SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549

FORM 10-K

(MARK ONE)
( X ) ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE
SECURITIES EXCHANGE ACT OF 1934

FOR THE FISCAL YEAR ENDED DECEMBER 31, 1995

OR

( ) TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE
SECURITIES EXCHANGE ACT OF 1934

FOR THE TRANSITION PERIOD FROM TO

COMMISSION FILE NUMBER 1-8489

DOMINION RESOURCES, INC.
(EXACT NAME OF REGISTRANT AS SPECIFIED IN ITS CHARTER)

<TABLE>
<S> <C>
VIRGINIA 54-1229715
(STATE OR OTHER JURISDICTION OF (IRS EMPLOYER IDENTIFICATION NO.)
INCORPORATION OR ORGANIZATION)

901 EAST BYRD STREET
RICHMOND, VIRGINIA 23219-4072
(ADDRESS OF PRINCIPAL EXECUTIVE OFFICES) (ZIP CODE)
</TABLE>

(804) 775-5700
(REGISTRANT'S TELEPHONE NUMBER, INCLUDING AREA CODE)

SECURITIES REGISTERED PURSUANT TO SECTION 12(B) OF THE ACT:

<TABLE>
<CAPTION>
TITLE OF EACH CLASS NAME OF EACH EXCHANGE ON WHICH REGISTERED
<S> <C>
Common Stock, no par value New York Stock Exchange
</TABLE>

SECURITIES REGISTERED PURSUANT TO SECTION 12(G) OF THE ACT:
NONE:
(TITLE OF CLASS)

Indicate by check mark whether the registrant (1) has filed all reports
required to be filed by Section 13 or 15(d) of the Securities Act of 1934 during
the preceding 12 months (or for such shorter period that the registrant was
required to file such reports), and (2) has been subject to such filing
requirements for the past 90 days. Yes X No
Indicate by check mark if disclosure of delinquent filers pursuant to Item
405 of Regulation S-K is not contained herein, and will not be contained, to the
best of registrant's knowledge, in definitive proxy or information statements
incorporated by reference in Part III of this Form 10-K or any amendment to this
Form 10-K. [X]
The aggregate market value of voting stock held by nonaffiliates of the
registrant was $6,974,930,066 at February 29, 1996, based on the closing price
of the Common Stock on such date, as reported on the composite tape by The Wall
Street Journal.
Indicate the number of shares outstanding of each of the registrant's
classes of common stock, as of the latest practicable date.

<TABLE>
<S> <C>
CLASS OUTSTANDING AT FEBRUARY 29, 1996
Common Stock, no par value 176,580,508
</TABLE>

DOCUMENTS INCORPORATED BY REFERENCE:
(a) Portions of the 1995 Annual Report to Shareholders for the fiscal year ended
December 31, 1995 are incorporated by reference in Parts I, II and IV
hereof.
(b) Portions of the 1996 Proxy Statement, dated March 11, 1996, are incorporated
by reference in Part III hereof.
DOMINION RESOURCES, INC.

<TABLE>
<CAPTION>
ITEM PAGE
NUMBER NUMBER
<S> <C> <C>
PART I
1. Business
The Company............................................................................................... 1
Regulation................................................................................................ 2
Capital Requirements and Financing Program................................................................ 4
Capital Requirements...................................................................................... 4
Construction and Nuclear Fuel Expenditures................................................................ 4
Financing Program......................................................................................... 4
Rates..................................................................................................... 5
Virginia.................................................................................................. 5
North Carolina............................................................................................ 6
Virginia Power Sources of Power........................................................................... 7
Virginia Power Sources of Energy Used and Fuel Costs...................................................... 7
Interconnections.......................................................................................... 9
Future Sources of Power................................................................................... 9
Competition and Strategic Initiatives..................................................................... 10
Conservation and Load Management.......................................................................... 12
2. Properties................................................................................................ 12
3. Legal Proceedings......................................................................................... 12
4. Submission of Matters to a Vote of Security Holders....................................................... 13

Executive Officers of the Registrant...................................................................... 13

PART II
5. Market for the Registrant's Common Equity and Related Stockholder Matters................................. 15
6. Selected Financial Data................................................................................... 15
7. Management's Discussion and Analysis of Financial Condition and Results of Operations..................... 15
8. Financial Statements and Supplementary Data............................................................... 15
9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure...................... 15

PART III
10. Directors and Executive Officers of the Registrant........................................................ 15
11. Executive Compensation.................................................................................... 15
12. Security Ownership of Certain Beneficial Owners and Management............................................ 15
13. Certain Relationships and Related Transactions............................................................ 15

PART IV
14. Exhibits, Financial Statement Schedules, and Reports on Form 8-K.......................................... 16
</TABLE>
PART I

ITEM 1. BUSINESS
THE COMPANY

Dominion Resources, Inc. (Dominion Resources), organized in 1983, has its
principal office at 901 East Byrd Street, Richmond, Virginia 23219-4072,
telephone (804) 775-5700. The principal assets of Dominion Resources are its
investments in its subsidiaries.

At December 31, 1995, Dominion Resources owned all of the outstanding
common stock of its subsidiaries: Dominion Capital, Inc. (Dominion Capital);
Dominion Energy, Inc. (Dominion Energy) and Virginia Electric and Power Company
(Virginia Power), its largest subsidiary.

Dominion Capital, established as a subsidiary of Dominion Resources in
1985, is a diversified investment and financial services company. The principal
assets of Dominion Capital are its joint venture with Household Commercial
Financial Services, Inc., First Source Financial, LLP, a middle market
commercial lender; a 50% limited partnership interest in a Louisiana
hydroelectric project; Dominion Lands, Inc., a subsidiary involved in planned
community real estate development and management; investments in marketable
securities and fixed income instruments; and Rincon Securities, Inc., a
subsidiary which holds a diversified portfolio of preferred stocks. Dominion
Capital also has investments in affordable housing and a commercial real estate
management company.

Dominion Energy, established as a subsidiary of Dominion Resources in 1987,
is active in a number of partnerships to develop nonutility electric power
generation projects outside the territory served by Virginia Power. Dominion
Energy is involved in projects in six states, Argentina, Bolivia and Belize,
which total approximately 2,156 Mw. Projects in operation throughout 1995 in
which Dominion Energy has an interest include three gas-fueled projects totaling
990 Mw owned by Enron/Dominion Cogen Corporation, two geothermal projects in
California, a solar project in California, four small hydro-
electric projects in New York, a waste coal-fueled project in West Virginia, a
wood- and coal-fueled project in Maine, a hydroelectric and a gas-fired project
in Argentina and two gas-fired projects in California. In August 1995, Dominion
Energy acquired two hydroelectric facilities in Bolivia totaling 126 Mw. During
1991, Dominion Energy announced its plans to develop a 25 Mw run-of-river
hydroelectric project in Belize which began construction in 1992. On November 1,
1995, this facility began commercial operation. Dominion Energy also
participates in partnerships to acquire and develop natural gas reserves. In
1995, it added 57 billion cubic feet (BCFE) of natural gas reserves. Production
from company holdings in 1995 totaled 37 BCFE. By the end of 1995, Dominion
Energy held 345 BCFE in natural gas reserves.

For additional information on the nonutility businesses, see NONUTILITY
ISSUES under FUTURE ISSUES in MANAGEMENT'S DISCUSSION AND ANALYSIS OF OPERATIONS
on page 25 of the 1995 Annual Report to Shareholders.

Dominion Resources is currently exempt from registration as a holding
company under the Public Utility Holding Company Act of 1935 (the 1935 Act).

Virginia Electric and Power Company, incorporated in 1909, Dominion
Resources' largest subsidiary, is a regulated public utility engaged in the
generation, transmission, distribution and sale of electric energy within a
30,000 square mile area in Virginia and northeastern North Carolina. It
transacts business under the name VIRGINIA POWER in Virginia and under the name
NORTH CAROLINA POWER in North Carolina. It sells electricity to retail customers
(including governmental agencies) and to wholesale customers such as rural
electric cooperatives and municipalities. The Virginia service area comprises
about 65% of Virginia's total land area but accounts for over 80% of its
population. As used herein, the term "Virginia Power" shall be deemed to refer
to the entirety of Virginia Electric and Power Company, including, without
limitation, its Virginia and North Carolina operations and all of its
subsidiaries.

Virginia Power has franchises or permits for electric operations in
substantially all cities and towns now served. It also has certificates of
convenience and necessity from the Virginia State Corporation Commission (the
Virginia Commission) for service in all territory served at retail in Virginia.
The North Carolina Utilities Commission (the North Carolina Commission) has
assigned territory to Virginia Power for substantially all of its retail service
outside certain municipalities in North Carolina.

Virginia Power strives to operate its generating facilities in accordance
with prudent utility industry practices and in conformity with applicable
statutes, rules and regulations. Like other electric utilities, Virginia Power's
generating facilities are subject to unanticipated or extended outages for
repairs, replacements or modifications of equipment or otherwise to comply with
regulatory requirements. Such outages may involve significant expenditures not
previously budgeted, including replacement energy costs.

1
Dominion Resources and its subsidiaries had 10,592 full-time employees as
of December 31, 1995.

Except for the historical information contained herein, the matters
discussed in this annual report on Form 10-K are forward-looking statements
which involve risks and uncertainties, including but not limited to regulatory,
economic, competitive, governmental and technological factors affecting Dominion
Resources and its subsidiaries operations, rates, markets, products, services
and prices, and other factors discussed herein and in the company's other
filings with the Securities and Exchange Commission.

REGULATION

GENERAL

In a wide variety of matters in addition to rates, Virginia Power is
presently subject to regulation by the Virginia Commission and the North
Carolina Commission, the Environmental Protection Agency (EPA), Department of
Energy (DOE), Nuclear Regulatory Commission (NRC), Federal Energy Regulatory
Commission (FERC), the Army Corps of Engineers, and other federal, state and
local authorities. Compliance with numerous laws and regulations increases the
Company's operating and capital costs by requiring, among other things, changes
in the design and operation of existing facilities and changes or delays in the
location, design, construction and operation of new facilities. The commissions
regulating the Company's rates have historically permitted recovery of such
costs.

Virginia Power may not construct, or incur financial commitments for
construction of, any substantial generating facilities or large capacity
transmission lines without the prior approval of state and federal governmental
agencies having jurisdiction over various aspects of its business. Such
approvals relate to, among other things, the environmental impact of such
activities, the relationship of such activities to the need for providing
adequate utility service and the design and operation of proposed facilities.

On January 11, 1996, the Virginia Commission granted interim approval for
limited affiliate services between Virginia Power and a subsidiary, A&C Enercom,
Inc., in connection with the purchase by the subsidiary of certain assets of two
energy services businesses. On March 12, 1996, Virginia Power filed an amendment
to its application seeking approval of additional services and asset transfers
between it and the subsidiary.

The City of Falls Church, Virginia has indicated it intends to pursue the
establishment of a municipal electric system and sent Virginia Power a formal
Request for Transmission Service pursuant to Sections 211 and 213 of the Federal
Power Act on January 11, 1995. Virginia Power has approximately 4,100 customers
in the City. Megawatt-hour sales by customer class in Falls Church are:
Residential - 36,000; Commercial - 67,000; Industrial - 0; and Other - 5,000.
Virginia Power denied the request and filed a Petition for Declaratory Judgment
against the City with the Virginia Commission. The Commission has ruled that
Falls Church must seek approval from the Commission prior to implementing plans
to condemn Virginia Power facilities within the City. Revenues from retail sales
within the City of Falls Church account for less than .2% of Virginia Power's
total revenues. As a result, Virginia Power will not experience a material loss
of revenues or net income should a municipal system be created. No other
municipality has communicated to Virginia Power any interest in forming a
municipal electric system.

On September 18, 1995, the Virginia Commission established a proceeding to
review and consider its policy regarding restructuring of, and competition in,
the electric utility industry. The Commission directed its Staff to investigate
the emerging issues in the industry and prepare a report of its findings and
recommendations on or before March 29, 1996. All interested parties may file
written comments and requests for oral argument in response to the Staff Report
on or before May 30, 1996.

Various provisions of the Energy Policy Act of 1992 (the Energy Act) that
could affect Virginia Power include those provisions encouraging the development
of non-utility generation, giving FERC authority to order transmission access
for wholesale transactions, requiring higher energy efficiency and alternative
fuels use, restructuring of nuclear plant licensing procedures and requiring
state regulatory authorities to give full rate treatment for the effects of
conservation and demand management programs, including the effects of reduced
sales. While the full impact of the Energy Act on Virginia Power cannot at this
time be quantified, it is likely, over time, to be significant.

FERC

On March 29, 1995, FERC issued a Notice of Proposed Rulemaking that would
require all FERC jurisdictional utilities to provide open access to the
interstate transmission system. Crucial elements of the Commission's proposal
included the

2
following: all jurisdictional utilities must file non-discriminatory open access
transmission tariffs; utilities must take service under the open access tariffs
for their own wholesale sales and purchases of electric energy; and utilities
will be allowed the opportunity to recover stranded costs. Virginia Power filed
its comments on August 7, 1995 and supported the Commission's objective of
promoting comparable open-access transmission service. However, Virginia Power
urged the Commission to reconsider its proposal to draft generic tariffs for the
electric industry. Virginia Power also challenged FERC's authority to impose
tariffs of general applicability and urged the adoption of principles of
comparability that it will apply to evaluate terms and conditions of tariffs
filed by utilities. Virginia Power urged that any pro forma tariffs included in
the final rule should provide for comparable service at rates that permit the
utility to recover all its costs of service.

See COMPETITION AND STRATEGIC INITIATIVES below and COMPETITION in UTILITY
ISSUES in FUTURE ISSUES under MANAGEMENT'S DISCUSSION AND ANALYSIS OF OPERATIONS
on pages 23 and 24 of the 1995 Annual Report to Shareholders.

ENVIRONMENTAL

From time to time, Virginia Power may be identified as a potentially
responsible party (PRP) with respect to a Superfund site. EPA (or a state) can
either (a) allow such a party to conduct and pay for a remedial investigation,
feasibility study and remedial action or (b) conduct the remedial investigation
and action and then seek reimbursement from the parties. Each party can be held
jointly, severally and strictly liable for all costs, but the parties can then
bring contribution actions against each other and seek reimbursement from their
insurance companies. As a result of the Superfund Act or other laws or
regulations regarding the remediation of waste, Virginia Power may be required
to expend amounts on remedial investigations and actions. Although Virginia
Power is not currently aware of any sites or events, including those sites
currently identified likely to result in significant liabilities, such amounts,
in the future, could be significant.

Permits under the Clean Water Act and state laws have been issued for all
of Virginia Power's steam generating stations now in operation. Such permits are
subject to reissuance and continuing review.

Virginia Power is subject to the Clean Air Act (the Air Act), which
provides the statutory basis for ambient air quality standards. In order to
maintain compliance with such standards and reduce the impact of emissions on
ambient air quality, Virginia Power may be required to incur significant
additional expenditures in constructing new facilities or in modifying existing
facilities. Virginia Power has completed its compliance plan for Phase II of the
Air Act, with the exception of some additional studies concerning Phase II
nitrogen oxide (NOx) controls. The plan will involve switching to lower sulfur
coal, purchase of emission allowances and additional NOx and sulfur dioxide
(SO2) controls. Maximum flexibility and least-cost compliance will be maintained
through annual studies. Capital expenditures on the Air Act compliance over the
next five years are projected to be approximately $61 million. Changes in the
regulatory environment, availability of allowances, and emission control
technology could substantially impact the timing and magnitude of compliance
expenditures.

Virginia Power continues to work with the West Virginia Office of Air
Quality concerning opacity requirements applicable to the Mt. Storm Power
Station.

For additional information on ENVIRONMENTAL MATTERS, see Note P to NOTES TO
CONSOLIDATED FINANCIAL STATEMENTS of the 1995 Annual Report to Shareholders.

NUCLEAR

All aspects of the operation and maintenance of Virginia Power's nuclear
power stations are regulated by the NRC. Operating licenses issued by the NRC
are subject to revocation, suspension or modification, and operation of a
nuclear unit may be suspended if the NRC determines that the public interest,
health or safety so requires.

From time to time, the NRC adopts new requirements for the operation and
maintenance of nuclear facilities. In many cases, these new regulations require
changes in the design, operation and maintenance of existing nuclear facilities.
If the NRC adopts such requirements in the future, it could result in
substantial increases in the cost of operating and maintaining Virginia Power's
nuclear generating units.

On July 18, 1995, the Virginia Commission instituted an investigation
regarding spent nuclear fuel disposal. It directed interested parties to provide
comments on legal and public policy issues related to spent nuclear fuel storage
and disposal, including, but not limited to, whether to allow utilities to
recover from ratepayers some or all money paid to the Nuclear Waste Fund
established by the Nuclear Policy Act of 1982, whether to establish an escrow
account for spent nuclear fuel storage and/or disposal, and whether utilities
should develop their own plans for storage and disposal of spent nuclear fuel.

3
The Commission's Order Establishing Investigation recites that Virginia Power
has paid $343.6 million to the Nuclear Waste Fund through 1994, including $44.8
million in 1994, and that future payments could exceed $400 million assuming its
North Anna and Surry reactors continue to operate through the end of their
existing operating licenses. Virginia Power and others filed comments on October
31, 1995. On February 27, 1996, the Virginia Commission Staff filed its Report
recommending that adoption of a definitive policy on the spent nuclear fuel
disposal fee be delayed until (1) a ruling is forthcoming on pending litigation
which seeks to impose an obligation on the federal government to begin
acceptance of spent nuclear fuel no later than January 31, 1998, (2) the outcome
of proposed legislation which would amend the Nuclear Waste Policy Act to
require the development of a centralized interim storage facility has been
determined, and (3) a vision of the likely outcome of the electric utility
industry's restructuring efforts has been more fully conceptualized.

CAPITAL REQUIREMENTS AND FINANCING PROGRAM

CAPITAL REQUIREMENTS

See MANAGEMENT'S DISCUSSION AND ANALYSIS OF CASH FLOWS AND FINANCIAL
CONDITION on pages 29 and 30 of the 1995 Annual Report to Shareholders.

CONSTRUCTION AND NUCLEAR FUEL EXPENDITURES

Virginia Power's estimated construction and nuclear fuel expenditures,
including Allowance for Funds Used During Construction (AFC), for the three-year
period 1996-1998, total $1.6 billion. It has adopted a 1996 budget for
construction and nuclear fuel expenditures as set forth below:

<TABLE>
<CAPTION>
ESTIMATED 1996
EXPENDITURES
(MILLIONS)
<S> <C>
New Generating Facilities:
Clover Unit 2....................................................................... $ 14
Other Production:
Clean Air Act....................................................................... 19
Other............................................................................... 60
General Support Facilities............................................................ 88
Transmission.......................................................................... 42
Distribution.......................................................................... 262
Nuclear Fuel.......................................................................... 84
Total Construction Requirements and Nuclear Fuel.................................... 569
AFC.............................................................................. 5
Total Expenditures.................................................................. $574
</TABLE>

FINANCING PROGRAM

See MANAGEMENT'S DISCUSSION AND ANALYSIS OF OPERATIONS and MANAGEMENT'S
DISCUSSION AND ANALYSIS OF CASH FLOWS AND FINANCIAL CONDITION on pages 21
through 30 of the 1995 Annual Report to Shareholders.

4
RATES

Virginia Power was subject to rate regulation in 1995 as follows:

<TABLE>
<CAPTION>
1995
PERCENT PERCENT
OF OF
REVENUES KWH SALES
<S> <C> <C> <C>
Virginia retail:
Non-Governmental customers.................... Virginia Commission 78% 73%
Governmental customers........................ Negotiated Agreements 10 12
North Carolina retail........................... North Carolina Commission 5 4
Wholesale:
Requirements -- Sales for Resale.............. FERC 5 7
Non-Requirements -- Sales for Resale.......... FERC 2 4
100% 100%
</TABLE>

Substantially all of Virginia Power's electric sales are subject to
recovery of changes in fuel costs either through fuel adjustment factors or
periodic adjustments to base rates, each of which requires prior regulatory
approval.

Each of these jurisdictions has the authority to disallow recovery of costs
it determines to be excessive or imprudently incurred. Various cost items may be
reviewed on occasion, including costs of constructing or modifying facilities,
on-going purchases of capacity or providing replacement power during generating
unit outages.

The principal rate proceedings in which Virginia Power was involved in 1995
are described below by jurisdiction. Rate relief obtained by Virginia Power is
frequently less than requested.

VIRGINIA

On January 13, 1995, the Supreme Court of Virginia affirmed a decision of
the Virginia Commission in Virginia Power's 1992 rate case that disallowed rate
recovery of the gross receipts tax component of certain purchased power costs.
On March 3, 1995, the Court denied the motions of Virginia Power and certain
industrial cogenerators for a rehearing, and on October 2, 1995, the United
States Supreme Court denied the Writ of Certiorari sought by those cogenerators.

On April 20, 1995, the Virginia Commission declined to approve Virginia
Power's proposed Schedule DEF -- Dispersed Energy Facility, a rate schedule that
would have allowed Virginia Power to respond to the request of an industrial or
commercial customer to build and operate a generating facility at its business
location and to sell to that customer all of the electricity and associated
steam from that facility under a long-term contract. The Commission stated that
the scope of the proposal was not an appropriate experiment under Virginia law,
and that, without a specific construction proposal before it, the Commission
could not approve the concept. The Commission stated, however, that upon a
proper record it would consider the public interest of allowing a DEF-type
facility to be constructed. Virginia Power subsequently negotiated a specific
DEF arrangement with Chesapeake Paper Products Company, and on December 18,
1995, it applied to the Virginia Commission for the approvals required for that
arrangement. (See COMPETITION AND STRATEGIC INITIATIVES below).

The Staff of the Virginia Commission has, in Virginia Power's Annual
Informational Filing proceeding for 1994, recommended that there be imputed to
Virginia Power for ratemaking purposes income reflecting (a) the estimated value
of credit support that Dominion Resources' nonutility subsidiaries allegedly
receive from Virginia Power and (b) the income earned by Dominion Resources on
the invested proceeds of its unallocated equity for which Virginia Power
provides the funds for payment of dividends. Virginia Power filed a response
opposing these recommendations. The Staff's reply agreed with Virginia Power
that no decision on these issues is required in the pending proceeding. On
February 23, 1996, the Virginia Commission issued its Order finding that
Virginia Power did not earn outside of its authorized range for the calendar
year 1994, and indicating that it will investigate the described issues further
in a subsequent proceeding. The Commission Order also approved higher collection
levels for decommissioning of nuclear plants.

On April 20, 1995, the Virginia Commission authorized Virginia Power to
implement a pilot program providing a real time pricing (RTP) option for its
industrial customers with loads in excess of 10 Mw. Under this option, all or a
portion of an industrial customer's load growth would be supplied at projected
incremental hourly production costs, adjusted for line losses

5
and taxes, plus a margin of 0.6 cents per Kwh. Additionally, a marginal
cost-based Generation Capacity Adder and a Transmission Capacity Adder would be
applicable during those hours when the Virginia Power system is approaching its
forecasted annual peak demand. Up to 20% of an industrial customer's existing
load could be served on an RTP basis if the customer executes a five-year
contract for such service.

On September 19, 1995, Virginia Power filed an application to revise its
annual fuel factor. Virginia Power proposed that the present fuel factor be
decreased by $97.1 million. The Staff of the Virginia Commission proposed
certain adjustments, which Virginia Power did not oppose, resulting in a
recommended reduction of $107.3 million. On October 31, 1995, the Virginia
Commission approved the reduction of $107.3 million, effective November 1, 1995.

NORTH CAROLINA

On February 13, 1995, the Supreme Court of North Carolina denied Virginia
Power's motion for rehearing of the appeal of its 1992 North Carolina rate case,
which disallowed recovery of certain capacity costs paid to a cogenerator and a
portion of the compensation of certain Company officers. On May 15, 1995,
Virginia Power filed with the United States Supreme Court a Petition for a Writ
of Certiorari asking the Court to reverse the North Carolina Court's decision as
to the recovery of capacity costs. On January 22, 1996, the United States
Supreme Court denied the Writ of Certiorari sought by the Company.

On June 27, 1995, the North Carolina Commission approved a Self-Generation
Deferral Rate that is a part of an Energy Agreement between the company and
Weyerhaeuser. The agreement involves the use of a negotiated pricing structure
which will result in the deferral of the installation of additional
self-generation facilities by Weyerhaeuser. The rate to be charged must be
prefiled each year, and the company is prohibited from recovering from other
customers the difference between the new rate and the rate that Weyerhaeuser
would otherwise have been charged.

On September 15, 1995, Virginia Power filed an application with the North
Carolina Commission for approval of a $1.3 million annual increase in fuel
rates. On December 8, 1995, the Commission approved an increase of $.8 million
reflecting a disallowance of $.5 million by reason of resolution of issues
surrounding the renegotiation of a coal transportation contract with CSX
Transportation, Inc.

6
VIRGINIA POWER SOURCES OF POWER

VIRGINIA POWER GENERATING UNITS

<TABLE>
<CAPTION>
TYPE SUMMER
YEARS OF CAPABILITY
NAME OF STATION, UNITS AND LOCATION INSTALLED FUEL MW
<S> <C> <C> <C>
Nuclear:
Surry Units 1 & 2, Surry, Va..................................................... 1972-73 Nuclear 1,602
North Anna Units 1 & 2, Mineral, Va.............................................. 1978-80 Nuclear 1,790(a)
Total nuclear stations........................................................ 3,392
Fossil Fuel:
Steam:
Bremo Units 3 & 4, Bremo Bluff, Va. .......................................... 1950-58 Coal 227
Chesterfield Units 3-6, Chester, Va. ......................................... 1952-69 Coal 1,250
Clover Unit 1, Clover, Va. ................................................... 1995 Coal 416(b)
Mt. Storm Units 1-3, Mt. Storm, W. Va. ....................................... 1965-73 Coal 1,587
Chesapeake Units 1-4, Chesapeake, Va. ........................................ 1953-62 Coal 595
Possum Point Units 3 & 4, Dumfries, Va. ...................................... 1955-62 Coal 322
Yorktown Units 1 & 2, Yorktown, Va. .......................................... 1957-59 Coal 326
Possum Point Units 1, 2, & 5, Dumfries, Va. .................................. 1948-75 Oil 929
Yorktown Unit 3, Yorktown, Va. ............................................... 1974 Oil & Gas 818
North Branch Unit 1, Bayard, W. Va. .......................................... 1994 Waste Coal 74(c)
Combustion Turbines:
35 units (8 locations)........................................................... 1967-90 Oil & Gas 1,019
Combined Cycle:
Chesterfield Units 7 & 8, Chester, Va. .......................................... 1990-92 Oil & Gas 397
Total fossil stations......................................................... 7,960
Hydroelectric:
Gaston Units 1-4, Roanoke Rapids, N.C. .......................................... 1963 Conventional 225
Roanoke Rapids Units 1-4, Roanoke Rapids, N.C. .................................. 1955 Conventional 96
Other............................................................................ 1930-87 Conventional 3
Bath County Units 1-6, Warm Springs, Va. ........................................ 1985 Pumped Storage 1,260(d)
Total hydro stations.......................................................... 1,584
Total Company generating unit capability...................................... 12,936
NET UTILITY PURCHASES.............................................................. 1,030
NON-UTILITY GENERATION............................................................. 3,295
Total Capability.............................................................. 17,261
</TABLE>

(a) Includes an undivided interest of 11.6 percent (208 Mw) owned by Old
Dominion Electric Cooperative (ODEC).

(b) Includes an undivided interest of 50 percent (208 Mw) owned by ODEC.

(c) Effective January 25, 1996, unit was placed in a cold reserve status.

(d) Reflects Virginia Power's 60 percent undivided ownership interest in the
2,100 Mw station. A 40 percent undivided interest in the facility is owned by
Allegheny Generating Company, a subsidiary of Allegheny Power System, Inc.
(APS).

Virginia Power's highest one-hour integrated service area summer peak
demand was 14,003 Mw on August 2, 1995, and a new all-time high one-hour
integrated winter peak demand of 14,910 Mw was reached on February 5, 1996.

VIRGINIA POWER SOURCES OF ENERGY USED AND FUEL COSTS

The average fuel cost of system energy output is shown below:

<TABLE>
<CAPTION>
MILLS PER KILOWATT-HOUR
1995 1994 1993
<S> <C> <C> <C>
Nuclear............................. 4.92 4.89 4.60
Coal................................ 14.44 14.61 14.69
Oil................................. 25.11 23.00 26.55
Purchased power, net................ 22.50 23.99 24.54
Other............................... 23.82 25.46 24.35
Average fuel cost................... 13.73 14.02 14.42
</TABLE>

7
System energy output is shown below:

<TABLE>
<CAPTION>
ESTIMATED ACTUAL
1996 1995 1994 1993
<S> <C> <C> <C> <C>
Nuclear(*).......................... 33% 32% 34% 31%
Coal(**)............................ 40 39 36 39
Oil................................. 1 1 3 3
Purchased power, net................ 23 25 23 23
Other............................... 3 3 4 4
100% 100% 100% 100%
</TABLE>

(*) Excludes ODEC's 11.6 percent ownership interest in the North Anna Power
Station

(**) Excludes ODEC's 50 percent ownership interest in the Clover Power
Station

NUCLEAR OPERATIONS AND FUEL SUPPLY

In 1995, Virginia Power's four nuclear units achieved a combined capacity
factor of 85.4 percent.

The North Anna Unit 2 steam generator replacement project was completed in
1995 at a total company cost of $96 million.

Virginia Power utilizes both long-term contracts and spot purchases to
support its needs for nuclear fuel. Virginia Power's nuclear fuel supply and
related services are expected to be adequate to support current and planned
nuclear generation requirements. Virginia Power continually evaluates worldwide
market conditions in order to obtain an adequate nuclear fuel supply. Current
agreements, inventories and market availability should support planned fuel
cycles throughout the remainder of the 1990s.

On-site spent nuclear fuel storage at the Surry Power Station is adequate
for Virginia Power's needs through 1998 when, in accordance with the Nuclear
Waste Policy Act, the DOE is to begin acceptance of spent fuel for disposal.
Should acceptance be delayed, incremental dry storage facilities will be added
under the existing storage license. North Anna Power Station will require an
interim spent fuel storage facility in the late 1990's. Virginia Power submitted
a license application to the NRC in May 1995 for such a facility at North Anna.

For details regarding nuclear insurance and certain related contingent
liabilities as well as a NRC rule that requires proceeds from certain insurance
policies to be used first to pay stabilization and decontamination expenses, see
Note P to the NOTES TO CONSOLIDATED FINANCIAL STATEMENTS in the 1995 Annual
Report to Shareholders.

FOSSIL OPERATIONS AND FUEL SUPPLY

The commercial operation of Clover Power Station Unit 1 began on October 7,
1995. The summer capability of Unit 1 is 416 Mw.

Virginia Power's fossil fuel mix consists of coal, oil and natural gas. In
1995, Virginia Power consumed approximately 11.0 million tons of coal. As with
nuclear fuel, Virginia Power utilizes both long-term contracts and spot
purchases to support its needs. Virginia Power presently anticipates that
sufficient coal supplies at reasonable prices will be available for the
remainder of the 1990s. Current projections for an adequate supply of oil remain
favorable, barring unusual international events or extreme weather conditions
which could affect both price and supply.

Virginia Power uses natural gas as needed throughout the year for two
combined cycle units and at several combustion turbine units. For winter usage
at the combined cycle sites, gas is purchased and stored during the summer and
fall and consumed during the colder months when gas supplies are not available
at favorable prices. Virginia Power has firm transportation contracts for the
delivery of gas to the combined cycle units. Current projections indicate gas
supplies will be available for the next several years.

PURCHASES AND SALES OF POWER

Virginia Power relies on purchases of power to meet a portion of its
capacity requirements. Virginia Power also makes economy purchases of power from
other utility systems when it is available at a cost lower than Virginia Power's
own generation costs.

8
Under contracts effective January 1, 1985, Virginia Power agreed to
purchase 400 Mw of electricity annually through 1999 from Hoosier Energy Rural
Electric Cooperative, Inc. (Hoosier), and agreed to purchase 500 Mw of
electricity annually during 1987-99 from certain operating units of American
Electric Power Company, Inc. (AEP).

On November 26, 1991, Virginia Power and ODEC signed an agreement whereby
the Company will provide 100 Mw of firm capacity and associated energy until the
commercial operation of Clover Unit 2 (currently scheduled for April 1996) or
December 31, 1996, whichever occurs first.

Virginia Power has a diversity exchange agreement with APS under which APS
delivers 200 Mw to Virginia Power in the summer and Virginia Power delivers 200
Mw to APS in the winter.

Virginia Power also has 67 non-utility power purchase contracts with a
combined dependable summer capacity of 3,493 Mw. Of this amount, 3,295 Mw were
operational at the end of 1995 with the balance scheduled to come on-line
through 1998 (see VIRGINIA POWER NON-UTILITY GENERATION under FUTURE SOURCES OF
POWER and Note P to the NOTES TO CONSOLIDATED FINANCIAL STATEMENTS in the 1995
Annual Report to Shareholders).

Early in 1995, a wholesale power group was formed within Virginia Power.
Its sole focus is the purchase and sale of wholesale electric power in the open
market. The wholesale power group has expanded the company's trading range
beyond the geographic limits of the Virginia Power service territory, and has
recently developed trading relationships with utilities in Illinois, Missouri,
Indiana, Kentucky, Ohio, Vermont, Michigan, and Tennessee in addition to most
states in the Mid-Atlantic area.

INTERCONNECTIONS

Virginia Power maintains major interconnections with Carolina Power and
Light Company, AEP, APS and the utilities in the Pennsylvania-New
Jersey-Maryland Power Pool. Through this major transmission network, Virginia
Power has arrangements with these utilities for coordinated planning, operation,
emergency assistance and exchanges of capacity and energy.

Virginia Power and Appalachian Power Company (Apco) (an operating unit of
AEP) have each sought approval from the Virginia Commission to construct
interconnecting transmission facilities. Apco proposes to construct 116 miles of
765 Kv line to connect with Virginia Power's proposed 102 miles of 500 Kv line.
Virginia Power does not intend to build its facility unless the Apco facility,
which requires approval in West Virginia as well as Virginia, is also approved
and built. Approval of both facilities has been recommended by a Virginia
Commission Hearing Examiner. On December 13, 1995, the Virginia Commission
issued an Interim Order in the Apco case in which it found that additional
transmission capacity is needed but directed Apco to provide further information
as to routing, mitigation of visual impact, and uses of the line.

FUTURE SOURCES OF POWER

With the expiration of long-term purchases, on December 31, 1999, with
Hoosier (400Mw) and with AEP (900 Mw) and continued system load growth, Virginia
Power presently anticipates adding 1,400 Mw of short-term (three-year) purchases
through the year 2000. Virginia Power has and will pursue capacity acquisition
plans to provide that capacity and maintain a high degree of service
reliability. This capacity may be owned and operated by others and sold to
Virginia Power or may be built by Virginia Power if it determines it can build
capacity at a lower overall cost. Virginia Power also pursues conservation and
demand-side management (see CONSERVATION AND LOAD MANAGEMENT below and CAPITAL
REQUIREMENTS under MANAGEMENT'S DISCUSSION AND ANALYSIS OF CASH FLOWS AND
FINANCIAL CONDITION on page 29 of the 1995 Annual Report to Shareholders).

In May 1990, Virginia Power entered into an agreement with ODEC, under
which Virginia Power purchased a 50 percent undivided ownership interest in a
832 Mw coal-fired power station to be constructed near Clover, Virginia in
Halifax County. Construction of Unit 1 is complete and it achieved commercial
operation on October 7, 1995. Virginia Power's 50 percent share of costs
incurred through December 31, 1995 amounted to $500.7 million. Construction of
Unit 2 is on schedule for completion in April 1996. Virginia Power expects that
completion costs for Unit 2 will total $14 million.

9
In March 1995, the Virginia Supreme Court upheld the May 1994 approval by
the Virginia Commission for a 75 mile 500 Kv transmission line from the Clover
Power Station to the Carson Substation in Dinwiddie County, Virginia. The
transmission line is now under construction and is scheduled for completion in
April 1996.

VIRGINIA POWER OWNED GENERATION

Virginia Power's continuing program to meet future capacity requirements is
summarized in the following table:

VIRGINIA POWER OWNED GENERATION

<TABLE>
<CAPTION>
SUMMER
CAPABILITY EXPECTED
NAME OF UNITS MW IN-SERVICE DATE
<S> <C> <C>
Clover Power Station:
Unit 2 416* April 1996
</TABLE>

* Includes the 50 percent undivided ownership interest of ODEC.

VIRGINIA POWER NON-UTILITY GENERATION

<TABLE>
<CAPTION>
NUMBER OF
PROJECTS MW
<S> <C> <C>
Projects Operational 66 3,295
Projects Financed 1 198
Unfinanced Projects 0 0
Total Contracts 67 3,493
</TABLE>

For additional information, see Note P to the NOTES TO CONSOLIDATED
FINANCIAL STATEMENTS in the 1995 Annual Report to Shareholders.

COMPETITION AND STRATEGIC INITIATIVES

In light of existing and potential threats and opportunities brought about
by increased competition in the wholesale and retail markets for electricity,
Virginia Power has undertaken cost-cutting measures to maintain its position as
a low-cost producer of electricity, engaged in re-engineering efforts of its
core business processes, and pursued a strategic planning initiative, called
Vision 2000, to encourage innovative approaches to serving traditional markets
and to prepare appropriate methods by which to service future markets. In
furtherance of these initiatives, Virginia Power has established separate
business units for its nuclear operations, fossil and hydroelectric operations,
commercial operations as well as its energy services business. It has gained
regulatory approval of innovative pricing proposals for industrial loads in
Virginia and North Carolina, entered into an energy partnership with a key
industrial customer, executed long term contracts with wholesale customers,
increased its presence in a broader geographic market for wholesale sales of
electricity, and acquired an existing energy services business to enhance its
national participation in that market. See Note O to the NOTES TO THE
CONSOLIDATED FINANCIAL STATEMENTS in the 1995 Annual Report to Shareholders.

WHOLESALE COMPETITION

Virginia Power has established long-term contractual service arrangements
with terms of several years in length with all of its major wholesale
cooperatives and municipalities. These contracts contain multi-year notice
provisions. To date, Virginia Power has not experienced any material loss of
load revenue or net income due to competition for its traditional wholesale
customers. In 1995 a wholesale power group was formed within Virginia Power to
engage in the purchase and sale of wholesale electric power. The group has
expanded Virginia Power's trading range beyond the geographic limits of Virginia
Power's service territory and has developed trading relationships with utilities
throughout the eastern United States.

Virginia Power has filed comments in the FERC's Notice of Proposed
Rulemaking on Open Access Transmission and will be subject to the final outcome
of the rulemaking proceeding.

10
RETAIL COMPETITION

At present, competition for retail customers is limited. It arises
primarily from the ability of certain business customers to relocate among
utility service territories, to substitute other energy sources for electric
power and to generate their own electricity. While the Energy Policy Act bans
federal orders of transmission service to ultimate customers, broader retail
competition that would allow customers to choose among electric suppliers is the
subject of intense debate in federal and state forums, both legislative and
regulatory.

A Retail Energy Services group was formed in July 1995 and has begun
developing non-traditional products and services to offer to customers both
inside and outside the service territory. These products and services include
fuel procurement and risk management services, electrical equipment maintenance,
power quality control, on-site turnkey industrial power plant construction, and
energy conservation systems. In December 1995, Virginia Power launched the name
EVANTAGE(SM) for the retail energy services division to establish a national
brand identity for the business.

In December 1995, Virginia Power entered into an agreement with a key
industrial customer, Chesapeake Paper
Products Company, to facilitate the design, construction, and financing of a 38
Mw cogeneration plant, in order to meet Chesapeake's energy requirements for its
industrial processes and applied to the Virginia Commission for the necessary
approval of these arrangements. To expand the offering of a range of energy
services, Virginia Power, in January 1996, acquired two divisions of A&C Enercom
of Atlanta, Georgia from Heartland Development Corporation of Madison,
Wisconsin. Virginia Power has formed a non-regulated subsidiary, A&C Enercom,
Inc., which will provide marketing, program planning and design, customer
engineering and energy services consulting to the utility industry. The new
subsidiary has approximately 230 employees in 15 offices located in 13 states.

In September 1995, the Virginia Commission launched an extensive
investigation into restructuring of and competition in the electric utility
industry. The scope of the investigation includes consideration of reliability,
continuity and stability of rates, fairness to all customers, fairness to
investors, and whether truly competitive markets that are in the public interest
can be developed. The outcome of the investigation could impact the extent to
which retail competition will exist within Virginia. In July 1995, the North
Carolina Commission declined to conduct an adversarial proceeding into the
question of whether retail competition should be allowed in North Carolina.
Instead, it is conducting an informal proceeding to gather information.

Virginia Power has initiated new programs aimed at meeting retail
customers' needs for increased flexibility and control of their electric costs.
Virginia Power has implemented a real time pricing rate experiment for a five
year period. The voluntary rate is available to industrial customers with loads
in excess of 10 Mw and allows a customer to move up to 20% of its existing load,
plus any load growth, to the hourly pricing rate. In 1995 Virginia Power also
implemented a self-generation deferral rate for a North Carolina industrial
customer, Weyerhauser. As a result of the rate being approved, Virginia Power
will serve approximately 25-30 Mw of new load through at least May 1, 1999.

The Virginia Commission entered its Final Order on November 27, 1995 in the
Company's Petition for Declaratory Judgment against the City of Falls Church.
The Petition had been filed in light of Falls Church's municipalization proposal
and request for transmission service under Sections 211 and 213 of the Federal
Power Act. The Commission ruled that it has jurisdiction over the City and that
the City must seek approval from the Commission prior to implementing plans to
condemn Company facilities within the City. No other city has communicated to
the Company any interest in forming a municipal electric system.

CORPORATE RE-ENGINEERING

The Vision 2000 strategic planning initiative has generated efforts aimed
at improving shareholder value as competitive threats intensify. Re-engineering
and remissioning efforts have included reducing the number of operating
divisions, consolidating district offices and closing business offices as work
practices have been reengineered to reduce costs and promote flexibility.

A review of Corporate Center functions has identified several activities
that were not core business functions and which were subsequently outsourced to
service providers. The Fossil and Hydroelectric Business Unit completed a
redesign effort in 1995. Re-engineering and restructuring efforts will continue
in the Corporate Center, Commercial Operations Business Unit, and Nuclear
Business Unit in an effort to improve Virginia Power's competitive capabilities.

11
REGULATORY/LEGISLATIVE STRATEGY

Consistent with implementation of other Vision 2000 efforts, Virginia Power
has developed a regulatory/legislative strategy intended to establish an orderly
transition to a more competitive environment. The regulatory/legislative
proposals are aimed at achieving greater flexibility on the part of Virginia
Power and the Virginia Commission in setting overall rate levels as well as in
setting rates for individual customers.

At this time, Dominion Resources is unable to predict how changing industry
conditions may affect future results and it is possible that in order to address
changing conditions in ways that are designed to improve the ability of Dominion
Resources and Virginia Power to compete and to serve the goal of preserving and
enhancing shareholder value, it may be necessary to effect structural changes
either within Virginia Power or with respect to the holding company structure,
or both.

CONSERVATION AND LOAD MANAGEMENT

Virginia Power is committed to integrated resource planning and has
developed a detailed analysis procedure in which effective demand-side and
supply-side options are both considered in order to determine the least cost
method to satisfy the customers' needs. Demand-side programs are selected
annually at Virginia Power through an integrated resource planning process which
directly compares the stream of costs and benefits from supply-side and
demand-side options. This process ensures the ultimate selection of a
demand-side package which reduces the need for additional capacity while
efficiently using Virginia Power's existing generation facilities.

ITEM 2. PROPERTIES

Dominion Resources owns the building at One James River Plaza, Richmond,
Virginia, in which Virginia Power has its principal offices. Dominion Resources'
other assets consist primarily of its investments in its subsidiaries, which
invest in various enterprises and assets, as described in THE COMPANY under Item
1. BUSINESS above. See also VIRGINIA POWER GENERATING UNITS under VIRGINIA POWER
SOURCES OF POWER under Item 1. BUSINESS.

ITEM 3. LEGAL PROCEEDINGS

From time to time, Virginia Power may be in violation of or in default
under orders, statutes, rules or regulations relating to protection of the
environment, compliance plans imposed upon or agreed to by Virginia Power or
permits issued by various local, state and federal agencies for the construction
or operation of facilities. There may be pending from time to time
administrative proceedings involving violations of state or federal
environmental regulations that Virginia Power believes are not material with
respect to it and for which its aggregate liability for fines or penalties will
not exceed $100,000. There are no material agency enforcement actions or citizen
suits pending or, to Virginia Power's present knowledge, threatened against
Virginia Power.

Doswell Limited Partnership (Doswell) brought suit against Virginia Power
in the Circuit Court of the City of Richmond alleging breach of contract and
actual and constructive fraud and seeking damages of not less than $75 million
arising out of a disagreement on the calculation of a Fixed Fuel Transportation
Charge to be paid to Doswell under a purchased power contract. The issues of
actual and constructive fraud were dismissed with prejudice, and on March 6,
1995, the Court entered its opinion in favor of Virginia Power. On March 1,
1996, the Supreme Court of Virginia affirmed the decision of the Circuit Court.
On March 8, 1996, Doswell filed notice of its intent to seek a re-hearing.

On December 13, 1995, a civil action was instituted in the United States
District Court for the Eastern District of Virginia, Norfolk Division, against
the City of Norfolk and Virginia Power by a landowner who alleges that his
property has been contaminated by toxic pollutants originating on an adjacent
property now owned by the city and formerly owned by Virginia Power. The
plaintiff seeks compensatory damages of $10 million and punitive damages of $5
million from Virginia Power. Virginia Power and prior owners operated a gas
manufacturing plant on the property until 1968, when the plant was closed and
dismantled. Virginia Power sold the property to the city in 1970. Virginia Power
filed its answer denying liability on January 10, 1996.

In reference to the lawsuit filed by Dominion Energy and Dominion Cogen
D.C., Inc. (DCDC) and others against the District of Columbia and officials
thereof, on August 4, 1995, the court dismissed the complaint against the
individual defendants. As a result, the case is proceeding only against the
District of Columbia. On August 18, 1995, the District of Columbia served a
counterclaim consisting of six counts on Dominion Energy, DCDC and the other
plaintiffs. One count alleges damages in restitution of $2.2 million, and each
of the other counts alleges compensatory damages of $500,000 and

12
punitive damages of $20 million. On September 11, 1995, Dominion Energy and DCDC
and other plaintiffs moved to dismiss all of the counterclaim. That motion has
been fully briefed by both sides and is waiting a ruling by the court. On
January 26, 1996, the defendant moved to dismiss the plaintiffs' claim that the
District of Columbia violated their constitutionally protected contract rights,
and the plaintiffs have filed a memorandum opposing this motion.

A dispute over corporate governance issues between Dominion Resources and
Virginia Power arose in 1994, and the Virginia Commission instituted a
proceeding concerning the holding company structure and the relationship between
the two companies. This proceeding was continued generally and has been inactive
since August 1994, when a related proceeding of broader scope was initiated by
the Commission. On February 20, 1995, Dominion Resources, Virginia Power and the
Commission Staff consented to an order in this proceeding under which Dominion
Resources must obtain the Commission's approval before taking steps such as
acting in the place of Virginia Power's Board of Directors or officers, removing
Virginia Power's Board members or officers or changing Virginia Power's Articles
of Incorporation or Bylaws. The order remains effective until July 2, 1996. On
April 12, 1995, the Staff of the Commission and its consultants filed a Final
Report, which contains a summary of the proceedings and numerous recommendations
by the consultants pertaining to the relationship between the two companies,
including recommendations relating to corporate governance issues, operating
relationships, including overhead allocations and financial controls, affiliate
service arrangements and transactions, compensation to Virginia Power for credit
support perceived by the consultants to flow to Dominion Resources and its other
subsidiaries, and possible regulatory tools for the Commission. In September
1995, Dominion Resources and Virginia Power each filed responses to the matters
addressed in the Final Report. The Staff is scheduled to file its final response
by March 15, 1996.

At this time, Dominion Resources is unable to predict the ultimate
resolution of these matters or their effect on the Company.

ITEM 4. SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS

None.

EXECUTIVE OFFICERS OF THE REGISTRANT

<TABLE>
<CAPTION>
NAME AND AGE BUSINESS EXPERIENCE PAST FIVE YEARS

<S> <C>
Thos. E. Capps (60) Chairman of the Board of Directors, President and Chief Executive Officer from
September 1, 1995 to date; Chairman of the Board of Directors and Chief
Executive Officer from August 16, 1994 to September 1, 1995; Chairman of the
Board of Directors, President and Chief Executive Officer of Dominion
Resources from December 30, 1992 to August 16, 1994; President and Chief
Executive Officer of Dominion Resources and Vice Chairman of the Virginia
Electric and Power Company Board of Directors prior to December 30, 1992.

James T. Rhodes (54) President and Chief Executive Officer of Virginia Electric and Power Company.

Paul J. Bonavia (44) Senior Vice President-Corporate July 1, 1995 to date; Senior Vice President
and General Counsel from January 1, 1995 to July 1, 1995; Vice President and
General Counsel of Dominion Resources from February 1, 1994 to January 1,
1995; Vice President-Regulation of Virginia Power from September 1, 1992 to
February 1, 1994; Vice President and General Counsel of Dominion Resources
from June 3, 1991 to September 1, 1992; Partner in the law firm of Steel,
Hector and Davis, Miami, Florida, prior to June 3, 1991.
</TABLE>

13
<TABLE>
<CAPTION>
NAME AND AGE BUSINESS EXPERIENCE PAST FIVE YEARS
<S> <C>
Thomas N. Chewning (50) Senior Vice President from October 1, 1994 to date; Vice President of Dominion
Resources from November 15, 1992 to October 1, 1994; Vice President, Treasurer
and Corporate Secretary of Virginia Power from October 1, 1991 to November 15,
1992; Vice President and Treasurer, Dominion Energy, Inc.; Vice President and
Treasurer, Dominion Lands, Inc. and Vice President-Administration, Dominion
Capital, Inc., prior to October 1, 1991.

David L. Heavenridge (49) Senior Vice President of Dominion Resources from March 1, 1994 to date; Senior
Vice President and Controller of Dominion Resources from April 1, 1992 to
March 1, 1994; Vice President and Controller of Dominion Resources prior to
April 1, 1992.

Linwood R. Robertson (56) Senior Vice President-Finance, Treasurer and Corporate Secretary, January 1,
1995 to date; Vice President-Finance and Treasurer of Dominion Resources from
March 1, 1994 to January 1, 1995; Vice President, Treasurer and Assistant
Corporate Secretary of Dominion Resources prior to March 1, 1994.

Thomas F. Farrell, II (41) Vice President and General Counsel from July 1, 1995 to date; Partner in the
law firm of McGuire, Woods, Battle & Boothe, L.L.P. prior to July 1, 1995.

Donald T. Herrick, Jr. (52) Vice President of Dominion Resources.

Elizabeth A. Martin (36) Vice President-Planning and Investment Analysis of Dominion Resources from
July 1, 1995 to date; Vice President-Adminsitration of Dominion Energy from
February 1, 1994 to July 1, 1995; Counsel-Dominion Energy from July 1, 1992 to
February 1, 1994; Associate in the law firm of Hunton & Williams, Richmond,
Virginia prior to July 1, 1992.

Everard Munsey (62) Vice President Public Policy of Dominion Resources.

James L. Trueheart (44) Vice President and Controller of Dominion Resources from March 1, 1994 to
date; Assistant Controller of Dominion Resources from March 15, 1991 to March
1, 1994; Assistant Controller of Virginia Power prior to March 15, 1991.
</TABLE>

14
PART II

ITEM 5. MARKET FOR THE REGISTRANT'S COMMON EQUITY AND
RELATED STOCKHOLDER MATTERS

Dominion Resources common stock is listed on the New York Stock Exchange
and at December 31, 1995 there were 233,496 registered common shareholders of
record. Quarterly information concerning stock prices and dividends is contained
on page 44 of the 1995 Annual Report to Shareholders, for the fiscal year ended
December 31, 1995, in Note Q to the NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
which is filed herein as Exhibit 13, is hereby incorporated herein by reference.

ITEM 6. SELECTED FINANCIAL DATA

This information is contained under the caption "Selected Consolidated
Financial Data" on page 19 of the 1995 Annual Report to Shareholders, for the
fiscal year ended December 31, 1995, filed herein as Exhibit 13, is hereby
incorporated herein by reference.

ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS
OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

This information is contained under the caption "Management's Discussion
and Analysis of Operations" on pages 21 through 25 and "Management's Discussion
and Analysis of Cash Flows and Financial Condition" on pages 29 and 30 of the
1995 Annual Report to Shareholders, for the fiscal year ended December 31, 1995,
filed herein as Exhibit 13, is hereby incorporated herein by reference.

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

This information is contained in the CONSOLIDATED FINANCIAL STATEMENTS on
pages 20, 26 through 28. Notes to the NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
on pages 31 through 45 and related report thereon of Deloitte & Touche LLP,
independent auditors, appearing on page 47 of the 1995 Annual Report to
Shareholders, for the fiscal year ended December 31, 1995, filed herein as
Exhibit 13, is hereby incorporated herein by reference.

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND
FINANCIAL DISCLOSURE

None.

PART III

ITEM 10. DIRECTORS AND EXECUTIVE OFFICERS OF THE REGISTRANT

Information regarding the Directors of Dominion Resources contained on
pages 2 and 3 of the 1996 Proxy Statement, File No. 1-8489, dated March 11, 1996
is hereby incorporated herein by reference. The information concerning the
executive officers of Dominion Resources required by this Item is incorporated
by reference to the section in Part I hereof entitled "EXECUTIVE OFFICERS OF THE
REGISTRANT."

ITEM 11. EXECUTIVE COMPENSATION

The information regarding executive and director compensation contained on
pages 7 through 17 of the 1996 Proxy Statement is hereby incorporated herein by
reference.

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT

The information concerning stock ownership by directors and executive
officers contained on page 5 of the 1996 Proxy Statement is hereby incorporated
herein by reference.

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS

The information contained on page 6 of the 1996 Proxy Statement under the
caption "COMPENSATION COMMITTEE INTERLOCKS AND INSIDER PARTICIPATION" and on
page 18 of the 1996 Proxy Statement concerning certain transactions and
relationships of Dominion Resources and its subsidiaries with its executive
officers and directors is hereby incorporated herein by reference.

15
PART IV

ITEM 14. EXHIBITS, FINANCIAL STATEMENT SCHEDULES, AND REPORTS ON FORM 8-K

A. The following documents are filed as part of this Form 10-K. The
Consolidated Financial Statements are incorporated herein by reference and are
found on the pages noted.

1. FINANCIAL STATEMENTS

<TABLE>
<CAPTION>
1995
ANNUAL REPORT
TO SHAREHOLDERS
(PAGE)
<S> <C>
Report of Independent Auditors.............................................................. 47
Consolidated Statements of Income and Retained Earnings
for the years ended December 31, 1995, 1994 and 1993...................................... 20
Consolidated Balance Sheets at December 31, 1995 and 1994................................... 26-27
Consolidated Statements of Cash Flows for the years ended
December 31, 1995, 1994 and 1993.......................................................... 28
Notes to Consolidated Financial Statements.................................................. 31-45
</TABLE>

2. EXHIBITS

<TABLE>
<S> <C> <C>
3(i) - Articles of Incorporation as in effect May 4, 1987 (Exhibit 3(i), Form 10-K for the fiscal year ended
December 31, 1993, File No. 1-8489, incorporated by reference).
3(ii) - Bylaws as in effect on September 21, 1994 (Exhibit 3(ii), Form 10-K for the fiscal year ended December 31,
1994, File No. 1-8489, incorporated by reference).
4(i) - See Exhibit 3(i) above.
4(ii) - Indenture of Mortgage of Virginia Electric and Power Company, dated November 1, 1935, as supplemented and
modified by fifty-eight Supplemental Indentures (Exhibit 4(ii), Form 10-K for the fiscal year ended
December 31, 1985, File No. 1-2255, incorporated by reference); Fifty-Ninth Supplemental Indenture
(Exhibit 4(ii), Form 10-Q for the quarter ended March 31, 1986, File No. 1-2255, incorporated by
reference); Sixtieth Supplemental Indenture (Exhibit 4(ii), Form 10-Q for the quarter ended September 30,
1986, File No. 1-2255, incorporated by reference); Sixty-First Supplemental Indenture (Exhibit 4(ii), Form
10-Q for the quarter ended June 30, 1987, File No. 1-2255, incorporated by reference); Sixty-Second
Supplemental Indenture (Exhibit 4(ii), Form 8-K, dated November 3, 1987, File No. 1-2255, incorporated by
reference); Sixty-Third Supplemental Indenture (Exhibit 4(i), Form 8-K, dated June 8, 1988, File No.
1-2255, incorporated by reference); Sixty-Fourth Supplemental Indenture (Exhibit 4(i), Form 8-K, dated
February 8, 1989, File No. 1-2255, incorporated by reference); Sixty-Fifth Supplemental Indenture (Exhibit
4(i), Form 8-K, dated June 22, 1989, File No. 1-2255, incorporated by reference); Sixty-Sixth Supplemental
Indenture, (Exhibit 4(i), Form 8-K, dated February 27, 1990, File No. 1 -2255, incorporated by reference);
Sixty-Seventh Supplemental Indenture (Exhibit 4(i), Form 8-K, dated April 2, 1991, File No. 1-2255,
incorporated by reference); Sixty-Eighth Supplemental Indenture, (Exhibit 4(i)), Sixty-Ninth Supplemental
Indenture, (Exhibit 4(ii)) and Seventieth Supplemental Indenture, (Exhibit 4(iii), Form 8-K, dated
February 25, 1992, File No. 1-2255, incorporated by reference); Seventy-First Supplemental Indenture
(Exhibit 4(i)) and Seventy-Second Supplemental Indenture, (Exhibit 4(ii), Form 8-K, dated July 7, 1992,
File No. 1-2255, incorporated by reference); Seventy-Third Supplemental Indenture, (Exhibit 4(i), Form
8-K, dated August 6, 1992, File No. 1-2255, incorporated by reference); Seventy-Fourth Supplemental
Indenture (Exhibit 4(i), Form 8-K, dated February 10, 1993, File No. 1-2255, incorporated by reference);
Seventy-Fifth Supplemental Indenture, (Exhibit 4(i), Form 8-K, dated April 6, 1993, File No. 1-2255,
incorporated by reference); Seventy-Sixth Supplemental Indenture, (Exhibit 4(i), Form 8-K, dated April 21,
1993, File No. 1 -2255, incorporated by reference); Seventy-Seventh Supplemental Indenture, (Exhibit 4(i),
Form 8-K, dated June 8, 1993, File No. 1-2255, incorporated by reference); Seventy-Eighth Supplemental
Indenture, (Exhibit 4(i), Form 8-K, dated August 10, 1993, File No. 1-2255, incorporated by reference);
Seventy-Ninth Supplemental Indenture, (Exhibit 4(i), Form 8-K, dated August 10, 1993, File No. 1-2255,
incorporated by reference); Eightieth Supplemental Indenture, (Exhibit 4(i), Form 8-K, dated
</TABLE>

16
<TABLE>
<S> <C> <C>
October 12, 1993, File No. 1-2255, incorporated by reference); Eighty-First Supplemental Indenture,
(Exhibit 4(iii), Form 10-K for the fiscal year ended December 31, 1993, File No. 1-2255, incorporated by
reference); Eighty-Second Supplemental Indenture, (Exhibit 4(i), Form 8-K, dated January 18, 1994, File
No. 1-2255, incorporated by reference); Eighty-Third Supplemental Indenture (Exhibit 4(i), Form 8-K, dated
October 19, 1994, File No. 1-2255, incorporated by reference) and Eighty-Fourth Supplemental Indenture
(Exhibit 4(i), Form 8-K, dated March 23, 1995, File
No. 1-2255, incorporated by reference).
4(iii) - Indenture, dated April 1, 1985, between Virginia Electric and Power Company and Crestar Bank (formerly
United Virginia Bank) (Exhibit 4(iv), Form 10-K for the fiscal year ended December 31, 1993, File No.
1-2255, incorporated by reference).
4(iv) - Indenture, dated as of June 1, 1986, between Virginia Electric and Power Company and Chemical Bank
(Exhibit 4(v), Form 10-K for the fiscal year ended December 31, 1993, File No. 1-2255, incorporated by
reference).
4(v) - Indenture, dated April 1, 1988, between Virginia Electric and Power Company and Chemical Bank, as
supplemented and modified by a First Supplemental Indenture, dated August 1, 1989, (Exhibit 4(vi), Form
10-K for the fiscal year ended December 31, 1993, File No. 1-2255, incorporated by reference).
4(vi) - Dominion Resources agrees to furnish to the Commission upon request any other instrument with respect to
long-term debt as to which the total amount of securities authorized thereunder does not exceed 10% of
Dominion Resources' total assets.
10(i) - Operating Agreement, dated June 17, 1981, between Virginia Electric and Power Company and Monongahela
Power Company, the Potomac Edison Company, West Penn Power Company, and Allegheny Generating Company
(Exhibit 10(vi), Form 10-K for the fiscal year ended December 31, 1983, File No. 1-8489, incorporated by
reference).
10(ii) - Purchase, Construction and Ownership Agreement, dated as of December 28, 1982 but amended and restated on
October 17, 1983, between Virginia Electric and Power Company and Old Dominion Electric Cooperative
(Exhibit 10(viii), Form 10-K for the fiscal year ended December 31, 1983, File No. 1-8489, incorporated by
reference).
10(iii) - Interconnection and Operating Agreement, dated as of December 28, 1982 as amended and restated on October
17, 1983, between Virginia Electric and Power Company and Old Dominion Electric Cooperative (Exhibit
10(ix), Form 10-K for the fiscal year ended December 31, 1983, File No. 1-8489, incorporated by
reference).
10(iv) - Nuclear Fuel Agreement, dated as of December 28, 1982 as amended and restated on October 17, 1983, between
Virginia Electric and Power Company and Old Dominion Electric Cooperative (Exhibit 10(x), Form 10-K for
the fiscal year ended December 31, 1983, File No. 1-8489, incorporated by reference).
10(v) - Credit Agreement, dated as of September 1, 1995, between Chemical Bank and Virginia Electric and Power
Company (filed herewith).
10(vi) - Inter-Company Credit Agreement, dated December 20, 1985, as modified on August 21, 1987, between Dominion
Resources and Dominion Capital, Inc. (Exhibit 10(vi), Form 10-K for the fiscal year ended December 31,
1993, File No. 1-8489, incorporated by reference).
10(vii) - Inter-Company Credit Agreement, dated October 1, 1987 as amended and restated as of May 1, 1988 between
Dominion Resources and Dominion Energy, Inc. (Exhibit 10(vii), Form 10-K for the fiscal year ended
December 31, 1993, File No. 1-8489, incorporated by reference).
10(viii) - Inter-Company Credit Agreement, dated as of September 1, 1988 between Dominion Resources and Dominion
Lands, Inc. (Exhibit 10(viii), Form 10-K for the fiscal year ended December 31, 1993, File No. 1-8489,
incorporated by reference).
10(ix) - Form of Amended and Restated Articles of Partnership in Commendam of Catalyst Old River Hydroelectric
Limited Partnership, by and between Catalyst Vidalia Corporation and Dominion Capital, Inc. effective as
of August 24, 1990 (Exhibit 10(xii) Form 10-K for the fiscal year ended December 31, 1990, File No.
1-8489, incorporated by reference).
10(x) - Supplemental Funding Agreement, dated as of August 24, 1990, by and among Dominion Capital, Inc., Catalyst
Old River Hydroelectric Limited Partnership and First National Bank of Commerce
</TABLE>

17
<TABLE>
<S> <C> <C>
(Exhibit 10(xiii) Form 10-K for the fiscal year ended December 31, 1990, File No. 1-8489, incorporated by
reference).
10(xi) - Credit Agreement, dated December 1, 1985, between Virginia Electric and Power Company and Old Dominion
Electric Cooperative (Exhibit 10(xix), Form 10-K for the fiscal year ended December 31, 1985, File No.
1-8489, incorporated by reference).
10(xii) - Agreement for Northern Virginia Services, dated as of November 1, 1985, between Potomac Electric Power
Company and Virginia Electric and Power Company (Exhibit 10(xxi), Form 10-K for the fiscal year ended
December 31, 1985, File No. 1-8489, incorporated by reference).
10(xiii) - Purchase, Construction and Ownership Agreement, dated May 31, 1990, between Virginia Electric and Power
Company and Old Dominion Electric Cooperative (Exhibit 10(xi), Form 10-K for the fiscal year ended
December 31, 1990, File No. 1 -2255, incorporated by reference).
10(xiv) - Operating Agreement, dated May 31, 1990, between Virginia Electric and Power Company and Old Dominion
Electric Cooperative (Exhibit 10(xii), Form 10-K for the fiscal year ended December 31, 1990, File No.
1-2255, incorporated by reference).
10(xv) - Coal-Fired Unit Turnkey Contract (Volume 1), dated April 6, 1989, and the United 2 Amendment (Volume 1),
dated May 31, 1990 between Virginia Electric and Power Company and Old Dominion Electric Cooperative,
Westinghouse, Black & Veatch, Combustion Engineering and H. B. Zachry (Volumes 2-11 contain technical
specifications) (Exhibit 10(xiii), Form 10-K for the fiscal year ended December 31, 1990, File No. 1-2255,
incorporated by reference).
10(xvi) - Receivables Purchase Agreement, dated as of December 11, 1991, between Virginia Electric and Power Company
and Dynamic Funding Corporation (Exhibit 10(xv), Form 10-K for the fiscal year ended December 31, 1991,
File No. 1-2255, incorporated by reference).
10(xvii) - Trust Agreement of Dominion Resources Black Warrior Trust, dated May 31, 1994, among Dominion Black
Warrior Basin, Inc., Dominion Resources, Inc., Mellon Bank (DE) National Association and Nationsbank of
Texas, N.A. (Exhibit 3.1, Amendment No. 1 to Registration Statement, File No. 33-53513, filed June 1,
1994, incorporated by reference).
10(xviii) - First Amendment of Trust Agreement of Dominion Resources Black Warrior Trust, dated June 27, 1994, among
Dominion Black Warrior Basin, Inc., Dominion Resources, Inc., Mellon Bank (DE) National Association and
Nationsbank of Texas, N.A. (Exhibit 10(ii), Form 10-Q for the quarter ended June 30, 1994, File No.
1-8489, incorporated by reference).
10(xix)* - Dominion Resources, Inc. Directors' Deferred Compensation Plan, effective July 1, 1986, (Exhibit 10(xx),
Form 10-K for the fiscal year end December 31, 1988, File No. 1-8489, incorporated by references.)
10(xx)* - Dominion Resources, Inc. Performance Achievement Plan, effective January 1, 1986, as amended and restated
effective February 19, 1988 (Exhibit 10(xxi), Form 10-K for the fiscal year ended December 31, 1988, File
No. 1-8489, incorporated by reference).
10(xxi)* - Dominion Resources, Inc. Executive Supplemental Retirement Plan, effective January 1, 1981 as amended and
restated effective October 22, 1988 (Exhibit 10(xxii), Form 10-K for the fiscal year ended December 31,
1988, File No. 1-8489, incorporated by reference), amended and restated June 15, 1990 (Exhibit 10(xxiv),
Form 10-K for the fiscal year ended December 31, 1990, File No. 1-8489, incorporated by reference).
10(xxii)* - Arrangements with certain executive officers regarding additional credited years of service for retirement
and retirement life insurance purposes (Exhibit 10(xxv), Form 10-K for the fiscal year ended December 31,
1991, File No. 1-8489, incorporated by reference).
10(xxiii)* - Dominion Resources, Inc.'s Cash Incentive Plan as adopted December 20, 1991 (Exhibit 10(xxii), Form 10-K
for the fiscal year ended December 31, 1991, File No. 1-8489, incorporated by reference).
10(xxiv)* - Dominion Resources, Inc. Long-Term Incentive Plan, effective April 17, 1987 (1987 Proxy Statement, File
No. 1-8489, incorporated by reference).
10(xxv)* - Form of Employment Continuity Agreement for certain officers of Dominion Resources (Exhibit (xxvi), Form
10-K for the fiscal year ended December 31, 1994, File No. 1-8489, incorporated by reference).
</TABLE>

18
<TABLE>
<S> <C> <C>
10(xxvi)* - Dominion Resources, Inc. Retirement Benefit Funding Plan, effective June 29, 1990 (Exhibit 10(xxxiii),
Form 10-K for the fiscal year ended December 31, 1990, File No. 1-8489, incorporated by reference).
10(xxvii)* - Dominion Resources, Inc. Retirement Benefit Restoration Plan as adopted effective January 1, 1991 (Exhibit
10(xxvii), Form 10-K for the fiscal year ended December 31, 1992, File No. 1-8489, incorporated by
reference).
10(xxviii)* - Dominion Resources, Inc. Executives' Deferred Compensation Plan, effective January 1, 1994 (Exhibit
10(xxviii), Form 10-K for the fiscal year ended December 31, 1993, File No. 1-8489, incorporated by
reference).
10(xxix)* - Employment Agreement dated April 12, 1995 (Exhibit 10(i), Form 10-Q for the quarter ended March 31, 1995,
File No. 1-8489, incorporated by reference) and an Amendment dated September 15, 1995 between Dominion
Resources and Thos. E. Capps (Exhibit 10(i), Form 10-Q for the quarter ended September 30, 1995, File No.
1-8489, incorporated by reference).
10(xxx)* - Employment Agreement dated April 12, 1995 (Exhibit 10(i), Form 10-Q for the quarter ended March 31, 1995,
File No. 1-8489, incorporated by reference) and an Amendment dated September 15, 1995 between Virginia
Power and James T. Rhodes (Exhibit 10(i), Form 10-Q for the quarter ended September 30, 1995, File No.
1-8489, incorporated by reference).
10(xxxi)* - Form of three year Employment Agreement between Dominion Resources and Paul J. Bonavia, David L.
Heavenridge and certain other executive officers of Dominion Resources (Exhibit 10(xxxiii), Form 10-K for
the fiscal year ended December 31, 1994, File No. 1-8489, incorporated by reference).
10(xxxii)* - Form of two year Employment Agreement between Dominion Resources and certain executive officers (Exhibit
10(xxxiv), Form 10-K for the fiscal year ended December 31, 1994, File No. 1-8489, incorporated by
reference).
11 - Computation of Earnings Per Share of Common Stock Assuming Full Dilution (filed herewith).
13 - Portions of the 1995 Annual Report to Shareholders for the fiscal year ended December 31, 1995 (filed
herewith).
22 - Subsidiaries of the Registrant (filed herewith).
23(i) - Consent of Hunton & Williams (filed herewith).
23(ii) - Consent of Jackson & Kelly (filed herewith).
23(iii) - Consent of Deloitte & Touche LLP (filed herewith).
27 - Financial Data Schedule (filed herewith).
99(i) - Consent Order by the Virginia State Corporation Commission (Item 5., Form 8-K, dated February 21, 1995,
File No. 1-8489, incorporated by reference).
99(ii) - Final Report by the Staff of the Virginia State Corporation Commission (Item 5., Form 8-K, dated April 17,
1995, File No. 1-8489, incorporated by reference).
</TABLE>

* Indicates management contract or compensatory plan or arrangement.

B. Reports on Form 8-K

None

19
SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities
Exchange Act of 1934, the registrant has duly caused this report to be signed on
its behalf by the undersigned, thereunto duly authorized.

DOMINION RESOURCES, INC.

By: THOS. E. CAPPS

(Thos. E. Capps, Chairman of the
Board of Directors,
President and Chief Executive
Officer)

Date: MARCH 12, 1996

Pursuant to the requirements of the Securities Exchange Act of 1934, this
report has been signed below by the following persons on behalf of the
registrant and in the capacities indicated and on the 12th day of March, 1996.

<TABLE>
<CAPTION>
SIGNATURE TITLE

<S> <C>
JOHN B. ADAMS, JR. Director
John B. Adams, Jr.

TYNDALL L. BAUCOM Director
Tyndall L. Baucom

JOHN B. BERNHARDT Director
John B. Bernhardt

THOS. E. CAPPS Chairman of the Board of Directors, President
(Chief Executive Officer)
Thos. E. Capps and Director

BENJAMIN J. LAMBERT, III Director
Benjamin J. Lambert, III

RICHARD L. LEATHERWOOD Director
Richard L. Leatherwood

HARVEY L. LINDSAY, JR. Director
Harvey L. Lindsay, Jr.

K. A. RANDALL Director
K. A. Randall

WILLIAM T. ROOS Director
William T. Roos

FRANK S. ROYAL Director
Frank S. Royal
</TABLE>

20
<TABLE>
<CAPTION>
SIGNATURE TITLE
<S> <C>
JUDITH B. SACK Director
Judith B. Sack

S. DALLAS SIMMONS Director
S. Dallas Simmons

Director
Robert H. Spilman

LINWOOD R. ROBERTSON Senior Vice President
(Chief Financial Officer)
Linwood R. Robertson

J. L. TRUEHEART Vice President and Controller
(Principal Accounting Officer)
J. L. Trueheart
</TABLE>

21