 15, 2022, the Gwangju District Court acquitted KHNP and its

 

126


Table of Contents

employee. Since the prosecutor made an appeal, this case is currently being adjudicated at the Gwangju District Court.

We and our subsidiaries are also involved in the following arbitrations, among others.

 

  

Enzen, one of our subcontractors, filed an arbitration case against us over a contractual dispute in connection with the electric power IT modernization project in Kerala, India. We have not recognized any losses because the probability of economic benefit outflow is remote and the related amount cannot be reasonably determined.

On November 9, 2018, certain of our former executive and employees were convicted in a district court on charges for receiving bribes. In May 2019, the appellate court confirmed the charges.

As part of our efforts to prevent recurrence of similar cases, we have implemented the following measures:

 

  

Implementing web training program on integrity for all employees,

 

  

Strengthening integrity and anti-corruption evaluation systems for high-ranking officers and reflecting such results in performance evaluations,

 

  

Increasing the punishment and penalties for employee corruption, and

 

  

Declaring management unaffected by conflicts of interest through banning the pursuit of private interests in the course of job performance and creating a work environment that caters integrity.

We do not believe such claims or proceedings, individually or in the aggregate, have had or will have a material adverse effect on us and our generation subsidiaries. However, we cannot assure you that this will be the case in the future, given the possibility that we may become subject to more legal and arbitral proceedings arising from changes in the environmental laws and regulations as they become applicable to us and our generation subsidiaries, and the related growth in demand for more compensation by actual and potential affected parties. Further, we cannot assure you that the above convictions and/or related events will not have an adverse effect on our reputation as well as the price of our common shares and our American depositary shares.

Dividend Policy

For our dividend policy, see Item 10.B. “Memorandum and Articles of Incorporation—Description of Capital Stock—Dividend Rights.” For a description of the tax consequences of dividends paid to our shareholders, see Item 10.E. “Taxation—Korean Taxes—Shares or ADSs—Dividends on the Shares of Common Stock or ADSs” and Item 10.E. “Taxation—U.S. Federal Income Tax Consideration for U.S. Persons—Tax Consequences with Respect to Common Stock and ADSs—Distributions on Common Stock or ADSs.”

Item 8.B. Significant Changes

Except as disclosed elsewhere in this annual report, we have not experienced any significant changes since the date of our audited consolidated financial statements included in this annual report.

 

ITEM 9.

THE OFFER AND LISTING

Item 9.A. Offer and Listing Details

Notes

We have issued the following registered notes and debentures, which are traded principally in the over-the-counter market:

 

  

7.95% Zero-To-Full Debentures, due April 1, 2096 (the “7.95% Debentures”);

 

127


Table of Contents
  

6% Debentures due December 1, 2026, (the “6% Debentures”);

 

  

7% Debentures due February 1, 2027 (the “7% Debentures”); and

 

  

6-3/4% Debentures due August 1, 2027 (the “6-3/4% Debentures,” and together with the 7.95% Debentures, the 6% Debentures and the 7% Debentures, the “Registered Debt Securities”).

Sales prices for the Registered Debt Securities are not regularly reported on any United States securities exchange or other United States securities quotation service.”

Share Capital

The principal trading market for our common stock is the Korea Exchange. Our common stock is also listed on the New York Stock Exchange in the form of ADSs. The ADSs have been issued by Citibank, N.A. as depositary and are listed on the New York Stock Exchange under the symbol “KEP.” One ADS represents one-half of one share of our common stock. As of December 31, 2023, 10,101,373 ADSs representing 1.6% shares of our common stock were outstanding.

Common Stock

Shares of our common stock are listed on the KRX KOSPI Market of the Korea Exchange. The table below shows the high and low closing prices on the KRX KOSPI Market of the Korea Exchange for our common stock since 2018.

 

   Closing Price 

Period

  High   Low 
   (In Won) 

2019

    

First Quarter

     35,800      29,900 

Second Quarter

   30,350    24,700 

Third Quarter

   27,950    24,700 

Fourth Quarter

   29,250    25,100 

2020

    

First Quarter

   28,500    16,250 

Second Quarter

   23,850    19,000 

Third Quarter

   21,950    18,700 

Fourth Quarter

   28,300    19,950 

2021

    

First Quarter

   27,150    22,700 

Second Quarter

   27,150    23,350 

Third Quarter

   25,650    23,150 

Fourth Quarter

   23,750    20,750 

Fourth Quarter

   28,300    19,950 

2022

    

First Quarter

   24,750    20,100 

Second Quarter

   23,800    21,050 

Third Quarter

   22,950    18,900 

Fourth Quarter

   22,450    16,650 

2023

    

First Quarter

   20,400    17,230 

Second Quarter

   20,600    17,890 

Third Quarter

   20,700    17,810 

Fourth Quarter

   19,650    16,190 

October

   17,650    16,320 

November

   19,000    16,190 

December

   19,650    18,550 

 

128


Table of Contents
   Closing Price 

Period

  High   Low 
   (In Won) 

2024

    

First Quarter

   24,850    18,030 

January

   19,920    18,030 

February

   24,850    20,200 

March

   24,850    22,000 

April (through April 5)

   22,100    21,350 

ADSs

The table below shows the high and low closing prices on the New York Stock Exchange for the outstanding ADSs since 2018. Each ADS represents one-half of one share of our common stock.

 

   Closing Price per ADS 

Period

   High     Low  
   (In US$) 

2019

    

First Quarter

   15.75    13.01 

Second Quarter

   13.20    10.42 

Third Quarter

   11.79    10.24 

Fourth Quarter

   12.22    10.52 

2020

    

First Quarter

   17.82    10.51 

Second Quarter

   15.65    10.15 

Third Quarter

   14.59    11.20 

Fourth Quarter

   16.25    11.47 

2021

    

First Quarter

   12.37    10.04 

Second Quarter

   12.18    10.39 

Third Quarter

   11.06    9.84 

Fourth Quarter

   10.04    8.77 

2022

    

First Quarter

   10.18    8.34 

Second Quarter

   9.54    8.26 

Third Quarter

   8.79    6.72 

Fourth Quarter

   8.64    5.80 

2023

    

First Quarter

   8.42    6.38 

Second Quarter

   7.75    6.82 

Third Quarter

   8.09    6.37 

Fourth Quarter

   7.50    5.96 

October

   6.53    5.96 

November

   7.40    6.08 

December

   7.50    7.07 

2024

    

First Quarter

   9.5    6.72 

January

   7.47    6.72 

February

   9.35    7.62 

March

   9.5    8.28 

April (through April 5)

   8.19    8.07 

 

129


Table of Contents

Item 9.B. Plan of Distribution

Not applicable.

Item 9.C. Markets

The Korea Exchange

The Korea Exchange began its operations in 1956, originally under the name of the Korea Stock Exchange. On January 27, 2005, pursuant to the Korea Securities and Futures Exchange Act, the Korea Exchange was officially created through the consolidation of the Korea Stock Exchange, the Korea Futures Exchange, the KOSDAQ Stock Market, Inc., or KOSDAQ, and the KOSDAQ Committee within the Korea Securities Dealers Association, which was in charge of the management of the KOSDAQ. The KRX KOSPI Market of the Korea Exchange, formerly the Korea Stock Exchange, has a single trading floor located in Seoul. The Korea Exchange is a limited liability company, the shares of which are held by (i) securities companies and futures companies that were the members of the Korea Stock Exchange or the Korea Futures Exchange and (ii) the shareholders of the KOSDAQ.

As of March 29, 2024, the aggregate market value of equity securities listed on the KOSPI of the Korea Exchange was approximately Won 2,240,538 billion. The average daily trading volume of equity securities for the first quarter of 2024 was approximately 531 million shares with an average transaction value of Won 8,005 billion.

The Korea Exchange has the power in some circumstances to suspend trading of shares of a given company or to de-list a security. The Korea Exchange also restricts share price movements. All listed companies are required to file accounting reports annually, semi-annually and quarterly and to release immediately all information that may affect trading of a security.

The Government has in the past exerted, and continues to exert, substantial influence over many aspects of the private sector business community which can have the intention or effect of depressing or boosting the market. In the past, the Government has informally both encouraged and restricted the declaration and payment of dividends, induced mergers to reduce what it considers excess capacity in a particular industry and induced private companies to publicly offer their securities.

The Korea Exchange publishes the Korea Composite Stock Price Index, or KOSPI, every ten seconds, which is an index of all equity securities listed on the KRX KOSPI Market of the Korea Exchange. On January 1, 1983, the method of computing KOSPI was changed from the Dow Jones method to the aggregate value method. In the new method, the market capitalizations of all listed companies are aggregated, subject to certain adjustments, and this aggregate is expressed as a percentage of the aggregate market capitalization of all listed companies as of the base date, January 4, 1980.

Movements in KOSPI in the past six years are set out in the following table:

 

   Opening   High   Low   Closing 

2019

   2,010.00    2,248.63    1,909.71    2,197.67 

2020

   2,175.17    2,873.47    1,457.64    2,873.47 

2021

   2,944.45    3,305.21    2,839.01    2,977.65 

2022

   2,988.77    2,989.24    2,155.49    2,236.40 

2023

   2,225.67    2,667.07    2,218.68    2,655.28 

2024 (through April 8)

   2,669.81    2,757.09    2,435.90    2,720.16 

 

Source: The Korea Exchange

 

130


Table of Contents

Shares are quoted “ex-dividend” on the first trading day of the relevant company’s accounting period; since the calendar year is the accounting period for the majority of listed companies, this may account for the drop in KOSPI between its closing level at the end of one calendar year and its opening level at the beginning of the following calendar year.

With certain exceptions, principally to take account of a share being quoted “ex-dividend” and “ex-rights,” upward and downward movements in share prices of any category of shares on any day are limited under the rules of the Korea Exchange to 30% of the previous day’s closing price of the shares, rounded down as set out below:

 

Previous Day’s Closing Price (Won)

  Rounded Down to (Won) 

less than 2,000

  W1 

2,000 to less than 5,000

   5 

5,000 to less than 20,000

   10 

20,000 to less than 50,000

   50 

50,000 to less than 200,000

   100 

200,000 to less than 500,000

   500 

500,000 or more

   1,000 

 

Source: The Korea Exchange

Note:

 

(1)

The above table is applicable since January 25, 2023.

As a consequence, if a particular closing price is the same as the price set by the fluctuation limit, the closing price may not reflect the price at which persons would have been prepared, or would be prepared to continue, if so permitted, to buy and sell shares. Orders are executed on an auction system with priority rules to deal with competing bids and offers.

Due to deregulation of restrictions on brokerage commission rates, the brokerage commission rate on equity securities transactions may be determined by the parties, subject to commission schedules being filed with the Korea Exchange by the securities companies. In addition, a securities transaction tax will generally be imposed on the transfer of shares or certain securities representing rights to subscribe for shares. A special agricultural and fishery tax of 0.15% of the sales prices will also be imposed on transfer of these shares and securities on the Korea Exchange. See Item 10.E. “Taxation—Korean Taxes.”

The number of companies listed on the KRX KOSPI Market of the Korea Exchange since 2016, the corresponding total market capitalization at the end of the periods indicated and the average daily trading volume for those periods are set forth in the following table:

 

Year

 Number
of Listed
Companies
  Total Market Capitalization on the Last
Day for Each Period
  Average Daily Trading
Volume, Value
 
 (Millions of Won)  (Thousands of U.S.
dollars)(1)
  (Thousands
of Shares)
  (Millions of Won)  (Thousands of
U.S. dollars)(1)
 

2019

  799   1,475,909,366   1,277,290,667   470,723   4,989,807   4,318,309 

2020

  795   1,980,543,162   1,823,536,656   895,256   12,200,417   11,233,235 

2021

  818   2,203,366,546   1,853,749,408   1,039,479   15,424,224   12,976,800 

2022

  820   1,976,432,573   1,568,348,336   595,196   9,008,397   7,148,387 

2023

  834   2,126,372,516   1,649,117,819   538,210   9,602,689   7,447,409 

2024 (through April 5)

  840   2,215,451,533   1,638,890,023   533,006   10,625,202   7,860,040 

 

Source: The Korea Exchange

 

131


Table of Contents

Note:

 

(1)

Converted at the market average exchange rate as announced by Seoul Money Brokerage Services, Ltd. in Seoul at the end of the periods indicated.

The Korean securities markets are principally regulated by the Financial Services Commission and the Financial Investment Services and Capital Markets Act. The law imposes restrictions on insider trading and price manipulation, requires specified information to be made available by listed companies to investors and establishes rules regarding margin trading, proxy solicitation, takeover bids, acquisition of treasury shares and reporting requirements for shareholders holding substantial interests.

Protection of Customer’s Interest in Case of Insolvency of Financial Investment Companies with a Brokerage License

Under Korean law, the relationship between a customer and a financial investment company with a brokerage license in connection with a securities sell or buy order is deemed to be consignment, and the securities acquired by a consignment agent (i.e., the financial investment company with a brokerage license) through such sell or buy order are regarded as belonging to the customer insofar as the customer and the consignment agent’s creditors are concerned. Therefore, in the event of bankruptcy or reorganization procedures involving a financial investment company with a brokerage license, the customer of such financial investment company is entitled to the proceeds of the securities sold by such financial investment company.

When a customer places a sell order with a financial investment company with a brokerage license which is not a member of the Korea Exchange and this financial investment company places a sell order with another financial investment company with a brokerage license which is a member of the Korea Exchange, the customer is still entitled to the proceeds of the securities sold received by the non-member company from the member company regardless of the bankruptcy or reorganization of the non-member company.

Likewise, when a customer places a buy order with a non-member company and the non-member company places a buy order with a member company, the customer has the legal right to the securities received by the non-member company from the member company because the purchased securities are regarded as belonging to the customer insofar as the customer and the non-member company’s creditors are concerned.

Under the Financial Investment Services and Capital Markets Act, the Korea Exchange is obliged to indemnify any loss or damage incurred by a counterparty as a result of a breach by its members. If a financial investment company with a brokerage license which is a member of the Korea Exchange breaches its obligation in connection with a buy order, the Korea Exchange is obliged to pay the purchase price on behalf of the breaching member.

As the cash deposited with a financial investment company with a brokerage license is regarded as belonging to such financial investment company, which is liable to return the same at the request of its customer, the customer cannot take back deposited cash from the financial investment company with a brokerage license if a bankruptcy or reorganization procedure is instituted against such financial investment company and, therefore, can suffer from loss or damage as a result. However, the Depositor Protection Act provides that Korean Deposit Insurance Corporation will, upon the request of the investors, pay investors up to Won 50 million per depositor per financial institution in case of such financial investment company’s bankruptcy, liquidation, cancellation of securities business license or other insolvency events (collectively, the “Insolvency Events”). Pursuant to the Financial Investment Services and Capital Markets Act, subject to certain exceptions, financial investment companies with a brokerage license are required to deposit the cash received from their customers with the Korea Securities Finance Corporation, a special entity established pursuant to the Financial Investment Services and Capital Markets Act. Set-off or attachment of cash deposits by financial investment companies with a brokerage license is prohibited. The premiums related to this insurance under the Depositor Protection Act are paid by financial investment companies with a brokerage license.

 

132


Table of Contents
Item 9.D.

Selling Shareholders

Not applicable.

 

Item 9.E.

Dilution

Not applicable.

 

Item 9.F.

Expenses of the Issue

Not applicable.

 

ITEM 10.

ADDITIONAL INFORMATION

 

Item 10.A.

Share Capital

Not applicable.

 

Item 10.B.

Memorandum and Articles of Incorporation

Set forth below is information relating to our capital stock, including brief summaries of material provisions of our Articles of Incorporation, the KEPCO Act, the Financial Investment Services and Capital Markets Act, the Korean Commercial Act and certain related laws of Korea, all currently in effect. The following summaries are qualified in their entirety by reference to our Articles of Incorporation and the applicable provisions of the KEPCO Act, Financial Investment Services and Capital Markets Act, the Korean Commercial Act, the Act on the Management of Public Institutions and certain related laws of Korea.

Objects and Purposes

We are a statutory juridical corporation established under the KEPCO Act for the purpose of ensuring “stabilization of the supply and demand of electric power, and further contributing toward the sound development of the national economy through expediting development of electric power resources and carrying out proper and effective operation of the electricity business.” The KEPCO Act and our Articles of Incorporation (Article 2) contemplate that we engage in the following activities:

 

 1.

development of electric power resources;

 

 2.

generation, transmission, transformation and distribution of electricity and other related business activities;

 

 3.

research and development of technology related to the businesses mentioned in items 1 and 2;

 

 4.

overseas businesses related to the businesses mentioned in items 1 through 3;

 

 5.

investments or contributions related to the businesses mentioned in items 1 through 4;

 

 6.

businesses incidental to items 1 through 5;

 

 7.

development and operation of certain real estate held by us to the extent that:

 

 a.

it is necessary to develop certain real estate held by us due to external factors, such as relocation, consolidation, conversion to indoor or underground facilities or deterioration of our substation or office; or

 

 b.

it is necessary to develop certain real estate held by us to accommodate development of relevant real estate due to such real estate being incorporated into or being adjacent to an area under planned urban development; and

 

133


Table of Contents
 8.

other activities entrusted by the Government.

Our registered name is “Hankook Chollryuk Kongsa” in Korean and “Korea Electric Power Corporation” in English. Our registration number in the commercial registry office is 114671-0001456.

Directors

Under the KEPCO Act and our Articles of Incorporation, our board of directors consists of our president, standing directors and non-standing directors. A majority of the board members constitutes a voting quorum, and resolutions will be passed by a majority of the board members. Directors who have an interest in certain agenda proposed to the board may not vote on such issues.

On April 2, 2021, we amended our Articles of Incorporation to accommodate new requirements under the Korean Commercial Act by requiring at least one director who will serve as a member of the audit committee to be appointed separately from other directors and adding details to the dividend record date in the article on shareholder rights.

On November 7, 2022, we further amended our Articles of Incorporation to incorporate an amendment to the Act on the Management of Public Institutions implemented on August 4, 2022, which requires a “market-oriented public enterprise” like us to appoint at least one non-standing director who has held his or her office for at least three years and either (a) is recommended by the representative of the employees (or the representative of the labor union if there is a labor union comprising the majority of the employees) or (b) obtains consent from the majority of the employees. The term of office of a labor director is two years, and candidates must be recommended and approved in accordance with the Act. In accordance with the guidelines for the management of public institutions, we have assigned labor directors in the appropriate departments or duties to ensure that they are able to carry out their responsibilities efficiently, and provide them with educational opportunities.

The standards of remuneration for our officers, including directors, shall be determined by a resolution of the board of directors, provided that the maximum amount of remuneration to be paid to our officers shall be determined by shareholder resolution and provided that the remuneration standards for the president and standing directors shall be determined by board resolution in accordance with the guideline thereon established by the Minister of the Ministry of Economy and Finance through review and resolution of our management committee. Directors who have an interest may not participate in the meeting of the board of directors for determining the remuneration for officers.

Neither the KEPCO Act nor our Articles of Incorporation have provisions relating to (i) borrowing powers exercisable by the directors and how such borrowing powers can be varied, (ii) retirement or non-retirement of directors under an age limit requirement, or (iii) the number of shares required for a director’s qualification.

Share Capital

Currently, our authorized share capital is 1,200,000,000 shares, which consists of shares of common stock and shares of non-voting preferred stock, par value Won 5,000 per share. Under our Articles of Incorporation, we are authorized to issue up to 150,000,000 non-voting preferred shares. As of December 31, 2023, 641,964,077 common shares were issued and no non-voting preferred shares have been issued. All of the issued and outstanding common shares are fully-paid and non-assessable and are in registered form. Our shares are electronically registered with our account management institution in lieu of issuing share certificates.

Description of Capital Stock

Dividend Rights

Under the KEPCO Act, we are authorized to pay preferential dividends on our shares held by public shareholders as opposed to those held by the Government. Dividends to public shareholders are distributed in

 

134


Table of Contents

proportion to the number of shares of the relevant class of capital stock owned by each public shareholder following approval by the shareholders at a general meeting of shareholders. Korea Development Bank may receive dividends in proportion to the numbers of our shares held by them. Under the Korean Commercial Act and our Articles of Incorporation, we will pay full annual dividends on newly issued shares.

Under our Articles of Incorporation, holders of non-voting preferred shares (of which there are currently none) are entitled to receive an amount not less than 8% of their par value as determined by a resolution of the board of directors at the time of their issuance. However, stock dividends shall be paid based on par value and may not exceed the amount equivalent to a half of the total amount of profit available for dividend payment.

We declare our dividend annually at the annual general meeting of shareholders which is held within three months after the end of the fiscal year. The annual dividend is paid to the shareholders on record as of the end of the fiscal year preceding the annual shareholders’ meeting. The Ministry of Justice of Korea has recently issued an official ruling to the effect that (i) a record date for determining shareholders entitled to exercise of their voting rights at the general meeting of shareholders for declaration of dividends and (ii) a record date for determining the shareholders entitled to payment of dividends so declared may be separately set. Based on the foregoing official ruling, the Government is recommending the listed companies to set the record date for determining the shareholders entitled to payment of dividends after the date of the general meeting of shareholders by resolution of their board of directors so that the investors may invest in the shares of the listed companies after checking whether the dividend is declared and the amount of dividend so declared. We are considering whether to amend our Articles of Incorporation in line with the recommendation but we cannot assure such amendment will take place.

Annual dividends may be distributed either in cash or in our shares. However, a dividend of shares must be distributed at par value, and dividends in shares may not exceed one-half of the annual dividend.

Under the Korean Commercial Act and our Articles of Incorporation, we do not have an obligation to pay any annual dividend unclaimed for five years from the payment date.

The KEPCO Act provides that we shall not pay an annual dividend unless we have made up any accumulated deficit and set aside as a legal reserve an amount equal to 20.0% or more of our net profit until our accumulated reserve reaches one-half of our stated capital.

Distribution of Free Shares

In addition to dividends in the form of shares to be paid out of retained or current earnings, the Korean Commercial Act permits us to distribute to our shareholders an amount transferred from our capital surplus or legal reserve to stated capital in the form of free shares.

Voting Rights

Holders of our common shares are entitled to one vote for each common share, except that voting rights with respect to any common shares held by us or by a corporate shareholder, more than one-tenth of whose outstanding capital stock is directly or indirectly owned by us, may not be exercised. Any person (with certain exceptions) who holds more than 3% of our issued and outstanding shares cannot exercise voting rights with respect to the shares in excess of this 3% limit. See “—Limitation on Shareholdings.” Pursuant to the Korean Commercial Act, cumulative voting is permissible in relation to the appointment of directors. Under the Korean Commercial Act, a cumulative vote can be requested by the shareholders of a corporation representing at least 1% of the total voting shares of such corporation if the relevant shareholders’ meeting is intended to elect more than two seats of the board of directors and the request for cumulative voting is made to the management of the corporation in writing at least six weeks in advance of the shareholders’ meeting. Under this new voting method, each shareholder will have multiple voting rights corresponding to the number of directors to be appointed in

 

135


Table of Contents

such voting and may exercise all such voting rights to elect one director. Shareholders are entitled to vote cumulatively unless the Articles of Incorporation expressly prohibit cumulative voting. Our current Articles of Incorporation do not prohibit cumulative voting. Except as otherwise provided by law or our Articles of Incorporation, a resolution can be adopted at a general meeting of shareholders by affirmative majority vote of the voting shares of the shareholders present or represented at a meeting, which must also represent at least one-fourth of the voting shares then issued and outstanding. The holders of our non-voting preferred shares (other than enfranchised preferred shares (as described below)) are not entitled to vote on any resolution or to receive notice of any general meeting of shareholders unless the agenda of the meeting includes consideration of a resolution on which such holders are entitled to vote. If we are unable to pay any dividend to holders of non-voting preferred shares as provided in our Articles of Incorporation, the holders of non-voting preferred shares will become enfranchised and will be entitled to exercise voting rights until such dividends are paid. The holders of these “enfranchised preferred shares” have the same rights as holders of our common shares to request, receive notice of, attend and vote at a general meeting of shareholders. Pursuant to the KEPCO Act and our Articles of Incorporation, the appointment of standing directors, the president and standing member of the audit committee are subject to shareholder approval.

Under the Korean Commercial Act, for the purpose of electing our standing member of the audit committee, a shareholder (together with certain related persons) holding more than 3% of the total shares having voting rights may not exercise voting rights with respect to shares in excess of such 3% limit and, according to the amendments to Articles of Incorporation and the Korean Commercial Act, the standing member of the audit committee should be appointed separately from other directors with the procedures and methods stipulated in Article 542-12 of the Korean Commercial Act. On November 7, 2022, we amended our Articles of Incorporation to incorporate an amendment to the Commercial Act implemented on December 29, 2020, which requires the affirmative votes of at least a majority of the voting rights of the shareholders present at the shareholders meeting for appointment of a member of the audit committee in lieu of the affirmative votes of (a) at least a majority of the voting rights of the shareholders present at the shareholders meeting and (b) at least one-fourth (1/4) of the total number of shares with the voting rights issued and outstanding if the shareholders are permitted to exercise a vote by electronic means at such shareholders meeting by the resolution of our board of directors.

The Korean Commercial Act provides that the approval by holders of at least two-thirds of those shares having voting rights present or represented at a meeting, where such shares also represent at least one-third of the total issued and outstanding shares having voting rights, is required in order to, among other things:

 

  

amend our Articles of Incorporation;

 

  

remove a director (including a member of the audit committee);

 

  

effect any dissolution, merger, consolidation or spin-off of us;

 

  

transfer the whole or any significant part of our business;

 

  

effect the acquisition by us of all of the business of any other company;

 

  

effect the acquisition by us of the business of another company that may have a material effect on our business;

 

  

reduce capital; or

 

  

issue any new shares at a price lower than their par value.

Under our Articles of Incorporation, an approval by the Ministry of Trade, Industry and Energy is required in order to amend the Articles of Incorporation. Any change to our authorized share capital requires an amendment to our Articles of Incorporation.

In addition, in the case of amendments to our Articles of Incorporation or any merger or consolidation of us or in certain other cases which affect the rights or interests of the non-voting preferred shares a resolution must

 

136


Table of Contents

be adopted by a meeting of the holders of non-voting preferred shares approving such event. This resolution may be adopted if approval is obtained from holders of at least two-thirds of those non-voting preferred shares present or represented at such meeting and such non-voting preferred shares also represent at least one-third of our total issued and outstanding non-voting preferred shares.

A shareholder may exercise his voting rights by proxy. The proxy shall present the power of attorney prior to the start of the general meeting of shareholders. Under the Financial Investment Services and Capital Markets Act and our Articles of Incorporation, no one other than us may solicit a proxy from shareholders.

Subject to the provisions of the deposit agreement, holders of our American Depositary Shares (“ADSs”) are entitled to instruct the depositary, whose agent is the record holder of the underlying common shares, how to exercise voting rights relating to those underlying common shares.

Preemptive Rights and Issuance of Additional Shares

Authorized but unissued shares may be issued at such times and, unless otherwise provided in the Korean Commercial Act, upon such terms as our board of directors may determine. The new shares must be offered on uniform terms to all our shareholders who have preemptive rights and who are listed on the shareholders’ register as of the record date. Subject to the limitations described under “—Limitation on Shareholdings” below and with certain other exceptions, all our shareholders are entitled to subscribe for any newly issued shares in proportion to their existing shareholdings. Under the Korean Commercial Act, we may vary, without shareholder approval, the terms of such preemptive rights for different classes of shares. Public notice of the preemptive rights to new shares and their transferability must be given not less than two weeks (excluding the period during which the shareholders’ register is closed) prior to the record date. Our board of directors may determine how to distribute shares for which preemptive rights have not been exercised or where fractions of shares occur.

Our Articles of Incorporation provide that new shares that are (1) publicly offered pursuant to the Financial Investment Services and Capital Markets Act, (2) issued to members of our employee stock ownership association, (3) represented by depositary receipts, (4) issued through offering to public investors, or (5) issued to investors in kind under the State Property Act may be issued pursuant to a resolution of the board of directors to persons other than existing shareholders, who in such circumstances will not have preemptive rights.

Under our Articles of Incorporation, we may issue convertible bonds or bonds with warrants each up to an aggregate principal amount of Won 2,000 billion and Won 1,000 billion, respectively, to persons other than existing shareholders. However, the aggregate principal amount of convertible bonds and bonds with warrants so issued to persons other than existing shareholders may not exceed Won 2,000 billion. The convertible bonds or bonds with warrants issued by us shall be electronically registered on the electronic registry maintained by the electronic registrar, in lieu of issuing any physical certificates representing such bonds in accordance with the Electronic Registration Act.

Under the Financial Investment Services and Capital Markets Act and our Articles of Incorporation, members of our employee stock ownership association, whether or not they are our shareholders, have a preemptive right, subject to certain exceptions, to subscribe for up to 20.0% of any shares publicly offered pursuant to the Financial Investment Services and Capital Markets Act. This right is exercisable only to the extent that the total number of shares so acquired and held by members of our employee stock ownership association does not exceed 20.0% of the total number of shares then outstanding.

Liquidation Rights

In the event of our liquidation, the assets remaining after payment of all debts, liquidation expenses and taxes will be distributed among shareholders in proportion to the number of shares held. Holders of our non-voting preferred shares have no preference in liquidation.

 

137


Table of Contents

Rights of Dissenting Shareholders

In certain limited circumstances (including, without limitation, the transfer of the whole or any significant part of our business or the merger, or consolidation upon a split-off of us with another company), dissenting holders of shares have the right to require us to purchase their shares. To exercise such right, shareholders must submit a written notice of their intention to dissent to us prior to the general meeting of shareholders or the class meeting of holders of non-voting preferred shares, as the case may be. Within 20 days after the date on which the relevant resolution is passed at such meeting, such dissenting shareholders must request us in writing to purchase their shares. We are obligated to purchase the shares of dissenting shareholders within one month after the expiration of such 20-day period. The purchase price for such shares must be determined through negotiation between the dissenting shareholders and us. Under the Financial Investment Services and Capital Markets Act, if we cannot agree on a price through negotiation, the purchase price will be the average of (1) the weighted average of the daily share price on the Korea Exchange for a two-month period before the date of adoption of the relevant board resolution, (2) the weighted average of the daily share price on the Korea Exchange for the one month period before such date and (3) the weighted average of the daily share price on the Korea Exchange for the one week period before such date. However, if we or dissenting shareholders who requested us to purchase their shares oppose such purchase price, the determination of a purchase price may be filed with a court. Holders of ADSs will not be able to exercise dissenter’s rights unless they have withdrawn the underlying Common Stock and become our direct shareholders.

Transfer of Shares

Under the Electronic Registration Act, the transfer of shares is effected by the electronic registration of such transfers on an electronic register pursuant to the Electronic Registration Act, under which the electronic registration of stocks, bonds and transfers thereof will be required. To assert shareholders’ right against us, the transferee must have his name and address registered on our electronic register of shareholders. For this purpose, a shareholder is required to apply for electronic registration of transfers between accounts.

These requirements do not apply to the holders of ADSs. Under current Korean regulations, the Korea Securities Depository, foreign exchange banks (including domestic branches of foreign banks), financial investment companies with a dealing, brokerage or collective investment license and internationally recognized foreign custodians are authorized to act as agents and provide related services for foreign shareholders. Our transfer agent is Kookmin Bank, located at 26, Gukjegeumyung-ro 8-gil, Yeongdeungpo-gu, Seoul, Korea. Certain foreign exchange controls and securities regulations apply to the transfer of our shares by non-residents of Korea or non-Koreans. See Item 9. “The Offer and Listing.”

Acquisition of Our Own Shares

Under the Korean Commercial Act, we may acquire our own shares through (1) purchases on a stock exchange or (2) purchase of the shares in proportion to the number of shares held by each shareholder on equal terms and conditions, by a resolution at a Shareholders’ meeting. The aggregate amount of the acquisition price shall not exceed the excess of our net assets, on a non-consolidated basis, over the sum of (1) our stated capital, (2) the total amount of our capital surplus reserve and earned surplus reserve which have accumulated up to the end of the previous fiscal year, (3) our earned surplus required to be accumulated for the then current fiscal year and (4) our net assets stated in the balance sheet as being increased as a result of the evaluation of the assets and liabilities in accordance with our accounting principles without being set off against any unrealized losses. In addition, under the Korean Commercial Act, we may not acquire our own shares if our net assets may fall short of the aggregate amount of the item (1) to (4) above, on a non-consolidated basis, as of the conclusion of the relevant business year of us. In general, our subsidiaries 50% or more of whose shares are owned by us may not acquire our shares.

 

138


Table of Contents

General Meeting of Shareholders

The ordinary general meeting of our shareholders is held within three months after the end of each fiscal year, and subject to board resolution or court approval, an extraordinary general meeting of our shareholders may be held as necessary or at the request of shareholders holding an aggregate of 1.5% or more of our outstanding common shares for at least six consecutive months. Under the Korean Commercial Act, an extraordinary general meeting of shareholders may be convened at the request of our audit committee, subject to a board resolution or court approval. Holders of non-voting preferred shares may only request a general meeting of shareholders once the non-voting preferred shares have become enfranchised as described under “—Description of Capital Stock—Voting Rights” above. Written notices setting forth the date, place and agenda of the meeting must be given to shareholders at least two weeks prior to the date of the general meeting of shareholders. However, pursuant to the Korean Commercial Act and our Articles of Incorporation, with respect to holders of less than 1% of the total number of our issued and outstanding shares which are entitled to vote, notice may be given by placing at least two public notices at least two weeks in advance of the meeting in at least two daily newspapers published in Seoul or by placing a public notice in the electrical disclosure system of the Financial Supervisory Service or the Korea Exchange, at least two weeks in advance of the meeting. Currently, for giving such notice, we use an electronic disclosure system available for access at a website maintained by the Financial Supervisory Service (known as the Data Analysis, Retrieval and Transfer System, or DART). Shareholders not on the shareholders’ register as of the record date are not entitled to receive notice of the general meeting of shareholders or attend or vote at such meeting. Holders of the enfranchised preferred shares on the shareholders’ register as of the record date are entitled to receive notice of, and to attend and vote at, the general meetings. Otherwise, holders of non-voting preferred shares are not entitled to receive notice of general meetings of shareholders or vote at such meetings but may attend such meetings.

The general meeting of shareholders is held in Naju, Jeollanam-do.

Register of Shareholders and Record Dates

Our transfer agent, Kookmin Bank, maintains the register of our shareholders at its office in Seoul, Korea. It registers transfers of our shares on the register of shareholders upon presentation of the share certificates.

The record date for annual dividends is December 31. For the purpose of determining the holders of shares entitled to annual dividends, the register of shareholders may be closed from January 1 to January 31 of each year. The Ministry of Justice of Korea has recently issued an official ruling to the effect that (i) a record date for determining shareholders entitled to exercise of their voting rights at the general meeting of shareholders for declaration of dividends and (ii) a record date for determining the shareholders entitled to payment of dividends so declared may be separately set. Based on the foregoing official ruling, the Government is recommending the listed companies to set the record date for determining the shareholders entitled to payment of dividends after the date of the general meeting of shareholders by resolution of their board of directors so that the investors may invest in the shares of the listed companies after checking whether the dividend is declared and the amount of dividend so declared. We are considering whether to amend our Articles of Incorporation in line with the recommendation but we cannot assure such amendment will take place.

Further, the Korean Commercial Act and our Articles of Incorporation permit us at least two weeks’ public notice to set a record date and/or close the register of shareholders for not more than three months for the purpose of determining the shareholders entitled to certain rights pertaining to our shares. The trading of our shares and the electronic registration of share transfer between accounts pursuant to the Electronic Registration Act in respect of them may continue while the register of shareholders is closed.

Annual Report

At least one week prior to the annual general meeting of shareholders, our business report and audited consolidated financial statements must be made available for inspection at our principal office and at all branch

 

139


Table of Contents

offices. Copies of business reports, the audited non-consolidated financial statements and any resolutions adopted at the general meeting of shareholders will be available to our shareholders.

Under the Financial Investment Services and Capital Markets Act, we must file with the Financial Services Commission and the Korea Exchange an annual report within 90 days after the end of our fiscal year, a half-year report within 45 days after the end of the first six months of our fiscal year and quarterly reports within 45 days after the end of the first three months and nine months of our fiscal year. Following our adoption of IFRS starting in January 1, 2011 pursuant to regulatory requirements for listed companies in Korea, we are required to file annual, half-year and quarterly reports containing annual and interim financial statements and notes thereto on a consolidated basis as well as on a separate basis.

In addition, pursuant to the Enforcement Decree of the Commercial Act, when a Korean listed company convokes a meeting of shareholders, it shall provide shareholders with the annual report and the audit report by sending them via email or posting them on its website no later than a week prior to the meeting of shareholders.

Limitation on Shareholdings

No person other than the Government, our employee stock ownership association and persons who obtain an approval from the Financial Services Commission may hold for its account more than 3% of our total issued and outstanding shares. In calculating shareholdings for this purpose, shares held by your spouse and your certain relatives or by your certain affiliates (such spouses, relatives and affiliates are together referred to as “Affiliated Holders”) are deemed to be held by you. If you hold our shares in violation of this 3% limit, you are not entitled to exercise the voting rights or preemptive rights of our shares in excess of such 3% limit and the Financial Services Commission may order you to take necessary corrective action. In addition, the KEPCO Act currently requires that the Government, directly or through Korea Development Bank, own not less than 51% of our capital. For other restrictions on shareholdings, see Item 9. “The Offer and Listing.”

Change of Control

The KEPCO Act requires that the Government, directly or pursuant to the Korea Development Bank Act, through Korea Development Bank, own not less than 51% of our capital.

Disclosure of Share Ownership

Under the Financial Investment Services and Capital Markets Act, any person whose direct or beneficial ownership of a listed company’s shares with voting rights, equity-related debt securities including convertible bonds, bonds with warrants, exchangeable bonds, certificates representing the rights to subscribe for common shares, derivatives-linked securities and depository receipts of the aforementioned securities (collectively referred to as “Equity Securities”), together with the Equity Securities directly or beneficially owned by certain related persons or by any person acting in concert with the person, accounts for 5% or more of our total outstanding Equity Securities is required to report the status and purpose (in terms of whether the purpose of shareholding is to participate in the management of the issuer) of the holdings and the material contents of the agreements relating to the Equity Securities and other matters prescribed by the Presidential Decree under the Financial Investment Services and Capital Markets Act to the Financial Services Commission of Korea and the Korea Exchange within five business days after reaching the 5% ownership interest threshold.

In addition, (A) any change in the number of the owned Equity Securities that is 1% or more of the total outstanding Equity Securities subsequent to the report or (B) any change in (i) the purpose of the shareholding or ownership of the Equity Securities (whether such shareholding or ownership is to participate in the management of the listed company or not), (ii) whether such shareholding or ownership is for a simple investment purpose or not (limited to the case where the purpose of the shareholding or ownership of the Equity Securities is not to participate in the management of the listed company), (iii) the major terms and conditions of the agreements

 

140


Table of Contents

relating to the Equity Securities owned (such as trust agreements and collateral agreements) to the extent the number of relevant Equity Securities is 1% or more of the total outstanding Equity Securities or (iv) the type of the ownership (direct ownership or holdings) to the extent the number of relevant Equity Securities is equal to or exceeds 1% of the total outstanding Equity Securities, subsequent to the report, must be reported to the Financial Services Commission and the Korea Exchange. Changes set forth in clauses (A) and (B) above must be reported within five business days from the date of such change (or by the tenth day of the month following the month in which the change described in (A) above occurs, in the case of a person (other than certain professional investors prescribed by the Presidential Decree under the Financial Investment Services and Capital Markets Act) with a purpose of simple investment, or within ten business days from the date of such change in the case of a person with a purpose of general investment with no intent to seek management control).

Notwithstanding the foregoing, certain professional investors prescribed by the Presidential Decree of the Financial Investment Services and Capital Markets Act may report the 5% ownership status and the changes described in (A) above to the Financial Services Commission and the Korea Exchange by the tenth day of the month immediately following the end of the quarter in which such 5% ownership interest is reached or the change occurs.

When filing a report to the Financial Services Commission and the Korea Exchange in accordance with the reporting requirements described above, a copy of such report must be sent to the relevant listed company. Violation of these reporting requirements may subject a person to sanctions such as prohibition on the exercise of voting rights with respect to the Equity Securities for which the reporting requirement was violated or fines or imprisonment. Furthermore, the Financial Services Commission may order the disposal of the Equity Securities for which the reporting requirement was violated or may impose administrative fine.

A person reporting to the Financial Services Commission and the Korea Exchange that his purpose of holding the Equity Securities is to participate in the management of the listed company is prohibited from acquiring additional Equity Securities of the listed company and exercising voting rights during the period commencing from the date on which the event triggering the reporting requirements occurs to the fifth day from the date on which the report is made.

Item 10.C. Material Contracts

None.

Item 10.D. Exchange Controls

General

The Foreign Exchange Transaction Act and the Presidential Decree and regulations under that Act and Decree, or collectively the Foreign Exchange Transaction Laws, regulate investment in Korean securities by non-residents and issuance of securities outside Korea by Korean companies. Non-residents may invest in Korean securities pursuant to the Foreign Exchange Transaction Laws. The Financial Services Commission has also adopted, pursuant to its authority under the Financial Investment Services and Capital Markets Act, regulations that regulate investment by foreigners in Korean securities and issuance of securities outside Korea by Korean companies.

Subject to certain limitations, the Ministry of Economy and Finance has the authority to take the following actions under the Foreign Exchange Transaction Laws: (i) if the Government deems it necessary on account of war, armed conflict, natural disaster or grave, sudden and significant changes in domestic or foreign economic circumstances or similar events or circumstances, the Ministry of Economy and Finance may temporarily suspend performance under any or all foreign exchange transactions, in whole or in part, to which the Foreign Exchange Transaction Laws apply (including suspension of payment and receipt of foreign exchange) or impose

 

141


Table of Contents

an obligation to deposit, safe-keep or sell any instruments of payment to the Bank of Korea or certain other governmental agencies or a foreign exchange equalization fund or financial institutions, or effective from July 18, 2017, impose an obligation on resident creditors to collect and recover debts owed by non-resident debtors, and (ii) if the Government concludes that the international balance of payments and international financial markets are experiencing or are likely to experience significant disruption or that the movement of capital between Korea and other countries are likely to adversely affect the Korean Won, exchange rates or other macroeconomic policies, the Ministry of Economy and Finance may take action to require any person who intends to effect or effects a capital transaction to obtain permission or to deposit a portion of the instruments of payment acquired in such transactions with the Bank of Korea or a foreign exchange equalization fund or financial institutions.

Government Review of Issuances of Debt Securities and ADSs and Report for Payments

In order for us to issue debt securities of any series outside of Korea, we are required to file a report with our designated foreign exchange bank or the Ministry of Economy and Finance on the issuance of such debt securities, depending on the issuance amount. The Ministry of Economy and Finance may at its discretion direct us to take measures as necessary to avoid undue exchange rate fluctuations before it accepts such report. Furthermore, in order for us to make payments of principal of or interest on the debt securities of any series and other amounts as provided in an indenture and such debt securities, we are required to present relevant documents to the designated foreign exchange bank at the time of each actual payment. The purpose of such presentation is to ensure that the actual remittance is consistent with the terms of the transaction reported to our designated foreign exchange bank or the Ministry of Economy and Finance.

In order for us to offer for purchase shares of our common stock held in treasury in the form of ADSs or issue shares of our common stock represented by the ADSs, we are required to file a prior report of such offer or issuance with our designated foreign exchange bank or the Ministry of Economy and Finance, depending on the offering amount. The Ministry of Economy and Finance may at its discretion direct us to take measures as necessary to avoid undue exchange rate fluctuations before it accepts such report. No further governmental approval is necessary for the initial offering and issuance of the ADSs.

In order for a depositary to acquire any existing shares of our common stock from holders of these shares of common stock (other than from us) for the purpose of issuance of depositary receipts representing these shares of common stock, the depositary would be required to obtain our consent for the number of shares to be deposited in any given proposed deposit which exceeds the difference between (1) the aggregate number of shares deposited by us or with our consent for the issuance of ADSs (including deposits in connection with the initial and all subsequent offerings of ADSs and stock dividends or other distributions related to these ADSs) and (2) the number of shares on deposit with the depositary at the time of such proposed deposit. We may not grant this consent for the deposit of shares of our common stock in the future, if our consent is required. Therefore, a holder of ADSs who surrenders ADSs and withdraws shares of our common stock may not be permitted subsequently to deposit such shares and obtain ADSs.

In addition, we are also required to notify the Ministry of Economy and Finance upon receipt of the full proceeds from the offering of ADSs. No additional governmental approval is necessary for the offering and issuance of ADSs.

Reporting Requirements for Holders of Substantial Interests

Under the Financial Investment Services and Capital Markets Act, any person whose direct beneficial ownership of a listed company’s Equity Securities, together with the Equity Securities beneficially owned by certain related persons or by any person acting in concert with such person, accounts for 5% or more of our total outstanding Equity Securities is required to report the status and purpose (namely, whether the purposes of the share ownership is to participate in the management of the issuer) of the holdings and the material contents of the

 

142


Table of Contents

agreements relating to the Equity Securities and other matters prescribed by the Presidential Decree under the Financial Investment Services and Capital Markets Act to the Financial Services Commission and the Korea Exchange within five business days after reaching the 5% ownership interest and any change in ownership interest subsequent to the report which equals or exceeds 1.0% of the total outstanding Equity Securities is required to be reported to the Financial Services Commission and the Korea Exchange within five business days from the date of the change.

In addition, (A) any change in the number of the owned Equity Securities that is 1% or more of the total outstanding Equity Securities subsequent to the report or (B) any change in (i) the purpose of the shareholding or ownership of the Equity Securities (whether such shareholding or ownership is to participate in the management of the listed company or not), (ii) whether such shareholding or ownership is for a simple investment purpose or not (limited to the case where the purpose of the shareholding or ownership of the Equity Securities is not to participate in the management of the listed company), (iii) the major terms and conditions of the agreements relating to the Equity Securities owned (such as trust agreements and collateral agreements) to the extent the number of relevant Equity Securities is 1% or more of the total outstanding Equity Securities or (iv) the type of the ownership (direct ownership or holdings) to the extent the number of relevant Equity Securities is equal to or exceeds 1% of the total outstanding Equity Securities, subsequent to the report, must be reported to the Financial Services Commission and the Korea Exchange. Changes set forth in clauses (A) and (B) above must be reported within five business days from the date of such change (or by the tenth day of the month following the month in which the change described in (A) above occurs, in the case of a person (other than certain professional investors prescribed by the Presidential Decree under the Financial Investment Services and Capital Markets Act) with a purpose of simple investment, or within ten business days from the date of such change in the case of a person with a purpose of general investment with no intent to seek management control).

Notwithstanding the foregoing, certain professional investors prescribed by the Presidential Decree of the Financial Investment Services and Capital Markets Act may report the 5% ownership status and the changes described in (A) above to the Financial Services Commission and the Korea Exchange by the tenth day of the month immediately following the end of the quarter in which such 5% ownership interest is reached or the change occurs.

When filing a report to the Financial Services Commission and the Korea Exchange in accordance with the reporting requirements described above, a copy of such report must be sent to the relevant listed company. Violation of these reporting requirements may subject a person to sanctions such as prohibition on the exercise of voting rights with respect to the Equity Securities for which the reporting requirement was violated or fines or imprisonment. Furthermore, the Financial Services Commission may order the disposal of the Equity Securities for which the reporting requirement was violated or may impose administrative fine.

A person reporting to the Financial Services Commission and the Korea Exchange that his purpose of holding the Equity Securities is to participate in the management of the listed company is prohibited from acquiring additional Equity Securities of the listed company and exercising voting rights during the period commencing from the date on which the event triggering the reporting requirements occurs to the fifth day from the date on which the report is made.

In addition to the reporting requirements described above, any person whose direct or beneficial ownership of our voting stock and/or depository receipts for our voting stock accounts for 10.0% or more of the total issued and outstanding voting stock, whom we refer to as a major shareholder, must file a report to the Securities and Futures Commission and to the Korea Exchange within five business days after the date on which the person reached such shareholding percentage. In addition, such person must file a report to the Securities and Futures Commission and to the Korea Exchange regarding any subsequent change in his/her shareholding. Such report on subsequent change in shareholding must be filed within five business days of the occurrence of any such change. Violation of these reporting requirements may subject a person to criminal sanctions such as fines and imprisonment.

 

143


Table of Contents

Restrictions Applicable to ADSs

No governmental approval is necessary for the sale and purchase of ADSs in the secondary market outside Korea or for the withdrawal of shares of our common stock underlying ADSs and the delivery inside Korea of the withdrawn shares.

Special Reporting Requirement for Companies Whose Securities Are Listed on Foreign Exchanges

Under the regulations of the Financial Services Commission and the Korea Exchange, (i) if a company listed on the Korea Exchange has submitted a public disclosure of material matters to a foreign financial investment supervisory authority pursuant to the laws of the foreign jurisdiction, then it must submit a copy of the public disclosure and a Korean translation thereof to the Financial Services Commission of Korea and the Korea Exchange, and (ii) if a company listed on the Korea Exchange is approved for listing on a foreign stock market or determined to be de-listed from the foreign stock market or actually listed on, or de-listed from, a foreign stock market, then it must submit a copy of any document, which it submitted to or received from the relevant foreign government, foreign financial investment supervisory authority or the foreign stock market, and a Korean translation thereof to the Financial Services Commission of Korea and the Korea Exchange.

Persons who have acquired shares of our common stock as a result of the withdrawal of shares of common stock underlying ADSs may exercise their preemptive rights for new shares, participate in free distributions and receive dividends on shares of our common stock without any further governmental approval.

Restrictions Applicable to Common Stock

Under the Foreign Exchange Transaction Laws and the Regulations on Financial Investment Business (together, the “Investment Rules”), foreigners are permitted to invest, subject to certain exceptions and procedural requirements, in all shares of Korean companies unless prohibited by specific laws. Foreign investors may trade shares listed on the Korea Exchange only through the Korea Exchange except for certain limited circumstances. These circumstances include, among others, (1) odd-lot trading of shares, (2) acquisition of shares by a foreign company as a result of a merger, (3) acquisition or disposal of shares in connection with a tender offer, (4) acquisition of shares by exercise of warrant, conversion right under convertible bonds, exchange right under exchangeable bonds or withdrawal right under depositary receipts, each issued outside of Korea by a Korean company, such shares being “Converted Shares,” (5) acquisition of shares through exercise of rights under securities issued outside of Korea, (6) acquisition of shares as a result of inheritance, donation, bequest or exercise of shareholders’ rights (including preemptive rights or rights to participate in free distributions and receive dividends), (7) over-the-counter transactions between foreigners of a class of shares for which a ceiling on aggregate acquisition by foreigners (as explained below) exists and has been reached or exceeded, (8) acquisition of shares by direct investment under the Foreign Investment Promotion Law, (9) acquisition and disposal of shares on an overseas stock exchange market, if such shares are simultaneously listed on the KRX KOSPI Market or the KRX KOSDAQ Market of the Korea Exchange and such overseas stock exchange, and (10) arm’s length transactions between foreigners in the event all such foreigners belong to an investment group managed by the same person.

Under current regulatory system, the foreign investors are required to obtain approval from the Financial Supervisory Service prior to the over-the-counter transactions other than those listed above as exceptions. The Investment Rules require a foreign investor who wishes to invest in or dispose of shares on the Korea Exchange (including Converted Shares and shares being issued for initial listing on the Korea Exchange) to register his/her identity with the Financial Supervisory Service prior to making any such investment or disposal unless he/she had previously registered. However, such registration requirement does not apply to foreign investors who (i) acquire Converted Shares with the intention of selling them within three months from the date they were acquired or (ii) acquire or dispose of shares in connection with a foreign direct investment under the Foreign Investment Promotion Law; provided that, the acquisition of shares on the Korea Exchange requires registration.

 

144


Table of Contents

Upon registration, the Financial Supervisory Service will issue to the foreign investor an Investment Registration Card which must be presented each time the foreign investor opens a brokerage account with a financial investment company or financial institution in Korea. Foreigners eligible to obtain an Investment Registration Card include any foreign nationals who are individuals (with residence abroad for six months or more), foreign governments, foreign municipal authorities, foreign public institutions, international financial institutions or similar international organizations, corporations incorporated under foreign laws and any person in any additional category designated by the Decree of the Financial Investment Services and Capital Markets Act. All Korean branches of a foreign corporation as a group are treated as a separate foreigner from the head office of the foreign corporation. However, a foreign branch of a Korean securities company, a foreign corporation or a depositary issuing depositary receipts may obtain one or more Investment Registration Cards in its name in certain circumstances as described in the relevant regulations.

Upon a foreign investor’s purchase of shares through the Korea Exchange, no separate report by the investor is required because the Investment Registration Card system is designed to control and oversee foreign investment through a computer system. However, a foreign investor’s acquisition or sale of shares outside the Korea Exchange (exceptionally permitted as discussed above) must be reported by the foreign investor or his standing proxy to the Governor of the Financial Supervisory Service at the time of each acquisition or sale. However, a foreign investor must ensure that any acquisition or sale by it of shares outside the Korea Exchange in the case of trades in connection with a tender offer, odd-lot trading of shares or trades of a class of shares for which the aggregate foreign ownership limit has been reached, exceeded or any other case set forth in the Investment Rules, is reported to the Governor of the Financial Supervisory Service by the Korea Securities Depository, financial investment companies with a dealing or brokerage license or securities finance companies engaged to facilitate such transactions. In the event a foreign investor desires to acquire or sell shares outside the Korea Exchange and the circumstances in connection with such sale or acquisition do not fall within the exceptions made for certain limited circumstances described above, then the foreign investor must obtain the prior approval of the Governor. Foreign investors are prohibited from engaging in margin transactions with respect to shares subject to a ceiling on acquisition by foreigners.

In January 2023, the Financial Service Commission announced its plan to (i) abolish the foreign investor registration requirement and allow the foreign investors to open a brokerage account with a financial investment company or financial institution in Korea only with (in case of the foreign legal entity) LEI (Legal Entity Identifier) or (in case of the foreign individual) his or her passport number (as the case may be), (ii) expand the scope of the over-the-counter transactions exceptionally permitted such as the transactions without change of actual owner (e.g., merger of funds, transaction between feeder fund and master fund, between asset manager and fund managed by such asset manager or between funds managed by the same asset manager), (iii) facilitate the use of omnibus account for the foreign investors by abolishing the reporting requirement for trading details of the listed shares by each end-investor immediately after the settlement and (iv) simplify the post-reporting procedures applying to the over-the-counter transactions exceptionally permitted. In December 2023, the Financial Service Commission announced that each plan would be implemented starting from December 14, 2023, and each plan was implemented accordingly.

A foreign investor may appoint one or more standing proxies from among the Korea Securities Depository, foreign exchange banks (including domestic branches of foreign banks), financial investment companies (including domestic branches of foreign financial investment companies) with a dealing, brokerage or collective investment license and certain eligible foreign custodians which will exercise shareholders’ rights or perform any matters related to the foregoing activities if the foreign investor does not perform these activities himself. Generally, a foreign investor may not permit any person, other than his/her standing proxy, to exercise rights relating to his shares or perform any tasks related thereto on his behalf. However, a foreign investor may be exempted from complying with these standing proxy rules with the approval of the Governor of the Financial Supervisory Service in cases deemed inevitable by reason of conflict between the laws of Korea and those of the home country of the foreign investor.

 

145


Table of Contents

The shares of a listed Korean company owned by a foreign investor must be electronically registered in accordance with the Electronic Registration Act through an eligible custodian in Korea. Only the Korea Securities Depository, foreign exchange banks (including domestic branches of foreign banks), financial investment companies (including domestic branches of foreign financial investment companies) with a dealing, brokerage or collective investment license and certain eligible foreign custodians are eligible to be a custodian of shares for a foreign investor; provided, however, that a foreign investor is exempted from the above requirement if it (i) acquires shares publicly offered or sold outside Korea for the purpose of listing on an overseas stock exchange or (ii) acquires or disposes of shares through an overseas stock exchange if such shares are simultaneously listed on the Korea Exchange and such overseas stock exchange. Furthermore, a foreign investor may be exempted from complying with this deposit requirement with the approval of the Governor of the Financial Supervisory Service in circumstances where compliance with that requirement is made impracticable, including cases where compliance would contravene the laws of the home country of such foreign investor.

Under the Investment Rules, with certain exceptions, a foreign investor may acquire shares of a Korean company without being subject to any single or aggregate foreign investment ceiling. However, certain designated public corporations are subject to a 40.0% ceiling on acquisitions of shares by foreigners in the aggregate and a ceiling on acquisitions of shares by a single foreign investor provided in the Articles of Incorporation of such corporations. Of the Korean companies listed on the Korea Exchange, we are so designated. The Financial Services Commission may impose other restrictions as it deems necessary for the protection of investors and the stabilization of the Korean securities and derivatives market. Generally, the ownership of Converted Shares constitutes foreign ownership for purposes of such aggregate foreign ownership limit. However, the acquisition of Converted Shares is one of the exceptions under which foreign investors may acquire shares of designated corporations in excess of the 40.0% ceiling.

In addition to the aggregate foreign investment ceiling set out under the Financial Investment Services and Capital Markets Act, our Articles of Incorporation set a 3% ceiling on acquisition by a single investor (whether domestic or foreign) of the shares of our common stock. Any person (with certain exceptions) who holds more than 3% of our issued and outstanding shares cannot exercise voting rights with respect to our shares in excess of this 3% limit.

The ceiling on aggregate investment by foreigners applicable to us may be exceeded in certain limited circumstances, including as a result of acquisition of:

 

  

shares by a depositary issuing depositary receipts representing such shares (whether newly issued shares or outstanding shares);

 

  

Converted Shares;

 

  

Shares, stock option from the exercise of shareholders’ rights; or

 

  

shares by gift, inheritance or bequest.

A foreigner who has acquired shares in excess of any ceiling described above may not exercise his voting rights with respect to the shares exceeding such limit and the Financial Services Commission may take necessary corrective action against him.

Under the Foreign Exchange Transaction Laws, a foreign investor who intends to acquire shares must designate a foreign exchange bank at which he must open a foreign currency account and a Won account exclusively for stock investments. No approval is required for remittance into Korea and deposit of foreign currency funds in the foreign currency account. Foreign currency funds may be transferred from the foreign currency account at the time required to place a deposit for, or settle the purchase price of, a stock purchase transaction to a Won account opened at a securities company. Funds in the foreign currency account may be remitted abroad without any governmental approval.

 

146


Table of Contents

Dividends on shares of our common stock are paid in Won. No governmental approval is required for foreign investors to receive dividends on, or the Won proceeds of the sale of, any shares to be paid, received and retained in Korea. Dividends paid on, and the Won proceeds of the sale of, any shares held by a non-resident of Korea must be deposited either in a Won account with the investor’s securities company or the investor’s Won account. Funds in the investor’s Won account may be transferred to his foreign currency account or withdrawn for local living expenses, provided that any withdrawal of local living expenses in excess of a certain amount should be reported to the Governor of the Financial Supervisory Service. Funds in the investor’s Won account may also be used for future investment in shares or for payment of the subscription price of new shares obtained through the exercise of preemptive rights.

Financial investment companies with a securities dealing, brokerage or collective investment license are allowed to open foreign currency accounts with foreign exchange banks exclusively for accommodating foreign investors’ stock investments in Korea. Through these accounts, these securities companies and asset management companies may enter into foreign exchange transactions on a limited basis, such as conversion of foreign currency funds and Won funds, either as a counterparty to or on behalf of foreign investors without the foreign investors having to open their own accounts with foreign exchange banks.

Item 10.E. Taxation

Korean Taxes

The following summary describes the material Korean tax consequences of ownership of the Registered Debt Securities and ADSs. Persons considering the purchase of the Registered Debt Securities or ADSs should consult their own tax advisors with regard to the application of the Korean income tax laws to their particular situations as well as any tax consequences arising under the laws of any other taxing jurisdiction. Reference is also made to a tax treaty between Korea and the United States entitled “Convention Between the United States of America and the Republic of Korea for the Avoidance of Double Taxation and the Prevention of Fiscal Evasion with Respect to Taxes on Income and the Encouragement of International Trade and Investment,” signed on June 4, 1976 and entered into force on October 20, 1979.

The following summary of Korean tax considerations applies to you so long as you are not:

 

  

a resident of Korea;

 

  

a corporation having its head office, principal place of business or place of effective management in Korea; or

 

  

engaged in a trade or business in Korea through a permanent establishment or a fixed base to which the relevant income is attributable or with which the relevant income is effectively connected.

Registered Debt Securities

Taxation of Interest

Pursuant to the Special Tax Treatment Control Law (“STTCL”), when we make payments of interest to you on the Registered Debt Securities, no amount will be withheld from such payments for, or on account of, any income taxes of any kind imposed, levied, withheld or assessed by Korea or any political subdivision or taxing authority thereof or therein, provided that Registered Debt Securities are deemed to be foreign currency-denominated bonds issued outside of Korea for the purpose of the STTCL.

If the tax exemption under the STTCL referred to above were to cease to be in effect, the rate of income tax or corporation tax applicable to the interest on the Registered Debt Securities would be 14% of income for a non-resident without a permanent establishment in Korea. In addition, local income tax would be imposed at the rate of 10.0% of the income tax or corporation tax (which would increase the total tax rate to 15.4%), unless

 

147


Table of Contents

reduction is available under an applicable income tax treaty. If you are a qualified resident in a country that has entered into a tax treaty with Korea, you may qualify for an exemption or a reduced rate of Korean withholding tax. See the discussion under “—Shares or ADSs—Tax Treaties” below for an additional explanation on treaty benefits.

In order to obtain the benefits of an exemption or a reduced withholding tax rate under a tax treaty, you must submit to us, prior to the interest payment date, such evidence of tax residence as may be required by the Korean tax authorities in order to establish your entitlement to the benefits of the applicable tax treaty.

Furthermore, Korean tax laws require the beneficial owner to submit an application for entitlement to a reduced tax rate together with the documents proving the beneficial owner of such Korean source income (including a certificate of tax residence of the beneficial owner issued by a competent authority of the country of tax residence of the beneficial owner) to a withholding obligor paying Korean source income in order to benefit from the available reduced tax rate pursuant to the relevant tax treaty. Under Korean tax laws and subject to certain exceptions, an overseas investment vehicle (which is defined as an organization established in a foreign jurisdiction that manages funds collected through investment solicitation by acquiring, disposing or otherwise investing in proprietary targets and then distributes the proceeds thereof to investors) (the “Overseas Investment Vehicle”) must obtain an application for entitlement to a reduced tax rate along with the documents proving the beneficial owner of such Korean source income (including a certificate of tax residence) from the beneficial owner and submit to the withholding obligor an overseas investment vehicle report (prepared by the Overseas Investment Vehicle) which includes a detailed statement on the beneficial owner together with the application for entitlement to a reduced tax rate received from the beneficial owner.

Due to recent amendment to the Korean tax laws, which applies for fiscal years beginning on or after January 1, 2020, Overseas Investment Vehicles may be regarded as beneficial owners of Korean sourced income in certain situations. Pursuant to such amendment, Overseas Investment Vehicles may be treated as beneficial owners of Korean source income if one of the following conditions are met: (i) the Overseas Investment Vehicle is subject to taxation in the jurisdiction in which it resides and there is no intentional tax avoidance purpose to establishing the Overseas Investment Vehicle in the jurisdiction; (ii) the Overseas Investment Vehicle is deemed as the beneficial owner under a tax treaty; or (iii) the Overseas Investment Vehicle is unable to confirm its list of beneficial owners investing in the Overseas Investment Vehicle (if only a portion of the beneficial owners are confirmed, applies with respect to the remaining unconfirmed list of beneficial owners). Overseas Investment Vehicles that are not regarded as foreign “corporations” for purposes of the Korean tax law may be recognized as beneficial owners if one of the above conditions (ii) or (iii) are met. Starting from January 1, 2022, the above conditions (i) and (ii) are changed as follows: (i) under the applicable tax treaty, the Overseas Investment Vehicle bears tax liabilities in the country in which it is established and the Korean source income is eligible for the treaty benefits under the tax treaty; or (ii) where the Overseas Investment Vehicle does not meet the above condition (i), the Overseas Investment Vehicle is deemed to be the beneficial owner of the Korean source income under the applicable tax treaty and the Korean source income is eligible for the treaty benefits under the tax treaty. Further, Overseas Investment Vehicles that meet condition (iii) would be subject to the default statutory withholding tax rate under the Korean tax laws and the treaty withholding rates under relevant tax treaties would not apply even though the Overseas Investment Vehicles are deemed to be beneficial owners of Korean source income.

Taxation of Capital Gains

Korean tax laws currently exclude from Korean taxation gains made by a non-resident without a permanent establishment in Korea from the sale of a Registered Debt Security to another non-resident (except where a non-resident sells Registered Debt Securities to another non-resident’s permanent establishment in Korea, if any). In addition, capital gains realized from the transfer of Registered Debt Securities outside Korea by non-residents with or without permanent establishments in Korea are currently exempt from taxation by virtue of the STTCL, provided that the issuance of such Registered Debt Securities is deemed to be an overseas issuance of foreign currency-denominated bonds under the STTCL. If you sell or otherwise dispose of a Registered Debt

 

148


Table of Contents

Security through other ways than those mentioned above, any gain realized on the transaction will be taxable at ordinary Korean withholding tax rates (which is the lesser of 11.0% (including local income tax) of the gross sale proceeds or 22.0% (including local income tax) of the net gain, subject to the production of satisfactory evidence of the acquisition cost of such Registered Debt Securities and certain direct transaction costs attributable to the disposal of such Registered Debt Securities), unless an exemption is available under an applicable income tax treaty. See the discussion under “—Shares or ADSs—Tax Treaties” below for an additional explanation on treaty benefits.

In order to obtain the benefit of an exemption from tax pursuant to a tax treaty, you must submit to the purchaser or any other withholding obligor, prior to or at the time of payment, such evidence of your tax residence as the Korean tax authorities may require in support of your claim for treaty benefits.

Furthermore, Korean tax laws require the beneficial owner to submit an application for tax exemption together with the documents proving the beneficial owner of such Korean source income (including a certificate of tax residence of the beneficial owner issued by a competent authority of the country of tax residence of the beneficial owner) to a withholding obligor paying Korean source income in order to benefit from the available exemption pursuant to the relevant tax treaty. Under Korean tax laws and subject to certain exceptions, the Overseas Investment Vehicle must obtain an application for tax exemption along with the documents proving the beneficial owner of such Korean source income (including a certificate of tax residence) from the beneficial owner and forward it to the withholding obligor along with an overseas investment vehicle report (prepared by the Overseas Investment Vehicle) which includes a detailed statement on the beneficial owner together with the application for tax exemption received from the beneficial owner. The withholding obligor must submit the application and the report to the relevant tax office by the ninth day of the month following the date of the first payment of such income.

Inheritance Tax and Gift Tax

If you die while you are the holder of Registered Debt Securities, the subsequent transfer of the Registered Debt Securities by way of succession will be subject to Korean inheritance tax. Similarly, if you transfer Registered Debt Securities as a gift, the donee will be subject to Korean gift tax and you may be required to pay the gift tax if the donee fails to do so.

At present, Korea has not entered into any tax treaty relating to inheritance or gift taxes.

Shares or ADSs

Dividends on the Shares of Common Stock or ADSs

We will deduct Korean withholding tax from dividends (whether in cash or in shares) paid to you at a rate of 22% (inclusive of local income tax). If you are a qualified resident in a country that has entered into a tax treaty with Korea, you may qualify for a reduced rate of Korean withholding tax. See the discussion under “—Tax Treaties” below for an additional explanation on treaty benefits.

In order to obtain the benefits of a reduced withholding tax rate under a tax treaty, you must submit to the Korea Securities Depository, prior to the dividend payment date, such evidence of tax residence as may be required by the Korean tax authorities in order to establish your entitlement to the benefits of the applicable tax treaty. Evidence of tax residence may be submitted to the Korea Securities Depository through the withholding tax agent. If we distribute to you free shares representing a transfer of certain capital reserves or asset revaluation reserves into paid-in capital, such distribution may be subject to Korean withholding tax.

Furthermore, Korean tax laws require the beneficial owner to submit an application for entitlement to a reduced tax rate together with the documents proving the beneficial owner of such Korean source income

 

149


Table of Contents

(including a certificate of tax residence of the beneficial owner issued by a competent authority of the country of tax residence of the beneficial owner) to a withholding obligor paying Korean source income in order to benefit from the available reduced tax rate pursuant to the relevant tax treaty. Under Korean tax laws and subject to certain exceptions, the Overseas Investment Vehicle must obtain an application for entitlement to a reduced tax rate along with the documents proving the beneficial owner of such Korean source income (including a certificate of tax residence) from the beneficial owner and submit to the withholding obligor an overseas investment vehicle report (prepared by the Overseas Investment Vehicle) which includes a detailed statement on the beneficial owner together with the application for entitlement to a reduced tax rate received from the beneficial owner.

If you hold common shares or ADSs and receive the dividend through an account at the Korea Securities Depository held by a foreign depositary settlement institute, you are not required to submit the application for entitlement to a reduced tax rate. However, the documents proving the beneficial owner of such Korean source income (including a certificate of tax residence of the beneficial owner) may need to be submitted to us through such foreign depositary settlement institute.

Taxation of Capital Gains

As a general rule, capital gains earned by non-residents upon the transfer of the common shares or ADSs would be subject to Korean income tax at a rate equal to the lesser of (i) 11.0% (including local income tax) of the gross proceeds realized or (ii) 22.0% (including local income tax) of the net realized gain (subject to the production of satisfactory evidence of the acquisition costs and certain direct transaction costs arising out of the transfer of such common shares or ADSs), unless such non-resident is exempt from Korean income taxation under an applicable Korean tax treaty into which Korea has entered with the non-resident’s country of tax residence. Please see the discussion under “—Tax Treaties” below for an additional explanation on treaty benefits. Even if you do not qualify for any exemption under a tax treaty, you will not be subject to the foregoing income tax on capital gains if you qualify for the relevant Korean domestic tax law exemptions discussed in the following paragraphs.

You will not be subject to Korean income taxation on capital gains realized upon the transfer of our common stocks or ADSs through the Korea Exchange if you (i) have no permanent establishment in Korea and (ii) did not own or have not owned (together with any shares owned by any entity which you have a certain special relationship with and possibly including the shares represented by the ADSs) 25.0% or more of our total issued and outstanding shares at any time during the calendar year in which the sale occurs and during the five calendar years prior to the calendar year in which the sale occurs.

It should be noted that (i) capital gains earned by you (regardless of whether you have a permanent establishment in Korea) from the transfer of ADSs outside Korea will be exempted from Korean income taxation provided that ADSs are deemed to have been issued overseas under the STTCL, but (ii) if and when an owner of the underlying shares of stock transfers ADSs after conversion of the underlying shares into ADSs, the exemption described in (i) is not applicable.

If you are subject to tax on capital gains with respect to the sale of ADSs, or of shares of common stock which you acquired as a result of a withdrawal, the purchaser or, in the case of the sale of shares of common stock on the Korea Exchange or through an investment dealer or investment broker under the Financial Investment Services and Capital Markets Act, an investment dealer or investment broker is required to withhold Korean tax from the sales price in an amount equal to 11.0% (including local income tax) of the gross realization proceeds and to make payment of these amounts to the Korean tax authority, unless you establish your entitlement to an exemption under an applicable tax treaty or domestic tax law or produce satisfactory evidence of your acquisition cost and transaction costs for the shares of common stock or the ADSs.

However, if you transfer the ADSs following an exchange of the underlying shares of stock owned by you for ADSs to a purchaser who is a non-resident or a foreign company without a permanent establishment in Korea,

 

150


Table of Contents

you are obligated to file an income tax return and pay tax on gain realized from such transfer unless exempt under an applicable tax treaty or domestic law. Further, if you transfer the shares of common stock outside of Korea (excluding a transfer on a foreign exchange) to non-residents or foreign companies without permanent establishments in Korea, you are obligated to file an income tax return and pay income tax on capital gain realized from such transfer unless exempt under an applicable tax treaty or domestic law. If a purchaser or an investment dealer or investment broker, as the case may be, withholds and remits the tax on capital gains derived from transfer of shares of common stock or ADSs, your obligation to file an income tax return and pay income tax will not apply.

In order to obtain the benefit of an exemption from tax pursuant to a tax treaty, you must submit to the purchaser or the investment dealer or the investment broker, or through the ADS depositary, as the case may be, prior to or at the time of payment, such evidence of your tax residence as the Korean tax authorities may require in support of your claim for treaty benefits. Please see the discussion under “—Tax Treaties” below for an additional explanation on claiming treaty benefits. Furthermore, Korean tax laws require the beneficial owner to submit an application for tax exemption together with the documents proving the beneficial of such Korean source income (including a certificate of tax residence of the beneficial owner issued by a competent authority of the country of tax residence of the beneficial owner) to a withholding obligor paying Korean source income in order to benefit from the available exemption pursuant to the relevant tax treaty. Under Korean tax laws and subject to certain exceptions, the Overseas Investment Vehicle must obtain an application for tax exemption along with the documents proving the beneficial owner of such Korean source income (including a certificate of tax residence) from the beneficial owner and forward it to the withholding obligor along with an overseas investment vehicle report (prepared by the Overseas Investment Vehicle) which includes a detailed statement on the beneficial owner together with the application for tax exemption received from the beneficial owner. The withholding obligor must submit the application and the report to the relevant tax office by the ninth day of the month following the date of the first payment of such income.

Tax Treaties

Korea has entered into a number of income tax treaties with other countries (including the United States), which would reduce or exempt Korean withholding tax on dividends on, and capital gains on transfer of, shares of our common stock or ADSs. For example, under the Korea-United States income tax treaty, reduced rates of Korean withholding tax of 16.5% or 11.0% (respectively, including local income tax, depending on your status and shareholding ratio) on dividends and an exemption from Korean withholding tax on capital gains are available to residents of the United States that are beneficial owners of the relevant dividend income or capital gains. However, under Article 17 (Investment of Holding Companies) of the Korea-United States income tax treaty, such reduced rates and exemption do not apply if (i) you are a United States corporation, (ii) by reason of any special measures, the tax imposed on you by the United States with respect to such dividends or capital gains is substantially less than the tax generally imposed by the United States on corporate profits, and (iii) 25.0% or more of your capital is held of record or is otherwise determined, after consultation between competent authorities of the United States and Korea, to be owned directly or indirectly by one or more persons who are not individual residents of the United States. Also, under Article 16 (Capital Gains) of the Korea-United States income tax treaty, the exemption on capital gains does not apply if you are an individual, and (a) you maintain a fixed base in Korea for a period or periods aggregating 183 days or more during the taxable year and your ADSs or shares of common stock giving rise to capital gains are effectively connected with such fixed base or (b) you are present in Korea for a period or periods of 183 days or more during the taxable year.

You should inquire for yourself whether you are entitled to the benefit of an income tax treaty with Korea. It is the responsibility of the party claiming the benefits of an income tax treaty in respect of interest or dividend payments or capital gains to submit to us, the purchaser or the investment dealer or the investment broker, as applicable, the documents proving the beneficial owner of such Korean source income including a certificate as to his tax residence. In the absence of sufficient proof, we, the purchaser or the investment dealer or the investment broker, as applicable, must withhold tax at the normal rates.

 

151


Table of Contents

Inheritance Tax and Gift Tax

If you die while holding an ADS or donate an ADS, it is unclear whether, for Korean inheritance and gift tax purposes, you will be treated as the owner of the shares of common stock underlying the ADSs. If the tax authority interprets depositary receipts as the underlying share certificates, you may be treated as the owner of the shares of common stock and your heir or the donee (or in certain circumstances, you as the donor) will be subject to Korean inheritance or gift tax presently at the rate of 10.0% to 50.0%, depending on the value of the ADSs or shares of common stock.

If you die while holding a share of common stock or donate a share of common stock, your heir or donee (or in certain circumstances, you as the donor) will be subject to Korean inheritance or gift tax at the same rate as indicated above.

At present, Korea has not entered into any tax treaty relating to inheritance or gift taxes.

Securities Transaction Tax

If you transfer shares of common stock on the Stock Market of the Korea Exchange, you will be subject to securities transaction tax at the rate of 0.03% (which will be reduced to 0% for transfers on or after January 1, 2025) and an agriculture and fishery special surtax at the rate of 0.15% of the sale price of the shares of common stock. If your transfer of the shares of common stock is not made on the Stock Market of the Korea Exchange, subject to certain exceptions you will be subject to securities transaction tax at the rate of 0.35% and will not be subject to an agriculture and fishery special surtax.

Under the Securities Transaction Tax Law, depositary receipts (such as ADSs) constitute share certificates subject to the securities transaction tax. However, a transfer of depositary receipts listed on the New York Stock Exchange, NASDAQ National Market or other qualified foreign exchanges will be exempt from the securities transaction tax although depositary receipts, including ADSs, constitute share certificates subject to the securities transaction tax.

In principle, the securities transaction tax, if applicable, must be paid by the transferor of the shares or rights. When the transfer is effected through the Korea Securities Depository, the Korea Securities Depository is generally required to withhold and pay the tax to the tax authorities. When such transfer is made through an investment dealer or investment broker under the Financial Investment Services and Capital Markets Act only, such investment dealer or investment broker is required to withhold and pay the tax. Where the transfer is effected by a non-resident without a permanent establishment in Korea, other than through the Korea Securities Depository or an investment dealer or investment broker, the transferee is required to withhold the securities transaction tax for payment to the Korean tax authority.

U.S. Federal Income Tax Considerations for U.S. Persons

The following is a summary of certain U.S. federal income tax consequences of the ownership and disposition of the Registered Debt Securities, common stock and ADSs for beneficial owners of the Registered Debt Securities, common stock and ADSs that are “U.S. Persons” (as defined below). For purposes of this summary, you are a “U.S. Person” if you are any of the following for U.S. federal income tax purposes:

 

  

an individual citizen or resident of the United States;

 

  

a corporation, or other entity treated as a corporation for U.S. federal income tax purposes, created or organized in or under the laws of the United States, any state thereof or the District of Columbia;

 

  

an estate the income of which is subject to U.S. federal income taxation regardless of its source; or

 

152


Table of Contents
  

a trust if (1) it is subject to the primary supervision of a court within the United States and one or more United States persons have the authority to control all substantial decisions of the trust or (2) it has a valid election in effect under applicable U.S. Treasury regulations to be treated as a United States person.

This summary is based on current law, which is subject to change (perhaps retroactively), is for general purposes only and should not be considered tax advice. This summary does not represent a detailed description of the U.S. federal income tax consequences to you and does not address the effects of the Medicare contribution tax on net investment income, U.S. federal estate and gift taxes or foreign, state, local or other tax considerations that may be relevant to you in light of your particular circumstances. The discussion set forth below is applicable to you if (i) you are a resident of the United States for purposes of the current income tax treaty between the United States and Korea (the “Treaty”), (ii) your Registered Debt Securities, common stock or ADSs are not, for purposes of the Treaty, effectively connected with a permanent establishment in Korea and (iii) you otherwise qualify for the full benefits of the Treaty. This summary deals only with Registered Debt Securities, common stock or ADSs held as capital assets, and it does not represent a detailed description of the U.S. federal income tax consequences applicable to you if you are subject to special treatment under the U.S. federal income tax laws (including if you are a dealer in securities or currencies, a financial institution, a regulated investment company, a real estate investment trust, an insurance company, a tax-exempt organization, a person holding the Registered Debt Securities, common stock or ADSs as part of a hedging, integrated or conversion transaction, constructive sale or straddle, a person owning 10.0% or more of our stock (by vote or value), a trader in securities that elects to use a mark-to-market method of accounting for your securities holdings, a person liable for alternative minimum tax, a person required to accelerate the recognition of any item of gross income with respect to the Registered Debt Securities, common stock or ADSs as a result of such income being recognized on an applicable financial statement, a partnership or other pass-through entity (or an investor therein), or a U.S. Person whose “functional currency” is not the U.S. dollar). We cannot assure you that a change in law will not alter significantly the tax considerations that we describe in this summary.

If a partnership (or other entity treated as a partnership for U.S. federal income tax purposes) holds the Registered Debt Securities, common stock or ADSs, the tax treatment of a partner will generally depend upon the status of the partner and the activities of the partnership. If you are a partner of a partnership holding our Registered Debt Securities, common stock or ADSs, you should consult your tax advisor.

Because of the 100-year maturity of the One Hundred Year 7.95% Zero-to-Full Debentures, due April 1, 2096 (the “ZTF Debentures”), it is not certain whether the ZTF Debentures will be treated as debt for U.S. federal income tax purposes. The discussion below assumes that the ZTF Debentures (as well as the other Registered Debt Securities) will be treated as debt, except that a summary of the consequences to you if the ZTF Debentures were not treated as debt is provided under “Tax Consequences with Respect to Registered Debt Securities Generally—ZTF Debentures Treated as Equity” below.

The discussion below of the tax consequences of the ownership and disposition of ADSs assumes that the deposit agreement, and all other related agreements, will be performed in accordance with their terms.

You should consult your own tax advisor concerning the particular U.S. federal income tax consequences to you of the ownership and disposition of the Registered Debt Securities, common stock and ADSs, as well as the consequences to you arising under other United States federal tax laws and the laws of any other taxing jurisdiction.

Tax Consequences with Respect to Registered Debt Securities Generally

Payments

Except as provided below with regard to original issue discount on the ZTF Debentures, interest on a Registered Debt Security will generally be taxable to you as ordinary income at the time it is paid or accrued in

 

153


Table of Contents

accordance with your method of accounting for tax purposes. Principal payments on an amortizing Registered Debt Security generally will constitute a tax-free return of capital to you to the extent of your adjusted tax basis in the Registered Debt Security, and any principal payments in excess of your adjusted tax basis generally will be taxed as capital gain.

Although interest payments to you are currently exempt from Korean taxation provided that Registered Debt Securities are deemed to be foreign currency-denominated bonds issued outside of Korea for the purpose of the STTCL (see—“Korean Taxes—Registered Debt Securities—Taxation of Interest,” above), if the Korean law providing for the exemption is repealed, then, in addition to interest payments on the Registered Debt Securities and original issue discount on the ZTF Debentures, you will be required to include in income any additional amounts paid and any Korean tax withheld from interest payments notwithstanding that you in fact did not receive such withheld tax. You may be entitled to credit such Korean tax (up to the Treaty rate), subject to applicable conditions and limitations in the Internal Revenue Code of 1986, as amended (the “Code”). However, Treasury regulations addressing foreign tax credits (the “Foreign Tax Credit Regulations”) impose additional requirements for foreign taxes to be eligible for a foreign tax credit, and there can be no assurance that those requirements will be satisfied if you do not elect to apply the benefits of the Treaty. The Department of the Treasury and the Internal Revenue Service (the “IRS”) are considering proposing amendments to the Foreign Tax Credit Regulations. In addition, recent notices from the IRS provide temporary relief by allowing taxpayers that comply with applicable requirements to apply many aspects of the foreign tax credit regulations as they previously existed (before the release of the current Foreign Tax Credit Regulations) for taxable years ending before the date that a notice or other guidance withdrawing or modifying the temporary relief is issued (or any later date specified in such notice or other guidance). For purposes of calculating the foreign tax credit, interest income on a Registered Debt Security (including additional amounts and any Korean taxes withheld in respect thereof) and original issue discount on a ZTF Debenture will be treated as foreign source income and will generally be considered passive category income. You will generally be denied a foreign tax credit for Korean taxes imposed with respect to the Registered Debt Securities if you do not meet a minimum holding period requirement during which you are not protected from risk of loss. Instead of claiming a foreign tax credit, you may be able to deduct Korean withholding taxes on interest in computing your taxable income, subject to generally applicable limitations under U.S. law (including that a U.S. Person is not eligible for a deduction for otherwise creditable foreign income taxes paid or accrued in a taxable year if such U.S. Person claims a foreign tax credit for any foreign income taxes paid or accrued in the same taxable year). The rules governing the foreign tax credit and deductions for foreign taxes are complex. Investors are urged to consult their tax advisors regarding the availability of the foreign tax credit or a deduction under their particular circumstances.

Original Issue Discount

The ZTF Debentures were issued with original issue discount (“OID”) for U.S. federal income tax purposes in an amount equal to the difference between (i) the sum of all scheduled amounts payable on the ZTF Debentures (including the interest payable on such ZTF Debentures) and (ii) the “issue price” of the ZTF Debentures. The “issue price” of each ZTF Debenture is the first price at which a substantial amount of the ZTF Debentures was sold to the public (other than to an underwriter, broker, placement agent or wholesaler). If you hold ZTF Debentures, then (subject to the discussion in “—Acquisition Premium; Bond Premium” below) you generally must include OID in gross income (as ordinary income) in advance of the receipt of cash attributable to that income, regardless of your method of accounting. However, you generally will not be required to include separately in income cash payments received on the ZTF Debentures, even if denominated as interest.

The amount of OID includible in income by the holder of a ZTF Debenture is the sum of the “daily portions” of OID with respect to the ZTF Debenture for each day during the taxable year or portion of the taxable year in which such holder held such ZTF Debenture, or “accrued OID” (for a discussion relevant to subsequent purchasers, see “—Market Discount” and “—Acquisition Premium; Bond Premium,” below). The daily portion is determined by allocating to each day in any “accrual period” a pro rata portion of the OID allocable to that accrual period. The “accrual period” for a ZTF Debenture may be of any length and may vary in length over the

 

154


Table of Contents

term of the ZTF Debenture, provided that each accrual period is no longer than one year and each scheduled payment of principal or interest occurs on the first day or the final day of an accrual period. The amount of OID allocable to any accrual period other than the final accrual period is an amount equal to the product of the ZTF Debenture’s adjusted issue price at the beginning of such accrual period and its yield to maturity (determined on the basis of compounding at the close of each accrual period and properly adjusted for the length of the accrual period). OID allocable to a final accrual period is the difference between the amount payable at maturity and the adjusted issue price at the beginning of the final accrual period. The “adjusted issue price” of a ZTF Debenture at the beginning of any accrual period is equal to its issue price increased by the accrued OID for each prior accrual period (for subsequent purchasers, determined without regard to the amortization of any acquisition or bond premium, as described below) and reduced by any payments previously made on such ZTF Debenture. Under these rules, you will have to include in income increasingly greater amounts of OID in successive accrual periods. We are required to provide information returns stating the amount of OID accrued on ZTF Debentures held of record by persons other than corporations and other exempt holders.

As discussed above, although interest payments to you are currently exempt from Korean taxation provided that Registered Debt Securities are deemed to be foreign currency-denominated bonds issued outside of Korea for the purpose of the STTCL (see—“Korean Taxes—Registered Debt Securities—Taxation of Interest,” above), if the Korean law providing for the exemption is repealed, then Korean withholding tax may be imposed at times that differ from the times at which you are required to include interest or OID in income for U.S. federal income tax purposes and this disparity may limit the amount of foreign tax credit available.

Market Discount

If you purchase a Registered Debt Security other than a ZTF Debenture for an amount that is less than its stated redemption price at maturity, or, in the case of a ZTF Debenture, its adjusted issue price, the amount of the difference will be treated as “market discount” for U.S. federal income tax purposes, unless that difference is less than a specified de minimis amount. Under the market discount rules, you will be required to treat any principal payment on, or any gain on the sale, exchange, retirement or other disposition of, a Registered Debt Security as ordinary income to the extent of the market discount that you have not previously included in income and are treated as having accrued on the Registered Debt Security at the time of the payment or disposition. In addition, you may be required to defer, until the maturity of the Registered Debt Security or its earlier disposition in a taxable transaction, the deduction of all or a portion of the interest expense on any indebtedness attributable to the Registered Debt Security. Any amount treated as ordinary income pursuant to the market discount rules generally should be treated as foreign source income.

Any market discount will be considered to accrue ratably during the period from the date of acquisition to the maturity date of the Registered Debt Security, unless you elect to accrue on a constant interest method. Your election to accrue market discount on a constant interest method is to be made for the taxable year in which you acquired the Registered Debt Security, applies only to that Registered Debt Security and cannot be revoked. Special rules will apply in determining the accrual of market discount for an amortizing Registered Debt Security. You may elect to include market discount in income currently as it accrues, on either a ratable or constant interest method, in which case the rule described above regarding deferral of interest deductions will not apply. Your election to include market discount in income currently, once made, applies to all market discount obligations acquired by you on or after the first day of the first taxable year to which your election applies and may not be revoked without the consent of the IRS. You should consult your own tax advisor before making this election.

Acquisition Premium; Bond Premium

If you purchase a ZTF Debenture for an amount that is greater than its adjusted issue price but equal to or less than the sum of all amounts payable on the ZTF Debenture after the purchase date, you will be considered to have purchased that ZTF Debenture at an “acquisition premium.” Under the acquisition premium rules, the

 

155


Table of Contents

amount of OID that you must include in gross income with respect to a ZTF Debenture for any taxable year will be reduced by the portion of the acquisition premium properly allocable to that year.

If you purchase a Registered Debt Security for an amount in excess of the sum of all amounts payable on the Registered Debt Security after the purchase date other than qualified stated interest (as defined in the Code), you will be considered to have purchased the Registered Debt Security at a “premium” and, if such Registered Debt Security is a ZTF Debenture, you will not be required to include any OID in income. Interest on a debt instrument is generally treated as qualified stated interest if it is unconditionally payable in cash or property (other than debt instruments of the issuer) at least annually at a single fixed rate. The interest on the ZTF Debentures does not constitute qualified stated interest. You generally may elect to amortize any premium on a Registered Debt Security over the remaining term of the Registered Debt Security on a constant yield method as an offset to interest when includible in income under your regular accounting method. In the case of instruments that provide for alternative payment schedules, bond premium is calculated by assuming that (a) you will exercise or not exercise options in a manner that maximizes your yield, and (b) we will exercise or not exercise options in a manner that minimizes your yield (except that we will be assumed to exercise call options in a manner that maximizes your yield). If you do not elect to amortize bond premium, that premium will decrease the gain or increase the loss you would otherwise recognize on disposition of a Registered Debt Security. Your election to amortize premium on a constant yield method will also apply to all taxable debt obligations held or subsequently acquired by you on or after the first day of the first taxable year to which the election applies. You may not revoke the election without the consent of the IRS. You should consult your own tax advisor before making this election.

Sale, Exchange and Retirement of Registered Debt Securities

Upon the sale, exchange, retirement or other disposition of a Registered Debt Security, you generally will recognize gain or loss equal to the difference between the amount you receive (not including an amount equal to any accrued qualified stated interest, which will be taxable as ordinary income to the extent not previously included in income) and your adjusted tax basis in the Registered Debt Security. Your adjusted tax basis in a Registered Debt Security other than a ZTF Debenture will generally be your cost of obtaining the Registered Debt Security, increased by any market discount previously included in income and reduced by payments of principal you receive and any bond premium that you have previously amortized. Your adjusted tax basis in a ZTF Debenture will, in general, be your cost therefor, increased by any market discount and OID previously included in income and reduced by any cash payments on the ZTF Debenture and any bond premium that you have previously amortized. Except as described above with respect to market discount, your gain or loss realized upon the sale, exchange, retirement or other disposition of a Registered Debt Security will be capital gain or loss and will generally be long-term capital gain or loss if, at the time of the sale, exchange, retirement or other disposition, you have held the Registered Debt Security for more than one year. Long-term capital gains of non-corporate U.S. Persons (including individuals) are eligible for reduced rates of taxation. Your ability to deduct capital losses is subject to limitations.

Except as described above with respect to market discount, your gain or loss realized upon the sale, exchange, retirement or other disposition of a Registered Debt Security will generally be treated as U.S. source gain or loss. Consequently, you may not be able to use a foreign tax credit for any Korean tax imposed on the disposition of Registered Debt Securities unless such credit can be applied (subject to applicable limitations) against tax due on other income treated as derived from foreign sources. However, pursuant to the Foreign Tax Credit Regulations, unless you elect to apply the benefits of the Treaty, any such Korean tax would generally not be a foreign income tax eligible for a foreign tax credit (regardless of any other income that you may have that is derived from foreign sources). In such case, the non-creditable Korean tax may reduce the amount realized upon the sale, exchange, retirement or other disposition. As discussed above, however, recent notices from the IRS provide temporary relief by allowing taxpayers that comply with applicable requirements to apply many aspects of the foreign tax credit regulations as they previously existed (before the release of the current Foreign Tax Credit Regulations) for taxable years ending before the date that a notice or other guidance withdrawing or

 

156


Table of Contents

modifying the temporary relief is issued (or any later date specified in such notice or other guidance). If any Korean tax is imposed upon the disposition of Registered Debt Securities and you apply such temporary relief, such Korean tax may be eligible for a foreign tax credit or deduction, subject to the applicable conditions and limitations. Investors are urged to consult their tax advisors regarding the availability of the foreign tax credit or a deduction under their particular circumstances.

ZTF Debentures Treated as Equity

If the ZTF Debentures were treated as equity for U.S. federal income tax purposes, amounts actually or deemed paid with respect to the ZTF Debentures would be deemed dividends for U.S. federal income tax purposes to the extent paid out of our current or accumulated earnings and profits (as determined for U.S. federal income tax purposes).

You would include the amounts actually or deemed paid by us on the ZTF Debentures (before reduction for Korean withholding tax, if any) as dividend income when actually or constructively paid by us. Section 305 of the Code, which would apply to the ZTF Debentures if they were treated as equity for U.S. federal income tax purposes, requires current accrual of dividends under principles similar to the accrual of OID. Amounts treated as dividends will not be eligible for the dividends received deduction generally allowed to U.S. corporations. In addition, it is unclear whether any amounts treated as dividends would be eligible for the reduced rates of taxation that apply to “qualified dividend income” (as described below in “—Tax Consequences with Respect to Common Stock and ADSs—Distributions on Common Stock or ADSs”).

Tax Consequences with Respect to Common Stock and ADSs

In general, for U.S. federal income tax purposes, holders of ADSs will be treated as the owners of the underlying common stock that is represented by such ADSs. Accordingly, deposits or withdrawals of common stock for ADSs will not be subject to U.S. federal income tax.

Distributions on Common Stock or ADSs

The gross amount of distributions (other than certain pro rata distributions of common stock or rights to subscribe for common stock) to holders of common stock or ADSs (including amounts withheld in respect of Korean withholding taxes) will be taxable dividends to such holders to the extent paid out of our current or accumulated earnings and profits, as determined under U.S. federal income tax principles. Such income (including withheld taxes) will be includable in the gross income of a holder as ordinary income on the day actually or constructively received by the holder, in the case of common stock, or by the depositary, in the case of ADSs. Such dividends will not be eligible for the dividends received deduction generally allowed to corporations under the Code.

Subject to applicable limitations (including a minimum holding period requirement), certain dividends received by non-corporate U.S. Persons from a qualified foreign corporation may be treated as “qualified dividend income” that is subject to reduced rates of taxation. A qualified foreign corporation includes a foreign corporation that is eligible for the benefits of an income tax treaty with the United States, if such treaty contains an exchange of information provision and the U.S. Treasury Department has determined that the treaty is satisfactory for purposes of the legislation. The U.S. Treasury Department has determined that the Treaty, which contains an exchange of information provision, is satisfactory for these purposes. In addition, we believe we are eligible for the benefits of the Treaty. In addition, a foreign corporation is also treated as a qualified foreign corporation with respect to dividends paid by that corporation on shares (or ADSs backed by such shares) that are readily tradable on an established securities market in the United States. Although shares of our common stock will generally not be considered readily tradable for these purposes, U.S. Treasury Department guidance indicates that our ADSs, which are listed on the New York Stock Exchange, are readily tradable on an established securities market in the United States. There can be no assurance that our ADSs will be considered

 

157


Table of Contents

readily tradable on an established securities market in the United States in later years. Holders should consult their own tax advisors regarding the application of the foregoing rules to their particular circumstances.

The amount of any dividend paid in Won will equal the U.S. dollar value of the Won received calculated by reference to the exchange rate in effect on the date the dividend is received by the holder, in the case of common stock, or by the depositary, in the case of ADSs, regardless of whether the Won are converted into U.S. dollars. If the Won received as a dividend are not converted into U.S. dollars on the date of receipt, a holder will have a basis in the Won equal to their U.S. dollar value on the date of receipt. Any gain or loss realized on a subsequent conversion or other disposition of the Won will be treated as U.S. source ordinary income or loss. The amount of any distribution of property other than cash will be the fair market value of such property on the date of distribution.

The maximum rate of withholding tax on dividends paid to you pursuant to the Treaty is 16.5%. You will be required to properly demonstrate your entitlement to the reduced rate of withholding under the Treaty (see “ —Korean Taxes—Shares or ADSs —Tax Treaties”). Subject to certain conditions and limitations, Korean withholding taxes (up to the Treaty rate) may be treated as foreign taxes eligible for credit against your U.S. federal income tax liability. However, the Foreign Tax Credit Regulations impose additional requirements for foreign taxes to be eligible for a foreign tax credit, and there can be no assurance that those requirements will be satisfied if you do not elect to apply the benefits of the Treaty. The Department of the Treasury and the IRS are considering proposing amendments to the Foreign Tax Credit Regulations. In addition, recent notices from the IRS provide temporary relief by allowing taxpayers that comply with applicable requirements to apply many aspects of the foreign tax credit regulations as they previously existed (before the release of the current Foreign Tax Credit Regulations) for taxable years ending before the date that a notice or other guidance withdrawing or modifying the temporary relief is issued (or any later date specified in such notice or other guidance). For purposes of calculating the foreign tax credit, dividends paid on the common stock or ADSs will be treated as foreign source income and will generally be considered passive category income. You will generally be denied a foreign tax credit for Korean taxes imposed on dividends paid on common stock or ADSs if you do not meet a minimum holding period requirement during which you are not protected from risk of loss. Instead of claiming a foreign tax credit, you may be able to deduct Korean withholding taxes on dividends in computing your taxable income, subject to generally applicable limitations under U.S. law (including that a U.S. Person is not eligible for a deduction for otherwise creditable foreign income taxes paid or accrued in a taxable year if such U.S. Person claims a foreign tax credit for any foreign income taxes paid or accrued in the same taxable year). The rules governing the foreign tax credit and deductions for foreign taxes are complex. Investors are urged to consult their tax advisors regarding the availability of the foreign tax credit or a deduction under their particular circumstances, including the possible adverse impact on creditability to the extent you are entitled to a refund of any Korean tax withheld or a reduced rate of withholding.

To the extent that the amount of any distribution exceeds our current and accumulated earnings and profits for a taxable year, as determined under U.S. federal income tax principles, the distribution will first be treated as a tax-free return of capital, causing a reduction in the adjusted basis of the common stock or ADSs (thereby increasing the amount of gain, or decreasing the amount of loss, to be recognized by the investor on a subsequent disposition of the common stock or ADSs), and the balance in excess of adjusted basis will be taxed as capital gain recognized on a sale or exchange of property. Consequently, such distributions in excess of our current and accumulated earnings and profits would not give rise to foreign source income and you generally would not be able to use a foreign tax credit for any Korean withholding tax imposed on such distributions unless such credit can be applied (subject to applicable limitations) against tax due on other income treated as derived from foreign sources. However, we do not expect to keep earnings and profits in accordance with U.S. federal income tax principles. Therefore, you should expect that a distribution will generally be reported and treated as a dividend (as discussed above).

Distributions of common stock or rights to subscribe for common stock that are received as part of a pro rata distribution to all of our shareholders generally will not be subject to U.S. federal income tax. Consequently,

 

158


Table of Contents

such distributions will not give rise to foreign source income and you generally will not be able to use a foreign tax credit for any Korean withholding tax imposed on such distributions unless such credit can be applied (subject to applicable limitations) against tax due on other income treated as derived from foreign sources.

Sale, Exchange or Other Disposition of ADSs or Common Stock

Upon the sale, exchange or other disposition of ADSs or common stock, you generally will recognize capital gain or loss equal to the difference between the amount realized upon the sale, exchange or other disposition and your adjusted tax basis in the ADSs or common stock, both as determined in U.S. dollars. The capital gain or loss will be long-term capital gain or loss if, at the time of the sale, exchange or other disposition, the ADSs or common stock have been held by you for more than one year. Long-term capital gains of non-corporate U.S. Persons (including individuals) are eligible for reduced rates of taxation. The deductibility of capital losses is subject to limitations.

Any gain or loss recognized by you will generally be treated as U.S. source gain or loss. Consequently, you may not be able to use a foreign tax credit for any Korean tax imposed on the disposition of ADSs or common stock unless such credit can be applied (subject to applicable limitations) against tax due on other income treated as derived from foreign sources. However, pursuant to the Foreign Tax Credit Regulations, unless you elect to apply the benefits of the Treaty, any such Korean tax would generally not be a foreign income tax eligible for a foreign tax credit (regardless of any other income that you may have that is derived from foreign sources). In such case, the non-creditable Korean tax may reduce the amount realized upon the disposition of ADSs or common stock. As discussed above, however, recent notices from the IRS provide temporary relief by allowing taxpayers that comply with applicable requirements to apply many aspects of the foreign tax credit regulations as they previously existed (before the release of the current Foreign Tax Credit Regulations) for taxable years ending before the date that a notice or other guidance withdrawing or modifying the temporary relief is issued (or any later date specified in such notice or other guidance). If any Korean tax is imposed upon the disposition of ADSs or common stock and you apply such temporary relief, such Korean tax may be eligible for a foreign tax credit or deduction, subject to the applicable conditions and limitations. Investors are urged to consult their tax advisors regarding the availability of the foreign tax credit or a deduction under their particular circumstances.

You should note that any Korean securities transaction tax will not be treated as a creditable foreign tax for U.S. federal income tax purposes.

Passive Foreign Investment Company Rules

Based upon the past and projected composition of our income and assets and the valuation of our assets, we do not believe that we were a passive foreign investment company (a “PFIC”) for 2023, and we do not expect to be a PFIC in 2024 or to become one in the foreseeable future, although there can be no assurance in this regard. If, however, we become a PFIC, such characterization could result in adverse U.S. tax consequences to you. For example, if we become a PFIC, our U.S. investors may become subject to increased tax liabilities under U.S. tax laws and regulations and will become subject to burdensome reporting requirements. In addition, non-corporate U.S. Persons will not be eligible for reduced rates of taxation on any dividends received from us if we are a PFIC in the taxable year in which such dividends are paid or in the preceding taxable year. Our PFIC status is determined on an annual basis and depends on the composition of our income and assets in each year. Specifically, we will be classified as a PFIC for U.S. federal income tax purposes for any taxable year if either: (i) 75% or more of our gross income in such year is passive income, or (ii) the average percentage of our assets by value in such year which produce or are held for the production of passive income (which generally includes cash) is at least 50%. We cannot assure you that we will not be a PFIC for 2024 or any future taxable year.

Information Reporting and Backup Withholding

In general, information reporting requirements will apply to interest and OID on Registered Debt Securities, dividend payments in respect of the common stock or ADSs or the proceeds received on the sale, exchange,

 

159


Table of Contents

retirement or other disposition of the Registered Debt Securities, common stock or ADSs that are paid within the United States (and in certain cases, outside of the United States), unless in each case you establish that you are an exempt recipient. A backup withholding tax may apply to the payment of such amounts if you fail to provide an accurate taxpayer identification number and a certification that you are not subject to backup withholding or if you fail to report interest and dividends required to be shown on your U.S. federal income tax returns. The amount of any backup withholding from a payment to you will be allowed as a refund or a credit against your U.S. federal income tax liability, provided the required information is timely furnished to the IRS.

Item 10.F. Dividends and Paying Agents

Not applicable.

Item 10.G. Statements by Experts

Not applicable.

Item 10.H. Documents on Display

We are subject to the information requirements of the Exchange Act, and, in accordance therewith, are required to file reports, including annual reports on Form 20-F, and other information with the U.S. Securities and Exchange Commission. You may inspect and copy these materials, including this annual report and the exhibits thereto, at SEC’s Public Reference Room 100 Fifth Street, N.E., Washington D.C. 20549. Please call the Commission at 1-800-SEC-0330 for further information on the public reference rooms. As a foreign private issuer, we are also required to make filings with the Commission by electronic means. Any filings we make electronically will be available to the public over the Internet at the Commission’s web site at http://www.sec.gov.

Item 10.I. Subsidiary Information

Not applicable.

Item 10.J. Annual Report to Security Holders

Not applicable.

 

ITEM 11.

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Our primary market risk exposures are to fluctuations in exchange rates, interest rates and fuel prices. We are exposed to foreign exchange risk related to foreign currency-denominated liabilities. As of December 31, 2023, 14.8% of our long-term debt (including the current portion but excluding original issue discounts and premium), without taking into consideration of swap transactions, was denominated in foreign currencies, principally U.S. dollar. However, a substantial portion of our revenues is denominated in Won. As a result, changes in exchange rates, particularly between the Won and the U.S. dollar, significantly affect us due to our significant amounts of foreign currency-denominated debt and the effect of such changes on the amount of funds required by us to make interest and principal payments on such debt. In order to reduce the impact of foreign exchange rate fluctuations on our results of operations, we have entered into currency swaps and other hedging arrangements with respect to our foreign currency denominated debt.

We are also exposed to foreign exchange risk related to our purchases of fuel since we obtain substantially all of our fuel materials (other than anthracite coal) directly or indirectly from sources outside Korea. Prices for such fuel materials are quoted based on prices stated in, and in many cases are paid for in, currencies other than Won. In 2023, fuel costs represented 30.8% of our sales.

 

160


Table of Contents

We are exposed to interest rate risk due to significant amounts of debt. Upward fluctuations in interest rates increase the cost of additional debt and the interest cost of outstanding floating rate borrowings. We are also exposed to fluctuations in prices of fuel materials. In 2023, for electricity generation, uranium accounted for 46.1% of our fuel requirements, coal accounted for 38.5%, LNG accounted for 12.0%, oil accounted for 0.02%, and others accounted for 3.38%, measured in each case by the amount of electricity we generated. In 2022, for electricity generation, uranium accounted for 43.1% of our fuel requirements, coal accounted for 40.2%, LNG accounted for 13.1%, oil accounted for 0.1%, and others accounted for 3.5%, measured in each case by the amount of electricity we generated.

For additional discussions of our market risks, see Item 3.D. “Risk Factors” and Item 5.B. “Liquidity and Capital Resources—Liquidity.”

We have entered into various swap contracts to hedge exchange rate risks arising from foreign currency-denominated debts. Details of currency swap contracts outstanding as of December 31, 2023 are as follows:

 

  

Counterparty

 Contract
Year
  Settlement
Year
  Contract amounts  Contract
interest rate
 Contract
Exchange
Rate
 

Type

    Pay       Receive    Pay Receive
          (in millions of Won or
thousands of foreign
currencies except contract
exchange rate information)
        

Trading

 Standard Chartered  2014   2029   KRW 102,470   USD 100,000  3.14% 3.57%  1,024.70 
 Societe Generale  2014   2024   KRW 105,017   USD 100,000  4.92% 5.13%  1,050.17 
 Hana Bank  2015   2024   KRW 107,970   USD 100,000  4.75% 5.13%  1,079.70 
 Credit Agricole  2015   2024   KRW 94,219   USD 86,920  4.85% 5.13%  1,083.97 
 Woori Bank  2019   2027   KRW 21,708   USD 19,417  5.04% 6.75%  1,118.00 
 Woori Bank  2019   2024   KRW 296,000   USD 250,000  1.21% 2.50%  1,184.00 
 Korea Development Bank  2019   2024   KRW 177,600   USD 150,000  1.24% 2.50%  1,184.00 
 Hana Bank  2019   2024   KRW 118,400   USD 100,000  1.24% 2.50%  1,184.00 
 Woori Bank  2020   2025   KRW 241,320   USD 200,000  0.54% 1.13%  1,206.60 
 Korea Development Bank  2020   2025   KRW 241,320   USD 200,000  0.54% 1.13%  1,206.60 
 Kookmin Bank  2020   2025   KRW 120,660   USD 100,000  0.54% 1.13%  1,206.60 
 Kookmin Bank  2020   2026   KRW 76,355   USD 70,445  5.83% 6.00%  1,083.90 
 Woori Bank  2021   2026   KRW 118,170   USD 100,000  1.11% 1.13%  1,181.70 
 Korea Development Bank  2021   2026   KRW 118,170   USD 100,000  1.11% 1.13%  1,181.70 
 Hana Bank  2021   2026   KRW 118,170   USD 100,000  1.11% 1.13%  1,181.70 
 Hana Bank  2022   2025   KRW 385,800   USD 300,000  3.11% 3.63%  1,286.00 
 Woori Bank  2022   2025   KRW 257,200   USD 200,000  3.12% 3.63%  1,286.00 
 JP Morgan  2022   2027   KRW 128,600   USD 100,000  3.56% 4.00%  1,286.00 
 Woori Bank  2022   2027   KRW 128,600   USD 100,000  3.56% 4.00%  1,286.00 
 Kookmin Bank  2022   2027   KRW 128,600   USD 100,000  3.56% 4.00%  1,286.00 
 Korea Development Bank  2022   2026   KRW 283,820   USD 200,000  4.67% 5.38%  1,419.10 
 Hana Bank  2022   2026   KRW 141,910   USD 100,000  4.68% 5.38%  1,419.10 
 JP Morgan  2022   2026   KRW 141,910   USD 100,000  4.69% 5.38%  1,419.10 
 Woori Bank  2022   2026   KRW 141,910   USD 100,000  4.68% 5.38%  1,419.10 
 Korea Development Bank  2022   2028   KRW 283,820   USD 200,000  5.12% 5.50%  1,419.10 
 Woori Bank  2022   2028   KRW 141,910   USD 100,000  5.13% 5.50%  1,419.10 
 Hana Bank  2023   2026   KRW 256,000   USD 200,000  3.97% 5.38%  1,280.00 
 Shinhan Bank  2023   2026   KRW 192,000   USD 150,000  3.99% 5.38%  1,280.00 
 Kookmin Bank  2023   2026   KRW 128,000   USD 100,000  4.03% 5.38%  1,280.00 
 Korea Development Bank  2023   2026   KRW 256,000   USD 200,000  4.04% 5.38%  1,280.00 
 Bank of America  2023   2026   KRW 128,000   USD 100,000  4.04% 5.38%  1,280.00 
 Standard Chartered  2023   2026   KRW 128,000   USD 100,000  4.04% 5.38%  1,280.00 
 Woori Bank  2023   2026   KRW 192,000   USD 150,000  4.05% 5.38%  1,280.00 
 Nomura  2015   2025   KRW 111,190   USD 100,000  2.60% 3.25%  1,111.90 
 Korea Development Bank  2015   2025   KRW 111,190   USD 100,000  2.62% 3.25%  1,111.90 
 Woori Bank  2015   2025   KRW 55,595   USD 50,000  2.62% 3.25%  1,111.90 
 Hana Bank  2015   2025   KRW 55,595   USD 50,000  2.62% 3.25%  1,111.90 
 Woori Bank  2017   2027   KRW 111,610   USD 100,000  2.25% 3.13%  1,116.10 
 Korea Development Bank  2017   2027   KRW 111,610   USD 100,000  2.31% 3.13%  1,116.10 

 

161


Table of Contents
  

Counterparty

 Contract
Year
  Settlement
Year
  Contract amounts  Contract
interest rate
 Contract
Exchange
Rate
 

Type

    Pay       Receive    Pay Receive
          (in millions of Won or
thousands of foreign
currencies except contract
exchange rate information)
        
 Hana Bank  2017   2027   KRW 111,610   USD 100,000  2.31% 3.13%  1,116.10 
 Korea Development Bank  2018   2028   KRW 108,600   HKD 800,000  2.69% 3.35%  135.75 
 Shinhan Bank  2018   2028   KRW 115,387   HKD 850,000  2.66% 3.35%  135.75 
 Korea Citi bank  2019   2024   KRW 239,956   CHF 200,000  1.44% 0.00%  1,199.78 
 Korea Development Bank  2019   2027   KRW 119,978   CHF 100,000  1.43% 0.05%  1,199.78 
 Woori Bank  2021   2026   KRW 222,800   USD 200,000  0.93% 1.25%  1,114.00 
 Shinhan Bank  2021   2026   KRW 111,400   USD 100,000  0.92% 1.25%  1,114.00 
 Korea Development Bank  2021   2026   KRW 111,400   USD 100,000  0.93% 1.25%  1,114.00 
 Nonghyup Bank  2021   2026   KRW 111,400   USD 100,000  0.93% 1.25%  1,114.00 
 Woori Bank  2022   2027   KRW 262,000   USD 200,000  3.62% 4.25%  1,310.00 
 Export-Import Bank of Korea  2022   2027   KRW 131,000   USD 100,000  3.63% 4.25%  1,310.00 
 Kookmin Bank  2022   2027   KRW 131,000   USD 100,000  3.62% 4.25%  1,310.00 
 Hana Bank  2022   2027   KRW 131,000   USD 100,000  3.61% 4.25%  1,310.00 
 Korea Development Bank  2022   2027   KRW 262,000   USD 200,000  3.63% 4.25%  1,310.00 
 Export-Import Bank of Korea  2022   2032   KRW 349,829   HKD 1,935,000  4.87% 5.16%  180.79 
 JP Morgan  2022   2032   KRW 75,194   HKD 415,000  5.00% 5.16%  181.19 
 Export-Import Bank of Korea  2023   2030   KRW 172,982   HKD 1,037,000  4.25% 4.51%  166.81 
 HSBC  2019   2024   USD 205,500   AUD 300,000  3M SOFR+

1.04%

 3M BBSW+

0.97%

  USD 0.69 

Cash flow hedge

 Kookmin Bank  2020   2025   KRW 118,780   USD 100,000  1.29% 2.13%  1,187.80 
 Shinhan Bank  2020   2025   KRW 118,780   USD 100,000  1.29% 2.13%  1,187.80 
 Hana Bank  2020   2025   KRW 118,780   USD 100,000  1.29% 2.13%  1,187.80 
 Korea Development Bank  2020   2026   KRW 118,910   USD 100,000  0.61% 1.00%  1,189.10 
 Hana Bank  2020   2026   KRW 118,910   USD 100,000  0.61% 1.00%  1,189.10 
 Woori Bank  2020   2026   KRW 118,910   USD 100,000  0.62% 1.00%  1,189.10 
 Nomura  2017   2037   KRW 52,457   EUR 40,000  2.60% 1.70%  1,311.42 
 Nomura  2017   2037   KRW 59,423   SEK 450,000  2.62% 2.36%  132.05 
 Kookmin Bank  2021   2026   KRW 114,230   USD 100,000  1.27% 1.25%  1,142.30 
 Korea Development Bank  2021   2026   KRW 114,230   USD 100,000  1.27% 1.25%  1,142.30 
 Hana Bank  2021   2026   KRW 114,230   USD 100,000  1.27% 1.25%  1,142.30 
 Korea Development Bank  2022   2027   KRW 123,710   USD 100,000  3.41% 3.63%  1,237.10 
 Woori Bank  2022   2027   KRW 123,710   USD 100,000  3.41% 3.63%  1,237.10 
 JP Morgan  2022   2027   KRW 123,710   USD 100,000  3.41% 3.63%  1,237.10 
 BNP Paribas  2019   2024   KRW 111,841   CHF 100,000  1.78% 0.13%  1,118.41 
 Kookmin Bank  2019   2024   KRW 111,841   CHF 100,000  1.78% 0.13%  1,118.41 
 Korea Development Bank  2022   2025   KRW 128,560   USD 100,000  3.37% 4.13%  1,285.60 
 Woori Bank  2022   2025   KRW 128,560   USD 100,000  3.37% 4.13%  1,285.60 
 Kookmin Bank  2022   2025   KRW 128,560   USD 100,000  3.37% 4.13%  1,285.60 
 Woori Bank  2021   2026   KRW 220,600   USD 200,000  0.47% 0.75%  1,103.00 
 Shinhan Bank  2021   2026   KRW 220,600   USD 200,000  0.47% 0.75%  1,103.00 
 Hana Bank  2021   2026   KRW 55,150   USD 50,000  0.48% 0.75%  1,103.00 
 Shinhan Bank  2023   2026   KRW 132,930   USD 100,000  4.07% 5.38%  1,329.30 
 Nonghyup Bank  2023   2026   KRW 132,930   USD 100,000  4.05% 5.38%  1,329.30 
 Kookmin Bank  2023   2026   KRW 132,930   USD 100,000  4.07% 5.38%  1,329.30 
 Woori Bank  2020   2025   KRW 245,560   USD 200,000  0.93% 1.75%  1,227.80 
 Hana Bank  2020   2025   KRW 245,560   USD 200,000  0.93% 1.75%  1,227.80 
 Korea Development Bank  2020   2025   KRW 122,780   USD 100,000  0.93% 1.75%  1,227.80 
 JP Morgan  2022   2025   KRW 126,180   USD 100,000  2.80% 3.60%  1,261.80 
 Hana Bank  2022   2025   KRW 126,180   USD 100,000  2.80% 3.60%  1,261.80 
 Korea Development Bank  2022   2025   KRW 252,360   USD 200,000  2.83% 3.60%  1,261.80 
 Woori Bank  2022   2025   KRW 126,180   USD 100,000  2.85% 3.60%  1,261.80 
 Woori Bank  2023   2028   KRW 259,000   USD 200,000  3.83% 4.88%  1,295.00 

 

162


Table of Contents
  

Counterparty

 Contract
Year
  Settlement
Year
  Contract amounts  Contract
interest rate
 Contract
Exchange
Rate
 

Type

    Pay       Receive    Pay Receive
          (in millions of Won or
thousands of foreign
currencies except contract
exchange rate information)
        
 Korea Development Bank  2023   2028   KRW 129,500   USD 100,000  3.85% 4.88%  1,295.00 
 Bank of America  2023   2028   KRW 64,750   USD 50,000  3.85% 4.88%  1,295.00 

Under these currency swap contracts, we recognized net valuation gain of Won 270 billion in 2023.

Details of interest rate contracts outstanding as of December 31, 2023 are as follows:

 

   Counterparty Contract
Year
  Settlement
Year
  Contract amounts  Contract interest rate per annum

Type

 Pay Receive
           (in millions of
Won or thousands
of foreign
currencies)
     

Trading

  Nomura(1)  2018   2038   30,000  3M CD+0.10% 3.75%
  Hana Bank  2019   2024   200,000  1.87% 3M CD + 0.13%
  Shinhan Bank  2021   2025   100,000  2.32% 3M CD + 0.43%
  Hana Bank  2022   2027   200,000  3.02% 3M CD + 0.61%
  Hana Bank  2022   2027   200,000  3.04% 3M CD + 0.58%
  Hana Bank  2022   2027   250,000  3.38% 3M CD + 0.59%
  Nomura  2022   2027   200,000  3.55% 3M CD + 0.60%
  Shinhan Bank  2022   2027   150,000  3.53% 3M CD + 0.55%
  Hana Bank  2022   2027   200,000  3.70% 3M CD + 0.59%
  Nomura  2022   2027   300,000  3.89% 3M CD + 0.67%
  Hana Bank  2022   2027   200,000  3.93% 3M CD + 0.67%
  Nomura  2022   2027   200,000  3.80% 3M CD + 0.68%
  Nomura  2022   2027   300,000  4.04% 3M CD + 0.60%
  Hana Bank  2022   2027   100,000  4.68% 3M CD + 1.04%
  Hana Bank  2022   2027   100,000  5.45% 3M CD + 1.20%
  Shinhan Bank  2023   2028   200,000  4.27% 3M CD + 0.76%
  Shinhan Bank  2023   2028   50,000  4.27% 3M CD + 0.76%
  Nomura  2023   2028   250,000  4.13% 3M CD + 0.73%
  Hana Bank  2023   2028   200,000  3.74% 3M CD + 0.51%
  Hana Bank  2023   2028   100,000  4.19% 3M CD + 0.50%
  Shinhan Bank  2023   2028   300,000  3.81% 3M CD + 0.70%
  Hana Bank  2023   2028   200,000  3.95% 3M CD + 0.50%
  Nomura  2017   2032   52,457  2.55%+Floating rate 2.60%
  Nomura  2017   2032   59,423  2.57%+Floating rate 2.62%
  Nomura(2)  2021   2041   30,000  1.84% 2.60%
  Nomura(3)  2021   2041   50,000  1.87% 2.38%
  ANZ  2022   2025   AUD 865  0.48% 3.33%
  DBS Bank  2022   2025   AUD 865  0.48% 3.33%
  Societe Generale  2022   2025   AUD 865  0.48% 3.28%
  MUFG  2022   2048   USD 155,941  SOFR(3M) 3.71%
  Mizuho Bank  2022   2048   USD 155,941  SOFR(3M) 1.05%
  Mizuho Bank  2022   2024   USD 112,194  SOFR(1M) 1.80%
  Rabobank  2022   2036   USD 37,130  1.83% SOFR(6M)
  Mizuho Capital
Markets LLC
  2021   2045   USD 82,886  5.38% 1.14%

 

163


Table of Contents
   Counterparty Contract
Year
  Settlement
Year
  Contract amounts  Contract interest rate per annum

Type

 Pay Receive
           (in millions of
Won or thousands
of foreign
currencies)
     

Cash flow hedge

  Export-Import Bank
of Korea
  2015   2031   USD 15,893  2.67% 6M USD Libor
  ING Bank  2015   2031   USD 7,861  2.67% 6M USD Libor
  BNP Paribas  2015   2031   USD 7,861  2.67% 6M USD Libor
  BNP Paribas  2009   2027   USD 41,040  4.16% 6M USD Libor
  KFW  2009   2027   USD 41,040  4.16% 6M USD Libor
  Export-Import Bank
of Korea
  2016   2036   USD 60,977  3.00% 6M USD Libor

 

Notes:

 

(1)

Subject to the right exercisable by the counterparty, early repayment of the contract is allowed after June 15, 2023.

(2)

1.84% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT + 0.35% is applied thereafter.

(3)

1.87% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT + 0.35% is applied thereafter.

Under these interest rate swap contracts, we recognized net valuation loss of Won 16 billion in 2023.

We engage in transactions denominated in foreign currencies and consequently become exposed to fluctuations in exchange rates. The carrying amounts of our foreign currency-denominated monetary assets and monetary liabilities as of December 31, 2022 and 2023 were as follows:

 

   Assets   Liabilities 

Type

    2022       2023       2022       2023   
   (In thousands of foreign currencies) 

AED

   5,610    24,441    25,597    18,143 

AUD

   4,448    4,310    299,663    299,795 

BDT

   7,514    2,260    —     —  

BWP

   824    777    —     —  

EGP

   —     1,665    1,162    1,941 

CAD

   89    —     595    —  

CHF

   —     —     500,158    499,930 

CZK

   —     —     153    —  

EUR

   1,976    12,259    41,073    81,744 

GBP

   —     75    31    —  

HKD

   —     —     4,014,446    5,079,189 

IDR

   598,697    25,567,281    1,323,840    2,118,580 

INR

   1,592,380    1,663,705    312,978    387,947 

JOD

   1,146    569    14    68,448 

JPY

   568,263    921,120    1,719,846    8,692,604 

KZT

   1,510    1,510    —     —  

MGA

   2,856,045    3,545,076    347,403    495,288 

MMK

   199,518    199,518    —     —  

MYR

   38,177    2,805    —     —  

PHP

   68,592    98,154    7,493    6,750 

PKR

   533,816    75,206,354    219,341    55,531 

 

164


Table of Contents
   Assets   Liabilities 

Type

    2022       2023       2022       2023   
   (In thousands of foreign currencies) 

RUB

   —     —     2,881    —  

SAR

   1,713    937    9,710    —  

SEK

   —     —     449,211    452,309 

SGD

   —     279    —     2,191 

THB

   —     —     389    —  

USD

   1,484,614    1,701,494    13,599,643    14,458,985 

UYU

   128,674    120,768    3,106    2,028 

VND

   1,184,670    848,242    4,495    —  

ZAR

   43,461    87,780    —     —  

The following analysis sets forth the sensitivity of our consolidated net income before income taxes (our “pre-tax income”) to changes in exchange rates, interest rates, electricity rates and fuel costs. For purposes of this section, we and our related parties are deemed one entity. The range of changes in such risk categories represents our view of the changes that are reasonably possible over a one-year period, although it is difficult to predict such changes as a result of adverse economic developments in Korea. See Item 3.D. “Risk Factors—Risks Relating to Korea and the Global Economy—Unfavorable financial and economic conditions in Korea and globally may have a material adverse impact on us.” The following discussion only addresses material market risks faced by us and does not discuss other risks which we face in the normal course of business, including country risk, credit risk and legal risk. Unless otherwise specified, all calculations are made under IFRS.

If the Won depreciates against the U.S. dollar and all other foreign currencies held by us by 10%, and all other variables are held constant from their levels as of December 31, 2023, we estimate that our unrealized foreign exchange translation losses will increase by Won 1,828 billion in 2023. Such sensitivity analysis is conducted for monetary assets and liabilities denominated in foreign currencies other than functional currency as of December 31, 2022 and 2023, without taking into consideration of the hedge effect of swap transactions. To manage our foreign currency risk related to foreign currency-denominated receivables and payables, we have a policy of entering into currency forward agreements. In addition, to manage our foreign currency risk related to foreign currency-denominated expected sales transactions and purchase transactions, we enter into cross-currency swap agreements.

We are exposed to interest rate risk due to our borrowings with floating interest rates. If interest rates increase by 1% on all of our borrowings and debentures bearing variable interest, and all other variables are held constant as of December 31, 2023, we estimate that our profit before income taxes will decrease by Won 125 billion (not reflecting the fact that a portion of such interest may be capitalized under IFRS) in 2023. Such sensitivity analysis does not take into consideration of the hedge effect of interest rate swap transactions. To manage our interest rate risks, we, in addition to maintaining an appropriate mix of fixed and floating rate loans, have entered into certain interest rate swap agreements.

We are exposed to electricity rates risk due to the rate regulation by the Government, which considers the effect of electricity rate changes on the national economy. If the electricity rate rises by 1% and all other variables are held constant as of December 31, 2023, we estimate that our profit before income taxes will increase by Won 830 billion in 2023.

We are exposed to fuel price risks due to the heavy influence of fuel costs on our sales and cost of sales. If the fuel prices of anthracite and bituminous coal, oil, LNG and others used for generation by us and our generation subsidiaries rise by 1% and all other variables are held constant as of December 31, 2023, we estimate that our profit before income taxes will decrease by Won 266 billion in 2023.

The above discussion and the estimated amounts generated from the sensitivity analyzes referred to above include “forward-looking statements,” which assume for analytical purposes that certain market conditions may

 

165


Table of Contents

occur. Accordingly, such forward-looking statements should not be considered projections by us of future events or losses.

See Note 45 of the notes to our consolidated financial statements included in this annual report for further related information.

 

ITEM 12.

DESCRIPTION OF SECURITIES OTHER THAN EQUITY SECURITIES

Item 12.A. Debt Securities

Not applicable.

Item 12.B. Warrants and Rights

Not applicable.

Item 12.C. Other Securities

Not applicable.

Item 12.D. American Depositary Shares

Under the terms of the Deposit Agreement in respect of our ADSs, the holder and beneficiary owners of ADSs, any party depositing or withdrawing or surrendering ADSs or ADRs, whichever applicable, may be required to pay the following fees and charges to Citibank, N.A., whose principal executive office located in 388 Greenwich St. New York, NY 10013, acting as depositary for our ADSs:

 

Item

  

Services

  

Fees

1  Taxes and other governmental charges  As applicable
2  Registration of transfer of common shares generally on our shareholders’ register, any institution authorized under the applicable law to effect book-entry transfers of securities (including Korea Securities Depositary), or any entity that presently carries out the duties of registrar for the common shares, and applicable to transfers of common shares to the name of the Depositary or its nominee on the making of deposits or withdrawals  A fee of US$1.50 or less per ADS
3  Cable, telex and facsimile transmission expenses  As applicable
4  Expenses incurred by the Depositary in the conversion of foreign currency  As applicable
5  Execution and delivery of ADRs and the surrender of ADRs  Fee of US$0.05 or less per ADS
6  Cash distribution made by the Depositary or its agent  Fee of US$0.02 or less per ADS
7  Fee for the distribution of proceeds of sales of securities or rights for distribution other than cash, common shares or rights to subscribe for shares, distribution in shares or distribution in rights to subscribe for shares  Lesser of (i) the fee for the execution and delivery of ADRs referred to above which would have been charged as a result of the deposit by the holders of securities or common shares received in exercise of rights distributed to them, but which securities or rights are instead sold by the Depositary and the

 

166


Table of Contents

Item

  

Services

  

Fees

    net proceeds distributed and (ii) the amount of such proceeds
8  Depositary services performed in administering the ADRs (which fee shall be assessed against holders of ADSs as of the record date or dates and shall be payable at the sole discretion of the Depositary by billing such holders or by deducting such charge from one or more cash dividends or other cash distributions)  Fee of US$0.02 or less per ADS per calendar year

Depositary fees payable upon the issuance and cancellation of ADSs are typically paid to the depositary by the brokers (on behalf of their clients) receiving the newly-issued ADSs from the depositary and by the brokers (on behalf of their clients) delivering the ADSs to the depositary for cancellation. The brokers in turn charge these transaction fees to their clients.

Depositary fees payable in connection with distributions of cash or securities to ADS holders and the depositary services fee are charged by the depositary to the holders of record of ADSs as of the applicable ADS record date. The depositary fees payable for cash distributions are generally deducted from the cash being distributed. In the case of distributions other than cash (i.e., stock dividends, rights offerings), the depositary charges the applicable fee to the ADS record date holders concurrent with the distribution. In the case of ADSs registered in the name of the investor (whether certificated or un-certificated in direct registration), the depositary sends invoices to the applicable record date ADS holders. In the case of ADSs held in brokerage and custodian accounts via the central clearing and settlement system, the Depository Trust Company (“DTC”), the depositary generally collects its fees through the systems provided by DTC (whose nominee is the registered holder of the ADSs held in DTC) from the brokers and custodians holding ADSs in their DTC accounts. The brokers and custodians who hold their clients’ ADSs in DTC accounts in turn charge their clients’ accounts the amount of the fees paid to the depositary.

In the event of refusal to pay the depositary fees, the depositary may, under the terms of the Deposit Agreement, refuse the requested service until payment is received or may set-off the amount of the depositary fees from any distribution to be made to the ADS holder.

The fees and charges the ADS holders may be required to pay may vary over time and may be changed by us and by the depositary. The ADS holders will receive prior notice of such changes.

Depositary Payments for the Fiscal Year 2023

The following table sets forth our expenses incurred in 2023, which were reimbursed by Citibank, N.A. in the aggregate:

 

   (In thousands
of U.S. dollars)(1)
 

Reimbursement of legal fees

  US$—  

Contributions towards our investor relations and other financing efforts (including investor conferences, non-deal roadshows and market information services)

     —  

Other

   —  
  

 

 

 

Total

  US$—  
  

 

 

 

 

Note:

 

(1)

Converted at the market average exchange rate as announced by Seoul Money Brokerage Services, Ltd. in Seoul for the year ended December 31, 2023.

 

167


Table of Contents

PART II

 

ITEM 13.

DEFAULTS, DIVIDEND ARREARAGES AND DELINQUENCIES

Not applicable.

 

ITEM 14.

MATERIAL MODIFICATIONS TO THE RIGHTS OF SECURITY HOLDERS AND USE OF PROCEEDS

Not applicable.

 

ITEM 15.

CONTROLS AND PROCEDURES

Disclosure Control

Under the supervision and with the participation of our management, including our chief executive officer and chief financial officer, we have evaluated the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rule 13a-15(e) under the Exchange Act) as of December 31, 2023. There are inherent limitations to the effectiveness of any system of disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can provide only reasonable assurance of achieving their control objectives. Based upon our evaluation, our chief executive officer and chief financial officer concluded that the design and operation of our disclosure controls and procedures as of December 31, 2023 were effective to provide reasonable assurance that information required to be disclosed by us in the reports we file and submit under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the applicable rules and forms, and that it is accumulated and communicated to our management, including our chief executive officer and chief financial officer, as appropriate to allow timely decision regarding required disclosure.

Management’s Annual Report on Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act, for our company. Under the supervision and with the participation of our management, including our chief executive officer and chief financial officer, we have evaluated the effectiveness of our internal control over financial reporting as of December 31, 2023 based on the framework established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013). Our internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of consolidated financial statements in accordance with generally accepted accounting principles and includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of a company’s assets, (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of consolidated financial statements in accordance with generally accepted accounting principles, and that a company’s receipts and expenditures are being made only in accordance with authorizations of a company’s management and directors, and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of a company’s assets that could have a material effect on the consolidated financial statements.

Because of its inherent limitations, a system of internal control over financial reporting can provide only reasonable assurance with respect to consolidated financial statement preparation and presentation and may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

 

168


Table of Contents

Following the overhaul in May 2013 by the Committee of Sponsoring Organization of the Treadway (“COSO”) of the COSO Framework relating to internal controls and adoption of the 2013 Integrated Framework of the Committee of Sponsoring Organizations of the Treadway Commission (the “COSO Framework (2013)”), we have, effective January 1, 2014, adopted the COSO Framework (2013) and incorporated it into our internal control system for us and our subsidiaries in order to comply with the Sarbanes Oxley Act and to standardize our internal control system. As required by Section 404 of the Sarbanes-Oxley Act of 2002 and related rules as promulgated by the Securities and Exchange Commission, management assessed the effectiveness of our internal control over financial reporting as of December 31, 2023 using criteria established by the COSO Framework (2013). Based on this evaluation, our management concluded that our internal control over financial reporting was effective as of December 31, 2023 based on the criteria established by the COSO Framework (2013).

Audit Report of the Independent Registered Public Accounting Firm

Ernst & Young Han Young has issued an audit report on the effectiveness of our internal control over financial reporting as of December 31, 2023, which is included elsewhere in this annual report.

Changes in Internal Controls

There were no changes in our internal control over financial reporting that occurred during the year ended December 31, 2023 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting. Our adoption of the COSO Framework (2013) did not have, and is not reasonably likely to have, any material effect on our internal control over financial reporting.

We operate an integrated ERP system for a transparent and efficient management of the core ERP components, including personnel, accounting, procurement, construction and facilities maintenance. In addition, we also operate a strategic enterprise management system that includes business warehouse, management information and business planning and simulation systems. We will continue to upgrade and improve the ERP system, which is being used as our core information infrastructure.

 

ITEM 16.

[RESERVED]

 

ITEM 16A.

AUDIT COMMITTEE FINANCIAL EXPERT

Our board of directors has determined that we have at least one “audit committee financial expert” as such term is defined by the regulations of the Securities and Exchange Commission issued pursuant to Section 407 of the Sarbanes-Oxley Act of 2002. Our audit committee financial experts are Kim, Jae-Shin and Kim, Sung-Eun. Such members are independent within the meaning of the Korea Exchange listing standards, the regulations promulgated under the Enforcement Decree of the Korean Commercial Act and the New York Stock Exchange listing standards.

 

ITEM 16B.

CODE OF ETHICS

We have adopted a code of ethics for our principal executive officer, principal financial officer, principal accounting officer or controller, or persons performing similar functions as required under Section 406 of the Sarbanes-Oxley Act of 2002, together with an insider reporting system in compliance with Section 301 of the Sarbanes-Oxley Act. The code of ethics is available on our website www.kepco.co.kr. We have not granted any waiver, including an implicit waiver, from a provision of the code of ethics to any of the above-mentioned officers during our most recently completed fiscal year.

ITEM 16C. PRINCIPAL ACCOUNTANT FEES AND SERVICES

The following table sets forth the aggregate fees billed for each of the years ended December 31, 2022 and 2023 for professional services rendered by our principal accountant for such year, for various types of services

 

169


Table of Contents

and a brief description of the nature of such services. Ernst & Young Han Young, an independent registered public accounting firm, was our principal accountant for the years ended December 31, 2022 and 2023 and we currently expect Ernst & Young Han Young to serve as our principal accountant for the year ended December 31, 2024.

 

   Aggregate Fees Billed During    

Type of Services

  2022   2023   

Nature of Services

   (In millions of Won)    

Audit Fees

  W 9,030   W 8,172   Audit service including interim review service for KEPCO and its subsidiaries.

Audit-Related Fees

   880    696   Comfort letter services.

Tax Fees

   106    48   Tax return and consulting advisory service.

All Other Fees

   —     —    All other services which do not meet the three categories above.
  

 

 

   

 

 

   

Total

  W 10,016   W 8,916   
  

 

 

   

 

 

   

 

The U.S. law and regulations in effect since May 6, 2003 generally require all service of the principal accountant to be pre-approved by an independent audit committee or, if no such committee exists with respect to an issuer, by the entire board of directors. We have adopted the following policies and procedures for consideration and approval of requests to engage our principal accountant to perform audit and non-audit services. If the request relates to services that would impair the independence of our principal accountant, the request must be rejected. If the service request relates to audit and permitted non-audit services for us and our subsidiaries, it must be forwarded to our audit committee and receive pre-approval.

In addition, the U.S. law and regulations permit the pre-approval requirement to be waived with respect to engagements for non-audit services aggregating no more than five percent of the total amount of revenues we paid to our principal auditors, if such engagements were not recognized by us at the time of engagement and were promptly brought to the attention of our audit committee or a designated member thereof and approved prior to the completion of the audit.

ITEM 16D. EXEMPTIONS FROM THE LISTING STANDARDS FOR AUDIT COMMITTEE

Not applicable.

ITEM 16E. PURCHASES OF EQUITY SECURITIES BY THE ISSUER AND AFFILIATED PURCHASERS

Neither we nor any “affiliated purchaser,” as defined in Rule 10b-18(a)(3) of the Exchange Act, purchased any of our equity securities during the period covered by this annual report.

ITEM 16F. CHANGE IN REGISTRANT’S CERTIFYING ACCOUNTANT

Not applicable.

ITEM 16G. CORPORATE GOVERNANCE

We are committed to high standards of corporate governance. We are in compliance with the corporate governance provisions of the KEPCO Act, the Act on the Management of Public Institutions, the Korean Commercial Act, the Financial Investment Services and Capital Markets Act of Korea and the Listing Rules of the Korea Exchange. We, like all other companies in Korea, must comply with the corporate governance

 

170


Table of Contents

provisions under the Korean Commercial Act, except to the extent the KEPCO Act and the Act on the Management of Public Institutions otherwise require. Our corporate governance is also affected by various regulatory guidelines, including those promulgated by the Ministry of Economy and Finance. In addition, as a company listed on the Korea Exchange, we are subject to the Financial Investment Services and Capital Markets Act of Korea, unless the Financial Investment Services and Capital Markets Act of Korea otherwise provides.

The Act on the Management of Public Institutions

General Provisions

On April 1, 2007, the Act on the Management of Public Institutions took effect by abolishing and replacing the Government-invested Enterprise Management Basic Act, which was enacted in 1984. Unless stated otherwise therein, the Act on the Management of Public Institutions takes precedence over any other laws and regulations in the event of inconsistency. On April 2, 2007, pursuant to this Act the Minister of the Ministry of Economy and Finance designated us as a “market-oriented public enterprise” as defined under this Act, and we became subject to this Act accordingly. We incorporated the applicable provisions of this Act into our Articles of Incorporation by amendment thereto in September 2007.

The Act on the Management of Public Institutions sets out the rules for corporate governance for entities that are subject to this Act, including the appointment of their respective president and directors. Under this Act as it applies to us as a “market-oriented public enterprise”, (i) a senior non-standing director as appointed by the Minister of the Ministry of Economy and Finance becomes the chairperson of our board of directors following the review and resolution of the Committee for Management of Public Institutions; (ii) our president and our standing directors who concurrently serve as members of our audit committee are appointed by the President of Korea upon the motion of the Ministry of Trade, Industry and Energy (in the case of our president) or of the Ministry of Economy and Finance (in the case of standing directors who concurrently serve as members of our audit committee), following the nomination by such enterprise’s director nomination committee, the review and resolution of the Committee for Management of Public Institutions pursuant to the Act on the Management of Public Institutions and an approval at the general meeting of our shareholders; (iii) our standing directors other than the president and those who also serve as audit committee members must be appointed by our president with the approval at the general meeting of our shareholders from a pool of candidates recommended by our director nomination committee; and (iv) our non-standing directors must be appointed by the Minister of the Ministry of Economy and Finance following the review and resolution of the Committee for Management of Public Institutions from a pool of candidates recommended by the director nomination committee, and must (a) have ample knowledge and experience in business management who cannot be public service personnel other than a public educational official at national or public schools or (b) have held their offices in us for at least three years and either (x) be recommended by the representative of our employees (or the representative of the labor union if there is a labor union comprising the majority of our employees) or (y) obtain consent from the majority of our employees. We are required to appoint at least one non-standing director who qualifies the requirement (b) above.

The Committee for Management of Public Institutions is established pursuant to the Act on the Management of Public Institutions and is comprised of one chairperson who is the Minister of the Ministry of Economy and Finance and the following members: (i) one Vice Minister-level public official from the Office for Government Policy Coordination as nominated by the Minister of the Office for Government Policy Coordination; (ii) one Vice Minister, Deputy Administrator or an equivalent public official of the related administrative agency as prescribed by Presidential Decree; (iii) one Vice Minister, Deputy Administrator, or an equivalent public official of the competent agency who does not fall under sub-clause (ii); and (iv) 11 or fewer persons commissioned by the President based on the recommendation of the Minister of the Ministry of Economy and Finance from among persons in various fields including law, economy, press, academia, labor, who have good knowledge and experience in the operation and business administration of public institutions as well as good reputation for impartiality.

 

171


Table of Contents

Our director nomination committee, which is also known as the Committee for Recommendation of Executive Officers, is comprised of non-standing directors and members appointed by the board of directors. The number of members ranges from five to 15 persons and must be decided by a resolution of the board of directors; provided that, the number of members appointed by the board of directors must be less than half of the total number of members of our director nomination committee.

Under the Act on the Management of Public Institutions and our Articles of Incorporation, the term of office is three years for our president and two years for our directors (standing and non-standing) other than our president. Our directors (including the president) may be reappointed for one or more additional terms of one year. In order to be reappointed, the president must be evaluated on the basis of his management performance; a standing director, on the basis of the performance of the duties for which he was elected to perform, or if the standing director has executed an incentive bonus contract, on the basis of his performance under the contract; and a non-standing director, on the basis of his performance of the duties for which he was elected to perform.

Under the Act on the Management of Public Institutions and our Articles of Incorporation, a recommendation from the director nomination committee is required for the appointment of our executive officers, except in the case of reappointments. The director nomination committee consists of five to fifteen members, including private-sector members appointed by the board of directors. Non-standing directors must comprise at least a majority of the director nomination committee. One of the private-sector members must be able to represent our opinion and must not be currently employed by us. As required under the Act on the Management of Public Institutions, we established an audit committee. At least two-thirds of the audit committee members must be non-standing directors, and at least one committee member must be an expert in finance or accounting. According to the Act on the Management of Public Institutions, our president’s term cannot be terminated unless done so by the President of Korea pursuant to the Act on the Management of Public Institutions or upon an event as specified in our Articles of Incorporation.

As required under Act on the Management of Public Institutions, we submit to the Government by October 31 every year a report on our medium to long-term management goals. Under the Act on the Management of Public Institutions, we are also required to give separate public notice of important management matters, such as our budget and financial statements, status of directors and annual reports. In addition, for purposes of providing a comparison of the management performances of Government agencies, we are required to post on a designated website a notice on a standard form detailing our management performance. Following consultation with the Minister of the Ministry of Trade, Industry and Energy and the review and resolution of the Committee for Management of Public Institutions, the Ministry of Economy and Finance must examine the adequacy and competency of Government agencies and establish plans on merger, abolishment, restructuring and privatization of public agencies. In such case, the Minister of the Ministry of Trade, Industry and Energy must execute these plans and submit a performance report to the Ministry of Economy and Finance.

Under certain amendments to the Act on the Management of Public Institutions that became effective as of July 1, 2019, our president is required to establish a plan to appoint directors and senior management based on the gender equality, endeavor to follow such plan, and submit an annual report on our gender equality plan regarding appointment of directors and senior management to the Ministry of Economy and Finance.

Application of the Act to Our Generation Subsidiaries

On January 24, 2011, the Ministry of Economy and Finance changed the designation of our six generation subsidiaries from “other public institutions” to “market-oriented public enterprises”, each as defined in the Act on the Management of Public Institutions, and all of our generation subsidiaries accordingly amended their respective articles of incorporation in 2011 to be in compliance with this Act. As “other public institutions”, our generation subsidiaries previously were not subject to the same regulations under the Act on the Management of Public Institutions applicable to us with regards to corporate governance matters such as the appointment and dismissal of directors and the composition of the boards of directors. However, as “market-oriented public enterprises”, our generation subsidiaries are currently subject to the same such regulations that are applicable to us.

 

172


Table of Contents

Specifically, prior to such designation, (i) our president appointed the presidents and the statutory auditors of our generation subsidiaries; (ii) the selection of non-standing directors of each such subsidiary was subject to approval by our president; (iii) the president of each such subsidiary entered into a management contract with our president; and (iv) our evaluation committee conducted performance evaluation of such subsidiaries. However, following such designation, akin to the appointment process applicable to us, (i) the President of Korea appoints the presidents and standing directors of our generation subsidiaries that concurrently serve as members of the audit committees; (ii) the selection of non-standing directors of these subsidiaries is subject to approval by the Minister of the Ministry of Economy and Finance; (iii) the president of each such generation subsidiary is required to enter into a management contract directly with the Minister of the Ministry of Trade, Industry and Energy; and the Committee for Management of Public Institutions conducts performance evaluation of such subsidiaries.

Our Control over the Generation Subsidiaries

Designation of our generation subsidiaries as “market-oriented public enterprises” was intended to promote responsible management by and improve operational efficiency of Government-affiliated electricity companies by fostering competition among them so as to provide improved service to the general public. Such designation also has had the effect of the Government exercising greater direct control over the appointment of the governing body of our generation subsidiaries (in ways that are similar how the Government exercises such control over us as our majority shareholder as well as our regulator).

In addition, the Government has imposed a number of regulations that further affect the respective operational boundaries between us and our generation subsidiaries, including as follows:

 

  

In August 2010, in furtherance of the Act on the Management of Public Institutions, the Ministry of Economy and Finance announced the Proposal for the Improvement in the Structure of the Electric Power Industry, which was designed to promote responsible management by and improve operational efficiency of Government-affiliated electricity companies by fostering competition among them. Key initiatives of the proposal included the following: (i) maintain the current structure of having six generation subsidiaries and designate the six generation subsidiaries as market-oriented public enterprises under the Act on the Management of Public Institutions in order to foster competition among the generation subsidiaries and promote efficiency in their operations, and (ii) clarify the scope of the business of us and the six generation subsidiaries (namely, that we shall manage the financial structure and governance of the six generation subsidiaries and nuclear power plant and overseas resources development projects, while the six generation subsidiaries will have greater autonomy with respect to construction and management of generation units and procurement of fuel, among others).

 

  

In January 2011, the Ministry of Economy and Finance created a “joint cooperation unit” consisting of officers and employees selected from the five thermal power generation subsidiaries in order to reduce inefficiencies in areas such as fuel transportation, inventories, materials and equipment and construction, etc. and allow the thermal power generation subsidiaries to continue utilizing the benefits of economy of scale after split off of our generation business units into separate subsidiaries. The purpose of the joint cooperation unit was to give greater autonomy to the generation subsidiaries with regard to power plant construction and management and fuel procurements, and thereby enhance efficiency in operating power plants. The main functions of the joint cooperation unit are as follows: (i) maintain inventories of bituminous coal through volume exchanges and joint purchases, (ii) reduce shipping and demurrage expenses through joint operation and distribution of dedicated vessels, (iii) reduce costs by sharing information on generation material inventories and (iv) sharing human resources among the five thermal power generation subsidiaries for construction projects, among other things.

 

  

In June 2016, the Government announced the Proposal for Adjustment of Functions of Public Institutions (Energy Sector) for the purpose of streamlining the operations of Government-affiliated energy companies by discouraging them from engaging in overlapping or similar businesses with each

 

173


Table of Contents
 

other, reducing non-core assets and activities and improving management and operational efficiency. The initiatives contemplated in this proposal that would affect us and our generation subsidiaries include the following: (i) the generation companies should take on greater responsibilities in overseas resource exploration and production projects as these involve procurement of fuels necessary for electricity generation while fostering cooperation among each other through closer coordination, (ii) KHNP should take a greater role in export of nuclear technology, and (iii) the current system of retail sale of electricity to end-users should be liberalized to encourage more competition.

However, notwithstanding these developments, we, also a government-controlled entity, remain as the sole shareholder of our generation subsidiaries and continue to exercise significant control over them in such capacity as the sole shareholder well as through other practical means as further described below.

First, as the sole shareholder, we continue to have the right, under the Act on the Management of Public Institutions, to approve or disapprove the appointment of key members of the governing body of our generation subsidiaries (namely, the president, the standing directors, and the non-standing directors) by way of a vote at the general shareholders meeting before such appointments are ultimately approved and made by the President of Korea (in the case of the presidents and standing directors concurrently serving as audit committee members of the generation subsidiaries) or by the president of each generation subsidiary (in the case of other standing directors of such generation subsidiary). Our right to exercise such voting right as a shareholder is also protected by the Commercial Act of Korea.

Second, in practice we retain significant control over our generation subsidiaries through the following means:

 

  

We are the sole purchaser of electricity produced by the generation subsidiaries and continue to have near monopoly in terms of transmitting and distributing electricity in Korea. Accordingly, we continue to have significant influence over our generation subsidiaries in the electricity industry.

 

  

Our president holds regular meetings (known as “CEO Meetings”) with the presidents of our generation subsidiaries for which our president determines whether and when to convene such meetings, sets the agenda for such meetings and chairs such meetings. Since significant issues that jointly affect us and our generation subsidiaries are often discussed and decided at these meetings, the leadership role exercised by our president in such meetings is significant in setting the policies and direction for us and our generation subsidiaries as a whole.

 

  

We maintain and operate the Affiliated Company Management Team within the parent company organizational structure. The purpose of this team is to support and coordinate the management of the generation subsidiaries. Activities of the Affiliated Company Management Team include preparation of the CEO meetings, deliberation on major issues to be discussed at CEO Meetings, convening a general meeting of shareholders of the generation subsidiaries and coordination on the decision-making process for the general meeting of shareholders of the generation subsidiaries.

Ultimately, our control over our generation subsidiaries is derived from the fact that the Government owns the majority of our shares and effectively controls us as the supervisor and regulator in a heavily regulated industry, and in effect also exercises the same degree of control over our generation subsidiaries through our sole share ownership over our generation subsidiaries as well as its statutory power of direct appointment of the governing bodies of our generation subsidiaries. In effect, we are acting as an intermediate holding company in a vertical control structure involving the Government, us and our generation subsidiaries, where the Government holds the ultimate control over both us and our generation subsidiaries and exercises its control over our generation subsidiaries in part through us acting as the sole shareholder and the parent company.

Differences between Korean and New York Stock Exchange Corporate Governance Practices

We are a “foreign private issuer” (as such term is defined in Rule 3b-4 under the Exchange Act), and our ADSs are listed on the New York Stock Exchange, or NYSE. Under Section 303A of the NYSE Listed Company

 

174


Table of Contents

Manual, NYSE-listed companies that are foreign private issuers are permitted to follow home country practice in lieu of the corporate governance provisions specified by the NYSE with limited exceptions. Under the NYSE Listed Company Manual, we as a foreign private issuer are required to disclose significant differences between NYSE’s corporate governance standards and those we follow under Korean law. The following summarizes some significant ways in which our corporate governance practices differ from those followed by U.S. companies listed on the NYSE under the listing rules of the NYSE.

Majority of Independent Directors on the Board

Under the NYSE listing rules, U.S. companies listed on the NYSE must have a board, the majority of which is comprised of independent directors satisfying the requirements of “independence” as set forth in Rule 10A-3 under the Exchange Act. No director qualifies as “independent” unless the board of directors affirmatively determines that the director has no material relationship with the listed company (either directly or as a partner, shareholder or officer of an organization that has a relationship with us). The NYSE rules include detailed tests for determining director independence. As a foreign private issuer, we are exempt from these requirements.

Under the Act on the Management of Public Institutions, the number of standing directors including our president must be less than one-half of incumbent directors. For a discussion on qualifications of non-standing directors, see Item 6.A. “Directors and Senior Management—Board of Directors.” Under the Act on the Management of Public Institutions, a non-standing director is appointed by the Ministry of Economy and Finance following the review and resolution of the Committee for Management of Public Institutions from a pool of candidates recommended by the director nomination committee, and must (i) have ample knowledge and experience in business management or (ii) have held his or her offices for at least three years and either (a) be recommended by the representative of the employees (or the representative of the labor union if there is a labor union comprising the majority of the employees) or (b) obtain consent from the majority of the employees. We are required to appoint at least one non-standing director who qualifies the requirement (ii) above. Government officials that are not part of the teaching staff in national and public schools are ineligible to become our non-standing directors.

Executive Session

Under the NYSE listing rules, non-management directors of U.S. companies listed on the NYSE are required to meet on a regular basis without management present and independent directors must meet separately at least once per year. While no such requirement currently exists under applicable Korean law, listing standards or our Articles of Incorporation, executive sessions were held from time to time in 2018 and in 2021 in order to promote the exchange of diverse opinions by non-standing directors.

Audit Committee

Under the NYSE listing rules, listed companies must have an audit committee that has a minimum of three members, and all audit committee members must satisfy the requirements of independence set forth in Section 303A.02 of the NYSE Listed Company Manual and Rule 10A-3 under the Exchange Act. Our audit committee members meet the requirements of independence set forth in Section 303A.02 of the NYSE Listed Company Manual and Rule 10A-3 under the Exchange Act. The audit committee must be directly responsible for the appointment, compensation, retention and oversight of the work of the independent registered public accountants. Our audit committee performs the roles and responsibilities required of an audit committee under the Sarbanes-Oxley Act, including the supervision of the audit by the independent registered public accountants. Under the Korea Exchange listing rules and the Korean Commercial Act, a large listed company must also establish an audit committee of which at least two-thirds of its members must be non-standing directors and whose chairperson must be a non-standing director. Under the Act on the Management of Public Institutions, the Korean Commercial Act, the amended Articles of Incorporation and the Korea Exchange listing rules, we are required to maintain an audit committee consisting of three members, of which not less than two members are required to be non-standing directors. In addition, pursuant to certain amendments to the Act on the Management

 

175


Table of Contents

of Public Institutions that became effective as of January 1, 2021, in appointing the standing member of the audit committee, the director nomination committee shall recommend the person who is qualified in any of the followings: (i) a person who is qualified as a certified public accountant or an attorney and has a minimum of three years of experience in work related to such qualification, (ii) a person who has served as an assistant professor or at a higher position for at least three years in areas directly related to audit, investigation and judicial affairs, budget and accounting, investigation, planning and evaluation, etc. (hereinafter referred to as “audit related works”) at a school under subparagraphs 1 through 5 of Article 2 of the Higher Education Act), (iii) a person who has been in charge of audit-related works for at least three years at a public institution, stock-listed corporation or research institute under Article 9(15)3 of the Financial Investment Services and Capital Markets Act and has experience prescribed by Presidential Decree, (iv) person who has been in charge of audit-related works for at least three years at the state or a local government and has served as a public official at the level prescribed by Presidential Decree, or (v) person with other expertise in accordance with the affairs of the relevant institution and qualified as prescribed by Presidential Decree.

Our audit committee is in compliance with the foregoing requirements under the Act on the Management of Public Institutions, the Korean Commercial Act, the amended Articles of Incorporation and the Korea Exchange listing rules.

On April 2, 2021, we amended our Articles of Incorporation to incorporate an amendment to the Commercial Act implemented on December 29, 2020, which requires at least one director who will serve as a member of the audit committee to be appointed separately from other directors at the meeting of shareholders. Our amended Articles of Incorporation requires all three directors who will serve as a member of the audit committee to be appointed separately from other directors at the meeting of shareholders.

On November 7, 2022, we amended our Articles of Incorporation to incorporate an amendment to the Commercial Act implemented on December 29, 2020, which requires the affirmative votes of at least a majority of the voting rights of the shareholders present at the shareholders meeting for appointment of a member of the audit committee in lieu of the affirmative votes of (i) at least a majority of the voting rights of the shareholders present at the shareholders meeting and (ii) at least one-fourth (1/4) of the total number of shares with the voting rights issued and outstanding if the shareholders are permitted to exercise a vote by electronic means at such shareholders meeting by the resolution of our board of directors.

Nomination/Corporate Governance Committee

Under the NYSE listing rules, U.S. companies listed on the NYSE must have a nomination/corporate governance committee composed entirely of independent directors. In addition to identifying individuals qualified to become board members, this committee must develop and recommend to the board a set of corporate governance principles. Under the Act on the Management of Public Institutions, we are required to have a director nomination committee which consists of non-standing directors and ad hoc members appointed by our board of directors. Our standing directors and executives as well as governmental officials that are not part of the teaching staff in national and public schools are ineligible to become a member of our director nomination committee. There is no requirement to establish a corporate governance committee under applicable Korean law.

Pursuant to the NYSE listing standards, non-management directors must meet on a regular basis without management present and independent directors must meet separately at least once per year. No such requirement currently exists under applicable Korean law.

Compensation Committee

Under the NYSE listing rules, U.S. companies listed on the NYSE are required to have a compensation committee which is composed entirely of independent directors. In January 2013, the SEC approved amendments to the listing rules of NYSE and NASDAQ regarding the independence of compensation committee members and the appointment, payment and oversight of compensation consultants. The listing rules were adopted as required

 

176


Table of Contents

by Section 952 of the Dodd-Frank Act and rule 10C-1 of the Exchange Act, which direct the national securities exchanges to prohibit the listing of any equity security of a company that is not in compliance with the rule’s compensation committee director and advisor independence requirements. Certain elements of the listing rules became effective on July 1, 2013 and companies listed on the NYSE must comply with such listing rules by the earlier of the company’s first annual meeting after January 15 or October 31, 2014.

No such requirement currently exists under applicable Korean law or listing standards, and we currently do not have a compensation committee.

Corporate Governance Guidelines and Code of Business Conduct and Ethics

Under the NYSE listing rules, U.S. companies listed on the NYSE are required to establish corporate governance guidelines and to adopt a code of business conduct and ethics for directors, officers and employees, and promptly disclose any waivers of the code for directors or executive officers. As a foreign private issuer, we are exempt from this requirement. Pursuant to the requirements of the Sarbanes-Oxley Act, we have adopted a code of ethics applicable to our President and Chief Executive Officer and all other directors and executive officers including the Chief Financial Officer and the Chief Accounting Officer, as well as all financial, accounting and other officers that are involved in the preparation and disclosure of our consolidated financial statements and internal control of financial reporting pursuant to Section 404 of the Sarbanes-Oxley Act. We have also adopted an insider reporting system in compliance with Section 301 of the Sarbanes-Oxley Act. The code of ethics applicable to our executive officers and financial officers are available on www.kepco.co.kr.

Shareholder Approval of Equity Compensation Plans

Under the NYSE listing rules, shareholders of U.S. companies listed on the NYSE are required to approve all equity compensation plans. Under Korean law and regulations, stock options can be granted to employees to the extent expressly permitted by the articles of incorporation. We currently do not have any equity compensation plans.

Annual Certification of Compliance

Under the NYSE listing rules, a chief executive officer of a U.S. company listed on the NYSE must annually certify that he or she is not aware of any violation by the company of NYSE corporate governance standards. As a foreign private issuer, we are not subject to this requirement. However, in accordance with rules applicable to both U.S. companies and foreign private issuers, we are required to promptly notify the NYSE in writing if any executive officer becomes aware of any material noncompliance with the NYSE corporate governance standards applicable to us. In addition, foreign private issuers, including us, are required to submit to the NYSE an annual written affirmation relating to compliance with Sections 303A.06 and 303A.11 of the NYSE listed company manual, which are the NYSE corporate governance standards applicable to foreign private issuers. All written affirmations must be executed in the form provided by the NYSE, without modification. An annual written affirmation is required to be submitted to the NYSE within 30 days of filing with the SEC our annual report on Form 20-F. We have been in compliance with this requirement in all material respects and plan to submit such affirmation within the prescribed timeline.

Whistle Blower Protection

On May 25, 2011, the SEC adopted final rules to implement whistleblower provisions of the Dodd-Frank Act, which are applicable to foreign private issuers with securities registered under the U.S. securities laws. The final rules provide that any eligible whistleblower who voluntarily provides the SEC with original information that leads to the successful enforcement of an action brought by the SEC under U.S. securities laws must receive an award of between 10 and 30 percent of the total monetary sanctions collected if the sanctions exceed US$1,000,000. An eligible whistleblower is defined as someone who provides information about a possible violation of the securities laws that he or she reasonably believes has occurred, is ongoing, or is about to occur.

 

177


Table of Contents

The possible violation does not need to be material, probably or even likely, but the information must have a “facially plausible relationship to some securities law violation”; frivolous submissions would not qualify. The final rules also prohibit retaliation against the whistleblower. While the final rules do not require employees to first report allegations of wrongdoing through a company’s corporate compliance system, they do seek to incentivize whistleblowers to utilize internal corporate compliance first by, among other things, (i) giving employees who first report information internally the benefit of the internal reporting date for purposes of the SEC program so long as the whistleblower submits the same information to the SEC within 120 days of the initial disclosure; (ii) clarifying that the SEC will consider, as part of the criteria for determining the amount of a whistleblower’s award, whether the whistleblower effectively utilized the company’s corporate compliance program or hindered the function of the program; and (iii) crediting a whistleblower who reports internally first and whose company passes the information along to the SEC, which would mean the whistleblower could receive a potentially higher award for information gathered in an internal investigation initiated as a result of the whistleblower’s internal report.

In addition, the final rules address concerns that the whistleblower rules incentivize officers, directors and those with legal, audit, compliance or similar responsibilities to abuse these positions by making whistleblower complaints to the SEC with respect to information they obtained in these roles by generally providing that information obtained through a communication subject to attorney-client privilege or as a result of legal representation would not be eligible for a whistleblower award unless disclosure would be permitted by attorney conduct rules. Accordingly, officers and directors, auditors and compliance personnel and other persons in similar roles would not be eligible to receive awards for information received in these positions unless (x) they have a reasonable basis to believe that (1) disclosure of the information is necessary to prevent the entity from engaging in conduct that is likely to cause substantial injury to the financial interests of the entity or investors; or (2) the entity is engaging in conduct that will impede an investigation of the misconduct, for example, destroying documents or improperly influencing witnesses; or (y) 120 days have passed since the whistleblower provided the information to senior responsible persons at the entity or 120 days have passed since the whistleblower received the information at a time when these people were already aware of the information.

In Korea, under the Financial Investment Services and Capital Markets Act, anyone may provide or furnish the Financial Services Commission or the Securities and Futures Commission with information on unfair trading or any other violation of the Financial Investment Services and Capital Markets Act. The Financial Services Commission shall keep the identity of the whistleblower confidential, and any institution, organization or company to which the whistleblower belongs may not treat the whistleblower unfavorably, directly or indirectly. In addition, the Financial Services Commission may also reward the whistleblower within the limit of the budget of the Financial Services Commission.

 

ITEM 16H.

MINE SAFETY DISCLOSURE

Not applicable.

 

ITEM 16I.

DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS.

Not applicable.

 

ITEM 16J.

INSIDER TRADING POLICIES.

Not applicable.

 

ITEM 16K.

CYBERSECURITY.

Overview

Cybersecurity presents an ever-evolving challenge to the electric power industry, and we and our generation subsidiaries have identified cybersecurity as a key enterprise risk. Our operations require the continuous

 

178


Table of Contents

availability of critical information and operational technology systems, sensitive customer and employee data, and infrastructure information, all of which are targets for malicious actors. Cybersecurity attacks, which can arise from external actors, internal threats, or through our supply chain, are continually becoming more frequent and sophisticated. Our increased reliance on technology necessarily increases cybersecurity risk. Cybersecurity incidents may cause a major disruption of our operations, and therefore materially affect our and our generation subsidiaries’ financial condition, operations, and business reputation. For more information regarding how cybersecurity threats could materially affect us and our generation subsidiaries, see Item 3.D. “Risk Factors—We are subject to physical security and cybersecurity risk” and Item 4.B. “Business Overview—Cybersecurity.”

We and our generation subsidiaries have not experienced any cybersecurity incidents in the last three years that have materially affected the business strategy, results of operations, or financial condition of us and our generation subsidiaries.

Risk Management, Strategy and Oversight

We assess and monitor cybersecurity risks to our infrastructure, new projects and third parties we engage with, especially service providers. We have established cybersecurity management system, which is called “Cybersecurity GRC System,” through which we identify, evaluate and manage cybersecurity risks. Additionally, the National Intelligence Service and the Ministry of Trade, Industry and Energy perform regular audits to identify, evaluate and manage material risks from cybersecurity threats in accordance with the Basic Guidelines for National Information Security and the detailed guidelines for information security issued by the Ministry of Trade, Industry and Energy.

We have formed an Information Security Committee under the supervision of our information security department. The Information Security Committee’s responsibilities include, among others, conducting investigations into cybersecurity incidents and developing preventive strategies. Moreover, we and our generation subsidiaries have jointly established a Cybersecurity Committee, a cybersecurity oversight group comprised of senior management teams of the respective companies, including Chief Information Security Officers, to monitor cybersecurity policies and provide strategic direction for the prevention, detection, mitigation and remediation of cybersecurity risks.

We use contractual terms to impose cybersecurity requirements on third-party service providers for compliance with our cybersecurity policies, including the requirement to immediately inform us of any occurrence of cybersecurity threats during the provision of their service. We and our generation subsidiaries conduct training, policies, technical and procedural controls and mitigation plans to address risks from cybersecurity threats.

Governance

Under the supervision of the head of the Co-prosperity and Cooperation Division, our Chief Information Security Officer (“CISO”), who is also a standing director and executive director of information security, is responsible for assessing and managing material risks from cybersecurity threats. The CISO has qualifications stipulated by relevant laws and extensive experience related to the management and protection of information security. All material cybersecurity-related matters are promptly notified to the CISO, who provides updates on security control to the head of the Co-prosperity and Cooperation Division on a weekly basis. Also, our Board of Directors is responsible for the oversight of risks from cybersecurity threats. The Board will receive reports of material cybersecurity incidents and threats as they occur. Additionally, pursuant to the Act on the Control and Supervision on Nuclear Power Suppliers for the Prevention of Corruption in the Nuclear Power Industry, our management is charged with submitting an operational plan for cybersecurity management every two years to our board of directors, which includes plans to prevent nuclear power-related misconduct. Such plan needs to be reviewed and approved by our board of directors.

 

179


Table of Contents

PART III

 

ITEM 17.

FINANCIAL STATEMENTS

We have responded to Item 18 in lieu of responding to this item.

 

ITEM 18.

FINANCIAL STATEMENTS

Reference is made to Item 19(a). “Exhibits” for a list of all financial statements filed as part of this annual report.

 

ITEM 19.

EXHIBITS

 

(a)

Exhibits filed as part of this Annual Report

See Index of Exhibits beginning on page 159 of this annual report.

 

(b)

Financial Statements filed as part of this Annual Report

See Index to Financial Statements on page F-1 of this annual report.

 

180


Table of Contents

INDEX OF EXHIBITS

 

  1.1(1)  Articles of Incorporation, as amended on November 7, 2022 (in English)
  2.1(2)  Form of Deposit Agreement
  8.1  List of Subsidiaries
 12.1  Certifications of our Chief Executive Officer required by Rule 13a-14(a) of the Exchange Act (Certifications under Section 302 of the Sarbanes-Oxley Act of 2002)
 12.2  Certifications of our Chief Financial Officer required by Rule 13a-14(a) of the Exchange Act (Certifications under Section 302 of the Sarbanes-Oxley Act of 2002)
 13.1  Certifications of our Chief Executive Officer required by Rule 13a-14(b) and Section 1350 of Chapter 63 of the United States Code (18 U.S.C. 1350) (Certifications under Section 906 of the Sarbanes-Oxley Act of 2002)
 13.2  Certifications of our Chief Financial Officer required by Rule 13a-14(b) and Section 1350 of Chapter 63 of the United States Code (18 U.S.C. 1350) (Certifications under Section 906 of the Sarbanes-Oxley Act of 2002)
 15.1(1)  The Korea Electric Power Corporation Act, as amended on December 31, 2022 (in English)
 15.2(3)  Enforcement Decree of the Korea Electric Power Corporation Act, as amended on January 5, 2021 (in English)
 15.3(1)  The Act on the Management of Public Institutions, as amended on February 3, 2022 (in English)
 15.4(1)  Enforcement Decree of the Act on the Management of Public Institutions, as amended on December 20, 2022 (in English)
 97.1  Policy Relating to Recovery of Erroneously Awarded Compensation, as required by applicable listing standards adopted pursuant to 17 CFR 240.10D-1
101.INS  Inline XBRL Instance Document — the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document
101.SCH  Inline XBRL Taxonomy Extension Schema Document
101.CAL  Inline XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF  Inline XBRL Taxonomy Extension Definition Linkbase Document
101.LAB  Inline XBRL Taxonomy Extension Label Linkbase Document
101.PRE  Inline XBRL Taxonomy Extension Presentation Linkbase Document
104  The cover page for the Company’s Annual Report on Form 20-F for the year ended December 31, 2023, has been formatted in Inline XBRL

 

(1)

Incorporated by reference to the Registrant’s annual report on Form 20-F (No. 001-13372) previously filed on April 28, 2023.

(2)

Incorporated by reference to the Registrant’s Registration Statement on Form F-6 with respect to the ADSs, registered under Registration No. 333-196703.

(3)

Incorporated by reference to the Registrant’s annual report on Form 20-F (No. 001-13372) previously filed on April 30, 2021.

 

181


Table of Contents

SIGNATURES

The registrant hereby certifies that it meets all of the requirements for filing on Form 20-F and that it has duly caused and authorized the undersigned to sign this Annual Report on its behalf.

 

KOREA ELECTRIC POWER CORPORATION
By: 

/s/ Kim, Dong-Cheol

Name: Kim, Dong-Cheol
Title: President and Chief Executive Officer
Date: April 30, 2024

 

182


Table of Contents
Korea Electric Power Corporation and subsidiariesIncorporated on December 31, 1981 in accordance with the Korea Electric Power Corporation Act (the “KEPCO Act”)Incorporated on December 31, 1981 in accordance with the Korea Electric Power Corporation Act (the “KEPCO Act”)SEMARNAT / CFE TransmissionCENACE / SEMARNATEngage in the generation, transmission and distribution of electricity and development of electric power resources. KEPCO also provides power plant construction service

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
ON CONSOLIDATED FINANCIAL STATEMENTS
To the Shareholders and Board of Directors of
Korea Electric Power Corporation
Opinion on the Consolidated Financial Statements
We have audited the accompanying consolidated statements of financial position of Korea Electric Power Corporation and subsidiaries (the “Company”) as of December 31, 2022 and 2023, the related consolidated statements of comprehensive income or loss, changes in equity and cash flows for each of the three years in the period ended December 31, 2023, and the related notes (collectively, the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2022 and 2023, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2023, in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company’s internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework), and our report dated April 30, 2024 expressed an unqualified opinion thereon.
Basis for Opinion
These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on the Company’s consolidated financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matter
The critical audit matter communicated below is a matter arising from the current period audit of the financial statements that was communicated or required to be communicated to the audit committee and that: (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective or complex judgments. The communication of the critical audit matter does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.
 
 
Impairment of property, plant and equipment in electricity transmission and distribution business
Description of the Matter
 
As described in note 18 to the consolidated financial statements, the aggregate carrying value of the Company’s property, plant and equipment (“PP&E”) as of December 31, 2023 is KRW 179,875,535 million, and no impairment charge was recognized during the year ended December 31, 2023. Since the Company was operating at a loss during the year, the Company evaluated its cash-generating unit (“CGU”) in its electricity transmission and distribution business for recoverability by comparing the carrying amount of the CGU with its
value-in-use
(“VIU”) amount measured using the discounted cash flow model and concluded that the CGU was fully recoverable as of December 31, 2023.
 
Auditing the Company’s impairment assessment involved subjective judgment and required the involvement of specialists because, in preparing the VIU estimate, management uses estimates in the discounted cash flow model that include, among others, assumptions about future sales volumes, unit sales prices, cost of power purchases, and discount rates, that are inherently uncertain. Further, the carrying amount of PP&E to the
 
F-2

 consolidated financial statements is material and as such these assumptions have a significant effect on the outcome of the impairment assessment.
How We Addressed the Matter in Our Audit
 
We obtained an understanding, evaluated the design, and tested the operating effectiveness, of controls over the Company’s processes in determining the VIU of the CGU. This included our evaluation of management review controls over significant assumptions (i.e., future sales volumes, unit sales prices, cost of power purchases, and discount rates) used to develop the discounted cash flow forecasts.
 
Our testing of the Company’s impairment calculation included, among other procedures, evaluating the discounted cash flow model used by the Company by involving our valuation specialists to assist in testing the significant assumptions used to develop the cash flow forecasts and testing the completeness and accuracy of the underlying data. We assessed the accuracy of the Company’s historical projections by comparing them with actual operating results, evaluated management’s methodology for determining the discount rate used to calculate the present value of the forecasted cash flows by comparing it against our own calculated rate using both market and entity-specific information, searched for and evaluated information that corroborates or contradicts the Company’s assumptions, and performed sensitivity analyses of significant assumptions to evaluate the changes in the VIU estimate that could result from changes in the assumptions. Furthermore, we considered the Company’s business plan and external market data for major unobservable inputs such as future sales volumes, unit sales prices and cost of power purchases, that were used in estimating the VIU. For example, we compared these significant assumptions to current industry practice, market and economic trends, historical results of the Company’s business and other relevant factors.
/s/ Ernst & Young Han Young
We have served as the Company’s auditor since 2018.
Seoul, the Republic of Korea
April 30, 2024
 
F-3

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
ON INTERNAL CONTROL OVER FINANCIAL REPORTING
To the Shareholders and Board of Directors of Korea Electric Power Corporation
Opinion on Internal Control Over Financial Reporting
We have audited Korea Electric Power Corporation and subsidiaries (the “Company”)’s internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) (the COSO criteria). In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2023, based on the COSO criteria.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated statements of financial position of the Company as of December 31, 2022 and 2023, the related consolidated statements of comprehensive income or loss, changes in equity and cash flows for each of the three years in the period ended December 31, 2023, and the related notes (collectively, the “consolidated financial statements”), and our report dated April 30, 2024 expressed an unqualified opinion thereon.
Basis for Opinion
The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting included in the accompanying Management’s Annual Report on Internal Control Over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects.
Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
Definition and Limitations of Internal Control Over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
/s/ Ernst & Young Han Young
Seoul, the Republic of Korea
April 30, 2024
 
F-4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Financial Position
As of December 31, 2022 and 2023
 
  
Note
     
2022
  
2023
 
        
In millions of won
 
Assets
    
Current assets
    
Cash and cash equivalents
  5,6,7,45     3,234,780   4,342,887 
Current financial assets, net
  5,6,9,11,12,13,45,47    4,286,975   3,107,397 
Trade and other receivables, net
  5,8,20,24,45,46,47    10,461,822   11,985,735 
Inventories, net
  14    9,930,732   8,875,615 
Income tax receivables
  41    46,619   69,612 
Current
non-financial
assets
  15    1,744,869   1,109,321 
Assets
held-for-sale
  16,42    44,748   45,648 
   
 
 
  
 
 
 
Total current assets
    29,750,545   29,536,215 
   
 
 
  
 
 
 
Non-current
assets
    
Non-current
financial assets, net
  5,6,9,10,11,12,13,45,47    3,336,835   3,546,214 
Non-current
trade and other receivables, net
  5,8,20,45,46,47    2,153,080   2,193,587 
Property, plant and equipment, net
  4,18,24,27,49    177,865,308   179,875,535 
Investment properties, net
  4,19,27    208,286   185,527 
Goodwill
  4,16    100,093   99,156 
Intangible assets other than goodwill, net
  4,21,27,46    956,664   1,033,984 
Investments in associates
  4,17    5,844,464   6,176,889 
Investments in joint ventures
  4,17    3,147,584   3,485,699 
Defined benefit assets, net
  25    198,626   70,187 
Deferred tax assets
  41    10,934,375   13,161,802 
Non-current
non-financial
assets
  4,15    309,134   350,170 
   
 
 
  
 
 
 
Total
non-current
assets
    205,054,449   210,178,750 
   
 
 
  
 
 
 
Total Assets
  4     234,804,994   239,714,965 
   
 
 
  
 
 
 
(Continued)
 
F-5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Financial Position, Continued
As of December 31, 2022 and 2023
 
  
Note
     
2022
  
2023
 
        
In millions of won
 
Liabilities
    
Current liabilities
    
Trade and other payables, net
  5,22,24,45,47     11,983,549   9,089,973 
Current financial liabilities, net
  5,12,23,45,47    22,703,996   41,139,726 
Income tax payables
  41    429,604   482,934 
Current
non-financial
liabilities
  20,28,29    6,974,377   7,881,663 
Current provisions
  26,45    2,427,051   2,654,125 
   
 
 
  
 
 
 
Total current liabilities
    44,518,577   61,248,421 
   
 
 
  
 
 
 
Non-current
liabilities
    
Non-current
trade and other payables, net
  5,22,24,45,47    5,638,914   4,981,957 
Non-current
financial liabilities, net
            5,12,23,45,47    98,334,120   92,944,338 
Non-current
non-financial
liabilities
  28,29    10,662,661   11,196,000 
Employee benefits liabilities, net
  25,45    828,721   1,035,320 
Deferred tax liabilities
  41    6,457,103   5,163,135 
Non-current
provisions
  26,45    26,364,642   25,881,044 
   
 
 
  
 
 
 
Total
non-current
liabilities
    148,286,161   141,201,794 
   
 
 
  
 
 
 
Total Liabilities
  4     192,804,738   202,450,215 
   
 
 
  
 
 
 
Equity
    
Contributed capital
  1,30,45    
Share capital
     3,209,820   3,209,820 
Share premium
    843,758   843,758 
   
 
 
  
 
 
 
    4,053,578   4,053,578 
   
 
 
  
 
 
 
Retained earnings
  31    
Legal reserves
    1,604,910   1,604,910 
Voluntary reserves
    27,782,969   2,812,313 
Unappropriated retained earnings (undisposed deficit)
    (7,956,579  11,921,039 
   
 
 
  
 
 
 
    21,431,300   16,338,262 
   
 
 
  
 
 
 
Other components of equity
  34    
Other capital surplus
    1,268,569   1,600,801 
Accumulated other comprehensive income
    496,976   557,430 
Other equity
    13,294,973   13,294,972 
   
 
 
  
 
 
 
    15,060,518   15,453,203 
   
 
 
  
 
 
 
Equity attributable to owners of the controlling company
    40,545,396   35,845,043 
Non-controlling
interests
  16,33    1,454,860   1,419,707 
   
 
 
  
 
 
 
Total Equity
     42,000,256   37,264,750 
   
 
 
  
 
 
 
Total Liabilities and Equity
     234,804,994   239,714,965 
   
 
 
  
 
 
 
See accompanying notes to the consolidated financial statements.
 
F-6
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Comprehensive Income or Loss
For each of the three years in the period ended December 31, 2023
 
   
Note
       
2021
  
2022
  
2023
 
           
In millions of won, except per share information
 
Sales
   4,35,45,47       
Sales of goods
  2      58,800,977   69,184,469   85,940,137 
Sales of construction services
   20      754,998   646,953   785,395 
Sales of services
       456,400   714,602   750,878 
      
 
 
  
 
 
  
 
 
 
       60,012,375   70,546,024   87,476,410 
      
 
 
  
 
 
  
 
 
 
Cost of sales
   14,25,43,47       
Cost of sales of goods
       (62,164,425  (99,441,768  (88,066,120
Cost of sales of construction services
       (898,963  (941,254  (1,003,601
Cost of sales of services
       (580,902  (520,572  (629,806
      
 
 
  
 
 
  
 
 
 
       (63,644,290  (100,903,594  (89,699,527
      
 
 
  
 
 
  
 
 
 
Gross loss
       (3,631,915  (30,357,570  (2,223,117
Selling and administrative expenses
     25,36,43,47      (2,875,796  (3,009,422  (3,061,582
Other income
   28,37      1,034,133   1,095,489   1,275,902 
Other expenses
   37      (257,932  (212,150  (258,905
Other gains (losses), net
   38      8,519   243,122   22,686 
      
 
 
  
 
 
  
 
 
 
Operating loss
   4      (5,722,991  (32,240,531  (4,245,016
Finance income
   5,12,39        1,402,614      1,833,312    1,425,031 
Finance expenses
   5,12,40      (3,245,777  (4,746,791  (5,347,018
Profit (loss) related to associates, joint ventures and subsidiaries
   4,16,17       
Gain on valuation of investments in associates and joint ventures
       775,588   1,393,486   804,141 
Gain on disposal of investments in associates and joint ventures
       1,844   11,091   18,204 
Reversal of impairment loss on investments in associates and joint ventures
      —  —   347 
Gain on disposal of investments in subsidiaries
      —  —   2 
Loss on valuation of investments in associates and joint ventures
       (218,532  (55,193  (209,085
Loss on disposal of investments in associates and joint ventures
       (64,119  (1,675   
Loss on impairment of investments in associates and joint ventures
          (5,174  (19
Loss on disposal of investments in subsidiaries
       (197  (32,144  (564
      
 
 
  
 
 
  
 
 
 
       494,584   1,310,391   613,026 
      
 
 
  
 
 
  
 
 
 
Loss before income tax
       (7,071,570  (33,843,619  (7,553,977
Income tax benefit
   41      1,855,989   9,414,511   2,837,833 
      
 
 
  
 
 
  
 
 
 
Loss for the year
        (5,215,581  (24,429,108  (4,716,144
(Continued)
 
F-7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Comprehensive Income or Loss, Continued
For each of the three years in the period ended December 31, 2023
 
   
Note
       
2021
  
2022
  
2023
 
           
In millions of won, except per share information
 
Other comprehensive income (loss), net of tax
   5,12,25,31,34       
Items that will not be reclassified subsequently to profit or loss:
        
Remeasurements of defined benefit liability
   25,31       210,409   663,095   (271,724
Share of other comprehensive income (loss) of associates and joint ventures
   31      3,609   12,305   (27,349
Net change in fair value of financial assets at fair value through other comprehensive income (loss)
   34      59,024   58,010   (31,665
Items that may be reclassified subsequently to profit or loss:
        
Net change in the unrealized fair value of derivatives using cash flow hedge accounting
   5,12,34      (15,778  (24,415  (3,654
Foreign currency translation of foreign operations
   34      41,189   28,387   (17,274
Share of other comprehensive income of associates and joint ventures
   34      301,161   509,487   122,994 
      
 
 
  
 
 
  
 
 
 
Other comprehensive income (loss) for the year
       599,614   1,246,869   (228,672
      
 
 
  
 
 
  
 
 
 
Total comprehensive loss for the year
        (4,615,967  (23,182,239  (4,944,816
      
 
 
  
 
 
  
 
 
 
Profit (loss) attributable to:
        
Owners of the controlling company
   44       (5,304,522  (24,466,853  (4,822,549
Non-controlling
interests
       88,941   37,745   106,405 
      
 
 
  
 
 
  
 
 
 
        (5,215,581  (24,429,108  (4,716,144
      
 
 
  
 
 
  
 
 
 
Total comprehensive income (loss) attributable to:
        
Owners of the controlling company
        (4,743,513  (23,273,171  (5,032,584
Non-controlling
interests
       127,546   90,932   87,768 
      
 
 
  
 
 
  
 
 
 
        (4,615,967  (23,182,239  (4,944,816
      
 
 
  
 
 
  
 
 
 
Earnings (loss) per share (in won)
   44       
Basic and diluted earnings (loss) per share
        (8,263  (38,112  (7,512
See accompanying notes to the consolidated financial statements.
 
F-8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Changes in Equity
For each of the three years in the period ended December 31, 2023
 
     
Equity attributable to owners of the controlling company
  
Non-

controlling
interests
    
     
Contributed
capital
  
Retained

earnings
  
Other

components

of equity
  
Subtotal
  
Total

equity
 
     
In millions of won
 
Balance as of January 1, 2021
 
 
 
  4,053,578   51,134,330   14,109,501   69,297,409   1,370,650   70,668,059 
Total comprehensive income (loss) for the year
       
Profit (loss) for the year
      (5,304,522     (5,304,522  88,941   (5,215,581
Items that will not be reclassified subsequently to profit or loss:
       
Remeasurements of defined benefit liability, net of tax
      201,067      201,067   9,342   210,409 
Share of other comprehensive income of associates and joint ventures, net of tax
      3,609      3,609      3,609 
Net change in fair value of financial assets at fair value through other comprehensive income, net of tax
         59,022   59,022   2   59,024 
Items that may be reclassified subsequently to profit or loss:
       
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax
         (19,610  (19,610  3,832   (15,778
Foreign currency translation of foreign operations, net of tax
         15,760   15,760   25,429   41,189 
Share of other comprehensive income of associates and joint ventures, net of tax
         301,161   301,161      301,161 
Transactions with owners of the Company, recognized directly in equity
       
Dividends paid
      (780,628     (780,628  (31,516  (812,144
Additional
paid-in
capital and others
         (491  (491  75,702   75,211 
Transactions between consolidated entities
         7,452   7,452   (42,199  (34,747
Changes in consolidation scope
         43   43   59,636   59,679 
Dividends paid (hybrid bond)
               (13,385  (13,385
Others
      4,388   (4,388         
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Balance as of December 31, 2021
       4,053,578   45,258,244   14,468,450   63,780,272     1,546,434   65,326,706 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
(Continued)
 
F-9
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Changes in Equity, Continued
For each of the three years in the period ended December 31, 2023
 
     
Equity attributable to owners of the controlling company
  
Non-

controlling
interests
    
     
Contributed
capital
  
Retained

earnings
  
Other

components

of equity
  
Subtotal
  
Total

equity
 
     
In millions of won
 
Balance as of January 1, 2022
 
 
 
  4,053,578   45,258,244   14,468,450   63,780,272   1,546,434   65,326,706 
Total comprehensive income (loss) for the year
       
Profit (loss) for the year
      (24,466,853     (24,466,853  37,745   (24,429,108
Items that will not be reclassified subsequently to profit or loss:
       
Remeasurements of defined benefit liability, net of tax
      626,769      626,769   36,326   663,095 
Share of other comprehensive income of associates and joint ventures, net of tax
      12,305      12,305      12,305 
Net change in fair value of financial assets at fair value through other comprehensive income, net of tax
         58,008   58,008   2   58,010 
Items that may be reclassified subsequently to profit or loss:
       
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax
         (32,437  (32,437  8,022   (24,415
Foreign currency translation of foreign operations, net of tax
         19,550   19,550   8,837   28,387 
Share of other comprehensive income of associates and joint ventures, net of tax
         509,487   509,487      509,487 
Transactions with owners of the Company, recognized directly in equity
       
Dividends paid
               (42,344  (42,344
Additional
paid-in
capital and others
      835   39,641   40,476   86,316   126,792 
Transactions between consolidated entities
         (1,584  (1,584  (75,791  (77,375
Changes in consolidation scope
         (597  (597  32,311   31,714 
Dividends paid (hybrid bond)
               (13,461  (13,461
Repayment of hybrid bond
               (169,537  (169,537
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Balance as of December 31, 2022
       4,053,578   21,431,300   15,060,518   40,545,396     1,454,860   42,000,256 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
(Continued)
 
F-10

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Changes in Equity, Continued
For each of the three years in the period ended December 31, 2023
 
     
Equity attributable to owners of the controlling company
  
Non-

controlling
interests
    
     
Contributed
capital
  
Retained

earnings
  
Other

components

of equity
  
Subtotal
  
Total

equity
 
     
In millions of won
 
Balance as of January 1, 2023
 
 
 
  4,053,578   21,431,300   15,060,518   40,545,396   1,454,860   42,000,256 
Total comprehensive income (loss) for the year
       
Profit (loss) for the year
      (4,822,549     (4,822,549  106,405   (4,716,144
Items that will not be reclassified subsequently to profit or loss:
       
Remeasurements of defined benefit liability, net of tax
      (242,987     (242,987  (28,737  (271,724
Share of other comprehensive loss of associates and joint ventures, net of tax
      (27,349     (27,349     (27,349
Net change in fair value of financial assets at fair value through other comprehensive income, net of tax
         (31,665  (31,665     (31,665
Items that may be reclassified subsequently to profit or loss:
       
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax
         (5,078  (5,078  1,424   (3,654
Foreign currency translation of foreign operations, net of tax
         (25,950  (25,950  8,676   (17,274
Share of other comprehensive income of associates and joint ventures, net of tax
         122,994   122,994      122,994 
Transactions with owners of the Company, recognized directly in equity
       
Dividends paid
               (45,322  (45,322
Additional
paid-in
capital and others
         (1  (1  6,024   6,023 
Transactions between consolidated entities
         332,280   332,280   (73,795  258,485 
Changes in consolidation scope
         (48  (48  384   336 
Dividends paid (hybrid bond)
               (10,212  (10,212
Others
      (153  153          
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Balance as of December 31, 2023
     4,053,578   16,338,262   15,453,203   35,845,043   1,419,707   37,264,750 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
See accompanying notes to the consolidated financial statements.
 
F-11

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Cash Flows
For each of the three years in the period ended December 31, 2023
 
     
2021
  
2022
  
2023
 
     
In millions of won
 
Cash flows from operating activities
  
Loss for the year
    (5,215,581   (24,429,108  (4,716,144
  
 
 
  
 
 
  
 
 
 
Adjustments to reconcile profit (loss) for the year to net cash provided by operating activities:
    
Income tax benefit
   (1,855,989  (9,414,511  (2,837,833
Depreciation
   11,776,331   12,305,252   12,869,089 
Amortization
   166,161   156,160   163,174 
Employee benefit expense
   512,270   485,700   358,730 
Bad debt expense
   67,242   29,997   101,550 
Interest expense
   1,914,457   2,818,546   4,451,659 
Loss on disposal of financial assets
   1,045   1,841   1 
Loss on disposal of property, plant and equipment
   92,622   100,066   98,120 
Loss on abandonment of property, plant and equipment
   207,934   160,909   196,697 
Loss (gain) on impairment of property, plant and equipment
   4,056   (97,425  17,031 
Loss on impairment of intangible assets
      164   2,865 
Loss on disposal of intangible assets
   145   116   71 
Increase in provisions
   2,466,452   2,146,979   1,611,082 
Loss on foreign currency translation, net
   997,119   523,285   363,659 
Gain on valuation of financial assets at fair value through profit or loss
   (14,338  (7,099  (152,322
Loss on valuation of financial assets at fair value through profit or loss
   5,480   44,329   24,015 
Valuation and transaction gain on derivative instruments, net
   (907,076  (448,903  (323,858
Gain on valuation of investments in associates and joint ventures, net
   (557,056  (1,338,293  (595,056
Gain on disposal of financial assets
   (7,718  (11,199  (13,162
Reversal of impairment loss on intangible assets
   (14      
Gain on disposal of property, plant and equipment
   (56,284  (148,667  (32,196
Gain on disposal of intangible assets
   (1  (41  (136
Gain on disposal of investments in associates and joint ventures
   (1,844  (11,091  (18,204
Loss on disposal of investments in associates and joint ventures
   64,119   1,675    
Impairment loss on investments in associates and joint ventures
      5,174   19 
Reversal of impairment loss on investments in associates and joint ventures
  —      (347
Gain on disposal of subsidiaries
  —      (2
Loss on disposal of investments in subsidiaries
   197   32,144   564 
Interest income
   (221,874  (340,753  (429,620
Dividend income
   (10,522  (28,875  (25,941
Others, net
   (169,856  215,943   6,910 
  
 
 
  
 
 
  
 
 
 
     14,473,058   7,181,423   15,836,559 
  
 
 
  
 
 
  
 
 
 
Changes in working capital:
    
Trade receivables
   (216,734  (1,909,649  (1,484,134
Non-trade
receivables
   869,870   80,444   625,993 
Accrued income
   (17,918  (34,706  (258,993
Other receivables
   24,306   80,236   56,460 
Other current assets
   (569,732  (651,926  251,842 
Inventories
   (1,738,000  (3,000,669  147,798 
Other
non-current
assets
   (3,462  58,790   (101,576
Trade payables
   2,144,561   2,782,474   (3,154,822
Non-trade
payables
   (571,051  61,737   (960,450
Accrued expenses
   (456,992  (191,681  (228,464
Other current liabilities
   379,378   446,064   901,692 
Other
non-current
liabilities
   458,007   422,916   437,809 
Investments in associates and joint ventures (dividends received)
   288,242   473,700   592,812 
Provisions
   (2,426,017  (1,564,243  (1,497,699
Payments of employee benefit obligations
   (159,477  (218,319  (281,383
Plan assets
   (317,707  (347,778  (188,566
  
 
 
  
 
 
  
 
 
 
    (2,312,726  (3,512,610  (5,141,681
  
 
 
  
 
 
  
 
 
 
(Continued)
 
F-12
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Consolidated Statements of Cash Flows, Continued
For each of the three years in the period ended December 31, 2023
 
 
     
2021
  
2022
  
2023
 
     
In millions of won
 
Cash generated from operating activities
    6,944,751   (20,760,295  5,978,734 
Dividends received (financial assets at fair value through other comprehensive income)
   10,522   28,875   25,941 
Interest paid
   (1,928,160  (2,517,694  (4,245,838
Interest received
   201,022   220,471   329,740 
Income taxes paid
   (736,757  (448,857  (566,415
  
 
 
  
 
 
  
 
 
 
Net cash provided by (used in) operating activities
     4,491,378    (23,477,500  1,522,162 
  
 
 
  
 
 
  
 
 
 
Cash flows from investing activities
    
Proceeds from disposals of investments in associates and joint ventures
   4,472   56,171   5,806 
Acquisition of investments in associates and joint ventures
   (673,017  (360,962  (497,634
Proceeds from disposals of property, plant and equipment
   277,998   629,924   309,627 
Acquisition of property, plant and equipment
   (12,686,726  (12,346,878  (13,908,373
Proceeds from disposals of intangible assets
   59   279   153 
Acquisition of intangible assets
   (113,100  (80,508  (74,832
Disposal of investment properties
      515    
Proceeds from disposals of financial assets
   7,023,674   14,182,348   4,389,228 
Acquisition of financial assets
   (5,893,404  (16,496,258  (3,141,906
Increase in loans
   (223,950  (401,377  (212,994
Collection of loans
   218,704   102,061   124,386 
Increase in deposits
   (222,924  (237,266  (138,205
Decrease in deposits
   166,066   141,000   130,221 
Proceeds from disposals of assets
held-for-sale
   1,148   24,205   28,727 
Receipt of government grants
   37,920   50,755   57,207 
Net cash outflow from changes in consolidation scope
   (63,492  (31,350  (25,849
Other cash outflow from investing activities, net
   (225,948  (186,412  (119,319
  
 
 
  
 
 
  
 
 
 
Net cash used in investing activities
   (12,372,520  (14,953,753  (13,073,757
  
 
 
  
 
 
  
 
 
 
Cash flows from financing activities
    
Proceeds from short-term borrowings, net
   1,621,440   5,852,426   1,946,992 
Proceeds from long-term borrowings and debt securities
   17,392,311   43,594,078   21,714,092 
Repayment of long-term borrowings and debt securities
   (9,360,357  (10,252,688  (10,968,160
Payment of lease liabilities
   (572,036  (562,646  (574,239
Settlement of derivative instruments, net
   98,068   407,627   332,263 
Change in
non-controlling
interests
   90,096   175,645   218,766 
Repayment of hybrid bond
      (169,537   
Dividends paid (hybrid bond)
   (13,385  (13,461  (10,212
Dividends paid
   (812,159  (42,348  (45,323
Other cash Inflow (outflow) from financing activities, net
   (8,901  8,803   47,703 
  
 
 
  
 
 
  
 
 
 
Net cash provided by financing activities
   8,435,077   38,997,899   12,661,882 
  
 
 
  
 
 
  
 
 
 
Net increase in cash and cash equivalents before effect of exchange rate fluctuations
   553,935   566,646   1,110,287 
Effect of exchange rate fluctuations on cash held
   51,719   32,896   (2,180
  
 
 
  
 
 
  
 
 
 
Net increase in cash and cash equivalents
   605,654   599,542   1,108,107 
Cash and cash equivalents at January 1
   2,029,584   2,635,238   3,234,780 
  
 
 
  
 
 
  
 
 
 
Cash and cash equivalents at December 31
    2,635,238   3,234,780   4,342,887 
  
 
 
  
 
 
  
 
 
 
See accompanying notes to the consolidated financial statements.
 
F-13

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements
December 31, 2022 and 2023
 
1.
Reporting Entity (Description of the controlling company)
Korea Electric Power Corporation (“KEPCO”) was
incorporated on December 31, 1981 in accordance with the
Korea Electric Power Corporation
Act (the “KEPCO Act”) to
engage in the generation, transmission and distribution of electricity and development of electric power resources
in the Republic of Korea. KEPCO also provides power plant construction services.
KEPCO’s stock was first listed on the Korea Stock Exchange on August 10, 1989 and subsequently on the New York Stock Exchange on October 27, 1994 through its depository receipts
.
KEPCO’s headquarters is located in
Naju-si,
Jeollanam-do.
As of December 31, 2023, KEPCO’s share capital amounts to ₩3,209,820 million and KEPCO’s shareholders are as follows:
 
   
Number of
shares
   
Percentage of
ownership
 
The Government of the Republic of Korea
   116,841,794    18.20
Korea Development Bank (KDB)
   211,235,264    32.90
Foreign investors
   86,927,104    13.54
Other
   226,959,915    35.36
  
 
 
   
 
 
 
   641,964,077    100.00
  
 
 
   
 
 
 
In accordance with the Restructuring Plan enacted on January 21, 1999 by the Ministry of Trade, Industry and Energy, KEPCO spun off its power generation divisions on April 2, 2001, resulting in the establishment of six power generation subsidiaries.
 
2.
Basis of Preparation
The consolidated financial statements of KEPCO and its subsidiaries (the “Company”) were approved by the Board of Directors of KEPCO on February 23, 2024 and authorized on April 19, 2024 for the purpose of Form
20-F
filing with the Securities and Exchange Commission.
 
(1)
Statement of compliance
These consolidated financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board (IASB).
 
(2)
Basis of measurement
These consolidated financial statements have been prepared on the historical cost basis, except for the following material items in the consolidated statements
o
f financial position:
 
  
financial assets at fair value through profit or loss;
 
  
financial assets at fair value through other comprehensive income or loss;
 
  
derivative financial instruments are measured at fair value; or
 
  
liabilities for defined benefit plans are recognized at the net of the total present value of defined benefit obligations less the fair value of plan assets.
 
(3)
Functional and presentation currency
These consolidated financial statements are presented in Korean won (presented as “₩”, “won” or “KRW”), which is also the functional currency of KEPCO and most of the significant operating subsidiaries.
 
(4)
Use of estimates and judgments
The preparation of the consolidated financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.
 
F-14

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
2.
Basis of Preparation, Continued
 
(4)
Use of estimates and judgments, continued
 
Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimates are revised and in any future periods affected.
Meanwhile, the Company considers climate-related matters in estimates and assumptions, where appropriate. This assessment includes a wide range of possible impacts on the group due to both physical and transition risks. Even though the Company believes its business model and products will still be viable after the transition to a low-carbon economy, climate-related matters increase the uncertainty in estimates and assumptions underpinning several items in the financial statements. Even though climate-related risks might not currently have a significant impact on measurement, the Company is closely monitoring relevant changes and developments, such as new climate-related legislation.
The followings are the key assumptions and other key sources of estimation uncertainty at the end of the reporting period, that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year.
 
 
(i)
Useful lives of property, plant and equipment, intangible assets other than goodwill and estimations on provision for decommissioning costs
The Company reviews the estimated useful lives of property, plant and equipment at the end of each annual reporting period. Management’s assumptions could affect the determination of estimated economic useful lives.
The Company records the fair value of estimated decommissioning costs as a liability in the period in which the Company incurs a legal obligation associated with the retirement of long-lived assets that result from acquisition, construction, development and/or normal use of the assets. The Company is required to record a liability for the dismantling (demolition) of nuclear power plants and disposal of spent fuel and low and intermediate radioactive wastes. The measurement of such liability is subject to change based on change in estimated cash flow, inflation rate, discount rate, and expected timing of decommissioning.
 
 
(ii)
Deferred tax
The Company recognizes deferred tax assets and liabilities based on the differences between the financial statement carrying amounts and the tax bases of assets and liabilities of each consolidated taxpaying entity. However, the amount of deferred tax assets may be different if the Company determines the estimated future taxable income is not sufficient to realize the deferred tax assets recognized.
 
 
(iii)
Valuations of financial instruments at fair values
The Company’s accounting policies and disclosures require the measurement of fair values, for both financial and
non-financial
assets and liabilities. The Company has established control framework with respect to the measurement of fair values. The valuation team regularly reviews significant unobservable inputs and valuation adjustments.
If third party information, such as broker quotes or pricing services, is used to measure fair values, then the valuation team assesses the evidence obtained from the third parties to support the conclusion that such valuations meet the requirements of IFRS including the level in the fair value hierarchy in which such valuation techniques should be classified.
When measuring the fair value of an asset or a liability, the Company uses market observable data as far as possible. Fair values are categorized into different levels in a fair value hierarchy based on the inputs used in the valuation techniques as follows.
If the inputs used to measure the fair value of an asset or a liability might be categorized in different levels of the fair value hierarchy, then the fair value measurement is categorized in its entirety in the same level of the fair value hierarchy as the lowest level input that is significant to the entire measurement. The Company recognizes transfers between levels of the fair value hierarchy at the end of the reporting period during which the change has occurred.
 
 
(iv)
Defined employee benefit liabilities
The Company offers its employees defined benefit plans. The cost of providing benefits is determined using the Projected Unit Credit Method, with actuarial valuations being carried out at the end of each reporting period. For actuarial valuations, certain inputs such as discount rates and future salary increases are estimated. Defined benefit plans contain significant uncertainties in estimations due to its long-term nature (refer to Note 25).
 
F-15

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
2.
Basis of Preparation, Continued
 
(4)
Use of estimates and judgments, continued
 
 
(v)
Unbilled revenue
Electricity delivered but neither metered nor billed is estimated at the reporting date based on the volume of electricity delivered which can vary significantly as a result of customer usage patterns, customer mix, meter reading schedules, weather, and etc. Unbilled revenue recognized as of December 31, 2022 and 2023 are ₩2,348,813 million and ₩2,504,479 million, respectively.
 
 (vi)
Construction contracts
The Company recognizes revenue over time using the cost-based input method which represents a faithful depiction of the Company’s progress towards complete satisfaction of providing the power plant construction, which has been identified as a single performance obligation. In applying the cost-based input method, it is necessary to use estimates and assumptions related to the Company’s efforts or inputs expected to be incurred. Costs incurred towards contract completion include costs associated with direct materials, labor, and other indirect costs related to contract performance. Judgment is required in estimating the costs expected to incur in completing the construction projects which involves estimating future materials, labor, contingencies and other related costs. Revenue is estimated based on the contractual amount; however, it can also be affected by uncertainties resulting from unexpected future events.
Information about critical judgments in applying accounting policies that have the most significant effect on the amounts recognized in the consolidated financial statements is included in the following notes:
 
 
 
Note 17 – Investments in Associates and Joint Ventures
 
 
 
Note 18 – Property, Plant and Equipment
 
 
 
Note 20 – Construction Contracts
 
 
 
Note 45 – Risk Management
Information about assumptions and estimation uncertainties that have a significant risk of resulting in a material adjustment within the next financial year is included in the following notes:
 
 
 
Note 25 – Employment Benefits
 
 
 
Note 41 – Income Taxes
 
(5)
Changes in accounting policies
Changes in accounting standards effective from January 1, 2023 are as follows. The Company believes that these amendments have no significant impact on the Company’s consolidated financial statements. The Company has not early adopted any other standards, interpretations or amendments that has been issued but is not yet effective.
Amendments to IFRS 17—‘Insurance Contracts’
The amendments provide a comprehensive new accounting standard for insurance contracts covering recognition and measurement, presentation and disclosure. IFRS 17 replaces IFRS 4 ‘Insurance Contracts’. IFRS 17 applies to all types of insurance contracts (i.e., life,
non-life,
direct insurance and
re-insurance),
regardless of the type of entities that issue them as well as to certain guarantees and financial instruments with discretionary participation features; a few scope exceptions will apply. The overall objective of IFRS 17 is to provide a comprehensive accounting model for insurance contracts that is more useful and consistent for insurers. In contrast to the requirements in IFRS 4, which are largely based on grandfathering previous local accounting policies, IFRS 17 provides a comprehensive model for insurance contracts, covering all relevant accounting aspects. IFRS 17 is based on a general model, supplemented by:
 
 
 
a specific adaptation for contracts with direct participation features (the variable fee approach); and
 
 
 
a simplified approach (the premium allocation approach) mainly for short-duration contracts.
 
F-16

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
2.
Basis of Preparation, Continued
 
(5)
Changes in accounting policies, continued
 
Amendments to IAS 8—‘Definition of Accounting Estimates’
The amendments to IAS 8 clarify the distinction between changes in accounting estimates, and changes in accounting policies and the correction of errors. They also clarify how entities use measurement techniques and inputs to develop accounting estimates.
Amendments to IAS 1—‘Disclosure of Accounting Policies’
The amendments to IAS 1 provide guidance and examples to help entities apply materiality judgements to accounting policy disclosures. The amendments aim to help entities provide accounting policy disclosures that are more useful by replacing the requirement for entities to disclose their ‘significant’ accounting policies with a requirement to disclose their ‘material’ accounting policies and adding guidance on how entities apply the concept of materiality in making decisions about accounting policy disclosures.
Amendments to IAS 12—‘Deferred Tax related to Assets and Liabilities arising from a Single Transaction’
The amendments IAS 12 ‘Income Taxes’ narrow the scope of the initial recognition exception, so that it no longer applies to transactions that give rise to equal taxable and deductible temporary differences such as leases and decommissioning liabilities.
Amendments to IAS 12—‘International Tax Reform : Pillar Two Model Rules’
The amendments to IAS 12 have been introduced in response to the OECD’s BEPS Pillar Two Model Rules and include:
 
 
 
a mandatory temporary exception to the recognition and disclosure of deferred taxes arising from the jurisdictional implementation of the Pillar Two Model Rules; and
 
 
 
disclosure requirements for affected entities to help users of the financial statements better understand an entity’s exposure to Pillar Two income taxes arising from that legislation, particularly before its effective date.
The mandatory temporary exception—the use of which is required to be disclosed—applies immediately. The remaining disclosure requirements apply for annual reporting periods beginning on or after January 1, 2023, but not for any interim periods ending on or before December 31, 2023.
The Company has applied the mandatory exception to recognizing and disclosing information about deferred tax assets and liabilities arising from Pillar Two income taxes.
Since the Pillar Two Model Rules legislation shall be effective from January 1, 2024, the Company has not recognized any Pillar Two income taxes for the year ended December 31, 2023.
The impact of Pillar Two Model Rules is described in Note 41. (8).
 
3.
Material Accounting Policies
The accounting policies applied by the Company in these consolidated financial statements are the same as those applied by the Company in its consolidated financial statements as of and for the year ended December 31, 2022, except for the changes described in Note 2.(5).
 
(1)
Basis of consolidation
The consolidated financial statements are the financial statements of the Company in which the assets, liabilities, equity, income, expenses and cash flows of KEPCO and its subsidiaries are presented as those of a single economic entity. Subsidiaries are those entities controlled by the Company. The Company controls an entity when it is exposed to, or has rights to, variable returns from its involvement with the entity and has the ability to affect those returns through its power over the entity.
 
F-17
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(1)
Basis of consolidation, continued
 
Income and expense of a subsidiary acquired or disposed of during the year are included in the consolidated statement of comprehensive income or loss from the effective date of acquisition and up to the effective date of disposal, as appropriate. Total comprehensive income of subsidiaries is attributed to the owners of the Company and to the
non-controlling
interests even if this results in the
non-controlling
interests having a deficit balance.
When necessary, adjustments are made to the financial statements of subsidiaries to bring their accounting policies in line with those of the Company.
All intra-company assets and liabilities, equity, income, expenses and cash flows relating to transactions between entities within the Company are eliminated in full on consolidation.
Changes in the Company’s ownership interests in a subsidiary that do not result in the Company losing control over the subsidiary are accounted for as equity transactions. The carrying amounts of the Company’s interests and the
non-controlling
interests are adjusted to reflect the changes in their relative interests in the subsidiary. Any difference between the amount by which the
non-controlling
interests are adjusted and the fair value of the consideration paid or received is recognized directly in equity and attributed to owners of the Company.
When the Company loses control of a subsidiary, the income or loss on disposal is calculated as the difference between (i) the aggregate of the fair value of the consideration received and the fair value of any retained interest and (ii) the previous carrying amount of the assets (including goodwill), and liabilities of the subsidiary and any
non-controlling
interests. When assets of the subsidiary are carried at revalued amounts or fair values and the related cumulative gain or loss has been recognized in other comprehensive income and accumulated in equity, the amounts previously recognized in other comprehensive income and accumulated in equity are accounted for as if the Company had directly disposed of the relevant assets (i.e., reclassified to profit or loss or transferred directly to retained earnings). The fair value of any investment retained in the former subsidiary at the date when control is lost is recognized as the fair value on initial recognition for subsequent accounting under IFRS 9 ‘Financial Instruments’ or, when applicable, the cost on initial recognition of an investment in an associate or a jointly controlled entity.
 
(2)
Business combinations
A business combination is accounted for by applying the acquisition method, unless it is a combination involving entities or businesses under common control.
The consideration transferred in a business combination is measured at fair value, which is calculated as the sum of the acquisition-date fair values of the assets transferred by the Company, liabilities incurred by the Company to the former owners of the acquiree and the equity interests issued by the Company in exchange for control of the acquiree. Acquisition-related costs are generally recognized in profit or loss as incurred.
At the acquisition date, the identifiable assets acquired and the liabilities assumed are recognized at their fair value at the acquisition date, except that:
 
 
 
deferred tax assets or liabilities and liabilities or assets related to employee benefit arrangements are recognized and measured in accordance with IAS 12 ‘Income Taxes’ and IAS 19 ‘Employee Benefits’ respectively;
 
 
 
assets (or disposal groups) that are classified as held for sale in accordance with IFRS 5
‘Non-current
Assets Held for Sale’ are measured in accordance with that standard.
Goodwill is measured as the excess of the sum of the consideration transferred, the amount of any
non-controlling
interests in the acquiree, and the fair value of the acquirer’s previously held equity interest in the acquiree (if any) over the net of the acquisition-date amounts of the identifiable assets acquired and the liabilities assumed. If, after reassessment, net of the acquisition-date amounts of the identifiable assets acquired and liabilities assumed exceeds the sum of the consideration transferred, the amount of any
non-controlling
interests in the acquiree and the fair value of the acquirer’s previously held interest in the acquiree (if any), the excess is recognized immediately in profit or loss as a bargain purchase gain.
Non-controlling
interest that is present on acquisition day and entitles the holder to a proportionate share of the entity’s net assets in an event of liquidation, may be initially measured either at fair value or at the
non-controlling
interest’s proportionate share of the
 
F-18

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(2)
Business combinations, continued
 
recognized amounts of the acquiree’s identifiable net assets. The choice of measurement can be elected on a
transaction-by-transaction
basis. Other types of
non-controlling
interests are measured at fair value or, when applicable, on the basis specified in other IFRSs.
When the consideration transferred by the Company in a business combination includes assets or liabilities resulting from a contingent consideration arrangement, the contingent consideration is measured at its acquisition-date fair value and included as part of the consideration transferred in a business combination. Changes in the fair value of the contingent consideration that qualify as measurement period adjustments are adjusted retrospectively, with corresponding adjustments against goodwill. Measurement period adjustments are adjustments that arise from additional information obtained during the ‘measurement period’ (which cannot exceed one year from the acquisition date) about facts and circumstances that existed at the acquisition date.
The subsequent accounting for changes in the fair value of the contingent consideration that do not qualify as measurement period adjustments depends on how the contingent consideration is classified. Contingent consideration that is classified as equity is not
re-measured
at subsequent reporting dates and its subsequent settlement is accounted for within equity. Contingent consideration that is classified as an asset or a liability is
re-measured
at subsequent reporting dates in accordance with IFRS 9 ‘Financial Instruments’, or with IAS 37 ‘Provisions, Contingent Liabilities and Contingent Assets’ as appropriate, with the corresponding gain or loss being recognized in profit or loss.
When a business combination is achieved in stages, the Company’s previously held equity interest in the acquiree is
re-measured
to fair value at the acquisition date (i.e., the date when the Company obtains control) and the resulting gain or loss, if any, is recognized in profit or loss. Amounts arising from interests in the acquiree prior to the acquisition date that have previously been recognized in other comprehensive income are reclassified to profit or loss where such treatment would be appropriate if that interest were disposed of.
If the initial accounting for a business combination is incomplete by the end of the reporting period in which the combination occurs, the Company reports provisional amounts for the items for which the accounting is incomplete. Those provisional amounts are adjusted during the measurement period (see above), or additional assets or liabilities are recognized, to reflect new information obtained about facts and circumstances that existed at the acquisition date that, if known, would have affected the amounts recognized at that date.
The assets and liabilities acquired under business combinations under common control are recognized at the carrying amounts recognized previously in the consolidated financial statements of the ultimate parent. The difference between consideration transferred and carrying amounts of net assets acquired is recognized as part of share premium.
 
(3)
Investments in associates
An associate is an entity over which the Company has significant influence and that is neither a subsidiary nor an interest in a joint venture. Significant influence is the power to participate in the financial and operating policy decisions of the investee but does not control or joint control over those policies. If the Company holds 20% ~ 50% of the voting power of the investee, it is presumed that the Company has significant influence over the investee.
The results and assets and liabilities of associates are incorporated in these consolidated financial statements using the equity method of accounting. If the investment is classified as held for sale, in which case it is accounted for in accordance with IFRS 5
‘Non-current
Assets Held for Sale’, any retained portion of an investment in associates that has not been classified as held for sale shall be accounted for using the equity method until disposal of the portion that is classified as held for sale takes place. After the disposal takes place, the Company shall account for any retained interest in associates in accordance with IFRS 9 ‘Financial Instruments’ unless the retained interest continues to be an associate, in which case the entity uses the equity method.
Under the equity method, an investment in an associate is initially recognized in the consolidated statement of financial position at cost and adjusted thereafter to recognize the Company’s share of the profit or loss and other comprehensive income of the associate. When the Company’s share of losses of an associate exceeds the Company’s interest in that associate (which includes any long-term interests that, in substance, form part of the Company’s net investment in the associate), the Company discontinues recognizing its share of further losses. Additional losses are recognized only to the extent that the Company has incurred legal or constructive obligations or made payments on behalf of the associate.
 
F-19

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(3)
Investments in associates, continued
 
Any excess of the cost of acquisition over the Company’s share of the net fair value of the identifiable assets, liabilities and contingent liabilities of an associate recognized at the date of acquisition is recognized as goodwill, which is included within the carrying amount of the investment. Any excess of the Company’s share of the net fair value of the identifiable assets, liabilities and contingent liabilities over the cost of acquisition, after reassessment, is recognized immediately in profit or loss.
Upon disposal of an associate that results in the Company losing significant influence over that associate, any retained investment is measured at fair value at that date and the fair value is regarded as its fair value on initial recognition as a financial asset in accordance with IFRS 9. The difference between the previous carrying amount of the associate attributable to the retained interest and its fair value is included in the determination of the gain or loss on disposal of the associate.
In addition, the Company accounts for all amounts previously recognized in other comprehensive income in relation to that associate on the same basis as would be required if that associate had directly disposed of the related assets or liabilities. Therefore, if a gain or loss previously recognized in other comprehensive income by that associate would be reclassified to profit or loss on the disposal of the related assets or liabilities, the Company reclassifies the gain or loss from equity to profit or loss (as a reclassification adjustment) when it loses significant influence over that associate.
The requirements of IAS 28’ Investments in Associates and Joint Ventures’ are applied to determine whether it is necessary to recognize any impairment loss with respect to the Company’s investment in an associate. When necessary, the entire carrying amount of the investment (including goodwill) is tested for impairment in accordance with IAS 36 ‘Impairment of Assets’ as a single asset by comparing its recoverable amount (higher of value in use and fair value less costs to sell) with its carrying amount, any impairment loss recognized forms part of the carrying amount of the investment. Any reversal of that impairment loss is recognized in accordance with IAS 36 to the extent that the recoverable amount of the investment subsequently increases.
When the Company transacts with its associate, incomes and losses resulting from the transactions with the associate are recognized in the Company’s consolidated financial statements only to the extent of interests in the associate that are not related to the Company.
 
(4)
Joint arrangements
A joint arrangement is an arrangement of which two or more parties have joint control. Joint control is the contractually agreed sharing of control of an arrangement, which exists only when decisions about the relevant activities require the unanimous consent of the parties sharing control. Joint arrangements are classified into two types - joint operations and joint ventures. A joint operation is a joint arrangement whereby the parties that have joint control of the arrangement (i.e., joint operators) have rights to the assets, and obligations for the liabilities, relating to the arrangement. A joint venture is a joint arrangement whereby the parties that have joint control of the arrangement (i.e., joint ventures) have rights to the net assets of the arrangement.
The classification of a joint arrangement as a joint operation or a joint venture depends upon the rights and obligations of the parties to the arrangement. The Company determines the type of joint arrangement in which it is involved by considering the structure and form of the arrangement, the terms agreed by the parties in the contractual arrangement and other facts and circumstances.
If the joint arrangement is a joint operation, the Company is to recognize and measure the assets and liabilities (and recognize the related revenues and expenses) in relation to its interest in the arrangement in accordance with relevant IFRSs applicable to the particular assets, liabilities, revenues and expenses. If the joint arrangement is a joint venture, the Company is to account for that investment using the equity method accounting in accordance with IAS 28 ‘Investment in Associates and Joint Ventures’ (refer to Note 3.(3)), except when the Company is applicable to the IFRS 5
‘Non-current
Assets Held for Sale’.
 
(5)
Non-current
assets held for sale
Non-current
assets and disposal groups are classified as held for sale if their carrying amount will be recovered principally through a sale transaction rather than through continuing use. This condition is regarded as met only when the sale is highly probable and the
non-current
asset (or disposal group) is available for immediate sale in its present condition. Management must be committed to the sale, which should be expected to qualify for recognition as a completed sale within one year from the date of classification.
When the Company is committed to a sale plan involving loss of control of a subsidiary, all of the assets and liabilities of that subsidiary are classified as held for sale when the criteria described above are met, regardless of whether the Company will retain a
non-controlling
interest in its former subsidiary after the sale.
 
F-20

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(5)
Non-current
assets held for sale, continued
 
Non-current
assets (and disposal groups) classified as held for sale are measured at the lower of their carrying amount and fair value less costs to sell.
 
(6)
Goodwill
The Company measures goodwill which acquired in a business combination at the amount recognized at the date on which it obtains control of the acquiree (acquisition date) less any accumulated impairment losses. Goodwill acquired in a business combination is allocated to each cash-generating unit (CGU) that is expected to benefit from the synergies arising from the business acquired.
The Company assesses at the end of each reporting period and whenever there is an indication that the asset may be impaired. An impairment loss is recognized if the carrying amount of an asset or a CGU exceeds its recoverable amount. Impairment losses are recognized in profit or loss.
Any impairment identified at the CGU level will first reduce the carrying value of goodwill and then be used to reduce the carrying amount of the other assets in the CGU on a pro rata basis. Except for impairment losses in respect of goodwill which are never reversed, an impairment loss is reversed if there has been a change in the estimates used to determine the recoverable amount. An impairment loss is reversed only to the extent that the asset’s carrying amount does not exceed the carrying amount that would have been determined, net of depreciation or amortization, if no impairment loss had been recognized.
On disposal of the relevant CGU, the amount of goodwill is included in the determination of the gain or loss on
disposal.
 
(7)
Revenue from Contracts with Customers
The Company recognizes revenue by applying the five-step approach (Step 1: Identify the contract(s) with a customer, Step 2: Identify the performance obligations in the contract, Step 3: Determine the transaction price, Step 4: Allocate the transaction price to the performance obligations in the contract, Step 5: Recognize revenue when the entity satisfied a performance obligation). The Company recognizes revenue to depict the transfer of promised goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services, excluding amounts collected on behalf of third parties. Also, the Company recognizes revenue when the Company satisfies a performance obligation by transferring a promised good or service to a customer.
 
 (i)
Sale of goods
The Company sells electricity to customers and accounts for the generation, transmission and distribution of electricity together as a single performance obligation. The sale of electricity is recognized at a point in time when electricity has been distributed to the customer. The transaction price includes variable consideration due to the progressive electricity billing system, discounts on electricity bills for government policy purposes and penalties. In situations where electricity had been delivered but not yet billed, the Company also estimates the volume of electricity delivered which can vary significantly as a result of customer usage patterns, customer mix, meter reading schedules, weather, etc. Variable consideration is estimated by using the expected value method which predicts the amount of consideration to which the Company will be entitled and is recognized only to the extent that it is highly probable that a significant reversal in the amount of cumulative revenue recognized will not occur when the uncertainty associated with the variable consideration is subsequently resolved which is when the customer is billed.
 
 (ii)
Sale of construction services
The Company provides power plant construction and EPC services which are each identified as a single performance obligation and is recognized over time on the estimated progress to completion using the cost-based input method. The Company believes using the cost-based input method represents a faithful depiction of the transfer of services to the customer. Cost incurred towards contract completion include costs associated with direct materials, labor, and other indirect costs related to contract performance. Judgment is required in estimating the costs expected to incur in completing the construction projects which involves estimating future materials, labor, contingencies and other related costs. Revenue is estimated based on the contractual amount; however it can also be affected by uncertainties resulting from unexpected future events.
 
F-21

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(7)
Revenue from Contracts with Customers, continued
 
Revenue may be recognized in advance of billing the customer which results in the recording of a contract asset. Once the Company meets the billing criteria and its rights to consideration become unconditional, the contract asset is then transferred to trade receivable. Billing requirements are generally structured around the completion of certain construction milestones. On some instances, contract liability is recognized when the Company receives consideration before being able to recognize revenue. Once revenue recognition conditions are met, the contract liability is subsequently released to revenue.
 
 (iii)
Sale of services
The Company develops electric power resources including the provision of power generation byproducts and O&M services which are accounted for as a separate performance obligation under each contract. The Company recognizes revenue over time when customers consume the benefits provided by the Company under the terms of the service agreement.
 
 (iv)
Adoption of the cost pass-through tariff system
The Company amended the basic supply terms and conditions with the approval of the Ministry of Trade, Industry and Energy (MOTIE) on December 17, 2020. The cost pass-through tariff system has been applied to the electricity rate after January 1, 2021 in accordance with the amendment. The Company expects the adoption of the new system would not affect the existing accounting policies including ‘revenue from contracts with customers’.
 
(8)
Deferred Revenue
The Company receives consideration in the form of an item of property, equipment or cash for constructing or acquiring an item of property or equipment
in
exchange for supplying electricity to its customers. The transaction price is based on the fair value of the consideration received and is initially recorded in deferred revenue included in current and
non-current
non-financial
liabilities of the Company’s consolidated statement of financial position. The Company determines the supply of electricity to be a single performance obligation. Deferred revenue is released to other income over time on a straight-line basis throughout the estimated service period which does not exceed the transferred asset’s useful life.
 
(9)
Leases
The lessee and the lessor account for each lease component separately from
non-lease
component, in the lease contracts or contracts that contain lease.
However
, the Company applied a practical expedient to each type of underlying asset in accounting as a lessee, and instead of separating the
non-lease
component from the lease component, it applied a method of accounting for each lease component and the related
non-lease
component as a single lease contract. The lessor’s accounting has not changed significantly. Therefore, a lease that transfers most of the risks and rewards of ownership of the underlying asset is classified as a finance lease, and a lease that does not transfer most of the risks and rewards of ownership of the underlying asset is classified as an operating lease.
 
 (i)
The Company as a lessor
In the case of finance leases, the Company recognizes the same amount of the net investment in the lease as finance lease receivables and recognizes interest income using the effective interest rate method. Income from operating leases is recognized using the straight-line basis over the lease term, and lease opening direct costs incurred during the negotiation and contract phase of the operating lease contract are added to the carrying amount of the lease asset and recognized as expenses over the lease term on a straight-line basis.
 
 (ii)
The Company as a lessee
 
 (a)
Right-of-use
assets
The Company recognizes
right-of-use
assets at the commencement date of the lease.
Right-of-use
assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any
re-measurement
of lease liabilities. The cost of
right-of-use
assets includes the amount of lease liabilities recognized, initial direct costs incurred, and lease payments
 
F-22

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(9)
Leases, continued
 
made at or before the commencement date less any lease incentives received. Unless the Company is reasonably certain to obtain ownership of the leased asset at the end of the lease term, the recognized
right-of-use
assets are depreciated on a straight-line basis over the shorter of its estimated useful life and the lease term.
Right-of-use
assets are subject to impairment.
 
 (b)
Lease liabilities
At the commencement date of the lease, the Company recognizes lease liabilities measured at the present value of lease payments to be made over the lease term. The lease payments include fixed payments (including
in-substance
fixed payments) less any lease incentives receivable, variable lease payments that depend on an index or a rate, and amounts expected to be paid under residual value guarantees. The lease payments also include the exercise price of a purchase option reasonably certain to be exercised by the Company and payments of penalties for terminating a lease, if the lease term reflects the Company exercising the option to terminate. The variable lease payments that do not depend on an index or a rate are recognized as expenses in the period on which the event or condition that triggers the payment occurs.
In calculating the present value of lease payments, the Company uses its incremental borrowing rate at the lease commencement date if the interest rate implicit in the lease is not readily determinable. After the commencement date, the amount of lease liabilities is increased to reflect the accretion of interest and reduced for the lease payments made. In addition, the carrying amount of lease liabilities is remeasured if there is a modification, a change in the lease term, a change in the
in-substance
fixed lease payments or a change in the assessment of an option to purchase the underlying asset.
 
 (c)
Short-term leases and leases of
low-value
assets
The Company applies the short-term leases recognition exemption to its short-term leases of machinery and equipment (i.e., those leases that have a lease term of 12 months or less from the commencement date and do not contain a purchase option). It also applies the leases of
low-value
assets recognition exemption to leases of office equipment that are considered to be low value. Lease payments on short-term leases and leases of
low-value
assets are recognized as expense on a straight-line basis over the lease term.
Book value and changes in book value of
right-of-use
assets and lease liabilities during the period are described in Note 24.
 
(10)
Foreign currencies
Transactions in foreign currencies are translated to the respective functional currencies of the Company entities at exchange rates at the dates of the transactions. Monetary items in foreign currencies are retranslated to the functional currency using the reporting date’s exchange rate.
Non-monetary
items that are measured at fair value in foreign currencies are retranslated to the functional currency at the exchange rate at the date that the fair value was determined, while non-monetary items that are measured in terms of historical cost in foreign currencies shall not be retranslated.
Exchange differences are recognized in profit or loss in the period in which they arise except for:
 
  
Exchange differences on foreign currency borrowings relating to assets under construction for future productive use, which are included in the cost of those assets when they are regarded as an adjustment to interest costs on those foreign currency borrowings;
 
  
Exchange differences on transactions entered into in order to hedge certain foreign currency risks (refer to note 3.(24)
 
  
Derivative financial instruments, including hedge accounting); and
 
  
Exchange differences on monetary items receivable from or payable to a foreign operation for which settlement is neither planned nor likely to occur (therefore forming part of the net investment in the foreign operation), which are recognized initially in other comprehensive income and reclassified from equity to profit or loss on disposal or partial disposal of the net investment.
For the purpose of presenting financial statements, the assets and liabilities of the Company’s foreign operations are expressed in Korean won using exchange rates prevailing at the end of the reporting period. Income and expense items are translated at the average
 
F-23

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(10)
Foreign currencies, continued
 
exchange rates for the period, unless exchange rates fluctuated significantly during that period, in which case the exchange rates at the dates of the transactions are used. Exchange differences arising, if any, are recognized in other comprehensive income and accumulated in equity (if applicable, in
non-controlling
interests).
On the disposal of a foreign operation, the cumulative amount of the exchange differences relating to that foreign operation that have been attributed to the controlling interests shall be reclassified from equity to profit or loss (as a reclassification adjustment). The cumulative amount of the exchange differences relating to that foreign operation that have been attributed to the
non-controlling
interests shall be derecognized, but shall not be reclassified to profit or loss.
On the partial disposal of a subsidiary that includes a foreign operation, the entity shall
re-attribute
the proportionate share of the cumulative amount of the exchange differences recognized in other comprehensive income to the
non-controlling
interests in that foreign operation. In any other partial disposal of a foreign operation the entity shall reclassify to profit or loss only the proportionate share of the cumulative amount of the exchange differences recognized in other comprehensive income.
Any goodwill arising on the acquisition of a foreign operation and any fair value adjustments to the carrying amounts of assets and liabilities arising on the acquisition of that foreign operation shall be treated as assets and liabilities of the foreign operation. Thus they shall be expressed in the functional currency of the foreign operation and shall be translated at the closing rate. Such exchange differences shall be recognized in equity.
 
(11)
Borrowing costs
The Company capitalizes borrowing costs directly attributable to the acquisition, construction or production of a qualifying asset as part of the cost of that asset. Other borrowing costs are recognized in expense as incurred. A qualifying asset is an asset that requires a substantial period of time to get ready for its intended use or sale.
Investment income earned on the temporary investment of specific borrowings pending their expenditure on qualifying assets is deducted from the borrowing costs eligible for capitalization.
All other borrowing costs are recognized in profit or loss in the period in which they are incurred.
 
(12)
Government grants
Government grants are not recognized unless there is reasonable assurance that the Company will comply with the grant’s conditions and that the grant will be received.
Benefit from a government loan at a below-market interest rate is treated as a government grant, measured as the difference between proceeds received and the fair value of the loan based on prevailing market interest rates.
 
 (i)
If the Company received grants related to assets, government grants whose primary condition is that the Company purchases, constructs or otherwise acquires long-term assets are deducted in calculating the carrying amount of the asset. The grant is recognized in profit or loss over the life of a depreciable asset as a reduced depreciation expense.
 
 (ii)
If the Company received grants related to expenses, government grants which are intended to compensate the Company for expenses incurred are recognized as other income (government grants) in profit or loss over the periods in which the Company recognizes the related costs as expenses.
 
(13)
Employee benefits
When an employee has rendered service to the Company during a period, the Company recognizes the contribution payable to a defined contribution plan in exchange for that service as a liability (accrued expense).
For defined benefit pension plans and other post-employment benefits, the net periodic pension expense is actuarially determined by “Pension Actuarial System” developed by independent actuaries using the projected unit credit method. The present value of the defined benefit obligation is determined by discounting the estimated future cash outflows using interest rates of high-quality
 
F-24

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(13)
Retirement benefit expenses, continued
 
corporate bonds that are denominated in the currency in which the benefits will be paid and that have terms to maturity approximating the terms of the related pension liability. However, if there is not a deep market, market yields on government bonds are used.
Net defined benefit liability’s measurement is composed of actuarial gains and losses, return on plan assets excluding net interest on net defined benefit liability, and any change in the effect of the asset ceiling, excluding net interest, which are immediately recognized in other comprehensive income. The actuarial gains or losses recognized in other comprehensive income which will not be reclassified into net profit or loss for later periods are immediately recognized in retained earnings. Past service cost will be recognized as expenses upon the earlier of the date of change or reduction to the plan, or the date of recognizing termination benefits.
The retirement benefit obligation recognized in the consolidated statement of financial position represents the present value of the defined benefit obligation as adjusted for unrecognized actuarial gains and losses and unrecognized past service cost, and as reduced by the fair value of plan assets. Any asset resulting from this calculation is limited to unrecognized actuarial losses and past service cost, plus the present value of available refunds and reductions in future contributions to the plan.
 
(14)
Income taxes
Income tax expense comprises current and deferred tax. Current tax and deferred tax are recognized in profit or loss except to the extent that it relates to a business combination, or items recognized directly in equity or in other comprehensive income.
 
 (i)
Current tax
Current tax is the expected tax payable or receivable on the taxable profit or loss for the year, using tax rates enacted or substantively enacted at the end of the reporting period and any adjustment to tax payable in respect of previous years. The taxable profit is different from the accounting profit for the period since the taxable profit is calculated excluding the temporary differences, which will be taxable or deductible in determining taxable profit (tax loss) of future periods, and
non-taxable
or
non-deductible
items from the accounting profit.
Current tax assets and liabilities are offset only if, the Company (a) has a legally enforceable right to set off the recognized amounts; and (b) intends either to settle on a net basis, or to realize the asset and settle the liability simultaneously.
 
 (ii)
Deferred tax
Deferred tax is recognized, using the asset-liability method, in respect of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for taxation purposes. A deferred tax liability is recognized for all taxable temporary differences. A deferred tax asset is recognized for all deductible temporary differences to the extent that it is probable that taxable profit will be available against which they can be utilized. However, deferred tax is not recognized for the following temporary differences: taxable temporary differences arising on the initial recognition of goodwill, or the initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting profit or loss nor taxable income.
In certain circumstances such as when accounting for leases or decommissioning costs of nuclear power plants, the carrying amount of the asset recorded is equal to the liability recognized at initial recognition. When recording its deferred tax balances, the Company considers these assets and liabilities separately on a gross basis. Accordingly, the taxable temporary difference relating to the asset and the deductible temporary difference relating to the liability are separately recognized and presented on a net basis in the consolidated financial statements.
The measurement of deferred tax liabilities and deferred tax assets reflects the tax consequences that would follow from the manner in which the Company expects, at the end of the reporting period, to recover or settle the carrying amount of its assets and liabilities. Deferred tax assets or deferred tax liabilities on investment properties measured at fair value, unless any contrary evidence exists, are measured using the assumption that the carrying amount of the property will be recovered entirely through sale.
 
F-25

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(14)
Income taxes, continued
 
The Company recognizes a deferred tax liability for all taxable temporary differences associated with investments in subsidiaries, associates, and interests in joint ventures, except to the extent that the Company is able to control the timing of the reversal of the temporary difference and it is probable that the temporary difference will not reverse in the foreseeable future. The Company recognizes a deferred tax asset for all deductible temporary differences arising from investments in subsidiaries and associates, to the extent that it is probable that the temporary difference will reverse in the foreseeable future and taxable profit will be available against which the temporary difference can be utilized.
The carrying amount of a deferred tax asset is reviewed at the end of each reporting period and reduces the carrying amount to the extent that it is no longer probable that sufficient taxable profit will be available to allow the benefit of part or all of that deferred tax asset to be utilized.
Deferred tax assets and liabilities are measured at the tax rates that are expected to apply to the period when the asset is realized or the liability is settled, based on tax rates (and tax laws) that have been enacted or substantively enacted by the end of the reporting period. The measurement of deferred tax liabilities and deferred tax assets reflects the tax consequences that would follow from the manner in which the Company expects, at the end of the reporting period to recover or settle the carrying amount of its assets and liabilities.
Deferred tax assets and liabilities are offset only if there is a legally enforceable right to offset the related current tax liabilities and assets, and they relate to income taxes levied by the same tax authority and they intend to settle current tax liabilities and assets on a net basis.
 
 (iii)
Current and deferred tax for the year
Current and deferred tax are recognized in profit or loss, except when they relate to items that are recognized in other comprehensive income or directly in equity, in which case, the current and deferred tax are also recognized in other comprehensive income or directly in equity respectively. Where current tax or deferred tax arises from the initial accounting for a business combination, the tax effect is included in the accounting for the business combination.
 
(15)
Property, plant and equipment
Property, plant and equipment are initially measured at cost and after initial recognition, are carried at cost less accumulated depreciation and accumulated impairment losses. The cost of property, plant and equipment includes expenditures arising directly from the construction or acquisition of the asset, any costs directly attributable to bringing the asset to the location and condition necessary for it to be capable of operating in the manner intended by management and the initial estimate of the costs of dismantling and removing the item and restoring the site on which it is located.
Subsequent costs are recognized in the carrying amount of property, plant and equipment at cost or, if appropriate, as separate items if it is probable that future economic benefits associated with the item will flow to the Company and the cost of the item can be measured reliably. The carrying amount of the replaced part is derecognized. The costs of the
day-to-day
servicing are recognized in profit or loss as incurred.
Property, plant and equipment, except for land, are depreciated on a straight-line basis over estimated useful lives that appropriately reflect the pattern in which the asset’s future economic benefits are expected to be consumed. For loaded nuclear fuel related to long-term raw materials and spent nuclear fuels related to asset retirement costs, the Company uses the
unit-of-production
method to measure and recognize depreciation expenses.
 
F-26

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(15)
Property, plant and equipment, continued
 
The estimated useful lives of the Company’s property, plant and equipment are as follows:
 
   
Useful lives (years)
Buildings
  8 ~ 40
Structures
  5 ~ 50
Machinery
  2 ~ 32
Vehicles
  3 ~ 8
Loaded heavy water
  30
Asset retirement costs
  18, 30, 40, 60
Right-of-use
assets
  1 ~ 65
Ships
  9
Others
  4 ~ 15
A component that is significant compared to the total cost of property, plant and equipment is depreciated over its separate useful life.
Depreciation methods, residual values and useful lives of property, plant and equipment are reviewed at the end of each reporting period and if change is deemed appropriate, it is treated as a change in accounting estimate.
Property, plant and equipment are derecognized on disposal, or when no future economic benefits are expected from its use or disposal. Gains or losses arising from derecognition of an item of property, plant and equipment, measured as the difference between the net disposal proceeds and the carrying amount of the asset, are recognized in profit or loss when the asset is derecognized.
 
(16)
Investment property
A property held for the purpose of earning rentals or benefiting from capital appreciation is classified as investment property. Investment property is initially measured at its cost. Transaction costs are included in the initial measurement. Subsequently, investment property is carried at depreciated cost less any accumulated impairment losses.
Subsequent costs are recognized in the carrying amount of investment property at cost or, if appropriate, as separate items if it is probable that future economic benefits associated with the item will flow to the Company and the cost of the item can be measured reliably. The carrying amount of the replaced part is derecognized. The costs of the
day-to-day
servicing are recognized in profit or loss as incurred.
Investment properties except for land, are depreciated on a straight-line basis over 8 ~ 40 years as estimated useful lives.
The estimated useful lives, residual values and depreciation method are reviewed at the end of each reporting period, with the effect of any changes in estimate accounted for on a prospective basis.
An investment property is derecognized upon disposal or when the investment property is permanently withdrawn from use and no future economic benefits are expected from the disposal. Any gain or loss arising on derecognition of the property (calculated as the difference between the net disposal proceeds and the carrying amount of the asset) is included in profit or loss in the period in which the property is derecognized.
 
(17)
Intangible assets
 
 (i)
Intangible assets acquired separately
Intangible assets with finite useful lives that are acquired separately are carried at cost less accumulated amortization and accumulated impairment losses. Amortization is recognized on a straight-line basis over their estimated useful lives. The estimated useful life and amortization method are reviewed at the end of each reporting period, with the effect of any changes in estimate being accounted for on a prospective basis. Intangible assets with indefinite useful lives that are acquired separately are carried at cost less accumulated impairment losses.
 
F-27

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(17)
Intangible assets, continued
 
 (ii)
Research and development
Expenditure on research activities is recognized as an expense in the period in which it is incurred. An internally-generated intangible asset arising from development (or from the development phase of an internal project) is recognized if, and only if, all of the following have been demonstrated:
 
  
The technical feasibility of completing the intangible asset so that it will be available for use or sale;
 
  
The intention to complete the intangible asset and use or sell it;
 
  
The ability to use or sell the intangible asset;
 
  
How the intangible asset will generate probable future economic benefits;
 
  
The availability of adequate technical, financial and other resources to complete the development and to use or sell the intangible asset; and
 
  
The ability to measure reliably the expenditure attributable to the intangible asset during its development.
The amount initially recognized for internally-generated intangible assets is the sum of the expenditure incurred from the date when the intangible asset first meets the recognition criteria listed above. When the development expenditure does not meet the criteria listed above, an internally-generated intangible asset cannot be recognized and the expenditure is recognized in profit or loss in the period in which it is incurred.
Internally-generated intangible assets are reported at cost less accumulated amortization and accumulated impairment losses.
The estimated useful lives and amortization methods of the Company’s intangible assets are as follows:
 
   
Useful lives (years)
  
Amortization methods
Usage rights for donated assets
  10 ~ 30  Straight line
Software
  4, 5  Straight line
Industrial rights
  5 ~ 10  Straight line
Development expenditures
  5  Straight line
Leasehold rights
  8 ~ 10  Straight line
Others
  3 ~ 50 or indefinite  Straight line
Mining rights
    Unit of production
 
 (iii)
Intangible assets acquired in a business combination
Intangible assets that are acquired in a business combination are recognized separately from goodwill are initially recognized at their fair value at the acquisition date.
Subsequent to initial recognition, intangible assets acquired in a business combination are reported at cost less accumulated amortization and accumulated impairment losses, on the same basis as intangible assets that are acquired separately.
 
 (iv)
Derecognition of intangible assets
An intangible asset is derecognized on disposal, or when no future economic benefits are expected from its use or disposal. Gains or losses arising from derecognition of an intangible asset are measured as the difference between the net disposal proceeds and the carrying amount of the asset, and are recognized in profit or loss when the asset is derecognized.
 
(18)
Greenhouse gas emissions rights (allowances) and obligations
In accordance with the Act on the Allocation and Trading of Greenhouse Gas Emission Rights and its Enforcement Decree, the Company applies the following accounting policies for greenhouse gas emissions rights and obligations.
 
 (i)
Greenhouse gas emissions rights
Greenhouse gas emissions rights consist of the allowances received free of charge from the government and the ones purchased. The cost of the greenhouse gas emissions rights includes expenditures arising directly from the acquisition and any other costs incurred during normal course of the a
cquisition
.
 
F-28

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(18)
Greenhouse gas emissions rights (allowances) and obligations, continued
 
Greenhouse gas emissions rights are held by the Company to fulfill the legal obligation and recorded as intangible assets. To the extent that the portion to be submitted to the government within one year from the end of reporting period, the greenhouse gas emissions rights are classified as current assets. Greenhouse gas emissions rights recorded as intangible assets are initially measured at cost and substantially remeasured at cost less accumulated impairment losses.
Greenhouse gas emissions rights are derecognized on submission to the government or when no future economic benefits are expected from its use or disposal.
 
 (ii)
Greenhouse gas emissions obligations
Greenhouse gas emissions obligations are the Company’s present legal obligation to submit the greenhouse gas emissions allowances to the government and recognized when an outflow of resources is probable and a reliable estimate can be made of the amount of the obligation. Greenhouse gas emissions obligations are measured as the sum of the carrying amount of the allocated rights that will be submitted to the government and the best estimate of expenditure required to settle the obligation at the end of the reporting period for any excess emission.
 
(19)
Impairment of
non-financial
assets other than goodwill
At the end of each reporting period, the Company reviews the carrying amounts of its property, plant and equipment and intangible assets with definite useful
lives
to determine whether there is any indication that those assets may have been impaired. If any such indication exists, the recoverable amount of the asset is estimated in order to determine the extent of the impairment loss (if any). Where it is not possible to estimate the recoverable amount of an individual asset, the Company estimates the recoverable amount of the cash-generating unit to which the asset belongs. Where a reasonable and consistent basis of allocation can be identified, corporate assets are also allocated to individual cash-generating units, or otherwise they are allocated to the smallest group of cash-generating units for which a reasonable and consistent allocation basis can be identified.
Intangible assets with indefinite useful lives and intangible assets not yet available for use are tested for impairment at least annually, and whenever there is an indication that the asset may be impaired.
Recoverable amount is the higher of fair value less costs to sell and value in use. In assessing value in use, the estimated future cash flows are discounted to their present value using a
pre-tax
discount rate that reflects current market assessments of the time value of money and the risks specific to the asset for which the estimates of future cash flows have not been adjusted.
If the recoverable amount of an asset (or a CGU) is estimated to be less than its carrying amount, the carrying amount of the asset (or CGU) is reduced to its recoverable amount. An impairment loss is recognized immediately in profit or loss.
When an impairment loss subsequently reverses, the carrying amount of the asset (or a CGU) is increased to the revised estimate of its recoverable amount, to the extent the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognized for the asset (or CGU) in prior years. A reversal of an impairment loss is recognized immediately in profit or loss.
 
(20)
Inventories
Inventories are measured at the lower of cost and net realizable value. Cost of inventories for inventories in transit are measured by using specific identification method. Cost of inventories, except for those in transit, are measured under the weighted average method and consists of the purchase price, cost of conversion and other costs incurred in bringing the inventories to their present location and condition.
Net realizable value is the estimated selling price in the ordinary course of business, less the estimated costs of completion and selling expenses. The amount of any write-down of inventories to net realizable value and all losses of inventories are recognized as an expense in the period the write-down or loss occurs. The amount of any reversal of any write-down of inventories, arising from an increase in net realizable value, are recognized as a reduction in the amount of inventories recognized as an expense in the period in which the reversal occurs.
 
F-29

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(21)
Provisions
Provisions are recognized when the Company has a present legal or constructive obligation as a result of a past event, it is probable that an outflow of resources embodying economic benefits will be required to settle the obligation and a reliable estimate can be made of the amount of the obligation.
The risks and uncertainties that inevitably surround many events and circumstances are taken into account in reaching the best estimate of a provision. Where the effect of the time value of money is material, provisions are determined at the present value of the expected future cash flows.
Where some or all of the expenditures required to settle a provision are expected to be reimbursed by another party, the reimbursement shall be recognized when, and only when, it is virtually certain that reimbursement will be received if the entity settles the obligation. The reimbursement shall be treated as a separate asset.
Provisions are reviewed at the end of each reporting period and adjusted to reflect the current best estimates. If it is no longer probable that an outflow of resources embodying economic benefits will be required to settle the obligation, the provision is reversed.
 
 (i)
Provision for employment benefits
The Company determines the provision for employment benefits as the incentive payments based on the results of the individual performance evaluation or management assessment.
 
 (ii)
Provision for decommissioning costs of nuclear power plants
The Company records the fair value of estimated decommissioning costs as a liability in the period in which the Company incurs a legal obligation associated with retirement of long-lived assets that result from acquisition, construction, development and/or normal use of the assets. Accretion expense consists of
period-to-period
changes in the liability for decommissioning costs resulting from the passage of time and revisions to either the timing or the amount of the original estimate of undiscounted cash flows.
 
 (iii)
Provision for disposal of spent nuclear fuel
Under the Radioactive Waste Management Act, the Company is levied to pay the spent nuclear fuel fund for the management of spent nuclear fuel. The Company recognizes the provision of present value of the payments.
 
 (iv)
Provision for low and intermediate radioactive wastes
Under the Radioactive Waste Management Act, the Company recognizes the provision for the disposal of low and intermediate radioactive wastes in best estimate of the expenditure required to settle the present obligation.
 
 (v)
Provision for Polychlorinated Biphenyls (“PCBs”)
Under the Persistent Organic Pollutants Control Act, enacted in 2007, the Company is required to remove PCBs, a toxin, from the insulating oil of its transformers by 2025. As a result of the enactments, the Company is required to inspect the PCBs contents of transformers and dispose of PCBs in excess of safety standards under the legally settled procedures. The Company’s estimates and assumptions used to determine fair value can be affected by many factors, such as the estimated costs of inspection and disposal, inflation rate, discount rate, regulations and the general economy.
 
 (vi)
Provisions for the power plant region support programs
The power plant region support programs consist of scholarship programs to local students, local economy support programs, local culture support programs, environment development programs, and local welfare programs. The Company recognizes the provision in relation to the power plant region support programs.
 
 (vii)
Provisions for transmission and transformation facilities-neighboring areas support
The Company has present obligation to conduct certain programs to support neighboring areas of our transmission and transformation facilities under the Act on Assistance to Electric Power Plants-Neighboring Areas. The Company recognizes the provision of estimated amount to fulfill the obligation.
 
F-30

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(21)
Provisions, continued
 
 (viii)
Renewable Portfolio Standard (“RPS”) provisions
RPS program is required to generate a specified percentage of total electricity to be generated in the form of renewable energy and provisions are recognized for the governmental regulations to require the production of energies from renewable energy sources such as solar, wind and biomass.
 
(22)
Financial instruments
The Company recognizes financial assets and financial liabilities in the consolidated statement of financial position when the Company becomes a party to
the
contractual provisions of the instrument. Upon initial recognition, financial assets and financial liabilities are measured at their fair value plus, in the case of a financial asset or financial liabilities not at fair value through profit or loss, transaction costs that are directly attributable to the asset’s acquisition or issuance.
 
 (i)
Classification and measurement of financial assets
The Company classifies financial assets into three principal categories; measured at amortized cost, fair value through other comprehensive income (FVOCI) and fair value through profit or loss (FVTPL) based on the business model in which assets are managed and their cash flow characteristics. The Company assesses the hybrid financial instrument in which derivatives embedded as a whole for classification.
 
  
Cash flow characteristics
Business model
 
Solely payments of
principal and interest
(SPPI)
 
Other than SPPI
To collect contractual cash flows
 Amortized cost FVTPL
(*2)
Both collecting contractual cash flows and selling financial assets
 FVOCI
(*1)
To sell financial assets
 FVTPL
 
 (*1)
To eliminate or reduce an accounting mismatch, the Company may elect to recognize the amount of change in fair value in profit or loss.
 
 (*2)
On initial recognition of an equity investment that is not held for trading, the Company may irrevocably elect to present subsequent changes in the investment’s fair value in OCI.
 
 
A financial asset is measured at amortized cost if it meets both of the following conditions and is not designated as at FVTPL: 1) it is held within a business model whose objective is to hold assets to collect contractual cash flows; and 2) its contractual terms of the financial asset give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.
 
 
A financial asset is measured at FVOCI if it meets both of the following conditions and is not designated as at FVTPL: 1) it is held within a
business
model whose objective is achieved by both collecting contractual cash flows and selling financial assets; and 2) its contractual terms of the financial asset give rise on specified dates to cash flow that are solely payments of principal and interest on the principal amount outstanding.
 
 
All financial assets not classified as measured at amortized cost or FVOCI as described above are measured at FVTPL. On initial recognition of equity investment that is not held for trading, the Company may irrevocably elect to present subsequent changes in fair value in OCI, and will not reclassify (recycle) those items in OCI to profit or loss subsequently.
 
 (ii)
Classification and measurement of financial liabilities
Financial liabilities are classified as FVTPL or other financial liabilities.
① A financial liability is classified as at FVTPL if it is classified as
held-for-trading,
it is a derivative or it is designated as such on initial recognition. Financial liabilities at FVTPL are measured at fair value and net gains and losses, including any interest expense, are recognized in profit or loss.
 
F-31

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(22)
Financial instruments, continued
 
② A
non-derivative
financial liability that is not classified as at FVTPL is classified as other financial liabilities. Other financial liabilities are measured initially at its fair value minus transaction costs that are directly attributable to the acquisition or issue. Other financial liabilities are subsequently measured at amortized cost using the effective interest rate method.
 
 (iii)
Impairment: Financial assets and contract assets
The Company applies a forward-looking ‘expected credit loss’ (ECL) model for debt instruments, lease receivables, contractual assets, loan commitments and financial guarantee contracts.
The Company recognizes loss allowances measured on either of the
12-month
or lifetime ECL based on the extent of increase in credit risk since inception as shown in the below table.
 
Classification
 
 
 
Loss allowances
Stage 1
 
Credit risk has not increased significantly since the initial
recognition
 
12-month ECL:
 ECLs that resulted from possible default events within the 12 months after the reporting date
Stage 2
 
Credit risk has increased
significantly since the initial
recognition
 Lifetime ECL: ECL that resulted from all possible default events over the expected life of a financial instrument
Stage 3
 Credit-impaired  
Under IFRS 9, the Company always measures the loss allowance at an amount equal to lifetime expected credit losses for trade receivables or contract assets that result from transactions that are within the scope of IFRS 15 and that do not contain a significant financing component in accordance with IFRS 15, and if the trade receivables or contract assets include a significant financing component, the Company may choose as its accounting policy to measure the loss allowance at an amount equal to lifetime expected credit losses.
The Company has chosen to measure the loss allowance at an amount equal to lifetime expected credit losses for the trade receivables, contract assets and lease receivables that contain a significant financing component.
 
 (iv)
Derecognition
The Company derecognizes a financial asset when the contractual rights to the cash flows from the financial asset expire, or it transfers the rights to receive the contractual cash flows in a transaction in which substantially all of the risks and rewards of ownership of the financial asset are transferred or in which the Company neither transfers nor retains substantially all of the risks and rewards of ownership and it does not retain control of the financial asset. The Company enters into transactions whereby it transfers assets recognized in its consolidated statement of financial position, but retains either all or substantially all of the risks and rewards of the transferred assets. In these cases, the transferred assets are not derecognized.
The Company derecognizes a financial liability when its contractual obligations are discharged or cancelled or expire. On derecognition of a financial liability, the difference between the carrying amount extinguished and the consideration paid (including any
non-cash
assets transferred or liabilities assumed) is recognized in profit or loss.
 
(23)
Service Concession Arrangements
The Company recognizes revenues from construction services and operating services related to service concession arrangements in accordance with IFRS 15 ‘Revenue from Contracts with Customers’.
The Company recognizes a financial asset to the extent that it has an unconditional contractual right to receive cash or another financial asset for the construction services and an intangible asset to the extent that it receives a right (license) to charge users of the public service. Borrowing costs attributable to the arrangement are recognized as an expense in the period in which they are incurred
 
F-32

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(23)
Service Concession Arrangements, continued
 
unless the Company has a contractual right to receive an intangible asset (a right to charge users of the public service). In this case, borrowing costs attributable to the arrangement are capitalized during the construction phase of the arrangement.
 
(24)
Derivative financial instruments, including hedge accounting
The Company enters into a variety of derivative arrangements to manage its exposure to interest rate and foreign exchange rate risk, including foreign
exchange
forward contracts, interest rate swaps and cross currency swaps and others.
Derivatives are initially recognized at fair value. Subsequent to initial recognition, derivatives are measured at fair value. The resulting gain or loss is recognized in profit or loss immediately unless the derivative is designated and effective as a hedging instrument, in such case the timing of the recognition in profit or loss depends on the nature of the hedge relationship.
A derivative with a positive fair value is recognized as a financial asset; a derivative with a negative fair value is recognized as a financial liability. A derivative is presented as a
non-current
asset or a
non-current
liability if the remaining maturity of the instrument is more than 12 months and it is not expected to be realized or settled within 12 months. Other derivatives are presented as current assets or current liabilities.
 
 (i)
Separable embedded derivatives
Derivatives embedded in other financial instruments or other host contracts are treated as separate derivatives when their risks and characteristics are not closely related to those of the host contracts and when the host contracts are not measured at FVTPL.
An embedded derivative is presented as a
non-current
asset or a
non-current
liability if the remaining maturity of the hybrid instrument to which the embedded derivative is part of, is more than 12 months and it is not expected to be realized or settled within 12 months. All other embedded derivatives are presented as current assets or current liabilities.
 
 (ii)
Hedge accounting
The Company designates certain hedging instruments, which include derivatives, embedded derivatives and
non-derivatives
in respect of foreign currency risk, as either fair value hedges or cash flow hedges. Hedges of foreign exchange risk on firm commitments are accounted for as cash flow hedges.
At the inception of the hedge relationship, the entity documents the relationship between the hedging instrument and the hedged item, along with its risk management objectives and its strategy for undertaking various hedge transactions. Furthermore, at the inception of the hedge and on an ongoing basis, the Company documents whether the hedging instrument is highly effective in offsetting changes in fair values or cash flows of the hedged item.
 
 (iii)
Fair value hedges
Changes in the fair value of derivatives that are designated and qualify as fair value hedges are recognized in profit or loss immediately, together with any changes in the fair value of the hedged asset or liability that are attributable to the hedged risk. The changes in the fair value of the hedging instrument and the change in the hedged item attributable to the hedged risk relating to the hedged items are recognized in the consolidated statements of comprehensive income or loss.

Hedge accounting is discontinued when the Company revokes the hedging relationship, when the hedging instrument expires or is sold, terminated, or exercised, or when it no longer qualifies for hedge accounting. The fair value adjustment to the carrying amount of the hedged item arising from the hedged risk is amortized and recognized as profit or loss from that date.
 
 (iv)
Cash flow hedges
The effective portion of changes in the fair value of derivatives that are designated and qualify as cash flow hedges is recognized in other comprehensive income. The gain or loss relating to the ineffective portion is recognized immediately in profit or loss, and is included in the ‘finance income and expense’.
 
F-33

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
3.
Material Accounting Policies, Continued
 
(24)
Derivative financial instruments, including hedge accounting, continued
 
Amounts previously recognized in other comprehensive income and accumulated in equity are reclassified to profit or loss in the periods when the hedged item is recognized in profit or loss, in the same line of the consolidated statement of comprehensive income or loss as the recognized hedged item. However, when the forecast transaction that is hedged results in the recognition of a
non-financial
asset or a
non-financial
liability, the gains or losses previously accumulated in equity are transferred from equity and included in the initial measurement of the cost of the
non-financial
asset or
non-financial
liability.
Hedge accounting is discontinued when the Company revokes the hedging relationship, when the hedging instrument expires or is sold, terminated, or exercised, or it no longer qualifies for hedge accounting. Any gain or loss accumulated in equity at that time remains in equity and is recognized when the forecast transaction is ultimately recognized in profit or loss. When a forecast transaction is no longer expected to occur, the gain or loss accumulated in equity is recognized immediately in profit or loss.
 
4.
Segment, Geographic and Other Information
 
(1)
Segment determination and explanation of the measurements
The Company’s operating segments are its business components that generate discrete financial information that is reported to and regularly reviewed by chief operating decision makers of the Company including but not limited to the Chief Executive Officer, for the purpose of resource allocation and assessment of segment performance. The Company’s reportable segments are ‘Transmission and distribution’, ‘Electric power generation (Nuclear)’, ‘Electric power generation
(Non-nuclear)’,
‘Plant maintenance & engineering service’ and ‘Others’; others mainly represent the business unit that manages the Company’s foreign operations.
Segment operating profit or loss is determined the same way that consolidated operating profit or loss is determined under IFRS without any adjustment for corporate allocations. The accounting policies used by each segment are consistent with the accounting policies used in the preparation of the consolidated financial statements. Segment assets and liabilities are determined based on separate financial statements of the entities instead of on a consolidated basis. There are various transactions between the reportable segments, including sales of property, plant and equipment and so on, that are conducted on an
arm’s-length
basis at market prices that would be applicable to an independent third party. For subsidiaries which are in a different segment from that of its immediate parent company, their carrying amount in separate financial statements is eliminated in the consolidating adjustments in the tables below. In addition, consolidation adjustments in the table below include adjustments of the amount of investment in associates and joint ventures from the cost basis amount reflected in segment assets to that determined using equity method in the consolidated financial statements.
 
F-34

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
4.
Segment, Geographic and Other Information, Continued
 
(2)
Financial information of the segments for the years ended December 31, 2021, 2022 and 2023, respectively, are as follows:
 
     
2021
 
Segment
    
Total segment
revenue
  
Intersegment
revenue
  
Revenue
from
external
customers
  
Depreciation
and
amortization
  
Interest
income
  
Interest
expense
  
Profit (loss)
related to
associates,
joint
ventures and
subsidiaries
  
Employee
benefit
expense
  
Loss on
abandonment
of property,
plant and
equipment
  
Increase in
provisions, net
     
Operating
profit (loss)
 
     
In millions of won
 
Transmission and distribution
    58,999,388   1,672,776   57,326,612   3,990,464   36,831   678,986   391,116   193,412   202,262   1,194,643    (7,244,319
Electric power generation (Nuclear)
   9,324,391   9,207,516   116,875   3,611,594   22,209   477,512   (18,146  86,730      680,358    762,164 
Electric power generation
(Non-nuclear)
   25,928,596   24,518,167   1,410,429   4,182,470   22,226   624,391   109,765   121,020   5,672   285,152    370,440 
Plant maintenance & engineering service
   2,805,785   2,370,900   434,885   121,493   9,515   933   11,849   94,269      213,500    245,360 
Others
   2,018,997   1,295,423   723,574   159,222   158,680   162,345      52,698      2,981    208,139 
Consolidation
adjustments
   (39,064,782  (39,064,782     (122,751  (27,587  (29,710     (36,187     89,818    (64,775
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
   
 
 
 
    60,012,375      60,012,375   11,942,492   221,874   1,914,457   494,584   511,942   207,934   2,466,452    (5,722,991
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
   
 
 
 
Finance income
              1,402,614 
             
 
 
 
Finance expense
              (3,245,777
             
 
 
 
Gain related to associates, joint ventures and subsidiaries
              494,584 
             
 
 
 
Loss before income tax
               (7,071,570
             
 
 
 
 
F-35
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
4.
Segment, Geographic and Other Information, Continued
 
(2)
Financial information of the segments for the years ended December 31, 2021, 2022 and 2023, respectively, are as follows, continued:
     
2022
 
Segment
    
Total segment
revenue
  
Intersegment
revenue
  
Revenue
from
external
customers
  
Depreciation
and
amortization
  
Interest
income
  
Interest
expense
  
Profit (loss)
related to
associates,
joint
ventures and
subsidiaries
  
Employee
benefit
expense
  
Loss on
abandonment
of property,
plant and
equipment
  
Increase in
provisions, net
     
Operating
profit (loss)
 
     
In millions of won
 
Transmission and distribution
    68,239,707   1,922,354   66,317,353   4,130,004   67,076   1,420,802   980,146   180,114   157,784   611,534    (33,623,874
Electric power generation (Nuclear)
   10,386,091   10,254,271   131,820   4,034,774   45,789   557,218   (753  82,466      624,221    761,109 
Electric power generation
(Non-nuclear)
   41,944,339   39,252,851   2,691,488   4,091,081   53,242   694,559   329,112   140,067      619,947    289,001 
Plant maintenance & engineering service
   2,975,062   2,516,699   458,363   123,168   14,003   1,405   1,886   82,070      213,671    239,529 
Others
   2,750,231   1,803,231   947,000   211,719   195,966   195,860      53,017   3,125   9,463    333,547 
Consolidation adjustments
   (55,749,406  (55,749,406     (129,334  (35,323  (51,298     (52,034     68,143    (239,843
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
   
 
 
 
    70,546,024      70,546,024   12,461,412   340,753   2,818,546   1,310,391   485,700   160,909   2,146,979    (32,240,531
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
   
 
 
 
Finance income
              1,833,312 
             
 
 
 
Finance expense
              (4,746,791
             
 
 
 
Gain related to associates, joint ventures and subsidiaries
              1,310,391 
             
 
 
 
Loss before income tax
               (33,843,619
             
 
 
 
 
F-36

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
4.
Segment, Geographic and Other Information, Continued
 
(2)
Financial information of the segments for the years ended December 31, 2021, 2022 and 2023, respectively, are as follows, continued:
 
     
2023
 
Segment
    
Total
segment
revenue
  
Intersegment
revenue
  
Revenue
from
external
customers
  
Depreciation
and
amortization
  
Interest
income
  
Interest
expense
  
Profit (loss)
related to
associates,
joint
ventures and
subsidiaries
  
Employee
benefit
expense
  
Loss on
abandonment
of property,
plant and
equipment
  
Increase in
provisions, net
     
Operating
profit (loss)
 
     
In millions of won
 
Transmission and distribution
    85,082,542   1,728,602   83,353,940   4,258,909   92,380   2,826,916   314,373   127,038   182,742   419,564    (6,153,936
Electric power generation (Nuclear)
   10,798,378   10,666,260   132,118   4,403,610   69,209   687,743   (2,639  62,280      585,630    819,838 
Electric power generation (Non-nuclear)
   35,159,641   32,253,979   2,905,662   4,180,939   65,403   741,282   301,681   109,151   13,863   352,058    929,210 
Plant maintenance & engineering service
   3,091,022   2,626,190   464,832   129,628   23,638   1,270   (389  52,890      206,215    355,284 
Others
   2,175,972   1,556,114   619,858   204,322   226,243   258,877      48,105   92   444    89,302 
Consolidation adjustments
   (48,831,145  (48,831,145     (145,145  (47,253  (64,429     (40,734)     47,171    (284,714
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
   
 
 
 
    87,476,410      87,476,410   13,032,263   429,620   4,451,659   613,026   358,730   196,697   1,611,082    (4,245,016
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
   
 
 
 
Finance income
              1,425,031 
             
 
 
 
Finance expense
              (5,347,018
             
 
 
 
Gain related to associates, joint ventures and subsidiaries
              613,026 
             
 
 
 
Loss before income tax
               (7,553,977
             
 
 
 
 
F-37
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
4.
Segment, Geographic and Other Information, Continued
 
(3)
Information related to segment assets and segment liabilities as of and for the years ended December 31, 2022 and 2023 are as follows:
     
2022
 
Segment
    
Segment

assets
  
Investments
in
associates
and joint
ventures
  
Acquisition of

non-current
assets
  
Segment
liabilities
 
     
In millions of won
 
Transmission and distribution
    131,023,727   5,678,141   6,055,179   108,963,058 
Electric power generation (Nuclear)
   69,129,625   143,304   2,008,409   42,843,974 
Electric power generation (Non-nuclear)
   69,468,039   3,113,918   3,547,815   40,428,907 
Plant maintenance & engineering service
   4,051,157   56,685   200,338   1,272,408 
Others
   12,895,981      839,885   5,796,718 
  
 
 
  
 
 
  
 
 
  
 
 
 
Segment totals
   286,568,529   8,992,048   12,651,626   199,305,065 
  
 
 
  
 
 
  
 
 
  
 
 
 
Consolidation adjustments:
     
Elimination of inter-segment amounts
   (43,801,723     (38,633  (9,304,648
Equity method adjustment
   2,859,623          
Deferred taxes
   (452        2,801,832 
Others
   (10,820,983        2,489 
  
 
 
  
 
 
  
 
 
  
 
 
 
   (51,763,535     (38,633  (6,500,327
  
 
 
  
 
 
  
 
 
  
 
 
 
Consolidated totals
    234,804,994   8,992,048   12,612,993   192,804,738 
  
 
 
  
 
 
  
 
 
  
 
 
 
     
2023
 
Segment
    
Segment

assets
  
Investments
in
associates
and joint
ventures
  
Acquisition of

non-current
assets
  
Segment
liabilities
 
     
In millions of won
 
Transmission and distribution
    138,838,342   5,872,000   7,636,677   120,181,250 
Electric power generation (Nuclear)
   70,535,018   169,155   3,070,528   45,660,916 
Electric power generation (Non-nuclear)
   66,265,884   3,567,345   3,490,863   38,415,202 
Plant maintenance & engineering service
   4,271,409   54,088   203,352   1,549,863 
Others
   13,378,229      736,155   6,480,959 
  
 
 
  
 
 
  
 
 
  
 
 
 
Segment totals
   293,288,882   9,662,588   15,137,575   212,288,190 
  
 
 
  
 
 
  
 
 
  
 
 
 
Consolidation adjustments:
     
Elimination of inter-segment amounts
   (46,071,077     (390,686  (11,463,805
Equity method adjustment
   2,997,016          
Deferred taxes
   1,636         1,629,280 
Others
   (10,501,492        (3,450
  
 
 
  
 
 
  
 
 
  
 
 
 
   (53,573,917     (390,686  (9,837,975
  
 
 
  
 
 
  
 
 
  
 
 
 
Consolidated totals
    239,714,965   9,662,588   14,746,889   202,450,215 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-38

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
4.
Segment, Geographic and Other Information, Continued
 
(4)
Geographic information
Electricity sales, the main operations of the Company, are conducted in the Republic of Korea. The following information on revenue from external customers and non-current assets is determined by the location of the customers and of the assets:
 
      
Revenue from external customers
  
Non-current assets
(*2)
 
Geographical unit
     
2021
  
2022
  
2023
  
2021
  
2022
  
2023
 
      
In millions of won
 
Domestic
     58,771,252   69,142,730   86,242,808   178,760,564   183,707,117   186,384,115 
Overseas (*1)
    1,241,123   1,403,294   1,233,602   3,572,784   4,724,416   4,822,845 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     60,012,375   70,546,024   87,476,410   182,333,348   188,431,533   191,206,960 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 (*1)
Middle East and other Asian countries make up the majority of overseas revenue and non-current assets. Since the overseas revenue or non-current
asse
ts attributable to particular countries are not material, they are not disclosed individually.
 
 (*2)
The amounts exclude financial assets and deferred tax assets.
 
F-39

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
4.
Segment, Geographic and Other Information, Continued
 
(5)
Information on significant customers
There is no single customer which accounts for 10% or more of the Company’s revenue for the years ended December 31, 2021, 2022 and 2023.
 
5.
Classification of Financial Instruments
 
(1)
Classification of financial assets as of December 31, 2022 and 2023 are as follows:
 
     
2022
 
     
Financial assets
at fair value
through profit or
loss
  
Financial assets
at fair value
through other
comprehensive
income
  
Financial assets
at amortized cost
  
Derivative assets
(applying hedge
accounting)
  
Total
 
     
In millions of won
 
Current assets
      
Cash and cash equivalents
          3,234,780      3,234,780 
Current financial assets
      
Current financial assets at fair value through profit or loss
   3,181,791            3,181,791 
Current financial assets at amortized costs
         16,762      16,762 
Current derivative assets
   154,730         134,873   289,603 
Other financial assets
         798,819      798,819 
Trade and other receivables
         10,461,822      10,461,822 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   3,336,521      14,512,183   134,873   17,983,577 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Non-current assets
      
Non-current financial assets
      
Non-current financial assets at fair value through profit or loss
   527,717            527,717 
Non-current financial assets at fair value through other comprehensive income
      502,829         502,829 
Non-current financial assets at amortized costs
         10,236      10,236 
Non-current derivative assets
   538,342         190,079   728,421 
Other financial assets
         1,567,632      1,567,632 
Trade and other receivables
         2,153,080      2,153,080 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   1,066,059   502,829   3,730,948   190,079   5,489,915 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    4,402,580   502,829   18,243,131   324,952   23,473,492 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-40

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
5.
Classification of Financial Instruments, Continued
 
(1)
Classification of financial assets as of December 31, 2022 and 2023 are as follows, continued:
 
     
2023
 
     
Financial assets
at fair value
through profit or
loss
  
Financial assets
at fair value
through other
comprehensive
income
  
Financial assets
at amortized cost
  
Derivative assets
(applying hedge
accounting)
  
Total
 
     
In millions of won
 
Current assets
      
Cash and cash equivalents
          4,342,887      4,342,887 
Current financial assets
      
Current financial assets at fair value through profit or loss
   2,054,021            2,054,021 
Current financial assets at amortized costs
         28,905      28,905 
Current derivative assets
   227,434         80,298   307,732 
Other financial assets
         716,739      716,739 
Trade and other receivables
         11,985,735      11,985,735 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   2,281,455      17,074,266   80,298   19,436,019 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Non-current
assets
      
Non-current
financial assets
      
Non-current
financial assets at fair value through profit or loss
   657,264            657,264 
Non-current
financial assets at fair value through other comprehensive income
      502,443         502,443 
Non-current
financial assets at amortized costs
         9,938      9,938 
Non-current
derivative assets
   503,514         189,148   692,662 
Other financial assets
         1,683,907      1,683,907 
Trade and other receivables
         2,193,587      2,193,587 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   1,160,778   502,443   3,887,432   189,148   5,739,801 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    3,442,233   502,443   20,961,698   269,446   25,175,820 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-41

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
5.
Classification of Financial Instruments, Continued
 
(2)
Classification of financial liabilities as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Financial liabilities

at fair value through

profit or loss
   
Financial liabilities
recognized at
amortized cost
   
Derivative liabilities
(applying hedge
accounting)
   
Total
 
       
In millions of won
 
Current liabilities
          
Borrowings
          12,457,853        12,457,853 
Debt securities
         10,201,149        10,201,149 
Derivative liabilities
     44,994            44,994 
Trade and other payables
         11,983,549        11,983,549 
    
 
 
   
 
 
   
 
 
   
 
 
 
     44,994    34,642,551        34,687,545 
    
 
 
   
 
 
   
 
 
   
 
 
 
Non-current liabilities
          
Borrowings
         2,962,323        2,962,323 
Debt securities
         94,984,040        94,984,040 
Derivative liabilities
     362,252        25,505    387,757 
Trade and other payables
         5,638,914        5,638,914 
    
 
 
   
 
 
   
 
 
   
 
 
 
     362,252    103,585,277    25,505    103,973,034 
    
 
 
   
 
 
   
 
 
   
 
 
 
      407,246    138,227,828    25,505    138,660,579 
    
 
 
   
 
 
   
 
 
   
 
 
 
       
2023
 
       
Financial liabilities

at fair value through

profit or loss
   
Financial liabilities
recognized at
amortized cost
   
Derivative liabilities
(applying hedge
accounting)
   
Total
 
       
In millions of won
 
Current liabilities
          
Borrowings
          16,446,821        16,446,821 
Debt securities
         24,674,526        24,674,526 
Derivative liabilities
     18,379            18,379 
Trade and other payables
         9,089,973        9,089,973 
    
 
 
   
 
 
   
 
 
   
 
 
 
     18,379    50,211,320        50,229,699 
    
 
 
   
 
 
   
 
 
   
 
 
 
          
Non-current
liabilities
          
Borrowings
         3,392,831        3,392,831 
Debt securities
         89,117,652        89,117,652 
Derivative liabilities
     410,291        23,564    433,855 
Trade and other payables
         4,981,957        4,981,957 
    
 
 
   
 
 
   
 
 
   
 
 
 
     410,291    97,492,440    23,564    97,926,295 
    
 
 
   
 
 
   
 
 
   
 
 
 
      428,670    147,703,760    23,564    148,155,994 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
F-42

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
5.
Classification of Financial Instruments, Continued
 
(3)
Classification of comprehensive income (loss) from financial instruments for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
         
2021
  
2022
  
2023
 
         
In millions of won
 
Cash and cash equivalents
  
Interest income
     12,692   51,872   100,205 
  
Gain (loss) on foreign currency transactions and translations
    34,923   22,158   (2,073
Financial assets at fair value through profit or loss
  
Interest income
    18,415   58,540   65,470 
  
Dividends income
    2,949   1,994   4,193 
  
Gain (loss) on valuation of derivatives
    450,896   336,049   144,797 
  
Gain (loss) on transaction of derivatives
    54,352   205,298   130,230 
  
Gain (loss) on valuation of financial assets
    8,858   (37,230  128,307 
  
Gain (loss) on disposal of financial assets
    4,221   9,358   13,161 
Financial assets at fair value through other comprehensive income
  
Dividends income
    7,573   26,881   21,748 
Financial assets at amortized cost
  
Interest income
    797   1,308   2,929 
  
Gain (loss) on foreign currency transactions and translations
    (3,647  5,087   (1,774
Loans
  
Interest income
    25,196   33,545   44,029 
  
Gain (loss) on foreign currency transactions and translations
    729   596   127 
Trade and other receivables
  
Interest income
    144,543   164,653   168,303 
  
Gain (loss) on disposal of financial assets
    2,452       
  
Gain (loss) on foreign currency transactions and translations
    14,207   1,019   27,363 
Short-term financial instruments
  
Interest income
    7,531   15,827   34,260 
  
Gain (loss) on foreign currency transactions and translations
    32,218   3,513    
Long-term financial instruments
  
Interest income
    12,470   14,371   14,183 
  
Gain (loss) on foreign currency transactions and translations
    27   1    
Other financial assets
  
Interest income
    230   637   241 
Derivatives (applying hedge accounting)
  
Gain (loss) on valuation of derivatives (profit or loss)
    211,180   149,888   76,814 
  
Gain (loss) on valuation of derivatives (equity, before tax)
    (11,734  (93,699  (10,539
  
Gain (loss) on transaction of derivatives
    31,351   54,422   19,604 
Financial liabilities at fair value through profit or loss
  
Gain (loss) on valuation of derivatives
    2,751   (345,313  961 
  
Gain (loss) on transaction of derivatives
    (15,358  (110,236  (80,640
Financial liabilities carried at amortized cost
  
Interest expense of borrowings and debt securities
    1,316,269   2,142,220   3,636,887 
  
Gain (loss) on repayment of financial liabilities
    (10  (15   
  
Interest expense of trade and other payables
    213,765   204,078   200,440 
  
Interest expense of others
    384,423   472,248   614,332 
  
Other finance income
    1,284   927   4,971 
  
Other finance expenses
    2,504   167   1,796 
  
Gain (loss) on foreign currency transactions and translations
    (1,162,835  (936,269  (420,203
Derivatives (applying hedge accounting)
  
Gain (loss) on valuation of derivatives (profit or loss)
    158,167   83,594   11,627 
  
Gain (loss) on valuation of derivatives (equity, before tax)
    (28,726  28,647   2,021 
  
Gain (loss) on transaction of derivatives
    13,737   75,201   20,465 
 
F-43

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
6.
Restricted Deposits
Restricted deposits as of December 31, 2022 and 2023 are as follows:
 
          
2022
   
2023
 
          
In millions of won
 
Cash and cash equivalents
  
Escrow accounts
      2,912    3,010 
  
Deposits for government project and others
     30,586    26,969 
  
Collateral provided for borrowings
     250,346    190,525 
  
Collateral provided for lawsuit
     57    54 
  
Deposits for transmission regional support program
     8,626    9,481 
  
Deposits for other business purposes
     3,825    5,550 
Short-term financial instruments
  
Restriction on withdrawal related to ‘win-win growth program’ for small and medium enterprises and others
     101,500    80,500 
  
Collateral provided for borrowings
     1,000    24,728 
Non-current financial assets at fair value through profit or loss
  
Decommissioning costs of nuclear power plants
     386,220    271,047 
Long-term financial instruments
  
Escrow accounts
     1,603     
  
Guarantee deposits for banking accounts at oversea branches
     18    36 
  
Collateral provided for borrowings
     21,745    28,245 
  
Decommissioning costs of nuclear power plants
     497,609    655,030 
Other non-current assets
  
Deposits for other business purposes
     4,355    7,558 
      
 
 
   
 
 
 
        1,310,402    1,302,733 
      
 
 
   
 
 
 
 
7.
Cash and Cash Equivalents
Cash and cash equivalents as of December 31, 2022 and 2023 are as follows:
 
      
2022
   
2023
 
      
In millions of won
 
Cash
     21,113    14,070 
Other demand deposits
    1,906,248    1,780,548 
Short-term deposits classified as cash equivalents
    1,063,290    1,107,687 
Short-term investments classified as cash equivalents
    244,129    1,440,582 
   
 
 
   
 
 
 
     3,234,780    4,342,887 
   
 
 
   
 
 
 
 
 
F-44

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
8.
Trade and Other Receivables
 
(1)
Trade and other receivables as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Gross
amount
   
Allowance for

doubtful accounts
   
Present value

discount
   
Book
value
 
       
In millions of won
 
Current assets
          
Trade receivables
      9,700,880    (196,829       9,504,051 
Other receivables
     1,004,528    (44,388   (2,369   957,771 
    
 
 
   
 
 
   
 
 
   
 
 
 
     10,705,408    (241,217   (2,369   10,461,822 
    
 
 
   
 
 
   
 
 
   
 
 
 
Non-current assets
          
Trade receivables
     197,955    (2,171       195,784 
Other receivables
     2,033,705    (65,065   (11,344   1,957,296 
    
 
 
   
 
 
   
 
 
   
 
 
 
     2,231,660    (67,236   (11,344   2,153,080 
    
 
 
   
 
 
   
 
 
   
 
 
 
      12,937,068    (308,453   (13,713   12,614,902 
    
 
 
   
 
 
   
 
 
   
 
 
 
       
2023
 
       
Gross
amount
   
Allowance for

doubtful accounts
   
Present value

discount
   
Book
value
 
       
In millions of won
 
Current assets
          
Trade receivables
  
 
   11,239,601    (230,058       11,009,543 
Other receivables
     1,034,655    (53,683   (4,780   976,192 
    
 
 
   
 
 
   
 
 
   
 
 
 
     12,274,256    (283,741   (4,780   11,985,735 
    
 
 
   
 
 
   
 
 
   
 
 
 
Non-current assets
          
Trade receivables
     207,668    (2,587       205,081 
Other receivables
     2,080,830    (80,270   (12,054   1,988,506 
    
 
 
   
 
 
   
 
 
   
 
 
 
     2,288,498    (82,857   (12,054   2,193,587 
    
 
 
   
 
 
   
 
 
   
 
 
 
  
 
   14,562,754    (366,598   (16,834   14,179,322 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
F-45
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
8.
Trade and Other Receivables, Continued
 
(2)
Other receivables as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Gross
amount
   
Allowance for

doubtful accounts
  
Present value
discount
  
Book
value
 
       
In millions of won
 
Current assets
        
Non-trade receivables
      459,245    (41,293  (21  417,931 
Accrued income
     109,267          109,267 
Deposits
     289,580       (2,348  287,232 
Finance lease receivables (*1)
     67,583    (1,802     65,781 
Others
     78,853    (1,293     77,560 
    
 
 
   
 
 
  
 
 
  
 
 
 
     1,004,528    (44,388  (2,369  957,771 
    
 
 
   
 
 
  
 
 
  
 
 
 
Non-current assets
        
Non-trade receivables
     140,128    (52,696  (182  87,250 
Accrued income
     2,004          2,004 
Deposits
     459,861       (11,162  448,699 
Finance lease receivables (*2)
     1,171,807    (2,703     1,169,104 
Others
     259,905    (9,666     250,239 
    
 
 
   
 
 
  
 
 
  
 
 
 
     2,033,705    (65,065  (11,344  1,957,296 
    
 
 
   
 
 
  
 
 
  
 
 
 
      3,038,233    (109,453  (13,713  2,915,067 
    
 
 
   
 
 
  
 
 
  
 
 
 
 
(*1)  Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩114,347 million.
 
(*2)  Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩1,024,927 million.
 
   
   
       
2023
 
       
Gross
amount
   
Allowance for

doubtful accounts
  
Present value
discount
  
Book
value
 
       
In millions of won
 
Current assets
        
Non-trade receivables
      393,859    (49,626  (53  344,180 
Accrued income
     133,033          133,033 
Deposits
     317,541    (4  (4,727  312,810 
Finance lease receivables (*1)
     75,661    (2,761     72,900 
Others
     114,561    (1,292     113,269 
    
 
 
   
 
 
  
 
 
  
 
 
 
     1,034,655    (53,683  (4,780  976,192 
    
 
 
   
 
 
  
 
 
  
 
 
 
Non-current assets
        
Non-trade receivables
     198,453    (54,182  (102  144,169 
Accrued income
     7,342          7,342 
Deposits
     441,721    (263  (11,952  429,506 
Finance lease receivables (*2)
     1,173,500    (2,495     1,171,005 
Others
     259,814    (23,330     236,484 
    
 
 
   
 
 
  
 
 
  
 
 
 
     2,080,830    (80,270  (12,054  1,988,506 
    
 
 
   
 
 
  
 
 
  
 
 
 
      3,115,485    (133,953  (16,834  2,964,698 
    
 
 
   
 
 
  
 
 
  
 
 
 
 
 (*1)
Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩114,118 million.
 
 (*2)
Gross amount of finance lease receivables is the net lease investment by deducting unearned finance income of ₩943,316 million.
 
F-46

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
8.
Trade and Other Receivables, Continued
 
(3)
Trade and other receivables are classified as financial assets at amortized cost and are measured using the effective interest rate method. No interest is accrued for trade receivables related to electricity for the duration between the billing date and the payment due dates. However once trade receivables are overdue, the Company imposes a monthly interest rate of 1.5% on the overdue trade receivables. The Company holds deposits of three months’ expected electricity usage for customers requesting temporary usage and customers with delinquent payments.
 
(4)
Aging analysis of trade receivables as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Trade receivables: (not overdue)
      9,509,775    11,120,582 
    
 
 
   
 
 
 
Trade receivables: (impairment reviewed)
     389,060    326,687 
    
 
 
   
 
 
 
Less than 60 days
     5,592    6,403 
60 ~ 90 days
     36,389    55,802 
90 ~ 120 days
     31,442    20,535 
120 days ~ 1 year
     99,655    58,350 
Over 1 year
     215,982    185,597 
    
 
 
   
 
 
 
     9,898,835    11,447,269 
Less: allowance for doubtful accounts
     (199,000   (232,645
    
 
 
   
 
 
 
      9,699,835    11,214,624 
    
 
 
   
 
 
 
At the end of each reporting period, the Company assesses whether the credit to trade receivables is impaired. The Company recognizes loss allowances for trade receivables individually when there is any objective evidence that trade receivables are impaired and significant and classifies the trade receivables that are not individually assessed as the trade receivables subject to be assessed on a collective basis. Also, the Company recognizes loss allowances based on an ‘expected credit loss’ (ECL) model.
 
(5)
Aging analysis of other receivables as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Other receivables: (not overdue)
      2,857,253    2,857,337 
    
 
 
   
 
 
 
Other receivables: (impairment reviewed)
     180,980    258,148 
    
 
 
   
 
 
 
Less than 60 days
     92    5 
60 ~ 90 days
     13,643    27,634 
90 ~ 120 days
     2,982    727 
120 days ~ 1 year
     18,494    69,651 
Over 1 year
     145,769    160,131 
    
 
 
   
 
 
 
     3,038,233    3,115,485 
Less: allowance for doubtful accounts
     (109,453   (133,953
Less: present value discount
     (13,713   (16,834
    
 
 
   
 
 
 
      2,915,067    2,964,698 
    
 
 
   
 
 
 
At the end of each reporting period, the Company assesses whether the credit to other receivables is impaired. The Company recognizes loss allowances for other receivables individually when there is any objective evidence that other receivables are impaired and significant, and classifies the other receivables that are not individually assessed as the other receivables subject to be assessed on a collective basis. Also, the Company recognizes loss allowances based on an ‘expected credit loss’ (ECL) model.
 
F-47

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
8.
Trade and Other Receivables, Continued
 
(6)
Changes in the allowance for doubtful accounts for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
  
2022
  
2023
 
       
Trade
receivables
  
Other
receivables
  
Trade
receivables
  
Other
receivables
  
Trade
receivables
  
Other
receivables
 
       
In millions of won
 
Beginning balance
  
 
  
 
208,990
 
 
 
132,379
 
 
 
205,339
 
 
 
82,710
 
  199,000   109,453 
Bad debt expense
    
 
19,039
 
 
 
18,411
 
 
 
27,078
 
 
 
4,220
 
  68,385   24,290 
Write-off
    
 
(21,809
 
 
(58,762
 
 
(26,319
 
 
(1,103
  (26,109  (4,472
Reversal
    
 
(1,071
 
 
(79
 
 
(3,444
 
 
(37
  (5,577  (1,942
Others
    
 
190
 
 
 
(9,239
 
 
(3,654
 
 
23,663
 
  (3,054  6,624 
    
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Ending balance
      205,339   82,710   199,000   109,453   232,645   133,953 
    
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
9.
Financial Assets at Fair Value through Profit or Loss
 
(1)
Financial assets at fair value through profit or loss as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
       
In millions of won
 
Financial assets at fair value through profit or loss
          
Beneficiary Certificate
  
 
  
 
294
 
  
 
121,406
 
   130,363    107,252 
Cooperative
    
 
 
  
 
6,329
 
       6,735 
Others (*)
    
 
3,181,497
 
  
 
173,386
 
   1,923,658    376,602 
    
 
 
   
 
 
   
 
 
   
 
 
 
     3,181,791    301,121    2,054,021    490,589 
    
 
 
   
 
 
   
 
 
   
 
 
 
Financial assets designated as at fair value through profit or loss
          
Debt with embedded derivatives
         226,596        166,675 
    
 
 
   
 
 
   
 
 
   
 
 
 
      3,181,791    527,717    2,054,021    657,264 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
(*)
‘Other’ includes MMT which is composed of government bonds, RP(Repurchase Paper), CP(Commercial Paper), etc.
 
(2)
Details of income (loss) from financial assets at fair value through profit or loss for the years ended December 31, 2022 and 2023 are as f
ollows:
 
       
2022
   
2023
 
       
In millions of won
 
Beneficiary Certificate
  
 
  
 
4,527
 
   (59
Cooperative
    
 
120
 
   272 
Debt with embedded derivatives
    
 
946
 
   2,934 
Others
    
 
27,068
 
   207,984 
    
 
 
   
 
 
 
      32,661    211,131 
    
 
 
   
 
 
 
 
F-48

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income
 
(1)
Changes in financial assets at fair value through other comprehensive income for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Beginning
balance
   
Acquisition
   
Disposal
  
Valuation
  
Others
  
Ending

balance
 
       
In millions of won
 
Equity securities
           
Listed
      273,826           28,585   (2,354  300,057 
Unlisted
     160,790    9,451       33,237   (1,235  202,243 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
     434,616    9,451       61,822   (3,589  502,300 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
Debt securities
           
Corporate bond
     491           38      529 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
     435,107    9,451       61,860   (3,589  502,829 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
Current financial assets at fair value through other comprehensive income
                        
Non-current financial assets at fair value through other comprehensive income
     435,107    9,451       61,860   (3,589  502,829 
       
2023
 
       
Beginning
balance
   
Acquisition
   
Disposal
  
Valuation
  
Others
  
Ending

balance
 
       
In millions of won
 
Equity securities
           
Listed
  
 
  
 
300,057
 
   430       (15,433     285,054 
Unlisted
    
 
202,243
 
   9,550    (5,332  5,445   856   212,762 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
     502,300    9,980    (5,332  (9,988  856   497,816 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
Debt securities
           
Corporate bond
    
 
529
 
   4,080      
 
18
 
 
 
 
 
 
4,627
 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
     502,829    14,060    (5,332  (9,970  856   502,443 
    
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
Current financial assets at fair value through other comprehensive income
                        
Non-current financial assets at fair value through other comprehensive income
    
 
502,829
 
   14,060    (5,332 
 
(9,970
 
 
856
 
 
 
502,443
 
 
F-49

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Listed
      
Korea District Heating Corp.
  2,264,068   19.55    173,201   64,526   64,526 
KG Mobility Co., Ltd. (formerly, Ssangyong Motor Co., Ltd.)
  12,205   0.03   428   107   107 
SM Korea Line Corp.
  180   0.00   1       
Namkwang Engineering & Construction Co., Ltd.
  121   0.00   15       
Bumyang Construction Co., Ltd.
  35   0.00   2       
ELCOMTEC Co., Ltd.
  32,875   0.04   217   34   34 
PAN Ocean Co., Ltd.
  1,492   0.00   14   9   9 
STX Heavy Industries Co., Ltd.
  7,419   0.03   107   54   54 
Codes Combine Co., Ltd.
  291   0.00   1   1   1 
PT Adaro Energy Tbk.
  480,000,000   1.50   65,028   149,503   149,503 
Denison Mines Corp.
  58,284,000   7.09   84,134   84,502   84,502 
Fission Uranium Corp.
  100,000   1.73   41   75   75 
SangSangin Industry Co., Ltd.
  5,831   0.01   38   3   3 
Vitzosys Co., Ltd.
  399   0.00   2       
EMnI Co., Ltd.
  628   0.00   25   3   3 
Vissem electronics, Co., Ltd.
  229   0.00   11   1   1 
KC Industry Co., Ltd.
  139   0.00   6       
Ihsung CNI Co., Ltd.
  142,860   4.81   1,500   1,229   1,229 
Aone Alform Co., Ltd.
  2,672   0.04   19   10   10 
    
 
 
  
 
 
  
 
 
 
     324,790  
 
300,057
 
 
 
300,057
 
    
 
 
  
 
 
  
 
 
 
Unlisted
(*1)
      
Intellectual Discovery Co., Ltd.
  200,000   6.00    5,000   954   954 
Hwan Young Steel Co., Ltd.
  10,916   0.14   1,092   97   97 
SAMBO AUTO. Co., Ltd.
  15,066   0.02   38   38   38 
Mobo Co., Ltd.
  504   0.00   14   14   14 
Dae Kwang Semiconductor Co., Ltd.
  589   0.07   6   6   6 
Sanbon Department Store
  828   0.01   124   3   3 
Miju Steel Mfg. Co., Ltd.
  1,097   0.23   50   50   50 
Sungwon Co., Ltd.
  117   0.07   29   29   29 
IMHWA Corp.
  329   0.11   5   5   5 
DALIM Special Vehicle Co., Ltd.
  58   0.08   10   10   10 
Altron Jeonju Co., Ltd.
  34,846   1.34   697   5   5 
Moonkyung Silica Co., Ltd.
  42   0.56          
Sungkwang Timber Co., Ltd.
  3   0.08   5   5   5 
KS Remicon Co., Ltd.
  12   0.04   3   3   3 
Joongang Platec Co., Ltd.
  3,591   0.75   72   35   35 
Pyungsan SI Co., Ltd.
  434   0.01   4   4   4 
Samgong Development Co., Ltd.
  12   0.01   7   7   7 
Joongang Development Co., Ltd.
  540   0.12   8   8   8 
Newasia Co., Ltd. (formerly, AJS Co., Ltd.)
  12,906   0.23   32   32   32 
MSE Co., Ltd.
  429   0.13   9   9   9 
Ilrim Nano Tec Co., Ltd.
  1,520   0.07   15   15   15 
Ilsuk Co., Ltd.
  152   0.17   10   10   10 
Zyle Daewoo Motor Sales Co., Ltd.
  22   0.00          
Daewoo Development Co., Ltd.
  8   0.00          
Seyang Inc.
  537   0.05   27   30   30 
Seungri Enterprise Co., Ltd.
  93   0.05   3   3   3 
Shin-E P&C Co., Ltd.
  1,569   0.64   110   2   2 
Ejung Ad Co., Ltd.
  132   0.09   3   3   3 
 
F-50

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Solvus Co., Ltd.
  1,056   0.04    3   3   3 
Myung Co., Ltd.
  89   0.05   2   2   2 
Biwang Industry Co., Ltd.
  406   0.04   2   2   2 
Young Sung Co., Ltd.
  89   0.40   26   26   26 
Yuil Industrial Electronics Co., Ltd.
  804   0.32   15   15   15 
Woojin Industry Corporation
  3   0.00   16   16   16 
Kwang Sung Industry Co., Ltd.
  325   0.35   7   7   7 
Futech Mold Co., Ltd.
  274   0.27   14   14   14 
Woojoo Environment Ind. Co., Ltd.
  101   0.11   13   13   13 
Hyungji Esquire Co., Ltd.
  61   0.02   22   22   22 
Morado Co., Ltd.
  209   0.04   2   2   2 
Myung Sung Tex Co., Ltd.
  20   0.00   2   2   2 
Kwang Sung Co., Ltd.
  610   0.53   31   31   31 
Seen Business and Technology Co., Ltd.
  29,424   0.73   148   7   7 
Woobang Construction Co., Ltd.
  8   0.00   8   8   8 
Shin Pyung Co., Ltd.
  6   0.03   3   3   3 
JMC Heavy Industries Co., Ltd.
  2,724   0.10   27   2   2 
Najin Steel Co., Ltd.
  37   0.06   5   5   5 
Sinkwang Industry Co., Ltd.
  1,091   1.68   5   5   5 
Elephant & Friends Co., Ltd.
  563   0.61   3   3   3 
Mireco Co., Ltd.
  109   0.25   11   11   11 
L&K Industry Co., Ltd.
  1,615   0.60   24   24   24 
JO Tech Co., Ltd.
  1,263   0.62   25   25   25 
Kendae Printing Co., Ltd.
  422   0.60   21   21   21 
Dauning Co., Ltd.
  231   0.41   6   6   6 
Korea Trecision Co., Ltd.
  22   0.45   5   5   5 
Hurim Biocell Co., Ltd.
  1,021   0.00   5   5   5 
Smart Power Co., Ltd.
  133,333   4.14   200   200   200 
Sunjin Power Tech Co., Ltd.
  4,941   0.92   247   32   32 
Beer Yeast Korea Inc.
  1,388   0.43   7   7   7 
B CON Co., Ltd.
  96   1.16   6   6   6 
Ace Integration Co., Ltd.
  105   0.09   24   24   24 
AceInti Agricultural Co., Ltd.
  16   0.02   5   5   5 
KyungDong Co., Ltd.
  130   0.01   1   1   1 
ChunWon Development Co., Ltd.
  193   0.19   39   39   39 
SungLim Industrial Co., Ltd.
  29   0.03   1   1   1 
Korea Minerals Co., Ltd.
  191   0.05   134   1   1 
HyoDong Development Co., Ltd.
  128   0.16   25   1   1 
JoHyun Co., Ltd.
  350   1.56   18   18   18 
KC Co., Ltd.
  5,107   0.17   26   26   26 
SeongJi Industrial Co., Ltd.
  41   0.05   1   1   1 
Seyang Precision Ind.Co., Ltd.
  829   0.23   41   41   41 
Dooriwon Food System Co., Ltd.
  13   0.27   1   1   1 
Sung Kwang Co., Ltd.
  23   0.37   6   6   6 
Shinheung petrol. Co., Ltd.
  699   0.14   35   35   35 
Force TEC Co., Ltd.
  3,501   0.02   18   18   18 
Samsung Tech Co., Ltd.
  486   1.28   97   36   36 
Younil Metal Co., Ltd.
  41   0.21   21   21   21 
Sevenvalley JC (formerly, CJ Paradise Co., Ltd.)
  24   0.02   12   12   12 
Han Young Technology Company Co., Ltd.
  35   0.00          
 
F-51

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Ptotronics Co., Ltd.
  843   0.42    84   6   6 
NFT Co., Ltd.
  136   0.40   8   8   8 
Hyundaitech Co., Ltd.
  1,363   0.87   27   27   27 
Dasan Material Co., Ltd.
  29   0.04   22   22   22 
Fish World Co., Ltd.
  47   0.21   2   2   2 
SG Shinsung Engineering and Construction Co., Ltd.
  10   0.00   6       
Samdo Industry Electric Co., Ltd.
  48   0.02   1   1   1 
Taejung Industries Co., Ltd.
  9,268   0.30   5   5   5 
Shinsei Trading Co., Ltd.
  64   0.72   6   6   6 
Dynamic Co., Ltd.
  111   0.19   3   3   3 
Green Alchemy Co., Ltd.
  38,202   1.48   191   17   17 
Youone TBM Engineering & Construction Co., Ltd.
  615   0.27   31   31   31 
KM Leatech Co., Ltd.
  1,648   0.98   8   8   8 
Semist Co., Ltd.
  555   0.80   3   3   3 
Sewon Bus Co., Ltd
  12   0.00          
Enertec Co., Ltd.
  7,937   0.19   44   44   44 
Sangji Co., Ltd.
  20   0.26   4   4   4 
Bellie Doughnuts Co., Ltd.
  169   0.19   10   10   10 
AIRTECH Information communication Co., Ltd.
  2,379   0.60   12   12   12 
Kiscom Co., Ltd.
  1,493   0.04   1   1   1 
Set Holding (*2)
  1,100,220   2.50   229,255   163,580   163,580 
Choheung packing Co., Ltd.
  61   0.13   12   12   12 
Jaewoo Co., Ltd.
  359   0.24   11   11   11 
Wooyang HC Co., Ltd
  1,375   0.01   159   13   13 
TheYeonriji Co., Ltd.
  116   0.10   6   6   6 
Flusys Co., Ltd.
  9   0.08   2   2   2 
DongSeo Electronics Co., Ltd.
  347   0.07   17   17   17 
Daewoo Display Co., Ltd.
  177   0.03   5   5   5 
NTS Co., Ltd.
  143   0.22   36   36   36 
AID CO., Ltd.
  1,212   0.57   36   36   36 
Changwon Eco-friendly farming Corp.
  3   0.01          
Kumo Hitech Co., Ltd.
  6,697   0.53   100   32   32 
Kyung Pyo Industry Co., Ltd.
  186   0.76   19   19   19 
Doosung Heavy Industries Co., Ltd.
  53   0.06   5   5   5 
Samjoo Hightech Co., Ltd.
  522   0.08   3   3   3 
Samkwang Chemical Co., Ltd.
  204   1.27   51   51   51 
Shinseung Chemical Industy Co., Ltd.
  5   0.01   60       
KJ Alloy Co., Ltd.
  368   0.20   7   7   7 
SM Hi-tech Co., Ltd.
  22   0.39   22   22   22 
Puruen Environment Co., Ltd.
  967   1.34   19   19   19 
Miretech Co., Ltd.
  9,111   0.27   18   18   18 
Sejin Hightech Co., Ltd.
  17,980   0.16   18   18   18 
Eun Sung Enterprise Co., Ltd.
  1,131   0.72   17   17   17 
Shinyoung Textiles Co., Ltd.
  523   1.01   52   23   23 
Ilwoo Steel Co., Ltd.
  41   0.28   17   17   17 
Dong-un Tech Co., Ltd.
  1,159   6.28   81   34   34 
Wongwang Door Corp.
  575   1.00   29   29   29 
Mansu Co., Ltd.
  344   0.25   15   15   15 
Eanskorea Co., Ltd.
  39   0.05   2   2   2 
Youngdongseafood Co., Ltd.
  165   0.33   8   8   8 
 
F-52

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Hyunwoo Winstar Co., Ltd.
  1   0.00           
Sungchang Tech Co., Ltd.
  159   0.31   19   19   19 
Yuchang Industry Co., Ltd.
  90   0.11   5   5   5 
Jeongpum Co., Ltd.
  322   0.35   16   16   16 
Korea Steel Power Co., Ltd.
  2,761   1.88   55   2   2 
Amanex Co., Ltd.
  10   0.02   9   9   9 
Dae-A Leisure Co., Ltd.
  23   0.00   4   4   4 
Caffe Bene Co., Ltd.
  1,908   0.03   9   9   9 
Shinjin International Corp.
  4   0.01   1   1   1 
Jinhung Packaging Co., Ltd
  4,329   3.02   22   22   22 
Donglim Eng Co., Ltd.
  26   0.11   3   3   3 
SIP Co., Ltd.
  274   0.55   7   7   7 
Clizen Co., Ltd.
  615   0.34   31   31   31 
Daeji Product Co., Ltd.
  15   0.05   1       
SSET Co., Ltd.
  181   0.30   18   18   18 
Sewon PM Tech Co., Ltd.
  963   1.11   48   48   48 
Dawon Yuhwa Co., Ltd.
  506   1.94   25   25   25 
Ogokbaekkwa Co., Ltd.
  101   0.12   1   1   1 
Ewon materials Co., Ltd. (formerly, Shinwoo Toptech Co., Ltd.)
  834   0.51   83   6   6 
KMLC Co., Ltd.
  281   0.14   22   22   22 
Seinfood Co., Ltd.
  13   0.17   7   7   7 
TaeSung Eco-Tech. Co., Ltd.
  1,368   4.55   34   34   34 
Kukex Inc.
  639   0.05   3   3   3 
Youngshin Plus Co., Ltd.
  104   0.12   5   5   5 
Chang won Engineering Co., Ltd.
  22   0.00   4   4   4 
Samsung Silup Co., Ltd.
  47   0.19   5   5   5 
Samwon Bio Tech Co., Ltd.
  390   0.25   6   6   6 
IZU KOREA Co., Ltd.
  48   0.00   2   2   2 
Dongdo CNP Co., Ltd.
  234   0.36   6   6   6 
Dae Bang Industry Co., Ltd.
  115   0.13   6   6   6 
S.I.T. Co., Ltd
  2,213   0.44   22   22   22 
Taejin Hiech Co., Ltd.
  78   0.26   3   3   3 
Headone Co., Ltd.
  69   0.12   7   7   7 
E-Won Solutech Co., Ltd.
  158   0.16   40   40   40 
KPL Circuit Co., Ltd.
  283   0.08   14   14   14 
Road Solar Co., Ltd.
  12   0.00          
Han Mi Flexible Co., Ltd.
  143   0.20   43   43   43 
Millennium PNT Co., Ltd.
  227   0.37   6   6   6 
GN Chem Co., Ltd.
  40   0.07   1   1   1 
Dae Myung Co., Ltd.
  114   0.08   3   3   3 
Nanomicart Co., Ltd.
  176   1.06   35   35   35 
Young San Heavy Industries Co., Ltd.
  74   0.11   7   7   7 
Samchungwon Co., Ltd.
  15   0.24   2   2   2 
Wooyang Frozen Foods Co., Ltd.
  66   0.82   27   27   27 
Nanomic Co., Ltd.
  94   0.63   38   38   38 
Samsung Nonferrous Metal Co., Ltd.
  89   0.26   9   9   9 
Daewha Fuel Pump Ind., Ltd.
  83   0.05   10   10   10 
Addies Direct Co., Ltd.
  1   0.00          
WorldCnM Inc.
  131   1.09   10   10   10 
Superone Co., Ltd.
  1,585   1.45   8   8   8 
 
F-53

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Buyoung Panji Co., Ltd.
  478   0.44    12   12   12 
International Paint Korea Co., Ltd.
  111   0.48   11   11   11 
EI Lighting Co., Ltd.
  358   0.36   18   18   18 
Hightech Mnp Co., Ltd.
  123   0.35   6   6   6 
Yooseung Co., Ltd.
  10   0.08   1   1   1 
Sungkwang Co., Ltd.
  48   0.35   2   2   2 
Taeyang gasteel Co., Ltd.
  8   0.02   1   1   1 
Ajin KSB Co., Ltd.
  204   0.31   18   18   18 
Sewon Ceramic Co., Ltd.
  530   1.01   5   5   5 
Choyang Tech Co., Ltd.
  465   1.01   23   23   23 
TK Co., Ltd.
  307   0.70   15   15   15 
Arari Co., Ltd.
  14   0.05   1   1   1 
C&S Corporation Co., Ltd.
  1,304   0.01   13   13   13 
Global The One of Korea Co., Ltd.
  62   0.06   3   3   3 
Steellife Co., Ltd.
  85   0.06   4   4   4 
D&C Castech Co., Ltd.
  330   1.89   25   25   25 
Geumhan Co., Ltd.
  498   0.24   7   7   7 
Mokgan Co., Ltd.
  5   0.02   1   1   1 
Wenex Co., Ltd.
  373   0.53   19   19   19 
Sulim Co., Ltd.
  30   0.20   6   6   6 
Shinkwang Engineering
  24   0.36   2   2   2 
Ek Cookware Co., Ltd.
  60   0.04   1   1   1 
KTTW Co., Ltd.
  28   0.05   2   2   2 
Avajar Co., Ltd.
  1,061   0.01   1   1   1 
Woosung I.B. Co., Ltd
  7,071   0.07   14   14   14 
CAP Korea Co., Ltd.
  16   0.30   3   3   3 
MSM Co., Ltd.
  25   0.08          
Ddpopstyle Co., Ltd.
  22   0.14   1   1   1 
Finemetal Co., Ltd.
  49   0.08   1   1   1 
Sungkyeong Co., Ltd.
  52   0.24   2   2   2 
RMK Co., Ltd.
  63   0.90   22   22   22 
Newko Co., Ltd.
  331   0.06   10   10   10 
Dongsung Mulsan Co., Ltd.
  137   0.34   14   14   14 
Pizzakorea Co., Ltd.
  42   0.18   9   9   9 
Geumdani Co., Ltd.
  2,377   1.82   36   36   36 
Mezzanine I-pack Co., Ltd.
  38   0.02   1   1   1 
Ltop Co., Ltd.
  36   0.06   7   7   7 
Simile Aluminium Co., Ltd.
  428   0.31   9   9   9 
GT Tooling Co., Ltd.
  604   0.17   6   6   6 
Team Korea Co., Ltd.
  4,782   0.37   24   24   24 
Donghwa TCA Co., Ltd.
  1,012   0.30   25   25   25 
Hankook Piaget Co., Ltd.
  4   0.01   1   1   1 
Coco Food Co., Ltd.
  648   1.24   33   33   33 
Woori Industry Co., Ltd.
  102   1.05   21   21   21 
Ssangyong Youngweol Plant Service&Engineering Co., Ltd.
  83   0.07   4   1   1 
SH Co., Ltd.
  39   0.20   8   8   8 
Daeyoung Co., Ltd.
  75   0.01   8   8   8 
Chandown Food Co., Ltd.
  46   0.14   9   9   9 
Getron Co., Ltd.
  7,259   0.20   37   4   4 
 
F-54

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Jungmun Co., Ltd.
  19   0.26    2   2   2 
Andong Trading Corporation Co., Ltd.
  42   0.00   2   2   2 
JM Tech Co., Ltd.
  403   0.67   82   10   10 
SGC Energy Co., Ltd.
  580,000   5.00   2,900   7,856   7,856 
Le Soleil KHNP LLC
  137,600   19.00   1,376   1,376   1,376 
Ihsung CNI Co., Ltd.
  127,660   4.30   1,500   2,016   2,016 
H Robotics Co., Ltd.
  903,601   8.05   4,000   5,638   5,638 
Good Tcells Co., Ltd.
  11,364   0.34   500   347   347 
IPS Bio Co., Ltd.
  1,975   3.13   1,000   843   843 
Nine B Co., Ltd.
  5,000   4.96   1,000   1,000   1,000 
Choigang-gujo Co., Ltd.
  61   0.45   6   1   1 
Youngheung Industry Co., Ltd.
  101   0.05   5   1   1 
Hosungsteel Co., Ltd.
  323   0.26   14   3   3 
Uktae IND. Co., Ltd.
  140   0.12   7   1   1 
JFC Co., Ltd.
  16   0.01   2   2   2 
Hyundai Tech Co., Ltd.
  28   0.69   10   10   10 
Daeil Co., Ltd.
  301   0.42   15   2   2 
Seohan Food Co., Ltd.
  83   0.19   2   2   2 
Daehyeon Recycle Co., Ltd.
  59   0.61   12   12   12 
Metal Link Inc. Co., Ltd.
  709   0.17   35   4   4 
Pipetec Korea Co., Ltd.
  50   0.07   10   1   1 
SungJin Tech Co., Ltd.
  803   1.20   24   8   8 
Yujin E&C Co., Ltd.
  29   0.18   6       
Daishin Logistics Co., Ltd.
  13   0.09   1   1   1 
JinSung Engineering Co., Ltd.
  18   0.30   18   18   18 
Yongho Industry Co., Ltd.
  157   0.22   32   1   1 
Wow tech Co., Ltd.
  369   0.75   11   11   11 
World Power Tech Co., Ltd.
  16   0.28   24   24   24 
PBM Auto Co., Ltd.
  1,001   1.06   10   10   10 
K2 Motors Co., Ltd.
  54   0.28   1   1   1 
CL Tech Co., Ltd.
  801   2.25   40   40   40 
Mirae Industry Co., Ltd.
  39   0.04   6   6   6 
Gentak Korea Co., Ltd.
  301   0.31   8   8   8 
Sungjin Chemical Co., Ltd.
  118   0.36   4   4   4 
LMAT Co., Ltd.
  198   0.04   20   20   20 
Poong Lim Industrial Co., Ltd.
  25   0.00   38   38   38 
Dae Sung GeoTech Co., Ltd.
  631   1.28   32   32   32 
Saeheemang Co., Ltd.
  756   0.60   15   15   15 
Hakbong Precision Co., Ltd.
  1,460   1.18   15   15   15 
Vornech Co., Ltd.
  431   0.37   11   2   2 
Woojin Formtech Co., Ltd.
  76   0.08   8   1   1 
Korea Engineer Manufacturing Co., Ltd.
  114   0.26   6   1   1 
Sinwa J&K Co., Ltd.
  476   0.28   5   5   5 
Owon E&G Co., Ltd.
  132   0.20   4   4   4 
Guseong Co., Ltd.
  141   0.20   3   3   3 
Irefarm Co., Ltd.
  45   0.30   3   3   3 
Nam-hae E&C Co., Ltd.
  117   0.10   2   2   2 
Haenarae Agricultural Corp.
  15   0.03   2   2   2 
DECO&E Co., Ltd.
  1,261   0.00   2   2   2 
Design Beyond Co.,
Ltd.
  17   0.19   2   2   2 
 
F-55

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
LBK Co., Ltd.
  8   0.05    1   1   1 
Duckwon industrial Co., Ltd.
  32   0.43   13   13   13 
ASPT Co., Ltd.
  64   0.82   19   19   19 
SIMA Co., Ltd.
  29   0.05   3   3   3 
Jingkang Resources Co., Ltd.
  90   1.57   13   13   13 
Eslin Co., Ltd.
  39   0.14   8   8   8 
Shinwon Co., Ltd.
  275   0.42   19   19   19 
CIC Tech Co., Ltd.
  96   0.54   10   10   10 
Orano Expansion
  5,742,405   4.72          
Fourever Co., Ltd.
  44   0.10   4   4   4 
Myungil Metal Co., Ltd.
  80   0.10   4   4   4 
Daeshin ECM Co., Ltd.
  182   0.30   9   9   9 
Greencarbon Co., Ltd.
  79   0.06   1   1   1 
Sunkoo Co., Ltd.
  4   0.10   2   2   2 
Jians Construction Co., Ltd.
  45   0.01   2   4   4 
DH trading Co., Ltd.
  891   0.04   178       
Sangsin Co., Ltd.
  29   0.09   15   15   15 
Steel focus Co., Ltd.
  154   0.20   4   4   4 
Kamada Korea Co., Ltd.
  437   0.33   22   22   22 
Fosys Co., Ltd.
  19   0.08   4   4   4 
GB precision Co., Ltd.
  137   0.57   1   1   1 
Ewon Art Co., Ltd.
  185   0.61   9   9   9 
DI Tech Co., Ltd.
  3   0.00          
Hans AD Co., Ltd.
  33   0.35   2   2   2 
Chaegim Environment Development Co., Ltd.
  158   0.01   3   3   3 
Daesung Stain Co., Ltd.
  32   0.32   2   2   2 
YSM Co., Ltd.
  281   2.07   14   14   14 
Dong In Industry Co., Ltd.
  65   0.13   3   3   3 
U&I Co., Ltd.
  50   0.22   5   5   5 
World One Co., Ltd.
  401   0.58   10   10   10 
Yewon Co., Ltd.
  24   0.02   1       
TSNT Co., Ltd.
  119   0.00   24   24   24 
Shinsung Tech Co., Ltd.
  314   0.01   16   16   16 
JSL Co., Ltd.
  51   0.49   3   3   3 
Loft Garden Co., Ltd.
  1   0.04          
Handon Co., Ltd.
  74   0.25   11   11   11 
GH Tech Co., Ltd.
  82   0.22   3   3   3 
Daeo Co., Ltd.
  13   0.23   4   4   4 
Bokwang Co., Ltd.
  76   0.00   15   15   15 
Samkum Industry Co., Ltd.
  201   0.48   40   40   40 
Dyntex Korea Co., Ltd.
  75   0.28   15   15   15 
Mirae Engineering Co., Ltd.
  66   0.15   1   1   1 
Mideumeul-juneun-namu Co., Ltd.
  119   0.53   6   6   6 
Seil Textile Co., Ltd.
  16   0.15   3   3   3 
Ilshin Tech Co., Ltd.
  36   0.00   7   7   7 
Magtec Co., Ltd.
  28   0.00   6   6   6 
Sukwon Co., Ltd.
  2,885   0.59   29   29   29 
Hae-sung Metal Co., Ltd.
  159   0.17   3   3   3 
White&Clean Foods Co., Ltd.
  330   0.00   3   3   3 
 
F-56

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Michang Cable Co., Ltd.
  1,096   0.26    16   16   16 
G.M Foods Co., Ltd.
  57   0.16   9   9   9 
Wecan Global Inc. Co., Ltd.
  165   0.08   8   8   8 
Daeju Steel Co., Ltd.
  11   0.20   1   1   1 
Hyundai Glass Co., Ltd.
  860   0.83   43   43   43 
MEC Co., Ltd.
  16,468   1.17   41   41   41 
Daeyeoneco Co., Ltd.
  151   0.00   15   15   15 
Hyesung Cable&Communication Inc.
  762   0.39   38   38   38 
Sangjin Co., Ltd.
  428   0.35   21   21   21 
Topis Co., Ltd.
  246   0.71   14   14   14 
G&L Tech Co., Ltd.
  2   0.06          
Cheonhae Co., Ltd.
  72   0.00   2   2   2 
Iksan-guwon Co., Ltd.
  563   0.00   11   11   11 
Korea Remicon Co., Ltd.
  36   0.03   5   5   5 
New Tech Co., Ltd.
  23   0.15   2   2   2 
Segeon Co., Ltd.
  124   0.00   4   4   4 
MS Tech Co., Ltd.
  9   0.15   1   1   1 
J.I Steel Co., Ltd.
  21   0.00   2   2   2 
HNT Co., Ltd.
  172   0.00   9   9   9 
Taejin Co., Ltd.
  27   0.08   3   3   3 
Macroad Co., Ltd.
  953   0.17   10   10   10 
Woongjin Energy Co., Ltd.
  94   0.00   9   9   9 
Electric Contractors’ Financial Cooperative Co., Ltd.
         39   39   39 
Information&Communication Financial Cooperative Co., Ltd.
         15   15   15 
Common Computer Co., Ltd.
  3,856   1.87   1,000   1,000   1,000 
Fine Powerex Co., Ltd.
  72,633   4.92   1,500   1,500   1,500 
Eunsung Industrial Co., Ltd.
  3   0.03   1   1   1 
KPE Co., Ltd.
  51   0.19   13   13   13 
Dongbangfarms Co., Ltd.
  904   0.55   41   5   5 
Sungdo Pack Co., Ltd.
  15   0.06   1   1   1 
Coffeenie Co., Ltd.
  2   0.00   1   1   1 
Medi Pharma Plan Co., Ltd.
  1,075   0.26   108   8   8 
Woori Ascon Co., Ltd.
  25   0.34   10   10   10 
Dong Shin Hydraulies Co., Ltd.
  9,460   0.14   47   47   47 
Cheonwoo E.P.S Co., Ltd.
  371   1.10   19   19   19 
Koa Tech Co., Ltd.
  1,244   0.77   12   12   12 
Jinwoo Textile Co., Ltd.
  91   0.68   9   9   9 
SKE Cable Co., Ltd.
  120   0.08   6   6   6 
Hi Korea Co., Ltd.
  1,845   1.94   185   185   185 
Daeheung Engineering Co., Ltd.
  65   0.01   1   1   1 
Etapol Co., Ltd.
  1,361   0.54   41   41   41 
Yoongwon International Co., Ltd.
  157   1.47   31   31   31 
Avoh Ceramic&Bath Co., Ltd.
  173   0.14   3   3   3 
Dongyang R.P.F. Industrial Co., Ltd.
  59   0.03   2   2   2 
Yuil Engineering Co., Ltd.
  14   0.03   1   1   1 
Taesan Co., Ltd.
  146   0.69   35   35   35 
Jico Co., Ltd.
  10,581   0.01   26   26   26 
K Shipbuilding Co., Ltd.
  8,622   0.25   1,078   1,078   1,078 
 
F-57

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
Seokjin E&T Co., Ltd.
  81   0.06    8   8   8 
Agencore Co., Ltd.
  104,350   5.67   1,200   1,200   1,200 
SamHong Machinery. EMC Co., Ltd.
  476,192   19.23   5,000   5,000   5,000 
Thermo Tec Co., Ltd.
  446   0.03   4   4   4 
DaeYang Hydro Co., Ltd.
  6   0.02   1   1   1 
SangMoo Steel Co., Ltd.
  24   0.04   2   2   2 
Jungin Distribution Co., Ltd.
  17   0.00   3   3   3 
TheSun Co., Ltd.
  77   0.06   1   1   1 
Daedong Co., Ltd.
  176   0.33   18   18   18 
Daewoong and Technology Co., Ltd.
  423   1.14   42   42   42 
Ebadom Co., Ltd.
  361   0.21   58   58   58 
ChoungHwa Precise Co., Ltd.
  428   0.08   43   4   4 
Snopa Co., Ltd.
  458   0.01   5   5   5 
Aloha Factory Co., Ltd.
  2,970   3.61   1,000   1,000   1,000 
Dailyshot Co., Ltd.
  339   1.85   1,001   1,001   1,001 
 
Mediquitous Co., Ltd.
  5,080   0.69   1,250   1,250   1,250 
SKD Korea Co., Ltd.
  40   0.28   20   20   20 
Samhyup Co., Ltd.
  376   0.91   38   38   38 
Gogang Aluminum Co., Ltd.
  828   1.52   41   41   41 
Taekwang Paper Board Co., Ltd.
  133   0.49   23   23   23 
NY Tech Co., Ltd.
  33   0.15   2   2   2 
Sekwang Precision Co., Ltd.
  394   0.84   79   79   79 
Dongbang Metal Co., Ltd.
  1,985   0.32   20   20   20 
Samwang Co., Ltd.
  170   0.25   17   17   17 
Yurim CNF Co., Ltd.
  15   0.23   2   2   2 
Guseul Co., Ltd.
  89   0.23   9   9   9 
Gaone International Co., Ltd.
  54   0.29   14   14   14 
Daekwang Forging Co., Ltd.
  1,298   1.99   130   130   130 
Dongyang Pratech Co., Ltd.
  265   1.21   29   29   29 
Samjin Placo Co., Ltd.
  661   0.52   33   33   33 
MS Steel Industrial Co., Ltd.
  167   0.40   8   8   8 
STS Global Co., Ltd.
  9   0.04   1   1   1 
Y Tech Co., Ltd.
  855   0.65   34   34   34 
CK Industry Co., Ltd.
  4,178   7.54   167   167   167 
J&J Tech Co.
  14   0.22   1   1   1 
Shield Board Co., Ltd.
  165   0.15   3   3   3 
SFC International Co., Ltd.
  11   0.01   1   1   1 
Korea Ocean Machinery & Technology Co., Ltd.
  763   0.45   76   76   76 
Hana ITM Inc.
  8,443   0.70   84   84   84 
Jeuvis Co., Ltd.
  191   0.30   2   2   2 
JBM Co., Ltd.
  662   0.34   20   20   20 
Jungwoo Metal Solution Co., Ltd.
  27   0.08   2   2   2 
MS Precision Co., Ltd.
  220   0.16   22   22   22 
YM Tech Co., Ltd.
  2   0.01   1   1   1 
C&C ENG Co., Ltd.
  439   1.59   22   22   22 
Minjin Co., Ltd.
  24   0.01   1   1   1 
Daejoo E&G Co., Ltd.
  133   0.00   27   27   27 
Taeyoung Precision Co., Ltd.
  31   0.22   1   1   1 
Shin Heung Precision Co., Ltd.
  93   4.63   4   4   4 
 
F-58

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
  
2022
 
  
Shares
  
Ownership
     
Acquisition cost
  
Book value
  
Fair value
 
           
In millions of won
 
TaeGwang P&C Co., Ltd.
  530   0.90    13   13   13 
KyeongGwang Tech Co., Ltd.
  244   1.04   7   7   7 
    
 
 
  
 
 
  
 
 
 
     269,065   202,243   202,243 
    
 
 
  
 
 
  
 
 
 
Debt securities
    
Aron Flying Ship Co., Ltd. (*1)
         500   529   529 
    
 
 
  
 
 
  
 
 
 
      594,355   502,829   502,829 
    
 
 
  
 
 
  
 
 
 
 
 (*1)
The Company used initial cost as their fair value because there was not enough information to determine fair value, and the range of the estimated fair value is wide.
 
 (*2)
The Company has estimated the fair value of Set Holding by using the discounted cash flow method and has recognized the difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the year ended December 31, 2022.
 
F-59

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Listed
           
Korea District Heating Corp.
   2,264,068    19.55     173,201    55,356    55,356 
KG Mobility Co., Ltd. (formerly, Ssangyong Motor Co., Ltd.)
   12,205    0.01    428    106    106 
SM Korea Line Corp.
   180    0.00    1         
Namkwang Engineering & Construction Co., Ltd.
   46    0.00    15         
Bumyang Construction Co., Ltd.
   35    0.00    2         
ELCOMTEC Co., Ltd.
   32,875    0.04    217    43    43 
PAN Ocean Co., Ltd.
   1,492    0.00    14    6    6 
STX Heavy Industries Co., Ltd.
   68,874    0.24    537    806    806 
Codes Combine Co., Ltd.
   291    0.00    1    1    1 
PT Adaro Energy Tbk.
   480,000,000    1.50    65,028    95,505    95,505 
Denison Mines Corp.
   58,284,000    6.54    84,134    131,790    131,790 
Fission Uranium Corp.
   100,000    0.01    41    105    105 
SangSangin Industry Co., Ltd.
   1,457    0.01    38    3    3 
Vitzrosys Co., Ltd.
   399    0.00    2         
EMnI Co., Ltd.
   628    0.00    25    1    1 
Vissem electronics, Co., Ltd.
   301    0.00    11    1    1 
KC Industry Co., Ltd.
   139    0.00    6         
Aone Alform Co., Ltd.
   2,672    0.04    19    4    4 
Ihsung CNI Co., Ltd.
   142,860    4.81    1,500    1,327    1,327 
BDI Co., Ltd. (*3)
   6,390,478    32.54             
       
 
 
   
 
 
   
 
 
 
        325,220    285,054    285,054 
       
 
 
   
 
 
   
 
 
 
Unlisted (*1)
           
Hwan Young Steel Co., Ltd.
   10,916    0.14     1,092    97    97 
SAMBO AUTO. Co., Ltd.
   15,066    0.02    38    38    38 
Mobo Co., Ltd.
   504    0.00    14    14    14 
Dae Kwang Semiconductor Co., Ltd.
   589    0.07    6    6    6 
Sanbon Department Store
   828    0.01    124    3    3 
Miju Steel Mfg. Co., Ltd.
   1,097    0.23    50    50    50 
Sungwon Co., Ltd.
   117    0.07    29    29    29 
IMHWA Corp.
   329    0.11    5    5    5 
DALIM Special Vehicle Co., Ltd.
   58    0.08    10    10    10 
Moonkyung Silica Co., Ltd.
   42    0.56             
Sungkwang Timber Co., Ltd.
   3    0.08    5    5    5 
KS Remicon Co., Ltd.
   12    0.04    3    3    3 
Joongang Platec Co., Ltd.
   3,591    0.75    72    35    35 
Pyungsan SI Co., Ltd.
   434    0.01    4    4    4 
Samgong Development Co., Ltd.
   12    0.01    7    7    7 
Joongang Development Co., Ltd.
   540    0.12    8    8    8 
Newasia Co., Ltd. (formerly, AJS Co., Ltd.)
   12,906    0.23    32    32    32 
MSE Co., Ltd.
   429    0.13    9    9    9 
Ilrim Nano Tec Co., Ltd.
   1,520    0.07    15    15    15 
Ilsuk Co., Ltd.
   152    0.17    10    10    10 
Zyle Daewoo Motor Sales Co., Ltd.
   22    0.00             
Daewoo Development Co., Ltd.
   8    0.00             
Seyang Inc.
   537    0.05    27    30    30 
Seungri Enterprise Co., Ltd.
   93    0.05    3    3    3 
Shin-E
P&C Co., Ltd.
   1,569    0.64    110    2    2 
Ejung Ad Co., Ltd.
   132    0.09    3    3    3 
Solvus Co., Ltd.
   1,056    0.04    3    3    3 
Myung Co., Ltd.
   89    0.05    2    2    2 
 
F-60

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Biwang Industry Co., Ltd.
   406    0.04     2    2    2 
Young Sung Co., Ltd.
   89    0.40    26    26    26 
Yuil Industrial Electronics Co., Ltd.
   804    0.32    15    15    15 
Woojin Industry Corporation
   3    0.00    16    16    16 
Kwang Sung Industry Co., Ltd.
   325    0.35    7    7    7 
Futech Mold Co., Ltd.
   274    0.27    14    14    14 
Woojoo Environment Ind. Co., Ltd.
   101    0.11    13    13    13 
Hyungji Esquire Co., Ltd.
   61    0.02    22    22    22 
Morado Co., Ltd.
   209    0.04    2    2    2 
Myung Sung Tex Co., Ltd.
   20    0.00    2    2    2 
Kwang Sung Co., Ltd.
   610    0.53    31    31    31 
Seen Business and Technology co., Ltd.
   29,424    0.73    148    7    7 
Woobang Construction Co., Ltd.
   8    0.00    8    8    8 
Shin Pyung Co., Ltd.
   6    0.03    3    3    3 
JMC Heavy Industries Co., Ltd.
   2,724    0.10    27    2    2 
Najin Steel Co., Ltd.
   37    0.06    5    5    5 
Sinkwang Industry Co., Ltd.
   1,091    1.68    5    5    5 
Elephant & Friends Co., Ltd.
   563    0.61    3    3    3 
Mireco Co., Ltd.
   109    0.25    11    11    11 
L&K Industry Co., Ltd.
   1,615    0.60    24    24    24 
JO Tech Co., Ltd.
   1,263    0.62    25    25    25 
Kendae Printing Co., Ltd.
   422    0.60    21    21    21 
Dauning Co., Ltd.
   231    0.41    6    6    6 
Korea Trecision Co., Ltd.
   22    0.45    5    5    5 
Hurim Biocell Co., Ltd.
   1,021    0.00    5    5    5 
Sunjin Power Tech Co., Ltd.
   4,941    0.92    247    32    32 
Beer Yeast Korea Inc.
   1,388    0.43    7    7    7 
B CON Co., Ltd.
   96    1.16    6    6    6 
Ace Integration Co., Ltd.
   105    0.09    24    24    24 
AceInti Agricultural Co., Ltd.
   16    0.02    5    5    5 
KyungDong Co., Ltd.
   130    0.01    1    1    1 
ChunWon Development Co., Ltd.
   193    0.19    39    39    39 
SungLim Industrial Co., Ltd.
   29    0.03    1    1    1 
Korea Minerals Co., Ltd.
   191    0.05    134    1    1 
HyoDong Development Co., Ltd.
   128    0.16    25    1    1 
JoHyun Co., Ltd.
   350    1.56    18    18    18 
KC Co., Ltd.
   5,107    0.17    26    26    26 
SeongJi Industrial Co., Ltd.
   41    0.05    1    1    1 
Seyang Precision Ind.Co., Ltd.
   829    0.23    41    41    41 
Dooriwon Food System Co., Ltd.
   13    0.27    1    1    1 
Sung Kwang Co., Ltd.
   23    0.37    6    6    6 
Shinheung petrol. Co., Ltd.
   699    0.14    35    35    35 
Samsung Tech Co., Ltd.
   486    1.28    97    36    36 
Younil Metal Co., Ltd.
   41    0.21    21    21    21 
Sevenvalley JC (formerly, CJ Paradise Co., Ltd.)
   24    0.02    12    12    12 
Han Young Technology Company Co., Ltd.
   35    0.00             
Ptotronics Co., Ltd.
   843    0.42    84    6    6 
NFT Co., Ltd.
   136    0.40    8    8    8 
Hyundaitech Co., Ltd.
   1,363    0.87    27    27    27 
Dasan Material Co., Ltd.
   29    0.04    22    22    22 
 
F-61

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Fish World Co., Ltd.
   47    0.21     2    2    2 
SG Shinsung Engineering and Construction Co., Ltd.
   10    0.00    6         
Samdo Industry Electric Co., Ltd.
   48    0.02    1    1    1 
Taejung Industries Co., Ltd.
   9,268    0.30    5    5    5 
Shinsei Trading Co., Ltd.
   64    0.72    6    6    6 
Dynamic Co., Ltd.
   111    0.19    3    3    3 
Green Alchemy Co., Ltd.
   38,202    1.48    191    17    17 
KM Leatech Co., Ltd.
   1,648    0.98    8    8    8 
Semist Co., Ltd.
   555    0.80    3    3    3 
Sewon Bus Co., Ltd.
   12    0.00             
Enertec Co., Ltd.
   7,937    0.19    44    44    44 
Sangji Co., Ltd.
   20    0.26    4    4    4 
Bellie Doughnuts Co., Ltd.
   169    0.19    10    10    10 
Set Holding (*2)
   1,100,220    2.50    229,255    165,923    165,923 
Choheung packing Co., Ltd.
   61    0.13    12    12    12 
Jaewoo Co., Ltd.
   359    0.24    11    11    11 
Wooyang HC Co., Ltd
   1,375    0.01    159    13    13 
TheYeonriji Co., Ltd.
   116    0.10    6    6    6 
Flusys Co., Ltd.
   9    0.08    2    2    2 
DongSeo Electronics Co., Ltd.
   347    0.07    17    17    17 
Daewoo Display Co., Ltd.
   177    0.03    5    5    5 
NTS Co., Ltd.
   143    0.22    36    36    36 
AID CO., Ltd.
   1,212    0.57    36    36    36 
Changwon Eco-friendly farming Corp.
   3    0.01             
Kumo Hitech Co., Ltd.
   6,697    0.53    100    32    32 
Kyung Pyo Industry Co., Ltd.
   186    0.76    19    19    19 
Doosung Heavy Industries Co., Ltd.
   53    0.06    5    5    5 
Samjoo Hightech Co., Ltd.
   522    0.08    3    3    3 
Samkwang Chemical Co., Ltd.
   204    1.27    51    51    51 
Shinseung Chemical Industy Co., Ltd.
   5    0.01    60         
KJ Alloy Co., Ltd.
   368    0.20    7    7    7 
SM Hi-tech Co., Ltd.
   22    0.39    22    22    22 
Puruen Environment Co., Ltd.
   967    1.34    19    19    19 
Miretech Co., Ltd.
   9,111    0.27    18    18    18 
Sejin Hightech Co., Ltd.
   17,980    0.16    18    18    18 
Eun Sung Enterprise Co., Ltd.
   1,131    0.72    17    17    17 
Shinyoung Textiles Co., Ltd.
   523    1.01    52    23    23 
Ilwoo Steel Co., Ltd.
   41    0.28    17    17    17 
Dong-un Tech Co., Ltd.
   1,159    6.28    81    34    34 
Wongwang Door Corp.
   575    1.00    29    29    29 
Mansu Co., Ltd.
   344    0.25    15    15    15 
Eanskorea Co., Ltd.
   39    0.05    2    2    2 
Youngdongseafood Co., Ltd.
   165    0.33    8    8    8 
Hyunwoo Winstar Co., Ltd.
   1    0.00             
Sungchang Tech Co., Ltd.
   159    0.31    19    19    19 
Yuchang Industry Co., Ltd.
   90    0.11    5    5    5 
Jeongpum Co., Ltd.
   322    0.35    16    16    16 
Korea Steel Power Co., Ltd.
   2,761    1.88    55    2    2 
Amanex Co., Ltd.
   10    0.02    9    9    9 
Dae-A Leisure Co., Ltd.
   23    0.00    4    4    4 
 
F-62

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Caffe Bene Co., Ltd.
   1,908    0.03     9    9    9 
Jinhung Packaging Co., Ltd.
   4,329    3.02    22    22    22 
Donglim Eng Co., Ltd.
   26    0.11    3    3    3 
SIP Co., Ltd.
   274    0.55    7    7    7 
Daeji Product Co., Ltd.
   15    0.05    1         
SSET Co., Ltd.
   181    0.30    18    18    18 
Sewon PM Tech Co., Ltd.
   963    1.11    48    48    48 
Dawon Yuhwa Co., Ltd.
   506    1.94    25    25    25 
Ewon materials Co., Ltd. (formerly, Shinwoo Toptech Co., Ltd.)
   834    0.51    83    6    6 
KMLC Co., Ltd.
   281    0.14    22    22    22 
Seinfood Co., Ltd.
   13    0.17    7    7    7 
TaeSung Eco-Tech. Co., Ltd.
   1,368    4.55    34    34    34 
Kukex Inc.
   639    0.05    3    3    3 
Youngshin Plus Co., Ltd.
   104    0.12    5    5    5 
Chang won Engineering Co., Ltd.
   22    0.00    4    4    4 
Samsung Silup Co., Ltd.
   47    0.19    5    5    5 
Samwon Bio Tech Co., Ltd.
   390    0.25    6    6    6 
IZU KOREA Co., Ltd.
   48    0.00    2    2    2 
Dongdo CNP Co., Ltd.
   234    0.36    6    6    6 
S.I.T. Co., Ltd
   2,213    0.44    22    22    22 
Taejin Hiech Co., Ltd.
   78    0.26    3    3    3 
Headone Co., Ltd.
   69    0.12    7    7    7 
E-Won Solutech Co., Ltd.
   158    0.16    40    40    40 
KPL Circuit Co., Ltd.
   283    0.08    14    14    14 
Road Solar Co., Ltd.
   12    0.00             
Han Mi Flexible Co., Ltd.
   143    0.20    43    43    43 
Millennium PNT Co., Ltd.
   227    0.37    6    6    6 
Dae Myung Co., Ltd.
   114    0.08    3    3    3 
Young San Heavy Industries Co., Ltd.
   74    0.11    7    7    7 
Samchungwon Co., Ltd.
   15    0.24    2    2    2 
Wooyang Frozen Foods Co., Ltd.
   66    0.82    27    27    27 
Nanomic Co., Ltd.
   94    0.63    38    38    38 
Samsung Nonferrous Metal Co., Ltd.
   89    0.26    9    9    9 
Daewha Fuel Pump Ind., Ltd.
   83    0.05    10    10    10 
WorldCnM Inc.
   131    1.09    10    10    10 
Superone Co., Ltd.
   1,585    1.45    8    8    8 
Buyoung Panji Co., Ltd.
   478    0.44    12    12    12 
International Paint Korea Co., Ltd.
   111    0.48    11    11    11 
EI Lighting Co., Ltd.
   358    0.36    18    18    18 
Yooseung Co., Ltd.
   10    0.08    1    1    1 
Sungkwang Co., Ltd.
   48    0.35    2    2    2 
Ajin KSB Co., Ltd.
   204    0.31    18    18    18 
Sewon Ceramic Co., Ltd.
   530    1.01    5    5    5 
Choyang Tech Co., Ltd.
   465    1.01    23    23    23 
TK Co., Ltd.
   307    0.70    15    15    15 
Arari Co., Ltd.
   14    0.05    1    1    1 
C&S Corporation Co., Ltd.
   1,304    0.01    13    13    13 
Global The One of Korea Co., Ltd.
   62    0.06    3    3    3 
Steellife Co., Ltd.
   85    0.06    4    4    4 
 
F-63

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Geumhan Co., Ltd.
   498    0.24     7    7    7 
Mokgan Co., Ltd.
   5    0.02    1    1    1 
Wenex Co., Ltd.
   373    0.53    19    19    19 
Sulim Co., Ltd.
   30    0.20    6    6    6 
Shinkwang Engineering
   24    0.36    2    2    2 
Ek Cookware Co., Ltd.
   60    0.04    1    1    1 
KTTW Co., Ltd.
   28    0.05    2    2    2 
Avajar Co., Ltd.
   1,061    0.01    1    1    1 
Woosung I.B. Co., Ltd.
   7,071    0.07    14    14    14 
CAP Korea Co., Ltd.
   16    0.30    3    3    3 
MSM Co., Ltd.
   25    0.08             
Ddpopstyle Co., Ltd.
   22    0.14    1    1    1 
Finemetal Co., Ltd.
   49    0.08    1    1    1 
Sungkyeong Co., Ltd.
   52    0.24    2    2    2 
Newko Co., Ltd.
   331    0.06    10    10    10 
Dongsung Mulsan Co., Ltd.
   137    0.34    14    14    14 
Pizzakorea Co., Ltd.
   42    0.18    9    9    9 
Geumdani Co., Ltd.
   2,377    1.82    36    36    36 
Mezzanine I-pack Co., Ltd.
   38    0.02    1    1    1 
Ltop Co., Ltd.
   36    0.06    7    7    7 
Simile Aluminium Co., Ltd.
   428    0.31    9    9    9 
GT Tooling Co., Ltd.
   604    0.17    6    6    6 
Team Korea Co., Ltd.
   4,782    0.37    24    24    24 
Donghwa TCA Co., Ltd.
   1,012    0.30    25    25    25 
Hankook Piaget Co., Ltd.
   4    0.01    1    1    1 
Coco Food Co., Ltd.
   648    1.24    33    33    33 
Woori Industry Co., Ltd.
   102    1.05    21    21    21 
Ssangyong Youngweol Plant Service&Engineering Co., Ltd.
   83    0.07    4    1    1 
SH Co., Ltd.
   39    0.20    8    8    8 
Daeyoung Co., Ltd.
   75    0.01    8    8    8 
Getron Co., Ltd.
   7,259    0.20    37    4    4 
Jungmun Co., Ltd.
   19    0.26    2    2    2 
JM Tech Co., Ltd.
   403    0.67    82    10    10 
SGC Energy Co., Ltd.
   580,000    5.00    2,900    6,249    6,249 
Le Soleil KHNP LLC
   137,600    19.00    1,376    1,376    1,376 
Ihsung CNI Co., Ltd.
   127,660    4.30    1,500    1,937    1,937 
H Robotics Co., Ltd.
   903,601    8.05    4,000    5,639    5,639 
Good Tcells Co., Ltd.
   11,364    0.33    500    399    399 
IPS Bio Co., Ltd.
   1,975    3.13    1,000    897    897 
Nine B Co., Ltd.
   5,000    4.96    1,000    1,000    1,000 
Choigang-gujo Co., Ltd.
   61    0.45    6    1    1 
Hosungsteel Co., Ltd.
   323    0.26    14    3    3 
Uktae IND. Co., Ltd.
   140    0.12    7    1    1 
JFC Co., Ltd.
   16    0.01    2    2    2 
Hyundai Tech Co., Ltd.
   28    0.69    10    10    10 
Daeil Co., Ltd.
   301    0.42    15    2    2 
Daehyeon Recycle Co., Ltd.
   59    0.61    12    12    12 
Metal Link Inc. Co., Ltd.
   709    0.17    35    4    4 
Pipetec Korea Co., Ltd.
   50    0.07    10    1    1 
 
F-64

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
SungJin Tech Co., Ltd.
   803    1.20     24    8    8 
Yujin E&C Co., Ltd.
   29    0.18    6         
Daishin Logistics Co., Ltd.
   13    0.09    1    1    1 
JinSung Engineering Co., Ltd.
   18    0.30    18    18    18 
Yongho Industry Co., Ltd.
   157    0.22    32    1    1 
Wow tech Co., Ltd.
   369    0.75    11    11    11 
World Power Tech Co., Ltd.
   16    0.28    24    24    24 
PBM Auto Co., Ltd.
   1,001    1.06    10    10    10 
K2 Motors Co., Ltd.
   54    0.28    1    1    1 
CL Tech Co., Ltd.
   801    2.25    40    40    40 
Mirae Industry Co., Ltd.
   39    0.04    6    6    6 
Gentak Korea Co., Ltd.
   301    0.31    8    8    8 
Sungjin Chemical Co., Ltd.
   118    0.36    4    4    4 
LMAT Co., Ltd.
   198    0.04    20    20    20 
Poong Lim Industrial Co., Ltd.
   25    0.00    38    38    38 
Dae Sung GeoTech Co., Ltd.
   631    1.28    32    32    32 
Saeheemang Co., Ltd.
   756    0.60    15    15    15 
Vornech Co., Ltd.
   431    0.37    11    2    2 
Woojin Formtech Co., Ltd.
   76    0.08    8    1    1 
Korea Engineer Manufacturing Co., Ltd.
   114    0.26    6    1    1 
Sinwa J&K Co., Ltd.
   476    0.28    5    5    5 
Owon E&G Co., Ltd.
   132    0.20    4    4    4 
Guseong Co., Ltd.
   141    0.20    3    3    3 
Irefarm Co., Ltd.
   45    0.30    3    3    3 
Haenarae Agricultural Corp.
   15    0.03    2    2    2 
DECO&E Co., Ltd.
   1,261    0.00    2    2    2 
Design Beyond Co., Ltd.
   17    0.19    2    2    2 
LBK Co., Ltd.
   8    0.05    1    1    1 
Duckwon industrial Co., Ltd.
   32    0.43    13    13    13 
ASPT Co., Ltd.
   64    0.82    19    19    19 
SIMA Co., Ltd.
   29    0.05    3    3    3 
Jingkang Resources Co., Ltd.
   90    1.57    13    13    13 
Eslin Co., Ltd.
   39    0.14    8    8    8 
CIC Tech Co., Ltd.
   96    0.54    10    10    10 
Orano Expansion
   5,742,405    4.72             
Fourever Co., Ltd.
   44    0.10    4    4    4 
Myungil Metal Co., Ltd.
   80    0.10    4    4    4 
Daeshin ECM Co., Ltd.
   182    0.30    9    9    9 
Greencarbon Co., Ltd.
   79    0.06    1    1    1 
Sunkoo Co., Ltd.
   4    0.10    2    2    2 
Jians Construction Co., Ltd.
   45    0.01    2    4    4 
DH trading Co., Ltd.
   891    0.04    178         
Sangsin Co., Ltd.
   29    0.09    15    15    15 
Steel focus Co., Ltd.
   154    0.20    4    4    4 
Kamada Korea Co., Ltd.
   437    0.33    22    22    22 
Fosys Co., Ltd.
   19    0.08    4    4    4 
GB precision Co., Ltd.
   137    0.57    1    1    1 
Ewon Art Co., Ltd.
   185    0.61    9    9    9 
DI Tech Co., Ltd.
   3    0.00             
Hans AD Co., Ltd.
   33    0.35    2    2    2 
Chaegim Environment Development Co., Ltd.
   158    0.01    3    3    3 
 
F-65

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Daesung Stain Co., Ltd.
   32    0.32     2    2    2 
YSM Co., Ltd.
   281    2.07    14    14    14 
U&I Co., Ltd.
   50    0.22    5    5    5 
World One Co., Ltd.
   401    0.58    10    10    10 
Yewon Co., Ltd.
   24    0.02    1         
TSNT Co., Ltd.
   119    0.00    24    24    24 
Shinsung Tech Co., Ltd.
   314    0.01    16    16    16 
Loft Garden Co., Ltd.
   1    0.04             
Handon Co., Ltd.
   74    0.25    11    11    11 
GH Tech Co., Ltd.
   82    0.22    3    3    3 
Daeo Co., Ltd.
   13    0.23    4    4    4 
Bokwang Co., Ltd.
   76    0.00    15    15    15 
Samkum Industry Co., Ltd.
   201    0.48    40    40    40 
Dyntex Korea Co., Ltd.
   75    0.28    15    15    15 
Mirae Engineering Co., Ltd.
   66    0.15    1    1    1 
Ilshin Tech Co., Ltd.
   36    0.00    7    7    7 
Sukwon Co., Ltd.
   2,885    0.59    29    29    29 
Hae-sung Metal Co., Ltd.
   159    0.17    3    3    3 
White&Clean Foods Co., Ltd.
   330    0.00    3    3    3 
Michang Cable Co., Ltd.
   1,096    0.13    16    16    16 
G.M Foods Co., Ltd.
   57    0.16    9    9    9 
Wecan Global Inc. Co., Ltd.
   165    0.08    8    8    8 
Daeju Steel Co., Ltd.
   11    0.20    1    1    1 
Hyundai Glass Co., Ltd.
   860    0.83    43    43    43 
MEC Co., Ltd.
   16,468    1.17    41    41    41 
Daeyeoneco Co., Ltd.
   151    0.00    15    15    15 
Hyesung Cable&Communication Inc.
   762    0.39    38    38    38 
Sangjin Co., Ltd.
   428    0.35    21    21    21 
Topis Co., Ltd.
   246    0.71    14    14    14 
Iksan-guwon Co., Ltd.
   563    0.00    11    11    11 
Korea Remicon Co., Ltd.
   36    0.03    5    5    5 
New Tech Co., Ltd.
   23    0.15    2    2    2 
Segeon Co., Ltd.
   124    0.00    4    4    4 
MS Tech Co., Ltd.
   9    0.15    1    1    1 
J.I Steel Co., Ltd.
   21    0.00    2    2    2 
HNT Co., Ltd.
   172    0.00    9    9    9 
Taejin Co., Ltd.
   27    0.08    3    3    3 
Macroad Co., Ltd.
   953    0.17    10    10    10 
Woongjin Energy Co., Ltd.
   94    0.00    9    9    9 
Common Computer Co., Ltd.
   3,856    1.64    1,000    1,154    1,154 
Fine Powerex Co., Ltd.
   72,633    4.58    1,500    1,772    1,772 
Eunsung Industrial Co., Ltd.
   3    0.03    1    1    1 
KPE Co., Ltd.
   51    0.19    13    13    13 
Dongbangfarms Co., Ltd.
   904    0.55    41    5    5 
Sungdo Pack Co., Ltd.
   15    0.06    1    1    1 
Coffeenie Co., Ltd.
   2    0.00    1    1    1 
Medi Pharma Plan Co., Ltd.
   1,075    0.26    108    8    8 
Woori Ascon Co., Ltd.
   25    0.34    10    10    10 
Dong Shin Hydraulies Co., Ltd.
   9,460    0.14    47    47    47 
Cheonwoo E.P.S Co., Ltd.
   371    1.10    19    19    19 
 
F-66

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Koa Tech Co., Ltd.
   1,244    0.77     12    12    12 
SKE Cable Co., Ltd.
   120    0.08    6    6    6 
Hi Korea Co., Ltd.
   1,845    1.94    185    185    185 
Daeheung Engineering Co., Ltd.
   65    0.01    1    1    1 
Etapol Co., Ltd.
   1,361    0.54    41    41    41 
Yoongwon Korea Co., Ltd. (formerly, Yoongwon International Co., Ltd.)
   157    1.47    31    31    31 
Avoh Ceramic&Bath Co., Ltd.
   173    0.14    3    3    3 
Dongyang R.P.F. Industrial Co., Ltd.
   59    0.03    2    2    2 
Yuil Engineering Co., Ltd.
   14    0.03    1    1    1 
Taesan Co., Ltd.
   146    0.69    35    35    35 
Seokjin E&T Co., Ltd.
   81    0.06    8    8    8 
Agencore Co., Ltd.
   175,779    8.32    2,200    2,200    2,200 
SamHong Machinery. EMC Co., Ltd.
   476,192    8.98    5,000    5,000    5,000 
Thermo Tec Co., Ltd.
   446    0.03    4    4    4 
DaeYang Hydro Co., Ltd.
   6    0.02    1    1    1 
SangMoo Steel Co., Ltd.
   24    0.04    2    2    2 
Jungin Distribution Co., Ltd.
   17    0.00    3    3    3 
TheSun Co., Ltd.
   77    0.06    1    1    1 
Daewoong and Technology Co., Ltd.
  
 
423
 
  
 
1.14
   
 
42
 
  
 
42
 
  
 
42
 
ChoungHwa Precise Co., Ltd.
   428    0.08    43    4    4 
Snopa Co., Ltd.
   458    0.01    5    5    5 
Aloha Factory Co., Ltd.
   2,970    3.70    1,000    739    739 
Dailyshot Co., Ltd.
   1,695    1.85    1,001    1,001    1,001 
Samhyup Co., Ltd.
   376    0.91    38    38    38 
Gogang Aluminum Co., Ltd.
   828    1.52    41    41    41 
Taekwang Paper Board Co., Ltd.
   133    0.49    23    23    23 
NY Tech Co., Ltd.
   33    0.15    2    2    2 
Dongbang Metal Co., Ltd.
   1,985    0.32    20    20    20 
Samwang Co., Ltd.
   170    0.25    17    17    17 
Yurim CNF Co., Ltd.
   15    0.23    2    2    2 
Guseul Co., Ltd.
   89    0.23    9    9    9 
Gaone International Co., Ltd.
   54    0.29    14    14    14 
Dongyang Pratech Co., Ltd.
   265    1.21    29    29    29 
Samjin Placo Co., Ltd.
   661    0.52    33    33    33 
MS Steel Industrial Co., Ltd.
   167    0.40    8    8    8 
STS Global Co., Ltd.
   9    0.04    1    1    1 
Y Tech Co., Ltd.
   855    0.65    34    34    34 
J&J Tech Co.
   14    0.22    1    1    1 
Shield Board Co., Ltd.
   165    0.15    3    3    3 
SFC International Co., Ltd.
   11    0.01    1    1    1 
Hana ITM Inc.
   8,443    0.70    84    84    84 
Jeuvis Co., Ltd.
   191    0.30    2    2    2 
JBM Co., Ltd.
   662    0.34    20    20    20 
Jungwoo Metal Solution Co., Ltd.
   27    0.08    2    2    2 
MS Precision Co., Ltd.
   220    0.16    22    22    22 
YM Tech Co., Ltd.
   2    0.01    1    1    1 
C&C ENG Co., Ltd.
   439    1.59    22    22    22 
Daejoo E&G Co., Ltd.
   133    0.00    27    27    27 
Taeyoung Precision Co., Ltd.
   31    0.22    1    1    1 
 
F-67

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Shin Heung Precision Co., Ltd.
   93    4.63     4    4    4 
TaeGwang P&C Co., Ltd.
   530    0.90    13    13    13 
KyeongGwang Tech Co., Ltd.
   244    1.04    7    7    7 
Altron Jeonju Co., Ltd.
   34,846    1.34    697    5    5 
SKD Korea Co., Ltd.
   40    0.28    20    20    20 
Moohan Enterprise Co., Ltd.
   63    0.12    3    3    3 
Value Invest Korea Co., Ltd.
   8    0.00    2    2    2 
Beomju Co., Ltd.
   1,037    0.60    42    42    42 
C&A Industries Co., Ltd.
   42,062    0.26    21    21    21 
Vehicle System Co., Ltd.
   225    0.19    23    23    23 
CH Solution Co., Ltd.
   1,456    0.16    4    4    4 
HNT Co., Ltd.
   8,567    0.09    9    9    9 
Sunquen Co., Ltd.
   4    0.01             
Hapdong Co., Ltd.
   7,096    1.08    106    106    106 
Shabath Co., Ltd.
   48    0.04    6    6    6 
Woori Elec Co., Ltd.
   102    0.17    5    5    5 
Dong-Yang Special Casting Co., Ltd.
   1,027    0.41    21    21    21 
DYC Co., Ltd.
   638    1.73    96    96    96 
Haegang Industry Co., Ltd.
   1,687    1.13    25    25    25 
Daone Co., Ltd.
   860    0.23    9    9    9 
Yeowoon Co., Ltd.
   3    0.00             
Evertrue Co., Ltd.
   15    0.00             
Black Materials Co., Ltd.
   37,038    8.31    500    500    500 
K Shipbuilding Co., Ltd.
   8,622    0.25    1,078    1,078    1,078 
Seohan Food Co., Ltd.
   83    0.19    2    2    2 
Andong Trading Corporation Co., Ltd.
   42    0.00    2    2    2 
RMK Co., Ltd.
   63    0.90    22    22    22 
Shinjin International Corporation Co., Ltd.
   4    0.01    1    1    1 
Asan Wood
  
 
6,391
 
  
 
1.03
   
 
64
 
  
 
64
 
  
 
64
 
Seil Textile Co., Ltd.
   16    0.15    3    3    3 
JSL Co., Ltd.
   51    0.49    3    3    3 
3i Powergen Inc.
       15.00    1,482         
PT. Kedap Sayaaq
   671    10.00    18,540         
Mediquitous Co., Ltd.
  
 
5,080
 
  
 
0.64
   
 
1,250
 
  
 
1,250
 
  
 
1,250
 
Monit Co., Ltd.
   166,667    14.29    1,000    1,000    1,000 
Enersys Co., Ltd.
   9,763    19.62    2,050    2,050    2,050 
Kalman Co., Ltd.
   23,172    10.02    1,000    1,000    1,000 
HiMet Corporation Co., Ltd.
   1,754,386    13.93    5,000    5,000    5,000 
Wonil Image Maker Inc.
   16    0.04             
Ohbaksa.com Co., Ltd.
   52    0.23    3    3    3 
Hanyang Electric Co., Ltd.
   918    3.27    92    92    92 
Geumchang Synthetic Fiber Co., Ltd.
   119    1.02    12    12    12 
Sung Min Fishery Co., Ltd.
   371    0.09    4    4    4 
Dreamfact Co., Ltd.
   77    0.10    3    3    3 
Donyworld Co., Ltd.
   125    0.68    10    10    10 
Dongsuh Companies Inc.
   18    0.23    2    2    2 
Dondodam Co., Ltd.
   262    0.34    13    13    13 
Vision Food Co., Ltd.
   1,732    1.00    86    86    86 
Aone Metal Co., Ltd.
   156    0.89    16    16    16 
Ecoplus Co., Ltd.
   2,786    0.91    3    3    3 
 
F-68

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
10.
Financial Assets at Fair Value through Other Comprehensive Income, Continued
 
(2)
Financial assets at fair value through other comprehensive income as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
   
Shares
   
Ownership
      
Acquisition cost
   
Book value
   
Fair value
 
              
In millions of won
 
Libechen Co., Ltd.
   151    0.13     8    8    8 
Hongin Co., Ltd.
   18    0.03    5    5    5 
Bolim Co., Ltd.
   37    0.10    5    5    5 
Neo Life Co., Ltd.
   19    0.04             
Daehong Industry Co., Ltd.
   1,152    1.01    85    85    85 
T-Eng Co., Ltd.
   123    1.05    25    25    25 
Badanuri
   8    0.10    2    2    2 
Daeyoung Co., Ltd.
   178    0.56    63    63    63 
Ki Soo Precision Co., Ltd.
   325    0.44    98    98    98 
DNGV
   5,516    0.14    11    11    11 
BJ Korea
   446    0.81    40    40    40 
R&S Co., Ltd.
   291    0.61    4    4    4 
Daekyoung Co., Ltd.
   85    0.66    17    17    17 
Gunsan Bio Energy Co., Ltd. (*4)
   200,000    18.87    1,000         
       
 
 
   
 
 
   
 
 
 
        295,627    212,762    212,762 
       
 
 
   
 
 
   
 
 
 
Debt securities
(*1)
           
Aron Flying Ship Co., Ltd.
            491    547    547 
Ino Platech Co., Ltd.
            1,080    1,080    1,080 
Daebon Tech Co., Ltd.
            3,000    3,000    3,000 
       
 
 
   
 
 
   
 
 
 
        4,571    4,627    4,627 
       
 
 
   
 
 
   
 
 
 
         625,418    502,443    502,443 
       
 
 
   
 
 
   
 
 
 
 
 (*1)
The Company used initial cost as their fair value because there was not enough information to determine fair value, and the range of the estimated fair value is wide.
 
 (*2)
The Company has estimated the fair value of Set Holding by using the discounted cash flow method and has recognized the difference between its fair value and book value as gain or loss on valuation of financial assets at FVOCI in other comprehensive income or loss during the year ended December 31, 2023.
 
 (*3)
The shares were acquired through a debt-to-equity conversion during the year ended December 31, 2023, in accordance with the corporate rehabilitation procedures of BDI Co., Ltd. Since the Company has no capacity to exercise significant influence until the rehabilitation procedures are complete, the Company has classified the investment as financial assets measured at fair value through other comprehensive income.
 
 (*4)
The investee declared bankruptcy during the year ended December 31, 2023. The Company has no capacity to exercise significant influence on the investee due to the receivership of the investee by a trustee in bankruptcy, so the investment was reclassified as financial assets measured at fair value through other comprehensive income.
 
F-69

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
11.
Financial Assets at Amortized Cost
Financial assets at amortized cost as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Financial assets

at amortized cost
   
Book

value
 
             
       
In millions of won
 
Government bonds
      1,920    1,920 
Others
     25,078    25,078 
    
 
 
   
 
 
 
      26,998    26,998 
    
 
 
   
 
 
 
Current
      16,762    16,762 
Non-current
     10,236    10,236 
       
2023
 
       
Financial assets

at amortized cost
   
Book

value
 
             
       
In millions of won
 
Government bonds
      1,528    1,528 
Others
     37,315    37,315 
    
 
 
   
 
 
 
      38,843    38,843 
    
 
 
   
 
 
 
Current
      28,905    28,905 
Non-current
     9,938    9,938 
 
F-70

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives
 
(1)
Derivatives as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
                     
       
In millions of won
 
Derivative assets
          
Currency forward
      648    17,432    18,019     
Currency swap
     236,470    589,300    274,782    527,701 
—Trading
     102,080    410,540    196,013    347,689 
—Hedging
     134,390    178,760    78,769    180,012 
Interest rate swap
     52,485    81,188    12,124    129,570 
—Trading
     52,485    81,188    12,124    129,570 
—Hedging
                  
Others (*2, 3)
         40,501    2,807    35,391 
    
 
 
   
 
 
   
 
 
   
 
 
 
      289,603    728,421    307,732    692,662 
    
 
 
   
 
 
   
 
 
   
 
 
 
Derivative liabilities
          
Currency forward
      32,660        4,755     
Currency swap
     6,319    328,995    6,867    287,824 
—Trading
     6,319    302,415    6,867    264,260 
—Hedging
         26,580        23,564 
Interest rate swap
         2,735        48,238 
—Trading
         2,735        48,238 
—Hedging
                  
Others (*1,2)
     6,015    56,027    6,757    97,793 
    
 
 
   
 
 
   
 
 
   
 
 
 
      44,994    387,757    18,379    433,855 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
 (*1)
In relation to the agreement to purchase hybrid securities issued by Samcheok Eco Materials Co., Ltd., an associate of the Company, the Company has recognized as other derivative liabilities the fair value of ₩18,752 million for its performance obligation to the underwriter of the bonds. In addition, the Company has granted stock option to Chester Solar IV SpA, a joint venture of the Company, and 4 other third party investors, and recorded the related fair value of
 
5,986
million (prior year : ₩6,197 million) as other derivative liabilities.
 
 (*2)
The Company recorded the fair value of derivatives in accordance with the shareholders’ agreement of its associate, Hyundai Green Power Co., Ltd., as other derivatives. In addition, the fair value of the derivatives regarding the power sales agreement of its subsidiary, Elara Energy Project, LLC, were recorded as other derivatives.
 
 (*3)
The Company recorded the fair value of derivatives regarding the Power Purchase Agreement (“PPA”) of its subsidiary Columboola Solar Farm Hold Co Pty., Ltd. as other derivatives.
 
F-71
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives, Continued
 
(2)
Currency forward contracts which are not designated as hedging instruments as of December 31, 2023 are as follows:
 
Counterparty
  
Contract

date
   
Maturity

date
      
Contract amounts
      
Contract

exchange rate

(in won)
 
     
Pay
  
Receive
     
   
In millions of won and thousands of foreign
currencies except contract exchange rate information
 
JP Morgan
   2023.12.08    2024.01.05    
W
   41,535   EUR 29,419    
W
   1,411.83 
JP Morgan
   2023.12.13    2024.01.03     13,131   USD 10,000     1,313.10 
Busan Bank
   2023.12.14    2024.01.05     18,126   USD 14,000     1,294.70 
Woori Bank
   2023.12.14    2024.01.09     18,092   USD 14,000     1,292.30 
Standard Chartered
   2023.12.18    2024.01.11     6,480   USD 5,000     1,295.90 
Korea Development Bank
   2023.12.20    2024.01.15     10,383   USD 8,000     1,297.90 
Shinhan Bank
   2023.12.20    2024.01.17     9,074   USD 7,000     1,296.40 
JP Morgan
   2023.12.21    2024.01.19     16,929   USD 13,000     1,302.20 
Hana Bank
   2023.12.21    2024.01.12     14,329   USD 11,000     1,302.60 
Kookmin Bank
   2023.12.21    2024.01.23     14,324   USD 11,000     1,302.20 
Mizuho Bank
   2023.12.22    2024.01.25     10,382   USD 8,000     1,297.70 
Standard Chartered
   2023.12.26    2024.01.26     10,382   USD 8,000     1,297.70 
Nonghyup Bank
   2023.12.28    2024.01.29     6,446   USD 5,000     1,289.20 
Morgan Stanley
   2023.12.28    2024.01.31     14,159   USD 11,000     1,287.20 
Busan Bank
   2023.12.28    2024.02.02     10,296   USD 8,000     1,287.00 
Woori Bank
   2023.12.28    2024.02.05     10,298   USD 8,000     1,287.20 
MUFG
   2023.11.23    2024.02.05     10,348   USD 8,000     1,293.50 
Nonghyup Bank
   2023.11.30    2024.01.23     5,147   USD 4,000     1,286.75 
MUFG
   2023.11.30    2024.01.23     5,147   USD 4,000     1,286.65 
JP Morgan
   2023.11.30    2024.02.22     11,561   USD 9,000     1,284.60 
Morgan Stanley
   2023.12.01    2024.01.23     5,199   USD 4,000     1,299.85 
Korea Development Bank
   2023.12.01    2024.01.15     14,303   USD 11,000     1,300.30 
Mizuho Bank
   2023.12.01    2024.02.14     10,386   USD 8,000     1,298.25 
JP Morgan
   2023.12.04    2024.02.14     6,485   USD 5,000     1,296.90 
Nonghyup Bank
   2023.12.06    2024.02.14     5,231   USD 4,000     1,307.75 
MUFG
   2023.12.13    2024.02.06     19,700   USD 15,000     1,313.30 
JP Morgan
   2023.12.13    2024.02.06     17,072   USD 13,000     1,313.20 
Mizuho Bank
   2023.12.15    2024.02.06     12,916   USD 10,000     1,291.55 
Korea Development Bank
   2023.12.15    2024.02.14     11,617   USD 9,000     1,290.80 
Busan Bank
   2023.12.20    2024.02.26     5,183   USD 4,000     1,295.80 
SMBC
   2023.12.20    2024.03.13     19,416   USD 15,000     1,294.43 
Nonghyup Bank
   2023.12.21    2024.01.05     26,065   USD 20,000     1,303.25 
JP Morgan
   2023.12.21    2024.01.05     26,064   USD 20,000     1,303.20 
MUFG
   2023.12.21    2024.01.05     27,365   USD 21,000     1,303.10 
Hana Bank
   2023.12.28    2024.01.15     18,041   USD 14,000     1,288.65 
Mizuho Bank
   2023.12.28    2024.02.26     32,146   USD 25,000     1,285.85 
JP Morgan
   2023.12.28    2024.03.26     8,984   USD 7,000     1,283.40 
Woori Bank
   2023.11.30    2024.01.03     6,440   USD 5,000     1,287.95 
Nonghyup Bank
   2023.11.30    2024.01.03     4,119   USD 3,200     1,287.15 
Woori Bank
   2023.12.20    2024.01.22     6,487   USD 5,000     1,297.30 
Woori Bank
   2023.12.27    2024.01.29     6,466   USD 5,000     1,292.20 
Mizuho Bank
   2023.12.28    2024.02.02     6,446   USD 5,000     1,289.25 
Nonghyup Bank
   2023.12.28    2024.02.02     12,882   USD 10,000     1,288.20 
HSBC
   2020.10.19    2024.10.29     140,913   USD 125,000     1,127.30 
JP Morgan
   2023.12.08    2024.01.05     6,541   USD 5,000     1,308.20 
 
F-72

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives, Continued
 
(2)
Currency forward contracts which are not designated as hedging instruments as of December 31, 2023 are as follows, continued:
 
Counterparty
  
Contract

date
   
Maturity

date
      
Contract amounts
      
Contract

exchange rate

(in won)
 
     
Pay
  
Receive
     
   
In millions of won and thousands of foreign
currencies except contract exchange rate information
 
Busan Bank
   2023.12.12    2024.01.23      19,686   USD 15,000      1,312.40 
Shinhan Bank
   2023.12.14    2024.01.23     10,338   USD 8,000     1,292.19 
Korea Citi Bank
   2023.12.15    2024.01.15     6,467   USD 5,000     1,293.45 
Nonghyup Bank
   2023.12.18    2024.01.15     11,668   USD 9,000     1,296.45 
Hana Bank
   2023.12.27    2024.01.26     6,459   USD 5,000     1,291.89 
Hana Bank
   2023.12.27    2024.01.26     6,457   USD 5,000     1,291.39 
JP Morgan
   2023.11.02    2024.01.26     8,406   USD 6,286     1,337.20 
HSBC
   2023.11.27    2024.03.08     6,482   USD 5,000     1,296.30 
HSBC
   2023.11.27    2024.03.08     6,476   USD 5,000     1,295.20 
Shinhan Bank
   2023.12.08    2024.03.08     13,034   USD 10,000     1,303.38 
Shinhan Bank
   2023.12.15    2024.03.08     3,865   USD 3,000     1,288.22 
Shinhan Bank
   2023.12.28    2024.04.23     2,160   USD 1,684     1,282.40 
Woori Bank
   2023.12.28    2024.04.23     10,253   USD 8,000     1,281.65 
 
F-73
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives, Continued
 
(3)
Currency swap contracts which are not designated as hedging instruments as of December 31, 2023 are as
follows
:
 
  
Contract year
     
Contract amount
  
Contract interest rate
    
Contract
exchange rate

(in won, USD)
 
Counterparty
 
Pay
  
Receive
  
Pay
 
Receive
   
                       
  
In millions of won and thousands of foreign currencies except contract exchange rate information
 
Standard Chartered
  2014~2029     102,470   USD 100,000  3.14% 3.57%    1,024.70 
Societe Generale
  2014~2024    105,017   USD 100,000  4.92% 5.13%   1,050.17 
Hana Bank
  2015~2024    107,970   USD 100,000  4.75% 5.13%   1,079.70 
Credit Agricole
  2015~2024    94,219   USD 86,920  4.85% 5.13%   1,083.97 
Woori Bank
  2019~2027    21,708   USD 19,417  5.04% 6.75%   1,118.00 
Woori Bank
  2019~2024    296,000   USD 250,000  1.21% 2.50%   1,184.00 
Korea Development Bank
  2019~2024    177,600   USD 150,000  1.24% 2.50%   1,184.00 
Hana Bank
  2019~2024    118,400   USD 100,000  1.24% 2.50%   1,184.00 
Woori Bank
  2020~2025    241,320   USD 200,000  0.54% 1.13%   1,206.60 
Korea Development Bank
  2020~2025    241,320   USD 200,000  0.54% 1.13%   1,206.60 
Kookmin Bank
  2020~2025    120,660   USD 100,000  0.54% 1.13%   1,206.60 
Kookmin Bank
  2020~2026    76,355   USD 70,445  5.83% 6.00%   1,083.90 
Woori Bank
  2021~2026    118,170   USD 100,000  1.11% 1.13%   1,181.70 
Korea Development Bank
  2021~2026    118,170   USD 100,000  1.11% 1.13%   1,181.70 
Hana Bank
  2021~2026    118,170   USD 100,000  1.11% 1.13%   1,181.70 
Hana Bank
  2022~2025    385,800   USD 300,000  3.11% 3.63%   1,286.00 
Woori Bank
  2022~2025    257,200   USD 200,000  3.12% 3.63%   1,286.00 
JP Morgan
  2022~2027    128,600   USD 100,000  3.56% 4.00%   1,286.00 
Woori Bank
  2022~2027    128,600   USD 100,000  3.56% 4.00%   1,286.00 
Kookmin Bank
  2022~2027    128,600   USD 100,000  3.56% 4.00%   1,286.00 
Korea Development Bank
  2022~2026    283,820   USD 200,000  4.67% 5.38%   1,419.10 
Hana Bank
  2022~2026    141,910   USD 100,000  4.68% 5.38%   1,419.10 
JP Morgan
  2022~2026    141,910   USD 100,000  4.69% 5.38%   1,419.10 
Woori Bank
  2022~2026    141,910   USD 100,000  4.68% 5.38%   1,419.10 
Korea Development Bank
  2022~2028    283,820   USD 200,000  5.12% 5.50%   1,419.10 
Woori Bank
  2022~2028    141,910   USD 100,000  5.13% 5.50%   1,419.10 
Hana Bank
  2023~2026    256,000   USD 200,000  3.97% 5.38%   1,280.00 
Shinhan Bank
  2023~2026    192,000   USD 150,000  3.99% 5.38%   1,280.00 
Kookmin Bank
  2023~2026    128,000   USD 100,000  4.03% 5.38%   1,280.00 
Korea Development Bank
  2023~2026    256,000   USD 200,000  4.04% 5.38%   1,280.00 
Bank of America
  2023~2026    128,000   USD 100,000  4.04% 5.38%   1,280.00 
Standard Chartered
  2023~2026    128,000   USD 100,000  4.04% 5.38%   1,280.00 
Woori Bank
  2023~2026    192,000   USD 150,000  4.05% 5.38%   1,280.00 
Nomura
  2015~2025    111,190   USD 100,000  2.60% 3.25%   1,111.90 
Korea Development Bank
  2015~2025    111,190   USD 100,000  2.62% 3.25%   1,111.90 
Woori Bank
  2015~2025    55,595   USD 50,000  2.62% 3.25%   1,111.90 
Hana Bank
  2015~2025    55,595   USD 50,000  2.62% 3.25%   1,111.90 
Woori Bank
  2017~2027    111,610   USD 100,000  2.25% 3.13%   1,116.10 
Korea Development Bank
  2017~2027    111,610   USD 100,000  2.31% 3.13%   1,116.10 
Hana Bank
  2017~2027    111,610   USD 100,000  2.31% 3.13%   1,116.10 
Korea Development Bank
  2018~2028    108,600   HKD 800,000  2.69% 3.35%   135.75 
Shinhan Bank
  2018~2028    115,387   HKD 850,000  2.66% 3.35%   135.75 
Korea Citi Bank
  2019~2024    239,956   CHF 200,000  1.44% 0.00%   1,199.78 
Korea Development Bank
  2019~2027    119,978   CHF 100,000  1.43% 0.05%   1,199.78 
Woori Bank
  2021~2026    222,800   USD 200,000  0.93% 1.25%   1,114.00 
 
F-74

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives, Continued
 
(3)
Currency swap contracts which are not designated as hedging instruments as of December 31, 2023 are as follows, continued:
 
  
Contract year
     
Contract amount
  
Contract interest rate
    
Contract
exchange rate

(in won, USD)
 
Counterparty
 
Pay
   
Receive
  
Pay
 
Receive
   
                        
  
In millions of won and thousands of foreign currencies except contract exchange rate information
 
Shinhan Bank
  2021~2026     111,400    USD 100,000  0.92% 1.25%    1,114.00 
Korea Development Bank
  2021~2026    111,400    USD 100,000  0.93% 1.25%   1,114.00 
Nonghyup Bank
  2021~2026    111,400    USD 100,000  0.93% 1.25%   1,114.00 
Woori Bank
  2022~2027    262,000    USD 200,000  3.62% 4.25%   1,310.00 
Export-Import Bank of Korea
  2022~2027    131,000    USD 100,000  3.63% 4.25%   1,310.00 
Kookmin Bank
  2022~2027    131,000    USD 100,000  3.62% 4.25%   1,310.00 
Hana Bank
  2022~2027    131,000    USD 100,000  3.61% 4.25%   1,310.00 
Korea Development Bank
  2022~2027    262,000    USD 200,000  3.63% 4.25%   1,310.00 
Export-Import Bank of Korea
  2022~2032    349,829    HKD 1,935,000  4.87% 5.16%   180.79 
JP Morgan
  2022~2032    75,194    HKD 415,000  5.00% 5.16%   181.19 
Export-Import Bank of Korea
  2023~2030    172,982    HKD 1,037,000  4.25% 4.51%   166.81 
HSBC
  2019~2024    USD 205,500    AUD 300,000  3M SOFR+1.04% 3M BBSW+0.97%   USD 0.69 
 
F-75
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes
to
the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives, Continued
 
(4)
Currency swap contracts which are designated as hedging instruments as of December 31,
2023
are as follows:
 
  
Contract year
     
Contract amount
  
Contract interest rate
    
Contract
exchange rate

(in won)
 
Counterparty
 
Pay
  
Receive
  
Pay
 
Receive
   
                       
  
In millions of won and thousands of foreign currencies except contract exchange rate information
 
Kookmin Bank
  2020~2025     118,780   USD 100,000  1.29% 2.13%    1,187.80 
Shinhan Bank
  2020~2025    118,780   USD 100,000  1.29% 2.13%   1,187.80 
Hana Bank
  2020~2025    118,780   USD 100,000  1.29% 2.13%   1,187.80 
Korea Development Bank
  2020~2026    118,910   USD 100,000  0.61% 1.00%   1,189.10 
Hana Bank
  2020~2026    118,910   USD 100,000  0.61% 1.00%   1,189.10 
Woori Bank
  2020~2026    118,910   USD 100,000  0.62% 1.00%   1,189.10 
Nomura
  2017~2037    52,457   EUR 40,000  2.60% 1.70%   1,311.42 
Nomura
  2017~2037    59,423   SEK 450,000  2.62% 2.36%   132.05 
Kookmin Bank
  2021~2026    114,230   USD 100,000  1.27% 1.25%   1,142.30 
Korea Development Bank
  2021~2026    114,230   USD 100,000  1.27% 1.25%   1,142.30 
Hana Bank
  2021~2026    114,230   USD 100,000  1.27% 1.25%   1,142.30 
Korea Development Bank
  2022~2027    123,710   USD 100,000  3.41% 3.63%   1,237.10 
Woori Bank
  2022~2027    123,710   USD 100,000  3.41% 3.63%   1,237.10 
JP Morgan
  2022~2027    123,710   USD 100,000  3.41% 3.63%   1,237.10 
BNP Paribas
  2019~2024    111,841   CHF 100,000  1.78% 0.13%   1,118.41 
Kookmin Bank
  2019~2024    111,841   CHF 100,000  1.78% 0.13%   1,118.41 
Korea Development Bank
  2022~2025    128,560   USD 100,000  3.37% 4.13%   1,285.60 
Woori Bank
  2022~2025    128,560   USD 100,000  3.37% 4.13%   1,285.60 
Kookmin Bank
  2022~2025    128,560   USD 100,000  3.37% 4.13%   1,285.60 
Woori Bank
  2021~2026    220,600   USD 200,000  0.47% 0.75%   1,103.00 
Shinhan Bank
  2021~2026    220,600   USD 200,000  0.47% 0.75%   1,103.00 
Hana Bank
  2021~2026    55,150   USD 50,000  0.48% 0.75%   1,103.00 
Shinhan Bank
  2023~2026    132,930   USD 100,000  4.07% 5.38%   1,329.30 
Nonghyup Bank
  2023~2026    132,930   USD 100,000  4.05% 5.38%   1,329.30 
Kookmin Bank
  2023~2026    132,930   USD 100,000  4.07% 5.38%   1,329.30 
Woori Bank
  2020~2025    245,560   USD 200,000  0.93% 1.75%   1,227.80 
Hana Bank
  2020~2025    245,560   USD 200,000  0.93% 1.75%   1,227.80 
Korea Development Bank
  2020~2025    122,780   USD 100,000  0.93% 1.75%   1,227.80 
JP Morgan
  2022~2025    126,180   USD 100,000  2.80% 3.60%   1,261.80 
Hana Bank
  2022~2025    126,180   USD 100,000  2.80% 3.60%   1,261.80 
Korea Development Bank
  2022~2025    252,360   USD 200,000  2.83% 3.60%   1,261.80 
Woori Bank
  2022~2025    126,180   USD 100,000  2.85% 3.60%   1,261.80 
Woori Bank
  2023~2028    259,000   USD 200,000  3.83% 4.88%   1,295.00 
Korea Development Bank
  2023~2028    129,500   USD 100,000  3.85% 4.88%   1,295.00 
Bank of America
  2023~2028    64,750   USD 50,000  3.85% 4.88%   1,295.00 
 
F-76

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives, Continued
 
(5)
Interest rate swap contracts which are not designated as hedging instruments as of December 31, 2023 are as follows:
 
Counterparty
  
Contract
year
      
Contract amount
   
Contract interest rate per annum
  
Pay
     
Receive
   
In millions of won and thousands of foreign currencies
Nomura (*1)
   2018~2038       30,000   
3M CD+0.10
%
    3.75%
Hana Bank
   2019~2024     200,000   1.87%    3M CD+0.13%
Shinhan Bank
   2021~2025     100,000   2.32%    3M CD+0.43%
Hana Bank
   2022~2027     200,000   3.02%    3M CD+0.61%
Hana Bank
   2022~2027     200,000   3.04%    3M CD+0.58%
Hana Bank
   2022~2027     250,000   3.38%    3M CD+0.59%
Nomura
   2022~2027     200,000   3.55%    3M CD+0.60%
Shinhan Bank
   2022~2027     150,000   3.53%    3M CD+0.55%
Hana Bank
   2022~2027     200,000   3.70%    3M CD+0.59%
Nomura
   2022~2027     300,000   3.89%    3M CD+0.67%
Hana Bank
   2022~2027     200,000   3.93%    3M CD+0.67%
Nomura
   2022~2027     200,000   3.80%    3M CD+0.68%
Nomura
   2022~2027     300,000   4.04%    3M CD+0.60%
Hana Bank
   2022~2027     100,000   4.68%    3M CD+1.04%
Hana Bank
   2022~2027     100,000   5.45%    3M CD+1.20%
Shinhan Bank
   2023~2028     200,000   4.27%    3M CD+0.76%
Shinhan Bank
   2023~2028     50,000   4.27%    3M CD+0.76%
Nomura
   2023~2028     250,000   4.13%    3M CD+0.73%
Hana Bank
   2023~2028     200,000   3.74%    3M CD+0.51%
Hana Bank
   2023~2028     100,000   4.19%    3M CD+0.50%
Shinhan Bank
   2023~2028     300,000   3.81%    3M CD+0.70%
Hana Bank
   2023~2028     200,000   3.95%    3M CD+0.50%
Nomura
   2017~2032     52,457   2.55%+Floating rate    2.60%
Nomura
   2017~2032     59,423   2.57%+Floating rate    2.62%
Nomura (*2)
   2021~2041     30,000   1.84%    2.60%
Nomura (*3)
   2021~2041     50,000   1.87%    2.38%
ANZ
   2022~2025     AUD 865   0.48%    3.33%
DBS Bank
   2022~2025     AUD 865   0.48%    3.33%
Societe Generale
   2022~2025     AUD 865   0.48%    3.28%
MUFG
   2022~2048     USD 155,941   SOFR(3M)    3.71%
Mizuho Bank
   2022~2048     USD 155,941   SOFR(3M)    1.05%
Mizuho Bank
   2022~2024     USD 112,194   SOFR(1M)    1.80%
Rabobank
   2022~2036     USD 37,130   1.83%    SOFR(6M)
Mizuho Capital Markets LLC
   2021~2045     USD 82,886   5.38%    1.14%
 
 (*1)
Depending on the counterparty exercising the right, the contract may be early settled on the same date every year from June 15, 2023.
 
 (*2)
1.84% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT+
0.35
% is applied thereafter.
 
 (*3)
1.87% of the contract paying interest rate is applied for five years from the date of issuance, and 3M CMT+0.35% is applied thereafter.
 
(6)
Interest rate swap contracts which are designated as hedging instruments as of December 31, 2023 are as follows:
 
Counterparty
  
Contract
year
   
Contract amount
   
Contract interest rate per annum
 
  
Pay
  
Receive
 
       
In thousands of USD
        
Export-Import Bank of Korea
   2015~2031    USD 15,893   2.67%   6M USD Libor 
ING Bank
   2015~2031    USD  7,861   2.67%   6M USD Libor 
BNP Paribas
   2015~2031    USD  7,861   2.67%   6M USD Libor 
BNP Paribas
   2009~2027    USD 41,040   4.16%   6M USD Libor 
KFW
   2009~2027    USD 41,040   4.16%   6M USD Libor 
Export-Import Bank of Korea
   2016~2036    USD 60,977   3.00%   6M USD Libor 
 
F-7
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
12.
Derivatives, Continued
 
(7)
Gain and loss on valuation and transaction of derivatives for the years ended December 31, 2021, 2022 and 2023 are as follows and included in finance income and expenses in the consolidated statements of comprehensive income
or
loss:
 
    
Net income effects of
valuation gain (loss)
  
Net income effects of
transaction gain (loss)
  
Other

comprehensive
income (loss) (*)
 
    
2021
  
2022
  
2023
  
2021
  
2022
  
2023
  
2021
  
2022
  
2023
 
                              
    
In millions of won
    
Currency forward
   33,066   (20,570  510   33,032   (2,710  34,216          
Currency swap
   787,264   155,937   269,795   61,353   234,195   38,282   (59,108  (102,969  (11,411
- Trading
   420,551   (77,618  181,342   16,265   104,572   (1,244         
- Hedging
   366,713   233,555   88,453   45,088   129,623   39,526   (59,108  (102,969  (11,411
Interest rate swap
   18,123   66,341   (16,377  (10,303  (6,800  10,400   18,648   37,917   2,893 
- Trading
   18,123   66,341   (16,377  (10,303  (6,800  10,400          
- Hedging
                     18,648   37,917   2,893 
Other derivatives
   (15,459  22,510   (19,729        6,761          
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   822,994  224,218  
234,199
  84,082  224,685  
89,659
  (40,460)  (65,052)  
(8,518)
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 (*)
For the years ended December 31, 2021, 2022 and 2023, the net loss on valuation of derivatives applying cash flow hedge accounting 
of ₩15,778 million
,
 ₩24,415
million and ₩
3,654
million, net of tax, are included in other comprehensive loss, respectively. 
 
13.
Other Financial Assets
 
(1)
Other financial assets as of December 31, 2022 and 2023 are as follows:
 
       
2022
  
2023
 
       
Current
  
Non-current
  
Current
  
Non-current
 
       
In millions of won
 
Loans
      132,890   968,468   139,178   966,421 
Less: Allowance for doubtful accounts
     (13  (54,824  (10  (80,783
Less: Present value discount
     (816  (32,334  (1,007  (35,468
    
 
 
  
 
 
  
 
 
  
 
 
 
     132,061   881,310   138,161   850,170 
    
 
 
  
 
 
  
 
 
  
 
 
 
Long-term / short-term financial instruments
     666,758   686,322   578,578   833,737 
    
 
 
  
 
 
  
 
 
  
 
 
 
       798,819   1,567,632   716,739   1,683,907 
    
 
 
  
 
 
  
 
 
  
 
 
 
 
F-7
8
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
13.
Other Financial Assets, Continued
 
(2)
Loans as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Face value
   
Allowance for
doubtful accounts
  
Present value
discount
  
Carrying value
 
       
In millions of won
 
Short-term loans
        
Loans for tuition
      30,261       (816  29,445 
Loans for housing
     29,630          29,630 
Other loans
     72,999    (13     72,986 
    
 
 
   
 
 
  
 
 
  
 
 
 
     132,890    (13  (816  132,061 
    
 
 
   
 
 
  
 
 
  
 
 
 
Long-term loans
        
Loans for tuition
     436,131    (37,783  (32,334  366,014 
Loans for housing
     309,446          309,446 
Loans for related parties
     187,728    (17,041     170,687 
Other loans
     35,163          35,163 
    
 
 
   
 
 
  
 
 
  
 
 
 
     968,468    (54,824  (32,334  881,310 
    
 
 
   
 
 
  
 
 
  
 
 
 
      1,101,358    (54,837  (33,150  1,013,371 
    
 
 
   
 
 
  
 
 
  
 
 
 
       
2023
 
       
Face value
   
Allowance for
doubtful accounts
  
Present value
discount
  
Carrying value
 
       
In millions of won
 
Short-term loans
        
Loans for tuition
      30,497       (1,007  29,490 
Loans for housing
     35,560          35,560 
Other loans
     73,121    (10     73,111 
    
 
 
   
 
 
  
 
 
  
 
 
 
     139,178    (10  (1,007  138,161 
    
 
 
   
 
 
  
 
 
  
 
 
 
Long-term loans
        
Loans for tuition
     419,684    (24,745  (35,468  359,471 
Loans for housing
     301,840          301,840 
Loans for related parties
     222,014    (43,640     178,374 
Other loans
     22,883    (12,398     10,485 
    
 
 
   
 
 
  
 
 
  
 
 
 
     966,421    (80,783  (35,468  850,170 
    
 
 
   
 
 
  
 
 
  
 
 
 
      1,105,599    (80,793  (36,475  988,331 
    
 
 
   
 
 
  
 
 
  
 
 
 
 
(3)
Changes in the allowance for doubtful accounts of loans for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
  
2023
 
       
In millions of won
 
Beginning balance
      20,267    52,677   54,837 
Bad debt expense
     30,942    2,180   16,394 
Other
     1,468    (20  9,562 
    
 
 
   
 
 
  
 
 
 
Ending balance
      52,677    54,837   80,793 
    
 
 
   
 
 
  
 
 
 
 
F-
79

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
13.
Other Financial Assets, Continued
 
(4)
Long-term and short-term financial instruments as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
       
In millions of won
 
Time deposits
      428,813    130,570    363,286    145,336 
CD
     30,000             
Others
     207,945    555,752    215,292    688,401 
    
 
 
   
 
 
   
 
 
   
 
 
 
      666,758    686,322    578,578    833,737 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
14.
Inventories
Inventories as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Acquisition cost
   
Valuation allowance
   
Book
value
 
       
In millions of won
 
Raw materials
      4,522,171    (1,350   4,520,821 
Merchandises
     1,001        1,001 
Work-in-progress
     172,089    (75   172,014 
Finished goods
     52,642    (57   52,585 
Supplies
     2,814,377        2,814,377 
Inventories-in-transit
     2,356,444        2,356,444 
Other inventories
     13,490        13,490 
    
 
 
   
 
 
   
 
 
 
      9,932,214    (1,482   9,930,732 
    
 
 
   
 
 
   
 
 
 
       
2023
 
       
Acquisition cost
   
Valuation allowance
   
Book
value
 
       
In millions of won
 
Raw materials
      4,624,638    (1,387   4,623,251 
Merchandises
     335        335 
Work-in-progress
     187,304        187,304 
Finished goods
     97,272    (57   97,215 
Supplies
     2,930,978        2,930,978 
Inventories-in-transit
     1,021,797        1,021,797 
Other inventories
     14,735        14,735 
    
 
 
   
 
 
   
 
 
 
      8,877,059    (1,444   8,875,615 
    
 
 
   
 
 
   
 
 
 
The reversal of the allowance for loss on inventory valuation deducted from the cost of sales for the years ended December 31, 2021, 2022 and 2023 amounts to
 
11,422
million
,
18,162
million and ₩9,974 million, respectively.
The amounts of loss from inventory valuation included in other gains or losses for the years ended December 31, 2021, 2022 and 2023
were ₩7,761 million
,
14,528
million and ₩9,936 million, respectively.
 
F-8
0
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
15.
Non-Financial Assets
Non-financial assets as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
       
In millions of won
 
Advanced payments
      160,596    51,425    300,350    75,489 
Prepaid expenses
     366,532    153,830    440,079    214,022 
Others (*)
     1,217,741    103,879    368,892    60,659 
    
 
 
   
 
 
   
 
 
   
 
 
 
      1,744,869    309,134    1,109,321    350,170 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
 (*)
Details of others as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
       
In millions of won
 
Greenhouse gas emissions rights
      192,005        25,246     
Other quick assets
     1,025,736    103,879    343,646    60,659 
    
 
 
   
 
 
   
 
 
   
 
 
 
      1,217,741    103,879    368,892    60,659 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
16.
Consolidated Subsidiaries
 
(1)
Consolidated subsidiaries as of December 31, 2022 and 2023 are as follows:
 
      
Percentage of ownership (%)
 
Subsidiaries
 
Key operation activities
 
Location
 
  2022  
  
  2023  
 
Korea Hydro & Nuclear Power Co., Ltd.
 Power generation Korea  100.00  100.00
Korea South-East Power Co., Ltd.
 Power generation Korea  100.00  100.00
Korea Midland Power Co., Ltd.
 Power generation Korea  100.00  100.00
Korea Western Power Co., Ltd.
 Power generation Korea  100.00  100.00
Korea Southern Power Co., Ltd.
 Power generation Korea  100.00  100.00
Korea East-West Power Co., Ltd.
 Power generation Korea  100.00  100.00
KEPCO Engineering & Construction Company, Inc. (*1)
 Engineering and construction for utility plant and others Korea  65.77  51.00
KEPCO Plant Service & Engineering Co., Ltd.
 Utility plant maintenance and others Korea  51.00  51.00
KEPCO Nuclear Fuel Co., Ltd.
 Nuclear fuel Korea  96.36  96.36
KEPCO KDN Co., Ltd.
 Electric power information technology and others Korea  100.00  100.00
KEPCO International HongKong Ltd.
 Holding company Hong Kong  100.00  100.00
KEPCO International Philippines Inc.
 Holding company Philippines  100.00  100.00
KEPCO Gansu International Ltd.
 Holding company Hong Kong  100.00  100.00
KEPCO Philippines Holdings Inc.
 Holding company Philippines  100.00  100.00
KEPCO Philippines Corporation
 Operation of utility plant Philippines  100.00  100.00
KEPCO Ilijan Corporation
 Construction and operation of utility plant Philippines  51.00  51.00
KEPCO Lebanon SARL
 Operation of utility plant Lebanon  100.00   
KEPCO Neimenggu International Ltd.
 Holding company Hong Kong  100.00  100.00
KEPCO Shanxi International Ltd.
 Holding company Hong Kong  100.00  100.00
KOMIPO Global Pte Ltd.
 Holding company Singapore  100.00  100.00
KEPCO Netherlands B.V.
 Holding company Netherlands  100.00  100.00
KEPCO Australia Pty., Ltd.
 Resources development Australia  100.00  100.00
KOSEP Australia Pty., Ltd.
 Resources development Australia  100.00  100.00
KOMIPO Australia Pty., Ltd.
 Resources development Australia  100.00  100.00
KOWEPO Australia Pty., Ltd.
 Resources development Australia  100.00  100.00
KOSPO Australia Pty., Ltd.
 Resources development Australia  100.00  100.00
KEPCO Middle East Holding Company
 Holding company Bahrain  100.00  100.00
Qatrana Electric Power Company
 Construction and operation of utility plant Jordan  80.00  80.00
KHNP Canada Energy Ltd.
 Holding company Canada  100.00  100.00
KEPCO Bylong Australia Pty., Ltd.
 Resources development Australia  100.00  100.00
 
F-8
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(1)
Consolidated subsidiaries as of December 31, 2022 and 2023 are as follows, continued:
 
      
Percentage of ownership (%)
 
Subsidiaries
 
Key operation activities
 
Location
 
  2022  
  
  2023  
 
Korea Waterbury Uranium Limited Partnership
 Resources development Canada  80.00  80.03
KEPCO Holdings de Mexico
 Holding company Mexico  100.00  100.00
KST Electric Power Company, S.A.P.I. de C.V.
 Construction and operation of utility plant Mexico  56.00  56.00
KEPCO Energy Service Company
 Operation of utility plant Mexico  100.00  100.00
KEPCO Netherlands S3 B.V.
 Holding company Netherlands  100.00  100.00
PT. KOMIPO Pembangkitan Jawa Bali
 Operation of utility plant Indonesia  51.00  51.00
PT. Cirebon Power Service (*2)
 Operation of utility plant Indonesia  27.50  27.50
KOWEPO International Corporation
 Operation of utility plant Philippines  99.99  99.99
KOSPO Jordan LLC
 Operation of utility plant Jordan  100.00  100.00
EWP America Inc.
 Holding company USA  100.00  100.00
EWP Renewable Corporation
 Holding company USA  100.00  100.00
KNF Canada Energy Limited
 Holding company Canada  100.00  100.00
EWP Barbados 1 SRL
 Holding company Barbados  100.00  100.00
California Power Holdings, LLC
 Power generation USA  100.00  100.00
Gyeonggi Green Energy Co., Ltd.
 Power generation Korea  62.01  62.01
PT. Tanggamus Electric Power
 Power generation Indonesia  52.50  52.50
Gyeongju Wind Power Co., Ltd.
 Power generation Korea  70.00  70.00
KOMIPO America Inc.
 Holding company USA  100.00  100.00
PT. EWP Indonesia
 Holding company Indonesia  99.96  99.96
KEPCO Netherlands J3 B.V.
 Holding company Netherlands  100.00  100.00
Korea Offshore Wind Power Co., Ltd.
 Power generation Korea  100.00  100.00
Global One Pioneer B.V.
 Holding company Netherlands  100.00  100.00
Global Energy Pioneer B.V.
 Holding company Netherlands  100.00  100.00
Mira Power Limited (*3)
 Power generation Pakistan  76.00  76.00
KOSEP Material Co., Ltd.
 Recycling fly ashes Korea  86.22  86.22
Commerce and Industry Energy Co., Ltd. (*4)
 RDF power generation Korea  85.03  85.03
KEPCO KPS Philippines Corp.
 Utility plant maintenance and others Philippines  99.99  99.99
KOSPO Chile SpA
 Holding company Chile  100.00  100.00
PT. KOWEPO Sumsel Operation And Maintenance Services
 Utility plant maintenance and others Indonesia  95.00  95.00
Hee Mang Sunlight Power Co., Ltd.
 Operation of utility plant Korea  100.00  100.00
Fujeij Wind Power Company
 Operation of utility plant Jordan  100.00  100.00
KOSPO Youngnam Power Co., Ltd.
 Operation of utility plant Korea  50.00  100.00
Chitose Solar Power Plant LLC
 Power generation Japan  65.00  65.00
KEPCO Energy Solution Co., Ltd.
 Energy service Korea  100.00  100.00
KEPCO Solar Co., Ltd.
 Power generation Korea  100.00  100.00
KOSPO Power Services Ltda.
 Utility plant maintenance and others Chile  65.00  65.00
Energy New Industry Specialized Investment Private Investment Trust
 Holding company Korea  99.01  99.01
KOEN Bylong Pty., Ltd.
 Resources development Australia  100.00  100.00
KOMIPO Bylong Pty., Ltd.
 Resources development Australia  100.00  100.00
KOWEPO Bylong Pty., Ltd.
 Resources development Australia  100.00  100.00
KOSPO Bylong Pty., Ltd.
 Resources development Australia  100.00  100.00
EWP Bylong Pty., Ltd.
 Resources development Australia  100.00  100.00
KOWEPO Lao International
 Utility plant maintenance and others Laos  100.00  100.00
KEPCO US Inc.
 Holding company USA  100.00   
KEPCO Mangilao Holdings LLC
 Holding company USA  100.00  100.00
Mangilao Investment LLC
 Holding company USA  80.06  80.06
KEPCO Mangilao Solar, LLC
 Power generation USA  100.00  100.00
Jeju Hanlim Offshore Wind Co., Ltd.
 Power generation Korea  79.03  79.03
PT. Siborpa Eco Power
 Construction and operation of utility plant Indonesia  55.00  55.00
BSK E-New Industry Fund VII
 Holding company Korea  81.67  81.67
e-New Industry LB Fund 1
 Holding company Korea  76.11  76.11
Songhyun e-New Industry Fund
 Holding company Korea  80.65  80.65
BSK E-New Industry Fund X
 Holding company Korea  66.80  66.80
PT. Korea Energy Indonesia
 Utility plant maintenance and others Indonesia  95.00  95.00
KOLAT SpA
 Utility plant maintenance and others Chile  100.00  100.00
KEPCO California, LLC
 Holding company USA  100.00  100.00
KEPCO Mojave Holdings, LLC
 Holding company USA  100.00  100.00
Incheon Fuel Cell Co., Ltd.
 Power generation Korea  60.00  60.00
 
F-8
2
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(1)
Consolidated subsidiaries as of December 31, 2022 and 2023 are as follows, continued:
 
      
Percentage of ownership (%)
 
Subsidiaries
 
Key operation activities
 
Location
 
  2022  
  
  2023  
 
KOEN Service Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
KOMIPO Service Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
KOWEPO Service Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
KOSPO Service Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
EWP Service Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
PT. KOMIPO Energy Indonesia
 Utility plant maintenance and others Indonesia  95.00  95.00
KNF Partners Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
KOSPO USA Inc.
 Holding company USA  100.00  100.00
Nambu USA LLC
 Holding company USA  100.00  100.00
Tamra Offshore Wind Power Co., Ltd.
 Power generation Korea  63.00  63.00
KEPCO MCS Co., Ltd.
 Electric meter reading and others Korea  100.00  100.00
KEPCO FMS Co., Ltd.
 Security service and others Korea  100.00  100.00
Firstkeepers Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
Secutec Co., Ltd.
 Security service Korea  100.00  100.00
SE Green Energy Co., Ltd.
 Power generation Korea  84.80  84.80
Mangilao Intermediate Holdings LLC
 Holding company USA  100.00  100.00
KEPCO CSC Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
KOAK Power Limited
 Hydro power facility maintenance Pakistan  100.00  100.00
KOMIPO Europe B.V.
 Holding company Netherlands  100.00  100.00
Haenanum Energy Fund
 Holding company Korea  99.64  99.64
Paju Ecoenergy Co., Ltd.
 Power generation Korea  89.00  89.00
Guam Ukudu Power LLC
 Power generation USA  100.00  100.00
K-SOLAR SHINAN Co., Ltd.
 Power generation Korea  90.00  90.00
KPS Partners Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
KEPCO E&C Service Co., Ltd.
 Facility maintenance and service Korea  100.00  100.00
Moha solar Co., Ltd.
 Power generation Korea  100.00  100.00
Ogiri Solar Power Co., Ltd.
 Power generation Korea  70.00  70.00
KHNP USA LLC
 Holding company USA  100.00  100.00
KOMIPO Vanphong Power Service LLC
 Utility plant maintenance and others Vietnam  100.00  100.00
Energy Innovation Fund I
 Holding company Korea  71.91  71.91
KHNP Chile SpA
 Holding company Chile  100.00  100.00
Yeong Yang Apollon Photovoltaic Co., Ltd.
 Power generation Korea  100.00  100.00
Yeong Yang Corporation Co., Ltd.
 Power generation Korea  100.00  100.00
SolarVader Co., Ltd.
 Power generation Korea  100.00  100.00
Yeong Yang Innovation Co., Ltd.
 Power generation Korea  100.00  100.00
Yeong Yang Horus Photovoltaic Co., Ltd.
 Power generation Korea  100.00  100.00
Yeong Yang Solar Management Co., Ltd.
 Power generation Korea  100.00  100.00
LSG Hydro Power Limited
 Holding company Pakistan  99.80  99.80
KOEN Bio Co., Ltd.
 Wood pellet utilization business Korea  70.00  70.00
KOMIPO Energy Solution America, LLC
 Holding company USA  100.00  100.00
Elara Investment Holdings, LLC (*5)
 Holding company USA  0.10  0.10
Elara Equity Holdings, LLC
 Holding company USA  54.00  54.00
Elara Class B Holdings, LLC
 Holding company USA  100.00  100.00
Elara Class B Member, LLC
 Holding company USA  100.00  100.00
Elara Development Holdings, LLC
 Holding company USA  100.00  100.00
KOMIPO Development, LLC
 Holding company USA  100.00  100.00
Elara Energy Holdings, LLC (*5)
 Holding company USA  43.94  43.94
Elara Energy Project, LLC
 Power generation USA  100.00  100.00
KOMIPO Iberian Solar Group, S.L.U.
 Holding company Spain  100.00  100.00
Jeongam Wind Power Co., Ltd.
 Power generation Korea  80.00  80.00
KOWEPO Europe B.V.
 Holding company Netherlands  100.00  100.00
CVS Equity Holdings, LLC
 Holding company USA  81.34  81.34
CVS Class B Holdings, LLC
 Holding company USA  100.00  100.00
CVS Development Holdings, LLC
 Holding company USA  100.00  100.00
CVS Development, LLC
 Holding company USA  100.00  100.00
CVS Class B Member, LLC
 Holding company USA  100.00  100.00
CVS Energy Holdings, LLC
 Holding company USA  70.79  70.79
Concho Valley Energy, LLC
 Holding company USA  100.00  100.00
 
F-8
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(1)
Consolidated subsidiaries as of December 31, 2022 and 2023 are as follows, continued:
 
      
Percentage of ownership (%)
 
Subsidiaries
 
Key operation activities
 
Location
 
  2022  
  
  2023  
 
Concho Valley Solar, LLC
 Power generation USA  100.00  100.00
Yeongdeok Sunrise Wind Power Co., Ltd.
 Power generation Korea  70.00  70.00
KHNP Spain, S.L.
 Holding company Spain  100.00   
UI Carbon-Neutrality Fund
 Holding company Korea  78.97  78.97
KA Power Limited
 Power generation Pakistan  100.00  100.00
Western Power Changgi Solar Co., Ltd.
 Power generation Korea  100.00  100.00
EWP Australia Pty., Ltd.
 Holding company Australia  100.00  100.00
Columboola Solar Farm Hold Co Pty., Ltd. (*3,6)
 
Holding company
 Australia  74.04  74.04
Digital Innovation Growth Fund
 Holding company Korea  76.92  76.92
J Wind First, LLC (*7)
 Company specializing in liquidization Korea    
KEPCO Holding Company
 Holding company Saudi Arabia  100.00  100.00
KEPCO for Power Company
 Power generation Saudi Arabia  60.00   
KEPCO for Maintenance Company
 Utility plant maintenance and others Saudi Arabia  100.00  100.00
KOSPO Trumbull LLC
 Holding company USA  100.00  100.00
Changjuk Wind Power Co., Ltd.
 Power generation Korea  73.00  73.00
Chile Solar JV SpA
 Power generation Chile     100.00
KEPCO KPS South Africa Pty., Ltd.
 Utility plant maintenance and others Republic of
South Africa
     100.00
KOWEPO Holding Limited
 Holding company United Arab
Emirates
     100.00
Magna Energy New Industrial Fund
 Holding company Korea     82.00
Columboola Solar Farm Nominees Pty., Ltd. (*3)
 Power generation Australia     100.00
Columboola Solar Farm Op Trust (*3)
 Power generation Australia     100.00
Columboola Solar Farm Fin Co Pty., Ltd. (*3)
 Holding company Australia     100.00
EWP ESS Holdings, LLC
 Holding company USA     100.00
Fairhaven ESS LLC
 Holding company USA     100.00
 
(*1)
Considering treasury stocks, the effective ownership
interest
is 51.24%. The Company sold a portion of its stocks in the subsidiary (14.77%) during the year ended December 31, 2023.
 
(*2)
The effective percentage of ownership is less than 50%. However, this subsidiary is included in the consolidated financial statements as the Company obtained the majority of the voting power under the shareholders’ agreement.
 
(*3)
As of December 31, 2023, the annual reporting period of all subsidiaries ends on December 31, except
for
Mira Power Limited, Columboola Solar Farm Hold Co Pty., Ltd., Columboola Solar Farm Nominees Pty., Ltd., Columboola Solar Farm Op Trust and Columboola Solar Farm Fin Co Pty., Ltd.
 
(*4)
The Company guarantees a certain return on investments in Commerce and Industry Energy Co., Ltd. for the financial investors holding such investments. The financial investors have a right to claim the Company to sell its shares in the entity, which can be exercised 36 months after the date of acquisition. Accordingly, the purchase price including the return on investment is classified as a borrowing.
 
(*5)
The effective percentage of ownership is less than 50%. However, this subsidiary is included in the consolidated financial statements as the Company has control over the board of directors under the shareholders' agreement.
 
(*6)
Excluding preferred stocks, the percentage of ownership with voting rights is 100%.
 
(*7)
Although the Company does not hold a stake as of December 31, 2023, considering the purpose and design of the structured entity, the Company is exposed to volatility in the profits of the structured entity. In addition, Company has the ability to direct activities that can most significantly affect the operations of the structured entity, so it has been determined that the Company has control over the entity.
 
F-8
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(2)
Subsidiaries newly included in and excluded from consolidation for the year ended December 31, 2023 are as follows:
Subsidiaries included in consolidation during the year ended December 31, 2023.
 
Subsidiaries
  
Reason
Chile Solar JV SpA
  Change in the scope of consolidation
KEPCO KPS South Africa Pty., Ltd.
  New investment
KOWEPO Holding Limited
  New investment
Magna Energy New Industrial Fund
  New investment
Columboola Solar Farm Nominees Pty., Ltd.
  New investment
Columboola Solar Farm Op Trust
  New investment
Columboola Solar Farm Fin Co Pty., Ltd.
  New investment
EWP ESS Holdings, LLC
  New investment
Fairhaven ESS LLC
  New investment
Subsidiaries excluded from consolidation during the year ended December 31, 2023.
 
Subsidiaries
  
Reason
KHNP Spain, S.L.
  Liquidation
KEPCO for Power Company
  Change in the scope of consolidation
KEPCO Lebanon SARL
  Under liquidation process
KEPCO US Inc.
  Liquidation
 
(3)
Summary of financial information of consolidated subsidiaries as of and for the years ended December 31, 2022 and 2023 are as follows:
 
2022
 
Subsidiaries
      
Total

assets
   
Total

liabilities
   
Sales
   
Profit (loss)

for the year
 
       
In millions of won
 
Korea Hydro & Nuclear Power Co., Ltd.
      69,129,625    42,843,974    10,386,091    (16,382
Korea South-East Power Co., Ltd.
     13,855,071    7,410,881    8,972,991    71,662 
Korea Midland Power Co., Ltd.
     16,062,605    10,776,943    8,629,165    (58,173
Korea Western Power Co., Ltd.
     13,459,054    8,125,312    8,112,727    106,361 
Korea Southern Power Co., Ltd.
     14,011,354    8,296,983    9,304,362    (68,315
Korea East-West Power Co., Ltd.
     12,079,954    5,818,789    6,925,094    2,888 
KEPCO Engineering & Construction Company, Inc.
     815,533    272,119    505,291    17,954 
KEPCO Plant Service & Engineering Co., Ltd.
     1,555,453    344,702    1,425,913    97,881 
KEPCO Nuclear Fuel Co., Ltd.
     949,455    490,215    304,405    31,508 
KEPCO KDN Co., Ltd.
     734,439    166,272    739,453    42,584 
KEPCO International HongKong Ltd.
     128,784            (216
KEPCO International Philippines Inc.
     127,744    101        9,976 
KEPCO Gansu International Ltd.
     7,125    598        (22
KEPCO Philippines Holdings Inc.
     191,634    129        39,346 
KEPCO Philippines Corporation
     3,799    14        102 
KEPCO Ilijan Corporation
     231,132    3,642    23,263    16,455 
KEPCO Lebanon SARL
     1,890    10,482        20 
 
F-8
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(3)
Summary of financial information of consolidated subsidiaries as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Subsidiaries
      
Total

assets
   
Total

liabilities
   
Sales
   
Profit (loss)

for the year
 
       
In millions of won
 
KEPCO Neimenggu International Ltd.
      269,582    3,917        9,938 
KEPCO Shanxi International Ltd.
     597,635    222,186        (11,312
KOMIPO Global Pte Ltd.
     388,071    1,817        58,030 
KEPCO Netherlands B.V.
     137,454    64        8,570 
KEPCO Australia Pty., Ltd.
     579    11        102 
KOSEP Australia Pty., Ltd.
     74,180    13,097    52,271    24,443 
KOMIPO Australia Pty., Ltd.
     81,216    10,327    52,272    23,368 
KOWEPO Australia Pty., Ltd.
     81,696    10,184    52,271    22,745 
KOSPO Australia Pty., Ltd.
     41,872    10,174    52,271    24,362 
KEPCO Middle East Holding Company
     116,731    102,054        (634
Qatrana Electric Power Company
     513,277    247,027    24,354    22,578 
KHNP Canada Energy Ltd.
     107,200    6,218        149 
KEPCO Bylong Australia Pty., Ltd.
     44,034    437,852        (45,880
Korea Waterbury Uranium Limited Partnership
     20,934    224        (116
KEPCO Holdings de Mexico
     728    1,974        (1,363
KST Electric Power Company, S.A.P.I. de C.V.
     653,830    528,315    232,893    23,122 
KEPCO Energy Service Company
     2,238    2,173    7,015    (211
KEPCO Netherlands S3 B.V.
     71,326    16,419        4,465 
PT. KOMIPO Pembangkitan Jawa Bali
     15,753    3,232    22,488    3,668 
PT. Cirebon Power Service
     2,316    784    9,602    355 
KOWEPO International Corporation
         10         
KOSPO Jordan LLC
     22,854    6,964    45,009    7,657 
EWP America Inc. (*1)
     47,775    2,595    21,717    4,337 
KNF Canada Energy Limited
     2,116    34        (59
EWP Barbados 1 SRL
     395,067    901    3,230    34,260 
Gyeonggi Green Energy Co., Ltd.
     220,414    226,517    112,524    (26,004
PT. Tanggamus Electric Power
     227,638    163,106    3,781    5,778 
Gyeongju Wind Power Co., Ltd.
     98,513    55,579    24,888    9,711 
KOMIPO America Inc. (*2)
     571,200    317,903    34,059    (3,293
PT. EWP Indonesia
     93,390    5        4,100 
KEPCO Netherlands J3 B.V.
     135,213    63        19,396 
Korea Offshore Wind Power Co., Ltd.
     376,449    192,335    52,526    13,083 
Global One Pioneer B.V.
     135    41        (68
Global Energy Pioneer B.V.
     320    40        (64
Mira Power Limited
     416,750    310,529    57,135    12,394 
KOSEP Material Co., Ltd.
     3,985    662    4,589    775 
Commerce and Industry Energy Co., Ltd.
     79,172    32,147    31,068    (3,730
KEPCO KPS Philippines Corp.
     5,294    600    5,232    1,004 
KOSPO Chile SpA
     159,500    70,037        (2,811
PT. KOWEPO Sumsel Operation And Maintenance Services
     25    252        (94
Hee Mang Sunlight Power Co., Ltd.
     5,877    2,606    862    304 
Fujeij Wind Power Company
     213,113    163,690        16,564 
KOSPO Youngnam Power Co., Ltd.
     425,000    312,831    568,224    10,878 
Chitose Solar Power Plant LLC
     109,964    94,366    14,384    1,615 
KEPCO Energy Solution Co., Ltd.
     317,392    6,147    33,638    138 
KEPCO Solar Co., Ltd.
     243,221    25,405    24,778    9,305 
KOSPO Power Services Ltda.
     6,722    4,762    17,911    (358
Energy New Industry Specialized Investment Private Investment Trust (*3)
     451,762    4,338    24,725    7,093 
KOEN Bylong Pty., Ltd.
     11    119        (12
KOMIPO Bylong Pty., Ltd.
     11    122        (33
KOWEPO Bylong Pty., Ltd.
     8    94        (7
KOSPO Bylong Pty., Ltd.
     25    148        (17
 
F-8
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(3)
Summary of financial information of consolidated subsidiaries as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Subsidiaries
     
Total

assets
   
Total

liabilities
   
Sales
   
Profit (loss)

for the year
 
      
In millions of won
 
EWP Bylong Pty., Ltd.
     8    54        1 
KOWEPO Lao International
     8,248    87    10,010    11,185 
KEPCO US Inc.
     91            (19,181
KEPCO Mangilao Holdings LLC
     112,948    40,558    21,743    21,166 
Mangilao Investment LLC
     258,674    4        (1
KEPCO Mangilao Solar, LLC
     240,736    373    8,870    (14,818
Jeju Hanlim Offshore Wind Co., Ltd.
     185,357    111,343        (3,546
PT. Siborpa Eco Power
     12,050    3        (39
PT. Korea Energy Indonesia
     1,675    80    1,937    (104
KOLAT SpA
     48,787    3,701    1,647    1,888 
KEPCO California, LLC
     46,151    4,768    596    (670
KEPCO Mojave Holdings, LLC
     95,550    75,846        (4,705
Incheon Fuel Cell Co., Ltd.
     268,063    242,176    107,193    (5,323
KOEN Service Co., Ltd.
     9,353    7,035    36,340    356 
KOMIPO Service Co., Ltd.
     6,597    4,503    35,031    905 
KOWEPO Service Co., Ltd.
     6,266    3,130    34,031    171 
KOSPO Service Co., Ltd.
     6,672    5,048    28,321    60 
EWP Service Co., Ltd.
     3,756    2,507    24,526    581 
PT. KOMIPO Energy Indonesia
     2,978    368    1,698    83 
KNF partners Co., Ltd.
     2,285    1,053    5,997    293 
KOSPO USA Inc.
     315,018    430        5,024 
Nambu USA LLC
     297,516            670 
Tamra Offshore Wind Power Co., Ltd.
     133,598    93,639    18,332    5,316 
KEPCO MCS Co., Ltd.
     114,316    52,241    363,627    8,468 
KEPCO FMS Co., Ltd.
     16,852    11,667    105,339    2,176 
Firstkeepers Co., Ltd.
     16,448    12,912    84,620    2,482 
Secutec Co., Ltd.
     12,578    9,209    69,383    690 
SE Green Energy Co., Ltd.
     149,189    114,241    49,873    1,304 
Mangilao Intermediate Holdings LLC
     236,266    116,426        (4,709
KEPCO CSC Co., Ltd.
     10,668    8,937    46,559    (2,134
KOAK Power Limited
     12,626    839        49 
KOMIPO Europe B.V.
     81,364    54    1,195    1,134 
Haenanum Energy Fund
     7,416    3        (48
Paju Ecoenergy Co., Ltd.
     61,930    3,066    20,718    1,290 
Guam Ukudu Power LLC
     293,422    323,292        (31,410
K-SOLAR SHINAN Co., Ltd.
     320,227    296,141    16,980    3,690 
KPS Partners Co., Ltd.
     3,619    2,007    12,417    487 
KEPCO E&C Service Co., Ltd.
     5,676    1,897    16,180    1,493 
Moha solar Co., Ltd.
     29,096    31,359    169    (1,137
Ogiri Solar Power Co., Ltd.
     1,033    23        (30
KHNP USA LLC
     1,290    97    1,127    392 
KOMIPO Vanphong Power Service LLC
     15,940    3,333    20,233    9,871 
Energy Innovation Fund I
     35,310    445        (961
KHNP Chile SpA
     5,547    4,147        (16
Yeong Yang Apollon Photovoltaic Co., Ltd.
     1,566    1,507    254    (82
Yeong Yang Corporation Co., Ltd.
     1,559    1,497    251    (91
SolarVader Co., Ltd.
     1,568    1,500    256    (78
Yeong Yang Innovation Co., Ltd.
     1,557    1,497    244    (91
Yeong Yang Horus Photovoltaic Co., Ltd.
     1,552    1,498    243    (93
Yeong Yang Solar Management Co., Ltd.
     1,573    1,500    262    (75
 
F-8
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(3)
Summary of financial information of consolidated subsidiaries as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Subsidiaries
     
Total

assets
   
Total

liabilities
   
Sales
   
Profit (loss)

for the year
 
      
In millions of won
 
LSG Hydro Power Limited
     1,144    1,159        (18
KOEN Bio Co., Ltd.
     261    219    639    (150
KOMIPO Iberian Solar Group, S.L.U.
     78,094    65,012        (1,304
Jeongam Wind Power Co., Ltd.
     81,800    68,317    10,722    892 
KOWEPO Europe B.V.
     42,865    2,422        1,668 
Yeongdeok Sunrise Wind Power Co., Ltd.
     42,187    22,031        (328
KHNP Spain, S.L.
     3            (1
KA Power Limited
     3,937    418        442 
Western Power Changgi Solar Co., Ltd. 
     48,770    44,647    3,447    (354
EWP Australia Pty., Ltd.
     51,105            15,203 
Columboola Solar Farm Hold Co Pty., Ltd.
     310,271    214,792    2,228    2,884 
Digital Innovation Growth Fund
     12,594    100        (363
J Wind First, LLC
     33,611    33,611    450     
KEPCO Holding Company
     3,273    17        (18
KEPCO for Power Company
     57,501    58,441        (960
KEPCO for Maintenance Company
                  
KOSPO Trumbull LLC
     37    3         
Changjuk Wind Power Co., Ltd.
     29,208    3,137    9,027    3,503 
 
 (*1)
Financial information of EWP America Inc. includes that of two other subsidiaries, EWP Renewable Corporation, and California Power Holdings, LLC.
 
 (*2)
Financial information of KOMIPO America Inc. includes that of 17 other subsidiaries including Elara Equity Holdings, LLC and CVS Equity Holdings, LLC.
 
 
F-8
8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(3)
Summary of financial information of consolidated subsidiaries as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
 (*3)
Financial information of Energy New Industry Specialized Investment Private Investment Trust includes that of five other subsidiaries, BSK E-New Industry Fund VII, e-New Industry LB Fund 1, Songhyun e-New Industry Fund, BSK E-New Industry Fund X, and UI Carbon-Neutrality Fund.
 
2023
 
Subsidiaries
      
Total

assets
   
Total

liabilities
   
Sales
   
Profit (loss)

for the period
 
       
In millions of won
 
Korea Hydro & Nuclear Power Co., Ltd.
       70,535,018    45,660,916    10,798,378    151,638 
Korea South-East Power Co., Ltd.
     13,158,245    6,964,695    7,761,713    196,522 
Korea Midland Power Co., Ltd.
     15,309,205    10,368,698    7,611,821    (1,844
Korea Western Power Co., Ltd.
     12,710,246    7,648,441    6,915,233    126,519 
Korea Southern Power Co., Ltd.
     13,405,076    7,807,334    7,298,989    226,811 
Korea East-West Power Co., Ltd.
     11,683,112    5,626,034    5,571,885    139,013 
KEPCO Engineering & Construction Company, Inc.
     854,704    307,396    545,092    32,654 
KEPCO Plant Service & Engineering Co., Ltd.
     1,585,380    318,597    1,523,031    161,849 
KEPCO Nuclear Fuel Co., Ltd.
     1,101,960    622,157    284,066    43,533 
KEPCO KDN Co., Ltd.
     733,434    301,713    738,833    65,495 
KEPCO International HongKong Ltd.
     133,915            8,795 
KEPCO International Philippines Inc.
     72,830            4,891 
KEPCO Gansu International Ltd.
     7,226    608        (23
KEPCO Philippines Holdings Inc.
     180,592    96        8,802 
KEPCO Philippines Corporation
     2,607            127 
KEPCO Ilijan Corporation
     142,711    800        3,718 
KEPCO Neimenggu International Ltd.
     284,280    4,346        15,021 
KEPCO Shanxi International Ltd.
     707,447    329,539        (3,875
KOMIPO Global Pte Ltd.
     411,249    32,900        17,174 
KEPCO Netherlands B.V.
     141,088    45        3,856 
KEPCO Australia Pty., Ltd.
     749    34        131 
KOSEP Australia Pty., Ltd.
     79,308    7,990    29,675    10,665 
KOMIPO Australia Pty., Ltd.
     86,077    4,014    29,676    9,248 
KOWEPO Australia Pty., Ltd.
     86,074    3,571    29,675    9,001 
KOSPO Australia Pty., Ltd.
     32,828    3,923    29,675    10,329 
KEPCO Middle East Holding Company
     121,015    107,611        (1,548
Qatrana Electric Power Company
     491,627    208,707    26,779    20,949 
KHNP Canada Energy Ltd.
     155,242    12,379        392 
KEPCO Bylong Australia Pty., Ltd.
     44,557    465,231        (16,669
Korea Waterbury Uranium Limited Partnership
     20,772    44        (67
KEPCO Holdings de Mexico
     1,171    2,621        (121
KST Electric Power Company, S.A.P.I. de C.V.
     631,348    490,470    93,843    19,657 
KEPCO Energy Service Company
     2,028    716    10,193    251 
KEPCO Netherlands S3 B.V.
     70,613    16,710        1,769 
PT. KOMIPO Pembangkitan Jawa Bali
     17,303    3,929    23,639    1,579 
PT. Cirebon Power Service
     2,936    714    9,457    672 
KOWEPO International Corporation
         10         
KOSPO Jordan LLC
     19,387    3,881    17,665    7,082 
EWP America Inc. (*1)
     46,954    4,032    14,549    895 
KNF Canada Energy Limited
     2,261    34        (56
EWP Barbados 1 SRL
     434,690    14,217    2,448    36,566 
Gyeonggi Green Energy Co., Ltd.
     180,176    214,822    80,630    (28,549
PT. Tanggamus Electric Power
     214,892    150,483    2,127    (2,230
Gyeongju Wind Power Co., Ltd.
     90,616    49,982    19,807    6,716 
KOMIPO America Inc. (*2)
     579,403    318,295    39,323    3,376 
PT. EWP Indonesia
     90,650    132        9,590 
KEPCO Netherlands J3 B.V.
     153,324    13,634        15,289 
Korea Offshore Wind Power Co., Ltd.
     334,444    143,827    40,313    6,497 
 
F-
8
9

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(3)
Summary of financial information of consolidated subsidiaries as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Subsidiaries
      
Total

assets
   
Total

liabilities
   
Sales
   
Profit (loss)

for the period
 
       
In millions of won
 
Global One Pioneer B.V.
      143    44        (85
Global Energy Pioneer B.V.
     336    44        (81
Mira Power Limited
     403,843    318,557    2,683    (1,590
KOSEP Material Co., Ltd.
     4,974    542    4,834    908 
Commerce and Industry Energy Co., Ltd.
     73,671    29,611    33,050    (2,901
KEPCO KPS Philippines Corp.
     5,775    884    4,608    97 
KOSPO Chile SpA
     166,643    75,619         
PT. KOWEPO Sumsel Operation And Maintenance Services
    
 
26
 
  
 
260
 
  
 
 
  
 
 
Hee Mang Sunlight Power Co., Ltd.
     5,877    2,403    689    202 
Fujeij Wind Power Company
     216,082    158,081        15,067 
KOSPO Youngnam Power Co., Ltd.
    
 
360,026
 
  
 
255,761
 
  
 
410,173
 
  
 
(7,965
Chitose Solar Power Plant LLC
     98,911    84,228    14,447    2,059 
KEPCO Energy Solution Co., Ltd.
     322,529    15,367    14,151    5,384 
KEPCO Solar Co., Ltd.
     246,273    36,127    23,234    8,367 
KOSPO Power Services Ltd.
     6,976    7,086    17,634    (211
Energy New Industry Specialized Investment Private Investment Trust (*3)
     454,888    3,364    24,030    10,812 
KOEN Bylong Pty., Ltd.
     11    128         
KOMIPO Bylong Pty., Ltd.
     13    147        (20
KOWEPO Bylong Pty., Ltd.
     12    142        (43
KOSPO Bylong Pty., Ltd.
     388    541        (20
EWP Bylong Pty., Ltd.
     13    13        46 
KOWEPO Lao International
     13,038    223    10,270    6,268 
KEPCO Mangilao Holdings LLC
     90,445    41,898    775    785 
Mangilao Investment LLC
     206,714    15        (1
KEPCO Mangilao Solar, LLC
     206,600    1,918    13,593    826 
Jeju Hanlim Offshore Wind Co., Ltd.
     459,229    388,171        (3,032
PT. Siborpa Eco Power
     12,209    3        (52
PT. Korea Energy Indonesia
     1,878    101    1,897    132 
KOLAT SpA
     46,958    352    2,237    1,820 
KEPCO California, LLC
     46,606    6,823    613    (385
KEPCO Mojave Holdings, LLC
     93,233    78,328        (3,901
Incheon Fuel Cell Co., Ltd.
     259,169    237,409    96,924    (4,112
KOEN Service Co., Ltd.
     11,470    8,745    38,164    305 
KOMIPO Service Co., Ltd.
     7,944    4,777    37,525    960 
KOWEPO Service Co., Ltd.
     10,300    6,584    36,421    264 
KOSPO Service Co., Ltd.
     6,122    4,182    30,369    703 
EWP Service Co., Ltd.
     5,487    3,790    26,767    176 
PT. KOMIPO Energy Indonesia
     2,983    250    2,023    38 
KNF partners Co., Ltd.
     2,589    1,106    6,380    340 
KOSPO USA Inc.
     378,732    377        (6,351
Nambu USA LLC
     297,370    230        (732
Tamra Offshore Wind Power Co., Ltd.
     120,460    83,161    18,570    1,089 
KEPCO MCS Co., Ltd.
     111,189    73,940    307,146    (4,757
KEPCO FMS Co., Ltd.
     21,310    18,142    107,336    1,895 
Firstkeepers Co., Ltd.
     18,698    12,437    90,575    2,689 
Secutec Co., Ltd.
     16,038    11,797    72,284    699 
SE Green Energy Co., Ltd.
     147,251    114,737    40,326    (1,305
Mangilao Intermediate Holdings LLC
     206,771    114,954        (5,293
KEPCO CSC Co., Ltd.
     15,985    12,170    49,502    2,644 
KOAK Power Limited
     15,000    528        714 
KOMIPO Europe B.V.
     86,109    69    1,183    109 
 
F-9
0

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(3)
Summary of financial information of consolidated subsidiaries as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Subsidiaries
      
Total

assets
   
Total

liabilities
   
Sales
   
Profit (loss)

for the period
 
       
In millions of won
 
Haenanum Energy Fund
      7,415    3    47    (1
Paju Ecoenergy Co., Ltd.
     60,653    2,146    15,351    (357
Guam Ukudu Power LLC
     749,837    720,795        (19,904
K-SOLAR
SHINAN Co., Ltd.
     298,866    281,676    37,137    (6,896
KPS Partners Co., Ltd.
    
 
3,503
 
  
 
1,776
 
  
 
12,921
 
  
 
183
 
KEPCO E&C Service Co., Ltd.
     7,167    1,938    16,454    1,505 
Moha solar Co., Ltd.
     27,213    29,363        112 
Ogiri Solar Power Co., Ltd.
     1,032    31        (9
KHNP USA LLC
     1,517    140    1,142    166 
KOMIPO Vanphong Power Service LLC
     26,819    3,768    21,396    10,879 
Energy Innovation Fund I
     43,725    419        (766
KHNP Chile SpA
     5,555    4,219        (66
Yeong Yang Apollon Photovoltaic Co., Ltd.
     1,529    1,427    219    42 
Yeong Yang Corporation Co., Ltd.
     1,519    1,418    216    39 
SolarVader Co., Ltd.
     1,529    1,421    219    40 
Yeong Yang Innovation Co., Ltd.
     1,510    1,418    210    32 
Yeong Yang Horus Photovoltaic Co., Ltd.
     1,502    1,418    206    28 
Yeong Yang Solar Management Co., Ltd.
     1,540    1,420    224    46 
LSG Hydro Power Limited
     717    8        (219
KOEN Bio Co., Ltd.
     1,010    585    2,467    372 
KOMIPO Iberian Solar Group, S.L.U.
     79,666    66,874        (931
Jeongam Wind Power Co., Ltd.
     75,744    63,219    8,154    (958
KOWEPO Europe B.V.
     107    3,177        (44,685
Yeongdeok Sunrise Wind Power Co., Ltd.
     94,615    74,842        (383
KA Power Limited
     3,173    172        126 
Western Power Changgi Solar Co., Ltd.
     46,950    40,815    7,036    2,011 
EWP Australia Pty., Ltd.
     52,734        325    337 
Columboola Solar Farm Hold Co Pty., Ltd. (*4)
     311,259    213,822    10,072    3,217 
Digital Innovation Growth Fund
     11,624    96        (266
J Wind First, LLC
     52,304    52,304    2,540     
KEPCO Holding Company
     3,307            (23
KEPCO for Maintenance Company
     118            (45
KOSPO Trumbull LLC
     25            (10
Changjuk Wind Power Co., Ltd.
     24,364    3,049    6,230    744 
Chile Solar JV SpA
     98,705    75,472    9,050    (2,768
KEPCO KPS South Africa Pty., Ltd.
     9,222    4,236    8,512    834 
KOWEPO Holding Limited
     1,323    1,371        (49
 
 (*1)
Financial information of EWP America Inc. includes that of 4 other subsidiaries, EWP Renewable Corporation, and California Power Holdings LLC, EWP ESS Holdings, LLC, and Fairhaven ESS LLC.
 
 (*2)
Financial information of KOMIPO America Inc. includes that of 17 other subsidiaries including Elara Equity Holdings, LLC and CVS Equity Holdings, LLC.
 
 (*3)
Financial information of Energy New Industry Specialized Investment Private Investment Trust includes that of 6 other subsidiaries, BSK
E-New
Industry Fund VII,
e-New
Industry LB Fund 1, Songhyun
e-New
Industry Fund, BSK
E-New
Industry Fund X, UI Carbon-Neutrality Fund, and Magna Energy New Industrial Fund.
 
 (*4)
Financial information of Columboola Solar Farm Hold Co Pty., Ltd. includes that of 3 other subsidiaries including Columboola Solar Farm Nominees Pty., Ltd.
 
F-9
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(4)
Significant restrictions on abilities to subsidiaries are as follows:
 
Company
  
Nature and extent of any significant restrictions
Gyeonggi Green Energy Co., Ltd.
  Acquisition or disposal of assets of more than
W
10 billion, change in the capacity of cogeneration units (except for the change due to performance improvement of equipment, maintenance) will require unanimous consent of all directors of the Company.
KOSPO Youngnam Power Co., Ltd.
  Dividends
may be payable
only when all conditions of the loan agreement are satisfied. Group’s shares cannot be wholly or partially transferred without prior written consent of financial institutions.
Jeongam Wind Power Co., Ltd.
  Dividends
may be payable
 only
when
 all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Also, payments to the contracting party may be restricted depending on the financial management priority of the contract. Group’s shares cannot be wholly or partially transferred without prior consent of other stakeholders including shareholders or financial institutions.
Incheon Fuel Cell Co., Ltd.
  Acquisition or disposal of assets of more than
W
20 billion, change in the capacity of cogeneration units (except for the change due to performance improvement of equipment, maintenance) will require unanimous consent of all directors of the Company.
Gyeongju Wind Power Co., Ltd.
  Dividends and settlement amounts for O&M and renewable energy certificate
may be payable
 only when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained.
Korea Offshore Wind Power Co., Ltd.
  Principals and interest on subordinated loans or dividends and settlement amounts for renewable energy certificate
may be payable
 only when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. The Company’s equity 
interest
in the subsidiary
may
be transferred either wholly or partially without prior written consent of financial institutions.
Jeju Hanlim Offshore Wind Co., Ltd.
  Prior approval from the lender is required when withdrawing funds (major expenditure, REC settlement, dividend payment, etc.) according to the loan agreement.
Yeongdeok Sunrise Wind Power Co., Ltd.
  Dividends
may be pay
able
only when all conditions of the loan agreement are satisfied.
Columboola Solar Farm Hold Co Pty., Ltd.
  Dividends
may be payable
only when all conditions of the loan agreement are satisfied.
Guam Ukudu Power LLC
  Dividends
may be payable
 only when all conditions of the loan agreement are satisfied. Disposing or transferring assets either as a whole or as a part is restricted, and the Company’s
equity interest
 in the subsidiary
may
not be transferred either wholly or partially without prior consent of other stakeholders including financial institutions.
KOSPO Trumbull LLC
  The Company’s
equity interest may
 not
 be transferred either wholly or partially without prior consent of other shareholders.
Mira Power Limited
  The Company’s
equity interest may
be transferred either wholly or partially without prior consent of other stakeholders.
Chile Solar JV SpA
  The Company’s
equity interest may
be transferred either wholly or partially without prior consent of other stakeholders.
 
F-9
2

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(4)
Significant restrictions on abilities to subsidiaries are as follows, continued:
 
Company
  
Nature and extent of any significant restrictions
K-SOLAR
SHINAN Co., Ltd.
  
Dividends may be payable only when all conditions of the loan agreement are satisfied. The Company’s equity interest may not be transferred either wholly or partially without prior consent of other stakeholders until five years have elapsed after the commencement of the operation.
Western Power Changgi Solar Co., Ltd.
  
Principals and interest on subordinated loans or dividends to investors are only payable when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Also, the Company’s equity interest may not be transferred either wholly or partially without prior written consent of financial institutions.
Chitose Solar Power Plant LLC
  
Capital expenditure may be incurred only upon prior consent of financial institutions. The issuance of securities to third parties, including current investors, is restricted, and the amount of paid-in capital cannot either increase, be written off or decrease.
Mangilao Intermediate Holdings LLC
  
Changes or termination of the O&M contract, and delays in the EPC contract may not be made without the prior written consent of the majority of the lenders, and dividends can be implemented only after repayment of the loan is completed.
Fujeij Wind Power Company
  
Incurring additional borrowings not specified in the loan agreement, or changing the PPA schedule or the EPC contract without the lender’s prior written consent is restricted. Also, commercial operation before acquiring wind turbine is restricted without prior consent from the EPC contractor. In addition, capital acquisition and new share issuance other than dividends payment to investors are restricted.
Qatrana Electric Power Company
  
Dividends payment, repayment of capital investment, and settlement for O&M can only be made when all conditions of the loan agreement are satisfied and prior consent of financial institutions is obtained.
KST Electric Power Company, S.A.P.I.
de C.V.
  Disposal of assets exceeding $5 million per year is restricted, and the debt ratio is required to be maintained below 90%. Additionally, capital and cost expenditures that do not meet the conditions in the loan agreement are restricted.
 
(5)
As of December 31, 2023, the Company has following entitlements in relation to its subsidiaries as per its shareholder’s agreements:
 
Company
  
Unrecognized Commitments
Jeongam Wind Power Co., Ltd.
  When the Company requests other shareholders to transfer shares after the completion of the power generation complex, the Company has a right to purchase the shares at fair value.
Changjuk Wind Power Co., Ltd.
  When other shareholders want to sell their shares after the performance guarantee period of wind power generators stipulated in the equipment supply contract is completed, the Company has an obligation to purchase the shares at fair value after consulting with the parties on the timing and size of the acquisition, taking in to account financial conditions, business conditions, and other circumstances.
Columboola Solar Farm Hold Co Pty., Ltd.
  The Company holds a call option to purchase the shares held by another shareholder at 80% of the stock's valuation in the event of a breach of obligation specified in the shareholder agreement.
 
F-9
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(6)
Details of non-controlling interests prior to intra-Company eliminations as of and for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
2021
 
Description
      
KEPCO Ilijan
Corporation
  
KEPCO Plant
Service &
Engineering
Co., Ltd.
  
KEPCO
Engineering &

Construction
Company, Inc.
  
Others
  
Total
 
       
In millions of won
 
Percentage of ownership
     49.00  49.00  33.92  
Current assets
      234,224   793,995   253,958   1,030,049   2,312,226 
Non-current assets
     24,845   626,710   451,085   3,838,233   4,940,873 
Current liabilities
     (30,783  (265,017  (183,100  (599,373  (1,078,273
Non-current liabilities
     (7,772  (46,590  (8,492  (2,666,345  (2,729,199
Net assets
     220,514   1,109,098   513,451   1,602,564   3,445,627 
Book value of non-controlling interests
     108,052   543,458   174,163   720,761   1,546,434 
Sales
     60,532   1,375,668   433,127   1,286,002   3,155,329 
Profit for the year
     12,981   98,132   16,452   128,264   255,829 
Profit for the year attributable to non-controlling interests
     6,361   48,085   5,581   28,914   88,941 
Cash flows from operating activities
     116,440   133,160   (16,270  303,577   536,907 
Cash flows from investing activities
     2,216   (39,444  19,061   (309,447  (327,614
Cash flows from financing activities before dividends to
non-controlling
interests
     (88,927  (30,599  (8,467  125,685   (2,308
Dividends to non-controlling interests
        (25,269  (3,639  (2,608  (31,516
Effect of exchange rate fluctuation
     10,683   885   38   7,243   18,849 
Net increase (decrease) of cash and cash equivalents
     40,412   38,733   (9,277  124,450   194,318 
 
2022
 
Description
      
KEPCO Ilijan
Corporation
  
KEPCO Plant
Service &
Engineering
Co., Ltd.
  
KEPCO
Engineering &

Construction
Company, Inc.
  
Others
  
Total
 
       
In millions of won
 
Percentage of ownership
     49.00  49.00  33.92  
Current assets
      230,031   861,705   372,031   1,147,973   2,611,740 
Non-current assets
     1,101   693,748   443,502   4,942,229   6,080,580 
Current liabilities
     (3,642  (316,497  (243,796  (841,521  (1,405,456
Non-current liabilities
        (28,205  (28,323  (2,944,145  (3,000,673
Net assets
     227,490   1,210,751   543,414   2,304,536   4,286,191 
Book value of non-controlling interests
     111,470   593,268   184,326   565,796   1,454,860 
Sales
     23,263   1,425,913   505,291   1,709,390   3,663,857 
Profit for the year
     16,455   97,881   17,954   91,566   223,856 
Profit for the year attributable to non-controlling interests
     8,063   47,962   6,090   (24,370  37,745 
Cash flows from operating activities
     68,475   81,419   4,918   231,653   386,465 
Cash flows from investing activities
     22,604   27,372   18,712   (747,507  (678,819
Cash flows from financing activities before dividends to
non-controlling
interests
     (9,609  (33,187  (7,260  582,580   532,524 
Dividends to non-controlling interests
     (8,834  (26,438  (3,071  (4,001  (42,344
Effect of exchange rate fluctuation
     8,807   (486  5   (11,023  (2,697
Net increase (decrease) of cash and cash equivalents
     81,443   48,680   13,304   51,702   195,129 
 
F-9
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(6)
Details of non-controlling interests prior to intra-Company eliminations as of and for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
 
2023
 
Description
      
KEPCO Ilijan
Corporation
  
KEPCO Plant
Service &
Engineering
Co., Ltd.
  
KEPCO
Engineering &

Construction
Company, Inc.
  
Others
  
Total
 
    
 
In millions of won
 
Percentage of ownership
     49.00
%
  49.00  48.76  
Current assets
      142,023   953,211   446,900   1,193,078   2,735,212 
Non-current assets
     688   632,169   407,804   4,639,760   5,680,421 
Current liabilities
     (252  (313,249  (249,899  (1,009,791  (1,573,191
Non-current liabilities
     (548  (5,348  (57,497  (2,737,589  (2,800,982
Net assets
     141,911   1,266,783   547,308   2,085,458   4,041,460 
Book value of non-controlling interests
     69,536   620,723   266,867   462,581   1,419,707 
Sales
        1,523,031   545,092   1,212,372   3,280,495 
Profit for the year
     3,718   161,849   32,654   63,145   261,366 
Profit for the year attributable to non-controlling interests
     1,822   79,306   15,922   9,355   106,405 
Cash flows from operating activities
     1,086   (35,492  39,985   368,415   373,994 
Cash flows from investing activities
     84   26,915   (19,345  (508,844  (501,190
Cash flows from financing activities before dividends to
non-controlling
interests
     (93,348  (36,433  (6,687  119,109   (17,359
Dividends to non-controlling interests
     (643  (28,775  (5,250  (20,866  (55,534
Effect of exchange rate fluctuation
     5,135   (454  (35  2,813   7,459 
Net increase of cash and cash equivalents
     (87,686  (74,239  8,668   (39,373  (192,630
 
(7)
Changes in goodwill
 
 (i)
Details of goodwill as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Acquisition cost
      100,093    101,738 
Less: Accumulated impairment
         (2,582
    
 
 
   
 
 
 
Carrying book value
      100,093    99,156 
    
 
 
   
 
 
 
 
F-9
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(7)
Changes in goodwill, continued
 
 (ii)
Changes in goodwill for the years ended December 31, 2022 and 2023 are as follows:
 
      
2022
 
      
Beginning
   
Increase
   
Decrease
   
Others
  
Ending
 
      
In millions of won
 
Acquisition cost
     105,647            (5,554  100,093 
Less: Accumulated impairment
                  
   
 
 
   
 
 
   
 
 
   
 
 
  
 
 
 
Carrying book value
     105,647            (5,554  100,093 
   
 
 
   
 
 
   
 
 
   
 
 
  
 
 
 
 
      
2023
 
      
Beginning
   
Increase
   
Decrease
   
Impairment
  
Others
  
Ending
 
      
In millions of won
 
Acquisition cost
     100,093    1,859           (214  101,738 
Less: Accumulated impairment
   
 
 
  
 
 
  
 
 
  
 
(2,582
 
 
 
 
 
(2,582
   
 
 
   
 
 
   
 
 
   
 
 
  
 
 
  
 
 
 
Carrying book value
     100,093    1,859        (2,582  (214  99,156 
   
 
 
   
 
 
   
 
 
   
 
 
  
 
 
  
 
 
 
 
(8)
Disposals of subsidiaries
As of December 31, 2023, the Company in the process of liquidating a subsidiary, KEPCO Lebanon SARL. For the year ended December 31, 2023, the Company completed the liquidation process of other subsidiaries, KHNP Spain, S.L. and KEPCO US Inc. For the year ended December 31, 2022, the Company completed the liquidation process of EWPRC Biomass Holdings, LLC, KEPCO Alamosa LLC, and KEPCO Mangilao America LLC, all of which are its subsidiaries, and sold KEPCO Solar of Alamosa LLC.
 
F-9
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
16.
Consolidated Subsidiaries, Continued
 
(9)
Cash dividends received from subsidiaries for the years ended December 31, 2021, 2022 and 2023, respectively, are as follows:
 
Subsidiaries
      
2021
   
2022
   
2023
 
       
In millions of won
 
Korea Hydro & Nuclear Power Co., Ltd.
      279,779    136,010    1,560,120 
Korea South-East Power Co., Ltd.
         4,808    340,710 
Korea Midland Power Co., Ltd.
         24,694    291,558 
Korea Western Power Co., Ltd.
             344,756 
Korea Southern Power Co., Ltd.
             293,027 
Korea East-West Power Co., Ltd.
         4,866    300,436 
KEPCO Engineering & Construction Company, Inc.
     7,089    5,983    7,114 
KEPCO Plant Service & Engineering Co., Ltd.
     26,301    27,517    29,952 
KEPCO Nuclear Fuel Co., Ltd.
     5,206    11,184    15,178 
KEPCO KDN Co., Ltd.
     18,854    36,986    185,549 
KEPCO Energy Solution Co., Ltd.
         1,707    9,480 
KEPCO Solar Co., Ltd.
         1,409    16,023 
KEPCO MCS Co., Ltd.
             15,353 
KEPCO International HongKong Ltd.
         9,044    5,962 
KEPCO Philippines Corporation
         2,375    24,246 
KEPCO Ilijan Corporation
     7,955    9,195    1,298 
KEPCO Philippines Holdings Inc.
     60,520    34,913    1,386 
KOSPO Australia Pty., Ltd.
     3,095    31,386     
KEPCO Netherlands B.V.
         16,795    3,124 
Qatrana Electric Power Company
     2,615    2,751    6,511 
KEPCO KPS Philippines Corp.
         302     
Tamra Offshore Wind Power Co., Ltd.
         2,877    3,863 
KEPCO Netherlands S3 B.V.
         4,005    2,477 
PT. KOMIPO Pembangkitan Jawa Bali
     153    859    578 
PT. EWP Indonesia
 
       4,262     
Gyeongju Wind Power Co., Ltd.
     2,800    2,100    6,300 
KOSPO Power Services Limitada
         305    1,201 
KEPCO Netherlands J3 B.V.
     27,237    46,510    13,144 
PT. Cirebon Power Service
         241    12,673 
Chitose Solar Power Plant LLC
         639    1,386 
Fujeij Wind Power Company
     11,920    15,102    6,047 
KOSPO Jordan LLC
     731    11,450    6,089 
EWP America Inc.
         3,887     
KOWEPO Lao International
         12,106     
KEPCO Neimenggu International Ltd.
             4,058 
KST Electric Power Company, S.A.P.I. de C.V.
             3,145 
KOMIPO Global Pte Ltd.
             31,066 
KOSPO Australia Pty., Ltd.
             12,558 
Changjuk Wind Power Co., Ltd.
             4,015 
EWP Barbados 1 SRL
             12,987 
KEPCO Energy Service Company
             629 
Chile Solar JV SpA
             1,127 
    
 
 
   
 
 
   
 
 
 
      454,255    466,268    3,575,130 
    
 
 
   
 
 
   
 
 
 
 
F-9
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows:
 
2022
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
    
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Associates>
               
Korea Gas Corporation
 Importing and wholesaling LNG Korea 20.47%    94,500   2,085,296 
Korea Electric Power Industrial Development Co., Ltd.
 Electricity metering and others Korea 29.00%   4,727   31,078 
YTN Co., Ltd. (*1)
 Broadcasting Korea 21.43%   59,000   55,027 
Gangwon Wind Power Co., Ltd. (*2)
 Power generation Korea 15.00%   5,725   12,158 
Hyundai Green Power Co., Ltd.
 Power generation equipment consignment and operation service Korea 29.00%   88,885   119,791 
Korea Power Exchange (*3)
 Management of power market and others Korea 100.00%   127,839   275,126 
Taebaek Wind Power Co., Ltd. (*29)
 Power generation Korea 60.00%   11,494   14,501 
Taebaek Guinemi Wind Power Co., Ltd. (*29)
 Power generation Korea 67.25%   12,637   13,049 
Daeryun Power Co., Ltd. (*2)
 Power generation Korea 6.85%   40,854   26,727 
KNH Solar Co., Ltd.
 Power generation Korea 27.00%   1,296   2,883 
SPC Power Corporation (*30)
 Power generation Philippines 38.00%   20,635   70,868 
Gemeng International Energy Co., Ltd.
 Power generation China 34.00%   413,153   578,821 
PT. Cirebon Electric Power
 Power generation Indonesia 27.50%   40,365   135,114 
KNOC Nigerian East Oil Co., Ltd. (*4)
 Resources development Nigeria 14.63%   12    
KNOC Nigerian West Oil Co., Ltd. (*4)
 Resources development Nigeria 14.63%   12    
PT Wampu Electric Power
 Power generation Indonesia 46.00%   21,292   37,743 
PT. Bayan Resources TBK
 Resources development Indonesia 20.00%   615,860   684,719 
S-Power Co., Ltd.
 Power generation Korea 49.00%   132,300   141,128 
Pioneer Gas Power Limited
 Power generation India 38.50%   49,831    
Eurasia Energy Holdings
 Power generation and resources development Russia 40.00%   461    
Xe-Pian Xe-Namnoy Power Co., Ltd.
 Power generation Laos 25.00%   87,426   115,584 
PT. Mutiara Jawa
 Manufacturing and operating floating coal terminal Indonesia 29.00%   2,978   3,597 
Samcheok Eco Materials Co., Ltd. (*5)
 Recycling fly ashes Korea 2.35%   686    
Noeul Green Energy Co., Ltd.
 Power generation Korea 29.00%   1,740    
Goseong Green Power Co., Ltd.
 Power generation Korea 29.00%   262,740   288,893 
Gangneung Eco Power Co., Ltd. (*2)
 Power generation Korea 1.61%   2,900    
Shin Pyeongtaek Power Co., Ltd.
 Power generation Korea 40.00%   72,000   133,823 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
 Power generation Korea 28.00%   194   278 
Dongducheon Dream Power Co., Ltd. (*6)
 Power generation Korea 33.61%   148,105   89,300 
Jinbhuvish Power Generation Pvt. Ltd. (*2)
 Power generation India 5.16%   9,000    
Daejung Offshore Wind Power Co., Ltd.
 Power generation Korea 46.59%   5,190   1,555 
GS Donghae Electric Power Co., Ltd.
 Power generation Korea 34.00%   204,000   260,145 
Daegu Photovoltaic Co., Ltd.
 Power generation Korea 29.00%   1,230   2,849 
Busan Green Energy Co., Ltd.
 Power generation Korea 29.00%   5,243   4,395 
Gunsan Bio Energy Co., Ltd. (*2)
 Power generation Korea 18.87%   1,000    
Hansuwon KNP Co., Ltd.
 Electric material agency Korea 28.98%   537   280 
Korea Electric Power Corporation Fund (*7)
 Developing electric enterprises Korea 98.09%   23,113   28,842 
Energy Infra Asset Management Co., Ltd. (*2)
 Asset management Korea 9.90%   297   1,184 
Daegu clean Energy Co., Ltd.
 Renewable power generation Korea 28.00%   140   12 
Yaksu
 
ESS Co., Ltd.
 Installing ESS related equipment Korea 29.00%   210   486 
Nepal Water & Energy Development Company Private Limited (*8)
 Construction and operation of utility plant Nepal 69.06%   70,228   69,940 
Gwangyang Green Energy Co., Ltd.
 Power generation Korea 20.00%   26,800   25,044 
PND
S
olar Co., Ltd.
 Power generation Korea 29.00%   1,250   1,403 
Hyundai Eco Energy Co., Ltd. (*2)
 Power generation Korea 19.00%   3,610   7,631 
YeongGwang Yaksu Wind Electric Co., Ltd. (*2)
 Power generation Korea 9.63%   533   156 
Green Energy Electricity Generation Co., Ltd.
 Power generation Korea 29.00%   1,189   1,571 
Korea Energy Solutions Co., Ltd.
 R & D Korea 20.00%   300   93 
ITR Co., Ltd.
 R & D Korea 20.00%   50    
 
F-9
8
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
    
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Associates>
               
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
 Technical testing and consulting Korea 20.00%    25   366 
Namjeongsusang Solar Power Operation Co., Ltd. (*9)
 Power generation Korea 15.00%   969   373 
Indeck Niles Development, LLC
 Power generation USA 50.00%   263,825   302,038 
Indeck Niles Asset Management, LLC
 Power generation USA 33.33%      94 
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
 Holding company 
Korea
 49.00%   6,910   6,932 
Suwon New Power Co., Ltd.
 Power generation 
Korea
 39.90%   798   919 
Gwangbaek Solar Power Investment Co., Ltd.
 Power generation 
Korea
 44.00%   4,757   5,133 
Go deok Clean Energy Co., Ltd.
 Fuel cell generation 
Korea
 40.00%   5,560   4,420 
SureDataLab Co., Ltd.
 R & D 
Korea
 23.95%   126   177 
SEP Co., Ltd.
 R & D 
Korea
 21.26%   27    
Hankook Electric Power Information Co., Ltd. (*13)
 R & D 
Korea
 16.49%   38   220 
Tronix Co., Ltd. (*13)
 R & D 
Korea
 12.50%   75   66 
O2&B Global Co., Ltd.
 R & D 
Korea
 20.00%   25   36 
Muan Sunshine Solar Power Plant Co., Ltd.
 Power generation 
Korea
 20.00%   1,570   2,562 
Bigeum Resident Photovoltaic Power Co., Ltd.
 Power generation 
Korea
 29.90%   1    
Goesan Solar Park Co., Ltd.
 Power generation 
Korea
 29.00%   1,276   2,591 
Saemangeum Heemang Photovoltaic Co., Ltd.
 Power generation 
Korea
 35.00%   11,022   13,010 
Bitgoel Eco Energy Co., Ltd.
 Power generation 
Korea
 49.25%   7,880   8,951 
Jeju Gimnyeong Wind Power Co., Ltd.
 Power generation 
Korea
 30.00%   714   872 
Seoroseoro Sunny Power Plant Co., Ltd.
 Power generation 
Korea
 42.58%   706   859 
Muan Solar park Co., Ltd.
 Power generation 
Korea
 20.00%   4,400   7,838 
YuDang Solar Co., Ltd.
 Power generation 
Korea
 20.00%   360   586 
Anjwa Smart Farm & Solar City Co., Ltd.
 Power generation 
Korea
 20.00%   5,651   8,662 
Daewon Green Energy Co., Ltd.
 Power generation 
Korea
 25.36%   3,910   4,485 
G.GURU Co., Ltd.
 R & D 
Korea
 24.65%   493   300 
UD4M Co., Ltd. (*10)
 R & D 
Korea
 12.50%   75   161 
Dongbu Highway Solar Co., Ltd.
 Power generation 
Korea
 20.00%   190   352 
Seobu Highway Solar Co., Ltd.
 Power generation 
Korea
 20.00%   195   316 
Korea Energy Data Co., Ltd.
 R & D 
Korea
 29.37%   60   62 
Gangneung Sacheon Fuel Cell Co., Ltd.
 Power generation 
Korea
 41.00%   5,695   4,277 
KOSTURE Co., Ltd. (*2)
 Coal recycling business 
Korea
 0.82%   1   1 
Taebaek Gadeoksan Wind Power Co., Ltd.
 Power generation 
Korea
 34.00%   12,570   20,040 
Chuncheon Green Energy Co., Ltd.
 Power generation 
Korea
 45.00%   9,540   9,155 
Yeomsubong Wind Power Co., Ltd. (*11)
 Power generation 
Korea
 3.81%   95   62 
Yeongyang Wind Power Corporation II
 Power generation 
Korea
 30.00%   7,965   7,461 
Haeparang Energy Co., Ltd.
 Power generation 
Korea
 25.00%   2,241   2,188 
Saemangeum Sebit Power Plant Co., Ltd. (*12)
 Power generation 
Korea
 63.33%   13,788   23,199 
Boulder Solar III, LLC
 Power generation USA 30.00%   715   744 
PlatformN. Co., Ltd.
 R & D Korea 29.58%   105   84 
PT. Cirebon Energi Prasarana (*9)
 Power generation Indonesia 10.00%   26,710   69,035 
Green Radiation Co., Ltd. (*13)
 R & D 
Korea
 10.00%   20   11 
Future Convergence Technology Laboratory. Co., Ltd.
 R & D 
Korea
 20.12%   76   50 
SC E&G. Co,. Ltd.
 R & D 
Korea
 20.00%   90   214 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.)
 R & D 
Korea
 20.00%   81   166 
ACE
 R & D 
Korea
 20.00%   20   20 
Environment and Energy Co., Ltd. (*13)
 R & D 
Korea
 10.54%   11   10 
Santiago Solar Power SpA
 Power generation Chile 50.00%   13,851   13,373 
Yanggu Floating Photovoltaic Power Plant Inc.
 Power generation Korea 29.00%   904   903 
     
 
 
  
 
 
 
       3,089,683   5,844,464 
     
 
 
  
 
 
 
 
F-
99

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
    
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Joint ventures>
               
KEPCO-Uhde Inc. (*14)
 Power generation Korea 52.80%    11,355   17 
Shuweihat Asia Power Investment B.V.
 Holding company Netherlands 49.00%   44,405   66,452 
Shuweihat Asia Operation & Maintenance Company (*14)
 Maintenance of utility plant Cayman 55.00%   30   1,631 
Waterbury Lake Uranium L.P. (*15)
 Resources development Canada 32.59%   26,602   21,750 
ASM-BG Investicii AD
 Power generation Bulgaria 50.00%   9,846   14,555 
RES Technology AD
 Power generation Bulgaria 50.00%   11,922   15,133 
KV Holdings, Inc. (*30)
 Power generation Philippines 40.00%   2,103   9,659 
KEPCO SPC Power Corporation (*14,30)
 Construction and operation of utility plant Philippines 75.20%   94,579   179,594 
Gansu Datang Yumen Wind Power Co., Ltd.
 Power generation China 40.00%   16,621   6,024 
Datang Chifeng Renewable Power Co., Ltd.
 Power generation China 40.00%   121,928   191,982 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
 Power generation China 40.00%   39,872   44,398 
Rabigh Electricity Company
 Power generation Saudi arabia 40.00%   109,743   214,607 
Rabigh Operation & Maintenance Company Limited
 Maintenance of utility plant Saudi arabia 40.00%   70   5,113 
Jamaica Public Service Company Limited
 Power generation Jamaica 40.00%   301,910   331,407 
KW Nuclear Components Co., Ltd.
 Manufacturing Korea 45.00%   833   17,090 
Busan Shinho Solar Power Co., Ltd.
 Power generation Korea 25.00%   2,100   6,719 
Global Trade Of Power System Co., Ltd. (*16)
 Exporting products and technology of small or medium business by proxy Korea 29.00%   290   698 
Expressway Solar-light Power Generation Co., Ltd. (*17)
 Power generation Korea 50.00%   1,856   4,754 
Amman Asia Electric Power Company (*14)
 Power generation Jordan 60.00%   111,476   220,254 
KAPES, Inc. (*14)
 R & D Korea 51.00%   5,629    
Honam Wind Power Co., Ltd.
 Power generation Korea 29.00%   3,480   4,819 
Korea Power Engineering Service Co., Ltd.
 Construction and service Korea 29.00%   290   5,543 
Chun-cheon Energy Co., Ltd.
 Power generation Korea 29.90%   52,700   32,044 
Yeonggwangbaeksu Wind Power Co., Ltd. (*16)
 Power generation Korea 15.00%   3,000   3,151 
Nghi Son 2 Power LLC
 Power generation Vietnam 50.00%   175,261   408,839 
Kelar S.A. (*14)
 Power generation Chile 65.00%   78,060   117,137 
PT. Tanjung Power Indonesia
 Power generation Indonesia 35.00%   57,039   92,907 
Incheon New Power Co., Ltd. (*18)
 Power generation Korea 29.00%   461   198 
Seokmun Energy Co., Ltd.
 Power generation Korea 29.00%   15,370   17,336 
Daehan Wind Power PSC
 Power generation Jordan 50.00%   7,493   13,923 
Barakah One Company (*19)
 Power generation UAE 18.00%   118    
Nawah Energy Company (*19)
 Operation of utility plant UAE 18.00%   296   315 
MOMENTUM
 
International thermonuclear
experimental reactor construction
management
 France 33.33%   1   345 
Daegu Green Power Co., Ltd. (*20)
 Power generation Korea 29.00%   46,225   29,360 
Yeonggwang Wind Power Co., Ltd.
 Power generation Korea 46.00%   17,475   20,713 
Chester Solar IV SpA
 Power generation Chile 45.00%   1,700   181 
Chester Solar V SpA
 Power generation Chile 45.00%   525   156 
Diego de Almagro Solar SpA
 Power generation Chile 45.00%   2,091   540 
South Jamaica Power Company Limited
 Power generation Jamaica 20.00%   20,430   46,437 
Daesan Green Energy Co., Ltd.
 Power generation Korea 35.00%   17,850   19,218 
RE Holiday Holdings LLC
 Power generation USA 50.00%   42,948   85,370 
RE Pioneer Holdings LLC
 Power generation USA 50.00%   27,891   55,172 
RE Barren Ridge 1 Holdings LLC
 Power generation USA 50.00%   28,021   3,350 
RE Astoria 2 LandCo LLC
 Power generation USA 50.00%   5,188   6,599 
RE Barren Ridge LandCo LLC
 Power generation USA 50.00%   2,187   2,333 
Laurel SpA
 Power generation Chile 45.00%   1,222   554 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd (*16)
 Power generation Australia 12.37%   4,095   3,651 
Chile Solar JV SpA
 Power generation Chile 50.00%   12,674   9,819 
Cheong-Song Noraesan Wind Power Co., Ltd. (*15)
 Power generation Korea 29.01%   3,200   4,263 
 
F-10
0
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
    
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Joint ventures>
               
Chester Solar I SpA
 Power generation Chile 45.00%    1,181   1,314 
Solar Philippines Calatagan Corporation
 Power generation Philippines 38.00%   47,903   56,902 
Saemangeum Solar Power Co., Ltd. (*21)
 Power generation Korea 81.01%   26,400   23,551 
Chungsongmeon BongSan wind power Co., Ltd. (*16)
 Power generation Korea 29.00%   2,900   3,470 
Jaeun Resident Wind Power Plant Co., Ltd. (*16)
 Power generation Korea 29.00%   2,494   2,236 
DE Energia SpA
 Power generation Chile 49.00%   8,364   9,536 
Dangjin Eco Power Co., Ltd.
 Power generation Korea 34.00%   25,661   26,859 
Haemodum Solar Co., Ltd.
 Power generation Korea 49.00%   2,940   3,367 
Yangyang Wind Power Co., Ltd.
 Power generation Korea 50.00%   12,000   10,864 
HORUS SOLAR, S.A. DE C.V. (*22)
 Renewable power generation Mexico 14.95%   5,068    6,976 
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V. (*22)
 Renewable power generation Mexico 14.95%   3,678   4,899 
SUNMEX RENOVABLES, S.A. DE C.V. (*22)
 Renewable power generation Mexico 14.95%   1,678   1,657 
Stavro Holding II A.B.
 Holding company Sweden 20.00%   18,566   17,171 
Solaseado Solar Power Co., Ltd.
 Power generation Korea 39.00%   7,020   16,233 
Yeongam Solar Power Co., Ltd. (*16)
 Power generation Korea 19.00%   6,460   9,879 
Samsu Wind Power Co., Ltd. (*16)
 Power generation Korea 19.00%   2,637   3,205 
Pulau Indah Power Plant Sdn. Bhd.
 Power generation Malaysia 25.00%   23,833   26,814 
NH-Amundi Global Infrastructure Investment Private Investment Trust 21
 Holding company Korea 29.53%   20,061   21,723 
Shin-han BNPP Private Investment Trust for East-West Sunlight Dream (*14)
 Holding company Korea 90.00%   15,012   15,587 
PT Barito Wahana Tenaga
 Power generation Indonesia 30.61%   59,574   137,047 
Cheongna Energy Co., Ltd. (*21)
 Generating and distributing vapor and hot/cold water Korea 50.10%   49,344   10,758 
Naepo Green Energy Co., Ltd.
 Power generation Korea 29.20%   29,200    
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.) (*23)
 Power generation Korea 30.66%   71,070    
OneEnergy Asia Limited
 Power generation Vietnam 40.00%   115,949   172,218 
KAS INVESTMENT I LLC (*15)
 Holding company USA 29.89%   23,437   18,247 
KAS INVESTMENT II LLC (*15)
 Holding company USA 29.89%   23,343   18,173 
Energyco Co., Ltd.
 Power generation Korea 29.00%   1,659   2,190 
CAES, LLC
 Holding company USA 36.00%   19,414   20,805 
Hapcheon Floating Photovoltaic Power Plant Inc. (*16)
 Power generation Korea 49.00%   7,512   8,471 
Busan Industrial Solar Power Co., Ltd.
 Power generation Korea 28.02%   510   1,168 
Bitsolar Energy Co., Ltd.
 Power generation Korea 27.10%   352   352 
Pulau Indah O&M Sdn. Bhd. (*24)
 Power generation Malaysia 60.00%       
Guadalupe Solar SpA (*24)
 Power generation Chile 60.00%   1,397   913 
Omisan Wind Power Co., Ltd.
 Power generation Korea 42.00%   10,752   10,411 
Foresight Iberian Solar Group Holding, S.L. (*24)
 Power generation Spain 75.00%   11,465   10,565 
Yeongwol Eco Wind Co., Ltd.
 Power generation Korea 29.00%   3,089   3,155 
Gurae Resident Power Co., Ltd.
 Power generation Korea 29.00%   386   391 
Cheongju Eco Park Co., Ltd.
 Power generation Korea 29.00%   5,858   10,490 
Enel X Midland Photovoltaic, LLC
 Power generation Korea 20.00%   1,695   1,856 
Geumsungsan Wind Power Co., Ltd.
 Power generation Korea 29.00%   6,531   3,493 
KEPCO KPS CARABAO Corp. (*18)
 Utility plant maintenance Philippines 40.00%   93   177 
Prime Swedish Holding AB
 Holding company Sweden 45.00%   35,410   36,245 
Goheung New Energy Co., Ltd.
 Power generation Korea 46.15%   12,959   11,832 
Gunsan Land Solar Co., Ltd. (*24)
 Power generation Korea 75.29%   19,091   27,544 
CapMan Lynx SCA, SICAR
 Holding company Luxembourg 50.00%   9,601    
International Offshore Power Transmission Holding Company Limited
 Undersea transmission network operation UAE 35.00%       
Pyeongchang Wind Power Co., Ltd. (*28)
 Power generation Korea 58.00%   9,329   14,464 
Eumseong Eco Park Co., Ltd.
 Power generation Korea 29.00%   5,741   5,557 
Songsan Green Energy Co., Ltd. (*15)
 Fuel cell generation Korea 25.00%   1,400   1,387 
 
F-10
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
     
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Joint ventures>
                
Changwon Nu-ri Energy Co., Ltd. (*15)
 Fuel cell generation Korea  33.33%     500   497 
Hasami Wind Farm Corporation
 Power generation Korea  29.00%    1,596   1,589 
PungBack Wind Farm Corporation (*26)
 Power generation Korea  32.89%    7,885   6,743 
Trumbull Asset Management, LLC (*27)
 Holding company USA  78.00%       246 
S-Power Chile SpA
 Power generation Chile  50.00%    127   127 
Seungmun Green Energy
 Power generation Korea  33.00%    8,973   9,054 
Seobusambo highway photovoltaics Co., Ltd. (*25)
 Power generation Korea  80.00%    3,020   3,066 
      2,332,579   3,147,584 
     
 
 
  
 
 
 
       5,422,262   8,992,048 
     
 
 
  
 
 
 
 
(*1)
The Company is planning to sell its investments in YTN Co., Ltd. based on the resolution of the Board of Directors on November 23, 2022, but investments in YTN Co., Ltd. are not classified as assets held-for-sale as the Company hasn't started the active selling procedures as of December 31, 2022.
 
(*2)
The effective percentage of ownership is less than 20%. However, the Company can exercise significant influence by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of the Company’s financial and operating policy of the board of directors.
 
(*3)
The effective percentage of ownership is 100%. However, the Government regulates the Company’s ability to make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and the Company’s other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. The Company can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.
 
(*4)
The effective percentage of ownership is less than 20%. However, the Company can exercise significant influence by virtue of its contractual right to appoint one out of four members of the steering committee of the entity. Moreover, the Company has significant financial transactions, which can affect its significant influence on the entity.
 
(*5)
Although the nominal percentage of ownership is 2.35%, the effective percentage of ownership is 25.54%, considering redeemable convertible preferred stock as a liability component.
 
(*6)
The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred stock into ordinary stock.
 
(*7)
The effective percentage of ownership is more than 50% but the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.
 
(*8)
The effective percentage of ownership is more than 50% but the Company does not hold control over the entity according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.
 
(*9)
The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Company exercises significant influence over the decisions related to finance and operation.
 
(*10)
The effective percentage of ownership is 14.29% due to the acquisition of treasury stocks. The effective percentage of ownership is less than 20%. However, the Company exercises significant influence over the decisions related to finance and operation by virtue of right to nominate directors to the board of directors of the entity.
 
(*11)
The effective percentage of ownership decreased due to the disproportionate paid-in capital increase, and the effective percentage of ownership is less than 20%. However, the Company exercises significant influence over all decisions related to finance and operation.
 
(*12)
The effective percentage of ownership decreased due to the disproportionate paid-in capital increase during the year ended December 31, 2022. The effective percentage of ownership is more than 50% but the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.
 
(*13)
The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Company exercises significant influence over the entity.
 
F-10
2

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
(*14)
The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement, all critical financial and operating decisions must be agreed to by all ownership parties and the Company can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.
 
(*15)
The effective percentage of ownership is less than 50%. However, the entity is classified as a joint venture, because all consent was required to make decisions on related activities.
 
(*16)
According to the shareholders’ agreement, the parties have joint control over all decisions related to finance and operation. Accordingly, the entity is classified as joint ventures.
 
(*17)
The effective percentage of ownership increased due to the disproportionate capital reduction of financial investors during the year ended December 31, 2022.
 
(*18)
The joint arrangement which the Company has joint control is structured through a separate company. The parties have joint control over the joint arrangement are classified as joint ventures, judging that they have rights to the net assets of the arrangement.
 
(*19)
The effective percentage of ownership is less than 20%. However, decisions in relevant activities must be agreed by ownership parties. Accordingly, the entity is classified as joint ventures.
 
(*20)
Although the nominal percentage of ownership is 29%, the effective percentage of ownership is 54.24%, considering the interest of financial investors as a liability component.
 
(*21)
The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.
 
(*22)
The effective percentage of ownership is less than 20%. However, according to the shareholders' agreement, decisions related principal operation must be agreed by all ownership parties. Accordingly, the Company can exercise significant influence.
 
(*23)
According to the Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.) Investment Agreement signed in March 2011, the Company has a commitment to guarantee principal and certain returns on shares of Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.). held by NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation. Since NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation have put option regarding their share of the entity, the Company was deemed to have acquired an additional 15.64% stake. As a result, the effective percentage of ownership is 46.3% in the current and prior period. In accordance with shareholders’ agreement signed during the current period, the Company has joint control with other investors in making important financial and operation decisions, so it has been reclassified from an associate to a joint venture.
 
(*24)
The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.
 
(*25)
Due to the changes in the agreement, the Company lost its control over the entity. Accordingly, the entity is reclassified to a joint venture from a subsidiary. Although the effective percentage of ownership is more than 50%, decisions in relevant activities must be agreed by all members of the board of directors.
 
(*26)
The effective percentage of ownership is 37%, considering potential common stock.
 
(*27)
The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all members of the board of directors. Accordingly, the entity is classified as a joint venture.
 
(*28)
After additional acquisition of the shares, the effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all members of the board of directors. Accordingly, the entity is classified as a joint venture.
 
(*29)
After additional acquisition of the shares, the effective percentage of ownership is more than 50%. However, the Company does not hold control over relevant business while it exercises significant influence by
participating
in the board of directors by the shareholders’ agreement. Accordingly, the entity is classified as an associate.
 
(*30)
T
he Company is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation, and KV Holdings, Inc.
T
he timing of and proceeds from such sales transaction is not specified as of December 31, 2022.
 
F-10
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
     
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Associates>
      
Korea Gas Corporation
 Importing and wholesaling LNG Korea  20.47  
W
   94,500   1,970,643 
Korea Electric Power Industrial Development Co., Ltd.
 Electricity metering and others Korea  29.00   4,727   29,500 
YTN Co., Ltd. (*1)
 Broadcasting Korea  21.43   59,000   52,303 
Gangwon Wind Power Co., Ltd. (*2)
 Power generation Korea  15.00   5,725   12,001 
Hyundai Green Power Co., Ltd.
 Power generation equipment consignment and operation service Korea  29.00   88,885   118,173 
Korea Power Exchange (*3)
 Management of power market and others Korea  100.00   127,839   274,286 
Taebaek Guinemi Wind Power Co., Ltd. (*28)
 Power generation Korea  67.25   12,637   13,530 
Daeryun Power Co., Ltd. (*2)
 Power generation Korea  6.85   46,373   26,834 
KNH Solar Co., Ltd.
 Power generation Korea  27.00   1,296   3,194 
SPC Power Corporation (*29)
 Power generation Philippines  38.00   20,635   78,931 
Gemeng International Energy Co., Ltd.
 Power generation China  42.00   516,007   705,812 
PT. Cirebon Electric Power
 Power generation Indonesia  27.50   40,365   134,259 
KNOC Nigerian East Oil Co., Ltd. (*4)
 Resources development Nigeria  14.63   12    
KNOC Nigerian West Oil Co., Ltd. (*4)
 Resources development Nigeria  14.63   12    
PT Wampu Electric Power
 Power generation Indonesia  46.00   21,292   34,555 
PT. Bayan Resources TBK
 Resources development Indonesia  20.00   615,860   619,207 
S-Power
Co., Ltd.
 Power generation Korea  49.00   132,300   162,765 
Pioneer Gas Power Limited
 Power generation India  38.50   49,831    
Xe-Pian
Xe-Namnoy
Power Co., Ltd.
 Power generation Laos  25.00   87,426   116,378 
PT. Mutiara Jawa
 Manufacturing and operating floating coal terminal Indonesia  29.00   2,978   5,168 
Samcheok Eco Materials Co., Ltd. (*5)
 Recycling fly ashes Korea  25.54   686    
Noeul Green Energy Co., Ltd.
 Power generation Korea  29.00   1,740    
Goseong Green Power Co., Ltd.
 Power generation Korea  29.00   262,740   287,624 
Gangneung Eco Power Co., Ltd. (*17)
 Power generation Korea  29.00   261,000   254,929 
Shin Pyeongtaek Power Co., Ltd.
 Power generation Korea  40.00   72,000   145,026 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
 Power generation Korea  28.00   194   294 
Dongducheon Dream Power Co., Ltd. (*6)
 Power generation Korea  33.61   148,105   87,203 
Jinbhuvish Power Generation Pvt. Ltd. (*2)
 Power generation India  5.16   9,000    
Daejung Offshore Wind Power Co., Ltd.
 Power generation Korea  46.59   5,190   1,483 
GS Donghae Electric Power Co., Ltd.
 Power generation Korea  34.00   204,000   259,085 
Daegu Photovoltaic Co., Ltd.
 Power generation Korea  29.00   1,230   2,804 
Busan Green Energy Co., Ltd.
 Power generation Korea  29.00   5,243   3,259 
Hansuwon KNP Co., Ltd.
 Electric material agency Korea  28.98   537   467 
Korea Electric Power Corporation Fund (*7)
 Developing electric enterprises Korea  98.09   20,847   23,421 
Energy Infra Asset Management Co., Ltd. (*33)
 Asset management Korea  9.90   297   1,213 
Daegu clean Energy Co., Ltd.
 Renewable power generation Korea  28.00   140    
Yaksu
 
ESS Co., Ltd.
 Installing ESS related equipment Korea  29.00   210   285 
Nepal Water & Energy Development Company Private Limited (*8,17)
 Construction and operation of utility plant Nepal  68.88   110,332   110,573 
Gwangyang Green Energy Co., Ltd.
 Power generation Korea  20.00   26,800   24,638 
PND
S
olar Co., Ltd.
 Power generation Korea  29.00   1,250   1,510 
Hyundai Eco Energy Co., Ltd. (*2)
 Power generation Korea  19.00   3,610   7,947 
YeongGwang Yaksu Wind Electric Co., Ltd. (*2)
 Power generation Korea  9.63   533   133 
Green Energy Electricity Generation Co., Ltd.
 Power generation Korea  29.00   1,189   8 
Korea Energy Solutions Co., Ltd.
 R & D Korea  20.00   300   170 
ITR Co., Ltd. (*32)
 R & D Korea  10.00   50    
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
 Technical testing and consulting Korea  20.00   25   391 
Indeck Niles Development, LLC
 
Power generation
 
USA
 
 
50.00
  
 
263,825
 
 
 
335,401
 
Indeck Niles Asset Management, LLC
 Power generation USA  33.33      93 
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
 Holding company Korea  49.00   6,482   6,496 
Suwon New Power Co., Ltd.
 Power generation Korea  39.90   798   1,022 
 
F-10
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
     
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Associates>
      
Gwangbaek Solar Power Investment Co., Ltd.
 Power generation Korea  44.00  
W
   4,757   5,155 
Go deok Clean Energy Co., Ltd.
 Fuel cell generation Korea  40.00   5,560   4,723 
SureDataLab Co., Ltd.
 R & D Korea  23.95   126   114 
SEP Co., Ltd.
 R & D Korea  21.26   27    
Hankook Electric Power Information Co., Ltd. (*13)
 R & D Korea  16.49   38   214 
Tronix Co., Ltd. (*13)
 R & D Korea  12.50   75   220 
O2&B Global Co., Ltd.
 R & D Korea  20.00   25   21 
Muan Sunshine Solar Power Plant Co., Ltd.
 Power generation Korea  20.00   1,570   2,822 
Bigeum Resident Photovoltaic Power Co., Ltd.
 Power generation Korea  29.90   1    
Goesan Solar Park Co., Ltd.
 Power generation Korea  29.00   1,276   2,877 
Saemangeum Heemang Photovoltaic Co., Ltd.
 Power generation Korea  35.00   11,022   14,420 
Bitgoel Eco Energy Co., Ltd.
 Power generation Korea  49.25   7,880   12,394 
Jeju Gimnyeong Wind Power Co., Ltd.
 Power generation Korea  30.00   714   246 
Seoroseoro Sunny Power Plant Co., Ltd.
 Power generation Korea  42.58   706   941 
Muan Solar park Co., Ltd.
 Power generation Korea  20.00   4,400   6,830 
YuDang Solar Co., Ltd.
 Power generation Korea  20.00   360   570 
Anjwa Smart Farm & Solar City Co., Ltd.
 Power generation Korea  20.00   5,651   7,665 
KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
 Power generation Korea  25.36   3,910   7,779 
G.GURU Co., Ltd.
 R & D Korea  24.65   493   167 
UD4M Co., Ltd. (*10)
 R & D Korea  12.50   75   150 
Dongbu Highway Solar Co., Ltd.
 Power generation Korea  20.00   190   380 
Seobu Highway Solar Co., Ltd.
 Power generation Korea  20.00   195   406 
Korea Energy Data Co., Ltd.
 R & D Korea  29.37   60   36 
Gangneung Sacheon Fuel Cell Co., Ltd.
 Power generation Korea  41.00   5,695   7,870 
KOSTURE Co., Ltd. (*2)
 Coal recycling business Korea  4.42   7   8 
Taebaek Gadeoksan Wind Power Co., Ltd.
 Power generation Korea  34.00   12,570   19,426 
Chuncheon Green Energy Co., Ltd.
 Power generation Korea  45.00   9,540   8,900 
Yeomsubong Wind Power Co., Ltd. (*11)
 Power generation Korea  29.00   1,411   871 
Yeongyang Wind Power Corporation II
 Power generation Korea  30.00   7,965   10,100 
Haeparang Energy Co., Ltd.
 Power generation Korea  25.00   2,241   2,104 
Saemangeum Sebit Power Plant Co., Ltd. (*12)
 Power generation Korea  55.14   21,037   37,191 
Boulder Solar III, LLC
 Power generation USA  30.00   715   754 
PlatformN. Co., Ltd.
 R & D Korea  29.58   105    
PT. Cirebon Energi Prasarana (*9)
 Power generation Indonesia  10.00   26,710   76,597 
Green Radiation Co., Ltd. (*13)
 R & D Korea  10.00   20   26 
Future Convergence Technology Laboratory. Co., Ltd.
 R & D Korea  20.12   76   36 
Eco Motion Co., Ltd. (formerly, SC E&G. Co,. Ltd.)
 R & D Korea  20.00   90   267 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.) (*33)
 R & D Korea  16.67   81   120 
ACE
 R & D Korea  20.00   25   2 
Environment and Energy Co., Ltd. (*13)
 R & D Korea  10.54   11   9 
Santiago Solar Power SpA
 Power generation Chile  50.00   13,851   11,769 
Yanggu Floating Photovoltaic Power Plant Inc.
 Power generation Korea  29.00   904   760 
Power Embedded
 R & D Korea  23.33   70   70 
Changwon SG Energy Co., Ltd. (*13)
 Power generation Korea  18.78   900   783 
Donpyung Technology. Co., Ltd.
 R & D Korea  20.00   125   254 
HORANG ENERGY Inc.
 Power generation Korea  40.00   4,240   4,149 
Hoenggye Renewable Energy Co., Ltd
 Power generation Korea  36.12   2,375   2,375 
Haman Green Energy Co., Ltd.
 Power generation Korea  35.00   4,771   2,981 
Songsan Green Energy Co., Ltd. (*21)
 Power generation Korea  60.00   8,400   8,323 
     
 
 
  
 
 
 
     
W
   3,509,099   6,176,889 
     
 
 
  
 
 
 
 
F-10
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
     
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Joint ventures>
      
Shuweihat Asia Power Investment B.V.
 Holding company Netherlands  49.00  
W
   44,405   69,902 
Shuweihat Asia Operation & Maintenance Company (*14)
 Maintenance of utility plant Cayman  55.00   30   1,818 
Waterbury Lake Uranium L.P. (*15)
 Resources development Canada  30.65   26,602   22,612 
ASM-BG
Investicii AD
 Power generation Bulgaria  50.00   9,846   14,739 
RES Technology AD
 Power generation Bulgaria  50.00   11,922   14,383 
KV Holdings, Inc. (*29)
 Power generation Philippines  40.00   2,103   5,186 
KEPCO SPC Power Corporation (*14,29)
 Construction and operation of utility plant Philippines  75.20   94,579   196,544 
Gansu Datang Yumen Wind Power Co., Ltd.
 Power generation China  40.00   16,621   6,315 
Datang Chifeng Renewable Power Co., Ltd.
 Power generation China  40.00   121,928   186,739 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
 Power generation China  40.00   39,872   43,207 
Rabigh Electricity Company
 Power generation Saudi arabia  40.00   109,743   235,051 
Rabigh Operation & Maintenance Company Limited
 Maintenance of utility plant Saudi arabia  40.00   70   4,964 
Jamaica Public Service Company Limited
 Power generation Jamaica  40.00   301,910   349,866 
KW Nuclear Components Co., Ltd.
 Manufacturing Korea  45.00   833   18,680 
Busan Shinho Solar Power Co., Ltd.
 Power generation Korea  25.00   2,100   6,669 
Global Trade Of Power System Co., Ltd. (*16)
 Exporting products and technology of small or medium business by proxy Korea  29.00   290   615 
Expressway Solar-light Power Generation Co., Ltd.
 Power generation Korea  50.00   1,856   5,187 
Amman Asia Electric Power Company (*14)
 Power generation Jordan  60.00   111,476   223,424 
KAPES, Inc. (*14)
 R & D Korea  51.00   5,629    
Honam Wind Power Co., Ltd.
 Power generation Korea  29.00   3,480   4,743 
Korea Power Engineering Service Co., Ltd.
 Construction and service Korea  29.00   290   5,708 
Chun-cheon Energy Co., Ltd.
 Power generation Korea  29.90   52,700   35,083 
Yeonggwangbaeksu Wind Power Co., Ltd. (*16)
 Power generation Korea  15.00   3,000   3,443 
Nghi Son 2 Power LLC
 Power generation Vietnam  50.00   175,261   417,989 
Kelar S.A. (*14)
 Power generation Chile  65.00   78,060   131,529 
PT. Tanjung Power Indonesia
 Power generation Indonesia  35.00   57,039   90,151 
Incheon New Power Co., Ltd. (*18)
 Power generation Korea  29.00   461   298 
Seokmun Energy Co., Ltd.
 Power generation Korea  29.00   15,370   16,591 
Daehan Wind Power PSC
 Power generation Jordan  50.00   7,493   16,426 
Barakah One Company (*19)
 Power generation UAE  18.00   118    
Nawah Energy Company (*19)
 Operation of utility plant UAE  18.00   296   330 
MOMENTUM
 
International thermonuclear
experimental reactor construction
management
 France  33.33   1   209 
Daegu Green Power Co., Ltd. (*20)
 Power generation Korea  29.00   46,225   26,430 
Yeonggwang Wind Power Co., Ltd.
 Power generation Korea  46.00   17,475   23,380 
Chester Solar IV SpA
 Power generation Chile  45.00   1,700   484 
Chester Solar V SpA
 Power generation Chile  45.00   525   191 
Diego de Almagro Solar SpA
 Power generation Chile  45.00   2,091   954 
South Jamaica Power Company Limited
 Power generation Jamaica  20.00   20,430   43,109 
Daesan Green Energy Co., Ltd.
 Power generation Korea  35.00   17,850   22,191 
RE Holiday Holdings LLC
 Power generation USA  50.00   42,948   84,092 
RE Pioneer Holdings LLC
 Power generation USA  50.00   27,891   54,081 
RE Barren Ridge 1 Holdings LLC
 Power generation USA  50.00   28,021   58,154 
RE Astoria 2 LandCo LLC
 Power generation USA  50.00   5,188   6,937 
RE Barren Ridge LandCo LLC
 Power generation USA  50.00   2,187   2,441 
Laurel SpA
 Power generation Chile  45.00   1,222   613 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd (*16)
 Power generation Australia  12.37   4,095   3,719 
Cheong-Song Noraesan Wind Power Co., Ltd. (*15)
 Power generation Korea  29.01   3,200   3,756 
Chester Solar I SpA
 Power generation Chile  45.00   1,181   1,238 
Solar Philippines Calatagan Corporation
 Power generation Philippines  38.00   47,903   58,130 
Saemangeum Solar Power Co., Ltd. (*21)
 Power generation Korea  81.01   26,400   23,419 
Chungsongmeon BongSan wind power Co., Ltd. (*16)
 Power generation Korea  29.00   2,900   2,665 
 
F-10
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
     
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Joint ventures>
      
Jaeun Resident Wind Power Plant Co., Ltd. (*16)
 Power generation Korea  29.00  
W
   2,494   2,214 
DE Energia SpA
 Power generation Chile  49.00   8,364   9,703 
Dangjin Eco Power Co., Ltd.
 Power generation Korea  34.00   25,661   26,753 
Haemodum Solar Co., Ltd.
 Power generation Korea  49.00   2,940   3,122 
Yangyang Wind Power Co., Ltd.
 Power generation Korea  50.00   12,000   10,435 
HORUS SOLAR, S.A. DE C.V. (*22)
 Renewable power generation Mexico  14.95   5,068   11,181 
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V. (*22)
 Renewable power generation Mexico  14.95   3,678   10,935 
SUNMEX RENOVABLES, S.A. DE C.V. (*22)
 Renewable power generation Mexico  14.95   1,678   3,541 
Stavro Holding II A.B.
 Holding company Sweden  20.00   18,566   18,263 
Solaseado Solar Power Co., Ltd.
 Power generation Korea  39.00   7,020   17,953 
Yeongam Solar Power Co., Ltd. (*16)
 Power generation Korea  19.00   6,460   9,637 
Samsu Wind Power Co., Ltd. (*16)
 Power generation Korea  19.00   2,637   3,022 
Pulau Indah Power Plant Sdn. Bhd.
 Power generation Malaysia  25.00   24,339   25,603 
NH-Amundi Global Infrastructure Investment Private Investment Trust 21
 Holding company Korea  29.53   19,897   21,897 
Shin-han BNPP Private Investment Trust for East-West Sunlight Dream (*14)
 Holding company Korea  90.00   14,916   15,487 
PT Barito Wahana Tenaga
 Power generation Indonesia  30.61   59,574   156,994 
Cheongna Energy Co., Ltd. (*21)
 Generating and distributing vapor and hot/cold water Korea  50.10   49,344   25,549 
Naepo Green Energy Co., Ltd.
 Power generation Korea  29.20   29,200   5,285 
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.) (*23)
 Power generation Korea  30.66   71,070    
OneEnergy Asia Limited
 Power generation Vietnam  40.00   195,130   289,966 
KAS INVESTMENT I LLC (*15)
 Holding company USA  29.89   23,437   15,784 
KAS INVESTMENT II LLC (*15)
 Holding company USA  29.89   23,343   15,709 
Energyco Co., Ltd.
 Power generation Korea  29.00   1,659   2,140 
CAES, LLC
 Holding company USA  36.00   19,414   20,380 
Hapcheon Floating Photovoltaic Power Plant
Inc. (*16)
 Power generation Korea  49.00   7,512   10,348 
Busan Industrial Solar Power Co., Ltd.
 Power generation Korea  28.02   510   1,058 
Bitsolar Energy Co., Ltd.
 Power generation Korea  27.10   352   352 
Pulau Indah O&M Sdn. Bhd. (*24)
 Power generation Malaysia  60.00       
Guadalupe Solar SpA (*24)
 Power generation Chile  60.00   1,397   1,200 
Omisan Wind Power Co., Ltd.
 Power generation Korea  42.00   10,752   10,229 
Foresight Iberian Solar Group Holding, S.L. (*24)
 Power generation Spain  75.00   10,564   8,119 
Yeongwol Eco Wind Co., Ltd.
 Power generation Korea  29.00   3,089   4,024 
Gurae Resident Power Co., Ltd.
 Power generation Korea  29.00   386   569 
Cheongju Eco Park Co., Ltd.
 Power generation Korea  29.00   5,858   9,072 
Enel X Midland Photovoltaic, LLC
 Power generation Korea  20.00   2,211   2,542 
Geumsungsan Wind Power Co., Ltd.
 Power generation Korea  29.00   6,531   5,515 
KEPCO KPS CARABAO Corp. (*18)
 Utility plant maintenance Philippines  40.00   93    
Prime Swedish Holding AB
 Holding company Sweden  45.00   36,227   38,789 
Goheung New Energy Co., Ltd.
 Power generation Korea  46.15   12,959   15,736 
Gunsan Land Solar Co., Ltd. (*24,30)
 Power generation Korea  75.29   19,091   22,429 
CapMan Lynx SCA, SICAR
 Holding company Luxembourg  50.00   9,601    
International Offshore Power Transmission Holding Company Limited
 Undersea transmission network operation UAE  35.00      1,423 
Pyeongchang Wind Power Co., Ltd. (*27)
 Power generation Korea  58.00   9,329   12,228 
Eumseong Eco Park Co., Ltd.
 Power generation Korea  29.00   5,741   8,386 
Changwon Nu-ri Energy Co., Ltd. (*16)
 Fuel cell generation Korea  61.00   8,095   8,027 
PungBack Wind Farm Corporation (*26)
 Power generation Korea  32.89   7,885   7,940 
Trumbull Asset Management, LLC (*27)
 Holding company USA  78.00   1   936 
 
F-10
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
 
Key operation activities
 
Location
 
Percentage of
ownership
     
Acquisition
cost
  
Book

value
 
  
In millions of won
 
<Joint ventures>
      
S-Power
Chile SpA
 Power generation Chile  50.00  
W
   127   64 
Seungmun Green Energy
 Power generation Korea  33.00   8,973   9,757 
Seobusambo highway photovoltaics Co.,
Ltd. (*25)
 Power generation Korea  80.00   3,020   3,580 
Yangyang Suri Wind Power Co., Ltd.(*15)
 
Power generation
 
Korea
 
 
29.00
  
 
10,498
 
 
 
9,608
 
KEPCO for Power Company (*34)
 Power generation 
Saudi arabia
  60.00   3,083   435 
Taebaek Wind Power Co., Ltd. (*35)
 Power generation Korea  60.00   11,494   13,932 
Jeonju Bio Green Energy Co., Ltd.(*24)
 Power generation Korea  65.00   3,250   3,195 
Kumyang Eco Park Co., Ltd.
 Power generation Korea  29.00   3,663   3,663 
Jeongeup Green Power Co., Ltd. (*36)
 Power generation Korea  18.71   1,560   1,560 
Hadong
E-factory
Co., Ltd.(*15)
 Power generation Korea  30.00   350   349 
Namyangju Combined Heat and Power Co., Ltd. (*37)
 Generating and distributing vapor and hot/cold water Korea  55.00   3,850   3,850 
Wadi Noor Solar Power Company SAOC
 Power generation Oman  50.00   847   846 
Fairhaven Energy Storage LLC (*31)
 Power generation USA  35.00       
     
 
 
  
 
 
 
      2,431,604   3,485,699 
     
 
 
  
 
 
 
     
W
   5,940,703   9,662,588 
     
 
 
  
 
 
 
 
(*1)
the Company is planning to sell its investments in YTN Co., Ltd. based on the resolution of the Board of Directors on November 23, 2022, but investments in YTN Co., Ltd. are not classified as assets
held-for-sale
as the Company hasn’t started the active selling procedures as of December 31, 2023.
 
(*2)
The effective percentage of ownership is less than 20%. However, the Company can exercise significant influence by virtue of its contractual right to appoint directors to the board of directors of the entity, and by strict decision criteria of the Company’s financial and operating policy of the board of directors.
 
(*3)
The effective percentage of ownership is 100%. However, the Government regulates the Company’s ability to make operating and financial decisions over the entity, as the Government requires maintaining arms-length transactions between KPX and the Company’s other subsidiaries. Accordingly, the entity is not classified as a consolidated subsidiary. The Company can exercise significant influence by virtue of right to nominate directors to the board of directors of the entity.
 
(*4)
The effective percentage of ownership is less than 20%. However, the Company can exercise significant influence by virtue of its contractual right to appoint one out of four members of the steering committee of the entity. Moreover, the Company has significant financial transactions, which can affect its significant influence on the entity.
 
(*5)
Although the nominal percentage of ownership is 2.35%, the effective percentage of ownership is 25.54%, considering redeemable convertible preferred stock as a liability component. The redeemable convertible preferred stock has been repaid in the current period.
 
(*6)
The effective percentage of ownership is 34.01% considering the conversion of redeemable convertible preferred stock into ordinary stock.
 
(*7)
The effective percentage of ownership is more than 50% but the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.
 
(*8)
The effective percentage of ownership is more than 50% but the Company does not hold control over the entity according to the shareholders’ agreement. Accordingly, the entity is classified as an associate.
 
(*9)
The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Company exercises significant influence over the decisions related to finance and operation.
 
(*10)
The effective percentage of ownership is 14.29% due to the acquisition of treasury stocks. The effective percentage of ownership is less than 20%. However, the Company exercises significant influence over the decisions related to finance and operation by virtue of right to nominate directors to the board of directors of the entity.
 
(*11)
The effective percentage of ownership decreased due to the disproportionate
paid-in
capital increase.
 
(*12)
The effective percentage of ownership decreased due to the disproportionate
paid-in
capital increase during the year ended December 31, 2023. The effective percentage of ownership is more than 50% but the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision Committee. Accordingly, the entity is classified as an associate.
 
F-108

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
(*13)
The effective percentage of ownership is less than 20%. However, the entity is classified as an associate because the Company exercises significant influence over the entity.
 
(*14)
The effective percentage of ownership is more than 50%. However, according to the shareholders’ agreement, all critical financial and operating decisions must be agreed to by all ownership parties and the Company can exercise same voting rights as other shareholders at the board of directors. Accordingly, the entities are classified as joint ventures.
 
(*15)
The effective percentage of ownership is less than 50%. However, the entity is classified as a joint venture, because all consent was required to make decisions on related activities.
 
(*16)
According to the shareholders’ agreement, the parties have joint control over all decisions related to finance and operation. Accordingly, the entity is classified as joint ventures.
 
(*17)
The effective percentage of ownership changed due to the disproportionate capital reduction of financial investors during the year ended December 31, 2023.
 
(*18)
The joint arrangement which the Company has joint control is structured through a separate company. The parties have joint control over the joint arrangement are classified as joint ventures, judging that they have rights to the net assets of the arrangement.
 
(*19)
The effective percentage of ownership is less than 20%. However, decisions in relevant activities must be agreed by ownership parties. Accordingly, the entity is classified as joint ventures.
 
(*20)
Although the nominal percentage of ownership is 29%, the effective percentage of ownership is 54.24%, considering the interest of financial investors as a liability component.
 
(*21)
The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.
 
(*22)
The percentage of effective ownership is more
 than 20%. However, according to the shareholders’ agreement, decisions related principal operation must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.
 
(*23)
According to the REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.). Investment Agreement signed in March 2011, the Company has a commitment to guarantee principal and certain returns on shares of REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.). held by NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation. Since NH Power 2nd Co., Ltd. and the National Agricultural Cooperative Federation have put option regarding their share of the entity, the Company was deemed to have acquired an additional 15.64% stake. As a result, the effective percentage of ownership is 46.3% in the current and prior period. In accordance with shareholders' agreement signed during the current period, the Company has joint control with other investors in making important financial and operation decisions, so it has been reclassified from an associate to a joint venture.
 
(*24)
The effective percentage of ownership is more
 than 50%. However, decisions in relevant activities must be agreed by all ownership parties. Accordingly, the entity is classified as a joint venture.
 
(*25)
Due to the changes in the agreement, the Company lost its control over the entity. Accordingly, the entity is reclassified to a joint venture from a subsidiary. Although the effective percentage of ownership is more than 50%, decisions in relevant activities must be agreed by all members of the board of directors.
 
(*26)
The effective percentage of ownership is 37%, considering potential common stock.
 
(*27)
The effective percentage of ownership is more than 50%. However, decisions in relevant activities must be agreed by all members of the board of directors. Accordingly, the entity is classified as a joint venture.
 
(*28)
The effective percentage of ownership is more than 50%. However, by the shareholders’ agreement, the Company does not hold control over relevant business while it exercises significant influence by participating in the Investment Decision committee. Accordingly, the entity is classified as an associate.
 
(*29)
The Company is planning to sell its investment in SPC Power Corporation, KEPCO SPC Power Corporation, and KV Holdings, Inc.
T
he timing of and proceeds from such sales transaction is not specified as of December 31, 2023.
 
(*30)
The nominal percentage of ownership is 75.29% and the effective percentage of ownership is 56.91%, as the Company has an obligation to provide excessive dividend income to Gunsan City when a certain rate of return defined in the shareholders’ agreement is met.
 
(*31)
Although the investment has not yet been paid, commitment to pay 35% of investment in the future has been made.
 
F-109

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(1)
Investments in associates and joint ventures as of December 31, 2022 and 2023 are as follows, continued:
 
(*32)
Although the Company’s effective percentage of ownership is less than 20%, the entity has been classified as an associate as the Company has significant influence on the entity considering the fact that ordinary resolutions passed at the shareholders’ meeting require the majority decision and the Company has the right to elect the entity’s directors.
 
(*33)
Although the Company’s effective percentage of ownership is less than 20%, the Company can exercise significant influence on the entity through its contractual right to appoint one director to the entity’s board of directors.
 
(*34)
Although the Company’s effective percentage of ownership is more than 50%, the entity is reclassified as a joint venture since the entity’s material financial and operational decisions require unanimous agreement of members in the board of directors due to the shareholders’ agreement concluded during the year ended December 31, 2023.
 
(*35)
Although the Company’s effective percentage of ownership is more than 50%, the entity is reclassified as a joint venture considering the minimum number of the entity’s board of directors’ members required to agree for making decision on material financial and operational policies, as the joint shareholders’ agreement changed during the year ended December 31, 2023.
 
(*36)
Although the Company’s effective percentage of ownership is less than 20%, the entity is reclassified as a joint venture considering the Company can exercise significant influence on the entity due to the Company’s contractual right to appoint a director to the entity’s board of directors and the minimum number of the entity’s board of directors members required to agree for making decision on material financial and operational policies in accordance with the joint shareholders’ agreement .
 
(*37)
Although the Company’s effective percentage of ownership is more than 50%, the entity is classified as a joint venture since the entity’s material financial and operational decisions require unanimous agreement of members in the board of directors.
 
(2)
The fair value of associates which are actively traded on an open market and have a readily available market value as of December 31, 2022 and 2023 are as follows:
 
Investees
      
2022
   
2023
 
       
In millions of won
 
<Associates>
      
Korea Electric Power Industrial Development Co., Ltd.
      80,454    69,298 
Korea Gas
Corporation(*2)
     684,180    466,830 
YTN Co., Ltd.
(*1)
     50,220    54,180 
SPC Power Corporation
     121,995    92,219 
PT. Bayan Resources TBK
     11,326,001    11,090,934 
 
 
(*1)

The Company sold all of its shares in YTN Co., Ltd. (21.43 %) on February 15, 2024 at the price
of ₩
221,490 million
as the Korea Communications Commission approved of the Company’s selling shares in entirety on February 7, 2024 (see Note 51). 
 
 
(*2)
An indicator of impairment has been identified for the Company’s investment in Korea Gas Corporation (“KOGAS”) for the years ended December 31, 2022 and 2023 as management determined that the carrying amount of the investment in KOGAS at ₩2,085,296 million and ₩1,970,642 million respectively were significantly higher than its fair value. Accordingly, management has assessed the recoverable amount of the investment by estimating the Company’s share of the present value of the estimated future cash flows expected to be generated by KOGAS. The carrying amount of KOGAS as at December 31, 2022 and 2023 are supported by the recoverable amount determination and as such, no impairment has been recognized for the years ended December 31, 2022 and 2023.
The recoverable amount estimate is most sensitive to assumptions regarding long-term revenue forecasts as well as the discount rate:
 
 
 
Revenue forecasts: price and volume of gas sold are based on the long-term natural gas supply and demand programs approved by the Ministry of Trade, Industry & Energy.
 
 
 
Discount rate: the discount rate is derived using the weighted average cost of capital methodology adjusted for any risks that are not reflected in the underlying cash flows. A real post-tax discount rate of 5.20% and 4.01% was applied to post-tax cash flows respectively as at December 31, 2022 and 2023.
Changes in circumstances may affect the assumptions used to determine recoverable amount and could result in an impairment of KOGAS at future reporting dates.
 
F-110

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows:
 
2022
 
Investees
     
Beginning
balance
   
Acquisitions
   
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
      
In millions of won
 
<Associates>
                             
Korea Gas Corporation
     1,815,513           (51,559  305,638   7,746   7,958   2,085,296 
Korea Electric Power Industrial Development Co., Ltd.
    24,617           (1,872  3,807      4,526   31,078 
YTN Co., Ltd.
    51,828           (450  1,565   (34  2,118   55,027 
Gangwon Wind Power Co., Ltd.
    10,554           (1,420  3,024         12,158 
Hyundai Green Power Co., Ltd.
    121,955           (4,008  1,770   1,345   (1,271  119,791 
Korea Power Exchange
    269,728              772      4,626   275,126 
Taebaek Wind Power Co., Ltd.
    6,800    7,684       (825  842         14,501 
Taebaek Guinemi Wind Power Co., Ltd.
    3,357    9,217          475         13,049 
Pyeongchang Wind Power Co., Ltd.
    5,411    5,454       (100  3,695      (14,460   
Daeryun Power Co., Ltd.
    25,426              429   1   871   26,727 
Changjuk Wind Power Co., Ltd.
    8,355    11,862       (1,350  817      (19,684   
KNH Solar Co., Ltd.
    2,278              606   (1     2,883 
SPC Power Corporation
    65,046           (2,694  1,188   7,330   (2  70,868 
Gemeng International Energy Co., Ltd.
    595,218              (233  (16,164     578,821 
PT. Cirebon Electric Power
    121,969           (10,659  14,776   704   8,324   135,114 
KNOC Nigerian East Oil Co., Ltd.
                  (11  (787  798    
KNOC Nigerian West Oil Co., Ltd.
                  (10  (724  734    
PT Wampu Electric Power
    35,077           (5,551  5,848   54   2,315   37,743 
PT. Bayan Resources TBK
    661,289           (515,139  531,528   7,041      684,719 
S-Power Co., Ltd.
    122,786              18,342         141,128 
Pioneer Gas Power Limited
                            
Eurasia Energy Holdings
                            
Xe-Pian Xe-Namnoy Power Co., Ltd.
    92,441              15,582   7,561      115,584 
PT. Mutiara Jawa
    2,569              1,197   (169     3,597 
Samcheok Eco Materials Co., Ltd.
                            
Noeul Green Energy Co., Ltd.
    3,808              (3,824     16    
Goseong Green Power Co., Ltd.
    260,858              27,992      43   288,893 
Gangneung Eco Power Co., Ltd.
    2,288              (2,288         
Shin Pyeongtaek Power Co., Ltd.
    93,074              40,713      36   133,823 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
    223              55         278 
Dongducheon Dream Power Co., Ltd.
    74,198              15,086      16   89,300 
Jinbhuvish Power Generation Pvt. Ltd.
                            
Daejung Offshore Wind Power Co., Ltd.
    1,704              (149        1,555 
GS Donghae Electric Power Co., Ltd.
    243,772              15,717      656   260,145 
Daegu Photovoltaic Co., Ltd.
    2,342           (268  775         2,849 
Busan Green Energy Co., Ltd.
    5,032              (667     30   4,395 
Gunsan Bio Energy Co., Ltd.
                            
Korea Electric Vehicle Charging Service
    1,250        (1,293     43          
Hansuwon KNP Co., Ltd.
    219              61         280 
Korea Electric Power Corporation Fund
    47,983        (25,297     7,966   (1,810     28,842 
Energy Infra Asset Management Co., Ltd.
    1,066              118         1,184 
Daegu clean Energy Co., Ltd.
    12                       12 
Yaksu
 
ESS Co., Ltd.
    716              (230        486 
Nepal Water & Energy Development Company Private Limited
    66,333              (923  4,530      69,940 
Gwangyang Green Energy Co., Ltd.
    25,466              (422        25,044 
PND
S
olar Co., Ltd.
    1,229              174         1,403 
Hyundai Eco Energy Co., Ltd.
    5,572              2,058   1      7,631 
YeongGwang Yaksu Wind Electric Co., Ltd.
    233              143      (220  156 
Green Energy Electricity Generation Co., Ltd.
    1,713              (142        1,571 
Korea Energy Solutions Co., Ltd.
    123              (30        93 
ITR Co., Ltd.
    32              (32         
 
F-11
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
     
Beginning
balance
   
Acquisitions
   
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
      
In millions of won
 
<Associates>
                             
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
     306              60         366 
Namjeongsusang Solar Power Operation Co., Ltd.
    361              12         373 
Indeck Niles Development, LLC
    246,273        (4,289     21,975   21,840   16,239   302,038 
Indeck Niles Asset Management, LLC
    111           (497  472      8   94 
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
    7,138        (202  (392  389   (1     6,932 
Suwon New Power Co., Ltd.
    1,035              (116        919 
KPGE Inc.
    309        (317     8          
Gwangbaek Solar Power Investment Co., Ltd.
    4,806              327         5,133 
Go deok Clean Energy Co., Ltd.
    4,302              118         4,420 
SureDataLab Co., Ltd.
    128              49         177 
SEP Co., Ltd.
    7              (7         
Hankook Electric Power Information Co., Ltd.
    161              121      (62  220 
Tronix Co., Ltd.
    109              (37     (6  66 
O2&B Global Co., Ltd.
    35              1         36 
Muan Sunshine Solar Power Plant Co., Ltd.
    1,268              1,294         2,562 
Bigeum Resident Photovoltaic Power Co., Ltd.
                            
Goesan Solar Park Co., Ltd.
    1,927              664         2,591 
Saemangeum Heemang Photovoltaic Co., Ltd.
    10,238              2,772         13,010 
Bitgoel Eco Energy Co., Ltd.
    4,356    3,240          1,355         8,951 
Jeju Gimnyeong Wind Power Co., Ltd.
    911              (39        872 
Seoroseoro Sunny Power Plant Co., Ltd.
    721              138         859 
Muan Solar park Co., Ltd.
    6,083           (600  2,377   (22     7,838 
YuDang Solar Co., Ltd.
    565           (160  181         586 
Anjwa Smart Farm & Solar City Co., Ltd.
    6,784              1,878         8,662 
Daewon Green Energy Co., Ltd.
    3,877              608         4,485 
G.GURU Co., Ltd.
    403              (103        300 
UD4M Co., Ltd.
    144              17         161 
Dongbu Highway Solar Co., Ltd.
    265              87         352 
Seobu Highway Solar Co., Ltd.
    289              27         316 
Korea Energy Data Co., Ltd.
    62                       62 
Gangneung Sacheon Fuel Cell Co., Ltd.
    1,878    3,745          (1,310  (36     4,277 
KOSTURE Co., Ltd.
        1                   1 
Digital Innovation Growth Fund
    9,890              (204     (9,686   
Taebaek Gadeoksan Wind Power Co., Ltd.
    16,495           (1,784  5,644      (315  20,040 
Chuncheon Green Energy Co., Ltd.
    3,372    6,140          (357        9,155 
Yeomsubong Wind Power Co., Ltd.
    95              (40     7   62 
Yeongyang Wind Power Corporation II
    7,965              (504        7,461 
Haeparang Energy Co., Ltd.
    2,241              (53        2,188 
Saemangeum Sebit Power Plant Co., Ltd.
    6,000    7,788          4,855      4,556   23,199 
Boulder Solar III, LLC
        715                29   744 
PlatformN. Co., Ltd.
        105          (21        84 
PT. Cirebon Energi Prasarana
        24,052          35,315   6,963   2,705   69,035 
Green Radiation Co., Ltd.
                  (9     20   11 
Future Convergence Technology Laboratory. Co., Ltd.
        76          (26        50 
SC E&G. Co,. Ltd.
        90          124         214 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.)
        81          85         166 
ACE
        20                   20 
Environment and Energy Co., Ltd.
        11          (1        10 
Santiago Solar Power SpA
        13,853          (379  (100  (1  13,373 
Yanggu Floating Photovoltaic Power Plant Inc.
        903                   903 
   
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    5,232,373    95,037    (31,398  (599,328  1,091,588   45,268   10,924   5,844,464 
   
 
 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-11
2
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
     
Beginning
balance
   
Acquisitions
   
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
      
In millions of won
 
<Joint ventures>
                             
KEPCO-Uhde Inc.
     58              (43     2   17 
Shuweihat Asia Power Investment B.V.
    37,069           (3,545  (1,303  34,231      66,452 
Shuweihat Asia Operation & Maintenance Company
    1,380           (995  1,154   92      1,631 
Waterbury Lake Uranium L.P.
    21,590              1   159      21,750 
ASM-BG Investicii AD
    18,692        (6,255  (2,395  2,979   1,534      14,555 
RES Technology AD
    16,703        (3,673  (333  1,427   1,009      15,133 
KV Holdings, Inc.
    2,527           (394  7,747   (221     9,659 
KEPCO SPC Power Corporation
    198,979           (34,280  27,591   (12,696     179,594 
Gansu Datang Yumen Wind Power Co., Ltd.
    6,635              (464  (147     6,024 
Datang Chifeng Renewable Power Co., Ltd.
    204,587           (8,732  2,849   (6,722     191,982 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
    44,217           (2,694  3,936   (1,061     44,398 
Rabigh Electricity Company
    143,678           (11,447  31,523   50,853      214,607 
Rabigh Operation & Maintenance Company Limited
    4,071           (2,735  3,866   (89     5,113 
Jamaica Public Service Company Limited
    294,649           (7,752  28,541   19,494   (3,525  331,407 
KW Nuclear Components Co., Ltd.
    15,734           (833  2,189         17,090 
Busan Shinho Solar Power Co., Ltd.
    5,841           (478  1,356         6,719 
Global Trade Of Power System Co., Ltd.
    597              101         698 
Expressway Solar-light Power Generation Co., Ltd.
    3,084              1,670         4,754 
Amman Asia Electric Power Company
    178,679           (19,350  23,442   37,483      220,254 
KAPES, Inc.
                            
Honam Wind Power Co., Ltd.
    4,041           (174  952         4,819 
Korea Power Engineering Service Co., Ltd.
    5,415           (86  145      69   5,543 
Chun-cheon Energy Co., Ltd.
    25,896              6,148         32,044 
Yeonggwangbaeksu Wind Power Co., Ltd.
    2,728              423         3,151 
Nghi Son 2 Power LLC
        172,480          51,218   185,141      408,839 
Kelar S.A.
    86,695              3,695   21,241   5,506   117,137 
PT. Tanjung Power Indonesia
    46,546    30,147       (6,104  4,645   18,323   (650  92,907 
Incheon New Power Co., Ltd.
                  198         198 
Seokmun Energy Co., Ltd.
    13,842              3,494         17,336 
Daehan Wind Power PSC
    5,154              2,446   6,323      13,923 
Barakah One Company
                            
Nawah Energy Company
    294              1   20      315 
Momentum
    368           (369  345   1      345 
Daegu Green Power Co., Ltd.
    24,054              5,079      227   29,360 
Yeonggwang Wind Power Co., Ltd.
    17,646              3,067         20,713 
Chester Solar IV SpA
                  202   (17  (4  181 
Chester Solar V SpA
    25              129   3   (1  156 
Diego de Almagro Solar SpA
    362              154   2   22   540 
South Jamaica Power Company Limited
    37,360              6,625   2,452      46,437 
Daesan Green Energy Co., Ltd.
    21,244              (2,030     4   19,218 
RE Holiday Holdings LLC
    73,167           (2,288  2,526   11,965      85,370 
RE Pioneer Holdings LLC
    47,015           (1,337  (275  9,769      55,172 
RE Barren Ridge 1 Holdings LLC
    1,883           (1,625  (2,886  5,978      3,350 
RE Astoria 2 LandCo LLC
    5,998           (388  571   418      6,599 
RE Barren Ridge LandCo LLC
    2,120           (160  225   148      2,333 
Laurel SpA
    290              245   3   16   554 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd
    3,625              26         3,651 
Chile Solar JV SpA
    32,457        (24,894     159   2,097      9,819 
Cheong-Song Noraesan Wind Power Co., Ltd.
    4,106           (672  832      (3  4,263 
Chester Solar I SpA
    1,120              120   (1  75   1,314 
Solar Philippines Calatagan Corporation
    58,231           (1,710  6,081   (5,700     56,902 
Saemangeum Solar Power Co., Ltd.
    23,939              (388        23,551 
 
F-11
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
     
Beginning
balance
   
Acquisitions
   
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
      
In millions of won
 
<Joint ventures>
                             
Chungsongmeon BongSan wind power Co., Ltd.
     3,808              (338        3,470 
Jaeun Resident Wind Power Plant Co., Ltd.
    1,958              278         2,236 
DE Energia SpA
    8,921                 615      9,536 
Dangjin Eco Power Co., Ltd.
    26,109              233   513   4   26,859 
Haemodum Solar Co., Ltd.
    3,081              286         3,367 
Yangyang Wind Power Co., Ltd.
    11,191              (327        10,864 
HORUS SOLAR, S.A. DE C.V.
    5,842              841   293      6,976 
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V.
    4,536              68   295      4,899 
SUNMEX RENOVABLES, S.A. DE C.V.
    1,610              (151  198      1,657 
Stavro Holding II A.B.
    17,627    952          157   (1,687  122   17,171 
Solaseado Solar Power Co., Ltd.
    9,891              6,342         16,233 
Yeongam Solar Power Co., Ltd.
    6,838              3,041         9,879 
Samsu Wind Power Co., Ltd.
    2,828              377         3,205 
Pulau Indah Power Plant Sdn. Bhd.
    22,099              1,681   3,034      26,814 
Sam-Yang Photovoltaic Power Co., Ltd.
    4,993              (123     (4,870   
NH-Amundi Global Infrastructure Investment Private Investment Trust 21
    21,456    485    (406  (1,415  1,603         21,723 
Shin-han BNPP Private Investment Trust for East-West Sunlight Dream
    16,288        (687     (14        15,587 
PT Barito Wahana Tenaga
    81,595    39          13,352   42,061      137,047 
Cheongna Energy Co., Ltd.
    11,198              (440        10,758 
Naepo Green Energy Co., Ltd.
                            
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
                            
OneEnergy Asia Limited
    79,700    39,033          (18,294  71,779      172,218 
KAS Investment I LLC
    15,273              2,426   548      18,247 
KAS Investment II LLC
    15,213              2,082   878      18,173 
Energyco Co., Ltd.
    1,535              655         2,190 
CAES, LLC
    18,435           (217  (198  1,756   1,029   20,805 
Hapcheon Floating Photovoltaic Power Plant Inc.
    6,971              1,500         8,471 
Busan Industrial Solar Power Co., Ltd.
    612              556         1,168 
Bitsolar Energy Co., Ltd.
    352                       352 
Pulau Indah O&M Sdn. Bhd.
                            
Guadalupe Solar SpA
    659              221   33      913 
Omisan Wind Power Co., Ltd.
    10,633              (222        10,411 
Foresight Iberian Solar Group Holding, S.L.
    9,743    1,781          (1,016  3   54   10,565 
Yeongwol Eco Wind Co., Ltd.
    3,196              (41        3,155 
Gurae Resident Power Co., Ltd.
    395              (4        391 
Cheongju Eco Park Co., Ltd.
    5,465              5,025         10,490 
Enel X Midland Photovoltaic, LLC
    1,688              168         1,856 
Geumsungsan Wind Power Co., Ltd.
    6,053              (2,560        3,493 
KEPCO KPS CARABAO Corp.
    386           (104  (105        177 
Prime Swedish Holding AB
    15,441    20,896          (261     169   36,245 
Goheung New Energy Co., Ltd.
    11,708              124         11,832 
Gunsan Land Solar Co., Ltd.
    19,317              8,220   7      27,544 
CapMan Lynx SCA, SICAR
    9,976              (10,195  5,173   (4,954   
International Offshore Power Transmission Holding Company Limited
                            
Pyeongchang Wind Power Co., Ltd.
                        14,464   14,464 
Eumseong Eco Park Co., Ltd.
        5,741          (184        5,557 
Songsan Green Energy Co., Ltd.
        1,400          (13        1,387 
Changwon Nu-ri Energy Co., Ltd.
        500          (3        497 
 
F-11
4
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
     
Beginning
balance
   
Acquisitions
  
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
      
In millions of won
 
<Joint ventures>
                            
Hasami Wind Farm Corporation
         1,596         (7        1,589 
PungBack Wind Farm Corporation
        7,884         (1,141        6,743 
Trumbull Asset Management, LLC
                 252   (1  (5  246 
S-Power Chile SpA
        127                  127 
Seungmun Green Energy
        8,973         120   (39     9,054 
Seobusambo highway photovoltaics Co., Ltd.
        (1              3,067   3,066 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    2,239,011    292,033   (35,915  (112,612  246,705   507,544   10,818   3,147,584 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     7,471,384    387,070   (67,313  (711,940  1,338,293   552,812   21,742   8,992,048 
   
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
2023
 
Investees
     
Beginning
balance
   
Acquisitions
  
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
      
In millions of won
 
<Associates>
                            
Korea Gas Corporation
 
 
  
 
2,085,296
 
  
 
 
 
 
 
 
 
 
 
 
(155,819
 
 
47,220
 
 
 
(6,054
 
 
1,970,643
 
Korea Electric Power Industrial Development Co., Ltd.
    31,078          (2,156  1,790      (1,212  29,500 
YTN Co., Ltd.
    55,027          (540  (1,147  (14  (1,023  52,303 
Gangwon Wind Power Co., Ltd.
    12,158          (2,272  2,115         12,001 
Hyundai Green Power Co., Ltd.
    119,791          (3,555  2,159      (222  118,173 
Korea Power Exchange
    275,126             4,575      (5,415  274,286 
Taebaek Wind Power Co., Ltd.
    14,501                   (14,501   
Taebaek Guinemi Wind Power Co., Ltd.
    13,049             481         13,530 
Daeryun Power Co., Ltd.
    26,727             143   (12  (24  26,834 
KNH Solar Co., Ltd.
    2,883             311         3,194 
SPC Power Corporation
    70,868          (2,669  9,667   1,065      78,931 
Gemeng International Energy Co., Ltd.
    578,821    102,854      (12,527  41,280   565   (5,181  705,812 
PT. Cirebon Electric Power
    135,114          (10,770  7,519      2,396   134,259 
KNOC Nigerian East Oil Co., Ltd.
                 (7  (213  220    
KNOC Nigerian West Oil Co., Ltd.
                 (7  (196  203    
PT Wampu Electric Power
    37,743          (3,850  (268  224   706   34,555 
PT. Bayan Resources TBK
    684,719          (344,360  252,406   26,500   (58  619,207 
S-Power Co., Ltd.
    141,128             21,637         162,765 
Pioneer Gas Power Limited
                           
Eurasia Energy Holdings
                           
Xe-Pian
Xe-Namnoy
Power Co., Ltd.
    115,584             (848  1,642      116,378 
PT. Mutiara Jawa
    3,597          (459  1,936   94      5,168 
Samcheok Eco Materials Co., Ltd.
                           
Noeul Green Energy Co., Ltd.
                           
Goseong Green Power Co., Ltd.
    288,893             (1,240     (29  287,624 
Gangneung Eco Power Co., Ltd.
        258,100         (3,171        254,929 
Shin Pyeongtaek Power Co., Ltd.
    133,823          (70,040  81,258      (15  145,026 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
    278             16         294 
Dongducheon Dream Power Co., Ltd.
    89,300             (2,568     471   87,203 
Jinbhuvish Power Generation Pvt. Ltd.
                           
Daejung Offshore Wind Power Co., Ltd.
    1,555             (72        1,483 
GS Donghae Electric Power Co., Ltd.
    260,145          (21,846  21,240      (454  259,085 
Daegu Photovoltaic Co., Ltd.
    2,849          (408  363         2,804 
Busan Green Energy Co., Ltd.
    4,395             (1,137     1   3,259 
Gunsan Bio Energy Co., Ltd.
                           
 
F-11
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
    
Beginning
balance
  
Acquisitions
  
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
     
In millions of won
 
<Associates>
                          
Hansuwon KNP Co., Ltd.
    280            187         467 
Korea Electric Power Corporation Fund
   28,842      (2,266     (2,865  (290     23,421 
Energy Infra Asset Management Co., Ltd.
   1,184         (89  118         1,213 
Daegu clean Energy Co., Ltd.
   12                  (12   
Yaksu
 
ESS Co., Ltd.
   486            (201        285 
Nepal Water & Energy Development Company Private Limited
   69,940   40,103         (325  855      110,573 
Gwangyang Green Energy Co., Ltd.
   25,044            (406        24,638 
PND
S
olar Co., Ltd.
   1,403            107         1,510 
Hyundai Eco Energy Co., Ltd.
   7,631         (874  1,198   (8     7,947 
YeongGwang Yaksu Wind Electric Co., Ltd.
   156            (23        133 
Green Energy Electricity Generation Co., Ltd.
   1,571            (1,563        8 
Korea Energy Solutions Co., Ltd.
   93            77         170 
ITR Co., Ltd.
               (33     33    
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
   366            25         391 
Namjeongsusang Solar Power Operation Co., Ltd.
   373      (217     (156         
Indeck Niles Development, LLC
   302,038            32,067   (3,623  4,919   335,401 
Indeck Niles Asset Management, LLC
   94         (337  334      2   93 
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
   6,932      (428  (373  366   (1     6,496 
Suwon New Power Co., Ltd.
   919            103         1,022 
Gwangbaek Solar Power Investment Co., Ltd.
   5,133         (644  666         5,155 
Go deok Clean Energy Co., Ltd.
  
 
4,420
 
 
 
 
 
 
 
 
 
 
 
 
303
 
 
 
 
 
 
 
 
 
4,723
 
SureDataLab Co., Ltd.
   177            (63        114 
SEP Co., Ltd.
                         
Hankook Electric Power Information Co., Ltd.
   220            (6        214 
Tronix Co., Ltd.
   66            154         220 
O2&B Global Co., Ltd.
   36            (15        21 
Muan Sunshine Solar Power Plant Co., Ltd.
   2,562         (340  600         2,822 
Bigeum Resident Photovoltaic Power Co., Ltd.
               (414  414       
Goesan Solar Park Co., Ltd.
   2,591            286         2,877 
Saemangeum Heemang Photovoltaic Co., Ltd.
   13,010            1,410         14,420 
Bitgoel Eco Energy Co., Ltd.
   8,951            3,443         12,394 
Jeju Gimnyeong Wind Power Co., Ltd.
   872            (626        246 
Seoroseoro Sunny Power Plant Co., Ltd.
   859            82         941 
Muan Solar park Co., Ltd.
   7,838         (2,680  1,672         6,830 
YuDang Solar Co., Ltd.
   586         (100  84         570 
Anjwa Smart Farm & Solar City Co., Ltd.
   8,662         (1,400  403         7,665 
KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
   4,485            3,294         7,779 
G.GURU Co., Ltd.
   300            (133        167 
UD4M Co., Ltd.
   161            (11        150 
Dongbu Highway Solar Co., Ltd.
   352            28         380 
Seobu Highway Solar Co., Ltd.
   316            90         406 
Korea Energy Data Co., Ltd.
   62            (26        36 
Gangneung Sacheon Fuel Cell Co., Ltd.
   4,277            3,593         7,870 
KOSTURE Co., Ltd.
   1   6         1         8 
 
F-11
6
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
    
Beginning
balance
  
Acquisitions
  
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
     
In millions of won
 
<Associates>
                           
Taebaek Gadeoksan Wind Power Co., Ltd.
    20,040         (3,723  3,109         19,426 
Chuncheon Green Energy Co., Ltd.
   9,155            (204  (51     8,900 
Yeomsubong Wind Power Co., Ltd.
   62   1,316         (507        871 
Yeongyang Wind Power Corporation II
   7,461            2,639         10,100 
Haeparang Energy Co., Ltd.
   2,188            (84        2,104 
Saemangeum Sebit Power Plant Co., Ltd.
   23,199   7,249         (709     7,452   37,191 
Boulder Solar III, LLC
   744                  10   754 
PlatformN. Co., Ltd.
   84            (84         
PT. Cirebon Energi Prasarana
   69,035            7,328   (891  1,125   76,597 
Green Radiation Co., Ltd.
   11            15         26 
Future Convergence Technology Laboratory. Co., Ltd.
   50            (14        36 
Eco Motion Co., Ltd. (formerly, SC E&G. Co,. Ltd.)
   214            53         267 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.)
   166            (72     26   120 
ACE
   20            (18        2 
Environment and Energy Co., Ltd.
   10            (1        9 
Santiago Solar Power SpA
   13,373            (1,522  (82     11,769 
Yanggu Floating Photovoltaic Power Plant Inc.
   903            (143        760 
Power Embedded
      70                  70 
Changwon SG Energy Co., Ltd.
      900         (117        783 
Donpyung Technology. Co., Ltd.
      125         154      (25  254 
HORANG ENERGY Inc.
      4,240         (91        4,149 
Hoenggye Renewable Energy Co., Ltd
      2,375                  2,375 
Haman Green Energy Co., Ltd.
      4,771         (1,790        2,981 
Songsan Green Energy Co., Ltd.
                     8,323   8,323 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   5,844,464   422,109   (2,911  (486,012  334,379   73,198   (8,338  6,176,889 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
<Joint ventures>
                          
KEPCO-Uhde Inc.
  
 
17
 
 
 
 
 
 
 
 
 
 
 
 
(10
 
 
 
 
 
(7
 
 
 
Shuweihat Asia Power Investment B.V.
   66,452         (512  (440  4,402      69,902 
Shuweihat Asia Operation & Maintenance Company
   1,631         (1,077  1,237   27      1,818 
Waterbury Lake Uranium L.P.
   21,750            70   792      22,612 
ASM-BG
Investicii AD
   14,555         (697  680   201      14,739 
RES Technology AD
   15,133         (697  (513  460      14,383 
KV Holdings, Inc.
   9,659            280   161   (4,914  5,186 
KEPCO SPC Power Corporation
   179,594            13,224   3,726      196,544 
Gansu Datang Yumen Wind Power Co., Ltd.
   6,024            316   (25     6,315 
Datang Chifeng Renewable Power Co., Ltd.
   191,982         (14,293  9,012   38      186,739 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
   44,398         (1,771  639   (59     43,207 
Rabigh Electricity Company
   214,607         (6,263  28,456   (1,749     235,051 
Rabigh Operation & Maintenance Company Limited
   5,113         (2,994  2,759   86      4,964 
Jamaica Public Service Company Limited
   331,407         (15,715  32,862   7,959   (6,647  349,866 
KW Nuclear Components Co., Ltd.
   17,090         (833  2,423         18,680 
Busan Shinho Solar Power Co., Ltd.
   6,719         (1,169  1,119         6,669 
Global Trade Of Power System Co., Ltd.
   698            (83        615 
 
F-11
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
    
Beginning
balance
  
Acquisitions
  
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
     
In millions of won
 
<Joint ventures>
                          
Expressway Solar-light Power Generation Co., Ltd.
    4,754            433         5,187 
Amman Asia Electric Power Company
   220,254         (15,636  17,833   973      223,424 
KAPES, Inc.
            (1,162  1,162          
Honam Wind Power Co., Ltd.
   4,819         (522  446         4,743 
Korea Power Engineering Service Co., Ltd.
   5,543         (44  349      (140  5,708 
Chun-cheon Energy Co., Ltd.
   32,044            3,039         35,083 
Yeonggwangbaeksu Wind Power Co., Ltd.
   3,151            292         3,443 
Nghi Son 2 Power LLC
   408,839            14,742   (5,592     417,989 
Kelar S.A.
   117,137            11,655   848   1,889   131,529 
PT. Tanjung Power Indonesia
   92,907         (12,641  9,679   338   (132  90,151 
Incheon New Power Co., Ltd.
   198         (69  147      22   298 
Seokmun Energy Co., Ltd.
   17,336            (745        16,591 
Daehan Wind Power PSC
   13,923            2,437   66      16,426 
Barakah One Company
                         
Nawah Energy Company
   315            10   5      330 
MOMENTUM
   345         (365  208   21      209 
Daegu Green Power Co., Ltd.
   29,360            (2,856     (74  26,430 
Yeonggwang Wind Power Co., Ltd.
   20,713         (2,688  5,355         23,380 
Chester Solar IV SpA
   181            324   (21     484 
Chester Solar V SpA
   156            35   (3  3   191 
Diego de Almagro Solar SpA
   540            447   (37  4   954 
South Jamaica Power Company Limited
   46,437         (7,667  3,709   630      43,109 
Daesan Green Energy Co., Ltd.
   19,218            2,977      (4  22,191 
RE Holiday Holdings LLC
   85,370         (1,549  (1,425  1,696      84,092 
RE Pioneer Holdings LLC
   55,172         (1,162  (2,089  2,160      54,081 
RE Barren Ridge 1 Holdings LLC
   3,350         (3,087  (1,733  59,624      58,154 
RE Astoria 2 LandCo LLC
   6,599         (354  575   117      6,937 
RE Barren Ridge LandCo LLC
   2,333         (161  228   41      2,441 
Laurel SpA
   554            64   (14  9   613 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd
   3,651            (23  91      3,719 
Chile Solar JV SpA
   9,819            3,569   1,276   (14,664   
Cheong-Song Noraesan Wind Power Co., Ltd.
   4,263         (865  358         3,756 
Chester Solar I SpA
   1,314            (71  (29  24   1,238 
Solar Philippines Calatagan Corporation
   56,902         (6,025  6,025   1,228      58,130 
Saemangeum Solar Power Co., Ltd.
   23,551            (132        23,419 
Chungsongmeon BongSan wind power Co., Ltd.
   3,470            (805        2,665 
Jaeun Resident Wind Power Plant Co., Ltd.
   2,236            (22        2,214 
DE Energia SpA
   9,536               167      9,703 
Dangjin Eco Power Co., Ltd.
  
 
26,859
 
 
 
 
 
 
 
 
 
 
 
 
212
 
 
 
(318
 
 
 
 
 
26,753
 
Haemodum Solar Co., Ltd.
   3,367         (392  147         3,122 
Yangyang Wind Power Co., Ltd.
   10,864            (429        10,435 
HORUS SOLAR, S.A. DE C.V.
   6,976            3,594   611      11,181 
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V.
   4,899            4,088   1,948      10,935 
SUNMEX RENOVABLES, S.A. DE C.V.
   1,657            1,482   402      3,541 
Stavro Holding II A.B.
   17,171            (17  149   960   18,263 
Solaseado Solar Power Co., Ltd.
   16,233            1,720         17,953 
Yeongam Solar Power Co., Ltd.
   9,879         (592  350         9,637 
Samsu Wind Power Co., Ltd.
   3,205         (514  331         3,022 
 
F-11
8
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
    
Beginning
balance
  
Acquisitions
  
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
     
In millions of won
 
<Joint ventures>
                          
Pulau Indah Power Plant Sdn. Bhd.
    26,814         (27  671   (2,360  505   25,603 
NH-Amundi
Global Infrastructure Investment Private Investment Trust 21
   21,723   928   (1,092  (1,568  1,906         21,897 
Shin-han
BNPP Private Investment Trust for East-West Sunlight Dream
   15,587      (96     (4        15,487 
PT Barito Wahana Tenaga
   137,047            20,546   (599     156,994 
Cheongna Energy Co., Ltd.
   10,758            14,791         25,549 
Naepo Green Energy Co., Ltd.
               5,285         5,285 
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
                         
OneEnergy Asia Limited
   172,218   79,182         39,091   (525     289,966 
KAS INVESTMENT I LLC
   18,247            (2,223  (240     15,784 
KAS INVESTMENT II LLC
   18,173            (2,225  (239     15,709 
Energyco Co., Ltd.
   2,190            (50        2,140 
CAES, LLC
   20,805            (860  114   321   20,380 
Hapcheon Floating Photovoltaic Power Plant Inc.
   8,471            1,877         10,348 
Busan Industrial Solar Power Co., Ltd.
   1,168            (110        1,058 
Bitsolar Energy Co., Ltd.
   352                     352 
Pulau Indah O&M Sdn. Bhd.
                         
Guadalupe Solar SpA
   913            322   (35     1,200 
Omisan Wind Power Co., Ltd.
   10,411            (182        10,229 
Foresight Iberian Solar Group Holding, S.L.
   10,565            (2,034     (412  8,119 
Yeongwol Eco Wind Co., Ltd.
   3,155            869         4,024 
Gurae Resident Power Co., Ltd.
   391            178         569 
Cheongju Eco Park Co., Ltd.
   10,490            (1,418        9,072 
Enel X Midland Photovoltaic, LLC
   1,856   516         170         2,542 
Geumsungsan Wind Power Co., Ltd.
   3,493            2,022         5,515 
KEPCO KPS CARABAO Corp.
   177            (184  7       
Prime Swedish Holding AB
   36,245   820         (236     1,960   38,789 
Goheung New Energy Co., Ltd.
   11,832            3,904         15,736 
Gunsan Land Solar Co., Ltd.
   27,544            (5,115        22,429 
CapMan Lynx SCA, SICAR
                         
International Offshore Power Transmission Holding Company Limited
               338   1,085      1,423 
Pyeongchang Wind Power Co., Ltd.
   14,464         (870  (1,366        12,228 
Eumseong Eco Park Co., Ltd.
   5,557            2,829         8,386 
Songsan Green Energy Co., Ltd.
   1,387   7,000         (25  (39  (8,323   
Changwon
Nu-ri
Energy Co., Ltd.
   497   7,595         (27  (38     8,027 
Hasami Wind Farm Corporation
   1,589      (1,586     (3         
PungBack Wind Farm Corporation
   6,743            1,197         7,940 
Trumbull Asset Management, LLC
   246   1         693      (4  936 
S-Power
Chile SpA
   127            (70  4   3   64 
Seungmun Green Energy
   9,054            703         9,757 
Seobusambo highway photovoltaics Co., Ltd.
   3,066            514         3,580 
Yangyang Suri Wind Power Co., Ltd.
  
 
 
 
 
10,498
 
 
 
 
 
 
 
 
 
(890
 
 
 
 
 
 
 
 
9,608
 
Kepco for Power Company
      3,083         (2,109  25   (564  435 
Taebaek Wind Power Co., Ltd.
            (2,820  2,251      14,501   13,932 
Jeonju Bio Green Energy Co., Ltd.
      3,250         (55        3,195 
 
F-1
19

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(3)
Changes in investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
    
Beginning
balance
  
Acquisitions
  
Disposals
  
Dividends
received
  
Share of
profit

(loss)
  
Other
comprehensive
income

(loss)
  
Others
  
Ending
balance
 
     
In millions of won
 
<Joint ventures>
                          
Kumyang Eco Park Co., Ltd.
       3,663                  3,663 
Jeongeup Green Power Co., Ltd.
      1,560                  1,560 
Hadong
E-factory
Co., Ltd.
      350            (1     349 
Namyangju Combined Heat and Power Co., Ltd.
      3,850                  3,850 
Wadi Noor Solar Power Company SAOC
      847            (1     846 
Fairhaven Energy Storage LLC
                         
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   3,147,584   123,143   (2,774  (106,801  260,677   79,554   (15,684  3,485,699 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    8,992,048   545,252   (5,685  (592,813  595,056   152,752   (24,022  9,662,588 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows:
 
2022
 
Investees
    
Total assets
  
Total liabilities
  
Sales
  
Profit (loss) for

the year
 
     
In millions of won
 
<Associates>
               
Korea Gas Corporation
     62,424,983   52,014,243   51,724,287   1,497,008 
Korea Electric Power Industrial Development Co., Ltd.
   148,112   40,946   336,333   15,434 
YTN Co., Ltd.
   364,115   107,324   152,187   7,250 
Gangwon Wind Power Co., Ltd.
   86,758   6,029   40,130   20,163 
Hyundai Green Power Co., Ltd.
   773,998   360,926   105,374   5,010 
Korea Power Exchange
   311,691   36,564   118,501   1,036 
Taebaek Wind Power Co., Ltd.
   27,562   3,394   7,565   551 
Taebaek Guinemi Wind Power Co., Ltd.
   44,036   28,709   6,793   1,906 
Daeryun Power Co., Ltd.
   1,201,510   799,370   472,211   4,999 
KNH Solar Co., Ltd.
   13,584   2,905   4,348   2,173 
SPC Power Corporation
   254,951   26,417   80,630   25,614 
Gemeng International Energy Co., Ltd.
   7,796,180   5,460,183   3,183,398   11,637 
PT. Cirebon Electric Power
   691,311   199,987   287,261   53,730 
KNOC Nigerian East Oil Co., Ltd.
   26,491   109,974      (72
KNOC Nigerian West Oil Co., Ltd.
   28,537   105,292      (72
PT Wampu Electric Power
   209,815   127,764   21,773   12,713 
PT. Bayan Resources TBK
   4,994,538   2,518,129   6,076,844   3,042,123 
S-Power Co., Ltd.
   937,067   646,411   1,091,425   37,104 
Pioneer Gas Power Limited
   271,340   477,127      (46,290
Eurasia Energy Holdings
   648   1,156       
Xe-Pian Xe-Namnoy Power Co., Ltd.
   1,371,292   904,907   174,693   61,020 
PT. Mutiara Jawa
   26,024   13,622   15,421   4,912 
Samcheok Eco Materials Co., Ltd.
   24,952   1,609   11,907   (1,127
Noeul Green Energy Co., Ltd.
   82,611   101,472   23,493   (31,970
Goseong Green Power Co., Ltd.
   5,518,258   4,516,607   1,999,825   26,981 
Gangneung Eco Power Co., Ltd.
   4,907,872   4,900,408   435,755   (142,387
Shin Pyeongtaek Power Co., Ltd.
   1,203,406   839,568   957,062   100,554 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
   1,788   802   558   200 
Dongducheon Dream Power Co., Ltd.
   1,521,089   1,219,018   2,240,175   43,072 
Jinbhuvish Power Generation Pvt. Ltd.
   60,477   12,489       
 
F-12
0

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
    
Total assets
  
Total liabilities
  
Sales
  
Profit (loss) for

the year
 
     
In millions of won
 
<Associates>
               
Daejung Offshore Wind Power Co., Ltd.
    5,350   2,013      (228
GS Donghae Electric Power Co., Ltd.
   2,130,287   1,365,156   1,053,112   46,226 
Daegu Photovoltaic Co., Ltd.
   13,254   3,431   4,755   2,914 
Busan Green Energy Co., Ltd.
   168,588   153,432   72,290   (7,409
Gunsan Bio Energy Co., Ltd.
   8,397   29,524      (649
Hansuwon KNP Co., Ltd.
   1,887   368   2,149   210 
Korea Electric Power Corporation Fund
   29,530   130   8,034   7,854 
Energy Infra Asset Management Co., Ltd.
   12,874   918   4,954   1,354 
Daegu clean Energy Co., Ltd.
   368   324      (1
Yaksu
 
ESS Co., Ltd.
   5,984   4,314   851   (146
Nepal Water & Energy Development Company Private Limited
   241,061   141,199   70,923   (1,364
Gwangyang Green Energy Co., Ltd.
   170,390   45,260      (1,923
PND
S
olar Co., Ltd.
   36,174   31,868   5,940   217 
Hyundai Eco Energy Co., Ltd.
   181,566   142,533   29,209   10,270 
YeongGwang Yaksu Wind Electric Co., Ltd.
   40,712   39,924   6,628   1,480 
Green Energy Electricity Generation Co., Ltd.
   75,033   72,300   1,404   (488
Korea Energy Solutions Co., Ltd.
   843   377   437   (185
ITR Co., Ltd.
   446   472   188   (190
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
   1,948   383   732   202 
Namjeongsusang Solar Power Operation Co., Ltd.
   55,616   53,261   7,724   83 
Indeck Niles Development, LLC
   1,178,303   762,139   302,041   (22,541
Indeck Niles Asset Management, LLC
   299   16   1,863   1,136 
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
   14,356   210   826   796 
Suwon New Power Co., Ltd.
   2,142   164      11 
Gwangbaek Solar Power Investment Co., Ltd.
   307,864   296,915   10,270   743 
Go deok Clean Energy Co., Ltd.
   71,431   60,382      (1,101
SureDataLab Co., Ltd.
   879   140   938   203 
SEP Co., Ltd.
   38   103      (98
Hankook Electric Power Information Co., Ltd.
   2,334   997   1,797   392 
Tronix Co., Ltd.
   2,880   2,354   1,938   (226
O2&B Global Co., Ltd.
   419   238   220   5 
Muan Sunshine Solar Power Plant Co., Ltd.
   142,911   132,573   19,591   6,467 
Bigeum Resident Photovoltaic Power Co., Ltd.
   107,690   109,229      (537
Goesan Solar Park Co., Ltd.
   52,235   43,299   7,642   2,292 
Saemangeum Heemang Photovoltaic Co., Ltd.
   160,695   125,635   29,543   6,481 
Bitgoel Eco Energy Co., Ltd.
   85,236   66,987   10,054   3,229 
Jeju Gimnyeong Wind Power Co., Ltd.
   63,471   60,564   12,231   (130
Seoroseoro Sunny Power Plant Co., Ltd.
   7,015   5,045   1,157   247 
Muan Solar park Co., Ltd.
   225,894   188,329   36,081   11,339 
YuDang Solar Co., Ltd.
   22,073   19,144   3,997   957 
Anjwa Smart Farm & Solar City Co., Ltd.
   278,806   239,581   42,477   9,672 
Daewon Green Energy Co., Ltd.
   141,974   124,460   45,095   4,037 
G.GURU Co., Ltd.
   1,228   12   478   (423
UD4M Co., Ltd.
   1,322   197   1,109   59 
Dongbu Highway Solar Co., Ltd.
   17,935   16,426   2,901   439 
Seobu Highway Solar Co., Ltd.
   18,236   16,655   3,052   138 
Korea Energy Data Co., Ltd.
   339   128   308   5 
Gangneung Sacheon Fuel Cell Co., Ltd.
   108,688   98,470      (2,720
KOSTURE Co., Ltd.
   180   24   293   32 
Taebaek Gadeoksan Wind Power Co., Ltd.
   197,944   139,004   31,534   19,406 
Chuncheon Green Energy Co., Ltd.
   159,151   138,925      (858
Yeomsubong Wind Power Co., Ltd.
   4,369   2,829      (859
 
F-12
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
    
Total assets
  
Total liabilities
  
Sales
  
Profit (loss) for

the year
 
     
In millions of won
 
<Associates>
               
Yeongyang Wind Power Corporation II
    104,821   86,984      (1,678
Haeparang Energy Co., Ltd.
   19,394   10,721      (211
Saemangeum Sebit Power Plant Co., Ltd.
   167,822   131,383   23,159   7,742 
Boulder Solar III, LLC
   1,896          
PlatformN. Co., Ltd.
   379   94   486   (70
PT. Cirebon Energi Prasarana
   3,361,288   2,670,941   319,986   36,451 
Green Radiation Co., Ltd.
   111   34   89   (93
Future Convergence Technology Laboratory. Co., Ltd.
   551   302   9   (130
SC E&G. Co,. Ltd.
   1,199   131   1,048   609 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.)
   1,275   447   754   499 
ACE
   100          
Environment and Energy Co., Ltd.
   93         (7
Santiago Solar Power SpA
   56,138   29,390      (2,943
Yanggu Floating Photovoltaic Power Plant Inc.
   3,115          
<Joint ventures>
               
KEPCO-Uhde Inc.
   48   15      (84
Shuweihat Asia Power Investment B.V.
   135,646   29      (2,660
Shuweihat Asia Operation & Maintenance Company
   3,037   71   3,013   2,099 
Waterbury Lake Uranium L.P.
   66,706   117       
ASM-BG Investicii AD
   72,999   43,889   16,056   6,230 
RES Technology AD
   62,345   32,079   11,205   3,018 
KV Holdings, Inc.
   24,149   1   1   353 
KEPCO SPC Power Corporation
   267,904   29,082   253,145   44,751 
Gansu Datang Yumen Wind Power Co., Ltd.
   67,651   52,592   10,048   (1,161
Datang Chifeng Renewable Power Co., Ltd.
   835,331   355,377   140,343   42,889 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
   168,680   57,685   29,459   4,919 
Rabigh Electricity Company
   2,520,946   1,855,836   322,108   65,550 
Rabigh Operation & Maintenance Company Limited
   23,664   10,882   32,572   9,176 
Jamaica Public Service Company Limited
   2,310,611   1,515,361   1,499,897   69,458 
KW Nuclear Components Co., Ltd.
   40,381   2,013   16,968   6,755 
Busan Shinho Solar Power Co., Ltd.
   36,868   9,991   10,543   5,424 
Global Trade Of Power System Co., Ltd.
   5,628   3,222   8,434   351 
Expressway Solar-light Power Generation Co., Ltd.
   14,248   4,740   3,711   1,654 
Amman Asia Electric Power Company
   759,885   392,795   28,665   39,090 
KAPES, Inc.
   82,943   45,068   20,006   3,797 
Honam Wind Power Co., Ltd.
   34,028   17,522   8,781   3,283 
Korea Power Engineering Service Co., Ltd.
   20,931   1,817   9,176   500 
Chun-cheon Energy Co., Ltd.
   629,202   521,212   585,641   19,940 
Yeonggwangbaeksu Wind Power Co., Ltd.
   80,042   59,070   14,150   2,764 
Nghi Son 2 Power LLC
   3,652,801   2,835,123   589,023   102,436 
Kelar S.A.
   689,802   514,085   107,577   943 
PT. Tanjung Power Indonesia
   730,239   464,791   99,169   13,619 
Incheon New Power Co., Ltd.
   2,633   755   4,497   1,244 
Seokmun Energy Co., Ltd.
   212,509   152,731   61,513   12,064 
Daehan Wind Power PSC
   145,065   117,219   17,958   5,524 
Barakah One Company
   33,587,352   34,422,965   498,129   (444,338
Nawah Energy Company
   338,883   337,134   395,580   3 
Momentum
   7,315   6,280   30,864   1,036 
Daegu Green Power Co., Ltd.
   551,431   459,881   516,254   9,364 
Yeonggwang Wind Power Co., Ltd.
   233,695   189,737   31,221   6,700 
Chester Solar IV SpA
   12,728   12,469   1,521   (174
Chester Solar V SpA
   4,364   4,315   520   83 
 
F-12
2

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
    
Total assets
  
Total liabilities
  
Sales
  
Profit (loss) for

the year
 
     
In millions of won
 
<Joint ventures>
               
Diego de Almagro Solar SpA
    15,908   14,946   1,877   (288
South Jamaica Power Company Limited
   521,558   289,359   314,064   33,348 
Daesan Green Energy Co., Ltd.
   245,826   190,918   101,689   (6,641
RE Holiday Holdings LLC
   351,243   180,503   22,671   3,022 
RE Pioneer Holdings LLC
   263,232   152,888   15,701   369 
RE Barren Ridge 1 Holdings LLC
   226,504   100,436   11,740   (903
RE Astoria 2 LandCo LLC
   13,517   319   1,004   913 
RE Barren Ridge LandCo LLC
   4,761   95   389   357 
Laurel SpA
   11,221   10,447   1,424   54 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd
   29,517   74      (260
Chile Solar JV SpA
   75,246   55,609   7,842   6,425 
Cheong-Song Noraesan Wind Power Co., Ltd.
   55,948   41,464   7,988   1,916 
Chester Solar I SpA
   13,246   10,933   1,094   (221
Solar Philippines Calatagan Corporation
   113,327   36,756   17,728   10,194 
Saemangeum Solar Power Co., Ltd.
   35,890   6,817      (479
Chungsongmeon BongSan wind power Co., Ltd.
   81,030   75,207      (1,120
Jaeun Resident Wind Power Plant Co., Ltd.
   89,756   82,047      (190
DE Energia SpA
   48,350   62,481   5,959   (1,109
Dangjin Eco Power Co., Ltd.
   98,714   20,721   4,185   700 
Haemodum Solar Co., Ltd.
   22,974   16,103   2,556   581 
Yangyang Wind Power Co., Ltd.
   107,471   85,829      (634
HORUS SOLAR, S.A. DE C.V.
   156,436   133,714   5,568   5,628 
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V.
   173,262   155,009   468   457 
SUNMEX RENOVABLES, S.A. DE C.V.
   129,502   118,449      (1,008
Stavro Holding II A.B.
   85,883   27      61 
Solaseado Solar Power Co., Ltd.
   363,492   325,262   51,198   16,301 
Yeongam Solar Power Co., Ltd.
   329,714   281,791   44,568   8,563 
Samsu Wind Power Co., Ltd.
   71,123   54,254   10,118   1,987 
Pulau Indah Power Plant Sdn. Bhd.
   760,536   675,853   797   6,723 
NH-Amundi Global Infrastructure Investment Private Investment Trust 21
   71,851   74   4,850   5,431 
Shin-han BNPP Private Investment Trust for East-West Sunlight Dream
   17,341   22   38   (10
PT Barito Wahana Tenaga
   447,688         49,471 
Cheongna Energy Co., Ltd.
   385,935   368,340   100,200   (889
Naepo Green Energy Co., Ltd.
   448,309   499,528   8,905   (34,347
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
   470,677   530,304   278,363   (12,893
OneEnergy Asia Limited
   1,039,987   673,223      16,041 
KAS Investment I LLC
   61,907   861   1,603   6,998 
KAS Investment II LLC
   61,661   861   1,592   6,967 
Energyco Co., Ltd.
   56,996   52,304   7,898   2,258 
CAES, LLC
   49,676   6      (547
Hapcheon Floating Photovoltaic Power Plant Inc.
   78,768   61,561   12,705   3,061 
Busan Industrial Solar Power Co., Ltd.
   21,149   18,016   3,190   901 
Bitsolar Energy Co., Ltd.
   78,779   83,324   9,557   261 
Pulau Indah O&M Sdn. Bhd.
             
Guadalupe Solar SpA
   10,148   8,790   924   (43
Omisan Wind Power Co., Ltd.
   142,274   117,881      (519
Foresight Iberian Solar Group Holding, S.L.
   94,181   81,997      (1,365
Yeongwol Eco Wind Co., Ltd.
   87,856   83,281      (144
Gurae Resident Power Co., Ltd.
   11,649   10,467      (19
Cheongju Eco Park Co., Ltd.
   152,139   116,639   66,260   17,319 
Enel X Midland Photovoltaic, LLC
   10,289   1,010   1,684   837 
Geumsungsan Wind Power Co., Ltd.
   125,324   115,196      (1,770
 
F-12
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
    
Total assets
  
Total liabilities
  
Sales
  
Profit (loss) for

the year
 
     
In millions of won
 
<Joint ventures>
               
KEPCO KPS CARABAO Corp.
    2,025   1,582   611   (327
Prime Swedish Holding AB
   77,942   114      (577
Goheung New Energy Co., Ltd.
   136,682   113,393      (1,591
Gunsan Land Solar Co., Ltd.
   158,371   121,785   28,828   12,154 
CapMan Lynx SCA, SICAR
   112,718   102,810   504   (16,780
International Offshore Power Transmission Holding Company Limited
   4,680   71,468      (68,093
Pyeongchang Wind Power Co., Ltd.
   70,599   45,661   14,524   3,693 
Eumseong Eco Park Co., Ltd.
   136,909   119,736      (636
Songsan Green Energy Co., Ltd.
   5,500         (69
Changwon Nu-ri Energy Co., Ltd.
   1,490         (10
Hasami Wind Farm Corporation
   3,100         (23
PungBack Wind Farm Corporation
   46,957   31,667      (3,089
Trumbull Asset Management, LLC
   316      656   323 
S-Power Chile SpA
   2,430   2,450   1,334   22 
Seungmun Green Energy
   46,283   18,843      367 
Seobusambo highway photovoltaics Co., Ltd.
   8,286   4,453   217   265 
 
F-12
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
      
Total assets
   
Total liabilities
   
Sales
   
Profit (loss) for

the year
 
       
In millions of won
 
<Associates>
                    
Korea Gas Corporation
  
 
  
 
57,254,666
 
  
 
47,428,628
 
  
 
44,555,995
 
  
 
(747,428
Korea Electric Power Industrial Development Co., Ltd.
     174,788    73,065    354,850    21,170 
YTN Co., Ltd.
     352,188    108,108    130,450    (3,616
Gangwon Wind Power Co., Ltd.
     83,062    3,380    32,525    14,098 
Hyundai Green Power Co., Ltd.
     738,107    330,616    107,367    7,446 
Korea Power Exchange
     366,092    91,806    119,182    4,443 
Taebaek Guinemi Wind Power Co., Ltd.
     42,243    26,200    5,529    716 
Daeryun Power Co., Ltd.
     1,120,453    716,752    451,527    4,043 
KNH Solar Co., Ltd.
     12,142    314    3,535    1,394 
SPC Power Corporation
     287,249    28,485    106,926    27,946 
Gemeng International Energy Co., Ltd.
     7,507,274    5,189,729    2,963,614    33,580 
PT. Cirebon Electric Power
     665,365    177,150    265,054    27,341 
KNOC Nigerian East Oil Co., Ltd.
     27,029    112,017        (50
KNOC Nigerian West Oil Co., Ltd.
     29,157    107,300        (50
PT Wampu Electric Power
     206,943    131,823    20,155    (582
PT. Bayan Resources TBK
     4,447,335    2,018,870    4,675,174    1,670,522 
S-Power
Co., Ltd.
     762,398    427,807    1,012,050    44,730 
Pioneer Gas Power Limited
     274,693    532,005    551    (49,745
Xe-Pian
Xe-Namnoy
Power Co., Ltd.
     1,370,110    900,713    171,978    (5,674
PT. Mutiara Jawa
     27,296    9,474    16,160    7,999 
Samcheok Eco Materials Co., Ltd.
     22,544    39,895    8,028    (1,776
Noeul Green Energy Co., Ltd.
     89,861    107,834    24,017    920 
Goseong Green Power Co., Ltd.
     5,374,233    4,372,531    1,580,545    152 
Gangneung Eco Power Co., Ltd.
     5,381,984    4,665,083    1,419,436    (7,388
Shin Pyeongtaek Power Co., Ltd.
     1,222,968    832,633    1,040,219    201,635 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
     1,618    573    575    82 
Dongducheon Dream Power Co., Ltd.
     1,337,529    1,042,681    1,744,247    (8,608
Jinbhuvish Power Generation Pvt. Ltd.
     61,227    12,644         
Daejung Offshore Wind Power Co., Ltd.
     5,277    2,094        (145
GS Donghae Electric Power Co., Ltd.
     1,932,098    1,170,085    876,826    62,471 
Daegu Photovoltaic Co., Ltd.
     14,140    4,471    4,225    1,772 
Busan Green Energy Co., Ltd.
     160,299    149,060    69,108    (3,920
Hansuwon KNP Co., Ltd.
     3,063    899    7,618    645 
Korea Electric Power Corporation Fund
     23,981    108    332    (2,921
Energy Infra Asset Management Co., Ltd.
     13,628    1,371    5,130    1,254 
Daegu clean Energy Co., Ltd.
     368    324        (1
Yaksu
 
ESS Co., Ltd.
     5,697    4,717    508    (691
Nepal Water & Energy Development Company Private Limited
     327,057    167,792    82,720    (3,186
Gwangyang Green Energy Co., Ltd.
     370,778    247,675        (2,034
PND
S
olar Co., Ltd.
     34,804    30,127    5,413    373 
Hyundai Eco Energy Co., Ltd.
     169,180    128,481    26,266    7,206 
YeongGwang Yaksu Wind Electric Co., Ltd.
     38,720    38,173    5,593    (241
Green Energy Electricity Generation Co., Ltd.
     69,667    72,325    948    (5,392
Korea Energy Solutions Co., Ltd.
     1,151    303    643    87 
ITR Co., Ltd.
     480    490    144    (234
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
     1,818    127    771    178 
Indeck Niles Development, LLC
     1,157,838    675,638    318,392    64,813 
Indeck Niles Asset Management, LLC
     307    29    1,081    1,001 
Hanwha Corporation-linked Sunlight Power Special Private Equity
Investment Trust No. 1
     13,444    186    820    747 
Suwon New Power Co., Ltd.
     3,448    1,130    2,318    341 
Gwangbaek Solar Power Investment Co., Ltd.
     287,838    276,840    11,267    1,513 
Go deok Clean Energy Co., Ltd.
     139,352    127,545    22,671    2,426 
SureDataLab Co., Ltd.
     890    416    548    (263
 
F-12
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
      
Total assets
   
Total liabilities
   
Sales
   
Profit (loss) for

the year
 
       
In millions of won
 
<Associates>
                    
SEP Co., Ltd.
      45    117        (7
Hankook Electric Power Information Co., Ltd.
    
 
2,270
 
  
 
974
 
  
 
1,672
 
  
 
223
 
Tronix Co., Ltd.
     4,564    2,807    2,718    578 
O2&B Global Co., Ltd.
     369    264    242    (73
Muan Sunshine Solar Power Plant Co., Ltd.
     136,382    124,745    16,360    2,999 
Bigeum Resident Photovoltaic Power Co., Ltd.
     303,462    309,185        (3,031
Goesan Solar Park Co., Ltd.
     50,659    40,738    6,530    985 
Saemangeum Heemang Photovoltaic Co., Ltd.
     152,496    113,407    23,448    4,063 
Bitgoel Eco Energy Co., Ltd.
     85,571    60,302    29,907    7,019 
Jeju Gimnyeong Wind Power Co., Ltd.
     56,906    56,087    9,261    (2,088
Seoroseoro Sunny Power Plant Co., Ltd.
     6,813    4,650    1,039    193 
Muan Solar park Co., Ltd.
     204,168    171,642    31,532    8,648 
YuDang Solar Co., Ltd.
     20,566    17,717    3,483    420 
Anjwa Smart Farm & Solar City Co., Ltd.
     258,076    223,831    37,742    3,119 
KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
     143,157    112,651    58,423    13,407 
G.GURU Co., Ltd.
     818    142    162    (540
UD4M Co., Ltd.
     1,242    194    1,066    (59
Dongbu Highway Solar Co., Ltd.
     16,563    14,913    2,580    140 
Seobu Highway Solar Co., Ltd.
     16,739    14,707    2,646    451 
Korea Energy Data Co., Ltd.
     313    191    348    (87
Gangneung Sacheon Fuel Cell Co., Ltd.
     138,761    119,779    23,523    9,191 
KOSTURE Co., Ltd.
     196    22    208    16 
Taebaek Gadeoksan Wind Power Co., Ltd.
     196,810    139,675    35,000    13,138 
Chuncheon Green Energy Co., Ltd.
     217,335    197,676    6,052    (497
Yeomsubong Wind Power Co., Ltd.
     32,742    30,586        (1,753
Yeongyang Wind Power Corporation II
     133,053    106,419    15,190    8,797 
Haeparang Energy Co., Ltd.
     40,698    32,359        (335
Saemangeum Sebit Power Plant Co., Ltd.
     165,283    97,997    22,663    (812
Boulder Solar III, LLC
     1,929             
PlatformN. Co., Ltd.
     184    394    404    (566
PT. Cirebon Energi Prasarana
     3,372,539    2,606,566    434,806    73,285 
Green Radiation Co., Ltd.
     1,038    812    298    100 
Future Convergence Technology Laboratory. Co., Ltd.
     479    302        (70
Eco Motion Co., Ltd. (formerly, SC E&G. Co,. Ltd.)
     1,664    329    633    372 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.)
     1,801    1,081    856     
ACE
     385    348    53    (30
Environment and Energy Co., Ltd.
     89            (4
Santiago Solar Power SpA
     88,687    65,149        (2,994
Yanggu Floating Photovoltaic Power Plant Inc.
     17,092    14,470    135    (495
Power Embedded
     298    2        (2
Changwon SG Energy Co., Ltd.
     5,738    1,649    436    (703
Donpyung Technology. Co., Ltd.
     2,039    643    1,664    93 
HORANG ENERGY Inc.
     64,736    54,923        (389
Hoenggye Renewable Energy Co., Ltd
     24,702    25,730        (4,864
Haman Green Energy Co., Ltd.
     40,801    32,285        (5,116
Songsan Green Energy Co., Ltd.
     46,016    32,262        (100
<Joint ventures>
                    
Shuweihat Asia Power Investment B.V.
     142,680    20        897 
Shuweihat Asia Operation & Maintenance Company
     4,421    1,116    3,194    2,249 
Waterbury Lake Uranium L.P.
     74,320    550         
ASM-BG
Investicii AD
     68,837    39,359    10,931    1,359 
 
F-12
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
      
Total assets
   
Total liabilities
   
Sales
   
Profit (loss) for

the year
 
       
In millions of won
 
<Joint ventures>
                    
RES Technology AD
      58,152    29,387    5,969    (1,027
KV Holdings, Inc.
     12,968    2    20    367 
KEPCO SPC Power Corporation
     288,140    26,778    222,773    17,270 
Gansu Datang Yumen Wind Power Co., Ltd.
     61,657    45,869    10,684    791 
Datang Chifeng Renewable Power Co., Ltd.
     812,124    345,277    117,833    25,055 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
    
 
166,959
 
  
 
58,942
 
  
 
23,638
 
  
 
1,597
 
Rabigh Electricity Company
     2,556,848    1,855,234    304,727    51,539 
Rabigh Operation & Maintenance Company Limited
     40,339    27,928    31,301    6,676 
Jamaica Public Service Company Limited
     2,332,019    1,491,199    1,400,582    87,307 
KW Nuclear Components Co., Ltd.
     42,363    460    14,344    5,386 
Busan Shinho Solar Power Co., Ltd.
     31,863    5,188    9,197    4,473 
Global Trade Of Power System Co., Ltd.
     2,398    277    2,044    (229
Expressway Solar-light Power Generation Co., Ltd.
     13,065    2,691    3,397    892 
Amman Asia Electric Power Company
    
 
719,388
 
  
 
347,015
 
  
 
21,772
 
  
 
33,811
 
KAPES, Inc.
     203,066    165,475    32,294    2,150 
Honam Wind Power Co., Ltd.
     31,183    14,938    6,570    1,540 
Korea Power Engineering Service Co., Ltd.
     21,534    1,853    11,248    1,203 
Chun-cheon Energy Co., Ltd.
     565,972    447,820    502,889    10,435 
Yeonggwangbaeksu Wind Power Co., Ltd.
     73,854    50,936    13,523    1,944 
Nghi Son 2 Power LLC
     3,775,717    2,939,740    825,701    33,505 
Kelar S.A.
     691,104    493,325    112,201    12,488 
PT. Tanjung Power Indonesia
     704,274    446,700    111,138    21,854 
Incheon New Power Co., Ltd.
     1,404    377    3,781    485 
Seokmun Energy Co., Ltd.
     201,776    144,565    54,575    (1,581
Daehan Wind Power PSC
     144,260    111,407    17,880    4,951 
Barakah One Company
     35,586,640    36,901,367    1,243,735    (230,503
Nawah Energy Company
     569,982    568,147    555,338    34 
MOMENTUM
     13,449    12,821    23,160    624 
Daegu Green Power Co., Ltd.
     515,354    429,204    380,130    (5,146
Yeonggwang Wind Power Co., Ltd.
     225,286    175,530    36,326    11,672 
Chester Solar IV SpA
     12,435    11,504    2,119    395 
Chester Solar V SpA
     4,124    4,002    696    141 
Diego de Almagro Solar SpA
     15,785    13,907    3,114    931 
South Jamaica Power Company Limited
     482,866    267,307    240,664    18,833 
Daesan Green Energy Co., Ltd.
     237,663    174,261    111,225    11,480 
RE Holiday Holdings LLC
     340,773    172,589    21,178    664 
RE Pioneer Holdings LLC
     257,091    148,929    14,136    (2,164
RE Barren Ridge 1 Holdings LLC
     213,491    97,184    11,915    (1,979
RE Astoria 2 LandCo LLC
     14,116    242    1,014    823 
RE Barren Ridge LandCo LLC
     4,980    97    393    329 
Laurel SpA
     10,665    9,768    1,646    169 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd
     30,081    84        (182
Cheong-Song Noraesan Wind Power Co., Ltd.
     54,086    41,352    6,780    1,240 
Chester Solar I SpA
     12,846    10,712    1,620    214 
Solar Philippines Calatagan Corporation
     146,304    37,922    16,420    9,121 
Saemangeum Solar Power Co., Ltd.
     34,905    5,994        (162
Chungsongmeon BongSan wind power Co., Ltd.
     83,147    80,102        (925
Jaeun Resident Wind Power Plant Co., Ltd.
     95,529    87,893    181    (80
DE Energia SpA
     28,017    21,416    5,006    21,118 
Dangjin Eco Power Co., Ltd.
     96,980    19,299    3,789    589 
Haemodum Solar Co., Ltd.
     21,612    15,241    2,216    299 
Yangyang Wind Power Co., Ltd.
     124,550    103,766    211    (858
HORUS SOLAR, S.A. DE C.V.
     210,868    160,006    20,586    26,865 
 
F-12
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(4)
Summary of financial information of associates and joint ventures as of and for the years ended December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
      
Total assets
   
Total liabilities
   
Sales
  
Profit (loss) for

the year
 
       
In millions of won
 
<Joint ventures>
                   
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V.
      239,548    180,912    4,920   24,984 
SUNMEX RENOVABLES, S.A. DE C.V.
     156,696    133,032       6,232 
Stavro Holding II A.B.
     91,342    28       (87
Solaseado Solar Power Co., Ltd.
     346,793    304,142    39,907   4,823 
Yeongam Solar Power Co., Ltd.
     326,429    279,779    35,280   4,506 
Samsu Wind Power Co., Ltd.
     67,150    51,247    8,751   1,741 
Pulau Indah Power Plant Sdn. Bhd.
     800,300    720,459    431   2,095 
NH-Amundi
Global Infrastructure Investment Private Investment Trust 21
     72,465    97    7,569   7,080 
Shin-han
BNPP Private Investment Trust for East-West Sunlight Dream
    
 
17,230
 
  
 
22
 
  
 
38
 
 
 
(3
PT Barito Wahana Tenaga
     512,846           72,320 
Cheongna Energy Co., Ltd.
     428,042    380,935    119,530   29,511 
Naepo Green Energy Co., Ltd.
     695,684    677,583    312,592   53,343 
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
     441,975    498,353    212,997   5,544 
OneEnergy Asia Limited
    
 
2,181,165
 
  
 
1,520,032
 
  
 
1,149,944
 
 
 
94,298
 
KAS INVESTMENT I LLC
     52,806        (7,436  (7,437
KAS INVESTMENT II LLC
     52,555    1    (7,444  (7,445
Energyco Co., Ltd.
     54,336    49,816    6,599   (173
CAES, LLC
     48,495    5       (2,388
Hapcheon Floating Photovoltaic Power Plant Inc.
     79,924    58,887    12,679   4,266 
Busan Industrial Solar Power Co., Ltd.
     18,636    15,896    2,378   106 
Bitsolar Energy Co., Ltd.
     73,435    79,367    8,249   (1,125
Pulau Indah O&M Sdn. Bhd.
                 
Guadalupe Solar SpA
     10,646    8,811    1,684   626 
Omisan Wind Power Co., Ltd.
     150,813    126,853       (453
Foresight Iberian Solar Group Holding, S.L.
     94,972    86,049       (2,712
Yeongwol Eco Wind Co., Ltd.
     109,716    102,143    3,561   2,975 
Gurae Resident Power Co., Ltd.
     14,096    12,299    652   615 
Cheongju Eco Park Co., Ltd.
     145,956    115,347    38,907   (4,892
Enel X Midland Photovoltaic, LLC
     12,825    115    2,128   850 
Geumsungsan Wind Power Co., Ltd.
     142,703    125,602    13,568   6,570 
KEPCO KPS CARABAO Corp.
     375    468       (467
Prime Swedish Holding AB
     83,699    218       (524
Goheung New Energy Co., Ltd.
     177,924    146,175    29,246   8,460 
Gunsan Land Solar Co., Ltd.
     144,435    108,848    23,523   (974
CapMan Lynx SCA, SICAR
     139,262    132,430    1,427   (12,401
International Offshore Power Transmission Holding Company Limited
     6,555    2,486       (195
Pyeongchang Wind Power Co., Ltd.
     60,535    39,452    9,361   (2,354
Eumseong Eco Park Co., Ltd.
     153,927    126,998    46,679   5,609 
Changwon
Nu-ri
Energy Co., Ltd.
     13,183    29       (44
PungBack Wind Farm Corporation
     70,330    51,804       (255
Trumbull Asset Management, LLC
     1,697    497    5,955   887 
S-Power
Chile SpA
     2,240    2,390    1,327   (139
Seungmun Green Energy
     144,600    115,034    10,879   2,127 
Seobusambo highway photovoltaics Co., Ltd.
     9,838    5,362    1,051   624 
Yangyang Suri Wind Power Co., Ltd.
     111,682    78,552       (3,069
KEPCO for Power Company
     235,212    234,487       (3,610
Taebaek Wind Power Co., Ltd.
     26,606    3,385    7,384   3,752 
Jeonju Bio Green Energy Co., Ltd.
     4,916           (84
Kumyang Eco Park Co., Ltd.
     13,831    1,395       (71
Jeongeup Green Power Co., Ltd.
     11,243    5,462       (1,343
Hadong
E-factory
Co., Ltd.
     1,544    399       (13
Namyangju Combined Heat and Power Co., Ltd.
     7,000            
Wadi Noor Solar Power Company SAOC
     70,963    69,288        
Fairhaven Energy Storage LLC
                 
 
F-12
8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the Company's investments in consolidated financial statements as of December 31, 2022 and 2023 are as follows:
 
2022
 
Investees
      
Net assets
  
Percentage
of ownership(*)
  
Share in

net

assets
  
Investment

differential
   
Intercompany

transaction
  
Others
  
Book value
 
       
In millions of won
 
<Associates>
                           
Korea Gas Corporation
        10,410,740   20.47    2,131,078          (45,782  2,085,296 
Korea Electric Power Industrial Development Co., Ltd.
     107,166   29.00  31,078             31,078 
YTN Co., Ltd.
     256,791   21.43  55,027             55,027 
Gangwon Wind Power Co., Ltd.
     80,729   15.00  12,109           49          12,158 
Hyundai Green Power Co., Ltd.
     413,072   29.00  119,791             119,791 
Korea Power Exchange
     275,126   100.00  275,126             275,126 
Taebaek Wind Power Co., Ltd.
     24,168   60.00  14,501             14,501 
Taebaek Guinemi Wind Power Co., Ltd.
     15,327   67.25  10,307          2,742   13,049 
Daeryun Power Co., Ltd.
     402,140   6.85  27,547          (820  26,727 
KNH Solar Co., Ltd.
     10,679   27.00  2,883             2,883 
SPC Power Corporation
     228,534   38.00  86,843          (15,975  70,868 
Gemeng International Energy Co., Ltd.
     2,335,997   34.00  794,239          (215,418  578,821 
PT. Cirebon Electric Power
     491,324   27.50  135,114                 135,114 
KNOC Nigerian East Oil Co., Ltd.
     (83,483  14.63  (12,214              12,214    
KNOC Nigerian West Oil Co., Ltd.
     (76,755  14.63  (11,229         11,229    
PT Wampu Electric Power
     82,051   46.00  37,743             37,743 
PT. Bayan Resources TBK
     2,476,409   20.00  495,282   265,817       (76,380  684,719 
S-Power Co., Ltd.
     290,656   49.00  142,421       (1,293     141,128 
Pioneer Gas Power Limited
     (205,787  38.50  (79,223  22,278       56,945    
Eurasia Energy Holdings
     (508  40.00  (203         203    
Xe-Pian Xe-Namnoy Power Co., Ltd.
     466,385   25.00  116,596   305    (1,028  (289  115,584 
PT. Mutiara Jawa
     12,402   29.00  3,597             3,597 
Samcheok Eco Materials Co., Ltd.
     23,343   25.54  5,962          (5,962   
Noeul Green Energy Co., Ltd.
     (18,861  29.00  (5,470         5,470    
Goseong Green Power Co., Ltd.
     1,001,651   29.00  290,479       (1,586     288,893 
Gangneung Eco Power Co., Ltd.
     7,464   1.61  120       (134  14    
Shin Pyeongtaek Power Co., Ltd.
     363,838   40.00  145,535   3,559    (15,271     133,823 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
     986   28.00  276          2   278 
Dongducheon Dream Power Co., Ltd.
     302,071   34.01  102,734   1,757    (2,609  (12,582  89,300 
Jinbhuvish Power Generation Pvt. Ltd.
     47,988   5.16  2,496          (2,496   
Daejung Offshore Wind Power Co., Ltd.
     3,337   46.59  1,555             1,555 
GS Donghae Electric Power Co., Ltd.
     765,131   34.00  260,145             260,145 
Daegu Photovoltaic Co., Ltd.
     9,823   29.00  2,849             2,849 
Busan Green Energy Co., Ltd.
     15,156   29.00  4,395             4,395 
Gunsan Bio Energy Co., Ltd.
     (21,127  18.87  (3,986         3,986    
Hansuwon KNP Co., Ltd.
     1,519   28.98  440          (160  280 
Korea Electric Power Corporation Fund
     29,400   98.09  28,838          4   28,842 
Energy Infra Asset Management Co., Ltd.
     11,956   9.90  1,184             1,184 
Daegu clean Energy Co., Ltd.
     44   28.00  12             12 
Yaksu
 
ESS Co., Ltd.
     1,670   29.00  484   2          486 
Nepal Water & Energy Development Company Private Limited
     99,862   69.06  68,968   972          69,940 
Gwangyang Green Energy Co., Ltd.
     125,130   20.00  25,026   18          25,044 
PND
S
olar Co., Ltd.
     4,306   29.00  1,249   154          1,403 
Hyundai Eco Energy Co., Ltd.
     39,033   19.00  7,416   215          7,631 
YeongGwang Yaksu Wind Electric Co., Ltd.
     788   9.63  76   300       (220  156 
Green Energy Electricity Generation Co., Ltd.
     2,733   29.00  793   778          1,571 
Korea Energy Solutions Co., Ltd.
     466   20.00  93             93 
ITR Co., Ltd.
     (26  20.00  (5  1       4    
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
     1,565   20.00  313   53          366 
Namjeongsusang Solar Power Operation Co., Ltd.
     2,355   15.00  353   20          373 
Indeck Niles Development, LLC
     416,164   50.00  208,082   93,956          302,038 
Indeck Niles Asset Management, LLC
     283   33.33  94             94 
 
F-1
29

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the Company's investments in consolidated financial statements as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
      
Net assets
  
Percentage
of ownership(*)
  
Share in

net

assets
  
Investment

differential
   
Intercompany

transaction
   
Others
   
Book value
 
       
In millions of won
 
<Associates>
                             
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
      14,146   49.00  6,932               6,932 
Suwon New Power Co., Ltd.
     1,978   33.05  654       265        919 
Gwangbaek Solar Power Investment Co., Ltd.
     10,949   44.00  4,818   315            5,133 
Go deok Clean Energy Co., Ltd.
     11,049   40.00  4,420               4,420 
SureDataLab Co., Ltd.
     739   23.95  177               177 
SEP Co., Ltd.
     (65  21.26  (14          14     
Hankook Electric Power Information Co., Ltd.
     1,337   16.49  220               220 
Tronix Co., Ltd.
     526   12.50  66               66 
O2&B Global Co., Ltd.
     181   20.00  36               36 
Muan Sunshine Solar Power Plant Co., Ltd.
     10,338   20.00  2,068   494            2,562 
Bigeum Resident Photovoltaic Power Co., Ltd.
     (1,539  29.90  (460  24        436     
Goesan Solar Park Co., Ltd.
     8,936   29.00  2,591               2,591 
Saemangeum Heemang Photovoltaic Co., Ltd.
     35,060   35.00  12,271   739            13,010 
Bitgoel Eco Energy Co., Ltd.
     18,249   49.05  8,951               8,951 
Jeju Gimnyeong Wind Power Co., Ltd.
     2,907   30.00  872               872 
Seoroseoro Sunny Power Plant Co., Ltd.
     1,970   42.58  839   20            859 
Muan Solar park Co., Ltd.
     37,565   20.00  7,513   325            7,838 
YuDang Solar Co., Ltd.
     2,929   20.00  586               586 
Anjwa Smart Farm & Solar City Co., Ltd.
     39,225   20.00  7,845   817            8,662 
Daewon Green Energy Co., Ltd.
     17,514   25.36  4,441   44            4,485 
G.GURU Co., Ltd.
     1,216   24.65  300               300 
UD4M Co., Ltd.
     1,125   14.29  161               161 
Dongbu Highway Solar Co., Ltd.
     1,509   20.00  302   50            352 
Seobu Highway Solar Co., Ltd.
     1,581   20.00  316               316 
Korea Energy Data Co., Ltd.
     211   29.37  62               62 
Gangneung Sacheon Fuel Cell Co., Ltd.
     10,218   41.00  4,189   88            4,277 
KOSTURE Co., Ltd.
     156   0.82  1               1 
Taebaek Gadeoksan Wind Power Co., Ltd.
     58,940   34.00  20,040               20,040 
Chuncheon Green Energy Co., Ltd.
     20,226   45.00  9,102   53            9,155 
Yeomsubong Wind Power Co., Ltd.
     1,540   3.81  59   3            62 
Yeongyang Wind Power Corporation II
     17,837   30.00  5,351   2,110            7,461 
Haeparang Energy Co., Ltd.
     8,673   25.00  2,168   20            2,188 
Saemangeum Sebit Power Plant Co., Ltd.
     36,439   63.09  22,990   209            23,199 
Boulder Solar III, LLC
     1,896   30.00  569   175            744 
PlatformN. Co., Ltd.
     285   29.58  84               84 
PT. Cirebon Energi Prasarana
     690,347   10.00  69,035               69,035 
Green Radiation Co., Ltd.
     77   10.00  8   3            11 
Future Convergence Technology Laboratory. Co., Ltd.
     249   20.12  50               50 
SC E&G. Co,. Ltd.
     1,068   20.00  214               214 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co., Ltd.)
     828   20.00  166               166 
ACE
     100   20.00  20               20 
Environment and Energy Co., Ltd.
     93   10.54  10               10 
Santiago Solar Power SpA
     26,748   50.00  13,373               13,373 
Yanggu Floating Photovoltaic Power Plant Inc.
     3,115   29.00  903               903 
<Joint ventures>
             
KEPCO-Uhde Inc.
     33   50.85  17               17 
Shuweihat Asia Power Investment B.V.
       135,617   49.00  66,452               66,452 
Shuweihat Asia Operation & Maintenance Company
     2,966   55.00  1,631               1,631 
Waterbury Lake Uranium L.P.
     66,589   32.59  21,701   49            21,750 
ASM-BG Investicii AD
     29,110   50.00  14,555               14,555 
 
F-13
0
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of
associates
and joint
ventures
reconciled to the Company's investments in consolidated financial statements as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
      
Net assets
  
Percentage
of ownership(*)
  
Share in

net

assets
  
Investment

differential
   
Intercompany

transaction
  
Others
  
Book value
 
       
In millions of won
 
<Joint ventures>
                           
RES Technology AD
      30,266   50.00     15,133             15,133 
KV Holdings, Inc.
     24,148   40.00  9,659             9,659 
KEPCO SPC Power Corporation
     238,822   75.20  179,594             179,594 
Gansu Datang Yumen Wind Power Co., Ltd.
     15,059   40.00  6,024             6,024 
Datang Chifeng Renewable Power Co., Ltd.
     479,954   40.00  191,982             191,982 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
     110,995   40.00  44,398             44,398 
Rabigh Electricity Company
     665,110   40.00  266,044       (50,632  (805  214,607 
Rabigh Operation & Maintenance Company Limited
     12,782   40.00  5,113             5,113 
Jamaica Public Service Company Limited
     795,250   40.00  318,100   29,357       (16,050  331,407 
KW Nuclear Components Co., Ltd.
     38,368   45.00  17,266          (176  17,090 
Busan Shinho Solar Power Co., Ltd.
     26,877   25.00  6,719             6,719 
Global Trade Of Power System Co., Ltd.
     2,406   29.00  698             698 
Expressway Solar-light Power Generation Co., Ltd.
     9,508   50.00  4,754             4,754 
Amman Asia Electric Power Company
     367,090   60.00  220,254             220,254 
KAPES, Inc.
     37,875   51.00  19,316       (22,451  3,135    
Honam Wind Power Co., Ltd.
     16,506   29.00  4,787   32          4,819 
Korea Power Engineering Service Co., Ltd.
     19,114   29.00  5,543             5,543 
Chun-cheon Energy Co., Ltd.
     107,990   29.90  32,289   3       (248  32,044 
Yeonggwangbaeksu Wind Power Co., Ltd.
     20,972   15.00  3,146   5          3,151 
Nghi Son 2 Power LLC
     817,678   50.00  408,839             408,839 
Kelar S.A.
     175,717   65.00  114,216   2,921          117,137 
PT. Tanjung Power Indonesia
     265,448   35.00  92,907             92,907 
Incheon New Power Co., Ltd.
     1,878   29.00  545          (347  198 
Seokmun Energy Co., Ltd.
     59,778   29.00  17,336             17,336 
Daehan Wind Power PSC
     27,846   50.00  13,923             13,923 
Barakah One Company
     (835,613  18.00  (150,410      56,437   93,973    
Nawah Energy Company
     1,749   18.00  315             315 
Momentum
     1,035   33.33  345             345 
Daegu Green Power Co., Ltd.
     91,550   54.24     49,657   84       (20,381  29,360 
Yeonggwang Wind Power Co., Ltd.
     43,958   46.00  20,221   492          20,713 
Chester Solar IV SpA
     259   45.00  117   64          181 
Chester Solar V SpA
     49   45.00  22   134          156 
Diego de Almagro Solar SpA
     962   45.00  433   107          540 
South Jamaica Power Company Limited
     232,199   20.00  46,440          (3  46,437 
Daesan Green Energy Co., Ltd.
     54,908   35.00  19,218             19,218 
RE Holiday Holdings LLC
     170,740   50.00  85,370             85,370 
RE Pioneer Holdings LLC
     110,344   50.00  55,172             55,172 
RE Barren Ridge 1 Holdings LLC
     126,068   50.00  63,034          (59,684  3,350 
RE Astoria 2 LandCo LLC
     13,198   50.00  6,599             6,599 
RE Barren Ridge LandCo LLC
     4,666   50.00  2,333             2,333 
Laurel SpA
     774   45.00  348   206          554 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd
     29,443   12.37  3,642   9          3,651 
Chile Solar JV SpA
     19,637   50.00  9,819             9,819 
Cheong-Song Noraesan Wind Power Co., Ltd.
     14,484   29.01  4,202   61          4,263 
Chester Solar I SpA
     2,313   45.00  1,041   273          1,314 
Solar Philippines Calatagan Corporation
     76,571   38.00  29,097          27,805   56,902 
Saemangeum Solar Power Co., Ltd.
     29,073   81.01  23,551             23,551 
Chungsongmeon BongSan wind power Co., Ltd.
     5,823   29.00  1,689   1,781          3,470 
Jaeun Resident Wind Power Plant Co., Ltd.
     7,709   29.00  2,236             2,236 
 
F-13
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the Company's
investments
in consolidated financial statements as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Investees
      
Net assets
  
Percentage
of ownership(*)
  
Share in

net

assets
  
Investment

differential
  
Intercompany

transaction
  
Others
  
Book value
 
       
In millions of won
 
<Joint ventures>
                          
DE Energia SpA
      (14,131  49.00  (6,924        16,460   9,536 
Dangjin Eco Power Co., Ltd.
     77,993   34.00  26,518   341         26,859 
Haemodum Solar Co., Ltd.
     6,871   49.00  3,367            3,367 
Yangyang Wind Power Co., Ltd.
     21,642   50.00  10,821   43         10,864 
HORUS SOLAR, S.A. DE C.V.
     22,722   14.95  3,396   3,580         6,976 
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V.
     18,253   14.95  2,728   2,171         4,899 
SUNMEX RENOVABLES, S.A. DE C.V.
     11,053   14.95  1,652   5         1,657 
Stavro Holding II A.B.
     85,856   20.00  17,171            17,171 
Solaseado Solar Power Co., Ltd.
     38,230   38.90  14,872   1,361         16,233 
Yeongam Solar Power Co., Ltd.
     47,923   19.00  9,105   774         9,879 
Samsu Wind Power Co., Ltd.
     16,869   19.00  3,205            3,205 
Pulau Indah Power Plant Sdn. Bhd.
     84,683   25.00  21,171   5,643         26,814 
NH-Amundi Global Infrastructure Investment Private Investment Trust 21
     71,777   29.53  21,196   527         21,723 
Shin-han BNPP Private Investment Trust for East-West Sunlight Dream
     17,319   90.00  15,587            15,587 
PT Barito Wahana Tenaga
     447,688   30.61  137,047            137,047 
Cheongna Energy Co., Ltd.
     17,595   50.10  8,815   3,137   (1,194     10,758 
Naepo Green Energy Co., Ltd.
     (51,219  29.20  (14,956        14,956    
Dayone Energy Co., Ltd.
     (59,627  46.30  (27,607     (868  28,475    
OneEnergy Asia Limited
     366,764   40.00  146,706   25,512         172,218 
KAS Investment I LLC
     61,046   29.89  18,247            18,247 
KAS Investment II LLC
     60,800   29.89  18,173            18,173 
Energyco Co., Ltd.
     4,692   29.00  1,361   829         2,190 
CAES, LLC
     49,670   36.00  17,881   2,924         20,805 
Hapcheon Floating Photovoltaic Power Plant Inc.
     17,207   49.00  8,432   39         8,471 
Busan Industrial Solar Power Co., Ltd.
     3,133   28.02  878   290         1,168 
Bitsolar Energy Co., Ltd.
     (4,545  27.10  (1,232  352      1,232   352 
Pulau Indah O&M Sdn. Bhd.
        60.00               
Guadalupe Solar SpA
     1,358   60.00  815   98         913 
Omisan Wind Power Co., Ltd.
     24,393   42.00  10,245   166         10,411 
Foresight Iberian Solar Group Holding, S.L.
     12,184   75.00  9,138   1,427         10,565 
Yeongwol Eco Wind Co., Ltd.
     4,575   29.00  1,327   1,828         3,155 
Gurae Resident Power Co., Ltd.
     1,182   29.00  343   48         391 
Cheongju Eco Park Co., Ltd.
     35,500   29.00  10,295   195         10,490 
Enel X Midland Photovoltaic, LLC
     9,279   20.00  1,856            1,856 
Geumsungsan Wind Power Co., Ltd.
     10,128   29.00  2,937   556         3,493 
KEPCO KPS CARABAO Corp.
     443   40.00  177            177 
Prime Swedish Holding AB
     77,828   45.00  35,023   1,222         36,245 
Goheung New Energy Co., Ltd.
     23,289   46.15  10,748   1,084         11,832 
Gunsan Land Solar Co., Ltd.
     36,586   75.29  27,544            27,544 
CapMan Lynx SCA, SICAR
     9,908   50.00  4,954         (4,954   
International Offshore Power Transmission Holding Company Limited
     (66,788  35.00  (23,376  (2     23,378    
Pyeongchang Wind Power Co., Ltd.
     24,938   58.00  14,464            14,464 
Eumseong Eco Park Co., Ltd.
     17,173   29.00  4,980   577         5,557 
Songsan Green Energy Co., Ltd.
     5,500   25.00  1,375   12         1,387 
Changwon Nu-ri Energy Co., Ltd.
     1,490   33.33  497            497 
Hasami Wind Farm Corporation
     3,100   29.00  899   690         1,589 
PungBack Wind Farm Corporation
     15,290   37.00  5,657   1,086         6,743 
Trumbull Asset Management, LLC
     316   78.00  246            246 
S-Power Chile SpA
     (20  50.00  (10        137   127 
Seungmun Green Energy
     27,440   33.00  9,054            9,054 
Seobusambo highway photovoltaics Co., Ltd.
     3,833   80.00  3,066            3,066 
 
(*)
The percentage of ownership shown above is after considering the treasury stocks and others.
 
F-13
2
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the
Company's
investments in consolidated financial
statements
as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
     
Net assets
  
Percentage
of ownership(*)
  
Share in


net
assets
  
Investment

differential
   
Intercompany

transaction
  
Others
  
Book value
 
      
In millions of won
 
<Associates>
                          
Korea Gas Corporation
 
 
  
 
  9,826,038
 
 
 
20.47
 
 
  2,011,390
 
 
 
 
  
 
        
 
 
 
(40,747
 
 
1,970,643
 
Korea Electric Power Industrial Development Co., Ltd.
    101,723   29.00  29,500             29,500 
YTN Co., Ltd.
    244,080   21.43  52,303             52,303 
Gangwon Wind Power Co., Ltd.
    79,682   15.00  11,952   49          12,001 
Hyundai Green Power Co., Ltd.
    407,491   29.00  118,173             118,173 
Korea Power Exchange
    274,286   100.00  274,286             274,286 
Taebaek Guinemi Wind Power Co., Ltd.
    16,043   67.25  10,788   2,742          13,530 
Daeryun Power Co., Ltd.
    403,701   6.85  27,654          (820  26,834 
KNH Solar Co., Ltd.
    11,828   27.00  3,194             3,194 
SPC Power Corporation
    258,764   38.00  98,330          (19,399  78,931 
Gemeng International Energy Co., Ltd.
    2,317,545   42.00  973,369          (267,557  705,812 
PT. Cirebon Electric Power
    488,215   27.50  134,259             134,259 
KNOC Nigerian East Oil Co., Ltd.
    (84,988  14.63  (12,434         12,434    
KNOC Nigerian West Oil Co., Ltd.
    (78,143  14.63  (11,432         11,432    
PT Wampu Electric Power
    75,120   46.00  34,555             34,555 
PT. Bayan Resources TBK
    2,428,465   20.00  485,693   209,894       (76,380  619,207 
S-Power
Co., Ltd.
    334,591   49.00  163,950       (1,185     162,765 
Pioneer Gas Power Limited
    (257,311  38.50  (99,058  22,278       76,780    
Xe-Pian
Xe-Namnoy
Power Co., Ltd.
    469,397   25.00  117,349   305    (987  (289  116,378 
PT. Mutiara Jawa
    17,822   29.00  5,168             5,168 
Samcheok Eco Materials Co., Ltd.
    (17,351  25.54  (4,431         4,431    
Noeul Green Energy Co., Ltd.
    (17,973  29.00  (5,212         5,212    
Goseong Green Power Co., Ltd.
    1,001,702   29.00  290,494       (2,870     287,624 
Gangneung Eco Power Co., Ltd.
    716,901   29.00  207,901   48,531    (1,503     254,929 
Shin Pyeongtaek Power Co., Ltd.
    390,335   40.00  156,134   3,559    (14,667     145,026 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
    1,045   28.00  293          1   294 
Dongducheon Dream Power Co., Ltd.
    294,848   34.01  100,278   1,757    (2,249  (12,583  87,203 
Jinbhuvish Power Generation Pvt. Ltd.
    48,583   5.16  2,526          (2,526   
Daejung Offshore Wind Power Co., Ltd.
    3,183   46.59  1,483             1,483 
GS Donghae Electric Power Co., Ltd.
    762,013   34.00  259,085             259,085 
Daegu Photovoltaic Co., Ltd.
    9,669   29.00  2,804             2,804 
Busan Green Energy Co., Ltd.
    11,239   29.00  3,259             3,259 
Hansuwon KNP Co., Ltd.
    2,164   28.98  627          (160  467 
Korea Electric Power Corporation Fund
    23,873   98.09  23,417          4   23,421 
Energy Infra Asset Management Co., Ltd.
    12,257   9.90  1,213             1,213 
Daegu clean Energy Co., Ltd.
    44   28.00  12          (12   
Yaksu
 
ESS Co., Ltd.
    980   29.00  284   1          285 
Nepal Water & Energy Development Company Private Limited
    159,265   68.88  109,701   872          110,573 
Gwangyang Green Energy Co., Ltd.
    123,103   20.00  24,620   18          24,638 
PND
S
olar Co., Ltd.
    4,677   29.00  1,356   154          1,510 
Hyundai Eco Energy Co., Ltd.
    40,699   19.00  7,733   214          7,947 
YeongGwang Yaksu Wind Electric Co., Ltd.
    547   9.63  53   300       (220  133 
Green Energy Electricity Generation Co., Ltd.
    (2,658  29.00  (771  779          8 
Korea Energy Solutions Co., Ltd.
    848   20.00  170             170 
ITR Co., Ltd.
    (10  10.00  (1         1    
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
    1,691   20.00  338   53          391 
Indeck Niles Development, LLC
    482,200   50.00  241,100   90,074       4,227   335,401 
Indeck Niles Asset Management, LLC
    278   33.33  93             93 
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
    13,258   49.00  6,496             6,496 
 
F-13
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the Company's investments in consolidated financial statements as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
     
Net assets
  
Percentage
of ownership(*)
  
Share in


net
assets
  
Investment

differential
   
Intercompany

transaction
  
Others
   
Book value
 
      
In millions of won
 
<Associates>
                           
Suwon New Power Co., Ltd.
 
 
  
 
2,318
 
 
 
33.05
 
 
766
 
 
 
 
  
 
256
 
 
 
 
  
 
1,022
 
Gwangbaek Solar Power Investment Co., Ltd.
    10,998   44.00  4,839   316           5,155 
Go deok Clean Energy Co., Ltd.
    11,807   40.00  4,723              4,723 
SureDataLab Co., Ltd.
    474   23.95  114              114 
SEP Co., Ltd.
    (72  21.26  (15         15     
Hankook Electric Power Information Co., Ltd.
    1,296   16.49  214              214 
Tronix Co., Ltd.
    1,757   12.50  220              220 
O2&B Global Co., Ltd.
    105   20.00  21              21 
Muan Sunshine Solar Power Plant Co., Ltd.
    11,637   20.00  2,328   494           2,822 
Bigeum Resident Photovoltaic Power Co., Ltd.
    (5,723  29.90  (1,711  24       1,687     
Goesan Solar Park Co., Ltd.
    9,921   29.00  2,877              2,877 
Saemangeum Heemang Photovoltaic Co., Ltd.
    39,089   35.00  13,681   739           14,420 
Bitgoel Eco Energy Co., Ltd.
    25,269   49.05  12,394              12,394 
Jeju Gimnyeong Wind Power Co., Ltd.
    819   30.00  246              246 
Seoroseoro Sunny Power Plant Co., Ltd.
    2,163   42.58  921   20           941 
Muan Solar park Co., Ltd.
    32,526   20.00  6,505   325           6,830 
YuDang Solar Co., Ltd.
    2,849   20.00  570              570 
Anjwa Smart Farm & Solar City Co., Ltd.
    34,245   20.00  6,849   816           7,665 
KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
    30,506   25.36  7,735   44           7,779 
G.GURU Co., Ltd.
    676   24.65  167              167 
UD4M Co., Ltd.
    1,048   14.29  150              150 
Dongbu Highway Solar Co., Ltd.
    1,650   20.00  330   50           380 
Seobu Highway Solar Co., Ltd.
    2,032   20.00  406              406 
Korea Energy Data Co., Ltd.
    122   29.37  36              36 
Gangneung Sacheon Fuel Cell Co., Ltd.
    18,982   41.00  7,783   87           7,870 
KOSTURE Co., Ltd.
    174   4.42  8              8 
Taebaek Gadeoksan Wind Power Co., Ltd.
    57,135   34.00  19,426              19,426 
Chuncheon Green Energy Co., Ltd.
    19,659   45.00  8,847   53           8,900 
Yeomsubong Wind Power Co., Ltd.
    2,156   29.00  625   246           871 
Yeongyang Wind Power Corporation II
    26,634   30.00  7,990   2,110           10,100 
Haeparang Energy Co., Ltd.
    8,339   25.00  2,084   20           2,104 
Saemangeum Sebit Power Plant Co., Ltd.
    67,286   55.00  37,009   182           37,191 
Boulder Solar III, LLC
    1,929   30.00  579   175           754 
PlatformN. Co., Ltd.
    (210  29.58  (62         62     
PT. Cirebon Energi Prasarana
    765,973   10.00  76,597              76,597 
Green Radiation Co., Ltd.
    226   10.00  23   3           26 
Future Convergence Technology Laboratory. Co., Ltd.
    177   20.12  36              36 
Eco motion Co., Ltd. (formerly, SC E&G. Co,. Ltd.)
    1,335   20.00  267              267 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.)
    720   16.67  120              120 
ACE
    37   20.00  7       (5      2 
Environment and Energy Co., Ltd.
    89   10.54  9              9 
Santiago Solar Power SpA
    23,538   50.00  11,769              11,769 
Yanggu Floating Photovoltaic Power Plant Inc.
    2,622   29.00  760              760 
Power Embedded
    296   23.33  69   1           70 
Changwon SG Energy Co., Ltd.
   
 
4,089
 
 
 
18.78
 
 
768
 
 
 
15
 
  
 
 
 
 
 
  
 
783
 
Donpyung Technology. Co., Ltd.
    1,396   20.00  279       (25      254 
HORANG ENERGY Inc.
    9,813   40.00  3,925   224           4,149 
 
F-13
4
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the Company's investments in consolidated financial statements as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
     
Net assets
  
Percentage
of ownership(*)
  
Share in


net
assets
  
Investment

differential
   
Intercompany

transaction
  
Others
  
Book value
 
      
In millions of won
 
<Associates>
                          
Hoenggye Renewable Energy Co., Ltd
     (1,028  36.10  (370  2,270       475   2,375 
Haman Green Energy Co., Ltd.
    8,516   35.00  2,981             2,981 
Songsan Green Energy Co., Ltd.
    13,754   60.00  8,252   71          8,323 
<Joint ventures>
                          
Shuweihat Asia Power Investment B.V.
   
 
142,660
 
 
 
49.00
 
 
69,902
 
 
 
 
  
 
 
 
 
 
 
 
69,902
 
Shuweihat Asia Operation & Maintenance Company
    3,305   55.00  1,818             1,818 
Waterbury Lake Uranium L.P.
    73,770   30.65  22,612             22,612 
ASM-BG
Investicii AD 
   
 
29,478
 
 
 
50.00
 
 
14,739
 
 
 
 
  
 
 
 
 
 
 
 
14,739
 
RES Technology AD
    28,765   50.00  14,383             14,383 
KV Holdings, Inc.
    12,966   40.00  5,186             5,186 
KEPCO SPC Power Corporation
    261,362   75.20  196,544             196,544 
Gansu Datang Yumen Wind Power Co., Ltd.
    15,788   40.00  6,315             6,315 
Datang Chifeng Renewable Power Co., Ltd.
    466,847   40.00  186,739             186,739 
Datang KEPCO Chaoyang Renewable Power Co., Ltd.
    108,017   40.00  43,207             43,207 
Rabigh Electricity Company
    701,614   40.00  280,646       (45,692  97   235,051 
Rabigh Operation & Maintenance Company Limited
    12,411   40.00  4,964             4,964 
Jamaica Public Service Company Limited
    840,820   40.00  336,328   29,357       (15,819  349,866 
KW Nuclear Components Co., Ltd.
    41,903   45.00  18,856          (176  18,680 
Busan Shinho Solar Power Co., Ltd.
    26,675   25.00  6,669             6,669 
Global Trade Of Power System Co., Ltd.
    2,121   29.00  615             615 
Expressway Solar-light Power Generation Co., Ltd.
    10,374   50.00  5,187             5,187 
Amman Asia Electric Power Company
    372,373   60.00  223,424             223,424 
KAPES, Inc.
    37,591   51.00  19,171       (22,186  3,015    
Honam Wind Power Co., Ltd.
    16,245   29.00  4,711   32          4,743 
Korea Power Engineering Service Co., Ltd.
    19,681   29.00  5,708             5,708 
Chun-cheon Energy Co., Ltd.
    118,152   29.90  35,327   3       (247  35,083 
Yeonggwangbaeksu Wind Power Co., Ltd.
    22,918   15.00  3,437   6          3,443 
Nghi Son 2 Power LLC
    835,977   50.00  417,989             417,989 
Kelar S.A.
    197,779   65.00  128,557   2,972          131,529 
PT. Tanjung Power Indonesia
    257,574   35.00  90,151             90,151 
Incheon New Power Co., Ltd.
    1,027   29.00  298             298 
Seokmun Energy Co., Ltd.
    57,211   29.00  16,591             16,591 
Daehan Wind Power PSC
    32,853   50.00  16,426             16,426 
Barakah One Company
    (1,314,727  18.00  (236,651      95,932   140,719    
Nawah Energy Company
    1,835   18.00  330             330 
MOMENTUM
    628   33.33  209             209 
Daegu Green Power Co., Ltd.
    86,150   54.24  46,728   84       (20,382  26,430 
Yeonggwang Wind Power Co., Ltd.
    49,756   46.00  22,888   492          23,380 
Chester Solar IV SpA
    931   45.00  419   65          484 
Chester Solar V SpA
    122   45.00  55   136          191 
Diego de Almagro Solar SpA
    1,878   45.00  846   108          954 
South Jamaica Power Company Limited
    215,559   20.00  43,112          (3  43,109 
Daesan Green Energy Co., Ltd.
    63,402   35.00  22,191             22,191 
RE Holiday Holdings LLC
    168,184   50.00  84,092             84,092 
RE Pioneer Holdings LLC
    108,162   50.00  54,081             54,081 
RE Barren Ridge 1 Holdings LLC
    116,307   50.00  58,154             58,154 
RE Astoria 2 LandCo LLC
    13,874   50.00  6,937             6,937 
RE Barren Ridge LandCo LLC
    4,883   50.00  2,441             2,441 
Laurel SpA
    897   45.00  403   210          613 
KIAMCO KOWEPO Bannerton Hold Co Pty Ltd
    29,997   12.37  3,710   9          3,719 
Cheong-Song Noraesan Wind Power Co., Ltd.
    12,734   29.01  3,695   61          3,756 
 
F-13
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the Company's investments in consolidated financial statements as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
     
Net assets
  
Percentage
of ownership(*)
  
Share in


net
assets
  
Investment

differential
  
Intercompany

transaction
  
Others
  
Book value
 
      
In millions of won
 
<Joint ventures>
                         
Chester Solar I SpA
     2,134   45.00  960   278         1,238 
Solar Philippines Calatagan Corporation
    108,382   38.00  41,185         16,945   58,130 
Saemangeum Solar Power Co., Ltd.
    28,911   81.01  23,419            23,419 
Chungsongmeon BongSan wind power Co., Ltd.
    3,045   29.00  883   1,782         2,665 
Jaeun Resident Wind Power Plant Co., Ltd.
   
 
7,636
 
 
 
29.00
 
 
2,214
 
 
 
 
 
 
 
 
 
 
 
 
2,214
 
DE Energia SpA
    6,601   49.00  3,235         6,468   9,703 
Dangjin Eco Power Co., Ltd.
    77,681   34.00  26,412   341         26,753 
Haemodum Solar Co., Ltd.
    6,371   49.00  3,122            3,122 
Yangyang Wind Power Co., Ltd.
    20,784   50.00  10,392   43         10,435 
HORUS SOLAR, S.A. DE C.V.
    50,862   14.95  7,601   3,580         11,181 
RECURSOS SOLARES PV DE MEXICO II, S.A. DE C.V.
    58,636   14.95  8,764   2,171         10,935 
SUNMEX RENOVABLES, S.A. DE C.V.
    23,664   14.95  3,536   5         3,541 
Stavro Holding II A.B.
   
 
91,314
 
 
 
20.00
 
 
18,263
 
 
 
 
 
 
 
 
 
 
 
 
18,263
 
Solaseado Solar Power Co., Ltd.
    42,651   38.90  16,592   1,361         17,953 
Yeongam Solar Power Co., Ltd.
    46,650   19.00  8,864   773         9,637 
Samsu Wind Power Co., Ltd.
    15,903   19.00  3,022            3,022 
Pulau Indah Power Plant Sdn. Bhd.
    79,841   25.00  19,960   5,643         25,603 
NH-Amundi
Global Infrastructure Investment Private Investment Trust 21
    72,368   29.53  21,370   527         21,897 
Shin-han
BNPP Private Investment Trust for East-West Sunlight Dream
    17,208   90.00  15,487            15,487 
PT Barito Wahana Tenaga
    512,846   30.61  156,994            156,994 
Cheongna Energy Co., Ltd.
    47,107   50.10  23,601   3,137   (1,189     25,549 
Naepo Green Energy Co., Ltd.
    18,101   29.20  5,285            5,285 
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
    (56,378  46.30  (26,103     (826  26,929    
OneEnergy Asia Limited
    661,133   40.00  264,454   25,512         289,966 
KAS INVESTMENT I LLC
    52,806   29.89  15,784            15,784 
KAS INVESTMENT II LLC
    52,554   29.89  15,709            15,709 
Energyco Co., Ltd.
    4,520   29.00  1,311   829         2,140 
CAES, LLC
    48,490   36.00  17,457   2,923         20,380 
Hapcheon Floating Photovoltaic Power Plant Inc.
    21,037   49.00  10,309   39         10,348 
Busan Industrial Solar Power Co., Ltd.
    2,740   28.02  768   290         1,058 
Bitsolar Energy Co., Ltd.
    (5,932  27.10  (1,607  352      1,607   352 
Pulau Indah O&M Sdn. Bhd.
       60.00               
Guadalupe Solar SpA
    1,835   60.00  1,102   98         1,200 
Omisan Wind Power Co., Ltd.
    23,960   42.00  10,063   166         10,229 
Foresight Iberian Solar Group Holding, S.L.
    8,923   75.00  6,692   1,427         8,119 
Yeongwol Eco Wind Co., Ltd.
    7,573   29.00  2,196   1,828         4,024 
Gurae Resident Power Co., Ltd.
    1,797   29.00  521   48         569 
Cheongju Eco Park Co., Ltd.
    30,609   29.00  8,877   195         9,072 
Enel X Midland Photovoltaic, LLC
    12,710   20.00  2,542            2,542 
Geumsungsan Wind Power Co., Ltd.
    17,101   29.00  4,959   556         5,515 
KEPCO KPS CARABAO Corp.
    (93  40.00  (37        37    
Prime Swedish Holding AB
    83,481   45.00  37,566   1,223         38,789 
Goheung New Energy Co., Ltd.
    31,749   46.15  14,652   1,084         15,736 
Gunsan Land Solar Co., Ltd.
    35,587   56.91  20,251         2,178   22,429 
CapMan Lynx SCA, SICAR
    6,832   50.00  3,416         (3,416   
International Offshore Power Transmission Holding Company Limited
    4,069   35.00  1,425   (2        1,423 
Pyeongchang Wind Power Co., Ltd.
    21,083   58.00  12,228            12,228 
 
F-13
6
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(5)
Financial information of associates and joint ventures reconciled to the Company's investments in consolidated financial statements as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Investees
     
Net assets
  
Percentage
of ownership(*)
  
Share in


net
assets
  
Investment

differential
   
Intercompany

transaction
   
Others
   
Book value
 
      
In millions of won
 
<Associates>
                            
Eumseong Eco Park Co., Ltd.
     26,929   29.00  7,809   577            8,386 
Changwon
Nu-ri
Energy Co., Ltd.
    13,154   61.00  8,024   3            8,027 
PungBack Wind Farm Corporation
    18,526   37.00  6,855   1,085            7,940 
Trumbull Asset Management, LLC
    1,200   78.00  936               936 
S-Power
Chile SpA
    (150  50.00  (75  139            64 
Seungmun Green Energy
    29,566   33.00  9,757               9,757 
Seobusambo highway photovoltaics Co., Ltd.
    4,476   80.00  3,580               3,580 
<Joint ventures>
            
Yangyang Suri Wind Power Co., Ltd.
   
 
33,130
 
 
 
29.00
 
 
9,608
 
 
 
 
  
 
 
  
 
 
  
 
9,608
 
KEPCO for Power Company
    725   60.00  435               435 
Taebaek Wind Power Co., Ltd.
    23,221   60.00  13,932               13,932 
Jeonju Bio Green Energy Co., Ltd.
    4,916   65.00  3,195               3,195 
Kumyang Eco Park Co., Ltd.
    12,436   29.00  3,607   56            3,663 
Jeongeup Green Power Co., Ltd.
    5,781   18.71  1,082   478            1,560 
Hadong
E-factory
Co., Ltd.
    1,145   29.99  343   6            349 
Namyangju Combined Heat and Power Co., Ltd.
    7,000   55.00  3,850               3,850 
Wadi Noor Solar Power Company SAOC
    1,675   50.00  837   9            846 
Fairhaven Energy Storage LLC
       35.00                  
 
(*)
The percentage of ownership shown above is after considering the treasury stocks and others.
 
(6)
As of December 31, 2022 and 2023, unrecognized equity interest in investments in associates and joint ventures whose book value has been reduced to zero due to accumulated losses are as follows:
 
       
2022
   
2023
 
       
Unrecognized
equity interest
  
Accumulated

unrecognized
equity interest
   
Unrecognized
equity interest
  
Accumulated

unrecognized
equity interest
 
                   
       
In millions of won
 
Eurasia Energy Holdings
      13   203    (203   
Gunsan Bio Energy Co., Ltd. (*1)
     122   3,986        
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
       3,565   27,017    937   27,954 
Nghi Son 2 Power LLC
     (18,940          
Samcheok Eco Materials Co., Ltd.
     344   806    3,625   4,431 
Naepo Green Energy Co., Ltd.
     7,209   14,956    (14,956   
Barakah One Company
     51,137   93,973    46,746   140,719 
Pioneer Gas Power Limited
     19,248   56,877    19,835   76,712 
Incheon New Power Co., Ltd.
     (163          
Bigeum Resident Photovoltaic Power Co., Ltd.
     162   460    (460   
KAPES, Inc.
     (355  3,160    (145  3,015 
Chester Solar IV SpA
     (21          
ITR Co., Ltd.
     5   5    (4  1 
SEP Co., Ltd.
     14   14    1   15 
International Offshore Power Transmission
Holding Company Limited
     23,378   23,378    (23,378   
Noeul Green Energy Co., Ltd.
     5,470   5,470    (258  5,212 
Gangneung Eco Power Co., Ltd.
     14   14    (14   
PlatformN. Co., Ltd.
            62   62 
KEPCO KPS CARABAO Corp.
            37   37 
 
 (*1)
During the year ended December 31, 2023, the entity was reclassified from an associate to financial assets measured at fair value through other comprehensive income.
 
F-13
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(7)
As of December 31, 2023, shareholders’ agreements on investments in associates and joint ventures that may cause future economic resource or cash outflows are as follows:
 
 (i)
Gemeng International Energy Co., Ltd.
Gemeng International Energy Co., Ltd. issued put options on 8% of its shares to its financial investors, KEPCO Woori Sprott PEF (NPS Co-Pa PEF). If the investment fund is not collected until the maturity date (December 25, 2023, two years extension is possible), PEF can exercise the option at strike price which is the same as a principal investment price (including operating fees ratio of below 1% per annum), and also, the Company provided a performance guarantee on this agreement.
 
 (ii)
Taebaek Wind Power Co., Ltd.
In the case where non-controlling shareholders decide to dispose of their shares in Taebaek Wind Power Co., Ltd. after the warrant period in the EPC contract of defect repair for wind power generator has expired, the Company acquires those shares at fair value. The acquisition is to be made after the conditions of the acquisition are discussed among the parties involved, with consideration of various factors such as financial status and business situation.
 
 (iii)
Pyeongchang Wind Power Co., Ltd.
In the case where non-controlling shareholders decide to dispose of their shares in Pyeongchang Wind Power Co., Ltd. after commercial operation of the power plant has started, the Company acquires those shares at fair value. The acquisition is to be made after the conditions of the acquisition are discussed among the parties involved, with the careful consideration of various factors such as financial status and business situation.
 
 (iv)
Daeryun Power Co., Ltd.
The Company reserves the right to participate in the transfer of shares in Daeryun Power Co., Ltd. on the same terms as Daeryun E&S Co., Ltd., if Daeryun E&S Co., Ltd. wishes to transfer its shares in Daeryun Power Co., Ltd.
 
 (v)
Daegu Green Power Co., Ltd.
The Company has a right to purchase all the shares of Daegu Green Power Co., Ltd. held by the financial investors at the yield-based transfer amount agreed with the shareholders. The Company can exercise its right 5, 10 and 13 years after the date of the investment. Also, the Company has a right to purchase all or part of the shares of Daegu Green Power Co., Ltd. held by Lotte Engineering & Construction Co. at the yield-based transfer amount agreed with the shareholders.
 
 (vi)
Yeonggwang Wind Power Co., Ltd.
In case the Company intends to purchase all or part of the shares from Daehan Green Energy Co., Ltd., which is a non-controlling shareholder, Daehan Green Energy Co., Ltd. has an obligation to evaluate the shares at fair value and transfer them to the Company.
 
 (vii)
Hyundai Green Power Co., Ltd.
The Company has an obligation to purchase certain shares in Hyundai Green Power Co., Ltd. from financial investors holding certain shares in Hyundai Green Power Co., Ltd. (i.e., IBK and others) when any of the financial investors claim to sell the Company’s shares at a certain point of time in the future. The Company also has the right to claim Hyundai Steel Company, another operating investor of Hyundai Green Power Co., Ltd., to sell its shares at a certain point of time in the future, and is obliged to sell the Company’s shares to Hyundai Steel Company or a third party designated by Hyundai Steel Company when Hyundai Steel Company requests the Company to sell its shares.
 
 (viii)
Kosture Co., Ltd.
The Company acquires the shares with the settled amount of coal provided to Kosture Co., Ltd. every year until completion of the subscription set forth in the shareholders' agreement.
 
 (ix)
Omisan Wind Power Co., Ltd.
The Company has the right to claim Unison Co., Ltd. to transfer its shares in Omisan Wind Power Co., Ltd. either as a whole or as a part after the completion of the power generation complex, and if the Company exercises its right to claim transfer, Unison Co., Ltd. is obliged to transfer such shares at fair value to the Company or a third party designated by the Company.
 
 (x)
Geumsungsan Wind Power Co., Ltd.
The Company has a right to purchase shares owned by Daemyung Energy Co., Ltd., within the range of 18%, for 3 years after the commencement of the operation.
 
F-13
8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(7)
As of December 31, 2023, shareholders’ agreements on investments in associates and joint ventures that may cause future economic resource or cash outflows are as follows, continued:
 
 (xi)
Seungmun Green Energy
According to the special conditions of the REC trading contract, a connected entity may demand the sale of ownership stakes held by other investors to the connected entity, or the investors may acquire new stakes or modify business documents through a capital increase in Seungmun Green Energy with prior written consent from the trustee. In the event that other investors sell their stakes to the connected entity, they may demand that the connected entity purchase their stakes in the future if certain conditions are met.
 
 (xii)
Taebaek Guinemi Wind Power Co., Ltd.
If shareholders of Taebaek Guinemi Wind Power Co., Ltd. other than the Company intend to sell their shares after the elapse of warranty period for wind power generators specified in the EPC contract, the Company has preferential right to other parties and third parties to take over the shares that the shareholders want to sell at fair value by reaching agreement with the shareholders on the timing of sales and volume of shares to be sold considering the financial conditions, management conditions and others.
 
 (xiii)
HORANG ENERGY Inc.
The Company has the right to purchase all or partial shares of HORANG ENERGY Inc. held by other shareholders after three years have elapsed from the date of commencing the operations under the unanimous agreement of all shareholders. The Company also has an obligation to sell its shares in HORANG ENERGY Inc. either as a whole or as a part to CNcore Co., Ltd. after three years have elapsed from the date of commencing the operations upon the claim of CNcore Co., Ltd., under the unanimous agreement of all shareholders.
 
 (xiv)
Namyangju Combined Heat and Power Co., Ltd.
The Company has an obligation to purchase certain shares from Narae Energy Co., Ltd. at fair value when Narae Energy Co., Ltd. intends to sell its shares in Namyangju Combined Heat and Power Co., Ltd. on the exercise date agreed upon in accordance with the shareholders’ agreement. If Narae Energy Co., Ltd. becomes the largest equity holder by selling, assigning, or transferring shares in accordance with the shareholders’ agreement, the Company is obligated to guarantee the drag-along right that allows Narae Energy Co., Ltd. to sell the shares held by both shareholders under the same conditions.
 
 (xv)
Wadi Noor Solar Power Company SAOC
The Company has an obligation to purchase certain shares to Nama Holding SAOC at the price agreed upon between shareholders when Nama Holding SAOC intends to purchase shares on the exercise date agreed upon according to the shareholders’ agreement.
 
 (xvi)
Jeongeup Green Power Co., Ltd.
The Company has the right to acquire the shares held by M Eco Co., Ltd. at fair value on the date when it has been third, seventh, and tenth year from the beginning date of commercial operation. However, if M Eco Co., Ltd. transfers its shares to the company holding the majority of shares in M Eco Co., Ltd., its right to transfer shares to the shareholder prevails the Company’s right to acquire shares from M Eco Co,. Ltd.
 
(8)
Significant restrictions on the Company’s abilities on associates or joint ventures as of December 31, 2023 are as follows:
 
Company
  
Nature and extent of any significant restrictions
Daegu Green Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of financial institutions.
Pyeongchang Wind Power Co., Ltd.
  Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior consent of the stakeholders.
Daeryun Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions. Shares cannot be wholly or partially transferred without prior consent of the financial institutions.
KNH Solar Co., Ltd.
  Principals and interests on subordinated loans or dividends to shareholders cannot be paid without written consent of financial institutions. Also, shares cannot be wholly or partially transferred without the consent of other stakeholders including shareholders and financial institutions.
 
F-1
39

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(8)
Significant restrictions on the Company’s abilities on associates or joint ventures as of December 31, 2023 are as follows, continued:
 
Company
  
Nature and extent of any significant restrictions
Korea Power Engineering Service Co., Ltd.
  Shares cannot be wholly or partially transferred without the consent of the board of directors.
Daehan Wind Power PSC
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Daejung Offshore Wind Power Co., Ltd.
  Before the commencement of the operation, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Naepo Green Energy Co., Ltd.
  Dividends can only be paid to shareholders when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior consent of interested parties. All or part of the stocks held cannot be transferred without the written consent of the financial institution and if the conditions for the O&M utilization rate are not met or if a payment deferment is necessary due to the fulfillment of the obligation to provide funds, the contract amount will be paid in a subordinated order.
Solaseado Solar Power Co., Ltd.
  Principals and interests on subordinated loans or dividends can only be paid when all conditions of the shareholders’ agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of other stakeholders including shareholders and financial institutions.
Samcheok Eco Materials Co., Ltd.
  Dividends can only be paid when all conditions of the shareholders’ agreement are satisfied. Also, shares cannot be wholly or partially transferred without the written consent of the other shareholders.
Taebaek Guinemi Wind Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied and consent of the financial institutions is obtained. Also, shares cannot be wholly or partially transferred without the written consent of the financial institutions.
Indeck Niles Asset Management, LLC
  Shares cannot be wholly or partially transferred without the consent of the stakeholders.
Indeck Niles Development, LLC
  Shares cannot be wholly or partially transferred without the consent of the stakeholders.
Chester Solar IV SpA
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Chester Solar V SpA
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Diego de Almagro Solar SpA
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Laurel SpA
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Chester Solar I SpA
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
Kelar S.A.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, shares cannot be wholly or partially transferred without the consent of the stakeholders.
GS Donghae Electric Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Busan Shinho Solar Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied.
Honam Wind Power Co., Ltd.
  Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied.
Seokmun Energy Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Also, principals and interests on subordinated loans can only be paid when written consent of financial institutions is obtained.
Chun-cheon Energy Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Also, principals and interests on subordinated loans shall not be paid until the payment conditions are satisfied.
Yeonggwangbaeksu Wind Power Co., Ltd.
  Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Also, principals and interests on subordinated loans can only be paid when written consent of financial institutions is obtained.
 
F-14
0

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(8)
Significant restrictions on the Company’s abilities on associates or joint ventures as of December 31, 2023 are as follows, continued:
 
Company
  
Nature and extent of any significant restrictions
Yeonggwang Wind Power Co., Ltd.
  Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Jamaica Public Service Company Limited
  Dividends can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
PT. Tanjung Power Indonesia
  Dividends can only be paid when all conditions of the loan agreement are satisfied.
DE Energia SpA
  Dividends can only be paid when all conditions of the loan agreement are satisfied.
Daesan Green Energy Co., Ltd.
  Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Taebaek Gadeoksan Wind Power Co., Ltd.
  Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Also, principals and interests on subordinated loans can only be paid when prior written consent of financial institutions is obtained.
Bitsolar Energy Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied.
Omisan Wind Power Co., Ltd.
  Principals and interests on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without the consent of the stakeholders including other shareholders financial institutions. Also, either of Omisan Wind Power Co., Ltd. and Unison Co., Ltd. shall not transfer their shares to others wholly or partially until 4 years have passed from the completion of power complex without the written consent from the other party. In case the shares of each party becomes less than 10% of outstanding shares after the transfer, it also requires the written consent from the other party.
Yangyang Wind Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Busan Industrial Solar Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Geumsungsan Wind Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred for 3 years after the commencement of operation, and also cannot be transferred or disposed to the third party in a way not permitted in the financial documents without prior written consent of an agent bank.
KPE green energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
  Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Cheongju Eco Park Co., Ltd.
  Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied, or permitted by related financing contracts, or prior written consent of financial institutions is obtained.
Goheung New Energy Co., Ltd.
  Payment of dividends or repayment of loans such as subordinated loans to the investors can only be made when all conditions of the loan agreement are satisfied, and prior written consent of financial institutions is obtained.
Seungmun Green Energy
  Dividends and settlement amount for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained.
Trumbull Asset Management, LLC
  Shares may not be either wholly or partially transferred without the consent of the stakeholders.
Horang Energy Inc.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred before three years have passed after the commencement of operation, and also cannot be transferred or disposed to the third party in a way not permitted in the financial documents without prior written consent of an agent bank.
Yanggu Floating Photovoltaic Power Plant Inc.
  Payment of dividends or repayment of loans such as subordinated loans to the investors can be made only when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained.
Hoenggye Renewable Energy Co., Ltd.
  Dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained.
 
F-141

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(8)
Significant restrictions on the Company’s abilities on associates or joint ventures as of December 31, 2023 are as follows, continued:
 
Company
  
Nature and extent of any significant restrictions
Daegu Photovoltaic Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior written consent of financial institutions is obtained.
Dongducheon Dream Power Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid only when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be either wholly or partially transferred without prior consent of the stakeholders.
Shin Pyeongtaek Power Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Seoroseoro Sunny Power Plant Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Anjwa Smart Farm & Solar City Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Muan Solar Park Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained.
YuDang Solar Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Haemodum Solar Co., Ltd.
  Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained.
Cheongna Energy Co., Ltd.
  Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained.
Hapcheon Floating Photovoltaic Power Plant Inc.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Yeongwol Eco Wind Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Gurae Resident Power Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Gunsan Land Solar Co., Ltd.
  Principals and interest payments on subordinated loans or dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained. In accordance with the shareholders’ agreement, when the internal rate of return defined in Korea Western Power Co., Ltd.’s dividend standard is met any excessive dividend income must be provided to Gunsan City.
Eumseong Eco Park Co., Ltd.
  Dividends and settlement amounts for renewable energy certificate can only be paid when all conditions of the loan agreement are satisfied and prior written consent of financial institutions is obtained. Shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained.
PungBack Wind Farm Corporation
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
 
F-142

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
17.
Investments in Associates and Joint Ventures, Continued
 
(8)
Significant restrictions on the Company’s abilities on associates or joint ventures as of December 31, 2023 are as follows, continued:
 
Company
  
Nature and extent of any significant restrictions
Seobusambo highway photovoltaics Co., Ltd.
  Principals and interest on subordinated loans or dividends can be paid either when all conditions of the loan agreement are satisfied or when prior written consent of financial institutions is obtained. Shares cannot be either wholly or partially transferred without prior written consent of the financial institutions.
Haman Green Energy Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied or prior written consent of financial institutions is obtained or prior written consent of financial institutions is obtained. In addition, the Company cannot transfer all or part of its shares without the consent of other shareholders until five years have elapsed from the date of issuance of the acquisition notice after the comprehensive completion of the EPC contract for the project, and shares cannot be wholly or partially transferred without prior written consent of the financial institutions is obtained.
Jeongeup Green Power Co., Ltd.
  Dividends to investors are only possible when the conditions in the loan agreement are met or prior written consent from the financial institution is obtained, and subordinated loans cannot be paid to investors before the loan principal and interest are fully repaid. Additionally, all or part of the shares held cannot be transferred without the consent of other shareholders before the commencement of commercial operation of this business. The company’s stocks may not be transferred to a third party or otherwise disposed of in a manner not permitted in the financial documents without the prior written consent of the agent bank.
Nepal Water & Energy Development Company Private Limited
  The Company must maintain a minimum percentage of ownership (50%) until the project completion date and thereafter.
Goseong Green Power Co., Ltd.
  The Company cannot transfer all or part of its shares without the consent of stakeholders until three years have passed since the start of commercial operation of the business.
Gangneung Eco Power Co., Ltd.
  The Company cannot transfer all or part of its shares without the consent of stakeholders until three years have passed since the start of commercial operation of the business.
S-Power Co., Ltd.
  Dividends can only be paid when all conditions of the loan agreement are satisfied. Shares cannot be wholly or partially transferred without prior consent of the stakeholders is obtained
South Jamaica Power Company Limited
  Dividends can be paid only when all conditions of the loan agreement signed between South Jamaica Power Company Limited and financial institutions are satisfied, and prior written consent of financial institutions is obtained.
 
18.
Property, Plant and Equipment
 
(1)
Property, plant and equipment as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Acquisition

cost
   
Government

grants
  
Accumulated

depreciation
  
Accumulated
impairment

losses
  
Book

value
 
       
In millions of won
 
                      
Land
       14,298,409    (27,405     (27,472  14,243,532 
Buildings
     24,230,827    (50,437  (10,931,672  (6,955  13,241,763 
Structures
     83,055,890    (165,608  (32,596,265  (10,390  50,283,627 
Machinery
     108,749,243    (127,126)   (54,015,594  (541,864  54,064,659 
Ships
     17,264       (3,788     13,476 
Vehicles
     393,046    (2,045  (305,242  (117  85,642 
Equipment
     2,168,348    (6,608  (1,732,564  (43  429,133 
Tools
     1,306,509    (99  (1,128,002  (6  178,402 
Construction-in-progress
     28,064,266    (135,926     (22,795  27,905,545 
Right-of-use
assets
     5,992,724       (2,281,599     3,711,125 
Asset retirement costs
     17,620,603       (6,185,214  (146,422  11,288,967 
Others
     15,520,160       (13,100,723     2,419,437 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
      301,417,289        (515,254  (122,280,663     (756,064  177,865,308 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
 
F-14
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
18.
Property, Plant and Equipment, Continued
 
(1)
Property, plant and equipment as of December 31, 2022 and 2023 are as follows, continued:
 
       
2023
 
       
Acquisition

cost
   
Government

grants
  
Accumulated

depreciation
  
Accumulated
impairment

losses
  
Book

value
 
       
In millions of won
 
                      
Land
      14,426,253    (27,404     (28,165  14,370,684 
Buildings
     25,236,830    (46,227  (11,870,875  (5,751  13,313,977 
Structures
     86,010,823    (157,881  (35,111,297  (9,525  50,732,120 
Machinery
     113,735,035    (119,824  (59,381,603  (536,386  53,697,222 
Ships
     17,845       (5,480     12,365 
Vehicles
     421,349    (2,837  (337,859  (116  80,537 
Equipment
     2,341,242    (5,932  (1,909,992  (375  424,943 
Tools
     1,354,532    (62  (1,190,057  (1  164,412 
Construction-in-progress
     32,031,297    (173,474     (22,795  31,835,028 
Right-of-use
assets
     6,041,794       (2,678,051     3,363,743 
Asset retirement costs
     17,007,088       (7,127,091  (146,423  9,733,574 
Others
     16,255,667       (14,108,737     2,146,930 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
      314,879,755        (533,641  (133,721,042     (749,537  179,875,535 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
 
(2)
Changes in property, plant and equipment for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Beginning
balance
  
Acquisition
   
Disposal
  
Depreciation
  
Impairment
  
Others
  
Ending

balance
 
       
In millions of won
 
                            
Land
      14,107,965   9,535    (49,377        202,814   14,270,937 
(Government grants)
     (23,474      1         (3,932  (27,405
Buildings
     12,926,226   3,202    (19,918  (906,528  (449  1,289,667   13,292,200 
(Government grants)
     (52,122         5,360      (3,675  (50,437
Structures
     48,290,052   217,450    (277,308  (2,677,395  (3,669  4,900,105   50,449,235 
(Government grants)
     (172,021      1,250   9,568      (4,405  (165,608
Machinery
     51,755,382   248,932    (188,924  (5,748,407  (33,191  8,157,993   54,191,785 
(Government grants)
     (140,082      405   17,283      (4,732  (127,126
Ships
     177          (1,053     14,352   13,476 
Vehicles
     89,257   1,813    (88  (41,907     38,612   87,687 
(Government grants)
     (1,675         663      (1,033  (2,045
Equipment
     397,183   79,369    (183  (205,908  (1  165,281   435,741 
(Government grants)
     (149         494      (6,953  (6,608
Tools
     183,065   25,291    (180  (77,902     48,227   178,501 
(Government grants)
     (64         32      (67  (99
Construction-in-progress
     30,156,094   11,671,907    (197,293     134,735   (13,723,972  28,041,471 
(Government grants)
     (111,822  23,155    17         (47,276  (135,926
Right-of-use
assets
     4,059,397   197,016    (2,838  (509,068     (33,382  3,711,125 
Asset retirement costs
     8,925,388          (1,133,866     3,497,445   11,288,967 
Others
     2,745,861   9,028    (22,531  (1,036,132     723,211   2,419,437 
    
 
 
  
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
      173,134,638   12,486,698    (756,967)   (12,304,766)       97,425   5,208,280   177,865,308 
    
 
 
  
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-14
4
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
18.
Property, Plant and Equipment, Continued
 
(2)
Changes in property, plant and equipment for the years ended December 31, 2022 and 2023 are as follows, continued:
 
       
2023
 
       
Beginning
balance
  
Acquisition
   
Disposal
  
Depreciation
  
Impairment(*) 
  
Others
  
Ending

balance
 
       
In millions of won
 
                            
Land
      14,270,937   23,519    (15,302        118,934   14,398,088 
(Government grants)
     (27,405      1            (27,404
Buildings
     13,292,200   3,706    (6,221  (938,549     1,009,068   13,360,204 
(Government grants)
     (50,437         5,070      (860  (46,227
Structures
     50,449,235   18,486    (311,877  (2,828,065     3,562,222   50,890,001 
(Government grants)
     (165,608      1,611   9,562      (3,446  (157,881
Machinery
     54,191,785   184,532    (195,673  (6,062,471  (6,331  5,705,204   53,817,046 
(Government grants)
     (127,126      1,230   17,413      (11,341  (119,824
Ships
     13,476          (1,812     701   12,365 
Vehicles
     87,687   5,778    (76  (40,760     30,745   83,374 
(Government grants)
     (2,045         960      (1,752  (2,837
Equipment
     435,741   62,291    (264  (206,894     140,001   430,875 
(Government grants)
     (6,608         2,011      (1,335  (5,932
Tools
     178,501   30,598    (364  (78,487     34,226   164,474 
(Government grants)
     (99         38      (1  (62
Construction-in-progress
     28,041,471   14,069,968    (1,511     (10,700  (10,090,726  32,008,502 
(Government grants)
     (135,926  5,544             (43,092  (173,474
Right-of-use assets
     3,711,125   261,862    (2,613  (536,517     (70,114  3,363,743 
Asset retirement costs
     11,288,967          (1,251,446     (303,947  9,733,574 
Others
     2,419,437   1,290       (958,649     684,852   2,146,930 
    
 
 
  
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
      177,865,308   14,667,574    (531,059  (12,868,596     (17,031    759,339   179,875,535 
    
 
 
  
 
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
(*)
The Company is in the process of calculating the actual damage in relation to Taean IGCC gas refinery fire incident in January 2023. For the year ended December 31, 2023, the Group recognized ₩6,331 million of estimated damage to its PP&E due to the fire incident as impairment loss, and the estimated damage may change depending on future investigations. In addition, as the recoverable amount of construction-in-progress of Guam Ukudu Power LLC, a subsidiary of the Group, is less than the book value, ₩10,700 million was recognized as an impairment loss during the year ended December 31, 2023.
 

(3)
The Company’s subsidiaries including Korea Hydro & Nuclear Power Co., Ltd. have recognized proceeds and costs from selling items produced before its intended use, by accounting ₩38,149 million (prior year : ₩94,264 million) as revenue and ₩45,578 (prior year : ₩63,405 million) as expense in profit or loss for the year ended December 31, 2023.
 
19.
Investment Properties
 
(1)
Investment properties as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Acquisition
cost
   
Government
grants
   
Accumulated
depreciation
   
Book

value
 
                     
       
In millions of won
 
Land
      194,417            194,417 
Buildings
     20,241    (21   (6,351   13,869 
    
 
 
   
 
 
   
 
 
   
 
 
 
           214,658         (21       (6,351       208,286 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
       
2023
 
       
Acquisition
cost
   
Government
grants
   
Accumulated
depreciation
   
Book

value
 
                     
       
In millions of won
 
Land
      172,594            172,594 
Buildings
     20,043    (22   (7,088   12,933 
    
 
 
   
 
 
   
 
 
   
 
 
 
          192,637      (22     (7,088       185,527 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
F-14
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
19.
Investment Properties, Continued
 
(2)
Changes in investment properties for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Beginning
balance
   
Disposal
   
Depreciation
   
Others
   
Ending
balance
 
                         
       
In millions of won
 
Land
      201,605      (208       (6,980   194,417 
Buildings
     11,209        (487   3,168    13,890 
(Government grants)
     (30           1    8    (21
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
      212,784    (208   (486   (3,804   208,286 
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
 
       
2023
 
       
Beginning
balance
   
Disposal
   
Depreciation
   
Others
   
Ending
balance
 
                         
       
In millions of won
 
Land
      194,417            (21,823   172,594 
Buildings
     13,890        (494   (441   12,955 
(Government grants)
     (21       1    (2   (22
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
      208,286        (493   (22,266   185,527 
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
 
(3)
Income and expenses related to investment properties for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Rental income
      9,775    10,519 
Operating and maintenance expenses related to rental income
     (587   (507
    
 
 
   
 
 
 
      9,188    10,012 
    
 
 
   
 
 
 
 
(4)
Fair value of investment properties as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
Book value
   
Fair value
   
Book value
   
Fair value
 
       
In millions of won
 
Land
      194,417    292,827    172,594    258,478 
Buildings
     13,869    15,626    12,933    13,437 
    
 
 
   
 
 
   
 
 
   
 
 
 
      208,286    308,453    185,527    271,915 
    
 
 
   
 
 
   
 
 
   
 
 
 
The Company determined the fair value of investment property on the transition date based on valuations conducted by an independent valuation firm that is independent of the Company. The valuation firm has appropriate qualifications and experience in the valuation of real estate in the Republic of Korea, and the valuation was conducted using a comparison method, which is a method of obtaining economic value based on the marketability of the property. The fair values of the investment properties as of the reporting date were determined in consideration of the fluctuation on the publicly announced individual land price after the IFRS transition date (January 1, 2010).
 
(5)
All of the Company’s investment properties are held under freehold interests.
 
F-14
6
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
20.
Construction Contracts
 
(1)
Changes in total contract amount in which revenue is not yet recognized for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
      
2021
 
      
Beginning

balance
   
Increase
(decrease) (*)
   
Recognized as

revenue
   
Ending

balance
 
                    
      
In millions of won
 
Nuclear power plant construction in
overseas
 and others
       3,152,725        386,208       (754,998     2,783,935 
 
 (*)
For the year ended December 31, 2021, the increased balance of contracts from new orders is ₩458,635 million and the decreased balance of contracts due to changes in scope of construction work and foreign exchange impact is ₩72,427 million.
 
      
2022
 
      
Beginning

balance
   
Increase
(decrease) (*)
   
Recognized as

revenue
   
Ending

balance
 
                    
      
In millions of won
 
Nuclear power plant construction in
overseas
 and others
       2,783,935       3,457,964       (646,953     5,594,946 
 
 (*)
For the year ended December 31, 2022, the increased balance of contracts from new orders is ₩3,578,599 million and the decreased balance of contracts due to changes in scope of construction work and foreign exchange impact is ₩81,401 million.
 
      
2023
 
      
Beginning

balance
   
Increase

(decrease) (*)
   
Recognized as

revenue
   
Ending
balance
 
                    
      
In millions of won
 
Nuclear power plant construction in overseas and others
       5,594,946        986,049       (785,395   5,795,600 
 
 (*)
For the year ended December 31, 2023, the increased balance of contracts from new orders is ₩1,029,165 million and the decreased balance of contracts due to changes in scope of construction work and foreign exchange impact is ₩43,116 million.
 
(2)
Accumulated earned revenue, expense and others related to the Company’s construction contracts in progress as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Accumulated

earned revenue
   
Accumulated

expense
   
Accumulated

profit
   
Unearned

advance receipts
 
                     
       
In millions of won
 
Nuclear power plant construction in
overseas
 and others
      22,507,004    21,666,552      840,452        29,877 
 
       
2023
 
       
Accumulated

earned revenue
   
Accumulated

expense
   
Accumulated

profit
   
Unearned

advance receipts
 
                     
       
In millions of won
 
Nuclear power plant construction in overseas and others
      22,996,785    22,382,628    614,157    74,253 
 
F-14
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
20.
Construction Contracts, Continued
 
(3)
Gross amount due from customers recognized as contract assets and due to customers recognized as contract liabilities for contract work as of December 31, 2022 and 2023 are as follows:
 
 
  
 
 
  
2022
 
  
2023
 
 
  
 
 
  
Contract
assets (*1)
 
  
Contract
liabilities (*2)
 
  
Contract
assets (*1)
 
  
Contract
liabilities (*2)
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
  
In millions of won
 
Nuclear power plant construction in overseas and others
      118,983    120,952    183,204    270,789 
 
 
(*1)
Included in trade and other receivables, net, in the consolidated statements of financial position. The balance of trade receivables from construction contracts are ₩85,757 million and ₩101,180 million, as of December 31, 2022 and 2023, respectively.
 
 
(*2)
Included in non-financial liabilities as advance received in the consolidated statements of financial position. The revenue recognized on December 31, 2023 from the amounts included in contract liabilities at the end of the prior year is ₩117,311 million.
Revenue recognized for the year ended December 31, 2023 from performance obligations satisfied in previous periods is ₩9,367 million.
 
21.
Intangible Assets other than Goodwill
 
(1)
Intangible assets as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Acquisition
cost
   
Government
grants
  
Accumulated
amortization
  
Accumulated
impairment
losses
  
Book

value
 
                      
       
In millions of won
 
Software
      1,002,040    (174  (799,013  (20  202,833 
Copyrights, patents rights and other industrial rights
     104,559       (67,368  (9,178  28,013 
Mining rights
     625,845       (46,187  (541,133  38,525 
Development expenditures
     938,032    (3,477  (883,527     51,028 
Intangible assets under development
     76,625    (2,108     (8,903  65,614 
Usage rights of donated assets and others
     592,797       (435,518  (136  157,143 
Leasehold rights
     28,185       (23,297     4,888 
Greenhouse gas emissions rights
     43,960             43,960 
Others
     551,396    (67  (174,714  (11,955  364,660 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
        3,963,439          (5,826    (2,429,624      (571,325      956,664 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
 
       
2023
 
       
Acquisition
cost
   
Government
grants
  
Accumulated
amortization
  
Accumulated
impairment
losses
  
Book

value
 
                      
       
In millions of won
 
Software
      1,083,537    (413  (885,677  (19  197,428 
Copyrights, patents rights and other industrial rights
     105,827       (73,158  (9,178  23,491 
Mining rights
     643,625       (57,549  (553,911  32,165 
Development expenditures
     966,530    (2,121  (911,096     53,313 
Intangible assets under development
     94,916    (2,458     (8,903  83,555 
Usage rights of donated assets and others
     592,739       (447,352  (136  145,251 
Leasehold rights
     28,185       (24,256     3,929 
Greenhouse gas emissions rights
     107,086             107,086 
Others
     599,958    (322  (199,865  (12,005  387,766 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
        4,222,403          (5,314    (2,598,953      (584,152    1,033,984 
    
 
 
   
 
 
  
 
 
  
 
 
  
 
 
 
 
F-14
8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
21.
Intangible Assets other than Goodwill, Continued
 
(2)
Changes in intangible assets for the years ended December 31, 2022 and 2023 are as follows:
 
     
2022
 
     
Beginning
balance
  
Acquisition
  
Disposal
  
Amortization
  
Reversal
  
Others
  
Ending
balance
 
                         
     
In millions of won
 
Software
    162,596   22,532   (57  (84,649     102,585   203,007 
(Government grants)
   (91        60      (143  (174
Copyrights, patents rights and other industrial rights
   35,187   270   (37  (7,136     (271  28,013 
Mining rights
   41,902   2,395      (4,296     (1,476  38,525 
Development expenditures
   72,944         (24,238     5,799   54,505 
(Government grants)
   (3,820        1,466      (1,123  (3,477
Intangible assets under development
   81,430   39,559         (14  (53,253  67,722 
(Government grants)
   (7,326              5,218   (2,108
Usage rights of donated assets and others
   169,783         (11,394  (150  (1,096  157,143 
Leasehold rights
   5,848         (960        4,888 
Greenhouse gas emissions rights
   78,137   57,466            (91,643  43,960 
Others
   407,558   4,073   (260  (25,017     (21,627  364,727 
(Government grants)
   (71        4         (67
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
      1,044,077       126,295           (354      (156,160         (164  (57,030      956,664 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
     
2023
 
     
Beginning
balance
  
Acquisition
  
Disposal
  
Amortization
  
Impairment
  
Others
  
Ending
balance
 
                         
     
In millions of won
 
Software
 
 
 
 
    203,007
 
 
 
12,837
 
 
 
(18
 
 
(86,174
 
 
 
 
 
68,189
 
 
 
197,841
 
(Government grants)
  
 
(174
 
 
 
 
 
 
 
 
85
 
 
 
 
 
 
(324
 
 
(413
Copyrights, patents rights and other industrial rights
   28,013   319   (70  (4,918  (180  327   23,491 
Mining rights
   38,525   2,164      (10,289     1,765   32,165 
Development expenditures
   54,505         (25,614     26,543   55,434 
(Government grants)
   (3,477             1,356               (2,121
Intangible assets under development
   67,722   51,282            (32,991  86,013 
(Government grants)
   (2,108              (350  (2,458
Usage rights of donated assets and others
   157,143         (11,857     (35  145,251 
Leasehold rights
   4,888         (959        3,929 
Greenhouse gas emissions rights
   43,960   8,577   (1  (2     54,552   107,086 
Others
   364,727   4,136   (119  (24,895  (103  44,342   388,088 
(Government grants)
   (67              93      (348  (322
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    956,664       79,315   (208  (163,174  (283  161,670     1,033,984 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-1
49

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
21.
Intangible Assets other than Goodwill, Continued
 
(3)
Significant specific intangible assets as of December 31, 2022 and 2023 are as follows:
 
2022
Type
  
Description
  
Currency
  
Amount
   
Remaining useful lives
              
   
In millions of won and thousands of Australian dollars
Software
  ORACLE license for SDIS integrated DB  KRW   5,509   3 years and 4 months
Copyrights, patents rights and other industrial rights
  Contributions to APR NRC DC  KRW   20,871   5 years
Mining rights
  Mining rights of Bylong mine  AUD      — (*)
Usage rights of donated assets and others
  Sejong Haengbogdosi sharing charge  KRW   17,772   3 years and 11 months
  Right of use electricity and gas supply facility (Community district of Songdo)  KRW   7,908   7 years and 6 months
Others
  Occupancy and use of public waters  KRW   76,212   14 years and 1 month
  Greenhouse gas emissions rights  KRW   43,960   — 
  Business rights  KRW   154,712   26 years and 11 months
 
(*)   The carrying amount of mining rights is nil, because KEPCO Australia Pty., Ltd. and KEPCO Bylong Australia Pty., Ltd. had recognized impairment losses in full.
 
2023
Type
  
Description
  
Currency
  
Amount
   
Remaining useful lives
              
   
In millions of won and thousands of Australian dollars
Software
  S/4HANA ERP license  KRW   5,742   3 years and 11 months
Copyrights, patents rights and other industrial rights
  Contributions to APR NRC DC  KRW   16,697   4 years
Mining rights
  Mining rights of Bylong mine  AUD      —  (*)
Usage rights of donated assets and others
  
Sejong Haengbogdosi sharing charge
  
KRW
  
 
13,235
 
  
2 years and 11 months
  Right of use electricity and gas supply facility (Community district of Songdo)  KRW   6,853   6 years and 6 months
Others
  Occupancy and use of public waters  KRW   70,800   13 years and 1 month
  Greenhouse gas emissions rights  KRW   107,086   — 
  Business rights  KRW   148,964   25 years and 11 months
 
(*)   The carrying amount of mining rights is nil, because KEPCO Australia Pty., Ltd. and KEPCO Bylong Australia Pty., Ltd. had recognized impairment losses in full.
 
(4)
For the years ended December 31, 2021, 2022 and 2023, the Company recognized research and development expenses of
689,397 million,
727,810 million, and
717,561 million, respectively.
 
F-15
0

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
22.
Trade and Other Payables
Trade and other payables as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
                     
       
In millions of won
 
Trade payables
  
 
  
 
7,529,857
 
  
 
 
  
 
4,341,482
 
  
 
 
Non-trade
payables
     2,132,838    2,023,985    2,140,906    1,716,345 
Accrued expenses
     1,605,118    6,351    1,859,765    23,148 
Leasehold deposits received
     2,479    35    2,548    1,042 
Other deposits received
     97,408    47,863    127,933    33,723 
Lease liabilities
     614,037    3,549,106    612,765    3,195,115 
Dividends payable
    
 
1,812
 
  
 
 
  
 
4,574
 
  
 
 
Others(*)
    
 
 
  
 
11,574
 
  
 
 
  
 
12,584
 
    
 
 
   
 
 
   
 
 
   
 
 
 
  
 
  
 
  11,983,549
 
  
 
5,638,914
 
   9,089,973    4,981,957 
  
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
 
 
(*)
Details of others as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
                     
       
In millions of won
 
Advance received from local governments
          3,477        3,069 
Others
         8,097        9,515 
  
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
                  11,574        12,584 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
23.
Borrowings and Debt Securities
 
(1)
Borrowings and debt securities as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Current liabilities
      
Short-term borrowings
      8,820,425    10,667,335 
Current portion of long-term borrowings
     3,638,202    5,780,638 
Current portion of debt securities
     10,205,395    24,681,439 
Less: Current portion of discount on long-term borrowings
     (774   (1,152
Less: Current portion of discount on debt securities
     (4,246   (7,176
Add:
C
urrent portion of premium on debt securities
         263 
    
 
 
   
 
 
 
     22,659,002    41,121,347 
    
 
 
   
 
 
 
Non-current
liabilities
      
Long-term borrowings
     2,977,268    3,407,514 
Debt securities
     95,160,920    89,293,561 
Less: Discount on long-term borrowings
     (14,945   (14,683
Less: Discount on debt securities
     (177,543   (175,909
Add: Premium on debt securities
    
 
663
 
  
 
 
    
 
 
   
 
 
 
     97,946,363    92,510,483 
    
 
 
   
 
 
 
      120,605,365    133,631,830 
    
 
 
   
 
 
 
 
F-15
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
23.
Borrowings and Debt Securities, Continued
 
(2)
Repayment schedule of borrowings and debt securities as of December 31, 2022 and 2023 are as follows:
 
2022
 
Type
      
Borrowings
   
Debt Securities  
 
             
       
In millions of won
 
Less than 1 year
      12,458,627    10,205,395 
1~ 5 years
     1,472,655    65,278,587 
Over 5 years
     1,504,613    29,882,333 
    
 
 
   
 
 
 
      15,435,895    105,366,315 
    
 
 
   
 
 
 
 
2023
 
Type
      
Borrowings
   
Debt Securities  
 
             
       
In millions of won
 
Less than 1 year
      16,447,973    24,681,439 
1~ 5 years
     1,649,696    64,342,617 
Over 5 years
     1,757,818    24,950,944 
    
 
 
   
 
 
 
      19,855,487    113,975,000 
    
 
 
   
 
 
 
 
(3)
Short-term borrowings as of December 31, 2022 and 2023 are as follows:
 
 
2022
 
Type
 
Creditor
 
Interest rate (%)
  
Maturity
  
Foreign

currency
     
Local

currency
 
                  
  
In millions of won and thousands of USD
 
Local short-term borrowings
 DB Financial Investment and others  3.21~5.80   2023.01.02
~2023.12.31
 
 
       5,549,120
Local short-term borrowings
 Nonghyup Bank and others  3M CD+1.11~1.70   2023.05.25
~2023.11.24
 
 
      3,000,000
Local short-term borrowings
 Shinhan Bank  6M Bank debenture
rate+1.77
 
 
  2023.11.17       50,000
Local short-term borrowings
 Korea Development Bank  4.15   2023.01.06       3,400
Foreign short-term borrowings
 Shinhan Bank  5.19   2023.02.28   USD 12,045    15,264
Foreign short-term borrowings
 Shinhan Bank  SOFR(1M)+0.65   2023.02.27   USD 40,000    50,692
Foreign short-term borrowings
 Kookmin Bank and others  3.32~5.88   2023.01.09
~2023.06.12
 
 
  USD 91,796    116,333
Local bank overdraft
 Woori Bank and others  
 
Standard overdraft
rate+1.32
4.83
 
 
 
  2023.01.06
~2023.02.24
 
 
      35,616
      
 
 
 
        8,820,425 
      
 
 
 
 
F-15
2
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
23.
Borrowings and Debt Securities, Continued
 
(3)
Short-term borrowings as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Type
 
Creditor
 
Interest rate (%)
  
Maturity
  
Foreign

currency
     
Local

currency
 
                  
  
In millions of won and thousands of USD
 
Local short-term borrowings
 DB Financial Investment and others  4.00~4.84   2024.01.05
~2024.12.31
 
 
       6,180,339 
Local short-term borrowings
 Nonghyup Bank and others  3M CD +0.98
~1.12
 
 
  2024.05.26
~2024.11.20
 
 
      4,300,000 
Local short-term borrowings
 Korea Development Bank  
 
Standard
overdraft
rate+1.06
 
 
 
  2024.02.24       30,000
Local short-term borrowings
 Export-Import Bank of Korea  
 
3M Bank
debenture
rate+0.34
 
 
 
  2024.12.27       50,000
Foreign short-term borrowings
 Export-Import Bank of Korea  5.49   2024.09.27   USD 40,000    51,576 
Foreign short-term borrowings
 Kookmin Bank  SOFR(1M)+0.95   2024.02.16   USD 40,000    51,576 
Local bank overdraft
 Woori Bank and others  

 
Standard
overdraft
rate+1.37
4.63~5.34
 
 
 
 
  2024.01.05
~2024.02.23
 
 
      3,844 
      
 
 
 
        10,667,335 
      
 
 
 
 
(4)
Long-term borrowings as of December 31, 2022 and 2023 are as follows:
 
2022
 
Type
 
Interest rate (%)
 
Maturity
 
Foreign

currency
  
Local

currency
 
             
  
In millions of won and thousands of foreign currencies
 
Local long-term borrowings
 
Korea Development Bank
 Others 
0.50
 2023~2044  —   2,133 
 Facility 
2.50
~
4.60
 2023~2028  —    28,420 
 Facility 
CB rate+0.90
 2029  —    9,985 
 Operating funds 
1yr KDB rate
+0.81~0.91
 2023~2024  —    54,300 
Hana Bank and others
 Commercial Paper 
3M CD+0.13~1.20
 2023~2027  —    3,250,000 
 Facility 
4.60
 2028  —    8,137 
 Facility 3yr KTB
rate-1.50
 2028  —    3,821 
Export-Import Bank of Korea
 Project loans 1.50 2026  —    10,312 
 Facility 1.32 2028  —    58,100 
 Operating funds 1.78 2023  —    15,700 
Korea Energy Agency
 
Development of power
resources
 
3yr KTB
rate-2.25
1.50~1.75
 2023~2028  —    11,175 
 Facility 3yr KTB
rate-2.50
 2023~2024  —    393 
 Project loans  2023~2027  —    1,197 
Shinhan Bank and others
 Facility CB rate+0.90~1.10 2028~2029  —    19,195 
 Commercial Paper 3M CD+0.38 2025  —    150,000 
 Others 3.95 2034  —    78,905 
 Others Standard overdraft rate+1.00 2034  —    78,905 
Kookmin Bank
 Facility MOR+0.79 3M CD+1.79 5.04 2023~2035  —    105,155 
 Others 4.00 2025  —    20,700 
Woori Bank
 Facility 
3M Libor
+1.90
5.04
 2035~2042  —    48,823 
 
F-15
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
23.
Borrowings and Debt Securities, Continued
 
(4)
Long-term borrowings as of December 31, 2022 and 2023 are as follows, continued:
 
2022
 
Type
 
Interest rate (%)
 
Maturity
  
Foreign

currency
  
Local

currency
 
              
  
In millions of won and thousands of foreign currencies
 
Others
 Facility 3.50~6.80  2028~2044   —   690,259 
 Facility CB rate+1.10 1.75~4.56  2024~2036   —    103,131 
 PF Refinancing CB rate+1.25  2030   —    7,634 
 PF Refinancing 4.10  2030   —    21,206 
 Securitized debts (*) 3M CD+1.80  2025   —    33,476 
 Others 4.40~7.90  2023~2039   —    120,217 
 Others 1.80~4.50  2031~2034   —    49,929 
     
 
 
 
     
4,981,208 
     
 
 
 
Foreign long-term borrowings
 
Korea Energy Agency
 Project loans   2026   USD 8,744   11,081 
Export-Import Bank of Korea and others
 Direct Loan and others 6M Libor+3.20  2036   USD 78,094   98,969 
 Direct Loan and others 3M Libor+2.25~3.70  2027   JOD 91,051   162,692 
 Facility 
6M Libor+1.70~2.50
SOFR(1M) +1.83
  2029~2032   USD 132,168   167,496 
Kookmin Bank and others
 EBL SOFR(1M)+0.11~0.75  2024   USD 149,592   189,578 
Riyad Bank
 EBL SOFR(3M)+1.20  2025   USD 49,870   63,201 
POSCO and others
 Shareholder’s loan 8.00  2025   USD 10,005   12,680 
 Shareholder’s loan 8.00  2031   JOD 4,853   8,671 
Samsung Life Insurance and others
 Syndicated Loan 3.10~8.00  2032   JPY 4,752,934   45,304 
Woori Bank and others
 Syndicated Loan JPY 6M Libor+1.84  2032   JPY 2,613,385   24,910 
Solar Construction Lendings, LLC
 Facility 5.00  2025   USD 31,140   39,464 
KiwoomSolar Power Professional Investor Private Placement Investment Trust V
 Senior borrowing 3.90  2029   EUR 40,531   54,765 
IFC and others
 Facility 
6M Libor+5.00

SOFR(3M)+1.83~1.99

5.41
~6.19
  2028~2031   USD 408,408   517,575 
Hanwha US Solar Private Fund and others
 Facility 3.00  2038   USD 58,308   73,894 
DBS Bank and others
 Facility 1M BBSY+1.40~2.25  2025   AUD 190,860   163,836 
Others
 Others      USD 116   146 
     
 
 
 
      1,634,262 
     
 
 
 
      6,615,470 
Less: Discount on long-term borrowings
    (15,719
Less: Current portion of long-term borrowings
    (3,638,202
Add: Current portion of discount on long-term borrowings
    774 
   
 
 
 
   2,962,323 
   
 
 
 
 
(*)
The main reasons for early repayment of securitized debts as of December 31, 2022 are as follows:
 
Type
 
Details
Non-payment
of proceeds
 Where the consignor fails to pay the principal to the trustee
Guarantees for supplemental funding
 Where the consignor fails to fulfill guarantees for supplemental funding
Additional trust obligation
 Where the consignor fails to fulfill the additional trust obligation
Event of default
 In case the event of default occurs under the ABL loan agreement
The
C
ompany
is responsible for collateral obligations (fund supplementation) and liability guarantees for entrusted assets.
 
F-15
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
23.
Borrowings and Debt Securities, Continued
 
(4)
Long-term borrowings as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Type
 
Interest rate (%)
 
Maturity
 
Foreign

currency
  
Local

currency
 
             
  
In millions of won
 
Local long-term borrowings
 
Korea Development Bank
 Others 0.50 2024~2044  —   1,758 
 Facility 2.60~4.94 2025~2042  —    53,052 
 Facility CB rate+0.90 2029  —    9,985 
 Operating funds 1yr KDB rate+0.91 2024  —    40,000 
Hana Bank and others
 Commercial Paper 3M CD+0.13~1.20 2024~2028  —    5,350,000 
 Facility 4.60 2028  —    6,558 
 Facility 3yr KTB rate-2.50 2028  —    3,156 
Export-Import Bank of Korea
 Project loans 1.00 2026  —    7,365 
 Facility 1.32 2028  —    80,000 
 Operating funds 3M Bank debenture rate +0.66 2026  —    40,000 
Korea Energy Agency
 
Development of power
resources
 
3yr KTB rate-2.25
2.25
 2024~2028  —    9,176 
 Facility 3yr KTB rate-1.50 2024  —    163 
 Project loans  2033  —    1,197 
Shinhan Bank and others
 Facility CB rate+0.90~1.10 2028~2029  —    16,825 
 Operating funds 6M Bank debenture rate+0.93 2025  —    20,000 
 Commercial Paper 3M CD+0.38 2025  —    150,000 
 Others 3.95 2034  —    73,425 
 Others Standard overdraft rate+1.00 2034  —    73,425 
Kookmin Bank
 Facility 
1yr
B
ank debenture rate +0.78
3M CD+1.79~2.10
5.04
 2025~2037  —    186,032 
Woori Bank
 Facility 
Standard overdraft rate+1.00
3M CD+1.90
5.04
 2034~2042  —    101,172 
IBK
 Facility 4.00~5.80 2042~2044  —    30,690 
Nonghyup Bank
 Facility 3M CD+2.00~2.10 2030~2041  —    22,517 
Others
 Facility 3.50~6.80 2028~2042  —    735,722 
 Facility 
CB rate+1.10
3M CD+2.10 1.75~3.30
 2024~2041  —    51,509 
 PF Refinancing CB rate+1.25 2030  —    6,680 
 PF Refinancing 4.10 2030  —    18,556 
 Securitized debts (*) 3M CD+1.80 2025  —    52,060 
 Others 4.40~7.90 2025~2039  —    113,973 
 Others 1.80~4.50 2031~2034  —    49,879 
     
 
 
 
     7,304,875 
     

 

 

 
 
F-15
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Stat
e
ments, Continued
December 31, 2022 and 2023
 
23.
Borrowings and Debt Securities, Continued
 
(4)
Long-term borrowings as of December 31, 2022 and 2023 are as follows, continued:
 
2023
 
Type
 
Interest rate (%)
 
Maturity
  
Foreign

currency
  
Local

currency
 
              
  
In millions of won and thousands of foreign currencies
 
Foreign long-term borrowings
 
Korea Energy Agency
 Project loans   2026   USD 8,744  11,274 
Export-Import Bank
of Korea and others
 Direct Loan and others 6M Synthetic Libor+1.80~3.20  2036   USD 78,347   101,020 
 Direct Loan and others 6M Synthetic Libor+2.25~3.70  2027   JOD 62,385   113,390 
 Facility 6M Synthetic Libor+1.70~2.50 SOFR(1M)+
1.83
  
2029
~
2031
   USD 120,916   155,909 
Korea Development Bank and others
 EBL SOFR(1M)+0.86  2025   USD 142,049   183,157 
POSCO and others
 Shareholder’s loan 5.60~8.00  2025   USD 10,770   13,887 
 Shareholder’s loan 8.00  2031   JOD 5,419   9,850 
Samsung Life Insurance and others
 Syndicated Loan 3.10~8.00  2032   JPY 4,350,671   39,707 
Woori Bank and others
 Syndicated Loan JPY 6M Tibor+1.84  2032   JPY 2,399,088   21,896 
Solar Construction Lending, LLC
 Facility 5.00  2025   USD 29,894   38,545 
KiwoomSolar Power Professional Investor Private Placement Investment Trust V
 Senior borrowing 3.90  2029   EUR 40,478   57,745 
IFC and others
 Facility SOFR(3M)+1.99 SOFR(6M)+5.00 3M BSBY+
1.70
6.05~6.62
  2024~2031   USD 655,922   845,746 
Hanwha US Solar Private Fund and others
 Facility 6.00  2039   USD 60,674   78,233 
DBS Bank and others
 Facility 1M BBSY+1.40~2.25  2025   AUD 185,086   162,891 
Nonghyup Bank and others
 Facility 10.40  2039   USD 38,799   50,027 
     
 
 
 
      1,883,277 
     
 
 
 
      9,188,152 
Less:
D
iscount on long-term borrowings
    (15,835
Less:
C
urrent portion of long-term borrowings
    (5,780,638
Add:
C
urrent portion of discount on long-term borrowings
    1,152 
   
 
 
 
   3,392,831 
   
 
 
 
 
(*)
The main reasons for early repayment of securitized debts as of December 31, 2023 are as follows:
 
Type
 
Details
Non-payment
of proceeds
 Where the consignor fails to pay the principal to the trustee
Guarantees for supplemental funding
 Where the consignor fails to fulfill guarantees for supplemental funding
Additional trust obligation
 Where the consignor fails to fulfill the additional trust obligation
Event of default
 In case the event of default occurs under the ABL loan agreement
The Company is responsible for collateral obligations (fund supplementation) and liability guarantees for entrusted assets.
 
F-15
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
23.
Borrowings and Debt Securities, Continued
 
(5)
Local debt securities as of December 31, 2022 and 2023 are as follows:
 
   
Issue date
   
Maturity
   
Interest rate (%)
       
2022
  
2023
 
                        
   
In millions of won
 
Electricity Bonds
   2012.03.27~2023.09.11    2023.01.08~2052.04.21    1.43~5.99       61,190,000   67,730,000 
Corporate Bonds (*)
   2009.10.16~2023.12.21    2024.01.12~2053.11.10    1.21~10.00      29,293,188   29,887,353 
Corporate Bonds
   2021.05.26~2023.12.28    2041.05.25~2043.09.15    2.00
~3.78
      11,578   41,578 
          
 
 
  
 
 
 
     90,494,766   97,658,931 
Less: Discount on local debt securities
 
     (56,924  (54,826
Less: Current portion of local debt securities
 
     (8,401,619  (23,141,584
Add: Current portion of discount on local debt securities
 
     2,344   4,712 
    
 
 
  
 
 
 
      82,038,567   74,467,233 
    
 
 
  
 
 
 
 
(*)
Among the corporate bonds, each holder of Hee Mang Sunlight Power Co., Ltd.’s private equity bonds, amounting to ₩1,584 million, may exercise the early redemption rights on the 5th year (March 31, 2021) from the date of issuance of the bonds and every year on March 31 thereafter, until the year before the redemption date.
 
(6)
Foreign debt securities as of December 31, 2022 and 2023 are as follows:
 
   
2022
 
Type
  
Issue date
  
Maturity
  
Interest rate (%)
  
Foreign currency
     
Local currency
 
                    
   
In millions of won and thousands of foreign currencies
 
FY-96
  1996.04.01~1996.12.06  2026.12.01~2096.04.01  6.00~7.95   USD 278,701     353,198 
FY-97
  1997.01.31~1997.08.04  2027.02.01~2027.08.01  6.75~7.00   USD 314,717    398,841 
FY-04
  2004.04.23  2034.04.23  5.13   USD 286,920    363,614 
FY-14
  2014.07.30  2029.07.30  3.57   USD 100,000    126,730 
FY-15
  2015.06.15  2025.06.15  3.25   USD 300,000    380,190 
FY-17
  2017.07.25  2027.07.25  3.13   USD 300,000    380,190 
FY-17
  2017.10.30  2037.10.30  1.70   EUR 40,000    54,048 
FY-17
  2017.11.16  2037.11.16  2.36   SEK 450,000    54,527 
FY-18
  2018.03.13  2028.03.13  3.35   HKD 1,650,000    268,208 
FY-18
  2018.06.07~2018.07.25  2023.06.07~2023.07.25  3.75~3.88   USD 1,400,000    1,774,220 
FY-19
  2019.02.27  2024.02.27  0.13   CHF 200,000    274,574 
FY-19
  2019.06.24  2024.06.24  2.50   USD 500,000    633,650 
FY-19
  2019.07.19  2024.07.19~2027.07.19  0.00~0.05   CHF 300,000    411,861 
FY-19
  2019.10.30  2024.10.30  3M BBSW+0.97   AUD 300,000    257,523 
FY-19
  2019.12.19  2037.12.31  3.30~5.70   USD 360,899    457,368 
FY-20
  2020.02.03  2025.02.03  2.13   USD 300,000    380,190 
FY-20
  2020.05.06  2025.05.06  1.75   USD 500,000    633,650 
FY-20
  2020.06.15  2025.06.15  1.13   USD 500,000    633,650 
FY-20
  2020.08.03  2026.02.03  1.00   USD 300,000    380,190 
FY-21
  2021.01.27  2026.01.27  0.75   USD 450,000    570,285 
FY-21
  2021.04.27  2026.04.27  1.25   USD 500,000    633,650 
FY-21
  2021.08.09  2026.08.09  1.25   USD 300,000    380,190 
FY-21
  2021.09.24  2026.09.24  1.13   USD 300,000    380,190 
FY-22
  2022.04.21  2027.04.21  3.63   USD 300,000    380,190 
FY-22
  2022.05.06  2025.05.06  3.60   USD 500,000    633,650 
FY-22
  2022.06.14  2025.06.14~2027.06.14  3.63~4.00   USD 800,000    1,013,840 
FY-22
  2022.06.28  2025.06.28  4.13   USD 300,000    380,190 
FY-22
  2022.07.27  2027.07.27  4.25   USD 700,000    887,110 
FY-22
  2022.10.06  2026.04.06~2028.04.06  5.38~5.50   USD 800,000    1,013,840 
FY-22
  2022.10.06~2022.11.01  2032.10.06  5.16   HKD 2,350,000    381,992 
          
 
 
 
     14,871,549 
Less: Discount on foreign debt securities
     (124,865
Add: Premium on foreign debt securities
     663 
Less: Current portion of foreign debt securities
     (1,803,776
Add: Current portion of discount on foreign debt securities
     1,902 
    
 
 
 
      12,945,473 
    
 
 
 
 
F-15
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
23.
Borrowings and Debt Securities, Continued
 
(6)
Foreign debt securities as of December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
Type
  
Issue date
  
Maturity
  
Interest rate (%)
  
Foreign currency
     
Local currency
 
   
In millions of won and thousands of foreign currencies
 
FY-96
  1996.04.01~1996.12.06  2026.12.01~2096.04.01  6.00~7.95   USD 278,701     359,357 
FY-97
  1997.01.31~1997.08.04  2027.02.01~2027.08.01  6.75~7.00   USD 314,717    405,796 
FY-04
  2004.04.23  2034.04.23  5.13   USD 286,920    369,955 
FY-14
  2014.07.30  2029.07.30  3.57   USD 100,000    128,940 
FY-15
  2015.06.15  2025.06.15  3.25   USD 300,000    386,820 
FY-17
  2017.07.25  2027.07.25  3.13   USD 300,000    386,820 
FY-17
  2017.10.30  2037.10.30  1.70   EUR 40,000    57,064 
FY-17
  2017.11.16  2037.11.16  2.36   SEK 450,000    58,050 
FY-18
  2018.03.13  2028.03.13  3.35   HKD 1,650,000    272,349 
FY-19
  2019.02.27  2024.02.27  0.13   CHF 200,000    305,364 
FY-19
  2019.06.24  2024.06.24  2.50   USD 500,000    644,700 
FY-19
  2019.07.19  2024.07.19~2027.07.19  0.00~0.05   CHF 300,000    458,046 
FY-19
  2019.10.30  2024.10.30  3M BBSW+0.97   AUD 300,000    264,024 
FY-19
  2019.12.19  2037.12.31  3.30~5.70   USD 342,753    441,946 
FY-20
  2020.02.03  2025.02.03  2.13   USD 300,000    386,820 
FY-20
  2020.05.06  2025.05.06  1.75   USD 500,000    644,700 
FY-20
  2020.06.15  2025.06.15  1.13   USD 500,000    644,700 
FY-20
  2020.08.03  2026.02.03  1.00   
USD 300,000
    386,820 
FY-21
  2021.01.27  2026.01.27  0.75   USD 450,000    580,230 
FY-21
  2021.04.27  2026.04.27  1.25   USD 500,000    644,700 
FY-21
  2021.08.09  2026.08.09  1.25   USD 300,000    386,820 
FY-21
  2021.09.24  2026.09.24  1.13   USD 300,000    386,820 
FY-22
  2022.04.21  2027.04.21  3.63   USD 300,000    386,820 
FY-22
  2022.05.06  2025.05.06  3.60   USD 500,000    644,700 
FY-22
  2022.06.14  2025.06.14~2027.06.14  3.63~4.00   USD 800,000    1,031,520 
FY-22
  2022.06.28  2025.06.28  4.13   USD 300,000    386,820 
FY-22
  2022.07.27  2027.07.27  4.25   USD 700,000    902,580 
FY-22
  2022.10.06  2026.04.06~2028.04.06  5.38~5.50   USD 800,000    1,031,520 
FY-22
  2022.10.06~2022.11.01  2032.10.06  5.16   HKD 2,350,000    387,891 
FY-23
  2023.06.07  2030.06.07  4.51   HKD 1,037,000    171,167 
FY-23
  2023.07.12  2028.07.12  4.88   USD 350,000    451,290 
FY-23
  2023.07.18  2028.07.18  5.00   USD 500,000    644,700 
FY-23
  2023.07.31  2026.07.31  5.38   USD 1,000,000    1,289,400 
FY-23
  2023.09.21  2026.09.21  5.38   USD 300,000    386,820 
          
 
 
 
     16,316,069 
Less:
D
iscount on foreign debt securities
     (128,259
Add: Premium on foreign debt securities
     263 
Less:
C
urrent portion of foreign debt securities
     (1,539,855
Add:
C
urrent portion of discount on foreign debt securities
     2,464 
Less:
C
urrent portion of
premium
 on foreign debt securities
     (263
    
 
 
 
      14,650,419 
    
 
 
 
 
(7)
Changes in borrowings and debt securities for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Beginning balance
      80,529,513    120,605,365 
Cash flow
     39,193,816    12,692,924 
Effect of exchange rate fluctuations
     906,877    335,353 
Others
     (24,841   (1,812
    
 
 
   
 
 
 
Ending balance
      120,605,365    133,631,830 
    
 
 
   
 
 
 
 
F-15
8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
24.
Leases
Company as a lessee
 
(1)
Lease contracts
The Company applies the short-term leases recognition exemption to its lease contracts that have a lease term of 12 months or less from the commencement date, and recognized ₩235,473 million and ₩172,711 million respectively, as expense for the years ended December 31, 2022 and 2023. The Company also applies the leases of
low-value
assets recognition exemption to leases contracts with underlying assets considered to be low value (i.e., approximately less than ₩5 million), and recognized ₩3,147 million and ₩4,659 million respectively, as expense for the years ended December 31, 2022 and 2023. The Company has lease contracts for various items such as consecutive voyage charter contracts, power purchase agreements (PPA), real estate lease contracts including buildings, switchyard, and land for electric substation, vehicles, and other equipment.
 
(2)
Right-of-use
assets as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Acquisition

cost
   
Accumulated

depreciation
   
Book

value
 
                 
       
In millions of won
 
Land
      886,076    (224,277   661,799 
Buildings
     135,290    (60,434   74,856 
Structures
     30,879    (6,914   23,965 
Machinery
     1,737    (902   835 
Ships
     4,151,460    (1,554,597   2,596,863 
Vehicles
     35,712    (20,996   14,716 
Others (*)
     751,570    (413,479   338,091 
    
 
 
   
 
 
   
 
 
 
        5,992,724      (2,281,599     3,711,125 
    
 
 
   
 
 
   
 
 
 
 
 (*)
Including a power purchase agreement (“PPA”) with CGN Yulchon Generation Co., Ltd.
 
       
2023
 
       
Acquisition

cost
   
Accumulated

depreciation
   
Book

value
 
                 
       
In millions of won
 
Land
      937,481    (281,621   655,860 
Buildings
     188,017    (97,444   90,573 
Structures
     46,573    (9,217   37,356 
Machinery
     26,453    (20,510   5,943 
Ships
     4,137,168    (1,823,863   2,313,305 
Vehicles
     59,208    (33,717   25,491 
Others (*)
     646,894    (411,679   235,215 
    
 
 
   
 
 
   
 
 
 
      6,041,794    (2,678,051   3,363,743 
    
 
 
   
 
 
   
 
 
 
 
 (*)
Including a power purchase agreement (“PPA”) with CGN Yulchon Generation Co., Ltd.
 
F-1
59

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
24.
Leases, Continued
 
(3)
Changes in
right-of-use
assets for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Beginning
balance
   
Increase
   
Depreciation
   
Decrease
   
Others
   
Ending
balance
 
       
In millions of won
 
Land
      652,795    63,654    (41,260       (13,390   661,799 
Buildings
     62,884    42,399    (30,243   (1,042   858    74,856 
Structures
     21,148    4,256    (1,758       319    23,965 
Machinery
     565    429    (159           835 
Ships
     3,029,219        (393,677       (38,679   2,596,863 
Vehicles
     13,618    13,475    (8,673   (962   (2,742   14,716 
Others
     279,168    72,803    (33,298   (834   20,252    338,091 
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
      4,059,397       197,016       (509,068       (2,838       (33,382   3,711,125 
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
 
       
2023
 
       
Beginning
balance
   
Increase
   
Depreciation
   
Decrease
   
Others
   
Ending
balance
 
       
In millions of won
 
Land
      661,799    2,696    (57,461   (126   48,952    655,860 
Buildings
     74,856    24,622    (32,591   (904   24,590    90,573 
Structures
     23,965    49    (2,471   (273   16,086    37,356 
Machinery
     835        (94       5,202    5,943 
Ships
     2,596,863    199,538    (382,298       (100,798   2,313,305 
Vehicles
     14,716    21,097    (10,464   (1,008   1,150    25,491 
Others
     338,091    13,860    (51,138   (302   (65,296   235,215 
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
      3,711,125       261,862       (536,517       (2,613       (70,114   3,363,743 
    
 
 
   
 
 
   
 
 
   
 
 
   
 
 
   
 
 
 
 
(4)
Lease liabilities as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Less than 1 year
      639,756    641,525 
1 ~ 5 years
     2,047,584    1,898,846 
More than 5 years
     1,925,012    1,694,729 
    
 
 
   
 
 
 
     4,612,352    4,235,100 
Less: Discount
     (449,209   (427,220
    
 
 
   
 
 
 
Present value of lease payment
      4,163,143    3,807,880 
    
 
 
   
 
 
 
 
(5)
The details of the liquidity classification of lease liabilities as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Current lease liabilities
      614,037    612,765 
Non-current
lease liabilities
     3,549,106    3,195,115 
    
 
 
   
 
 
 
      4,163,143    3,807,880 
    
 
 
   
 
 
 
 
F-16
0

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
24.
Leases, Continued
 
(6)
Changes in lease liabilities for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
 
       
Beginning
balance
   
Increase
   
Decrease
   
Interest
expenses
   
Others(*)
   
Ending
balance
 
       
In millions of won
 
Lease liabilities
         4,410,503         109,019        (654,236         91,590        206,267    4,163,143 
 
 
(*)
Including translation effect of foreign currency lease liabilities and others.
 
       
2023
 
       
Beginning
balance
   
Increase
   
Decrease
   
Interest
expenses
   
Others(*)
   
Ending
balance
 
       
In millions of won
 
Lease liabilities
         4,163,143    253,495    (661,665   87,426    (34,519   3,807,880 
 
 (*)
Including translation effect of foreign currency lease liabilities and others.
 
(7)
Details of expense relating to lease contracts as lessee for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Depreciation of
right-of-use
assets
      509,068    536,517 
Interest expenses of lease liabilities
     91,590    87,426 
Leases expenses for short-term leases
     235,473    172,711 
Leases expenses for leases of
low-value
assets
     3,147    4,659 
Variable lease payments
     112,158    62,006 
    
 
 
   
 
 
 
        951,436      863,319 
    
 
 
   
 
 
 
 
(8)
The total cash outflow related to the lease contracts, including cash outflows due to short-term leases and leases of
low-value
assets, amounts to
1,005,014 million and
901,041 million, for the years ended December 31, 2022 and 2023, respectively.
Company as a lessor
 
(1)
Finance lease contracts
The Company entered into power purchase agreements (“PPA”) with Jordan Electric Power Company to provide a 373MW level Qatrana gas combined power plant over a
25-year
lease term, and an 89.1MW level Fujeij wind power plant over a
20-year
lease term. In addition, the Company provides 21 energy storage system installation projects and 151 energy efficiency contracts as finance leases with a lease term of 2 to 11 years. Also, the Company entered into a PPA with The Federal Electricity Commission in Mexico to provide for 25 years (from December 2013 to November 2038) all electricity generated from the power plant after completion of its construction and collect rates consisting of fixed costs (to recover the capital) and variable costs during the contracted period.
 
(2)
Profit and loss related to finance lease for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Finance income on the net investment in the lease
        122,355        118,695 
 
F-16
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
24.
Leases, Continued
 
(3)
Maturity analysis of the lease payments receivable and reconciliation of the undiscounted lease payments to the net investment in the lease as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Less than 1 year
      181,930    189,779 
1 ~ 2 years
     169,693    182,743 
2 ~ 3 years
     166,787    179,428 
3 ~ 4 years
     166,196    178,074 
4 ~ 5 years
     166,965    168,221 
More than 5 years
     1,527,093    1,408,350 
    
 
 
   
 
 
 
     2,378,664    2,306,595 
Less: Unearned finance income
     (1,139,274   (1,057,434
    
 
 
   
 
 
 
Net investment in the lease (*)
      1,239,390    1,249,161 
    
 
 
   
 
 
 
 
 (*)
Including the present value of unguaranteed residual value amounting to ₩22,910 million and ₩25,521 million, as of December 31, 2022 and 2023, respectively.
The implicit interest rate for a lease term is determined on the lease contract date. The implicit interest rate of the finance lease contracts is from 0.00% up to 17.03% per year as of December 31, 2023. (prior year : 0.00% ~ 17.08%)
 
(4)
Changes in the allowance for doubtful accounts of finance lease receivables for the years ended December 31, 2022 and 2023 are as follows:
 
    
 
2022
   
2023
 
    
 
In millions of won
 
Beginning balance
  

      768    4,505 
Bad debt expense
  

 3,737    751 
  

 
 
   
 
 
 
Ending balance
  

 4,505    5,256 
  

 
 
   
 
 
 
 
25.
Employment Benefits
 
(1)
Employment benefit obligations as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Net defined benefit asset
       198,626    70,187 
Net defined benefit obligations
     825,927    1,033,409 
Other long-term employee benefit obligations
     2,794    1,911 
 
(2)
Principal assumptions used for actuarial valuation as of December 31, 2022 and 2023 are as follows:
 
   
2022
  
2023
Discount rate
  5.16%~5.19%  4.06%~5.44%
Future salary and benefit levels
  4.55%  4.82%
Weighted average duration
  8.84 years  9.52 years
 
F-16
2
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
25.
Employment Benefits, Continued
 
(3)
Details of expense relating to defined benefit plans for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
   
2023
 
       
In millions of won
 
Current service cost
      524,942    496,722    373,802 
Interest cost
     91,877    116,256    190,257 
Expected return on plan assets
     (52,782   (73,484   (163,074
Past service cost
     5,483    125     
    
 
 
   
 
 
   
 
 
 
      569,520    539,619    400,985 
    
 
 
   
 
 
   
 
 
 
Expenses described above are recognized in those items below in the consolidated financial statements.
 
       
2021
   
2022
   
2023
 
       
In millions of won
 
Cost of sales
      416,287    404,243    285,209 
Selling and administrative expenses
     95,983    81,457    73,521 
Others
(Construction-in-progress
and others)
     57,250    53,919    42,255 
    
 
 
   
 
 
   
 
 
 
      569,520    539,619    400,985 
    
 
 
   
 
 
   
 
 
 
In addition, for the years ended December 31, 2021, 2022 and 2023, employee benefit obligations expenses of, ₩71,976 million, ₩101,369 million and ₩85,560 million, respectively, are recognized as cost of sales, and ₩17,144 million, ₩28,301 million and ₩16,012 million, respectively, are recognized as selling and administrative expenses, and ₩13,025 million, ₩14,827 million and ₩15,639 million, respectively, are recognized as
construction-in-progress
and others, relates to the Company’s defined contribution plans.
 
(4)
Details of defined benefit obligations as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Present value of defined benefit obligation from funded plans
      3,776,715    4,312,702 
Fair value of plan assets
     (3,149,414   (3,349,480
    
 
 
   
 
 
 
Net liabilities incurred from defined benefit plans
      627,301    963,222 
    
 
 
   
 
 
 
 
(5)
Changes in the present value of defined benefit obligations for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Beginning balance
       4,564,417    3,776,715 
Current service cost
     496,722    373,802 
Interest cost
     116,256    190,257 
Remeasurement component
     (1,012,727   409,635 
Past service cost
     125     
Actual payments
     (388,105   (437,734
Others
     27    27 
    
 
 
   
 
 
 
Ending balance
      3,776,715    4,312,702 
    
 
 
   
 
 
 
 
F-16
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
25.
Employment Benefits, Continued
 
(6)
Changes in the fair value of plan assets for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
In millions of won
 
Beginning balance
      2,909,547    3,149,414 
Expected return
     73,484    163,074 
Remeasurement component
     (11,609   4,777 
Contributions by the employers
     347,778    188,566 
Actual payments
     (169,786   (156,351
    
 
 
   
 
 
 
Ending balance
      3,149,414    3,349,480 
    
 
 
   
 
 
 
 
(7)
Details of the fair value of plan assets as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Equity instruments
      171,301    5,326 
Debt instruments
     854,640    697,907 
Bank deposits
     590,103    611,821 
Others(*)
     1,533,370     2,034,426 
    
 
 
   
 
 
 
         3,149,414    3,349,480 
    
 
 
   
 
 
 
 
 (*)
‘Others’ consist of various financial assets managed by external asset management companies.
For the years ended December 31, 2022 and 2023, actual returns on plan assets amounted to ₩61,875 and ₩167,851 million, respectively.
 
(8)
Remeasurement components recognized in other comprehensive income (loss) for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Actuarial gain from changes in financial assumptions
       (967,366   429,810 
Experience adjustments, etc.
     (45,361   (20,175
Expected return
     11,609    (4,777
    
 
 
   
 
 
 
        (1,001,118   404,858 
    
 
 
   
 
 
 
Remeasurement components recognized as other comprehensive income or loss are included in retained earnings.
In addition, gain on accumulated remeasurement component amounting to ₩614,805 million and gain on accumulated remeasurement component amounting to ₩29,229 million have been recognized as other comprehensive income or loss as of December 31, 2022 and 2023, respectively.
 
F-16
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
26.
Provisions
 
(1)
Provisions as of December 31, 2022 and 2023 are as follows:
 
      
2022
  
2023
 
     
Current
  
Non-current
  
Current
  
Non-current
 
                 
      
In millions of won
 
Employment benefits
      
Provisions for employment benefits
     1,045,058      999,691    
Litigation
      
Litigation provisions
    26,974   154,205   5,299   171,719 
Decommissioning cost
      
Nuclear plants
       23,035,427   81,684   21,565,203 
Spent fuel
    415,890   1,011,028   940,585   1,985,149 
Radioactive waste
    94,158   1,895,849   67,572   1,840,513 
PCBs
       88,359      57,944 
Other recovery provisions
       32,770      36,082 
Others
      
Power plant regional support program
    144,504      130,034    
Transmission regional support program
    239,235      256,006    
Provisions for financial guarantee
    22,895   44,345   25,534   24,458 
Provisions for RPS
    24,339      36,074    
Provisions for greenhouse gas emissions obligations
    298,876      18,672    
Others
    115,122   102,659   92,974   199,976 
   
 
 
  
 
 
  
 
 
  
 
 
 
     2,427,051   26,364,642   2,654,125   25,881,044 
   
 
 
  
 
 
  
 
 
  
 
 
 
 
(2)
Changes in provisions for the years ended December 31, 2022 and 2023 are as follows:
 
     
2022
 
     
Beginning
balance
  
Increase
in
provision
  
Payment
  
Reversal
  
Others
  
Ending

balance
 
                      
     
In millions of won
 
Employment benefits
       
Provisions for employment benefits
    1,048,939   997,281   (1,001,283     121   1,045,058 
Litigation
       
Litigation provisions
   114,718   112,797   (39,633  (6,360  (343  181,179 
Decommissioning cost
       
Nuclear plants
   19,461,461   3,630,830   (56,813     (51  23,035,427 
Spent fuel
   1,350,662   493,943   (417,687        1,426,918 
Radioactive waste
   1,832,535   221,629   (64,157        1,990,007 
PCBs
   103,665   1,949   (17,156  (99     88,359 
Other recovery provisions
   30,231   2,093   (165  (751  1,362   32,770 
Others
       
Power plant regional support program
   146,588   52,470   (54,554        144,504 
Transmission regional support program
   250,288   176,424   (187,477        239,235 
Provisions for financial guarantee
   80,841   4,738   (17,789     (550  67,240 
Provisions for RPS
      587,586   (556,993  (6,254     24,339 
Provisions for greenhouse gas emissions obligations
   655,544   387,299   (590,172  (33,596  (120,199  298,876 
Others
   271,828   4,447   (39,566   (19,853  925   217,781 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    25,347,300   6,673,486   (3,043,445  (66,913  (118,735  28,791,693 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-16
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
26.
Provisions, Continued
 
(2)
Changes in provisions for the years ended December 31, 2022 and 2023 are as follows, continued:
 
     
2023
 
     
Beginning
balance
  
Increase in
provision
  
Payment
  
Reversal
  
Others
  
Ending

balance
 
                      
     
In millions of won
 
Employment benefits
       
Provisions for employment benefits
    1,045,058   834,102   (877,933  (1,536     999,691 
Litigation
       
Litigation provisions
   181,179   151,189   (67,478  (87,872     177,018 
Decommissioning cost
       
Nuclear plants
  
 
23,035,427
 
  572,379   (62,035  (1,898,935  51   21,646,887 
Spent fuel
  
 
1,426,918
 
  1,877,827   (379,011        2,925,734 
Radioactive waste
  
 
1,990,007
 
  89,054   (86,823  (84,153     1,908,085 
PCBs
  
 
88,359
 
  1,699   (17,100  (15,014     57,944 
Other recovery provisions
  
 
32,770
 
  1,319   (432 
 
 
  2,425   36,082 
Others
       
Power plant regional support program
  
 
144,504
 
  51,814   (66,284 
 
 
     130,034 
Transmission regional support program
  
 
239,235
 
  177,520   (160,749 
 
 
     256,006 
Provisions for financial guarantee
  
 
67,240
 
  10,215   (25,174 
 
(2,251
  (38  49,992 
Provisions for RPS
  
 
24,339
 
  620,855   (609,120 
 
 
     36,074 
Provisions for greenhouse gas emissions obligations
   298,876   77,207   (298,859  (58,552     18,672 
Others
   217,781   181,756   (101,601  (3,816  (1,170  292,950 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    28,791,693   4,646,936   (2,752,599  (2,152,129  1,268   28,535,169 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
(3)
Greenhouse gas emissions rights and obligations:
 
 (i)
Allowances received free of charge from the government for each planned period as of December 31, 2023 are as follows:
 
   
3rd planned period
 
   
2021
   
2022
   
2023
   
2024
   
2025
   
Total
 
                         
   
In ten thousands of
tons(tCO2-eq)
 
Allowances received free of charge
from the government
       14,696    14,776    10,603    10,603    50,678 
 
F-16
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
26.
Provisions, Continued
 
(3)
Greenhouse gas emissions rights and obligations, continued:
 
 (ii)
Changes in greenhouse gas emissions rights for the years ended December 31, 2022 and 2023 are as follows:
 
  
2022
 
  
3rd planned period
 
 
2021
  
2022
  
2023
  
2024
  
2025
  
Total
 
 
Quantity
  
Amount
  
Quantity
  
Amount
  
Quantity
  
Amount
  
Quantity
  
Amount
  
Quantity
  
Amount
  
Quantity
  
Amount
 
                                     
  
In ten thousands
tons(tCO2-eq),
millions of Won
 
Beginning (*)
  16,433   524,658   14,942   62,735   11,166   8,529   3,671      3,696   6,873   49,908   602,795 
Purchase (Sell)
  1,191   267,433   1,343   272,824   32   6,315   35   7,185         2,601   553,757 
Government submission
  (17,602  (580,807  (838  (173,145     245               (18,440  (753,707
Borrowing (carryforward)
  (22  (3,298  286   45,847   48   12,225   22   5,699         334   60,473 
Others
     (207,986     (16,256     (8,529           5,419      (227,352
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Ending
       
 
15,733
 
  192,005   11,246   18,785   3,728   12,884   3,696   12,292   34,403   235,966 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 (*)
Changes such as additional allowances or cancellation of allowances are reflected.
 
  
2023
 
  
3rd planned period
 
 
2022
  
2023
  
2024
  
2025
  
Total
 
 
Quantity
  
Amount
  
Quantity
  
Amount
  
Quantity
  
Amount
  
Quantity
  
Amount
  
Quantity
  
Amount
 
  
In ten thousands
tons(tCO2-eq),
millions of Won
 
Beginning (*)
  14,704   192,005   14,204   18,785   8,088   12,884   8,065   12,292   45,061   235,966 
Purchase (Sell)
  1,315   135,040   707   67,506   73   14,839         2,095   217,385 
Government Submission
  (15,972  (302,918  (484  (39,837              (16,456  (342,755
Carry Forward (Borrowing)
  (45  (24,127  (231  (28,266  568   79,430         292   27,037 
Reclassification
  (2        6,940     
 
(7,
185
     (5,419  (2  (5,664
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Ending
        14,196   25,128   8,729   99,968   8,065   6,873   30,990   131,969 
 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 (*)
Changes such as additional allowances or cancellation of allowances are reflected.
 
 (iii)
The Company does not have greenhouse gas emissions rights pledged as collateral as of December 31, 2023.
 
 (iv)
The Company does not hold any greenhouse gas emissions rights prepared for generating a profit from short-term fluctuations in price as of December 31, 2023.
 
 (v)
Estimated greenhouse gas emission of the Company for the year ended December 31, 2023 is 14,941 ten thousand tons.
 
F-16
7

KOREA ELECTRIC POWER C
ORPORATION AND S
UBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
27.
Government Grants
 
(1)
Government grants as of December 31, 2022 and 2023 are as follows:
 
      
2022
   
2023
 
            
      
In millions of won
 
Land
      (27,405   (27,404
Buildings
    (50,437   (46,227
Structures
    (165,608   (157,881
Machinery
    (127,126   (119,824
Vehicles
    (2,045   (2,837
Equipment
    (6,608   (5,932
Tools
    (99   (62
Construction-in-progress
    (135,926   (173,474
Investment properties
    (21   (22
Software
    (174   (413
Development expenditures
    (3,477   (2,121
Intangible assets under development
    (2,108   (2,458
Other intangible assets
    (67   (322
   
 
 
   
 
 
 
      (521,101   (538,977
   
 
 
   
 
 
 
 
(2)
Changes in government grants for the years ended December 31, 2022 and 2023 are as follows:
 
      
2022
 
      
Beginning

balance
  
Receipt
  
Acquisition
  
Offset the

items of

depreciation

expense and

others
  
Disposal
  
Others
  
Ending

balance
 
      
In millions of won
 
Cash
        (50,755           50,755    
Land
    (23,474           1   (3,932  (27,405
Buildings
    (52,122        5,360      (3,675  (50,437
Structures
    (172,021        9,568   1,250   (4,405  (165,608
Machinery
    (140,082        17,283   405   (4,732  (127,126
Vehicles
    (1,675        663      (1,033  (2,045
Equipment
    (149        494      (6,953  (6,608
Tools
    (64        32      (67  (99
Construction-in-progress
    (111,822     23,155      17   (47,276  (135,926
Investment properties
    (30        1      8   (21
Software
    (91        60      (143  (174
Development expenditures
    (3,820        1,466      (1,123  (3,477
Intangible assets under development
    (7,326              5,218   (2,108
Other intangible assets
    (71        4         (67
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     (512,747   (50,755  23,155   34,931   1,673    (17,358  (521,101
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-16
8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
27.
Government Grants, Continued
 
(2)
Changes in government grants for the years ended December 31, 2022 and 2023 are as follows, continued:
 
      
2023
 
      
Beginning
balance
  
Receipt
  
Acquisition
  
Offset the
items of
depreciation
expense and
others
  
Disposal
  
Others
  
Ending
balance
 
      
In millions of won
 
Cash
        (57,207           57,207    
Land
    (27,405           1      (27,404
Buildings
    (50,437        5,070      (860  (46,227
Structures
    (165,608        9,562   1,611   (3,446  (157,881
Machinery
    (127,126        17,413   1,230   (11,341  (119,824
Vehicles
    (2,045        960      (1,752  (2,837
Equipment
    (6,608        2,011      (1,335  (5,932
Tools
    (99        38      (1  (62
Construction-in-progress
    (135,926     5,544         (43,092  (173,474
Investment properties
    (21        1      (2  (22
Software
    (174        85      (324  (413
Development expenditures
    (3,477        1,356         (2,121
Intangible assets under development
    (2,108              (350  (2,458
Other intangible assets
    (67        93      (348  (322
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     (521,101  (57,207  5,544   36,589   2,842   (5,644  (538,977
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-1
69

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
27.
Government Grants, Continued
 
(3)
Changes in government grants for specific business projects for the years ended December 31, 2022 and 2023 are as follows:
 
   
2022
 
Department
 
Business
Name
 
Description
 
Period
 
Budget
  
Beginning
Balance
  
Received
  
Interest
  
Used
  
Return
  
Others
  
Ending
Balance
 
        
In millions of won
 
Ministry of Trade, Industry and Energy Temporary electricity bill support for small business owners Temporary electricity bill support for small business owners 2021.04.01
~
2022.06.30
  211,235   17,735   71,685      (88,300        1,120 
Ministry of Trade, Industry and Energy 2021 project to support the supply of open electric vehicle charging station 2021 project to support the supply of open electric vehicle charging station 2021.01.01
~
2022.05.31
  40,100      11,796      (11,796       
Ministry of Trade, Industry and Energy 2022 Electricity supply business in rural areas (Newly Electricity Supply Construction Fees) 2022 Electricity supply business in rural areas (Newly Electricity Supply Construction Fees) 2022.01.01
~
2023.01.31
  149      151      (151         
Ministry of Trade, Industry and Energy 2022 Electricity supply business in rural areas (Reservation of Financial Loans) 2022 Electricity supply business in rural areas (Reservation of Financial Loans) 2022.01.01
~
2023.01.31
  166      166      (166         
Ministry of Trade, Industry and Energy 2022 Electricity supply business in rural areas (Support for operational deficits of electricity providers) 2022 Electricity supply business in rural areas (Support for operational deficits of electricity providers) 2023.01.31
~
2022.01.31
  166,732      158,669      (158,669         
Ministry of Trade, Industry and Energy 2022 Electricity supply business in rural areas (Technical support for local governments and residents) 2022 Electricity supply business in rural areas (Technical support for local governments and residents) 2022.01.01
~
2023.01.31
  1,028      268      (268         
Ministry of Trade, Industry and Energy 2022 Electricity supply business in rural areas (Support for Losses in Local Government Operations) 2022 Electricity supply business in rural areas (Support for Losses in Local Government Operations) 2022.01.01
~
2023.01.31
  10,078      11,071      (11,071         
Ministry of Trade, Industry and Energy 2022 Establishment of eco-friendly microgrid in island areas 2022 Establishment of eco-friendly microgrid in island areas 2022.01.01
~
2023.01.31
  7,742      14,113      (14,113         
Ministry of Trade, Industry and Energy 2022 Operating expenses for regional projects around the power plant 2022 Operating expenses for regional projects around the power plant 2022.01.01
~
2022.12.31
  387      63      (63         
Ministry of Trade, Industry and Energy 2022 Renewable Energy Generation Difference Support 2022 Renewable Energy Generation Difference Support 2022.01.01
~
2022.12.31
  98,656      81,739      (81,739         
Ministry of Trade, Industry and Energy Safety inspection of general electrical equipment Safety inspection of general electrical equipment 2022.01.01
~
2022.12.31
  2,122      2,117      (2,117         
Ministry of Trade, Industry and Energy Establishment of Integrated Control System for Renewable Energy in the transmission and substation sector Establishment of Integrated Control System for Renewable Energy in the transmission and substation sector 2021.01.01
~
2022.08.31
  940      463      (463         
Ministry of Trade, Industry and Energy Establishment of Integrated Control System for Renewable Energy in the power distribution sector Establishment of Integrated Control System for Renewable Energy in the power distribution sector 2021.01.01
~
2022.08.31
  5,060      5,027      (5,027         
Ministry of Employment and Labor Support for replacement of teaching materials at workplace daycare centers Support for replacement of teaching materials at workplace daycare centers 2022.01.01
~
2022.01.07
  48      29      (29         
 
F-17
0

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
27.
Government Grants, Continued
 
(3)
Changes in government grants for specific business projects for the years ended December 31, 2022 and 2023 are as follows, continued:
 
   
2023
 
Department
 
Business
Name
 
Description
 
Period
 
Budget
  
Beginning
Balance
  
Received
  
interest
  
Used
  
Return
  
Others
  
Ending
Balance
 
        
In millions of won
 
Ministry of Trade, Industry and Energy Temporary electricity bill support for small business owners Temporary electricity bill support for small business owners 2021.04.01
~
2022.06.30
  211,235   1,120         (51        1,069 
Ministry of Trade, Industry and Energy Construction of the Integrated Control System for Renewable Energy in Transmission Area Construction of the Integrated Control System for Renewable Energy in Transmission Area 2022.01.01
~
2023.09.30
  940      798      (798       
Ministry of Trade, Industry and Energy
 2023 Electricity supply business in rural areas (Newly Electricity Supply Contribution Fees) 
Electricity supply business in rural areas (Newly Electricity Supply Contribution Fees)
 2023.01.01
~
2024.01.31
  2      35      (35         
Ministry of Trade, Industry and Energy 2023 Electricity supply business in rural areas (Reservation of Financial Loans) Electricity supply business in rural areas (Reservation of Financial Loans) 2023.01.01
~
2024.01.31
  166      166      (166         
Ministry of Trade, Industry and Energy 2023 Electricity supply business in rural areas (Support for operational deficits of electricity providers) Electricity supply business in rural areas (Support for operational deficits of electricity providers) 2023.01.01
~
2024.01.31
  158,275      149,259      (149,259         
Ministry of Trade, Industry and Energy 2023 Electricity supply business in rural areas (Technical support for local governments and residents) Electricity supply business in rural areas (Technical support for local governments and residents) 2023.01.01
~
2024.01.31
  1,176      1,862      (1,862         
Ministry of Trade, Industry and Energy 2023 Electricity supply business in rural areas (Support for Losses in Local Government Operations) Electricity supply business in rural areas (Support for Losses in Local Government Operations) 2023.01.01
~
2024.01.31
  12,036      8,619      (8,619         
Ministry of Trade, Industry and Energy 2023 Establishment of eco-friendly microgrid in island areas Establishment of eco-friendly microgrid in island areas 2023.01.01
~
2024.01.31
  3,871      26,091      (26,091         
Ministry of Trade, Industry and Energy 2023 Operating expenses for regional projects around the power plant Operating expenses for regional projects around the power plant 2023.01.01
~
2023.12.31
  361      51      (51         
Ministry of Trade, Industry and Energy 2023 Renewable Energy Generation Difference Support Renewable Energy Generation Difference Support 2023.01.01
~
2023.12.31
  78,311      69,599      (69,599         
 Energy Cashback Energy Cashback         
Ministry of Trade, Industry and Energy Safety inspection of general electrical equipment Safety inspection of general electrical equipment 2023.01.01
~
2023.12.31
  2,560      2,560      (2,560         
Ministry of Trade, Industry and Energy Establishment of Integrated Control System for Renewable Energy in the power distribution sector Establishment of Integrated Control System for Renewable Energy in the power distribution sector 2023.01.01
~
2023.04.18
  495      635      (635         
Ministry of Trade, Industry and Energy Support for the installation of workplace daycare centers Support for the installation of workplace daycare centers 2023.01.01
~
2023.12.31
  2,510      680   2   (680  (1,832  1,832   2 
Ministry of Employment and Labor Support for replacement of teaching materials at workplace daycare centers Support for replacement of teaching materials at workplace daycare centers 2023.01.01
~
2023.12.31
  1,490      270      (270         
 
F-17
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
28.
Deferred Revenues
Deferred revenue for the years ended December 31, 2022 and 2023 are as follows which included in current and
non-current
non-financial
liabilities in the consolidated statements of financial position:
 
       
2022
   
2023
 
             
       
In millions of won
 
Beginning balance
      10,356,555    10,974,845 
Increase
     1,330,129    1,317,061 
Recognized as revenue
     (711,839   (743,051
    
 
 
   
 
 
 
Ending balance
      10,974,845    11,548,855 
    
 
 
   
 
 
 
 
29.
Non-financial
Liabilities
Non-financial
liabilities as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
       
Current
   
Non-current
   
Current
   
Non-current
 
                     
       
In millions of won
 
Advance received
      4,544,206    284,618    5,204,113    288,686 
Unearned revenue
     86,584    7,200    36,716    12,108 
Deferred revenue
     702,430    10,272,415    734,825    10,814,030 
Withholdings
     207,217    2,408    259,755    2,369 
Others
     1,433,940    96,020    1,646,254    78,807 
    
 
 
   
 
 
   
 
 
   
 
 
 
      6,974,377    10,662,661    7,881,663    11,196,000 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
30.
Contributed Capital
 
(1)
Details of shares issued as of December 31, 2022 and 2023 are as follows:
 
  
2022
 
  
Shares

authorized
  
Shares

issued
     
Par value

per share

(in won)
  
Owned by

government(*)
  
Owned by

others
  
Total
 
                      
  
In millions of won except share information
    
Common shares
  1,200,000,000   641,964,077     5,000   1,640,385   1,569,435   3,209,820 
 
 (*)
Korea Development Bank’s interest of ₩1,056,176 million is included.
 
  
2023
 
  
Shares

authorized
  
Shares

issued
     
Par value

per share

(in won)
  
Owned by

government(*)
  
Owned by

others
  
Total
 
                      
  
In millions of won except share information
    
Common shares
  1,200,000,000   641,964,077     5,000   1,640,385   1,569,435   3,209,820 
 
 (*)
Korea Development Bank’s interest of ₩1,056,176 million is included.
 
F-17
2
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
30.
Contributed Capital, Continued
 
(2)
Details in number of outstanding capital stock for the years ended December 31, 2022 and 2023 are as follows.
 
                                                            
       
2022
   
2023
 
             
       
Number of shares
 
Beginning balance
    
 
641,964,077
 
  
 
641,964,077
 
    
 
 
   
 
 
 
Ending balance
  
 
 
  
 
641,964,077
  
  
 
641,964,077
 
    
 
 
   
 
 
 
 
(3)
Details of share premium as of December 31, 2022 and 2023 are as follows: 
 
                                                            
       
2022
   
2023
 
             
       
In millions of won
 
Share premium
  
 
  
 
   843,758
  
  
 
    843,758
 
 
31.
Retained Earnings and Dividends Paid
 
(1)
Details of retained earnings as of December 31, 2022 and 2023 are as follows:
 
                                                            
       
2022
   
2023
 
             
       
In millions of won
 
Legal reserve (*)
  
 
 
  
 
1,604,910
 
  
 
1,604,910
 
Voluntary reserves
    
 
27,782,969
 
  
 
2,812,313
 
Retained earnings (Undisposed deficit) before appropriations
    
 
(7,956,579
  
 
11,921,039
 
    
 
 
   
 
 
 
Retained earnings
  
 
 
  
 
21,431,300
 
  
 
16,338,262
 
    
 
 
   
 
 
 
 
 (*)
The KEPCO Act requires KEPCO to appropriate a legal reserve equal to at least
20
 percent of net income for each accounting period until the reserve equals 50 percent of KEPCO’s common stock. The legal reserve is not available for cash dividends; however, this reserve may be credited to
paid-in
capital or offset against accumulated deficit by the resolution of the shareholders.
 
(2)
Details of voluntary reserves as of December 31, 2022 and 2023 are as follows:
 
                                                            
       
2022
   
2023
 
             
       
In millions of won
 
Reserve for investment on social overhead capital
  
 
  
 
5,277,449
 
  
 
2,272,313
 
Reserve for research and human development (*)
    
 
330,000
 
  
 
330,000
 
Reserve for business expansion
    
 
21,965,520
  
  
 
 
Reserve for equalizing dividends
    
 
210,000
 
  
 
210,000
 
    
 
 
   
 
 
 
  
 
  
 
27,782,969
 
  
 
2,812,313
 
    
 
 
   
 
 
 
 
 (*)
The reserve for research and human development is appropriated by KEPCO to use as qualified tax credits to reduce corporate tax liabilities. The reserve is available for cash dividends for a certain period as defined by the Restriction of Special Taxation Act of Korea.
 
F-17
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
31.
Retained Earnings and Dividends Paid, Continued
 
(3)
Changes in retained earnings for the years ended December 31, 2022 and 2023 are as follows:
 
                                                            
       
2022
   
2023
 
             
       
In millions of won
 
Beginning balance
  
 
  
 
45,258,244
 
  
 
21,431,300
 
Loss for the year attributed to owners of the controlling company
    
 
(24,466,853
  
 
(4,822,549
Changes in equity method retained earnings
    
 
12,305
 
  
 
(27,349
Remeasurements of defined benefit liability, net of tax
    
 
626,769
 
  
 
(242,987
Others
    
 
 
  
 
(153
Additional
paid-in
capital and others
    
 
835
 
  
 
 
    
 
 
   
 
 
 
Ending balance
  
 
  
 
21,431,300
 
  
 
16,338,262
 
    
 
 
   
 
 
 
 
(4)
Dividends paid for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
  
2021
 
In millions of won
 
Number of

shares issued
  
Number of

treasury stocks
  
Number of

shares eligible for

dividends
     
Dividends paid

per share
  
Dividends

paid
 
                   
              
(In won)
    
Common shares
  641,964,077      641,964,077     1,216   780,628 
 
  
2022
 
In millions of won
 
Number of

shares issued
  
Number of

treasury stocks
  
Number of

shares eligible for

dividends
     
Dividends paid

per share
  
Dividends

paid
 
                   
              
(In won)
    
Common shares
  641,964,077      641,964,077             
 
  
2023
 
In millions of won
 
Number of

shares issued
  
Number of

treasury stocks
  
Number of

shares eligible for

dividends
     
Dividends paid

per share
  
Dividends

paid
 
                   
              
(In won)
    
Common shares
  641,964,077      641,964,077             
 
(5)
Changes in retained earnings of investments in associates and joint ventures for the years ended December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Beginning balance
             3,970        16,275 
Changes
     12,305    (27,349
    
 
 
   
 
 
 
Ending balance
      16,275     (11,074
    
 
 
   
 
 
 
 
F-17
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
31.
Retained Earnings and Dividends Paid, Continued
 
(6)
Changes in remeasurement components related to defined benefit liability for the years ended December 31, 2022 and 2023 are as follows:
 
     
2022
   
2023
 
           
     
In millions of won
 
Beginning balance
    98,844    614,805 
Changes
       964,791    (376,121
Income tax effect
    (338,022   133,134 
Transfer to reserve for business expansion
    (110,808   (342,589
   
 
 
   
 
 
 
Ending balance
    614,805    29,229 
   
 
 
   
 
 
 
 
32.
Statements of Appropriation of Retained Earnings (Disposition of Deficit)
For the year ended December 31, 2022, KEPCO’s Deficit was disposed on March 28, 2023. For the year ended December 31, 2023, KEPCO’s deficits are expected to be disposed on March 26, 2024. Statements of disposition of deficit of KEPCO, the controlling company, for the years ended December 31, 2022 and 2023, respectively, are as follows:
 
      
2022
   
2023
 
            
      
In millions of won except for
dividends per share
 
I.   Deficit before disposition
     
Undisposed deficit carried over from prior years
          
Net loss
    (25,297,713   (3,249,233
Remeasurement of the defined benefit plan
        327,056    (149,474
   
 
 
   
 
 
 
    (24,970,657   (3,398,707
   
 
 
   
 
 
 
II. Transfer from voluntary reserves
    24,970,657    2,812,314 
   
 
 
   
 
 
 
III.  Subtotal (I+II)
        (586,393
   
 
 
   
 
 
 
IV.  Disposition of deficit
   
   586,393 
   
 
 
   
 
 
 
V. Undisposed deficit to be carried over forward to subsequent year
         
   
 
 
   
 
 
 
 
33.
Hybrid Bonds
Hybrid bonds classified as equity
(non-controlling
interest) as of December 31, 2022 and 2023 are as follows:
 
Issuer
 
Hybrid bond
 
Issued date
  
Maturity
  
Yield (%)
     
2022
   
2023
 
                      
  
In millions of won
 
Korea South-East Power Co., Ltd. (*)
 2nd hybrid bond  2012.12.07   2042.12.06   4.44     230,000    230,000 
Expense of issuance
 
   (627   (627
      
 
 
   
 
 
 
        229,373    229,373 
      
 
 
   
 
 
 
 
 (*)
Bondholders may not require prepayment in any case, and the Company has a call option to repay all of these bonds on or after 12 years from the date of issuance of the bonds, or on each interest payment date henceforth. In addition, there is a
step-up
clause from the date of the initial call option exercise. Although these instruments have contractual maturity dates, the contractual agreements allow these subsidiaries to indefinitely extend the maturity dates and defer the payment of interest without modification to the other terms of the instruments. When the Company decides not to pay dividends on common shares, they are not required to pay interest on the hybrid bonds.
 
F-17
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
34.
Other Components of Equity
 
(1)
Other components of equity of the parent as of December 31, 2022 and 2023 are as follows:
 
     
2022
   
2023
 
     
In millions of won
 
Other capital surplus
    1,268,569    1,600,801 
Accumulated other comprehensive income
   496,976    557,430 
Other equity
   13,294,973    13,294,972 
  
 
 
   
 
 
 
    15,060,518    15,453,203 
  
 
 
   
 
 
 
 
(2)
Changes in other capital surplus for the years ended December 31, 2022 and 2023 are as follows:
 
     
2022
  
2023
 
    
Gains on
disposal of

treasury

stocks
   
Others
  
Subtotal
  
Gains on

disposal of

treasury

stocks
   
Others
  
Subtotal
 
     
In millions of won
 
Beginning balance
    387,524    843,585   1,231,109   387,524    881,045   1,268,569 
Changes in consolidation scope
       (597  (597      (48  (48
Additional
paid-in
capital and others
       39,641   39,641           
Transactions between consolidated entities
       (1,584  (1,584      332,280   332,280 
  
 
 
   
 
 
  
 
 
  
 
 
   
 
 
  
 
 
 
Ending balance
    387,524    881,045   1,268,569   387,524    1,213,277   1,600,801 
  
 
 
   
 
 
  
 
 
  
 
 
   
 
 
  
 
 
 
 
(3)
Changes in accumulated other comprehensive income (loss) for the years ended December 31, 2022 and 2023 are as follows:
 
 
     
2022
 
     
Financial assets at

fair value through

other

comprehensive

income

valuation reserve
  
Shares in other

comprehensive

income of

investments in

associates and
joint ventures
  
Reserve for

overseas

operations

translation credit
  
Reserve for

gain (loss) on

valuation of

derivatives
  
Total
 
     
In millions of won
 
Beginning balance
    (46,498  311,252   (325,170  2,784   (57,632
Changes in the unrealized fair value of financial assets at FVOCI, net of tax
   58,008            58,008 
Shares
of
 other comprehensive income of associates and joint ventures, net of tax
      509,487         509,487 
Foreign currency translation of foreign operations, net of tax
         19,550      19,550 
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax
            (32,437  (32,437
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Ending balance
    11,510   820,739   (305,620  (29,653  496,976 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
F-17
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
34.
Other Components of Equity, Continued
 
(3)
Changes in accumulated other
compr
ehensive income (loss) for the years ended December 31, 2022 and 2023 are as follows, continued:
 
     
2023
 
     
Financial assets at

fair value through

other

comprehensive

income

valuation reserve
  
Shares in other

comprehensive

income of

investments in

associates and
joint ventures
  
Reserve for

overseas

operations

translation credit
  
Reserve for

gain (loss) on
valuation of

derivatives
  
Total
 
     
In millions of won
 
Beginning balance
    11,510   820,739   (305,620  (29,653  496,976 
Changes in the unrealized fair value of financial assets at FVOCI, net of tax
   (31,665           (31,665
Shares in other comprehensive income of associates and joint ventures, net of tax
      122,994         122,994 
Foreign currency translation of foreign operations, net of tax
         (25,950     (25,950
Net change in the unrealized fair value of derivatives using cash flow hedge accounting, net of tax
            (5,078  (5,078
Others
   153            153 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Ending balance
    (20,002  943,733   (331,570  (34,731  557,430 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
(4)
Other equity as of December 31, 2022 and 2023 are as follows:
 
      
2022
  
2023
 
      
In millions of won
 
Statutory revaluation reserve
     13,295,098   13,295,098 
Changes in other equity
    (125  (126)
 
   
 
 
  
 
 
 
     13,294,973   13,294,972 
   
 
 
  
 
 
 
 
F-17
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
35.
Sales
Details of sales for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
      
2021
  
2022
  
2023
 
      
Domestic
  
Overseas
  
Domestic
  
Overseas
  
Domestic
  
Overseas
 
      
In millions of won
 
[Type of goods and services]
 
Sales of goods
     58,359,774   441,203   68,578,390   606,079   85,588,151   351,986 
Electricity
    57,308,555      66,198,964      82,954,778    
Heat supply
    232,738      489,629      440,435    
Others
    818,481   441,203   1,889,797   606,079   2,192,938   351,986 
Sales related to rendering of services
    252,216   204,184   370,799   343,803   467,661   283,217 
Sales related to construction services
    159,262   595,736   193,541   453,412   186,996   598,399 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     58,771,252   1,241,123   69,142,730   1,403,294   86,242,808   1,233,602 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
[Timing of revenue recognition]
 
Performance obligations satisfied at a point in time
     58,359,774   441,203   68,578,390   606,079   85,588,151   351,986 
Performance obligations satisfied over time
    411,478   799,920   564,340   797,215   654,657   881,616 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     58,771,252   1,241,123   69,142,730   1,403,294   86,242,808   1,233,602 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
36.
Selling and Administrative Expenses
 
(1)
Selling and administrative expenses for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
   
2023
 
       
In millions of won
 
Salaries
      1,121,188    1,142,360    1,098,460 
Retirement benefit expense
     113,127    109,758    89,533 
Welfare and benefit expense
     155,558    155,781    152,836 
Insurance expense
     17,909    20,835    27,726 
Depreciation
     219,427    244,676    241,533 
Amortization of intangible assets
     91,428    85,661    88,648 
Bad debt expense
     17,968    23,634    62,808 
Commission
     410,287    420,390    460,644 
Advertising expense
     29,230    33,739    30,305 
Training expense
     4,923    7,327    7,900 
Vehicle maintenance expense
     8,849    10,749    9,044 
Publishing expense
     3,568    3,732    3,281 
Business promotion expense
     3,522    3,198    2,559 
Rent expense
     43,650    47,680    44,807 
Telecommunication expense
     8,569    7,945    7,813 
Transportation expense
     870    1,012    1,099 
Taxes and dues
     93,446    122,177    112,449 
Expendable supplies expense
     9,052    9,617    7,252 
Water, light and heating expense
     12,351    17,950    16,207 
Repairs and maintenance expense
     123,134    152,449    154,062 
Ordinary development expense
     213,936    213,932    217,319 
Travel expense
     11,099    16,062    16,265 
Clothing expense
     10,540    13,044    10,450 
Survey and analysis expense
     889    1,126    1,068 
Membership fee
     1,331    1,469    1,503 
Others
     149,945    143,119    196,011 
    
 
 
   
 
 
   
 
 
 
      2,875,796    3,009,422    3,061,582 
    
 
 
   
 
 
   
 
 
 
 
F-17
8
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
36.
Selling and Administrative Expenses, Continued
 
(2)
Details of “others” included in selling and administrative expenses for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
       
2021
   
2022
   
2023
 
       
In millions of won
 
Accommodation development expenses
      57,815    56,038    49,988 
Miscellaneous wages
     47,221    31,910    97,474 
Litigation and filing expenses
     16,383    14,876    19,204 
Compensation for damages
     3,303    3,116    4,300 
Outsourcing expenses
     3,799    3,635    3,511 
Reward expenses
     3,006    2,740    2,770 
Overseas market development expenses
     1,192    1,376    1,503 
Others
     17,226    29,428    17,261 
    
 
 
   
 
 
   
 
 
 
        149,945      143,119    196,011 
    
 
 
   
 
 
   
 
 
 
 
37.
Other Income and Expenses
 
(1)
Other income for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
   
2023
 
       
In millions of won
 
Reversal of other provisions
      15,548    15,265    79,001 
Reversal of other allowance for doubtful accounts
     98    37    1,941 
Gains on government grants
     458    301    239 
Gains on assets contributed
     9,347    1,953    24,183 
Gains on liabilities exempted
     1,830    1,181    854 
Compensation and reparations revenue
     104,826    89,638    93,785 
Revenue from foundation fund
     1    3    60 
Income related to transfer of assets from customers
     661,212    711,839    743,051 
Rental income
     204,123    208,064    210,972 
Others
     36,690    67,208    121,816 
    
 
 
   
 
 
   
 
 
 
      1,034,133    1,095,489    1,275,902 
    
 
 
   
 
 
   
 
 
 
 
(2)
Details of “others” included in other income for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
   
2023
 
       
In millions of won
 
Refund of claim for rectification
      7,274    701    1,054 
Adjustment of research project
     7,638         
Maintenance expenses on lease building
     160    125    124 
Training expenses
     1,739    1,684    1,946 
Deposit redemption
     378    12    100 
Reversal of expenses on litigation
     991    1,920    44,197 
Revenue on royalty fee
     173    455    422 
Reimbursement of insurance fee
     1         
Gains on guarantee contracts
     27    22    16 
Others
     18,309    62,289    73,957 
    
 
 
   
 
 
   
 
 
 
        36,690      67,208    121,816 
    
 
 
   
 
 
   
 
 
 
 
F-1
7
9

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
37.
Other Income and Expenses, Continued
 
(3)
Other expenses for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
      
2021
   
2022
   
2023
 
      
In millions of won
 
Compensation and indemnification expense
      663    36    34 
Accretion expenses of other provisions
    2,711    1,138    4,962 
Depreciation expenses on investment properties
    1,386    486    493 
Depreciation expenses on idle assets
    3,621    3,635    3,683 
Other bad debt expense
    49,372    6,400    40,683 
Donations
    152,456    131,037    169,748 
Others
    47,723    69,418    39,302 
   
 
 
   
 
 
   
 
 
 
          257,932        212,150        258,905 
   
 
 
   
 
 
   
 
 
 
 
(4)
Details of “others” included in other expenses for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
      
2021
   
2022
   
2023
 
      
In millions of won
 
Operating expenses related to the idle assets
      44    1,683    1,494 
Research grants
    109    562    174 
Expenses related to farming and fishing village supports
    17,065    11,272    13,249 
Expenses related to Operating of a fitness center
    6,948    8,370    8,921 
Expenses on adjustment of research and development grants
    2,241    260    388 
Taxes and dues
    119    31,985    1,935 
Expenses on R&D supports
    861    48    9 
Others
    20,336    15,238    13,132 
   
 
 
   
 
 
   
 
 
 
           47,723         69,418         39,302 
   
 
 
   
 
 
   
 
 
 
 
38.
Other Gains (Losses)
 
(1)
Composition of other gains (losses) for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
      
2021
  
2022
   
2023
 
      
In millions of won
 
Other gains
      
Gains on disposal of property, plant and equipment
     56,284   148,667    32,196 
Gains on disposal of intangible assets
    1   41    136 
Reversal of impairment loss on property, plant and equipment
       134,735     
Reversal of impairment loss on intangible assets
    14       16,035 
Gains on foreign currency translation
    20,598   36,097    27,123 
Gains on foreign currency transaction
    48,671   235,221    139,077 
Gains on insurance proceeds
    144   43,497    6,785 
Others
    250,174   294,091    346,795 
Other losses
      
Losses on disposal of property, plant and equipment
    (92,622  (100,066   (98,120
Losses on disposal of intangible assets
    (145  (116   (71
Impairment loss on property, plant and equipment
    (4,056  (37,311   (17,031
Impairment loss on intangible assets
       (164   (2,865
Impairment loss on other
non-current
assets
    (16,035       
Losses on foreign currency translation
    (4,732  (14,738   (3,901
Losses on foreign currency transaction
    (67,990  (299,117   (165,187
Others
    (181,787  (197,715   (258,286
   
 
 
  
 
 
   
 
 
 
          8,519         243,122         22,686 
   
 
 
  
 
 
   
 
 
 
 
F-18
0
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
38.
Other Gains (Losses), Continued
 
(2)
Details of “others” included in other gains for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
      
2021
   
2022
   
2023
 
                
      
In millions of won
 
Gains on disposal of inventories
      4,446    11,091    20,447 
Gains on proxy collection of TV license fee
        42,271            42,286        41,372 
Gains on compensation of impaired electric poles
    812    768    1,138 
Gains on harbor facilities dues
    3,281    4,198    3,666 
Gains on technical fees
    3,968    2,972    3,071 
Reversal of occupation development training fees
    229    525     1,452 
Gains on disposal of waste
    4,272    7,749    3,815 
Gains on insurance
    690         
Gains on tax rebate
    685     548    374 
Gains on other commission
    1,822    2,097    2,044 
Gains on disposal of greenhouse gas emissions rights
    8,739         
Gains on disposal of assets
held-for-sale
    160    236     
Others
    178,799    221,621    269,416 
   
 
 
   
 
 
   
 
 
 
     250,174    294,091    346,795 
   
 
 
   
 
 
   
 
 
 
 
(3)
Details of “others” included in other losses for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
      
2021
   
2022
   
2023
 
                
      
In millions of won
 
Losses on valuation of inventories
     7,761    14,528    9,936 
Losses on disposal of inventories
    8,874    8,324     5,471 
Losses due to disaster
    6,238    5,068    7,138 
Losses on rounding adjustment of electric charge surtax
    1,283     1,317    1,332 
Loss on disposal of greenhouse gas emissions rights
    11,282         
Others
    146,349    168,478    234,409 
   
 
 
   
 
 
   
 
 
 
        181,787           197,715    258,286 
   
 
 
   
 
 
   
 
 
 
 
39.
Finance Income
 
(1)
Finance income for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
      
2021
  
2022
  
2023
 
              
      
In millions of won
 
Interest income
     221,874   340,753   429,620 
Dividends income
    10,522   28,875   25,941 
Gains on disposal of financial assets
    7,718   11,199   13,162 
Gains on valuation of financial assets at fair value through profit or loss
    14,338   7,099   152,322 
Gains on valuation of derivatives
    860,011   595,256   382,611 
Gains on transaction of derivatives
    124,900    429,847   268,618 
Gains on foreign currency translation
    146,349   389,361    104,901 
Gains on foreign currency transaction
    15,618   29,997   42,886 
Other financial income
    1,284   925   4,970 
   
 
 
  
 
 
  
 
 
 
     1,402,614      1,833,312   1,425,031 
   
 
 
  
 
 
  
 
 
 
 
F-18
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
39.
Finance Income, Continued
 
(2)
Details of interest income included in finance income for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
      
2021
  
2022
  
2023
 
              
      
In millions of won
 
Cash and cash equivalents
     12,692   51,872   100,205 
Financial assets at fair value through profit or loss
    18,415   58,540   65,470 
Financial assets at amortized cost
    797   1,308    2,929 
Loans
    25,196    33,545   44,029 
Short-term financial instruments
    7,531   15,827   34,260 
Long-term financial instruments
    12,470   14,371   14,183 
Other financial assets
    230   637   241 
Trade and other receivables
    144,543   164,653   168,303 
   
 
 
  
 
 
  
 
 
 
         221,874         340,753   429,620 
   
 
 
  
 
 
  
 
 
 
 
40.
Finance Expenses
 
(1)
Finance expenses for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
       
2021
   
2022
   
2023
 
                 
       
In millions of won
 
Interest expense
      1,914,457    2,818,546    4,451,659 
Losses on sale of financial assets
     1,045    1,841    1 
Losses on valuation of financial assets at fair value through profit or loss
     5,480    44,329    24,015 
Losses on valuation of derivatives
     37,017    371,038    148,412 
Losses on transaction of derivatives
     40,818    205,162    178,959 
Losses on foreign currency translation
     1,159,334    934,005    491,782 
Losses on foreign currency transaction
     83,558    346,711    49,677 
Losses on repayment of financial liabilities
    
 
10
 
  
 
15
 
  
 
 
Others
     4,058    25,144    2,513 
    
 
 
   
 
 
   
 
 
 
      3,245,777    4,746,791    5,347,018 
    
 
 
   
 
 
   
 
 
 
 
(2)
Details of interest expense included in finance expenses for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
  
2022
  
2023
 
       
In millions of won
 
Trade and other payables
      213,765   204,078   200,440 
Short-term borrowings
     42,371   145,201   376,066 
Long-term borrowings
     115,141   204,037   407,915 
Debt securities
     1,728,588   2,388,517   3,634,680 
Other financial liabilities
     384,423   472,248   614,332 
    
 
 
  
 
 
  
 
 
 
     2,484,288   3,414,081   5,233,433 
Less: Capitalized borrowing costs
     (569,831  (595,535  (781,774
    
 
 
  
 
 
  
 
 
 
      1,914,457   2,818,546   4,451,659 
    
 
 
  
 
 
  
 
 
 
Capitalization rates for the years ended December 31, 2021, 2022 and 2023 are 2.02%~4.33%, 2.25%~3.86% and 2.34%~4.28%, respectively.
 
F-18
2
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
41.
Income Taxes
 
(1)
Income tax expense (benefit) for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
       
2021
   
2022
   
2023
 
                 
       
In millions of won
 
Current income tax expense
        
Payment of income tax
      357,767    563,681    621,957 
Adjustment in respect of prior years due to change in estimate
     153,113    48,374    (32,100
Current income tax directly recognized in equity
     (198,714   (350,348   93,705 
    
 
 
   
 
 
   
 
 
 
     312,166    261,707    683,562 
    
 
 
   
 
 
   
 
 
 
Deferred tax benefit
        
Generation and realization of temporary differences
     (489,411   (564,801   (1,845,236
Reclassified from equity to profit (loss)
         (4,964    
Changes of unrecognized tax losses, tax credit and temporary differences for prior periods
     (43,653   (38,708   (15,244
Changes in deferred tax on tax losses carryforwards
     (1,641,823   (9,175,755   (1,650,017
Tax credit carryforwards
     (12,199   34,019    (16,734
Amount due to change in tax rate or regulations
     18,931    73,991    5,836 
    
 
 
   
 
 
   
 
 
 
     (2,168,155   (9,676,218   (3,521,395
    
 
 
   
 
 
   
 
 
 
Income tax benefit
      (1,855,989   (9,414,511   (2,837,833) 
    
 
 
   
 
 
   
 
 
 
 
(2)
Reconciliation between actual income tax benefit and amount computed by applying the statutory tax rate to loss before income taxes for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
   
2023
 
                 
       
In millions of won
 
L
oss before income tax
      (7,071,570   (33,843,619   (7,553,977
    
 
 
   
 
 
   
 
 
 
Income tax benefit computed at applicable tax rate (*1)
     (1,944,682   (9,306,995   (1,936,840
Adjustments
        
Effect of applying gradual tax rate
     (10,362   (10,362   (10,362
Effect of
non-taxable
income
     (4,983   (9,471   (26,993
Effect of
non-deductible
expenses
     78,814    39,663    39,411 
Effect of tax losses that are not recognized as deferred tax asset
     1,351    19,275     
Effects of tax credits and deduction
     (43,931   (98,684   (53,724
Reversal of unrecognized deferred tax asset, net
     (43,641   (38,708   (15,244
Effect of change in deferred tax due to change in tax rate
     18,931    393,416    211,736 
Deduction of deferred tax assets
     73,887    (85,514   29,095 
Deferred tax related to investments in subsidiaries, associates and joint ventures
     (135,878   (375,064   (1,063,007
Others, net
     1,392    9,559    20,195 
    
 
 
   
 
 
   
 
 
 
     (64,420   (155,890   (868,893
Adjustment in respect of prior years due to change in estimate
     153,113    48,374    (32,100
    
 
 
   
 
 
   
 
 
 
Income tax benefit
      (1,855,989   (9,414,511   (2,837,833
    
 
 
   
 
 
   
 
 
 
Effective tax rate
     (*2   (*2   (*2
 
 (*1)
Applicable tax rates are 27.5%,
 26.5% and 25.64% as
of December 31, 2021, 2022 and 2023, respectively. 
 
 (*2)
The effective tax rate for the year ended December 31, 2021, 2022 and 2023 is not calculated due to income tax benefit.
 
 
F-18
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
41.
Income Taxes, Continued
 
(3)
Income tax directly adjusted to equity (except for accumulated other comprehensive income (loss)) for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
   
2023
 
                 
       
In millions of won
 
Dividends of hybrid bond
      4,736    4,149     
Disposal of subsidiaries
         406     
    
 
 
   
 
 
   
 
 
 
        4,736      4,555       
    
 
 
   
 
 
   
 
 
 
 
(4)
Income tax recognized as other comprehensive income (loss) for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
       
2021
   
2022
   
2023
 
                 
       
In millions of won
 
Income tax recognized as other comprehensive income (loss)
        
L
oss on valuation of financial assets at fair value through other comprehensive income
      (9,753   (31,416   (10,624
Net change in the unrealized fair value of derivatives using
cash flow hedge accounting, net of tax
     24,220    40,390    4,863 
Remeasurement of defined benefit liability
     (126,890   (322,489   133,134 
Investments in associates
     (53,672   (66,677   (40,213
Others
     (37,355   25,289    6,545 
    
 
 
   
 
 
   
 
 
 
      (203,450   (354,903   93,705 
    
 
 
   
 
 
   
 
 
 
 
F-184

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
41.
Income Taxes, Continued
 
(5)
Changes in deferred tax assets (liabilities) recognized in the consolidated statements of financial position for the years ended December 31, 2022 and 2023 are as follows:
 
     
2022
 
     
Beginning

balance
  
Amounts
recognized in
profit or loss
  
Amount
recognized in
other
comprehensive
income (loss)
  
Amounts

recognized

directly

in equity
  
Ending

balance
 
                   
     
In millions of won
 
Deferred tax on temporary differences
      
Employee benefits
     558,383   (36,341  (322,489     199,553 
Cash flow hedge
   (49,947  (46,188  40,390   405   (55,340
Investments in subsidiaries, associates and joint ventures
   (8,721,320  410,310   (66,677     (8,377,687
Property, plant and equipment
   (7,430,461  (111,177        (7,541,638
Finance lease
   (415,558  9,919         (405,639
Intangible assets
   (31,481  6,550         (24,931
Financial assets at fair value through profit or loss
   12   3,445         3,457 
Financial assets at fair value through other comprehensive income
   27,381   25,178   (31,416     21,143 
Deferred revenue
   186,391   (16,411        169,980 
Provisions
   6,494,314   595,030         7,089,344 
Doubtful receivables
   801   1,673         2,474 
Other finance liabilities
   31,410   (14,142     4,150   21,418 
Gains or losses on foreign exchange translation
   91,411   42,905         134,316 
Allowance for doubtful accounts
   64,264   (6,029        58,235 
Accrued income
   10,002   6,612         16,614 
Special deduction for property, plant and equipment
   (224,127  8,968         (215,159
Others
   1,445,827   16,456   25,289      1,487,572 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   (7,962,698  896,758   (354,903  4,555   (7,416,288
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Deferred tax on unused tax losses and tax credit
      
Unused tax losses
   2,559,877   9,102,228         11,662,105 
Excess of donation limit
   69,185   11,861         81,046 
Tax credit
   134,690   15,719         150,409 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   2,763,752   9,129,808         11,893,560 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     (5,198,946  10,026,566   (354,903  4,555   4,477,272 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
F-18
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
41.
Income Taxes, Continued
 
(5)
Changes in deferred tax assets (liabilities) recognized in the consolidated statements of financial position for the years ended December 31, 2022 and 2023 are as follows, continued:
 
     
2023
 
     
Beginning

balance
  
Amounts
recognized in
profit or loss
  
Amount
recognized in
other
comprehensive
income (loss)
  
Amounts

recognized

directly

in equity
  
Ending

balance
 
                   
     
In millions of won
 
Deferred tax on temporary differences
      
Employee benefits
  
   199,553   6,597   133,134      339,284 
Cash flow hedge
   (55,340  29,622   4,863      (20,855
Investments in subsidiaries, associates and joint ventures
   (8,377,687  1,300,263   (40,213     (7,117,637
Property, plant and equipment
   (7,541,638  534,361         (7,007,277
Finance lease
   (405,639  179,943         (225,696
Intangible assets
   (24,931  1,526         (23,405
Financial assets at fair value through profit or loss
   3,457   (5,199        (1,742
Financial assets at fair value through other comprehensive income
   21,143   16,839   (10,624     27,358 
Deferred revenue
   169,980   (13,580        156,400 
Provisions
   7,089,344   (47,684        7,041,660 
Doubtful receivables
   2,474   (74        2,400 
Other finance liabilities
   21,418   (3,426        17,992 
Gains or losses on foreign exchange translation
   134,316   (6,306        128,010 
Allowance for doubtful accounts
   58,235   (2,492        55,743 
Accrued income
   16,614   17,321         33,935 
Special deduction for property, plant and equipment
   (215,159  3,299         (211,860
Others
   1,487,572   (277,889  6,545      1,216,228 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   (7,416,288  1,733,121   93,705      (5,589,462
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Deferred tax on unused tax losses and tax credit
      
Unused tax losses
   11,662,105   1,676,638         13,338,743 
Excess of donation limit
   81,046   (34,724        46,322 
Tax credit
   150,409   52,665         203,064 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
   11,893,560   1,694,569         13,588,129 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
      
  
   4,477,272   3,427,690   93,705      7,998,667 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
(6)
Deferred tax assets (liabilities) recognized in the consolidated statements of financial position as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Deferred tax assets
      10,934,375    13,161,802 
Deferred tax liabilities
     (6,457,103   (5,163,135
    
 
 
   
 
 
 
      4,477,272    7,998,667 
    
 
 
   
 
 
 
The Company changed the average tax rate used to measure deferred tax for the current year in accordance with the Korea Accounting Standards Board’s inquiry response.
 
F-18
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
41.
Income Taxes, Continued
 
(7)
Details of deductible temporary differences, tax losses and unused tax credits for which no deferred tax assets were recognized as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Deductible temporary differences
 and others
      1,381,532    1,811,062 
 
(8)
Pillar Two Model Rules
Pillar Two Model Rules legislation has been enacted or substantively enacted in certain jurisdictions where the Company operates. The legislation will be effective for the Company’s fiscal year beginning on January 1, 2024. The Company is currently assessing the potential exposure arising from the Pillar Two legislation. The assessment currently carried out is based on the tax filing documents for the recent period and the financial information for 2022 and 2023. In certain jurisdictions, the assessment is not yet completed since information required for the assessment is not collected enough. Based on the assessment carried out so far, the Company has identified potential exposure to Pillar Two income taxes on profits earned in Jordan, Laos and others where the expected Pillar Two effective tax rate is likely to be lower than 15%. Although the potential exposure is expected to arise from the constituent entities (mainly operating subsidiaries) in these jurisdictions, exposure may also arise from other jurisdictions where the assessment is not completed. The Company expects that the potential exposure to the Pillar Two income taxes is not significant. The Company continues to proceed the assessment and expects to complete the assessment in the first of half of 2024.
 
42.
Assets
Held-for-Sale
Assets
held-for-sale
as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
             
       
In millions of won
 
Land (*1,2)
      31,766    31,766 
Buildings (*1,2)
     12,981    13,881 
Structures (*1)
     1    1 
    
 
 
   
 
 
 
      44,748    45,648 
    
 
 
   
 
 
 
 
 (*1)
The board of directors of KEPCO Engineering & Construction Company, Inc., a subsidiary of the Company, made a resolution to sell its old office building in
Yongin-si,
Gyeonggi-do, and reclassified the buildings, structures, and land as assets
held-for-sale
expecting its carrying amount would be recovered through a sale transaction. In accordance with the resolution of the Board of Directors on April 1, 2022, a sales contract for the assets scheduled for sale was entered into on April 13, 2022, and the related down payment and interim payment of ₩52,666 million were recorded as long-term advance received.
 
 (*2)
The board of directors of Korea Electric Power Corporation, the controlling company, made a resolution to sell the Uijeongbu substation, and reclassified the buildings and land as assets
held-for-sale
expecting its carrying amount would be recovered through a sale
transaction during the year ended December 31, 2022. 
 
F-18
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
43.
Expenses Classified by Nature
Expenses classified by nature for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
 
 
 
 
 
 
2021
 
 
 
 
 
 
Selling and
administrative
expenses
 
  
Cost of
sales
 
  
Total
 
 
 
 
 
 
 
 
  
 
 
  
 
 
 
 
 
 
 
In millions of won
 
Raw materials used
         18,660,477    18,660,477 
Power purchase
          21,619,039    21,619,039 
Salaries
    1,121,188    4,276,494    5,397,682 
Retirement benefit expense
    113,127    488,263    601,390 
Welfare and benefit expense
    155,558    570,440    725,998 
Insurance expense
    17,909    104,544    122,453 
Depreciation
    219,427    11,551,897    11,771,324 
Amortization of intangible assets
    91,428    74,733    166,161 
Bad debt expense
    17,968        17,968 
Commission
    410,287    307,272    717,559 
Advertising expense
    29,230    9,552    38,782 
Training expense
    4,923    13,283    18,206 
Vehicle maintenance expense
    8,849    8,152    17,001 
Publishing expense
    3,568    3,310    6,878 
Business promotion expense
    3,522    3,777    7,299 
Rent expense
    43,650    194,234    237,884 
Telecommunication expense
    8,569    10,959    19,528 
Transportation expense
    870    53,365    54,235 
Taxes and dues
    93,446    529,380    622,826 
Expendable supplies expense
    9,052    41,414    50,466 
Water, light and heating expense
    12,351    43,025    55,376 
Repairs and maintenance expense
    123,134    2,494,861    2,617,995 
Ordinary development expense
    213,936    475,461    689,397 
Travel expense
    11,099    67,103    78,202 
Clothing expense
    10,540    7,994    18,534 
Survey and analysis expense
    889    3,992    4,881 
Membership fee
    1,331    8,492    9,823 
Others
    149,945    2,022,777    2,172,722 
   
 
 
   
 
 
   
 
 
 
     2,875,796    63,644,290    66,520,086 
   
 
 
   
 
 
   
 
 
 
 
F-18
8
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
43.
Expenses Classified by Nature, Continued
Expenses classified by nature for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
 
     
2022
 
     
Selling and
administrative
expenses
   
Cost of
sales
   
Total
 
               
     
In millions of won
 
Raw materials used
         34,832,581    34,832,581 
Power purchase
          41,984,858    41,984,858 
Salaries
   1,142,360    4,329,099    5,471,459 
Retirement benefit expense
   109,758    505,612    615,370 
Welfare and benefit expense
   155,781    540,058    695,839 
Insurance expense
   20,835    106,672    127,507 
Depreciation
   244,676    12,056,455    12,301,131 
Amortization of intangible assets
   85,661    70,499    156,160 
Bad debt expense
   23,634        23,634 
Commission
   420,390    351,557    771,947 
Advertising expense
   33,739    10,552    44,291 
Training expense
   7,327    14,813    22,140 
Vehicle maintenance expense
   10,749    10,275    21,024 
Publishing expense
   3,732    3,014    6,746 
Business promotion expense
   3,198    3,340    6,538 
Rent expense
   47,680    186,439    234,119 
Telecommunication expense
   7,945    9,677    17,622 
Transportation expense
   1,012    113,845    114,857 
Taxes and dues
   122,177    554,320    676,497 
Expendable supplies expense
   9,617    47,159    56,776 
Water, light and heating expense
   17,950    60,002    77,952 
Repairs and maintenance expense
   152,449    2,586,975    2,739,424 
Ordinary development expense
   213,932    513,878    727,810 
Travel expense
   16,062    78,999    95,061 
Clothing expense
   13,044    8,778    21,822 
Survey and analysis expense
   1,126    4,322    5,448 
Membership fee
   1,469    16,912    18,381 
Others
   143,119    1,902,903    2,046,022 
  
 
 
   
 
 
   
 
 
 
     3,009,422    100,903,594    103,913,016 
  
 
 
   
 
 
   
 
 
 
 
F-1
89

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
43.
Expenses Classified by Nature, Continued
Expenses classified by nature for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
 
 
     
2023
 
     
Selling and
administrative
expenses
   
Cost of sales
   
Total
 
               
     
In millions of won
 
Raw materials used
         27,135,770    27,135,770 
Power purchase
       38,304,309    38,304,309 
Salaries
  
 
1,098,460
 
  
 
4,416,706
 
  
 
5,515,166
 
Retirement benefit expense
  
 
89,533
 
  
 
370,769
 
  
 
460,302
 
Welfare and benefit expense
  
 
152,836
 
  
 
542,367
 
  
 
695,203
 
Insurance expense
  
 
27,726
 
  
 
119,964
 
  
 
147,690
 
Depreciation
  
 
241,533
 
  
 
12,623,380
 
  
 
12,864,913
 
Amortization of intangible assets
  
 
88,648
 
  
 
74,526
 
  
 
163,174
 
Bad debt expense
  
 
62,808
 
  
 
 
  
 
62,808
 
Commission
  
 
460,644
 
  
 
341,124
 
  
 
801,768
 
Advertising expense
  
 
30,305
 
  
 
8,856
 
  
 
39,161
 
Training expense
  
 
7,900
 
  
 
16,064
 
  
 
23,964
 
Vehicle maintenance expense
  
 
9,044
 
  
 
9,128
 
  
 
18,172
 
Publishing expense
  
 
3,281
 
  
 
2,879
 
  
 
6,160
 
Business promotion expense
  
 
2,559
 
  
 
2,523
 
  
 
5,082
 
Rent expense
  
 
44,807
 
  
 
161,749
 
  
 
206,556
 
Telecommunication expense
  
 
7,813
 
  
 
9,706
 
  
 
17,519
 
Transportation expense
  
 
1,099
 
  
 
102,502
 
  
 
103,601
 
Taxes and dues
  
 
112,449
 
  
 
574,617
 
  
 
687,066
 
Expendable supplies expense
  
 
7,252
 
  
 
47,252
 
  
 
54,504
 
Water, light and heating expense
  
 
16,207
 
  
 
41,200
 
  
 
57,407
 
Repairs and maintenance expense
  
 
154,062
 
  
 
2,620,200
 
  
 
2,774,262
 
Ordinary development expense
  
 
217,319
 
  
 
500,242
 
  
 
717,561
 
Travel expense
  
 
16,265
 
  
 
77,232
 
  
 
93,497
 
Clothing expense
  
 
10,450
 
  
 
9,490
 
  
 
19,940
 
Survey and analysis expense
  
 
1,068
 
  
 
4,156
 
  
 
5,224
 
Membership fee
   1,503    15,164    16,667 
Others
   196,011    1,567,652    1,763,663 
  
 
 
   
 
 
   
 
 
 
     3,061,582    89,699,527    92,761,109 
  
 
 
   
 
 
   
 
 
 
 
44.
Earnings (Loss) Per Share
 
(1)
Basic earnings (loss) per share for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
Type
 
 
 
 
2021
 
 
2022
 
 
2023
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In won
 
 
 
 
Basic earnings (loss) per share
  
 

 (8,263  (38,112  (7,512
 
(2)
Diluted earnings (loss) per share for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
Type
 
 
 
 
2021
 
 
2022
 
 
2023
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In won
 
 
 
 
Diluted earnings (loss) per share
  
 
  (8,263)
 
  (38,112)
 
  (7,512)
 
 
F-19
0

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
44.
Earnings (Loss) Per Share, Continued
 
(3)
Basic earnings (loss) per share
Profit (loss) for the year and weighted average number of common shares used in the calculation of basic earnings (loss) per share for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
Type
    
2021
  
2022
  
2023
 
             
     
In millions of won except number of shares
 
Profit (loss) attributable to owners of the controlling company
 
    (5,304,522  (24,466,853  (4,822,549
Profit (loss) used in the calculation of total basic earnings (loss) per share
   (5,304,522  (24,466,853  (4,822,549
Weighted average number of common shares
   641,964,077   641,964,077   641,964,077 
 
(4)
Diluted earnings (loss) per share
Diluted earnings (loss) per share is calculated by applying adjusted weighted average number of common shares under the assumption that all dilutive potential common shares are converted to common shares.
Profit (loss) used in the calculation of total diluted earnings (loss) per share for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
Type
    
2021
  
2022
  
2023
 
             
     
In millions of won
 
Profit (loss) used in the calculation of total diluted earnings (loss) per share
    (5,304,522  (24,466,853  (4,822,549
Weighted average number of common shares used in calculating diluted earnings (loss) per share are adjusted from weighted average number of common shares used in calculating basic earnings (loss) per share. Detailed information of the adjustment for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
Type
  
2021
   
2022
   
2023
 
             
   
In number of shares
 
Weighted average number of common shares
   641,964,077    641,964,077    641,964,077 
Diluted weighted average number of shares
   641,964,077    641,964,077    641,964,077 
 
(5)
There are no potential dilutive instruments, thus diluted earnings (loss) per share are same as basic earnings (loss) per share for the years ended December 31, 2021, 2022 and 2023.
 
45.
Risk Management
 
(1)
Capital risk management
The Company manages its capital to ensure that entities in the Company will be able to continue while maximizing the return to shareholder through the optimization of the debt and equity balance. The capital structure of the Company consists of net debt (offset by cash and cash equivalents) and equity. The Company’s overall capital risk management strategy remains consistent with the prior year.
 
F-19
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(1)
Capital risk management, continued
 
Details of the Company’s capital management accounts as of December 31, 2022 and 2023 are as follows:
 
       
2022
  
2023
 
       
In millions of won
 
Total borrowings and debt securities
      120,605,365   133,631,830 
Cash and cash equivalents
     3,234,780   4,342,887 
    
 
 
  
 
 
 
Net borrowings and debt securities
     117,370,585   129,288,943 
    
 
 
  
 
 
 
Total equity
     42,000,256   37,264,750 
    
 
 
  
 
 
 
Debt to equity ratio
     279.45  346.95
 
(2)
Financial risk management
The Company is exposed to various risks related to its financial instruments, such as, market risk (currency risk, interest rate risk, price risk), credit risk. The Company monitors and manages the financial risks relating to the operations of the Company through internal risk reports which analyze exposures by degree and magnitude of risks. The Company uses derivative financial instruments to hedge certain risk exposures. The Company’s overall financial risk management strategy remains consistent with the prior year.
 
 (i)
Credit risk
Credit risk is the risk of finance loss to the Company if a customer or counterparty to a financial instrument fails to meet its contractual obligations, and arises primarily from the sales activities, securities and derivatives. In addition, credit risk exposure may exist within financial guarantees and unused line of credits. As these financial institutions the Company makes transactions with are reputable financial institutions, the credit risk from them are considered limited. The Company decides credit transaction limits based on evaluation of client’s credit, through information obtained from the credit bureau and disclosed financial position at committing contracts.
 
 
Credit risk management
Electricity sales, the main operations of the Company are the necessity for daily life and industrial activities of Korean nationals and have importance as one of the national key industries. The Company dominates the domestic market supplying electricity to customers. The Company is not exposed to significant credit risk as customers of the Company are diverse and are from various industries and areas. The Company uses publicly available information and its own internal data related to trade receivables, to rate its major customers and to measure the credit risk that a counter party will default on a contractual obligation. For the incurred but not recognized loss, it is measured considering overdue period.
 
 
Impairment and allowance account
In accordance with the Company policies, individual material financial assets are assessed on a regular basis, trade receivables that are assessed not to be impaired individually are, in addition, assessed for impairment on a collective basis. Value of the acquired collateral (including the confirmation of feasibility) and estimated collectable amounts are included in this assessment.
Allowance for bad debts assessed on a collective basis are recognized for (i) the Company of assets which individually are not material and (ii) incurred but not recognized losses that are assessed using statistical methods, judgment and past experience.
 
F-19
2

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(2)
Financial risk management, continued
 
Book values of the financial assets represent the maximum exposed amounts of the credit risk. Details of the Company’s level of maximum exposure to credit risk as of December 31, 2022 and 2023 are as follows:
 
     
2022
  
2023
 
          
     
In millions of won
 
Cash and cash equivalents
    3,234,780   4,342,887 
Financial assets at fair value through profit or loss(*1)
   3,610,408   2,590,228 
Derivative assets (trading)
   693,072   730,948 
Financial assets at fair value through other comprehensive income (debt securities)
   529   4,627 
Financial assets at amortized cost
   26,998   38,843 
Loans
   1,013,371   988,331 
Long-term/short-term financial instruments
   1,353,080   1,412,315 
Derivative assets (applying hedge accounting)
   324,952   269,446 
Trade and other receivables
   12,614,902   14,179,322 
Financial guarantee contracts(*2)
   3,776,060   4,399,189 
 
 (*1)
Equity investments held by the Company are excluded.
 
 (*2)
Maximum exposure associated with the financial guarantee contracts is the maximum amounts of the obligation.
For the year ended December 31, 2023, there are no financial assets and
non-financial
assets that were acquired through the exercise of the right of collateralized assets and reinforcement of credit arrangement.
 
 (ii)
Market risk
Market risk is the risk that the Company’s fair values of the financial instruments or future cash flows are affected by the changes in the market. Market risk consists of interest rate risk, foreign currency risk and other price risk.
 
 (iii)
Sensitivity analysis
Significant assets and liabilities with uncertainties in underlying assumptions
 
 
Defined benefit obligation
A sensitivity analysis of defined benefit obligation assuming a 1% increase and decrease movements in the actuarial valuation assumptions as of December 31, 2022 and 2023 are as follows:
 
          
2022
  
2023
 
Type
  
Accounts
      
1% Increase
  
1% Decrease
  
1% Increase
  
1% Decrease
 
                     
          
In millions of won
 
Future salary increases
  
Increase (decrease) in
defined benefit obligation
      321,930   (283,658  392,392   (361,359
Discount rate
  Increase (decrease) in defined benefit obligation     (289,229  337,033   (371,103  415,361 
Changes of employee benefits assuming a 1% increase and decrease movements in discount rate on plan asset for the years ended December 31, 2022 and 2023 are ₩27,495 million and ₩29,993 million, respectively.
 
F-19
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(2)
Financial risk management, continued
 
 
Provisions
Changes in provisions due to movements in underlying assumptions as of December 31, 2022 and 2023 are as follows:
 
Type
  
Accounts
  
2022
  
2023
 
PCBs
  Inflation rate   1.98  2.40
  Discount rate   1.92  2.12
Nuclear plants
  Inflation rate   2.25  1.91
  Discount rate   2.48  2.76
Spent fuel
  Inflation rate   2.93  1.91
  Discount rate   4.49  2.49
Radioactive waste
  Inflation rate   3.06  3.89
  Discount rate   2.62  3.65
A sensitivity analysis of provisions assuming a 0.1% increase and decrease movements in the underlying assumptions as of December 31, 2022 and 2023 are as follows:
 
 
  
 
  
 
 
  
2022
 
 
2023
 
Type
  
Accounts
  
 
 
  
0.1%p Increase
 
 
0.1%p Decrease
 
 
0.1%p Increase
 
 
0.1%p Decrease
 
 
  
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
 
  
In millions of won
 
Discount rate
  PCBs      (169  169   (123  123 
  Nuclear plants     (474,432  491,360   (418,570  432,847 
  Spent fuel     (54,330  56,453   (130,065  130,761 
  Radioactive waste     (15,089  15,260   (13,538  13,683 
Inflation rate
  PCBs     169   (169  123   (123
  Nuclear plants     515,262   (498,258  458,047   (443,531
  Spent fuel     57,269   (55,191  133,931   (128,607
  Radioactive waste     14,190   (14,056  13,291   (13,174
 
F-194

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(2)
Financial risk management, continued
 
Management judgment effected by uncertainties in underlying assumptions
 
 
Foreign currency risk
The Company undertakes transactions denominated in foreign currencies; consequently, exposures to exchange rate fluctuations arise. The carrying amounts of the Company’s foreign currency denominated monetary assets and monetary liabilities as of December 31, 2022 and 2023 are as follows:
 
  
 
Assets
 
  
 
Liabilities
 
Type
  
2022
   
2023
   
2022
   
2023
 
   
In thousands of foreign currencies
 
AED
   5,610    24,441    25,597    18,143 
AUD
   4,448    4,310    299,663    299,795 
BDT
   7,514    2,260         
BWP
   824    777         
EGP
       1,665    1,162    1,941 
CAD
   89        595     
CHF
           500,158    499,930 
CZK
           153     
EUR
   1,976    12,259    41,073    81,744 
GBP
       75    31     
HKD
           4,014,446    5,079,189 
IDR
   598,697    25,567,281    1,323,840    2,118,580 
INR
   1,592,380    1,663,705    312,978    387,947 
JOD
   1,146    569    14    68,448 
JPY
   568,263    921,120    1,719,846    8,692,604 
KZT
   1,510    1,510         
MGA
   2,856,045    3,545,076    347,403    495,288 
MMK
   199,518    199,518         
MYR
   38,177    2,805         
PHP
   68,592    98,154    7,493    6,750 
PKR
   533,816    75,206,354    219,341    55,531 
RUB
           2,881     
SAR
   1,713    937    9,710     
SEK
           449,211    452,309 
SGD
       279        2,191 
THB
           389     
USD
   1,484,614    1,701,494    13,599,643    14,458,985 
UYU
   128,674    120,768    3,106    2,028 
VND
   1,184,670    848,242    4,495     
ZAR
   43,461    87,780         
 
F-19
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(2)
Financial risk management, continued
 
A sensitivity analysis on the Company’s income for the period assuming a 10% increase and decrease in currency exchange rates as of December 31, 2022 and 2023 are as follows:
 
                     
       
2022
   
2023
 
Type
      
10% Increase
   
10% Decrease
   
10% Increase
   
10% Decrease
 
       
In millions of won
 
                     
Increase (decrease) of profit before income tax
      (1,703,053   1,703,053    (1,828,308   1,828,308 
Increase (decrease) of equity(*)
     (1,703,053   1,703,053    (1,828,308   1,828,308 
 
 (*)
The effect on the shareholders’ equity excluding the impact of income taxes.
The sensitivity analysis above is conducted for monetary assets and liabilities denominated in foreign currencies other than functional currency, without consideration of hedge effect of related derivatives, as of December 31, 2022 and 2023.
To manage its foreign currency risk related to foreign currency denominated receivables and payables, the Company has a policy to enter into currency forward agreements. In addition, to manage its foreign currency risk related to foreign currency denominated expected sales transactions and purchase transactions, the Company enters into currency forward agreements.
There is an economic relationship between the hedged item and the hedging instrument as the terms of cross-currency swap agreement is consistent with the terms of expected transaction (repayment of foreign debt securities and others). The hedging ratio is 1:1 as the risk of cross-currency swap agreement matches the hedged instrument. As of December 31, 202
3
, the hedging instrument (cross-currency swap) hedges the risk of the hedged item(repayment of foreign debt securities and others).
 
 
Interest rate risk
The Company is exposed to interest rate risk due to its borrowing with floating interest rates. A 1% increase or decrease is used when reporting interest rate risk internally to key management personnel and represents management’s assessment of the reasonably possible change in interest rates.
The Company’s borrowings and debt securities with floating interest rates as of December 31, 2022 and 2023 are as follows:
 
Type
      
2022
   
2023
 
             
       
In millions of won
 
Short-term borrowings
      3,154,972    4,435,420 
Long-term borrowings
     5,388,073    7,766,588 
Debt securities
     269,101    305,602 
    
 
 
   
 
 
 
      8,812,146    12,507,610 
    
 
 
   
 
 
 
A sensitivity analysis on the Company’s long-term borrowings and debt securities assuming a 1% increase and decrease in interest for the years ended December 31, 2022 and 2023 are as follows:
 
 
  
 
 
 
2022
 
 
2023
 
Type
  
 
 
 
1%p Increase
 
 
1%p Decrease
 
 
1%p Increase
 
 
1%p Decrease
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
In millions of won
 
Increase (decrease) of profit before income tax
     (88,121  88,121   (125,076  125,076 
Increase (decrease) of shareholder’s equity(*)
    (88,121  88,121   (125,076  125,076 
 
 (*)
The effect on the shareholders’ equity excluding the impact of income taxes.
The Company manages its interest rate risk by having a balanced portfolio of fixed and variable rate loans and borrowings. To manage this, the Company enters into interest rate swaps, in which it agrees to exchange, at specified intervals, the difference between fixed and variable rate interest amounts calculated by reference to an agreed-upon notional principal amount. The above analysis measures the interest rate risk before reflecting the hedge effect by related derivatives.
 
F-19
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(2)
Financial risk management, continued
 
 
Electricity rates risk
The Company is exposed to electricity rates risk due to changes in government regulations and policies on national power supply schemes and electricity billing rates, in consideration of the national economy.
A sensitivity analysis on the Company’s income for the period assuming a 1% increase and decrease in price of electricity for the years ended December 31, 2022 and 2023 is as follows:
 
      
2022
  
2023
 
Type
     
1% Increase
  
1% Decrease
  
1% Increase
  
1% Decrease
 
                 
      
In millions of won
 
Increase (decrease) of profit before income tax
     661,990   (661,990  829,548   (829,548
Increase (decrease) of shareholder’s equity(*)
    661,990   (661,990  829,548   (829,548
 
 (*)
The effect on the equity excluding the impact of income taxes.
 
 (iv)
Liquidity risk
The Company has established an appropriate liquidity risk management framework for the management of the Company’s short, medium and long-term funding and liquidity management requirements. The Company manages liquidity risk by continuously monitoring forecasted and actual cash flows, and by matching the maturity profiles of financial assets and liabilities.
In addition, the Company has established credit lines on its trade financing and bank overdrafts, and through payment guarantees it has received, it maintains an adequate credit (borrowing) line. In addition, the Company has the ability to utilize excess cash or long-term borrowings for major construction investments.
The expected maturities for
non-derivative
financial liabilities as of December 31, 2022 and 2023 in detail are as follows:
 
     
2022
 
Type
    
Less than

1 year
  
1~2 Years
  
2~5 Years
  
More than

5 years
  
Total
 
                   
             
             
     
In millions of won
 
Borrowings and debt securities
    26,157,747   27,367,577   47,361,676   37,115,832   138,002,832 
Lease liabilities
   639,756   657,210   1,390,374   1,925,012   4,612,352 
Trade and other payables(*1)
   11,369,512   347,563   1,008,133   734,112   13,459,320 
Financial guarantee contracts(*2)
   105,091   54,310   3,495,437   121,222   3,776,060 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    38,272,106   28,426,660   53,255,620   39,896,178   159,850,564 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
     
2023
 
Type
    
Less than

1 year
  
1~2 Years
  
2~5 Years
  
More than

5 years
  
Total
 
                   
     
In millions of won
 
Borrowings and debt securities
    50,878,929   29,046,036   42,420,850   32,778,830   155,124,645 
Lease liabilities
   641,525   588,850   1,309,996   1,694,729   4,235,100 
Trade and other payables(*1)
   8,477,209   364,443   833,394   589,004   10,264,050 
Financial guarantee contracts(*2)
   121,415   2,546,689   1,645,488   85,597   4,399,189 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    60,119,078   32,546,018   46,209,728   35,148,160   174,022,984 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 (*1)
Excludes lease liabilities.
 (*2)
This represents the total guarantee amounts associated with the financial guarantee contracts. Financial guarantee liabilities which are recognized as of December 31, 2022 and 2023 are
W
67,240 and ₩49,992 million, respectively.
 
F-19
7

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(2)
Financial risk management, continued
 
As the Company manages liquidity based on net assets and net liabilities, information about non-derivative financial assets should be included in the disclosure for better understanding of liquidity risk management.
The expected maturities for
non-derivative
financial assets as of December 31, 2022 and 2023 in detail are as follows:
 
     
2022
 
Type
    
Less than

1 year
  
1~5 Years
  
More than

5 years
  
Other (*)
  
Total
 
                   
     
In millions of won
 
Cash and cash equivalents
    3,234,780            3,234,780 
Financial assets at fair value through other comprehensive income
  
        502,829   502,829 
Financial assets at amortized cost
   16,762   10,231   5      26,998 
Loans
   132,877   411,594   502,050      1,046,521 
Long-term/short-term financial instruments
   666,758      25   686,297   1,353,080 
Financial assets at fair value through profit or loss
   3,181,791   645   3,535   523,537   3,709,508 
Trade and other receivables
   10,464,191   1,083,593   1,080,831      12,628,615 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    17,697,159   1,506,063   1,586,446   1,712,663   22,502,331 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     
2023
 
Type
    
Less than

1 year
  
1~5 Years
  
More than

5 years
  
Other (*)
  
Total
 
                   
     
In millions of won
 
Cash and cash equivalents
    4,342,887            4,342,887 
Financial assets at fair value through other comprehensive income
            502,443   502,443 
Financial assets at amortized cost
   28,905   9,938         38,843 
Loans
   139,168   465,666   411,100   8,872   1,024,806 
Long-term/short-term financial instruments
   578,578   22   23   833,692   1,412,315 
Financial assets at fair value through profit or loss
   2,054,021   1,381   6,523   649,360   2,711,285 
Trade and other receivables
   11,990,515   911,822   1,292,539   1,280   14,196,156 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
    19,134,074   1,388,829   1,710,185   1,995,647   24,228,735 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 (*)
The maturities cannot be presently determined.
 
F-19
8
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(2)
Financial risk management, continued
 
Derivative liabilities classified by maturity periods which from reporting date to maturity dates as per the contracts as of December 31, 2022 and 2023 are as follows:
 
      
2022
 
Type
     
Less than

1 year
  
1~2 Years
  
2~5 Years
  
More than

5 years
  
Total
 
                    
      
In millions of won
 
Net settlement
       
— Trading
                  
Gross settlement
       
— Trading and others
    (42,663  (15,225  (171,130  (84,924  (313,942
— Hedging
       (10,064  (5,176  (10,265  (25,505
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
     (42,663)   (25,289  (176,306)   (95,189  (339,447
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
      
2023
 
Type
     
Less than

1 year
  
1~2 Years
  
2~5 Years
  
More than

5 years
  
Total
 
                    
      
In millions of won
 
Net settlement
                  
— Trading
                  
Gross settlement
       
— Trading and others
   
 
(22,571
  (11,566  (201,590  (130,119  (365,846
— Hedging
   
 
 
  (4,680  (13,243  (5,641  (23,564
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 
  
 
(22,571
  (16,246  (214,833  (135,760  (389,410
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
Derivative assets classified by maturity periods which from reporting date to maturity dates as per the contracts as of December 31, 2022 and 2023 are as follows:
 
      
2022
 
Type
     
Less than

1 year
   
1~2
Years
   
2~5 Years
  
More than

5 years
   
Total
 
                       
      
In millions of won
 
Net settlement
          
— Trading
                     
Gross settlement
          
— Trading
    861,621    160,938    (352,657)   65,661    735,563 
— Hedging
    134,390    47,502    131,258       313,150 
   
 
 
   
 
 
   
 
 
  
 
 
   
 
 
 
     996,011    208,440    (221,399  65,661    1,048,713 
   
 
 
   
 
 
   
 
 
  
 
 
   
 
 
 
      
2023
 
Type
     
Less than

1 year
   
1~2
Years
   
2~5 Years
  
More than

5 years
   
Total
 
                       
      
In millions of won
 
Net settlement
          
— Trading
                     
Gross settlement
          
— Trading
    257,073    123,132    169,004  
 
145,728
 
   694,937 
— Hedging
    78,769    61,031    131,687  
 
 
   271,487 
   
 
 
   
 
 
   
 
 
  
 
 
   
 
 
 
     335,842    184,163    300,691   145,728    966,424 
   
 
 
   
 
 
   
 
 
  
 
 
   
 
 
 
 
F-
199

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(3)
Fair value risk
The fair value of the Company’s actively-traded financial instruments (i.e., FVTPL, FVOCI, etc.) is based on the traded market-price as of the reporting period end. The fair value of the Company’s financial assets is the amount which the asset could be exchanged for or the amount a liability could be settled for.
The fair values of financial instruments where no active market exists or where quoted prices are not otherwise available are determined by using valuation techniques. Valuation techniques include using recent arm’s length market transactions between knowledgeable, willing parties, if available, reference to the current fair value of another instrument that is substantially the same, discounted cash flow analysis and option pricing models. If there is a valuation technique commonly used by market participants to price the instrument and that technique has been demonstrated to provide reliable estimates of prices obtained in actual market transactions, the Company uses that technique.
For trade receivables and payables, the Company considers the carrying value net of impairment as fair value. While for disclosure purposes, the fair value of financial liabilities is estimated by discounting the future contractual cash flows based on current market interest rates applied to similar financial instruments.
 
 (i)
Fair value and book value of financial assets and liabilities as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
Type
      
Book value
   
Fair value
   
Book value
   
Fair value
 
       
In millions of won
 
Assets recognized at fair value
          
Financial assets at fair value through other comprehensive income
  
 
  
 
502,829
 
  
 
502,829
 
   502,443    502,443 
Derivative assets (trading)
    
 
693,072
 
  
 
693,072
 
   730,948    730,948 
Derivative assets (hedge designated)
    
 
324,952
 
  
 
324,952
 
   269,446    269,446 
Financial assets at fair value through profit or loss
    
 
3,709,508
 
  
 
3,709,508
 
   2,711,285    2,711,285 
    
 
 
   
 
 
   
 
 
   
 
 
 
      5,230,361    5,230,361    4,214,122    4,214,122 
    
 
 
   
 
 
   
 
 
   
 
 
 
Assets carried at amortized cost
          
Financial assets at amortized cost
  
 
  
 
26,998
 
  
 
26,998
 
   38,843    38,843 
Loans and receivables
    
 
1,013,371
 
  
 
1,013,371
 
   988,331    988,331 
Trade and other receivables
    
 
12,614,902
 
  
 
12,614,902
 
   14,179,322    14,179,322 
Long-term financial instruments
    
 
686,322
 
  
 
686,322
 
   833,737    833,737 
Short-term financial instruments
    
 
666,758
 
  
 
666,758
 
   578,578    578,578 
Cash and cash equivalents
    
 
3,234,780
 
  
 
3,234,780
 
   4,342,887    4,342,887 
    
 
 
   
 
 
   
 
 
   
 
 
 
  
 
  
 
18,243,131
 
  
 
18,243,131
 
   20,961,698    20,961,698 
    
 
 
   
 
 
   
 
 
   
 
 
 
Liabilities recognized at fair value
          
Derivative liabilities (trading)
  
 
  
 
407,246
 
  
 
407,246
 
   428,670    428,670 
Derivative liabilities (hedge designated)
    
 
25,505
 
  
 
25,505
 
   23,564    23,564 
    
 
 
   
 
 
   
 
 
   
 
 
 
      432,751    432,751    452,234    452,234 
    
 
 
   
 
 
   
 
 
   
 
 
 
Liabilities carried at amortized cost
          
Secured borrowings
  
 
  
 
102,368
 
  
 
102,368
 
   773,646    773,646 
Unsecured bond
    
 
105,185,189
 
  
 
96,846,056
 
   113,792,178    111,218,771 
Lease liabilities
    
 
4,163,143
 
  
 
4,163,143
 
   3,807,880    3,807,880 
Unsecured borrowings
    
 
15,282,193
 
  
 
15,280,693
 
   19,062,162    19,061,348 
Trade and other payables(*)
    
 
13,459,320
 
  
 
13,459,320
 
   10,264,050    10,264,050 
Bank overdraft
    
 
35,615
 
  
 
35,615
 
   3,844    3,844 
    
 
 
   
 
 
   
 
 
   
 
 
 
      138,227,828    129,887,195    147,703,760    145,129,539 
    
 
 
   
 
 
   
 
 
   
 
 
 
 
 (*)
Excludes lease liabilities.
 
F-20
0
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(3)
Fair value risk, continued
 
 (ii)
Interest rates used for determining fair value
The interest rates used to discount estimated cash flows, when applicable, are based on the government yield curve at the reporting date plus an adequate credit spread.
The discount rates used for calculating fair value as of December 31, 2022 and 2023 are as follows:
 
Type
  
2022
   
2023
 
Derivatives
   0.60% ~ 7.93%    0.93%~10.36% 
Borrowings and debt securities
   0.75% ~ 5.84%    0.96%~5.84% 
Finance lease
   0.00% ~ 17.08%    0.00%~17.03% 
 
 (iii)
Fair value hierarchy
The following table provides an analysis of financial instruments that are measured subsequent to initial recognition at fair value, classified as Level 1, 2 or 3, based on the degree to which the fair value is observable.
Level 1: Unadjusted quoted prices in active markets for identical assets or liabilities;
Level 2: Inputs other than quoted prices that are observable for the asset or liability either directly or indirectly; and
Level 3: Inputs that are not based on observable market data.
Fair values of financial instruments by hierarchy level as of December 31, 2022 and 2023 are as follows:
 
       
2022
 
Type
      
Level 1
   
Level 2
   
Level 3
   
Total
 
                     
       
In millions of won
 
Financial assets at fair value
          
Financial assets at fair value through other comprehensive income
      300,057        202,772    502,829 
Derivative assets
         1,018,024        1,018,024 
Financial assets at fair value through profit or loss
         3,703,179    6,329    3,709,508 
    
 
 
   
 
 
   
 
 
   
 
 
 
      300,057    4,721,203    209,101    5,230,361 
    
 
 
   
 
 
   
 
 
   
 
 
 
Financial liabilities at fair value
          
Derivative liabilities
          432,751        432,751 
       
2023
 
Type
      
Level 1
   
Level 2
   
Level 3
   
Total
 
                     
    
 
In millions of won
 
Financial assets at fair value
          
Financial assets at fair value through other comprehensive income
  
 
  
 
285,054
 
  
 
 
  
 
217,389
 
   502,443 
Derivative assets
    
 
 
  
 
1,000,394
 
  
 
 
   1,000,394 
Financial assets at fair value through profit or loss
    
 
 
  
 
2,704,550
 
  
 
6,735
 
   2,711,285 
    
 
 
   
 
 
   
 
 
   
 
 
 
      285,054    3,704,944    224,124    4,214,122 
    
 
 
   
 
 
   
 
 
   
 
 
 
Financial liabilities at fair value
          
Derivative liabilities
          452,234        452,234 
 
F-20
1

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
45.
Risk Management, Continued
 
(3)
Fair value risk, continued
 
The fair value of financial assets traded in the market (including those measured at FVTPL and FVOCI) is measured at the closing bid price quoted at the end of the reporting period. Meanwhile, the fair value of unmarketable financial assets (including those measured at FVTPL and FVOCI) is calculated using the fair value measurement performed by external pricing service agents. In addition, the Company considered the major economic indicators and economic environment of the derivatives to be evaluated, and measured the fair value of the derivatives using a discounted cash flow model that reflects the Company’s credit risk.
Changes of financial assets and liabilities which are classified as level 3 for the years ended December 31, 2022 and 2023 are as follows:
 
     
2022
 
     
Beginning
balance
  
Acquisitions
  
Reclassified
category
  
Valuation
  
Disposal
  
Foreign
currency
translation
and others
  
Ending
balance
 
     
In millions of won
 
Financial assets at fair value
        
Financial assets at fair value through profit or loss Cooperative
    5,797   400      132         6,329 
Financial assets at fair value through other comprehensive income
        
Unlisted securities
   160,790   9,451      33,237      (1,235  202,243 
Debt securities
   491         38         529 
     
2023
 
     
Beginning
balance
  
Acquisitions
  
Reclassified
category
  
Valuation
  
Disposal
  
Foreign
currency
translation
and others
  
Ending
balance
 
     
In millions of won
 
Financial assets at fair value
        
Financial assets at fair value through profit or loss Cooperative
    6,329      270   136         6,735 
Financial assets at fair value through other comprehensive income
        
Unlisted securities
   202,243   9,550      5,445   (5,332)   856   212,762 
Debt securities
   529   4,080      18         4,627 
 
46.
Service Concession Arrangements
 
(1)
Hydroelectric Power Generation at Semangka, Indonesia (BOT)
 
 (i)
Significant terms and concession period of the arrangement
Regarding Semangka hydroelectric power-generation business (BOT) in Indonesia, the Company has entered into a contract with PT. Perusahaan Listrik Negara (the “PT PLN”) whereby the Company shall provide electricity generated for about 30 years (2018 – 2048) after subsequent to the completion of plant construction and shall receive charge tariff rates designed to recover capital cost, fixed O&M cost, water usage cost, variable O&M cost and special facilities cost during the concession period.
 
 (ii)
Rights and classification of the arrangement
The Company has the rights to use and own the power plant during the concession period from 2018 to 2048. At the end of the concession period, PT PLN has an option to take over the ownership of the power plant from the Company.
 
F-20
2

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
46.
Service Concession Arrangements, Continued
 
 (iii)
Classification method
This project allows PT PLN to acquire ownership of the plant after the end of the 30 years contract period.
 
 (iv)
The Company’s expected future collections of service concession arrangements as of December 31, 2023 are as follows:
 
Type
      
Amounts
 
       
In millions of won
 
Less than 1 year
      32,354 
1 ~ 2 years
     32,281 
2 ~ 3 years
     32,321 
Over 3 years
     525,642 
    
 
 
 
      622,598 
    
 
 
 
 
(2)
CPPAg Power Generation
 
 (i)
Significant terms and concession period of the arrangement
The Company has entered into a contract with CPPAg(The Central Power Purchasing Agency Guarantee Limited) whereby the Company shall provide electricity generated for approximately 30 years (2020 – 2050) subsequent to the completion of plant construction and shall receive charge tariff rates designed to recover capital cost, variable O&M cost, fixed O&M cost, water usage cost, insurance cost and others during the concession period.
 
 (ii)
Rights and classification of the arrangement
The Company has the rights to use and own the power plant during the concession period from 2020 to 2050. The Government of Pakistan has an option to take over the ownership of the power plant from the Company after the concession period has elapsed.
 
 (iii)
Classification method
This project allows the Government of Pakistan to acquire ownership of the plant after the end of the contract period.
 
 (iv)
The Company’s expected future collections of service concession arrangements as of December 31, 2023 are as follows:
 
Type
      
Amounts
 
       
In millions of won
 
Less than 1 year
      75,717 
1 ~ 2 years
     75,717 
2 ~ 3 years
     75,717 
Over 3 years
     893,254 
    
 
 
 
      1,120,405 
    
 
 
 
 
F-20
3

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties
 
(1)
Related parties of the Company as of December 31, 2023 are as follows:
 
Type
  
Related party
Parent
  Republic of Korea government
Subsidiaries
(166 subsidiaries)
  Korea Hydro & Nuclear Power Co., Ltd., Korea South-East Power Co., Ltd., Korea Midland Power Co., Ltd., Korea Western Power Co., Ltd., Korea Southern Power Co., Ltd., Korea East-West Power Co., Ltd., KEPCO Engineering & Construction Company, Inc., KEPCO Plant Service & Engineering Co., Ltd., KEPCO Nuclear Fuel Co., Ltd., KEPCO KDN Co., Ltd., Gyeonggi Green Energy Co., Ltd., Korea Offshore Wind Power Co., Ltd., KOSEP Material Co., Ltd., KEPCO International HongKong Ltd., KEPCO International Philippines Inc., KEPCO Philippines Corporation, KEPCO Ilijan Corporation, KEPCO Gansu International Ltd., KEPCO Philippines Holdings Inc., KEPCO Neimenggu International Ltd., KEPCO Australia Pty., Ltd., KEPCO Shanxi International Ltd., KOMIPO Global Pte Ltd., KOSEP Australia Pty., Ltd., KOMIPO Australia Pty., Ltd., KOWEPO Australia Pty., Ltd., KOSPO Australia Pty., Ltd., KEPCO Netherlands B.V., KEPCO Middle East Holding Company, Qatrana Electric Power Company, KOWEPO International Corporation, KOSPO Jordan LLC, Korea Waterbury Uranium Limited Partnership, PT. Cirebon Power Service, EWP America Inc., KHNP Canada Energy Ltd., KEPCO Bylong Australia Pty., Ltd., KNF Canada Energy Limited, KEPCO Holdings de Mexico, KST Electric Power Company, S.A.P.I. de C.V., KEPCO Energy Service Company, KEPCO Netherlands S3 B.V., PT. KOMIPO Pembangkitan Jawa Bali, EWP Barbados 1 SRL, PT. Tanggamus Electric Power, KOMIPO America Inc., PT. EWP Indonesia, KEPCO Netherlands J3 B.V., Global One Pioneer B.V., Global Energy Pioneer B.V., Mira Power Limited, KEPCO KPS Philippines Corp., KOSPO Chile SpA, PT. KOWEPO Sumsel Operation And Maintenance Services, Commerce and Industry Energy Co., Ltd., Gyeongju Wind Power Co., Ltd., California Power Holdings, LLC, EWP Renewable Corporation, Hee Mang Sunlight Power Co., Ltd., Fujeij Wind Power Company, KOSPO Youngnam Power Co., Ltd., Chitose Solar Power Plant LLC., KEPCO Solar Co., Ltd., KEPCO Energy Solution Co., Ltd., KOSPO Power Services Ltda., KOEN Bylong Pty., Ltd., KOWEPO Bylong Pty., Ltd., KOSPO Bylong Pty., Ltd., EWP Bylong Pty., Ltd., KOWEPO Lao International, KOMIPO Bylong Pty., Ltd., Energy New Industry Specialized Investment Private Investment Trust., KEPCO Mangilao Holdings LLC, Mangilao Investment LLC, KEPCO Mangilao Solar, LLC, Jeju Hanlim Offshore Wind Co., Ltd., PT. Siborpa Eco Power,
e-New
Industry LB Fund 1, Songhyun
e-New
Industry Fund, BSK
E-New
Industry Fund VII, PT. Korea Energy Indonesia, KOLAT SpA, KEPCO California, LLC, KEPCO Mojave Holdings, LLC, Incheon Fuel Cell Co., Ltd., KOEN Service Co., Ltd., KOMIPO Service Co., Ltd., KOWEPO Service Co., Ltd., KOSPO Service Co., Ltd., EWP Service Co., Ltd., PT. KOMIPO Energy Indonesia, KNF Partners Co., Ltd., KOSPO USA Inc., Nambu USA LLC, Tamra Offshore Wind Power Co., Ltd., KEPCO MCS Co., Ltd., KEPCO FMS Co., Ltd., Firstkeepers Co., Ltd., Secutec Co., Ltd., SE Green Energy Co., Ltd., Mangilao Intermediate Holdings LLC, KEPCO CSC Co., Ltd., KOAK Power Limited, KOMIPO Europe B.V., Haenanum Energy Fund, Paju Ecoenergy Co., Ltd., Guam Ukudu Power LLC,
K-SOLAR
SHINAN Co., Ltd., KPS Partners Co., Ltd., KEPCO E&C Service Co., Ltd., Moha solar Co., Ltd., KHNP USA LLC, KOMIPO Vanphong Power Service LLC, Ogiri Solar Power Co., Ltd., BSK
E-New
Industry Fund X, Energy Innovation Fund I, KHNP Chile SpA, Yeong Yang Apollon Photovoltaic Co., Ltd., Yeong Yang Corporation Co., Ltd., SolarVader Co., Ltd., Yeong Yang Innovation Co., Ltd., Yeong Yang Horus Photovoltaic Co., Ltd., Yeong Yang Solar Management Co., Ltd., LSG Hydro Power Limited, KOEN Bio Co., Ltd., KOMIPO Energy Solution America, LLC, Elara Investment Holdings, LLC, Elara Equity Holdings, LLC, Elara Class B Holdings, LLC, Elara Class B Member, LLC, Elara Development Holdings, LLC, KOMIPO Development, LLC, Elara Energy Holdings, LLC, Elara Energy Project, LLC, KOMIPO Iberian Solar Group, S.L.U., KOWEPO Europe B.V., CVS Equity Holdings, LLC, CVS Class B Holdings, LLC, CVS Development Holdings, LLC, CVS Development, LLC, CVS Class B Member, LLC, CVS Energy Holdings, LLC, Concho Valley Energy, LLC, Concho Valley Solar, LLC, Jeongam Wind Power Co., Ltd., Yeongdeok Sunrise Wind Power Co., Ltd., UI Carbon-Neutrality Fund, KA Power Limited, Western Power Changgi Solar Co., Ltd., Digital Innovation Growth Fund, EWP Australia Pty., Ltd., Columboola Solar Farm Hold Co Pty., Ltd., J Wind First, LLC, KEPCO Holding Company, KEPCO for Maintenance Company, KOSPO Trumbull LLC, Changjuk Wind Power Co., Ltd., KEPCO KPS South Africa Pty., Ltd., Chile Solar JV SpA, KOWEPO Holding Limited, Columboola Solar Farm Nominees Pty., Ltd., Columboola Solar Farm Op Trust, Columboola Solar Farm Fin Co Pty., Ltd., Magna Energy New Industrial Fund, EWP ESS Holdings, LLC, Fairhaven ESS LLC
 
F-20
4

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(1)
Related parties of the Company as of December 31, 2023 are as follows, continued:
 
Type
  
Related party
Associates
(99 associates)
  
Dongducheon Dream Power Co., Ltd., Korea Gas Corporation, Daegu Photovoltaic Co., Ltd., Haeng Bok Do Si Photovoltaic Power Co., Ltd., Korea Electric Power Industrial Development Co., Ltd., Goseong Green Power Co., Ltd., Gangneung Eco Power Co., Ltd., Shin Pyeongtaek Power Co., Ltd., Noeul Green Energy Co., Ltd., YTN Co., Ltd., Samcheok Eco Materials Co., Ltd., Gangwon Wind Power Co., Ltd., Gwangyang Green Energy Co., Ltd., Hyundai Green Power Co., Ltd., Korea Power Exchange, Taebaek Guinemi Wind Power Co., Ltd., Daeryun Power Co., Ltd., KNH Solar Co., Ltd., S-Power Co., Ltd., SPC Power Corporation, Gemeng International Energy Co., Ltd., PT. Cirebon Electric Power, KNOC Nigerian East Oil Co., Ltd., KNOC Nigerian West Oil Co., Ltd., PT Wampu Electric Power, PT. Bayan Resources TBK, Nepal Water & Energy Development Company Private Limited, Pioneer Gas Power Limited, Xe-Pian Xe-Namnoy Power Co., Ltd., PT. Mutiara Jawa, Jinbhuvish Power Generation Pvt. Ltd., Daejung Offshore Wind Power Co., Ltd., GS Donghae Electric Power Co., Ltd., Busan Green Energy Co., Ltd., Hansuwon KNP Co., Ltd., Korea Electric Power Corporation Fund, Energy Infra Asset Management Co., Ltd., Daegu clean Energy Co., Ltd., Yaksu ESS Co., Ltd., PND Solar Co., Ltd., Hyundai Eco Energy Co., Ltd., YeongGwang Yaksu Wind Electric Co., Ltd., Green Energy Electricity Generation Co., Ltd., Korea Energy Solutions Co., Ltd., ITR Co., Ltd., STN Co., Ltd. (formerly, Structure test network Co., Ltd.), Indeck Niles Development, LLC, Indeck Niles Asset Management, LLC, Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1, Suwon New Power Co., Ltd., Gwangbaek Solar Power Investment Co., Ltd., Go deok Clean Energy Co., Ltd., SureDataLab Co., Ltd., SEP Co., Ltd., Hankook Electric Power Information Co., Ltd., Tronix Co., Ltd., O2&B Global Co., Ltd., Muan Sunshine Solar Power Plant Co., Ltd., Bigeum Resident Photovoltaic Power Co., Ltd., Goesan Solar park Co., Ltd., Saemangeum Heemang Photovoltaic Co., Ltd., Bitgoel Eco Energy Co., Ltd., Jeju Gimnyeong Wind Power Co., Ltd., Seoroseoro Sunny Power Plant Co., Ltd., Muan Solar Park Co., Ltd., YuDang Solar Co., Ltd., Anjwa Smart Farm & Solar City Co., Ltd., KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.), G.GURU Co., Ltd., UD4M Co., Ltd., Dongbu Highway Solar Co., Ltd., Seobu Highway Solar Co., Ltd., Korea Energy Data Co., Ltd., Gangneung Sacheon Fuel Cell Co., Ltd., Kosture Co., Ltd., Taebaek Gadeoksan Wind Power Co., Ltd., Chuncheon Green Energy Co., Ltd., Yeomsubong Wind Power Co., Ltd., Yeongyang Wind Power Corporation II, Haeparang Energy Co., Ltd., Saemangeum Sebit Power Plant Co., Ltd., Boulder Solar III, LLC, PlatformN. Co., Ltd., PT. Cirebon Energi Prasarana, Future Convergence Technology Laboratory. Co., Ltd., ECO Motion Co., Ltd. (formerly, SC E&G Co., Ltd.), REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co., Ltd.), ACE, Co., Ltd., Environment and Energy Co., Ltd., Green Radiation Co., Ltd., Santiago Solar Power SpA, Yanggu Floating Photovoltaic Power Plant Inc., Changwon SG energy Co., Ltd., Donpyung Technology. Co., Ltd., Power Embedded, HORANG ENERGY Inc., Hoenggye Renewable Energy Co., Ltd., Haman Green Energy Co., Ltd., Songsan Green Energy Co., Ltd.
Joint ventures (111 joint ventures)
  
Daegu Green Power Co., Ltd., KEPCO SPC Power Corporation, KAPES, Inc., Honam Wind Power Co., Ltd., Korea Power Engineering Service Co., Ltd., Seokmun Energy Co., Ltd., Incheon New Power Co., Ltd., Chun-cheon Energy Co., Ltd., Yeonggwangbaeksu Wind Power Co., Ltd., KW Nuclear Components Co., Ltd., Busan Shinho Solar Power Co., Ltd., Global Trade Of Power System Co., Ltd., Expressway Solar-light Power Generation Co., Ltd., Gansu Datang Yumen Wind Power Co., Ltd., Datang Chifeng Renewable Power Co., Ltd., Rabigh Electricity Company, Rabigh Operation & Maintenance Company Limited, Datang KEPCO Chaoyang Renewable Power Co., Ltd., Shuweihat Asia Power Investment B.V., Shuweihat Asia Operation & Maintenance Company, Waterbury Lake Uranium L.P., ASM-BG Investicii AD, RES Technology AD, Jamaica Public Service Company Limited, KV Holdings, Inc., Amman Asia Electric Power Company, Kelar S.A., PT. Tanjung Power Indonesia, Nghi Son 2 Power LLC, Daehan Wind Power PSC, MOMENTUM, Barakah One Company, Nawah Energy Company, Yeonggwang Wind Power Co., Ltd., Chester Solar IV SpA, Chester Solar V SpA, Diego de Almagro Solar SpA, South Jamaica Power Company Limited, Daesan Green Energy Co., Ltd., RE Holiday Holdings LLC, RE Pioneer Holdings LLC, RE Barren Ridge 1 Holdings LLC, RE Astoria 2 LandCo LLC, RE Barren Ridge LandCo LLC, Laurel SpA, KIAMCO KOWEPO Bannerton Hold Co Pty Ltd, Cheong-Song Noraesan Wind Power Co., Ltd., Chester Solar I SpA, Solar Philippines Calatagan Corporation, Saemangeum Solar Power Co., Ltd., Chungsongmeon BongSan wind power Co., Ltd., Jaeun Resident Wind Power Plant Co., Ltd., DE Energia SpA, Dangjin Eco Power Co., Ltd., Haemodum Solar Co., Ltd., Yangyang Wind Power Co., Ltd., Horus Solar, S.A. de C.V., Recursos Solares PV de Mexico II, S.A. de C.V., Sunmex Renovables, S.A. de C.V., Stavro Holding II A.B., Solaseado Solar Power Co., Ltd., Yeongam Solar Power Co., Ltd., Samsu Wind Power Co., Ltd., Pulau Indah Power Plant Sdn. Bhd., NH-Amundi Global Infrastructure Investment Private Investment Trust 21, Shin-han BNPP Private Investment Trust for East-West Sunlight Dream, PT Barito Wahana Tenaga, Cheongna Energy Co., Ltd., Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.), OneEnergy Asia Limited, KAS INVESTMENT I LLC, KAS INVESTMENT II LLC, Energyco Co., Ltd., CAES, LLC, Hapcheon Floating Photovoltaic Power Plant Inc., Busan Industrial Solar Power Co., Ltd., Bitsolar Energy Co., Ltd., Naepo Green Energy Co., Ltd., Pulau Indah O&M Sdn. Bhd., Guadalupe Solar SpA, Omisan Wind Power Co., Ltd., Foresight Iberian Solar Group Holding, S.L., Yeongwol Eco Wind Co., Ltd., Gurae Resident Power Co., Ltd., Cheongju Eco Park Co., Ltd., Prime Swedish Holding AB, Enel X Midland Photovoltaic, LLC, Geumsungsan Wind Power Co., Ltd., KEPCO KPS CARABAO Corp., Goheung New Energy Co., Ltd., Gunsan Land Solar Co., Ltd., CapMan Lynx SCA, SICAR, International Offshore Power Transmission Holding Company Limited, Eumseong Eco Park Co., Ltd., Changwon Nu-ri Energy Co., Ltd., PungBack Wind Farm Corporation, Seobusambo highway photovoltaics Co., Ltd., Seungmun Green Energy, Pyeongchang Wind Power Co., Ltd., Trumbull Asset Management, LLC, S-Power Chile SpA, Taebaek Wind Power Co., Ltd., Yangyang Suri Wind Power Co., Ltd., KEPCO for Power Company, Jeonju Bio Green Energy Co., Ltd., Kumyang Eco Park Co., Ltd., Jeongeup Green Power Co., Ltd., Hadong E-factory Co., Ltd., Namyangju Combined Heat and Power Co., Ltd., Wadi Noor Solar Power Company SAOC, Fairhaven Energy Storage LLC 
Others (2 others)
  Korea Development Bank, KEPCO Lebanon SARL
 
F-20
5

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
 
(2)
Transactions between the Company and its subsidiaries are eliminated during the consolidation and are not disclosed in notes.
 
(3)
Related party transactions for the years ended December 31, 2021, 2022 and 2023 are as follows:
<Sales and Others>
 
          
Sales and others
 
Company name
  
Transaction type
      
2021
   
2022
   
2023
 
          
In millions of won
 
<Associates>
                   
Korea Gas Corporation
  Electricity sales      96,362    155,309    140,630 
Goseong Green Power Co., Ltd.
  Electricity sales     514,470    1,062,108    842,270 
Dongducheon Dream Power Co., Ltd.
  Electricity sales     19,923    8,942    16,138 
Saemangeum Sebit Power Plant Co., Ltd.
  Electricity sales         1,418    2,313 
Daejung Offshore Wind Power Co., Ltd.
  Electricity sales     46    46    84 
Daegu Photovoltaic Co., Ltd.
  Electricity sales     207    268    408 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
  
Electricity sales
     2    2    3 
Korea Electric Power Industrial Development Co., Ltd.
  
Service
     11,208    10,369    11,115 
Gangneung Eco Power Co., Ltd.
  Fuel sales     14,200    459,404    943,063 
Shin Pyeongtaek Power Co., Ltd.
  Electricity sales     23,501    27,486    91,830 
Noeul Green Energy Co., Ltd.
  Electricity sales     30    9,396    8,431 
Samcheok Eco Materials Co., Ltd.
  Electricity sales     620    546    615 
YTN Co., Ltd.
  Electricity sales     1,922    2,180    2,908 
Busan Green Energy Co., Ltd.
  Electricity sales     49    5,055    10,733 
Gunsan Bio Energy Co., Ltd.
  Electricity sales     20         
Korea Electric Vehicle Charging Service (*5)
  Electricity sales     3,039    3,686     
Energy Infra Asset Management Co., Ltd.
  Electricity sales     4,629        89 
Gangwon Wind Power Co., Ltd.
  Electricity sales     1,865    1,549    2,464 
Gwangyang Green Energy Co., Ltd.
  Electricity sales     486    1,848    1,492 
Bigeum Resident Photovoltaic Power Co., Ltd.
  Electricity sales     755    660    888 
Hyundai Green Power Co., Ltd.
  Electricity sales
and design
service
     11,934    7,063    6,668 
Korea Power Exchange
  
Service
     39,796    16,596    52,262 
Taebaek Wind Power Co., Ltd. (*1)
  
Service
     44    861     
Taebaek Guinemi Wind Power Co., Ltd.
  
Electricity sales
     26         
Pyeongchang Wind Power Co., Ltd.
  
Electricity sales
     1,180    1,323     
Daeryun Power Co., Ltd.
  
Electricity sales
     1,944    2,016    3,187 
Changjuk Wind Power Co., Ltd. (*4)
  
Electricity sales
     463    1,350     
GS Donghae Electric Power Co., Ltd.
  
Electricity sales
     21,127    5,238    28,164 
KNH Solar Co., Ltd.
  
Electricity sales
     14    13    15 
S-Power Co., Ltd.
  
Service
     5,229    4,588    4,965 
Chuncheon Green Energy Co., Ltd.
  
Electricity sales
         2    82 
Yeongyang Wind Power Corporation II
  
Commission
             150 
PND Solar Co., Ltd.
  
Electricity sales
     416    427    547 
Hyundai Eco Energy Co., Ltd.
  
Electricity sales
     187    277    1,236 
YeongGwang Yaksu Wind Electric Co., Ltd.
  
Electricity sales
     78    66    96 
Taebaek Gadeoksan Wind Power Co., Ltd.
  
Electricity sales
     295    1,952    3,998 
Korea Energy Solutions Co., Ltd.
  
Electricity sales
     2    2    2 
ITR Co., Ltd.
  
Service
     3    6    3 
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
  
Service
     5    7     
Namjeongsusang Solar Power Operation Co., Ltd. (*3)
 
Electricity sales
 
 
 
 
 
 
 
22
 
 
 
21
 
 
 
31
 
 
F-20
6

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(3)
Related party transactions for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
<Sales and Others>, continued

           
Sales and others
 
Company name
  
Transaction type
       
2021
   
2022
   
2023
 
           
In millions of won
 
<Associates>
                    
Hanwha Corporation-linked Sunlight Power Special Private Equity Investment Trust No. 1
   
Service
       399    394    405 
Bitgoel Eco Energy Co., Ltd.
   
Electricity sales
      282    1,397    1,581 
Jeju Gimnyeong Wind Power Co., Ltd.
   
Electricity sales
          367    315 
Seoroseoro Sunny Power Plant Co., Ltd.
   
Electricity sales
          1    2 
Muan Solar park Co., Ltd.
   
Electricity sales
      232    950    3,083 
YuDang Solar Co., Ltd.
   
Electricity sales
          160    100 
Anjwa Smart Farm & Solar City Co., Ltd.
   
Electricity sales
      624    1,068    2,479 
KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
   
Electricity sales
      155    185    163 
Saemangeum Heemang Photovoltaic Co., Ltd.
   
Electricity sales
      13    5,740    3,538 
UD4M Co., Ltd.
   
Electricity sales
      4    2    3 
Dongbu Highway Solar Co., Ltd.
   
Electricity sales
      5    8    11 
Seobu Highway Solar Co., Ltd.
   
Electricity sales
      8    8    12 
Santiago Solar Power SpA
   
Dividends income
              586 
Gwangbaek Solar Power Investment Co., Ltd.
   
Electricity sales
              644 
Go deok Clean Energy Co., Ltd.
   
Electricity sales
              4,685 
SureDataLab Co., Ltd.
   
Electricity sales
      1    1    1 
Suwon New Power Co., Ltd.
   
Electricity sales
      1,820    118    91 
Hankook Electric Power Information Co., Ltd.
   
Electricity sales
      1         
Kosture Co., Ltd.
   
Electricity sales
      1    5     
PlatformN. Co., Ltd.
   
Others
          14    16 
Muan Sunshine Solar Power Plant Co., Ltd.
 
 
Electricity sales
 
 
 
 
 
 
 
52
 
 
 
17
 
 
 
403
 
Gangneung Sacheon Fuel Cell Co., Ltd.
 
 
Electricity sales
 
 
 
 
 
 
 
 
 
 
151
 
 
 
133
 
11 Associates (Overseas)
 
 
Electricity sales
 
 
 
 
 
 
 
125,723
 
 
 
548,507
 
 
 
385,605
 
<Joint ventures>
          
Seobusambo highway photovoltaics Co., Ltd.
   
Electricity sales
          3    16 
Yangyang Suri Wind Power Co., Ltd.
   
Electricity sales
              169 
Naepo Green Energy Co., Ltd.
   
Electricity sales
      467    761    3,462 
Cheongna Energy Co., Ltd.
   
Others
      16,469    39,802    32,835 
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
   
Service
      8,159    7,761    2,110 
Daegu Green Power Co., Ltd.
   
Electricity sales
      1,053    1,190    1,694 
Prime Swedish Holding AB
   
Electricity sales
          284    292 
KAPES, Inc.
   
Commission
      413    450    1,604 
Honam Wind Power Co., Ltd.
   
Electricity sales
      71    242    610 
Jeongam Wind Power Co., Ltd
   
Electricity sales
and others
      588         
Korea Power Engineering Service Co., Ltd.
   
Service
      339    268    159 
Seokmun Energy Co., Ltd.
   
Service
     1,701    1,685    1,792 
Incheon New Power Co., Ltd.
 
 
Construction
revenue
 
 
 
 
 
 
 
 
14
 
 
 
 
14
 
 
 
 
458
 
 
F-207

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(3)
Related party transactions for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
<Sales and Others>, continued
 

 
  
 
  
 
 
  
Sales and others
 
Company name
  
Transaction type
  
 
 
  
2021
 
  
2022
 
  
2023
 
 
  
 
  
 
 
  
In millions of won
 
<Joint ventures>
  
 
  
 
 
  
 
 
  
 
 
  
 
 
Chun-cheon Energy Co., Ltd.
 
Electricity sales
 
 
 
 
 
2,329
 
 
 
2,505
 
 
 
2,976
 
Yeonggwangbaeksu Wind Power Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
1,836
 
 
 
1,898
 
 
 
1,962
 
Yeonggwang Wind Power Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
818
 
 
 
871
 
 
 
3,607
 
Western Power Changgi Solar Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
1,920
 
 
 
 
 
 
 
NH-Amundi
Global Infrastructure Investment Private Investment Trust 21
 
Service
 
 
 
 
 
 
1,727
 
 
 
1,415
 
 
 
1,568
 
KW Nuclear Components Co., Ltd.
 
Service
 
 
 
 
 
 
2,598
 
 
 
1,624
 
 
 
1,612
 
Taebaek Wind Power Co., Ltd. (*1)
 
Others
 
 
 
 
 
 
 
 
 
 
 
 
2,864
 
Pyeongchang Wind Power Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
 
 
 
 
 
 
2,087
 
KEPCO-Uhde Inc. (*2)
 
Electricity sales
   
 
 10    12     
Busan Shinho Solar Power Co., Ltd.
 
Electricity sales
  
 
 376    502    1,205 
Expressway Solar-light Power Generation Co., Ltd.
 
Electricity sales
  
 
         43 
Goheung New Energy Co., Ltd.
 
Electricity sales
  
 
     141    3,214 
Gunsan Land Solar Co., Ltd.
 
Electricity sales
  
 
     518    809 
Daesan Green Energy Co., Ltd.
 
Electricity sales
   
 
  523    394    760 
Cheong-Song Noraesan Wind Power Co., Ltd.
 
Electricity sales
  
 
 30    698    901 
Chungsongmeon BongSan wind power Co., Ltd.
 
Electricity sales
  
 
 1    1    1 
Saemangeum Solar Power Co., Ltd.
 
Service
  
 
 1,141    100     
Dangjin Eco Power Co., Ltd.
 
Electricity sales
  
 
 32    32    40 
Yangyang Wind Power Co., Ltd.
 
Electricity sales
  
 
         13 
Energyco Co., Ltd.
 
Electricity sales
  
 
 1    463    457 
Hapcheon Floating Photovoltaic Power Plant Inc.
 
Electricity sales
  
 
     544    88 
Busan Industrial Solar Power Co., Ltd.
 
Electricity sales
  
 
 9    14    22 
Bitsolar Energy Co., Ltd.
 
Electricity sales
  
 
 296    498    357 
Omisan Wind Power Co., Ltd.
 
Electricity sales
  
 
 1    1    26 
S-Power Chile SpA
 
Interest income
  
 
         20 
Haemodum Solar Co., Ltd.
 
Electricity sales
  
 
 6    42    431 
Yeongam Solar Power Co., Ltd.
 
Electricity sales
  
 
 339    379    1,131 
Samsu Wind Power Co., Ltd.
 
Electricity sales
  
 
         514 
Solaseado Solar Power Co., Ltd.
 
Electricity sales
  
 
 2,890    1,851    1,876 
Yeongwol Eco Wind Co., Ltd.
 
Electricity sales
  
 
         102 
Gurae Resident Power Co., Ltd.
 
Electricity sales
  
 
         8 
Cheongju Eco Park Co., Ltd.
 
Electricity sales
  
 
     204    6,397 
Enel X Midland Photovoltaic, LLC
 
Electricity sales
  
 
     12    11 
Eumseong Eco Park Co., Ltd.
 
Electricity sales
  
 
     2    19 
Geumsungsan Wind Power Co., Ltd.
 
Electricity sales
  
 
     7    68 
41 Joint ventures (Overseas)
 
Electricity sales
  
 
 773,291    606,513    746,989 
<Others>
  
 
    
Korea Development Bank
 Electricity sales  
 
 4,177    4,134    5,467 
 Interest income  
 
 756    2,222    5,930 

F-20
8

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related
Parties
, Continued
 
(3)
Related party transactions for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
 
<Purchase and Others>
 
 
 
 
 
 
 
 
Purchase and others
 
Company name
 
Transaction type
 
 
 
 
2021
 
 
2022
 
 
2023
 
 
 
 
 
 
 
 
In millions of won
 
<Associates>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Korea Gas Corporation
 
Electricity sales
 
 
 
 
5,646,713
 
 
 
11,996,402
 
 
 
8,873,781
 
Goseong Green Power Co., Ltd.
 
Electricity sales
 
 
 
987,540
 
 
 
1,905,502
 
 
 
1,572,074
 
Dongducheon Dream Power Co., Ltd.
 
Electricity sales
 
 
 
750,148
 
 
 
2,244,332
 
 
 
1,744,247
 
Saemangeum Sebit Power Plant Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
23,159
 
 
 
22,365
 
Daegu Photovoltaic Co., Ltd.
 
Electricity sales
 
 
 
3,532
 
 
 
4,744
 
 
 
4,247
 
Haeng Bok Do Si Photovoltaic Power Co., Ltd.
 
Electricity sales
 
 
 
393
 
 
 
563
 
 
 
408
 
Korea Electric Power Industrial Development Co., Ltd.
 
Service
 
 
 
241,925
 
 
 
251,468
 
 
 
305,105
 
Gangneung Eco Power Co., Ltd.
 
Others
 
 
 
 
 
 
 
 
 
6,996
 
Shin Pyeongtaek Power Co., Ltd.
 
Electricity sales
 
 
 
653,306
 
 
 
957,294
 
 
 
1,040,965
 
Noeul Green Energy Co., Ltd.
 
Electricity sales
 
 
 
10,014
 
 
 
14,176
 
 
 
10,466
 
Samcheok Eco Materials Co., Ltd.
 
Electricity sales
 
 
 
13,612
 
 
 
12,019
 
 
 
8,130
 
YTN Co., Ltd.
 
Electricity sales
 
 
 
388
 
 
 
304
 
 
 
309
 
Busan Green Energy Co., Ltd.
 
Electricity sales
 
 
 
18,996
 
 
 
26,219
 
 
 
23,211
 
Korea Electric Vehicle Charging Service (*5)
 
Electricity sales
 
 
 
393
 
 
 
 
 
 
 
Energy Infra Asset Management Co., Ltd.
 
Service
 
 
 
2,657
 
 
 
2,779
 
 
 
2,701
 
Yaksu ESS Co., Ltd.
 
Electricity sales
 
 
 
1,715
 
 
 
851
 
 
 
508
 
Gangwon Wind Power Co., Ltd.
 
Electricity sales
 
 
 
19,623
 
 
 
40,130
 
 
 
32,525
 
Goesan Solar park Co., Ltd.
 
Electricity sales
 
 
 
6,209
 
 
 
7,642
 
 
 
6,530
 
Korea Power Exchange
 
Service
 
 
 
86,716
 
 
 
93,817
 
 
 
82,572
 
Taebaek Wind Power Co., Ltd. (*1)
 
Service and REC
 
 
 
5,930
 
 
 
7,442
 
 
 
 
Taebaek Guinemi Wind Power Co., Ltd.
 
Electricity sales
 
 
 
5,910
 
 
 
6,793
 
 
 
5,529
 
Pyeongchang Wind Power Co., Ltd.
 
Design service and others
 
 
 
4,099
 
 
 
3,884
 
 
 
 
Daeryun Power Co., Ltd.
 
Electricity sales
 
 
 
157,234
 
 
 
428,534
 
 
 
353,371
 
Changjuk Wind Power Co., Ltd. (*4)
 
Electricity sales
 
 
 
6,213
 
 
 
9,027
 
 
 
 
GS Donghae Electric Power Co., Ltd.
 
Electricity sales
 
 
 
760,377
 
 
 
1,035,263
 
 
 
1,047,584
 
KNH Solar Co., Ltd.
 
Electricity sales
 
 
 
3,222
 
 
 
4,348
 
 
 
3,535
 
S-Power
Co., Ltd.
 
Service
 
 
 
608,530
 
 
 
1,091,741
 
 
 
973,646
 
Yeongyang Wind Power Corporation II
 
Commission
 
 
 

 
 
 
 
 
 
1,457
 
PND Solar Co., Ltd.
 
Electricity sales
 
 
 
5,502
 
 
 
6,173
 
 
 
5,301
 
Hyundai Eco Energy Co., Ltd.
 
Electricity sales
 
 
 
25,762
 
 
 
29,209
 
 
 
26,266
 
YeongGwang Yaksu Wind Electric Co., Ltd.
 
Electricity sales
 
 
 
11,729
 
 
 
7,382
 
 
 
6,776
 
Taebaek Gadeoksan Wind Power Co., Ltd.
 
Electricity sales
 
 
 
16,360
 
 
 
25,880
 
 
 
34,940
 
Korea Energy Solutions Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
102
 
 
 
128
 
STN Co., Ltd. (formerly, Structure test network Co., Ltd.)
 
Others
 
 
 


 

 
 


 

 
 

10

 

Green Energy Electricity Generation Co., Ltd.
 
Electricity sales
 
 
 
1,238
 
 
 
2,962
 
 
 
948
 
Namjeongsusang Solar Power Operation Co., Ltd. (*3)
 
Electricity sales
 
 
 
14,286
 
 
 
9,491
 
 
 
 
Bitgoel Eco Energy Co., Ltd.
 
Service and others
 
 
 
 
 
 
930
 
 
 
28,334
 
Jeju Gimnyeong Wind Power Co., Ltd.
 
Electricity sales
 
 
 
12,833
 
 
 
12,364
 
 
 
8,635
 
Seoroseoro Sunny Power Plant Co., Ltd.
 
REC and others
 
 
 
217
 
 
 
1,138
 
 
 
874
 
Muan Solar Park Co., Ltd.
 
REC and others
 
 
 
31,017
 
 
 
17,052
 
 
 
16,554
 
YuDang Solar Co., Ltd.
 
REC and others
 
 
 
3,495
 
 
 
1,915
 
 
 
1,860
 
Anjwa Smart Farm & Solar City Co., Ltd.
 
Electricity sales
 
 
 
24,601
 
 
 
16,942
 
 
 
17,332
 
KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
 
Others
 
 
 
 
 
 
42,651
 
 
 
62,212
 
Saemangeum Heemang Photovoltaic Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
1,039
 
 
 
440
 
G.GURU Co., Ltd.
 
Electricity sales
 
 
 
 
 
 
452
 
 
 
 
 
F-209

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(3)
Related party transactions for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
<Purchase and Others>, continued


 
 
 
 
 
 
 
 
Purchase and others
 
Company name
 
Transaction type
 
 
 
 
 
2021
 
 
2022
 
 
2023
 
 
 
 
 
 
 
 
 
In millions of won
 
<Associates>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
UD4M Co., Ltd.
  Electricity sales        313   117 
Dongbu Highway Solar Co., Ltd.
  Electricity sales    2,605   3,516   2,937 
Seobu Highway Solar Co., Ltd.
  Electricity sales    2,963   3,452   2,880 
REC’s Innovation Co., Ltd. (formerly, Wang San Engineering. Co,. Ltd.)
 
 
Interest income/
Dividends
income
 
  
 
 
 
 
 
 
 
6
 
Green Radiation Co., Ltd.
  


Ordinary
development
expense
 
 
 
   

 
  

 
  11 
Gwangbaek Solar Power Investment Co., Ltd.
  Electricity sales    742   602   565 
Go deok Clean Energy Co., Ltd.
  Electricity sales          11,545 
PlatformN. Co., Ltd.
  Others       475    
Muan Sunshine Solar Power Plant Co., Ltd.
  Electricity sales    15,900   19,514   16,328 
Gangneung Sacheon Fuel Cell Co., Ltd.
  Electricity sales          1,324 
11 Associates (Overseas)
  Electricity sales    502   101,790   91,233 
<Joint ventures>
                   
 
Seobusambo highway photovoltaics Co., Ltd.
  Electricity sales       103   502 
Cheongna Energy Co., Ltd.
  Service    57   80   60 
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
  Service    5,409   13,872   8,151 
Daegu Green Power Co., Ltd.
  Electricity sales    289,052   508,601   370,787 
KAPES, Inc.
  Commission    64,140   9,306   19,112 
Honam Wind Power Co., Ltd.
  
Electricity sales
    4,807   7,662   8,643 
Jeongam Wind Power Co., Ltd.
  
Electricity sales
    3,145       
Korea Power Engineering Service Co., Ltd.
  
Service
    1,315   830   812 
Seokmun Energy Co., Ltd.
  
Service
    44,315   60,799   60,009 
Chun-cheon Energy Co., Ltd.
 
 
Electricity sales
 
  
 
327,536
 
 
 
585,689
 
 
 
585,656
 
Yeonggwangbaeksu Wind Power Co., Ltd.
 
 
Electricity sales
 
  
 
9,471
 
 
 
13,990
 
 
 
17,228
 
Yeonggwang Wind Power Co., Ltd.
 
 
Electricity sales
 
  
 
21,004
 
 
 
31,221
 
 
 
40,605
 
Western Power Changgi Solar Co., Ltd.
 
 
Electricity sales
 
  
 
5,852
 
 
 
 
 
 
 
KW Nuclear Components Co., Ltd.
 
 
Service
 
  
 
96
 
 
 
9,504
 
 
 
14,114
 
Taebaek Wind Power Co., Ltd. (*1)
  
Service
          7,476 
Pyeongchang Wind Power Co., Ltd.
  
Electricity sales
          3,542 
Busan Shinho Solar Power Co., Ltd.
  
Electricity sales
    7,895   10,601   10,248 
Global Trade Of Power System Co., Ltd.
  
Service
    323   715   223 
Expressway Solar-light Power Generation Co., Ltd.
  
Electricity sales
    3,146   4,016   3,362 
Goheung New Energy Co., Ltd.
  
Electricity sales
          5,264 
Gunsan Land Solar Co., Ltd.
  Electricity sales       533   486 
Daesan Green Energy Co., Ltd.
  Electricity sales    146,776   129,736   139,721 
Cheong-Song Noraesan Wind Power Co., Ltd.
  Electricity sales       980   882 
Saemangeum Solar Power Co., Ltd.
  Electricity sales    5   1    
Dangjin Eco Power Co., Ltd.
  
Electricity sales
    4,139   5,696   5,583 
Yangyang Wind Power Co., Ltd.
  
Service and
Electricity sales
          10 
Energyco Co., Ltd.
  
Electricity sales
       7,898   6,539 
 
F-210

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes
to
the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(3)
Related party transactions for the years ended December 31, 2021, 2022 and 2023 are as follows, continued:
<Purchase and Others>, continued

 
 
 
 
 
 
 
Purchase and others
 
Company name
 
Transaction type
 
 
 
 
2021
 
 
2022
 
 
2023
 
 
 
 
 
 
 
 
In millions of won
 
<Associates>
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Hapcheon Floating Photovoltaic Power Plant Inc.
 
Service and REC
  
 
 
 
 
  2,526    
Busan Industrial Solar Power Co., Ltd.
 
Electricity sales
  
 
2,815
 
  4,575   3,656 
Bitsolar Energy Co., Ltd.
 
Electricity sales
  
 
5,703
 
  13,030   12,946 
Omisan Wind Power Co., Ltd.
 
Electricity sales
   7       
Haemodum Solar Co., Ltd.
 
Electricity sales
   1,625   2,168   402 
Yeongam Solar Power Co., Ltd.
 
Electricity sales
   47,805   44,745   34,981 
Samsu Wind Power Co., Ltd.
 
Electricity sales
   2,800   10,605   8,269 
Solaseado Solar Power Co., Ltd.
 
Electricity sales
   31,031   28,698   18,259 
Gurae Resident Power Co., Ltd.
 
Electricity sales
         1 
Cheongju Eco Park Co., Ltd.
 
Electricity sales
  
 
 
  94,409   95,059 
Enel X Midland Photovoltaic, LLC
 
Electricity sales
      1,871   2,431 
Eumseong Eco Park Co., Ltd.
 
Electricity sales
         27,765 
41 Joint ventures (Overseas)
 
Electricity sales
   54,135   16,859   17,222 
<Others>
     
Korea Development Bank
 
Interest expense
   2,756   4,208   5,559 
 
Dividends paid
   256,862   12    
 
(*1)
Taebaek Wind Power Co., Ltd. was changed from an associate to a joint venture for the year ended December 31, 2023.
 
(*2)
KEPCO-Uhde Inc. is not a related party of the Company as of December 31, 2023 as the liquidation process was completed for the year ended December 31, 2023.
 
(*3)
Namjeongsusang Solar Power Operation Co., Ltd. is not a related party of the Company as of December 31, 2023 as the sale of shares was completed for the year ended December 31, 2023.
 
(*4)
Changjuk Wind Power Co., Ltd. was reclassified from an associate to a subsidiary for the year ended December 31, 2022, and the amount is before reclassification to a subsidiary.
 
(*5)
Korea Electric Vehicle Charging Service is not a related party of the Company as of December 31, 2023 as the sale of shares was completed for the year ended December 31, 2022.
 
F-211

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
 
(4)
Receivables and payables arising from related party transactions as of December 31, 2022 and 2023 are as follows:
 
       
Receivables
  
Payables
 
Company name
 
Type
    
2022
  
2023
  
2022
  
2023
 
       
In millions of won
 
<Associates>
                 
Korea Gas Corporation
 Trade receivables    12,415   14,671   —    —  
 Non-trade receivables and others   54,232   12,513   —    —  
 Trade payables   —    —    1,882,607   480,974 
 Non-trade payables and others   —    —    1,294   1,378 
Goseong Green Power Co., Ltd.
 Trade receivables   76,254   55,719   —    —  
 
Non-trade
receivables and others
   14   15   —    —  
 Trade payables   —    —    182,095   120,270 
 
Non-trade
payables and others
   —    —    52,515   48,621 
Dongducheon Dream Power Co., Ltd.
 Trade receivables   592   2,573   —    —  
 
Non-trade
receivables and others
   270   478   —    —  
 Trade payables   —    —    293,256   117,975 
Saemangeum Sebit Power Plant Co., Ltd.
 
Non-trade
receivables and others
   653   341      —  
Daejung Offshore Wind Power Co., Ltd.
 
Non-trade
receivables and others
   123   263   —    —  
Daegu Photovoltaic Co., Ltd.
 Trade payables   —    —    135   105 
 
Non-trade
payables and others
   —    —    2   —  
Korea Electric Power Industrial
 Trade receivables   164   176   —    —  
Development Co., Ltd.
 
Non-trade
receivables and others
   2   —    —    —  
 Trade payables   —    —    150   2,021 
 
Non-trade
payables and others
   —    —    9,588   8,077 
Gangneung Eco Power Co., Ltd.
 Trade receivables   19,364   59,623   —    —  
 
Non-trade
receivables and others
   478   —    —    —  
 
Non-trade
payables and others
   —    —    94   94 
Shin Pyeongtaek Power Co., Ltd.
 Trade receivables   7,375   1,814   —    —  
 
Non-trade
receivables and others
   1,068   4,933   —    —  
 Trade payables   —    —    109,274   86,801 
 
Non-trade
payables and others
   —    —    101   385 
Noeul Green Energy Co., Ltd.
 Trade receivables   3   6   —    —  
 
Non-trade
receivables and others
   9,365   18,356   —    —  
 
Non-trade
payables and others
   —    —    2,468   3,005 
Samcheok Eco Materials Co., Ltd.
 Trade receivables   46   33   —    —  
YTN Co., Ltd.
 Trade receivables   112   133   —    —  
Busan Green Energy Co., Ltd.
 Trade receivables   1   1   —    —  
 
Non-trade
receivables and others
   26,681   32,720   —    —  
 
Non-trade
payables and others
   —    —    4,415   3,642 
Gunsan Bio Energy Co., Ltd.(*4)
 
Non-trade
receivables and others
   11,728   —    —     
Yaksu ESS Co., Ltd.
 Trade payables   —    —    —    538 
Gangwon Wind Power Co., Ltd.
 Trade receivables   6   13   —    —  
 Trade payables   —    —    5,197   3,206 
Gwangyang Green Energy Co., Ltd.
 Trade receivables   —    1,069   —    —  
 Non-trade receivables and others   1,436   716   —    —  
Bigeum Resident Photovoltaic Power Co., Ltd.
 Trade receivables   343   406   —    —  
 
Non-trade
receivables and others
   516   1,316   —    —  
Goesan Solar park Co., Ltd.
 Trade payables   —    —    346   56 
Hyundai Green Power Co., Ltd.
 Trade receivables   839   903   —    —  
Korea Power Exchange
 Trade receivables   223   1,583  —   —  
 
Non-trade
receivables and others
   —    1  —   —  
 Trade payables   —    —   —   16,367 
 
Non-trade
payables and others
   —    —   2,405  2,520 
Taebaek Wind Power Co., Ltd.
 Trade payables   —    —   680  —  
 
Non-trade
payables and others
   —    —   178  —  
Pyeongchang Wind Power Co., Ltd.(*1)
 Trade receivable   3   —   —  — 
 Non-trade payables and others   —    —   211 — 
Taebaek Guinemi Wind Power Co., Ltd.
 Trade payables   —    —   885 572
 Non-trade payables and others   —    —   —  286
Daeryun Power Co., Ltd.
 Trade receivables   195   326  —  — 
 Trade payables   —    —   55,725 32,140
GS Donghae Electric Power Co., Ltd.
 Trade receivables   872   159   —    —  
 
Non-trade
receivables and others
   1,558   169   —    —  
 Trade payables   —    —    72,947   72,951 
 
Non-trade
payables and others
   —    —    14,565   125 
Yeongyang Wind Power Corporation II
 Non-trade receivables and others   —    165   —    —  
KNH Solar Co., Ltd.
 Trade receivables   1   1   —    —  
 
F-212

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(4)
Receivables and payables arising from related party transactions as of December 31, 2022 and 2023 are as follows, continued:
 
       
Receivables
  
Payables
 
Company name
 
Type
    
2022
  
2023
  
2022
  
2023
 
       
In millions of won
 
<Associates>
                 
S-Power
Co., Ltd.
 Trade receivables    77   213   —    —  
 
Non-trade
receivables and others
   44   53   —    —  
 Trade payables   —    —    135,504   79,459 
 
Non-trade
payables and others
   —    —    11   —  
PND Solar Co., Ltd.
 Trade payables   —    —    210   296 
Hyundai Eco Energy Co., Ltd.
 Trade receivables   22   28   —    —  
 Trade payables   —    —    738   408 
YeongGwang Yaksu Wind Electric Co., Ltd.
 Trade receivables   7   10   —    —  
 Non-trade receivables and others   —    2,294   —    —  
 Trade payables   —    —    589   828 
 
Non-trade
payables and others
   —    —    2,050   —  
Taebaek Gadeoksan Wind Power Co., Ltd.
 
Non-trade
receivables and others
   97   1,539   —    —  
 Trade payables   —    —    12,739   12,739 
 
Non-trade
payables and others
   —    —    5   7 
Korea Energy Solutions Co., Ltd.
 
Non-trade
payables and others
   —    —    94   —  
Green Energy Electricity Generation Co., Ltd.
 Trade payables   —    —    —    62 
 
Non-trade
payables and others
   —    —    —    45 
Namjeongsusang Solar Power Operation Co., Ltd. (*3)
 Trade receivables   2   —    —    —  
Bitgoel Eco Energy Co., Ltd.
 
Non-trade
receivables and others
   6   131   —    —  
 Trade payables   —    —    —    6,226 
 
Non-trade
payables and others
   —    —    1,023   —  
Jeju Gimnyeong Wind Power Co., Ltd.
 
Non-trade
receivables and others
   130   112   —    —  
 Trade payables   —    —    1,758   1,467 
 
Non-trade
payables and others
   —    —    —    9 
Muan Solar Park Co., Ltd.
 Trade receivables   25   —    —    —  
 
Non-trade
receivables and others
   9   4   —    —  
Anjwa Smart Farm & Solar City Co., Ltd.
 
Non-trade
payables and others
   —    —    921   1,296 
KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.)
 Trade receivables   1   1   —    —  
 Trade payables   —    —    5,485   5,485 
Saemangeum Heemang Photovoltaic Co., Ltd.
 
Non-trade
receivables and others
   3,435   —    —    —  
 
Non-trade
payables and others
   —    —    1   —  
Dongbu Highway Solar Co., Ltd.
 Trade receivables   1   1   —    —  
 Trade payables   —    —    2   —  
 
Non-trade
payables and others
   —    —    2   —  
Seobu Highway Solar Co., Ltd.
 Trade receivables   1   1   —    —  
 Trade payables   —    —    8   —  
 
Non-trade
payables and others
   —    —    3   —  
Gwangbaek Solar Power Investment Co., Ltd.
 
Non-trade
payables and others
   —    —    61   —  
Go deok Clean Energy Co., Ltd.
 
Non-trade
receivables and others
   —    4,562   —    —  
 
Non-trade
payables and others
   —    —    —    5,288 
Suwon New Power Co., Ltd.
 Trade receivables      876   —     
 
Non-trade
receivables and others
   1,280   560   —    —  
Tronix Co., Ltd.
 
Non-trade
receivables and others
   1   —    —    —  
KOSTURE Co., Ltd.
 Trade receivables   6   —    —    —  
Muan Sunshine Solar Power Plant Co., Ltd.
 Trade payables   —    —    3,076   1,440 
 
Non-trade
payables and others
   —    —    1,265   —  
PlatformN. Co., Ltd.
 
Non-trade
payables and others
   —    —    232   —  
9 Associates (Overseas)
 Trade receivables   93   —    —    —  
 
Non-trade
receivables and others
   49,409   77,814   —    —  
 
Non-trade
payables and others
   —    —    502   6,242 
<Joint ventures>
                 
Daegu Green Power Co., Ltd.
 Trade receivables   53   122   —    —  
 
Non-trade
receivables and others
   56   55   66,715   32,222 
 Trade payables   —    —    
Seobusambo highway photovoltaics Co., Ltd.
 Trade receivables   —    1   —    —  
 
Non-trade
receivables and others
   —    4   —    —  
Yangyang Suri Wind Power Co., Ltd.
 Non-trade receivables and others   —    55   —    —  
KAPES, Inc.
 Trade receivables   2   4   —    —  
 
Non-trade
receivables and others
   —    89   —    —  
 
Non-trade
payables and others
   —    —    106   3,791 
Honam Wind Power Co., Ltd.
 Trade payables   —    —    515   515 
Korea Power Engineering Service Co., Ltd.
 
Non-trade
receivables and others
   47   48   —    —  
 
F-213

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(4)
Receivables and payables arising from related party transactions as of December 31, 2022 and 2023 are as follows, continued:
 
       
Receivables
  
Payables
 
Company name
 
Type
    
2022
  
2023
  
2022
  
2023
 
       
In millions of won
 
<Joint ventures>
                 
 
Non-trade
payables and others
    —    —    77   76 
Seokmun Energy Co., Ltd.
 Trade receivables   67   44   —    —  
 
Non-trade
receivables and others
   113   199   —    —  
 Trade payables   —    —    7,000   7,000 
Naepo Green Energy Co., Ltd.
 Trade receivables   169   190   —    —  
 
Non-trade
receivables and others
   —    1   —    —  
 
Non-trade
payables and others
   —    —    3   —  
Chun-cheon Energy Co., Ltd.
 Trade receivables   124   239   —    —  
 
Non-trade
receivables and others
   165   165   —    —  
 Trade payables   —    —    79,117   79,117 
 Non-trade payables and others   —    —    —    2 
Yeonggwangbaeksu Wind Power Co., Ltd.
 Trade receivables   8   10   —    —  
 
Non-trade
receivables and others
   166   —    —    —  
 Trade payables   —    —    1,076   1,076 
Cheongna Energy Co., Ltd.
 Trade receivables   17,324   13,898   —    —  
 
Non-trade
receivables and others
   1,654   2,160   —    —  
 
Non-trade
payables and others
   —    —    1   1 
Yeonggwang Wind Power Co., Ltd.
 Trade receivables   12   15   —    —  
 
Non-trade
receivables and others
   62   56   —    —  
 Trade payables   —    —    2,251   2,251 
KW Nuclear Components Co., Ltd.
 Trade receivables   4   —    —    —  
 
Non-trade
receivables and others
   18   17   —    —  
Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.)
 Trade receivables   79   84   —    —  
 
Non-trade
receivables and others
   10,218   10,779   —    —  
 Trade payables   —    —    1,027   721 
 
Non-trade
payables and others
   —    —    9,119   14,193 
Taebaek Wind Power Co., Ltd. (*1)
 Trade payables   —    —    —    603 
 
Non-trade
payables and others
   —    —    —    341 
Pyeongchang Wind Power Co., Ltd.
 Trade receivables   —    4   —    —  
KEPCO-Uhde Inc. (*2)
 
Non-trade
payables and others
   —    —    10   —  
Busan Shinho Solar Power Co., Ltd.
 Trade receivables   3   3   —    —  
 Trade payables   —    —    304   304 
Expressway Solar-light Power Generation Co., Ltd.
 Trade payables   —    —    166   220 
Gunsan Land Solar Co., Ltd.
 
Non-trade
receivables and others
   138   295   —    —  
Daesan Green Energy Co., Ltd.
 Trade receivables   18   13   —    —  
 
Non-trade
receivables and others
   218   170   —    —  
 Trade payables   —    —    4,946   4,946 
Cheong-Song Noraesan Wind Power Co., Ltd.
 Trade receivables   2   2   —    —  
Saemangeum Solar Power Co., Ltd.
 
Non-trade
receivables and others
   4,368   4,368   —    —  
Dangjin Eco Power Co., Ltd.
 Trade receivables   3   4   —    —  
 Trade payables   —    —    222   222 
 
Non-trade
payables and others
   —    —    105   176 
Yangyang Wind Power Co., Ltd.
 
Non-trade
receivables and others
   —    13   —    —  
Energyco Co., Ltd.
 
Non-trade
receivables and others
   —    3   —    —  
 Trade payables   —    —    —    99 
Hapcheon Floating Photovoltaic Power Plant Inc.
 Trade receivables   9   10   —    —  
 
Non-trade
receivables and others
   —    68   —    —  
Busan Industrial Solar Power Co., Ltd.
 Trade receivables   2   2   —    —  
Bitsolar Energy Co., Ltd.
 
Non-trade
receivables and others
   222   1   —     
 Trade payables   —    —    201   201 
Haemodum Solar Co., Ltd.
 Trade receivables   1   1   —    —  
Yeongam Solar Power Co., Ltd.
 Trade receivables   44   56   —    —  
 Trade payables   —    —    3,655   3,517 
Samsu Wind Power Co., Ltd.
 Trade payables   —    —    1,303   1,229 
Solaseado Solar Power Co., Ltd.
 
Non-trade
receivables and others
   23   24   —    —  
 
Non-trade
payables and others
   —    —    2,911   —  
Cheongju Eco Park Co., Ltd.
 Trade receivables   —    6,899   —    —  
 Trade payables   —    —    7,994   7,994 
Enel X Midland Photovoltaic, LLC
 Trade receivables   1   1   —    —  
 Trade payables   —    —    3   144 
 
Non-trade
payables and others
   —    —    —    49 
Geumsungsan Wind Power Co., Ltd.
 Trade receivables   3   4   —    —  
 
Non-trade
payables and others
   —    —    1   —  
 
F-214

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(4)
Receivables and payables arising from related party transactions as of December 31, 2022 and 2023 are as follows, continued:
 
       
Receivables
  
Payables
 
Company name
 
Type
    
2022
  
2023
  
2022
  
2023
 
       
In millions of won
 
<Joint ventures>
                 
26 Joint ventures (Overseas)
 Trade receivables    73,805   160,474   —    —  
 
Non-trade
receivables and others
   71,661   55,897   —    —  
 
Non-trade
payables and others
   —    —    117,754   22,877 
<Others>
      
Korea Development Bank
 Accrued interest income   5   —    —    —  
 
Non-trade
receivables and others
   30,836   33,140   —    —  
 
Non-trade
payables and others
   —    —    101   147 
 Derivatives and others   67,662   45,898   3,759   72,050 
KEPCO Lebanon SARL (*5)
 Trade receivables   —    75   —    —  
 
 (*1)
Taebaek Wind Power Co., Ltd. was changed from an associate to a joint venture for the year ended December 31, 2023.
 
 (*2)
KEPCO-Uhde Inc. is not a related party of the Company as of December 31, 2023 as the liquidation process was completed for the year ended December 31, 2023.
 
 (*3)
Namjeongsusang Solar Power Operation Co., Ltd. is not a related party of the Company as of December 31, 2023 as the sale of shares was completed for the year ended December 31, 2023.
 
 (*4)
Busan Green Energy Co., Ltd. was declared bankrupt for the year ended December 31, 2023 and was excluded from an associate due to the appointment of a bankruptcy trustee.
 
 (*5)
The entire amount has been set as bad debt.
 
(5)
Loans and others arising from related party transactions as of December 31, 2022 and 2023 are as follows:
 
Type
 
Company name
    
Beginning
balance
  
Loans
  
Collection
  
Others
  
Ending

balance
 
                     
       
In millions of won
 
Associates
 
KNOC Nigerian East Oil Co., Ltd.,
KNOC Nigerian West Oil Co., Ltd.
 
 
 
 
31,473
 
 
 
170
 
 
 
 
 
 
510
 
 
 
32,153
 
 
(Allowance for doubtful accounts)
  
 
(10,751
 
 
(12,995
 
 
 
 
 
(1,797
 
 
(25,543
Associates
 
Nepal Water & Energy Development
Company Private Limited
  
 
19,914
 
 
 
 
 
 
 
 
 
(1,862
 
 
18,052
 
Associates
 
Xe-Pian
Xe-Namnoy
Power Co., Ltd.
  
 
22,936
 
 
 
 
 
 
 
 
 
401
 
 
 
23,337
 
Associates
 
PT Wampu Electric Power
  
 
9,171
 
 
 
 
 
 
(9,613
 
 
442
 
 
 
 
Associates
 
PT. Cirebon Energi Prasarana
  
 
29,569
 
 
 
 
 
 
 
 
 
5,973
 
 
 
35,542
 
Associates
 
Bigeum Resident Photovoltaic Power
Co., Ltd.
  
 
11,212
 
 
 
 
 
 
 
 
 
(1,687
 
 
9,525
 
Associates
 
Daejung Offshore Wind Power Co., Ltd.
  
 
1,000
 
 
 
 
 
 
 
 
 
 
 
 
1,000
 
Associates
 
Bitgoel Eco Energy Co., Ltd.
  
 
34,790
 
 
 
 
 
 
(3,905
 
 
 
 
 
30,885
 
Associates
 
Saemangeum Sebit Power Plant Co., Ltd.
  
 
37,249
 
 
 
 
 
 
(8,279
 
 
 
 
 
28,970
 
Joint ventures
 
Solaseado Solar Power Co., Ltd.
  
 
35,000
 
 
 
 
 
 
 
 
 
 
 
 
35,000
 
Joint ventures
 
Recursos Solares PV de Mexico II, S.A. de C.V.
  
 
8,457
 
 
 
1,944
 
 
 
 
 
 
188
 
 
 
10,589
 
Joint ventures
 
Horus Solar, S.A. de C.V.
  
 
19,287
 
 
 
 
 
 
(8,552
 
 
464
 
 
 
11,199
 
Joint ventures
 
Sunmex Renovables, S.A. de C.V.
  
 
16,383
 
 
 
536
 
 
 
 
 
 
291
 
 
 
17,210
 
Joint ventures
 
Kelar S.A.
  
 
43,965
 
 
 
 
 
 
 
 
 
(2,980
 
 
40,985
 
Joint ventures
 
DE Energia SpA
  
 
7,260
 
 
 
 
 
 
 
 
 
126
 
 
 
7,386
 
Joint ventures
 
Daehan Wind Power PSC
  
 
14,618
 
 
 
 
 
 
 
 
 
254
 
 
 
14,872
 
Joint ventures
 
Bitsolar Energy Co., Ltd.
  
 
3,165
 
 
 
 
 
 
 
 
 
 
 
 
3,165
 
Joint ventures
 
Daesan Green Energy Co., Ltd.
  
 
3,514
 
 
 
190
 
 
 
(1,293
 
 
 
 
 
2,411
 
Joint ventures
 Yangyang Wind Power Co., Ltd.      3,257         3,257 
 
F-215

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(5)
Loans and others arising from related party transactions as of December 31, 2022 and 2023 are as follows, continued:
 
Type
 
Company name
    
Beginning
balance
  
Loans
  
Collection
  
Others
  
Ending

balance
 
                     
       
In millions of won
 
Joint ventures
 
Nghi Son 2 Power LLC
 
 
 
 
186,735
 
 
 
 
 
 
 
 
 
3,256
 
 
 
189,991
 
Joint ventures
 
Pulau Indah Power Plant Sdn. Bhd.
  
 
10,207
 
 
 
 
 
 
 
 
 
(244
 
 
9,963
 
Joint ventures
 
Guadalupe Solar SpA
  
 
3,344
 
 
 
 
 
 
(225
 
 
42
 
 
 
3,161
 
Joint ventures
 
Foresight Iberian Solar Group Holding,
S.L.
  
 
61,302
 
 
 
 
 
 
(1,292
 
 
4,308
 
 
 
64,318
 
Joint ventures
 
Capman Lynx SCA, SICAR
  
 
31,628
 
 
 
 
 
 
 
 
 
3,582
 
 
 
35,210
 
 
(Allowance for doubtful accounts)
  
 
(4,467
 
 
(30,743
 
 
 
 
 
 
 
 
(35,210
Joint ventures
 
S-Power
Chile SpA
  
 
253
 
 
 
 
 
 
 
 
 
5
 
 
 
258
 
Others
 
KEPCO Lebanon SARL
  
 
3,834
 
 
 
 
 
 
 
 
 
 
 
 
3,834
 
 
(Allowance for doubtful accounts)
  
 
(3,834
 
 
 
 
 
 
 
 
 
 
 
(3,834
 Gunsan Bio Energy Co., Ltd. (*1)   12,396            12,396 
 (Allowance for doubtful accounts)   (12,396           (12,396
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
  
 
 
 
627,214
 
 
 
(37,641
 
 
(33,159
 
 
11,272
 
 
 
567,686
 
   
 
 
  
 
 
  
 
 
  
 
 
  
 
 
 
 
 (*1)
Bankruptcy was declared during the year ended December 31, 2023. The Company cannot hold significant influence due to the appointment of a bankruptcy trustee, so the Company was reclassified from an associate to financial assets at fair value through other comprehensive income.
 
(6)
Borrowings arising from related party transactions as of December 31, 2022 and 2023 are as follows:
 
Related parties
  
Type
      
Beginning

balance
   
Borrowings
   
Repayment
  
Others
  
Ending

balance
 
                          
          
In millions of won
 
Korea Development Bank
  Facility      96,584        (12,387  906   85,103 
  Others     2,133        (375     1,758 
  Operating funds     62,433    478,394    (442,027  21,200   120,000 
  Syndicated Loan     12,455        (978  (529  10,948 
  EBL and others     48,892    25,701    (3,398  37,017   108,212 
      
 
 
   
 
 
   
 
 
  
 
 
  
 
 
 
        222,497    504,095    (459,165)  58,594   326,021 
      
 
 
   
 
 
   
 
 
  
 
 
  
 
 
 
 
(7)
Guarantees provided to related parties as of December 31, 2023 are as follows:
 
Primary guarantor
 
Principal obligor
 
Type of guarantees
  
Credit limit
  
Creditor
       
In millions of won
and thousands of
foreign currencies
   
Korea Electric Power Corporation
 Shuweihat Asia Operation & Maintenance Company Performance guarantees   USD 11,000  Shuweihat Asia Power Investment B.V.
Korea Electric Power Corporation
 Rabigh Operation & Maintenance Company Limited Performance guarantees and others   USD 1,387  Rabigh Electricity Company
Korea Electric Power Corporation
 Nghi Son 2 Power LLC Performance guarantees and others   USD 40,738  SMBC Singapore and others
Korea Electric Power Corporation
 Barakah One Company Debt guarantees   USD 1,223,355  Export-Import Bank of Korea and others
  Performance guarantees and others   USD 4,103,269  
Korea Electric Power Corporation
 RE Holiday Holdings LLC Performance guarantees (*9)   USD 222,077  EFS Renewables Holdings, LLC,
CA-CIB
and others
Korea Electric Power Corporation
 RE Pioneer Holdings LLC Performance guarantees   USD 106,873  EFS Renewables Holdings, LLC
Korea Electric Power Corporation
 Rabigh Electricity Company Performance guarantees   SAR 4,151  Hana Bank
Korea Electric Power Corporation
 Shuweihat Asia Power Investment B.V. Performance guarantees   USD 50,000  ING Bank
Korea Electric Power Corporation
 Amman Asia Electric Power Company Performance guarantees   USD 17,400  Shinhan Bank
Korea Electric Power Corporation
 Horus Solar, S.A. de C.V. Other performance guarantees   MXN 16,413  CENACE and others
 
F-216

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(7)
Guarantees provided to related parties as of December 31, 2023 are as follows, continued:
 
Primary guarantor
 
Principal obligor
 
Type of guarantees
  
Credit limit
  
Creditor
       
In millions of won
and thousands of
foreign currencies
   
Korea Electric Power Corporation
 Recursos Solares PV de Mexico II, S.A. de C.V. Other performance guarantees   MXN 1,518  
SEMARNAT
     USD 393  CFE Transmission
Korea Electric Power Corporation
 Sunmex Renovables, S.A. de C.V. Other performance guarantees   USD 9,078  
CENACE
     MXN 3,666  SEMARNAT
Korea Electric Power Corporation
 International Offshore Power Transmission Holding Company Limited Performance guarantees   USD 52,500  Mizuho Bank
  Other performance guarantees   USD 7,000  Credit Agricole
Korea Electric Power Corporation
 Pulau Indah Power Plant Sdn. Bhd.  Collateralized money invested (*10)   KRW 13,210  Malaysian Trustee Berhad
Korea Electric Power Corporation
 KEPCO for Power Company Debt guarantees   USD 60,000  Riyad bank
  Other performance guarantees   USD 70,000  SMBC Seoul and others
Korea Western Power Co., Ltd.
 Cheongna Energy Co., Ltd. Collateralized money invested   KRW 25,549  Kookmin Bank and others
  Guarantees for supplemental funding (*1)     
Korea Western Power Co., Ltd.
 
Xe-Pian
Xe-Namnoy
Power Co., Ltd.
 Collateralized money invested   KRW 116,378  Krung Thai Bank
  Impounding bonus guarantees (*11)   USD 5,000  SK Eco Plant Co., Ltd.
Korea Western Power Co., Ltd.
 Rabigh Operation & Maintenance Company Limited Performance guarantees and others   SAR 11,200  National Bank of Kuwait
Korea Western Power Co., Ltd.
 Daegu Photovoltaic Co., Ltd. Collateralized money invested   KRW 2,804  Korea Development Bank
Korea Western Power Co., Ltd.
 Dongducheon Dream Power Co., Ltd. Collateralized money invested (*5)   KRW 50,682  Kookmin Bank and others
  Debt guarantees   KRW 20,300  Hanyang Securities
Korea Western Power Co., Ltd.
 PT. Mutiara Jawa Collateralized money invested   KRW 5,168  Woori Bank
Korea Western Power Co., Ltd.
 Haeng Bok Do Si Photovoltaic Power Co., Ltd. Collateralized money invested   KRW 294  Nonghyup Bank
Korea Western Power Co., Ltd.
 Shin Pyeongtaek Power Co., Ltd. Collateralized money invested   KRW 145,025  Kookmin Bank and others
  Guarantees for supplemental funding (*1)     
Korea Western Power Co., Ltd.
 Haemodum Solar Co., Ltd. Collateralized money invested   KRW 3,122  Nonghyup Bank
Korea Western Power Co., Ltd.
 Muan Solar Park Co., Ltd. Collateralized money invested   KRW 6,830  IBK and others
Korea Western Power Co., Ltd.
 Anjwa Smart Farm & Solar City Co., Ltd. Collateralized money invested   KRW 7,665  Hana Bank and others
Korea Western Power Co., Ltd.
 Seoroseoro Sunny Power Plant Co., Ltd. Collateralized money invested   KRW 941  Hana Bank and others
Korea Western Power Co., Ltd.
 YuDang Solar Co., Ltd. Collateralized money invested   KRW 570  Hana Bank and others
  Guarantees for supplemental funding (*1)     
Korea Western Power Co., Ltd.
 Hapcheon Floating Photovoltaic Power Plant Inc. Collateralized money invested   KRW 10,348  Nonghyup Bank and others
Korea Western Power Co., Ltd.
 Yeongwol Eco Wind Co., Ltd. Collateralized money invested   KRW 4,024  Hana Bank and others
  Guarantees for supplemental funding (*1)     
Korea Western Power Co., Ltd.
 Gurae Resident Power Co., Ltd. Collateralized money invested   KRW 569  Hana Bank and others
  Guarantees for supplemental funding (*1)     
Korea Western Power Co., Ltd
 Gunsan Land Solar Co., Ltd. Collateralized money invested   KRW 22,429  Hana Bank and others
  Guarantees for supplemental funding (*1)     
Korea Western Power Co., Ltd
 
Seobusambo highway photovoltaics Co., Ltd.
 
Collateralized money invested
  
 
KRW 3,580
 
 
Hana Bank and others
  Guarantees for supplemental funding (*1)     
Korea Western Power Co., Ltd
 Eumseong Eco Park Co., Ltd. Collateralized money invested   KRW 8,386  
Kyobo Life Insurance Co., Ltd. and others
Korea Western Power Co., Ltd
 PungBack Wind Farm Corporation Collateralized money invested   KRW 7,940  
Hanwha Life Insurance Co., Ltd. and others
Korea Western Power Co., Ltd
 Wadi Noor Solar Power Company SAOC Loan payment guarantee   USD 54,855  DBS Bank
Korea East-West Power Co., Ltd.
 Busan Shinho Solar Power Co., Ltd. Collateralized money invested   KRW 6,669  
Korea Development Bank and others
Korea East-West Power Co., Ltd.
 Seokmun Energy Co., Ltd. Collateralized money invested    KRW 16,591  Kookmin Bank and others
  
Guarantees for supplemental funding (*1)
  
 
 
 
Korea East-West Power Co., Ltd.
 Chun-cheon Energy Co., Ltd. Collateralized money invested   KRW 35,083  Kookmin Bank and others
  
Guarantees for supplemental funding (*1)
  
 
KRW 90,800
 
 
Korea East-West Power Co., Ltd.
 Honam Wind Power Co., Ltd. Collateralized money invested   KRW 4,743  Shinhan Bank and others
Korea East-West Power Co., Ltd.
 GS Donghae Electric Power Co., Ltd. Collateralized money invested   KRW 259,084  
Korea Development Bank and others
Korea East-West Power Co., Ltd.
 Yeonggwangbaeksu Wind Power Co., Ltd. Collateralized money invested   KRW 3,443  Kookmin Bank and others
Korea East-West Power Co., Ltd.
 Yeonggwang Wind Power Co., Ltd. Collateralized money invested   KRW 23,380  
KDB Capital Corporation and others
 
F-217

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(7)
Guarantees provided to related parties as of December 31, 2023 are as follows, continued:
 
Primary guarantor
 
Principal obligor
 
Type of guarantees
  
Credit limit
 
 
Creditor
 
 
 
 
 
  
In millions of won
and thousands of
foreign currencies
 
 
 
Korea East-West Power Co., Ltd.
 
Daesan Green Energy Co., Ltd.
 Collateralized money invested  KRW 22,191  
IBK
  Guarantees for supplemental funding (*1)    
Korea East-West Power Co., Ltd.
 Taebaek Gadeoksan Wind Power Co., Ltd. Collateralized money invested  KRW 19,426  Hana Bank and others
Korea East-West Power Co., Ltd.
 
PT. Tanjung Power Indonesia
 Other guarantees  USD 3,150  PT. Adaro Indonesia
  Guarantees for supplemental funding (*1)    
Sumitomo mitsui banking and others
  Collateralized money invested  KRW 90,151  MUFG and others
Korea East-West Power Co., Ltd.
 South Jamaica Power Company Limited Performance guarantees (*14)  USD 14,400  Hana Bank
  Collateralized money invested  KRW 43,109  
JCSD Trustee Services Limited and others
Korea East-West Power Co., Ltd.
 DE Energia SpA Collateralized money invested  KRW 9,703  
Mirae Asset Securities Co., Ltd. and others
  
Collateralized loans
 
 
USD 5,728
 
 
  
Payment guarantees (*7)
 
 
USD 959
 
 
Hana Bank
Korea East-West Power Co., Ltd.
 Bitsolar Energy Co., Ltd. Collateralized money invested  KRW 352  
Mirae Asset Life Insurance Co., Ltd. and others
Korea East-West Power Co., Ltd.
 Cheongju Eco Park Co., Ltd. Collateralized money invested  KRW 9,072  
Kyobo Life Insurance Co., Ltd. and others
Korea East-West Power Co., Ltd.
 Busan Industrial Solar Power Co., Ltd. Collateralized money invested  KRW 1,058  Shinhan Bank and others
Korea East-West Power Co., Ltd.
 Yangyang Wind Power Co., Ltd. Collateralized money invested  KRW 10,435  
Hana Bank and others
  Guarantees for supplemental funding (*1)    
Korea East-West Power Co., Ltd.
 KPE Green Energy Co., Ltd. (formerly, Daewon Green Energy Co., Ltd.) Collateralized money invested  KRW 7,779  Hana Bank and others
Korea East-West Power Co., Ltd.
 Goheung New Energy Co., Ltd. Collateralized money invested  KRW 4,808  Woori Bank and others
Korea East-West Power Co., Ltd.
 Seungmun Green Energy Collateralized money invested  KRW 9,757  
Hana Bank and others
  Guarantees for supplemental funding (*1)    
Korea East-West Power Co., Ltd.
 Yanggu Floating Photovoltaic Power Plant Inc. Collateralized money invested  KRW 760  Korea Development Bank
Korea East-West Power Co., Ltd.
 Hoenggye Renewable Energy Co., Ltd. 
Collateralized money invested
Guarantees for supplemental funding (*1)
  
KRW 2,375
 
 
 
IBK
Korea Southern Power Co., Ltd.
 KNH Solar Co., Ltd. Collateralized money invested  KRW 3,194  
Shinhan Bank and others
  
Performance guarantees and guarantees for supplemental funding (*1)
    
Korea Southern Power Co., Ltd.
 Daeryun Power Co., Ltd. Collateralized money invested  KRW 26,834  
Korea Development Bank and others
Korea Southern Power Co., Ltd.
 Daegu Green Power Co., Ltd. Collateralized money invested  KRW 26,430  
Shinhan Bank and others
  Performance guarantees    
Korea Southern Power Co., Ltd.
 Kelar S.A. Performance guarantees  USD 33,930  Hana Bank, MUFG
  Payment guarantees (*12)  USD 11,707  Hana Bank
Korea Southern Power Co., Ltd.
 Daehan Wind Power PSC Performance guarantees  USD 1,800  Shinhan Bank
  Payment guarantees (*6)  USD 2,000  Hana Bank
  Collateralized money invested  KRW 16,426  Standard Chartered
Korea Southern Power Co., Ltd.
 Pyeongchang Wind Power Co., Ltd. Collateralized money invested  KRW 12,228  
Woori Bank, Shinhan Bank and others
  Performance guarantees    
Korea Southern Power Co., Ltd.
 Taebaek Guinemi Wind Power Co., Ltd. Collateralized money invested  KRW 13,530  IBK
Korea Southern Power Co., Ltd.
 Samcheok Eco Materials Co., Ltd. Payment guarantees (*2)    
SEM Investment Co., Ltd.
  Performance guarantees (*15)    
Korea Southern Power Co., Ltd.
 Solaseado Solar Power Co., Ltd. Collateralized money invested  KRW 13,370  Kookmin Bank and others
Korea Southern Power Co., Ltd.
 Naepo Green Energy Co., Ltd. Collateralized money invested (*8)  KRW 5,285  IBK and others
  Performance guarantees and guarantees for supplemental funding (*1)  KRW 30,000  
Korea Southern Power Co., Ltd
.
 Omisan Wind Power Co., Ltd. Collateralized money invested  KRW 10,229  
Shinhan Bank
  Performance guarantees and guarantees for supplemental funding (*1)    
Korea Southern Power Co., Ltd.
 Geumsungsan Wind Power Co., Ltd. Collateralized money invested  KRW 5,515  Kookmin Bank
Korea Southern Power Co., Ltd.
 HORANG ENERGY Inc. Collateralized money invested  KRW 4,149  Woori Bank and others
  Guarantees for supplemental funding (*1)    
Korea Southern Power Co., Ltd.
 Haman Green Energy Co., Ltd. Collateralized money invested  KRW 2,981  Hana Bank and others
  Guarantees for supplemental funding (*1)    
 
F-218

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(7)
Guarantees provided to related parties as of December 31, 2023 are as follows, continued:
 
Primary guarantor
 
Principal obligor
 
Type of guarantees
  
Credit limit
  
Creditor
       
In millions of won
and thousands of
foreign currencies
   
Korea Southern Power Co., Ltd.
 Jeongeup Green Power Co., Ltd. Collateralized money invested   KRW 1,560  Woori Bank and others
  Guarantees for supplemental funding (*1)     
KOSPO Power Services Ltda.
 Kelar S.A. Payment guarantees   USD 1,316  Scotia bank
KOSPO Chile SpA
 Kelar S.A. Collateralized money invested   KRW 131,529  
Export-Import Bank of Korea
and others
KOSPO Chile SpA
 Chester Solar I SpA Collateralized money invested   KRW 1,238  IBK
KOSPO Chile SpA
 Chester Solar IV SpA Collateralized money invested   KRW 484  IBK
KOSPO Chile SpA
 Chester Solar V SpA Collateralized money invested   KRW 191  IBK
KOSPO Chile SpA
 Diego de Almagro Solar SpA Collateralized money invested   KRW 954  IBK
KOSPO Chile SpA
 Laurel SpA Collateralized money invested   KRW 613  IBK
Korea Midland Power Co., Ltd.
 YeongGwang Yaksu Wind Electric Co., Ltd. Collateralized money invested   KRW 133  IBK and others
Korea Midland Power Co., Ltd.
 Hyundai Green Power Co., Ltd. Collateralized money invested   KRW 118,172  
Korea Development Bank
and others
Korea Midland Power Co., Ltd.
 PT. Cirebon Electric Power Debt guarantees   USD 3,355  Mizuho Bank
Korea Midland Power Co., Ltd.
 PT Wampu Electric Power Debt guarantees   USD 5,473  PT. Bank KB Bukopin
Korea Midland Power Co., Ltd.
 Green Energy Electricity Generation Co., Ltd. Collateralized money invested   KRW 8  IBK
  Guarantees for supplemental funding (*1)     IBK and others
Korea Midland Power Co., Ltd.
 Yaksu ESS Co., Ltd. Collateralized money invested   KRW 285  IBK
Korea Midland Power Co., Ltd.
 Gwangbaek Solar Power Investment Co., Ltd. Collateralized money invested   KRW 5,155  
Kyobo Life Insurance Co.,
Ltd. and others
Korea Midland Power Co., Ltd.
 Muan Sunshine Solar Power Plant Co., Ltd. Collateralized money invested   KRW 2,822  IBK
Korea Midland Power Co., Ltd.
 Goesan Solar park Co., Ltd. Collateralized money invested   KRW 2,877  IBK
Korea Midland Power Co., Ltd
.
 Bitgoel Eco Energy Co., Ltd. Collateralized money invested   KRW 7,328  
IBK and others
  Guarantees for supplemental funding (*1)     
Korea Midland Power Co., Ltd.
 Energyco Co., Ltd. Collateralized money invested   KRW 2,140  Nonghyup Bank
  Payment guarantees   KRW 2,700  Shinhan bank
Korea Midland Power Co., Ltd.
 Jeju Gimnyeong Wind Power Co., Ltd. Collateralized money invested   KRW 246  Nonghyup Bank
Korea Midland Power Co., Ltd.
 Dongbu Highway Solar Co., Ltd. Collateralized money invested   KRW 380  Shinhan Bank
Korea Midland Power Co., Ltd.
 Seobu Highway Solar Co., Ltd. Collateralized money invested   KRW 406  Shinhan Bank
Korea Midland Power Co., Ltd.
 Yeongyang Wind Power Corporation II Collateralized money invested   KRW 10,100  
Korea Development Bank
and others
Korea Midland Power Co., Ltd.
 Haeparang Energy Co., Ltd. Collateralized money invested   KRW 2,104  
Templeton hana asset
management Co. Ltd.
  Guarantees for supplemental funding (*1)     
Korea Midland Power Co., Ltd.
 Saemangeum Sebit Power Plant Co., Ltd. 
Collateralized money invested
Guarantees for supplemental funding (*1)
   
KRW 27,762
 
 
 IBK and others
Korea Midland Power Co., Ltd.
 Yeomsubong Wind Power Co., Ltd. Collateralized money invested   KRW 871  Korea Development Bank
  Guarantees for supplemental funding (*1)     
Korea South-East Power Co., Ltd.
 Boim Combined Heat and Power Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.) Collateralized money invested (*3)     IBK
  Guarantees for supplemental funding and others (*1,4)   KRW 76,800  
NH investment & securities
Co., Ltd. and others
Korea South-East Power Co., Ltd.
 RES Technology AD Collateralized money invested   KRW 14,383  
UniCredit Bulbank and
others
Korea South-East Power Co., Ltd.
 
ASM-BG
Investicii AD
 Collateralized money invested   KRW 14,739  
UniCredit Bulbank and
others
Korea South-East Power Co., Ltd.
 Expressway Solar-light Power Generation Co., Ltd. Collateralized money invested (*1)   KRW 5,187  Woori Bank
Korea South-East Power Co., Ltd.
 Goseong Green Power Co., Ltd. Collateralized money invested   KRW 287,624  
Kyobo Life Insurance Co.,
Ltd. and others
Korea South-East Power Co., Ltd.
 Gangneung Eco Power Co., Ltd. Collateralized money invested   KRW 254,929  
Kyobo Life Insurance Co.,
Ltd. and others
Korea South-East Power Co., Ltd.
 PND Solar Co., Ltd. Collateralized money invested   KRW 1,510  IBK
Korea South-East Power Co., Ltd.
 Hyundai Eco Energy Co., Ltd. Collateralized money invested   KRW 7,947  
Samsung Life Insurance
and others
Korea South-East Power Co., Ltd.
 Jaeun Resident Wind Power Plant Co., Ltd. Collateralized money invested   KRW 2,214  IBK
 
F-219
KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(7)
Guarantees provided to related parties as of December 31, 2023 are as follows, continued:
 
Primary guarantor
 
Principal obligor
 
Type of guarantees
  
Credit limit
  
Creditor
       
In millions of won
and thousands of
foreign currencies
   
Korea South-East Power Co., Ltd.
 Chungsongmeon BongSan wind power Co., Ltd. Collateralized money invested   KRW 2,665  
Kyobo Life Insurance Co.,
Ltd. and others
Korea South-East Power Co., Ltd.
 Yeongam Solar Power Co., Ltd. Collateralized money invested   KRW 9,637  Kookmin Bank and others
Korea South-East Power Co., Ltd.
 Samsu Wind Power Co., Ltd. Collateralized money invested   KRW 3,022  Shinhan Bank and others
Korea South-East Power Co., Ltd.
 Saemangeum Heemang Photovoltaic Co., Ltd. Collateralized money invested   KRW 14,420  Woori Bank and others
Korea South-East Power Co., Ltd.
 
Nepal Water & Energy
Development Company Private Limited
 Collateralized money invested   USD 97,105  
International Finance
Corporation and others
 Business reserve payment guarantee   USD 33,333 
Korea Hydro & Nuclear Power Co., Ltd.
 Noeul Green Energy Co., Ltd. Collateralized money invested     Hana Bank and others
Korea Hydro & Nuclear Power Co., Ltd.
 Busan Green Energy Co., Ltd. Collateralized money invested   KRW 3,260  Shinhan Bank and others
Korea Hydro & Nuclear Power Co., Ltd.
 Go deok Clean Energy Co., Ltd. Collateralized money invested   KRW 4,722  Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd.
 Cheong-Song Noraesan Wind Power Co., Ltd. Collateralized money invested   KRW 3,755  Woori Bank and others
Korea Hydro & Nuclear Power Co., Ltd.
 Gwangyang Green Energy Co., Ltd. Collateralized money invested   KRW 24,638  Shinhan Bank and others
Korea Hydro & Nuclear Power Co., Ltd.
 Gangneung Sacheon Fuel Cell Co., Ltd. Collateralized money invested   KRW 7,869  Hana Bank and others
Korea Hydro & Nuclear Power Co., Ltd
 Chuncheon Green Energy Co., Ltd. Collateralized money invested   KRW 8,901  Hana Bank and others
    Guarantees for supplemental funding (*1)     
 
Korea Hydro & Nuclear Power Co., Ltd.
 Yangyang Suri Wind Power Co., Ltd. Collateralized money invested   KRW 9,608  Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd.
 Bigeum Resident Photovoltaic Power Co., Ltd. Collateralized money invested     Kookmin Bank and others
Korea Hydro & Nuclear Power Co., Ltd.
 Songsan Green Energy Co., Ltd. Collateralized money invested   KRW 8,323  Hana Bank
Korea Hydro & Nuclear Power Co., Ltd.
 Changwon Nu-ri Energy Co., Ltd. Collateralized money invested   KRW 8,026  Hana Bank
Korea Hydro & Nuclear Power Co., Ltd.
 KAS INVESTMENT I LLC Payment guarantees (*13)   USD 9,770  WOORI AMERICA BANK
Korea Hydro & Nuclear Power Co., Ltd.
 KAS INVESTMENT II LLC Payment guarantees (*13)   USD 9,730  WOORI AMERICA BANK
 
(*1)
The Company guarantees to provide supplemental funding for business with respect to excessive business expenses or insufficient repayment of borrowings.
 
(*2)
Samcheok Eco Materials Co., Ltd., an associate of the Company has issued the hybrid bonds. If the bonds are not repaid by December 8, 2026, the parent company and shareholders except the parent company must purchase the bonds from the acquirer. As of December 31, 2023, derivative liabilities of W18,753
million
were recognized in relation to this obligation.
 
(*3)
The Company recognized an impairment loss on all of the equity securities of Generation Co., Ltd. (formerly, Dayone Energy Co., Ltd.) before the prior year, and the acquisition cost of the securities provided as collateral is ₩47,067 million.
 
(*4)
Pursuant to the guarantee agreement, the Company recognized other provisions of ₩8,418 million as the possibility of economic benefit outflow to fulfill the obligation was deemed probable and the amount could be reasonably estimated.
 
(*5)
The common stocks of Dongducheon Dream Power Co., Ltd. held by the Company were pledged as collateral.
 
(*6)
The Company provided a payment guarantee to Jordan Tafila wind power project for opening L/C for Debt Service Reserve Account (DSRA).
 
(*7)
This includes a guarantee related to L/C for debt repayment allowance provided to DE Energia SpA, a joint venture of the Company.
 
(*8)
The Company recognized an impairment loss on all of the equity securities of Naepo Green Energy Co., Ltd. before the prior year, and the acquisition cost of the securities provided as collateral is ₩29,200 million.
 
(*9)
The credit limits of guarantees to RE Holiday Holdings LLC include the credit limits of guarantees to their subsidiaries.
 
(*10)
The Company, together with other shareholders, has provided a guarantee for the project financing of Pulau Indah Power Plant Sdn. Bhd., by establishing the right of pledge on the shares of Pulau Indah Power Plant Sdn. Bhd.
 
(*11)
Xe-Pian Xe-Namnoy Power Co., Ltd., an associate of the Company, has entered a contract to pay an incentive type of impounding bonus to SK Eco Plant Co., Ltd. when the Xe-Pian Xe-Na-mnoy Dam is completed. If Xe-Pian Xe-Namnoy Power Co., Ltd. fails to pay SK Eco Plant Co., Ltd., the Company guarantees the payment, and the amount is USD 5,000
 thousand
.
 
(*12)
The Company provided a payment guarantee to Chile Kelar project for opening L/C for Debt Service Reserve Account (DSRA), and others.
 
(*13)
The credit limits of guarantees to KAS INVESTMENT I LLC, KAS INVESTMENT II LLC include the credit limits of guarantees to their subsidiaries.
 
(*14)
This is an L/C opening guarantee for the performance of each contract in relation to the power sales contract and gas supply contract of South Jamaica Power Company Limited, a joint venture of the Company.
 
(*15)
The Company has entered into an agreement to settle and pay the estimated loss amount in case damages occur in relation to the fulfillment of the mandatory supply volume according to the mandatory supply agreement for coal ash.
 
F-220

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(8)
Guarantees received from related parties as of December 31, 2023 are as follows
:
 
Primary Guarantor
 
Type of guarantees
      
Credit limit
 
KAPES, Inc.
 Defect guarantees      17,558 
 Performance guarantees     6,229 
 Advance payment guarantee     135,598 
 
(9)
Derivatives transactions with related parties as of December 31, 2023 are as follows:
 
 (i)
Currency Swap
 
Counterparty
  
Contract
year
       
Contract

amounts
   
Contract interest rate

per annum
      
Contract

exchange

rate

(in won)
 
      
Pay
   
Receive
   
Pay
  
Receive
 
   
In millions of won and thousands of foreign currencies except contract exchange rate information
 
Korea Development Bank
   2019~2024       177,600    USD 150,000    1.24  2.50     1,184.00 
   2020~2025      241,320    USD 200,000    0.54  1.13    1,206.60 
   2021~2026      118,170    USD 100,000    1.11  1.13    1,181.70 
   2022~2026      283,820    USD 200,000    4.67  5.38    1,419.10 
   2022~2028      283,820    USD 200,000    5.12  5.50    1,419.10 
   2023~2026      256,000    USD 200,000    4.04  5.38    1,280.00 
   2015~2025      111,190    USD 100,000    2.62  3.25    1,111.90 
   2017~2027      111,610    USD 100,000    2.31  3.13    1,116.10 
   2018~2028      108,600    HKD 800,000    2.69  3.35    135.75 
   2019~2027      119,978    CHF 100,000   1.43  0.05    1,199.78 
   2021~2026      111,400    USD 100,000    0.93  1.25    1,114.00 
   2022~2027      262,000    USD 200,000    3.63  4.25    1,310.00 
   2020~2026      118,910    USD 100,000    0.61  1.00    1,189.10 
   2021~2026      114,230    USD 100,000    1.27  1.25    1,142.30 
   2022~2027      123,710    USD 100,000    3.41  3.63    1,237.10 
   2022~2025      128,560    USD 100,000    3.37  4.13    1,285.60 
   2020~2025      122,780    USD 100,000    0.93  1.75    1,227.80 
   2022~2025      252,360    USD 200,000    2.83  3.60    1,261.80 
   2023~2028      129,500    USD 100,000    3.85  4.88    1,295.00 
 
 (ii)
Currency forward
In millions of won and thousands of foreign currencies except contract exchange rate information
 
Counterparty
  
Contract

date
   
Maturity

date
       
Contract amounts
       
Contract

exchange

rate
(in won)
 
      
Pay
   
Receive
 
Korea Development Bank
   2023.12.20    2024.01.15       10,383    USD 8,000       1,297.90 
   2023.12.01    2024.01.15      14,303    USD 11,000      1,300.30 
   2023.12.15    2024.02.14      11,617    USD 9,000      1,290.80 
 
F-221

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
47.
Related Parties, Continued
 
(10)
The Company considers all standing directors of the Board who serve as executive officers responsible for planning, operations and/or control of business activities, as key management personnel, except a standing director who is a member of the Audit Committee. The Company recorded salaries and other compensations related to the key management personnel as follows:
 
 
Type
      
2021
   
2022
   
2023
 
       
In millions of won
 
Salaries
      1,272    1,026    866 
Retirement benefits
     21    58    33 
    
 
 
   
 
 
   
 
 
 
           1,293         1,084         899 
    
 
 
   
 
 
   
 
 
 
 

48.
Statement of Cash Flows
 
(1)
Significant
non-cash
transactions for the years ended December 31, 2021, 2022 and 2023 are as follows:
 
Transactions
      
2021
   
2022
   
2023
 
       
In millions of won
 
Transfer from
construction-in-progress
to other assets
      12,902,589    13,723,972    10,090,726 
Recognition of asset retirement cost and related provision for decommissioning costs
     2,356,805    3,497,866    (292,120
Transfer from provision for disposal of spent nuclear fuel to accrued expenses
     455,401    417,687    379,011 
Transfer from long-term borrowings and debt securities to current portion of long-term borrowings and debt securities
     11,109,271    13,838,578    30,454,012 
Transfer from inventory to stored nuclear fuel
     908,842    738,720    827,279 
Transfer of
right-of-use
assets due to change in accounting policy and others
     78,213    197,016    261,862 
 
(2)
Changes in liabilities incurred from financing activities for the years ended December 31, 2022 and 2023 are as follows:
 
 
       
2022
 
              
Non-cash
changes
     
       
Beginning
balance
   
Cash flows
  
Increase
   
Effect of
exchange rate

fluctuations
and others
   
Ending
balance
 
       
In millions of won
 
Borrowings and debt securities
      80,529,513    39,193,815       882,037    120,605,365 
Lease liabilities
     4,410,503    (562,647  109,019    206,268    4,163,143 
    
 
 
   
 
 
  
 
 
   
 
 
   
 
 
 
      84,940,016    38,631,168   109,019    1,088,305    124,768,508 
    
 
 
   
 
 
  
 
 
   
 
 
   
 
 
 
 
       
2023
 
              
Non-cash
changes
    
       
Beginning
balance
   
Cash flows
  
Increase
   
Effect of
exchange rate

fluctuations
and others
  
Ending
balance
 
       
In millions of won
 
Borrowings and debt securities
      120,605,365    12,692,924       333,541   133,631,830 
Lease liabilities
     4,163,143    (574,239  253,495    (34,519  3,807,880 
    
 
 
   
 
 
  
 
 
   
 
 
  
 
 
 
      124,768,508    12,118,685   253,495    299,022   137,439,710 
    
 
 
   
 
 
  
 
 
   
 
 
  
 
 
 
 
F-222

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, 
Continued
December 31, 2022 and 2023
 
 
49.
Commitments for Expenditure
 
(1)
The commitments related to acquisition of property, plant and equipment as of December 31, 2022 and 2023 are as follows:
 
       
2022
   
2023
 
Contracts
      
Commitment
amounts
   
Remaining

liability balances
   
Commitment
amounts
   
Remaining
liability balances
 
       
In millions of won
 
Purchase of cable (PVC, 1C, 2000SQ) 153,000M and others (Shin-Bupyung-Youngseo)
      57,203    12,595    57,226    417 
Purchase of cable (PVC, 1C, 2500SQ) 103,374M and others (Bukdangjin-Shin-Tangjung)
     50,151    37,638    51,796    20,661 
Purchase of GIS (362kV, 6300A, 63kA) 23CB – Youngseo S/S
     37,168    16,788    37,168    15,109 
Purchase of GIS (362kV, 6300A, 63kA) 27CB – Kwangyang S/S
     37,744    140    37,744    140 
Purchase of cable (PVC, 1C, 2500SQ) 100,548M and others (Kyungin Construction)
     58,269    3,883    58,271    746 
Purchase of GIS (362kV, 6300A, 63kA) 25CB – Migeum S/S
     33,841    25,641    35,136    20,370 
Purchase of cable (PVC, 1C, 2000SQ) 5,862M and others (Baekun-Gwangyanghang)
     35,949    3,232    35,016    703 
Concrete pole (10M, general purpose, 350KGF) 126,948 ea and five other equipments (unit price contract)
     202,795    95,428         
Purchase of GIS (362KV, 6300A, 63KA) Type 19 – Shinyangsan S/S
     31,834    17,334    32,460    5,635 
Purchase of cable (PVC, 1C, 2500SQ) 57,868M and others (Goduk-Seoansung)
     40,937    3,748    40,937    654 
Purchase of cable (PVC, 1C, 2000SQ) 87,732M and others (Eulwangboonki)
     36,155    10,274    36,446    1,015 
Purchase of GIS(362KV,6300A,63KA) Type 18 – Wolsung S/Y
     32,090    32,090    32,090    26,742 
Purchase of cable (FR
CNCO-W,1C,325SQ)
672,300M (unit price contract)
     31,387    19,213         
Purchase of cable (TR
CNCE-W,1C,325SQ)
1,342,000M (unit price contract)
     75,620    40,497         
Purchase of cable (TR
CNCE-W,1C,600SQ)
377,000M (unit price contract)
     31,851    17,478         
Purchase of cable (TR
CNCE-W/AL,1C,400SQ)
2,175,300M (unit price contract)
     53,064    29,436         
System stabilization ESS equipment (Bubuk S/S) Type 1
     222,300    222,300    222,300    145,014 
System stabilization ESS equipment (Shinnamwon S/S) Type 1
     211,500    211,500    211,500    130,169 
System stabilization ESS equipment (Yeongcheon S/S) Type 1
     73,104    73,104    73,104    18,604 
Concrete pole (10M, general purpose, 500KGF) 111,000 ea and four other equipments
             67,996    39,971 
Advanced EType low voltage electronic watt-hour meter 1,311,552 ea
             36,103     
System stabilization ESS equipment (Yesan S/S) Type 1
             56,403    12,095 
System stabilization ESS equipment (Hamyang S/S) Type 1
             35,609    12,870 
Construction of Saeul Units (#3,4)
     9,800,424    2,455,673    9,800,424    1,113,349 
Construction of Shin-Hanul Units (#1,2)(*)
     10,327,372    97,889    10,592,760     
Construction of Shin-Hanul Units (#3,4)
     11,007,232    10,858,828    11,680,361    10,935,737 
Other 30 contracts
     853,941    425,149    1,631,574    1,133,467 
Purchase of main machine for Jeju LNG combined
     166,287    10,898    166,287     
Purchase of equipments for the construction project of Boryeong indoor coal storage yard
     318,197    287,965    334,932    279,920 
Purchase of main machine for Boryeong New Complex Unit 1
             281,600    228,053 
Boryeong New Complex Unit 1 Construction Project
             186,358    186,358 
Service of designing Taean Units (#9,10)
     112,909    12,468    112,909    12,468 
Purchase of gas turbine and turbine equipment of Gimpo combined heat & power plant
     126,302    32,748    123,495    15,603 
Purchase of steam turbine, HRSG and POWER BLOCK of Gimpo combined heat & power plant
     221,997    38,714    220,864    214 
Construction of Gimpo combined heat & power plant
     181,798    56,558    211,372    13,960 
Purchase of gas turbines, steam turbines, and accessories for Gumi natural gas power plant
     197,983    197,983    197,983    193,578 
Purchase of heat recovery boiler and accessories for Gumi natural gas power plant
             65,918    45,299 
 
F-223

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
49.
Commitments for Expenditure, Continued
 
(1)
The commitments related to acquisition of property, plant and equipment as of December 31, 2022 and 2023 are as follows, continued:
 
       
2022
   
2023
 
Contracts
      
Commitment
amounts
   
Remaining

liability balances
   
Commitment
amounts
   
Remaining
liability balances
 
       
In millions of won
 
Construction of Gumi natural gas power plant
      204,094    204,094    210,393    173,350 
Installation of natural gas supply facility at Gumi natural gas power plant
     70,620    70,620    70,620    61,799 
Purchase of coal handling machine for construction of Samcheok Units (#1,2)
     299,048    6,687    312,150    5,682 
Purchase of main equipment for Namjeju
     140,144    3    140,144    3 
Purchase of main equipment for Shin-Sejong combined thermal power plant
     234,392    32,621    234,392    8,342 
Purchase of Hadong thermal power indoor carboniferous plant
     162,814    62,299    167,259    48,495 
Purchase of phase 2 power generation facility for Yeongwol fuel cells
     86,100    30,527    86,350    219 
Purchase of fuel cell power generation facilities for the fifth stage of Shinincheon headquarters
     81,960    81,960    81,960    18,290 
 
(*)
As of December 31, 2023, the commitment amounts include the Shin-Hanul Unit #1, construction of which has completed during the year ended December 31, 2022. In addition, as of December 31, 2023, Shin-hanul Unit #2 is in commissioning.
 
(2)
As of December 31, 2023, details of contracts for inventory purchase commitment are as follows:
The Company imports all of its uranium ore concentrates from sources outside Korea (including the United States, United Kingdom, Kazakhstan, France, Russia, South Africa, Canada and Australia) which are paid for with currencies other than Won, primarily in U.S. dollars. In order to ensure stable supply, the Company entered into long-term and medium-term contracts with various suppliers, and supplements such supplies with purchases of fuels on spot markets. The long-term and medium-term contract periods vary among contractors and the stages
of
fuel manufacturing process. Contract prices for processing of uranium are generally based on market prices. Contract periods for ore concentrates, conversion, enrichment and design and fabrication are as follows:
 
Type
  
Periods
   
Contracted
quantity
Concentrate
   2023 ~ 2033   21,400 Ton U3O8
Conversion
   2023 ~ 2030   16,300 Ton U
Enrichment
   2023 ~ 2032   18,893 Ton SWU
In addition, the contracted quantity of the molded uranium between Korea Hydro & Nuclear Power Co., Ltd. and KEPCO Nuclear Fuel Co., Ltd., which are subsidiaries of the Company, is 1,285 Ton U (contract periods : 2014 ~ 202
6
).
 
50.
Contingencies and Commitments
 
(1)
Ongoing litigations and claims related with contingent liabilities and contingent assets as of December 31, 2022 and 2023 are as follows:
 
   
2022
   
2023
 
   
Number
of cases
   
Claim
amount
   
Number
of cases
   
Claim
amount
 
   
In millions of won
 
As the defendant
   653   981,878    666   805,227 
As the plaintiff
   238    599,809    268    571,593 
As of December 31, 2023, there are 3 ongoing litigations and 1 arbitration case between consolidated entities.
 
F-224

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
50.
Contingencies and Commitments, Continued
 
(1)
Ongoing litigations and claims related with contingent liabilities and contingent assets as of December 31, 2022 and 2023 are as follows, continued:
 
1)
The Company is the defendant against a number of claims. The following is ongoing claim pertaining to the Company which can potentially be significant:
There are multiple ongoing claims against the Company related to ordinary wages, requesting payment of unpaid wages. The Company believes that the possibility of the outflow of economic benefits is probable on the ongoing and the expected lawsuits. Accordingly, the Company recognized ₩39,229 million as litigation provisions in relation to the lawsuit as of December 31, 2023.
 
2)
In addition to the abovementioned significant ongoing claims, there are 15 arbitration cases pertaining to the Company as of December 31, 2023 and the significant arbitration cases for the year ended December 31, 2023 are as follows:
 
 i)
During the year ended December 31, 2022, the Company filed an arbitration application with Westinghouse Electric Company LLC to Korean Commercial Arbitration Board, requesting to confirm whether the Company is subject to nuclear power plant export control procedures or not. As of the December 31, 2023, the Company has
not
recognized any provision because the amount and timing of economic benefit outflow cannot be reasonably estimated.
 
 ii)
During the year ended December 31, 2023, the Company filed an arbitration application to Korean Commercial Arbitration Board in relation to the insufficient operation performance of Sinseongnam Substation (345kV) STATCOM (reactive power compensation system for voltage stabilization in metropolitan area), but cannot reasonably estimate whether the inflow of economic benefits is probable as a result of the arbitration.
 
 iii)
During the year ended December 31, 2023, Hitachi Energy Sweden filed an arbitration against the Company regarding the request for additional payment due to the increase in capacity of some facilities and the withdrawal of liquidated damage in relation to Shin
Young-ju
and Shin Jecheon substation TCSC construction projects. The Company has
not
recognized any provision because the amount and timing of economic benefit outflow cannot be reasonably estimated.
 
 iv)
During the year ended December 31, 2023, the Company filed a commercial arbitration to request payment of expenses such as monitoring vessel operating expenses for Jindo-Jeju high-voltage direct current (HVDC) connection project contract, but has
not
recognized any provision because the amount and timing of economic benefit outflow cannot be reasonably estimated.
 
(2)
Guarantees of payments and commitments provided to other companies as of December 31, 2023 are as follows:
 
 1)
The Company has provided the syndicate of lenders of PT Indo Raya Tenaga, the business corporation of PT Barito Wahana Tenaga, a guarantee by establishing the right of pledge on the shares of PT Barito Wahana Tenaga for project financing of PT Barito Wahana Tenaga as of December 31, 2023.
 
 2)
The Company has outstanding borrowings with a limit of USD 264,800 thousand from its creditors such as International Finance Corporation. Regarding the borrowing contract, the Company has guaranteed capital contribution of USD 69,808 thousand and additional contribution up to USD 19,000 thousand for contingencies, if any. In relation to this financial agreement, the Company is providing its entire shares in Mira Power Limited and business-related PP&E as collateral to the lenders.
 
 3)
The Company has provided USD 6,085 thousand, equivalent to the shareholdings of PTBS Energy and PT Nusantara Hydro Alam, for third-party joint guarantee to Export-Import Bank of Korea, BNP Paribas and ING Bank, to guarantee the payment of debt related to hydroelectric power business of Tanggamus, Indonesia.
 
 4)
The Company has provided USD 5,473 thousand
for a debt guarantee to PT. Bank KB Bukopin, to guarantee the payment of debt in relation to hydroelectric power business of Wampu, Indonesia. 
 
 5)
The Company has provided RBC Community Investments Impact Renewables
HoldCo-1,
LLC a performance guarantee regarding weatherization in relation with tax investors up to USD 3,000 thousand for the of the power plant construction for Concho Valley solar power project in the United States.
 
 6)
The Company has provided EUR 12,053 thousand for a performance guarantee to Microsoft through Kookmin Bank, to guarantee the implementation of the power plant construction for Guba Buget wind power project in Sweden.
 
 7)
The Company has provided Axia Power Holdings B.V. and others a performance guarantee up to USD 54,000 thousand for the implementation of Cirebon thermal power generation project in Indonesia.
 
F-225

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
50.
Contingencies and Commitments, Continued
 
(2)
Guarantees of payments and commitments provided to other companies as of December 31, 2023 are as follows, continued:
 
 8)
The Company has provided USD 54,000 thousand for a performance guarantee to PT. Cirebon Electric Power, to guarantee the Cirebon coal-fired power plant operation and maintenance project in Indonesia.
 
 9)
The Company has provided USD
3,355
thousand for the guarantee of debt repayment reserves of PT. Cirebon Electric Power’s Indonesia Cirebon power plant project to Mizuho Bank, Ltd. through Nonghyup Bank.
 
 10)
The Company has provided PT Perusahaan Listrik Negara a performance guarantee up to IDR 35,588,165 thousand for the implementation of Tanjung Jati power plant operation project in Indonesia. 
 
 11)
The Company has provided USD 30,000 thousand for a performance guarantee to Morgan Stanley Capital Group Inc., to guarantee the electricity purchase contract in relation to photovoltaic power generation project in USA.
 
 12)
The Company has provided Morgan Stanley Renewables Inc. a guarantee up to USD 70,000 thousand for the fulfillment of subscription obligation regarding photovoltaic power generation project in USA.
 
 13)
The Company has provided Kookmin Bank a debt guarantee up to USD 40,000 thousand to guarantee Equity Bridge Loan for Concho Valley solar business in the United States.
 
 14)
The Company has provided Van Phong Power Company, Ltd. a performance guarantee up to USD
5,000
 
thousand for the operation maintenance project in Van Phong, Vietnam.
 
 15)
The Company has provided RBC Community Investments Impact Renewables HoldCo-1, LLC a guarantee for up to USD 62,800 thousand for the fulfillment of subscription obligation regarding Concho Valley solar power project in the United States.
 
 16)
The Company has provided PT Perusahaan Listrik Negara a performance guarantee up to USD 2,280 thousand for the operation maintenance project in Indonesia siborpa.
 
 17)
As of December 31, 2023, Gunsan Land Solar Co., Ltd., a joint venture of the Company, has built and is operating a 99 MW photovoltaic power generation facility in the public water reclamation area in Osikdo-dong, Gunsan-si, Jeollabuk-do. The Company is obligated to ensure that Gunsan Land Solar Co., Ltd. can finance up to 80% of the total project cost with investments from citizen and provide a 7% return on the citizen who invested after the construction period is over according to the Shareholders’ agreement. In addition, when the investment from citizen fails to reach the target percentage of 80% and additional debts are collected for fulfill the target percentage, the Company is obligated to provide Gunsan-si the amount of 7% return on uncollected citizen investments estimated to be collected less the amount of additional debts collected instead.
 
 18)
The Company has provided joint guarantee for ₩1,641 million guarantee insurance contracted by Haetbyeotgil Sunlight Co., Ltd.
 
F-226

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes
to
the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
50.
Contingencies and Commitments, Continued
 
(3)
Lines of credit provided by financial institutions as of December 31, 2023 are as follows:
 
Commitments
  
Financial institutions
  
Currency
 
Credit

limit
   
Used amount
 
              
   
In millions of won and thousands of foreign currencies
 
Commitments on Bank-overdraft
  Nonghyup Bank and others  KRW  2,260,500    3,096 
Limit amount available for CP
  Hana Bank and others  KRW  5,650,000    5,650,000 
General Loan, etc.
  Hana Bank and others  KRW  4,400,000    4,350,000 
Limit amount available for card
  Hana Bank and others  KRW  47,424    1,919 
Loan limit
  Korea Development Bank and others   KRW   2,708,395    1,969,529  
  
DBS Bank and others
  
USD
 
 
1,782,000
 
  
 
USD 40,000
 
        KRW 200,000 
Certification of payment on payables from foreign country Certification of payment on L/C
  
Nonghyup Bank
  
USD
 
 
8,700
 
  
 
5,270
 
  
Shinhan Bank and others
  USD  1,160,452    178,558 
  Kookmin Bank and others  EUR  42,688    42,688 
  Shinhan Bank  JPY  481,785    481,785 
Certification of Performance guarantee on contract
  Hana Bank and others  KRW  145,855    125,289 
  First Abu Dhabi Bank and others  USD  921,138    788,313 
  Korea Development Bank and others  JPY  620,000    620,000 
  Hana Bank  EUR  12,106    12,106 
  Hana Bank  INR  44,872    44,872 
  Hana Bank  OMR  6,250    6,250 
  Hana Bank  SAR  4,151    4,151 
Certification of bidding
  Hana Bank  USD  5,200     
  Export-Import Bank of Korea  EUR  10,000    10,000 
Advance payment bond, Warranty bond, Retention bond and others
  
Seoul Guarantee Insurance
Hana Bank and others
  
KRW
USD
  
57,670
813,839
 
 
   
57,670
763,596
 
 
  Saudi National Bank  SAR  21,000    21,000 
  Hana Bank and others  MXN  21,597    20,027 
Others (*)
  Nonghyup Bank and others  KRW  337,126    KRW 19,943 
        USD 20,832 
        EUR 282 
  Nonghyup Bank and others  USD  316,327    USD 60,073 
        EUR 48,825 
  StandardChartered  AED  50    50 
Secured loan of credit sales
  Nonghyup Bank and others  KRW  271,000     
Inclusive credit
  Hana Bank  KRW  8,000    4,920 
  Hana Bank and others  USD  135,000    USD 15,141 
       
 
INR 345,206
 
Equity Bridge Loan Guarantee
  
Export-Import Bank of Korea
and others
  USD  1,764,555    1,372,546 
Trade finance
  DBS Bank and others  USD  870,000     
 
 (*)
As of December 31, 2023, the Company has entered into a credit extension agreement for derivatives transactions with Nonghyup Bank, Hana Bank, and Woori Bank as ancillary to currency swap transactions.
 
F-227

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
50.
Contingencies and Commitments, Continued
 
(4)
As of December 31, 2023, blank check and assets provided as collaterals or pledges to financial institutions by the Company are follows:
 
Obligor
  
Creditor
  
Assets provided as security
  
Currency
 
Amount
   
Description
                
   
In millions of won and thousands of foreign currencies
Mira Power Limited
  
International Finance
Corporation and others
  
Property, plant and
equipment and others
  USD  264,800   Collateral for borrowings(*1)
Tamra Offshore Wind Power Co., Ltd.
  
Kyobo Life Insurance Co., Ltd. and others
  
Property, plant and
equipment and others
  
KRW
 
 
171,600
 
  
Collateral for borrowings(*2)
Gyeonggi Green Energy Co., Ltd.
  
Korea Development Bank and others
  
Cash and cash
equivalents and others
  
KRW
 
 
327,080
 
  
Collateral for borrowings(*2)
Commerce and Industry Energy Co., Ltd.
  
IBK and others
  
Property, plant and
equipment and others
  
KRW
 
 
110,500
 
  
Collateral for borrowings(*2)
Jeongam Wind Power Co., Ltd.
  KDB Capital Corporation and others  
Cash and cash
equivalents and others
  KRW  230,259   Collateral for borrowings(*2)
Gyeongju Wind Power Co., Ltd.
  
Shinhan Bank and others
  
Property, plant and
equipment and others
  
KRW
 
 
68,400
 
  
Collateral for borrowings(*2)
Korea Offshore Wind Power Co., Ltd.
  
Woori Bank and others
  
Property, plant and
equipment and others
  
KRW
 
 
293,400
 
  
Collateral for borrowings(*2)
Qatrana Electric Power Company
  
The Islamic Development Bank and others
  
Finance lease receivable
and property, plant and
equipment and others
  
JOD
 
 
136,623
 
  
Collateral for borrowings(*1)
KST Electric Power Company, S.A.P.I. de C.V.
  
Export-Import Bank of Korea and others
  
Finance lease receivable and property, plant and equipment and others
  
USD
 
 
401,277
 
  
Collateral for debt securities(*1)
Incheon Fuel Cell Co., Ltd.
  Kookmin Bank and others  Cash and cash equivalents and others  KRW  276,960   Collateral for borrowings(*2)
K-SOLAR SHINAN Co., Ltd.
  
Kyobo Life Insurance Co., Ltd. and others
  
Property, plant and
equipment and others
  
KRW
 
 
329,736
 
 
 
Collateral for borrowings(*2)
KOSPO Youngnam
Power Co., Ltd.
  
 
Shinhan Bank and others
  
 
Cash and cash
equivalents and others
  
 
KRW
 
 
 
 
744,120
 
 
  
 
Collateral for borrowings(*2)
Jeju Hanlim Offshore Wind Co., Ltd.
    Kookmin Bank and others  
 
Property, plant and
equipment and others
  
 
KRW
 
 
 
 
1,800
 
 
  
 
Collateral for borrowings(*2)
Western Power Changgi Solar Co., Ltd.
  
 
Samsung Life Insurance and others
  
 
Property, plant and
equipment and others
  
 
KRW
 
 
 
 
58,500
 
 
  
 
Collateral for borrowings(*2)
J Wind First, LLC
  Woori Bank  
Trade receivable and
others
  KRW  55,000   Collateral for borrowings (*2)
Chitose Solar Power Plant LLC
  
Korea Development
Bank
  
Property, plant and
equipment and others
  USD  134,289   Collateral for borrowings(*1)
Mangilao Intermediate Holdings LLC
  
 
Mizuho Bank
  
 
Trade receivable and
others
  
 
USD
 
 
 
 
93,392
 
 
  
 
Collateral for borrowings(*1)
 
F-228

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
50.
Contingencies and Commitments, Continued
 
(4)
As of December 31, 2023, blank check and assets provided as collaterals or pledges to financial institutions by the Company are follows, continued:
 
(*1)
This is based on the amount of loan commitment limit.
 
(*2)
As of December 31, 2023, the Company has established guarantees for pledge for transfer of rights of long-term borrowings, pledge for insurance claims, pledge for shares, etc.
The Company has ₩1,197 million of project loans from the Korea Energy Agency as of December 31, 2023. The Company has provided a promissory note as a repayment guarantee.
 
(5)
The Company temporarily suspended operations of the Gangneung hydroelectric generating plant, with a carrying amount of ₩62,871 million as of September December 31, 2023, to improve the quality of water used in generating electricity. The expenses related to the suspension of operations of ₩1,494 million and depreciation on the idle assets of ₩3,683 million are recorded in other expenses for the year ended December 31, 2023. Regarding the improvement of water quality, the results of damages compensation for the local residents cannot be reasonably estimated, and the Company is in negotiations with Gangneung City and related stakeholders to restart the Gangneung hydroelectric generating plant as of December 31, 2023.
 
(6)
As the government of the Republic of Korea announced the suspension of operation in Gaeseong Industrial District, it is uncertain if the Company can exercise the property rights for the Company’s facility in Gaeseong Industrial District as of December 31, 2023. The book value of facility is ₩12,123 million and trade receivables related to the companies residing in Gaeseong Industrial District have been fully
written-off.
As of December 31, 2023, the Company cannot make reasonable estimation on whether assets will be recovered or utilized in regular way related thereto.
 
(7)
As of December 31, 2023, the Company owns land at
6171-1
Nuri-ri,
Yeongi-myeon, Sejong Special Self-Governing City as PP&E with limited ownership, and its book value is ₩
64,371
million.
 
(8)
The Korea Institute of Energy Technology(KENTECH) was established in April, 2020, in accordance with the “Basic plan for the establishment of KENTECH (July, 2019)”. By the special law to create KENTECH, the Company, government, and local government may contribute to the fund. The Company will decide whether to contribute to the fund on a board resolution after consulting with relevant organizations considering its financial situation by year.
 
(9)
The ongoing armed conflict in Ukraine started in February 2022 and relevant sanctions against Russia imposed by the international community can impact not only sanctioned entities but also the entities doing business directly or indirectly with Ukraine or Russia and the entities exposed directly or indirectly to industries or economy of Russia or Ukraine. The Company cannot make reasonable estimation of the financial impact of the recent conflict in Ukraine on the future events.
 
51.
Subsequent Events
 
(1)
Subsequent to December 31, 2023, KEPCO and KEPCO Nuclear Fuel Co., Ltd., a subsidiary of the
Company
, borrowed long-term borrowings for the purposes of operation and details related thereto are as follows:
 
Company
 
Type
 
Interest

Type
  
Interest rate

(%)
 
Borrowing
date
  
Maturity
  
Amount
 
  
In millions of won
 
Korea Electric Power Corporation
 
Long-term borrowing
(Mid-
to long-term CP) (*)
  Floating  3M CD+0.49  2024.02.21   2029.02.21   200,000 
 
Long-term borrowing
(Mid-
to long-term CP) (*)
  Floating  3M CD+0.50  2024.02.28   2029.02.28   200,000 
 
Long-term borrowing
(Mid- to long-term CP) (*)
  Floating  3M CD+0.34  2024.04.05   2027.04.05   250,000 
 
Long-term borrowing
(Mid- to long-term CP) (*)
  Floating  3M CD+0.48  2024.04.11   2027.04.09   250,000 
KEPCO Nuclear Fuel Co., Ltd.
 Long-term borrowings  Floating  
3M Bank
debenture
rate+0.66
  2024.01.04   2026.12.28   10,000 
 (*)
The maturity of
mid-
to long-term CPs corresponds to contract period of commercial paper repurchase agreements.
 
F-229

KOREA ELECTRIC POWER CORPORATION AND SUBSIDIARIES
Notes to the Consolidated Financial Statements, Continued
December 31, 2022 and 2023
 
51.
Subsequent Events, Continued
 
(2)
Subsequent to December 31, 2023, KEPCO and its subsidiaries Korea Hydro & Nuclear Power Co., Ltd., Korea Western Power Co., Ltd. and Korea Southern Power Co., Ltd. issued bonds denominated in Korean won and foreign currency for debt repayment and facility funding and details related thereto are as follows:
 
In millions of won and thousands of USD
 
     
Company
  
Type
  
Issue date
   
Maturity
   
Interest rate (%)
     
Amount
 
Korea Electric Power Corporation
  FY24 Global 15th   2024.01.31    2027.01.31    4.88  USD   1,200,000 
Korea Hydro & Nuclear Power Co., Ltd.
  
#77-1 Corporate bond
   2024.03.05    2029.03.05    5yr KTB rate+0.35     150,000 
  
#77-2 Corporate bond
   2024.03.05    2034.03.05    10yr KTB rate+0.41     100,000 
  
#77-3 Corporate bond
   2024.03.05    2044.03.05    20yr KTB rate+0.40     60,000 
   
#78-1 Corporate bond
   2024.03.25    2029.03.25    3.62      100,000 
   
#78-2 Corporate bond
   2024.03.25    2034.03.25    3.74      90,000 
   
#78-3 Corporate bond
   2024.03.25    2044.03.25    3.72      100,000 
Korea Western Power Co., Ltd.
  
#60-1 Corporate bond
   2024.01.16    2026.01.16    3.67     150,000 
  
#60-2 Corporate bond
   2024.01.16    2029.01.16    3.73     50,000 
  
#60-3 Corporate bond
   2024.01.16    2044.01.16    3.74     20,000 
  
#61-1 Corporate bond
   2024.01.25    2025.01.24    3.54     100,000 
  
#61-2 Corporate bond
  
 
2024.01.25
 
  
 
2027.01.25
 
  
 
3.73
 
   
 
40,000
 
  
#61-3 Corporate bond
  
 
2024.01.25
 
  
 
2044.01.25
 
  
 
3.82
 
   
 
10,000
 
Korea Southern Power Co., Ltd.
  
#72-1 Corporate bond
  
 
2024.01.11
 
  
 
2027.01.11
 
  
 
3.70
 
   
 
70,000
 
  
#72-2 Corporate bond
   2024.01.11    2029.01.11    3.79     30,000 
Korea East-West Power Co., Ltd.
  
#47-1 Corporate bond
   2024.04.08    2027.04.08    3.62     30,000 
  
#47-2 Corporate bond
   2024.04.08    2029.04.06    3.67     50,000 
 
(3)
KEPCO KDN Co., Ltd., a subsidiary of the Company, sold all of its shares in the associate YTN Co., Ltd. (
21.43
%) on February 15, 2024 at the price of ₩
221,490
 million after the Korea Communications Commission approved to sell the shares.
 
(4)
On February 23, 2024, the board of directors of KEPCO decided to contribute ₩
76,600
 million for the construction of the campus of
Korea
Institute of Energy Technology.
 