UNITED STATESSECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM10-Q
(Mark One)
☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended March 31, 2026
or
☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from __________ to __________
Commission File Number: 001-40370
Keel Infrastructure Corp.
(Exact name of registrant as specified in its charter)
120 Broadway, Suite 1375, New York, NY 10004
(Address of principal executive offices) (Zip code)
(929)264-5151
(Registrant’s telephone number, including area code)
Bitfarms Ltd.
110 Yonge Street, Suite 1601
Toronto, Ontario, Canada M5C 1T4
(Former name, former address and former fiscal year, if changed since last report)
Securities registered pursuant to Section 12(b) of the Act:
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. ☒ Yes ☐ No
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). ☒ Yes ☐ No
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). ☐ Yes ☒ No
Number of shares of the registrant’s common stock outstanding on May 8, 2026: 603,828,651
i
GENERAL MATTERS
In this Quarterly Report on Form 10-Q for the quarter ended March 31, 2026 (referred to herein as this “Quarterly Report”) “we”, “us”, “our”, and the “Company” refer to Keel Infrastructure Corp., a Delaware corporation (“Keel”) and its consolidated subsidiaries, including Bitfarms Ltd., a corporation existing under the laws of the Province of Ontario (“Bitfarms”) unless the context requires otherwise.
Effective as of 12:01 a.m. (Eastern Daylight Time) on April 1, 2026, Keel became the ultimate parent company of Bitfarms and its subsidiaries pursuant to a statutory plan of arrangement under Section 182 of the Business Corporations Act (Ontario) (the “Arrangement”) as part of Bitfarms’ previously announced intention to redomicile from Canada to the United States (the “U.S. Redomiciliation Transaction”). Pursuant to the Arrangement, Keel indirectly acquired all of the issued and outstanding common shares in the capital of Bitfarms, and in exchange, holders of the common shares of Bitfarms received one share of common stock of Keel per common share of Bitfarms. The issuance of shares of common stock of Keel pursuant to the Arrangement was exempt from registration under Section 3(a)(10) of the Securities Act of 1933, as amended (the “Securities Act”).
The common shares of Bitfarms were listed on the Nasdaq Stock Market (“Nasdaq”) and the Toronto Stock Exchange (the “TSX”) and registered pursuant to Section 12(b) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”) prior to the U.S. Redomiciliation Transaction. Keel is the successor issuer to Bitfarms pursuant to Rule 12g-3(a) under the Exchange Act, and the common stock of Keel is therefore deemed to be registered under Section 12(b) of the Exchange Act. Keel reported this succession on a Form 8-K filed on April 1, 2026 in accordance with Rule 12g-3(f) under the Exchange Act. While Bitfarms was a foreign private issuer, Keel is a U.S. domestic issuer.
This Quarterly Report on Form 10-Q is filed by Keel as successor issuer to Bitfarms, but it relates to the quarter ended March 31, 2026 which ended prior to the closing of the U.S. Redomiciliation Transaction. References in this report to the “Annual Report” refer to Bitfarms’ Annual Report on Form 10-K for the fiscal year ended December 31, 2025, filed on March 31, 2026, for which Keel is the successor issuer.
Words importing the singular, where the context requires, include the plural and vice versa and words importing any gender include all genders.
Keel and the associated Keel logo are registered trademarks of Keel Infrastructure Corp. or its subsidiaries. All other trademarks and brand names used herein are the property of their respective owners.
Unless we indicate otherwise: (i) all dollar amounts are expressed in U.S. dollars; and (ii) all references to “USD” or “$” are to U.S. dollars and all references to “CAD” are to Canadian dollars.
Note that use of the word “including” in this Quarterly Report means “including, without limitation.”
Unless we indicate otherwise, all information in this Quarterly Report is stated as of May 8, 2026.
ii
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
This Quarterly Report contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act, and Section 21E of the Exchange Act. Forward-looking statements generally are identified by words such as “intend,” “plan,” “may,” “should,” “will,” “project,” “estimate,” “anticipate,” “believe,” “expect,” “continue,” “potential,” “opportunity,” “predict,” “forecast,” “target,” “seek,” “could,” “would” and similar expressions, or the negatives thereof. All statements other than statements of historical fact are statements that could be deemed forward-looking statements. Such statements are based on management’s current expectations and are subject to a number of factors and uncertainties that could cause actual results to differ materially from those described in the forward-looking statements. These risks and uncertainties include, but are not limited to, the following risks, uncertainties, and other factors:
iii
There can be no assurance that actual results or business conditions will not differ materially from those projected or suggested in such forward-looking statements as a result of various factors, including those described in Part I, Item 1A, “Risk Factors” in our Annual Report and our subsequent filings with the U.S. Securities and Exchange Commission.
You should read this Quarterly Report with the understanding that our actual future results, performance and achievements may be materially different from what we expect. We qualify all of our forward-looking statements by these cautionary statements. Except as required by applicable law, we do not assume any obligation to update or revise these forward-looking statements for any reason, even if new information becomes available in the future.
iv
ITEM 1. FINANCIAL STATEMENTS
1
See accompanying notes to the unaudited condensed consolidated financial statements
F-1
F-2
Number of shares
Should be read in conjunction with the notes to the unaudited condensed consolidated financial statements
F-3
F-4
KEEL INFRASTRUCTURE CORP. (formerly known as Bitfarms Ltd.)
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
(Expressed in thousands of U.S. dollars, except data relating to number of PPE, shares, warrants, options and digital assets - unaudited)
NOTE 1: ORGANIZATION
Keel Infrastructure Corp. (“Keel” or the “Company”) is a North American digital and energy infrastructure company that develops data centers and energy infrastructure to lease for high-performance computing (“HPC”) and artificial intelligence (“AI”) workloads. The Company, founded in 2017 and previously known as Bitfarms Ltd., finalized its redomiciliation from Canada to the United States (the “U.S. Redomiciliation Transaction”) and adopted the name Keel Infrastructure Corp. on April 1, 2026.
Keel currently maintains its legacy Bitcoin Mining operations in the United States and Canada. As part of these operations, the Company owns and operates data centers housing specialized computers (referred to as “Miners”) designed for validating transactions on the Bitcoin Blockchain (referred to as “Mining”). Keel generally operates its Miners 24 hours per day to produce computational power (measured in hashrate) used to perform hashing calculations. The Company sells this hashrate to Mining Pool operators under a formula-derived rate commonly known in the industry as Full Pay Per Share (“FPPS”). Under FPPS, Mining Pool operators compensate Mining companies for their hashrate based on the expected value of the revenue that would be generated by that hashrate over a given period, regardless of the Mining Pool’s actual results during that period. This compensation may be paid in cryptocurrency, U.S. dollar, or another currency. Keel receives payments from Mining Pool operators in Bitcoin (as defined herein) on a daily basis and accumulates the Bitcoin it receives or exchanges it for U.S. dollar through reputable and established cryptocurrency trading platforms.
Terms and definitions
In these financial statements, the terms below have the following definitions:
F-5
NOTE 2: SIGNIFICANT ACCOUNTING POLICIES
Basis of presentation and principles of consolidation
These unaudited condensed consolidated financial statements include the accounts of the Company and its wholly-owned subsidiaries. The Company also consolidates certain variable interest entities (“VIEs”) for which the Company is the primary beneficiary, generally as a result of having the power to direct the activities that most significantly affect the VIE’s economic performance and holding variable interests that convey to the Company the obligation to absorb losses or the right to receive benefits that could potentially be significant to the VIEs. Subsidiaries that are not considered VIEs are consolidated if the Company owns, directly or indirectly, a controlling interest in the entities. The Company performs an assessment at inception and regularly reevaluates whether the entity is a VIE and whether the Company continues to be the primary beneficiary. All intercompany balances and transactions have been eliminated in consolidation.
The unaudited condensed consolidated financial statements are presented in USD and have been prepared in accordance with the accounting principles generally accepted in the United States of America (“U.S. GAAP”) and regulations of the U.S. Securities and Exchange Commission (the “SEC”) applicable to interim financial information, which permit the omission of certain information to the extent it has not changed materially since the latest audited annual financial statements.
In the opinion of the Company, the accompanying unaudited condensed consolidated financial statements contain all adjustments, consisting of only normal recurring adjustments, necessary for a fair statement of its unaudited condensed consolidated balance sheet as of March 31, 2026 and its results of operations for the three months ended March 31, 2026 and 2025 and cash flows for the three months ended March 31, 2026, and 2025. The consolidated balance sheet as of December 31, 2025, was derived from 2025 audited annual financial statements but does not contain all of the footnote disclosures from the annual financial statements.
These unaudited condensed consolidated financial statements should be read in conjunction with the annual consolidated financial statements and related notes thereto contained in the Company’s most recent Annual Report on Form 10-K for the fiscal year ended December 31, 2025, filed with the SEC on March 31, 2026 (the “Annual Report”).
Additionally, since there are no differences between net income (loss) and comprehensive income (loss), all references to comprehensive income (loss) have been excluded from the unaudited condensed consolidated financial statements.
Use of estimates
The preparation of unaudited condensed consolidated financial statements in conformity with U.S. GAAP requires Management to make estimates and assumptions that affect reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the unaudited condensed consolidated balance sheets and the reported amounts of revenue and expenses during the reporting periods. Actual results may differ materially from those estimates. The most significant accounting estimates inherent in the preparation of the Company’s unaudited condensed consolidated financial statements include revenue recognition; measurement of digital assets; determination of the useful lives, residual values, depreciation method and recoverability of long-lived assets; impairment analysis of property, plant and equipment; allocating the fair value of purchase consideration to assets acquired and liabilities assumed in business combinations and measurement of financial instruments.
F-6
NOTE 2: SIGNIFICANT ACCOUNTING POLICIES (Continued)
Adopted accounting pronouncements
In July 2025, the FASB issued ASU 2025-05, Financial Instruments—Credit Losses (Topic 326): Measurement of Credit Losses for Accounts Receivable and Contract Assets (“ASU 2025-05”). ASU 2025-05 provides an optional practical expedient when applying the guidance related to the estimate of expected credit losses for current accounts receivable and current contract assets resulting from transactions arising from contracts with customers. The Company adopted ASU 2025-05 effective January 1, 2026 and had elected to apply the practical expedient related to the estimation of expected credit losses for current accounts receivable and current contract assets. The adoption of ASU 2025-05 did not have a material impact on the Company’s consolidated financial statements.
In November 2024, the FASB issued ASU 2024-04, Debt—Debt with Conversion and Other Options (Subtopic 470-20): Induced Conversions of Convertible Debt Instruments (“ASU 2024-04”). ASU 2024-04 clarifies the accounting for induced conversions of convertible debt instruments and improves the consistency of accounting for settlements of convertible debt that occur at terms different from those specified in the original contract. The Company adopted ASU 2024-04 effective January 1, 2026. The adoption of the ASU 2024-04 did not have a material impact on the Company’s consolidated financial statements.
Recently issued accounting pronouncements not yet adopted
For recently issued accounting pronouncements not yet adopted, refer to the Company’s audited annual consolidated financial statements in the Annual Report.
NOTE 3: BUSINESS COMBINATION
On March 14, 2025 (the “Acquisition Date”), the Company acquired 100% of the issued share capital of Stronghold Digital Mining, Inc. (“Stronghold”) in a stock-for-stock merger transaction. Under the terms of the merger agreement, each Stronghold shareholder received 2.52 shares of Bitfarms for each Stronghold share they owned. A total of 59,866,609 common shares and 12,893,650warrants were issued. In addition, the Company paid $51,060 on closing to retire Stronghold’s outstanding loans and other closing costs. The acquisition was accounted for as a business combination using the acquisition method of accounting in accordance with ASC 805, Business Combinations. The fair value of the 59,866,609 shares issued as part of the consideration paid for Stronghold was based on the published share price on March 14, 2025 of $1.11 per share. Issuance costs of $196, which were directly attributable to the issuance of the shares, were netted against the deemed proceeds.
As a result of the business combination, the pre-existing hosting agreements between the Company and Stronghold were effectively settled. A gain of $945 was recognized on the settlement of the Refundable Hosting Deposits. Refer to Note 15 for more details.
Stronghold is a vertically integrated power generation and data center company focused on environmental remediation and reclamation services in Pennsylvania, United States. The Stronghold transaction is aligned with the Company’s strategic objectives to diversify its operations and expand its presence in the United States through vertical integration of power generation and energy arbitrage capabilities.
F-7
NOTE 3: BUSINESS COMBINATION (Continued)
Details of the final purchase price allocation and the fair value of the net assets acquired on March 14, 2025 are as follows:
Total acquisition-related costs that were not directly attributable to the issuance of shares amounted to $7,081, of which $1,571 were incurred during the first quarter of 2025, and $5,510 were expensed during the year ended December 31, 2024. These amounts were included in general and administrative expenses in the unaudited condensed consolidated statements of operations.
The following table presents the supplemental cash flow information:
F-8
NOTE 4: RIGHTS TO RENEWABLE ENERGY CREDITS (“RECS”) AND WASTE TAX CREDITS (“WTCS”)
NOTE 5: DIGITAL ASSETS
Bitcoin transactions and the corresponding values for the three months ended March 31, 2026 and 2025 were as follows:
F-9
NOTE 6: DERIVATIVE ASSETS AND LIABILITIES
Bitcoin option and selling contracts
The Company purchased Bitcoin option contracts that provide it with the right, but not the obligation, to sell digital assets at a fixed price. The Company also entered into contracts and earned premiums by agreeing to sell Bitcoin if the Bitcoin price reached specific targets.
On March 16, 2026, Reliz Ltd., the operating entity of BlockFills, a Chicago-based cryptocurrency brokerage, trading platform, and liquidity provider, filed voluntary petitions for relief under Chapter 11 restructuring proceedings of the United States Bankruptcy Code. Prior to March 16, 2026, in connection with its Bitcoin option and selling contracts, the Company closed all outstanding contracts with BlockFills. During the three months ended March 31, 2026, the Company recorded a credit loss expense for the $4,218 receivable from BlockFills related to the closed contracts and was recorded in Other Expenses in the unaudited condensed consolidated statements of operations.
Bitcoin redemption options
Starting in November 2024, the Company entered into purchase orders of Miners with a supplier which allows the Company to pay for the Miners in cash, Bitcoin or a combination of both. The right to redeem the Bitcoin (“Bitcoin Redemption Option”) meets the definition of an embedded derivative. As of December 31, 2025, the Company no longer held any Bitcoin Redemption Options.
Capped call transactions
In October 2025, in connection with the Convertible Notes, the Company entered into capped call transactions, with a cap price of $11.88per share (representing a 125% premium over the reference price). The capped call transactions do not meet the scope exception from derivative accounting, as they fail the equity classification requirements as the Company cannot settle these transactions by means other than cash and are therefore treated as a derivative asset, which are measured at fair value.
The following table summarizes the derivatives and reconciles the fair value measurement, which are classified within Level 2 of the fair value hierarchy:
F-10
NOTE 6: DERIVATIVE ASSETS AND LIABILITIES (Continued)
The following gain (loss) on derivatives is recognized in the unaudited condensed consolidated statements of operations:
Refer to Note 15 for more details of derivative instruments.
NOTE 7: RESTRICTED CASH
In February 2026, the Credit Facility was fully repaid and the cash balance of $57,500 is no longer restricted. Refer to Note 12 for more details.
In March 2026, the Company issued two letters of credit requiring a total of $41,075 of restricted cash pledged as collateral as of March 31, 2026. Refer to Note 20 for more details.
F-11
NOTE 8: ASSETS HELD FOR SALE AND DISCONTINUED OPERATIONS
Miners and Mining electrical components
As of March 31, 2026 and December 31, 2025, the Company determined it had surplus Miners and Mining electrical equipment that met the criteria as “assets held for sale” under ASC 360-10-45 as of the respective balance sheet dates. These assets were measured at the lower of their carrying amount and fair value less costs to sell at the time of the classification. These surplus assets are not determined to be discontinued operations as their planned sale did not represent a strategic shift on the Company’s operations and financial results.
The fair value of these assets were determined using the market approach, which is based on recent sales prices for similar Miners and equipment. Such fair value measurements are a non-recurring Level 3 measurement under the fair value hierarchy. The key assumption used by Management to determine fair value is the most recent amount contracted with a third party for a comparable Miner or equipment sold.
Assets of disposal group classified as held for sale
In addition to surplus Miners and equipment, the Company classified assets in Paraguay which met the criteria as “assets held for sale” during the year ended December 31, 2025, which have been classified as discontinued operations as detailed in this note. The Paraguay disposal group included the Paso Pe Bitcoin data center which met the “held for sale” criteria during the third quarter of 2025.
The following table provides the components of the assets or disposal groups that either met the criteria of “assets held for sale” as of March 31, 2026 or December 31, 2025.
F-12
NOTE 8: ASSETS HELD FOR SALE AND DISCONTINUED OPERATIONS (Continued)
Discontinued operations
In 2025, the Company began a significant transformation of its corporate strategy, exiting its Latin American Bitcoin Mining operations in Paraguay and Argentina to fully concentrate on the U.S. and Canadian HPC infrastructure markets. As a result of these strategic decisions, the Company classified certain of its Latin American asset groups as “held for sale” and its operations as discontinued operations. As discussed below, the Argentina asset group was abandoned, and therefore its assets were not classified as “held for sale”.
The combined results of the Company’s Argentina and Paraguay operations for the three months ended March 31, 2026 and 2025 are presented below:
F-13
Discontinued operations (Continued)
The net cash flows incurred by Argentina’s and Paraguay’s operations are, as follows:
i. Argentina’s operations as discontinued operations
During the second quarter of 2025, the Company’s energy supplier halted the supply of electricity to the Company’s Rio Cuarto, Argentina Bitcoin data center. Following this event, on August 11, 2025, the Company determined that it would discontinue and abandon its operations in Rio Cuarto, Argentina. The Company negotiated to eliminate its asset retirement obligation and reduced the reserved power to a minimum. As of September 30, 2025, the Company’s Argentina operations were abandoned and classified as a discontinued operation. As these operations represent an asset group that was abandoned, it is not classified as “held for sale” of a disposal group. Notwithstanding, commencing in the second quarter of 2025, the Company also identified certain electrical equipment and BVVE that could be sold separately and not abandoned.
Impairment on Argentina asset group in the first quarter of 2025
During the first quarter of 2025, due to indicators of impairment that included the decline of the Company’s market capitalization and Bitcoin price, the Company performed recoverability tests for operating Bitcoin data centers in Canada, United States, Paraguay and Argentina. The Company also experienced an increase in gas prices which affected the Company’s cost of energy in Argentina.
In performing a recoverability test, the Company calculated the sum of the estimated undiscounted future cash flows from continued use and eventual disposition for the Argentina asset group, and determined it was lower than its carrying amount, therefore the Argentina asset group was not recoverable, and an impairment loss in the amount of $17,504 was recognized to write down the carrying amount of the asset group to its fair value.
To measure the impairment loss, fair value was determined using an income approach under ASC 820 based on a discounted cash flow model incorporating management’s estimates of future cash flows, expected Bitcoin prices, projected operating expenses, and a market-based discount rate. Due to the use of significant unobservable inputs, the fair value measurement was classified within Level 3 of the fair value hierarchy.
On May 8, 2026, the Company entered into a definitive share purchase agreement for the sale of its wholly-owned Argentina subsidiary, Backbone Hosting Solutions SAU (“Backbone Argentina”). Refer to Note 21 for more details.
F-14
ii. Paraguay’s operations as discontinued operations and assets held for sale
During the first quarter of 2025, the Company finalized the sale of its Yguazu Bitcoin data center in Paraguay. Subsequently, during the third quarter of 2025, the Company determined that the Paso Pe Bitcoin data center met the criteria to be classified as “held for sale”, and that all operations in Paraguay should be classified as discontinued operations as the Company makes a strategic shift towards HPC data center projects in North America.
Sale of the Yguazu Bitcoin Data Center
On March 17, 2025, the Company completed the sale of its 200 MW Bitcoin data center under development in Yguazu, Paraguay to HIVE Digital Technologies Ltd. (“HIVE”) pursuant to a January 24, 2025 share purchase agreement. The transaction involved the sale of the Company’s 100% ownership stake in the Yguazu Bitcoin data center and resulted in the derecognition of the subsidiary’s assets and liabilities. The transaction details are as follows:
Sale of the Paso Pe Bitcoin data center
In January 2026, a definitive purchase agreement was signed for the sale of the Paso Pe Bitcoin data center. The sale of the Paso Pe Bitcoin data center was completed on April 21, 2026 for total proceeds of approximately $13,000. Refer to Note 21 for more details.
During the three months ended March 31, 2026, the Company used the most recent agreed upon selling price to estimate the fair value less costs to sell of the Paso Pe Bitcoin data center and recognized a further impairment loss of $12,806. This impairment loss is presented within loss from discontinued operations in the consolidated statements of operations.
F-15
NOTE 9: PROPERTY, PLANT AND EQUIPMENT, NET
As of March 31, 2026 and December 31, 2025, property, plant and equipment (“PPE”) consisted of the following:
Assets not subject to depreciation
As of March 31, 2026, property, plant and equipment that are not yet placed into service amounted to $27,810 (December 31, 2025: $12,169) and land was $51,869 (December 31, 2025: $48,119). These assets are not depreciated. Depreciation begins when assets are ready and available for their intended use; land is not depreciated.
NOTE 10: LONG-TERM DEPOSITS, EQUIPMENT PREPAYMENTS AND OTHER
NOTE 11: ACCOUNTS PAYABLE AND ACCRUED EXPENSES
F-16
NOTE 12: LONG-TERM DEBT
The Company’s long-term debt is as follows:
Movement in long-term debt is as follows:
Credit Facility
In April 2025, the Company signed a credit facility for up to $300,000 (the “Credit Facility”) with Macquarie.
An initial $50,000 was drawn (the “Initial Tranche”), bearing interest at 8% per annum, with monthly payments and a term of two years. Interest for the first three months was paid in kind and added to the loan. The payments shall be solely interest until the Initial Tranche maturity date, April 1, 2027, at which time the principal debt of $50,000 and interest paid in kind will be payable in full. In connection with the Initial Tranche, Macquarie received 5,330,946 equity warrants convertible for common shares of the Company with an initial fair value of $2,900. Refer to Note 13 for more details. The $50,000 proceeds from the Initial Tranche were allocated to the equity warrants and debt based on relative fair value. Therefore, a discount on debt of $2,711 is deducted from the carrying amount of the debt and is amortized over the term of the Initial Tranche.
An additional $250,000 (“Second Tranche”) was made available to the Company as it achieves specific development milestones at the Panther Creek, Pennsylvania, United States location.
F-17
NOTE 12: LONG-TERM DEBT (Continued)
Credit Facility (Continued)
In October 2025, the Company converted the entirety of the loan into a $300,000 project debt facility for the development of the Panther Creek property and secured at the project level with a parent company guarantee, with the Initial Tranche rolled into the project debt facility. The Company drew an additional $50,000from the converted facility, for a total of $100,000 drawn and issued an additional 2,197,127 equity warrants convertible for common shares of the Company with an initial fair value of $7,093. Refer to Note 13 for more details. The $50,000 proceeds from the Second Tranche were allocated to the equity warrants and debt based on relative fair values. Therefore, a discount on debt of $5,899 is deducted from the carrying amount of the debt and is amortized over the term of the Second tranche.
In February 2026, the Credit Facility was fully repaid for a total of $116,855, including interest, principal and additional base return fees and the cash balance of $57,500 is no longer restricted. The Company recorded a total $21,596 loss related to the termination of the Credit Facility, which included $19,858 from the extinguishment itself and $1,738 in transaction costs recorded in long-term deposits and other related fees. These amounts are presented within Loss on extinguishment of long-term debt in the unaudited condensed consolidated statement of operations.
Convertible Senior Notes
In October 2025, the Company issued $588,000 aggregate principal amount of convertible senior notes (the “Convertible Notes”), which included the full exercise of the purchasers’ option to purchase up to an additional $88,000 principal amount of Convertible Notes. The Convertible Notes are unsecured, bear interest at 1.375% per annum, payable semi-annually and mature on January 15, 2031, unless earlier converted, redeemed or repurchased. The Company purchased capped calls to reduce the potential dilution to its common stock (or reduce the Company’s cash payment obligation if the Convertible Notes are settled in cash) if the trading price of the Company’s common stock price exceeds the conversion price of the Convertible Notes at the time of conversion. The capped calls are a legally separate derivative instrument which is accounted for separately from the Convertible Notes. Refer to Notes 6 and 15 for more details.
Prior to October 15, 2030, the Convertible Notes may be converted only upon the occurrence of certain events, including: (i) during specified periods when the market price of the Company’s common shares exceeds 130% of the applicable conversion price, (ii) during specified periods when the trading price of the Convertible Notes is less than 98% of the product of the last reported sale price of the Company’s common shares and the applicable conversion rate, (iii) following a notice of redemption by the Company, or (iv) upon the occurrence of specified corporate events. On or after October 15, 2030 and until the close of business on the second scheduled trading day immediately preceding the maturity date, holders may convert their Convertible Notes at any time, regardless of these conditions.
Upon conversion, the Company may settle the obligation in cash, common shares, or a combination of both, at its discretion. The initial conversion rate is 145.6876 common shares per $1 principal amount, which is equivalent to an initial conversion price of approximately $6.86 per share, representing a 30% premium over the $5.28 reference price. The $5.28 reference price is the last reported sale price of the Company’s common shares on Nasdaq on October 16, 2025. The conversion rate is subject to customary anti-dilution adjustments and, in certain circumstances, may be increased for conversions in connection with a make-whole fundamental change or following a notice of redemption.
F-18
Convertible Senior Notes (Continued)
The Convertible Notes are not redeemable prior to October 20, 2028, except upon the occurrence of certain changes in laws governing Canadian withholding taxes. On or after October 20, 2028, the Company may redeem the Convertible Notes, in whole or in part, for cash if the last reported sale price of its common shares has been at least 130% of the conversion price for at least 20 trading days, whether or not consecutive, during any 30 consecutive trading day period ending on, and including, the trading day immediately preceding the date on which the Company provides notice of redemption. In the event of a fundamental change, holders may require the Company to repurchase their Convertible Notes for cash at 100% of the principal amount thereof, plus accrued and unpaid interest, if any, up to, but excluding, the repurchase date.
Transaction costs of $18,937 relating to agent fees and legal fees were capitalized and deducted from the carrying amount of the Convertible Notes. Net proceeds from the offering were $569,063.
As of March 31, 2026, none of the conditions permitting the holders of the Convertible Notes to convert their notes early or to require the Company to repurchase the Convertible Notes for cash have been met. Accordingly, the Convertible Notes are classified as long-term debt.
NOTE 13: STOCKHOLDERS’ EQUITY
Common shares
Bitfarms’ authorized share capital consists of an unlimited number of common shares without par value and are fully paid. Each share entitles the holder to one vote per share and to receive equally any dividends declared by the Company and the remaining property and assets of the Company in the event Keel undergoes a liquidation, dissolution or winding up. As a result of the U.S. Redomiciliation Transaction, on April 1, 2026, the Company’s authorized share capital became the authorized share capital of Keel, which consists of 1,500,000,000 shares of Common Stock, with a par value of $0.001 per share, and 120,000,000 shares of Class A Preferred Stock, with a par value of $0.001 per share.
The following table details the movement in number of common shares:
Corporate Share Buyback Program
On July 22, 2025, the Company announced that the TSX had approved a normal course issuer bid (“NCIB”), under which the Company may repurchase up to 49,943,031 of its common shares, representing approximately 10% of the Company’s public float as of July 14, 2025. Purchases under the NCIB commenced on July 28, 2025. All common shares purchased on the TSX or Nasdaq under the NCIB were cancelled. Following the U.S. Redomiciliation Transaction, Keel is continuing the NCIB under the same terms.
F-19
NOTE 13: STOCKHOLDERS’ EQUITY (Continued)
Equity warrants
Details of the outstanding number of Warrants are as follows:
The weighted average contractual life of the warrants as of March 31, 2026, was 2.1 years (December 31, 2025: 2.2 years).
On March 14, 2025, the Company issued 12,893,650warrants at an average exercise price of $1.30 as part of the consideration paid to acquire Stronghold. The total value was $11,477 using the Black-Scholes valuation model. Refer to Note 3 for more details. The warrants are convertible into a fixed number of common shares of the Company, which are classified as equity instruments.
The Company evaluates its warrants to determine whether they are within the scope of ASC 480-10 or ASC 815-40. The Company concluded that the warrants are not within the scope of ASC 480-10 and meet the criteria for equity classification under ASC 815-40 as they are indexed to the Company’s own stock and are exercisable for a fixed number of common shares. The warrants are settled on a gross physical basis, and the Company is not required to net cash settle the instruments under any circumstances. Accordingly, the warrants are classified in equity and are not subsequently remeasured.
In April 2025, in connection with the Credit Facility, the Company granted Macquarie 5,330,946 warrants (the “2025 Warrants”) with an exercise price of $1.17. The holder has the right to exercise the warrants before 2030 to subscribe for and purchase common shares from the Company. These warrants are classified as equity instruments.
In October 2025, in connection with the Credit Facility with Macquarie (see Note 12 for more details), the Company granted Macquarie 2,197,127 warrants with a strike price of $5.69 and a term of 5 years. The holder has the right to exercise the warrants before 2030 to subscribe for and purchase common shares from the Company. These warrants are classified as equity instruments.
The Black-Scholes option-pricing model utilized the following weighted-average inputs to determine the fair values of the warrants granted during the year ended December 31, 2025:
F-20
NOTE 14: STOCK-BASED COMPENSATION
Stock-based compensation expense is recognized within general and administrative expenses in the unaudited condensed consolidated statements of operations. The stock-based compensation expense related to Stock Options (“Options”), Restricted Share Units (“RSUs”), and Performance Share Units (“PSUs”) for employees, directors, consultants and former employees and share awards for a former executive of Stronghold were as follows:
Long-Term Incentive Plan (“2025 LTIP”)
The 2025 LTIP Plan was adopted in July 2025 and provides the Company the ability to grant various share-based compensation such as, but not limited to, Options, RSUs and PSUs. The 2025 LTIP is a 10% rolling plan, permitting the issuance of up to 10% of the Company’s outstanding shares in respect of the awards granted. In April 2026, the 2025 LTIP was amended to eliminate the rolling plan feature and fix the number of shares available for issuance under the 2025 LTIP as of the date of such amendment.
Options
Under 2025 LTIP
During the three months ended March 31, 2026, the Board approved Options grants to purchase 1,440,000 common shares in accordance with the 2025 LTIP (for March 31, 2025: nil common shares). All Options issued according to the 2025 LTIP become exercisable when they vest and can be exercised for a maximum period of 5 years from the date of the grant.
Under 2021 LTIP
During the three months ended March 31, 2025, the Board approved Options grants to purchase 540,302 common shares in accordance with the 2021 Long-Term Incentive Plan (the “2021 LTIP “) adopted on May 18, 2021. All Options issued according to the 2021 LTIP become exercisable when they vest and can be exercised for a maximum period of 5 years from the date of the grant. As part of the options granted during the three months ended March 31, 2025, the Company granted 302 Options to certain employees of Stronghold as part of the business combination described in Note 3.
F-21
NOTE 14: STOCK-BASED COMPENSATION (Continued)
Options (Continued)
Details of the outstanding Options are as follows:
The weighted-average inputs used to value the Options grants using the Black-Scholes model are as follows:
RSUs
Details of the RSUs are as follows:
Under the 2025 LTIP
During the three months ended March 31, 2026, no RSUs were granted.
F-22
RSUs (Continued)
Under the 2021 LTIP
During the three months ended March 31, 2025, the Board approved the grant of 1,890,000 RSUs to certain employees and executive Management of Stronghold as part of the business combination described in Note 3. 1,631,700 RSUs were fully vested upon grant and 258,300 RSUs vest approximately17% every 3 months. The fair value of the RSUs is based on the Company’s share price at the date of grant.
PSUs
Details of the PSUs are as follows:
PSUs vest in a single tranche at the end of the performance cycle, contingent upon the attainment of certain corporate objectives. Upon vesting, each PSU converts into one common share of the Company, subject to a multiplier based on the level of achievement. The actual number of shares awarded may be 0%, 50%, 100% or200% of the target award.
Share awards
During the three months ended March 31, 2025, following the Stronghold transaction, the Company entered into a stock award agreement as well as a consulting agreement with a former executive of Stronghold and granted 1,543,320 share awards with a grant-date fair value of $1.11 per award. The share awards fully vested in September 2025, subject to continued provision of services through this date. Notwithstanding the foregoing, the share awards can be accelerated and fully vested if certain conditions are met. In April 2025, the conditions were met and the share awards were settled.
F-23
NOTE 15: FINANCIAL INSTRUMENTS
a. Measurement categories and fair value
The following table presents the fair values of the Company’s financial instruments and their level within the fair value hierarchy:
There were no transfers between Level 1, 2 or 3 of the fair value hierarchy three months ended March 31, 2026 and 2025.
In addition to assets and liabilities that are measured at fair value on a recurring basis, the Company also measures certain assets and liabilities at fair value on a non-recurring basis. The Company’s long-lived assets, including intangible assets, operating lease right-of-use assets, and property, plant and equipment, are measured at fair value when there is an indication of impairment and the carrying amount exceeds the asset’s projected undiscounted cash flows. These assets are measured at fair value only when an impairment loss is recognized.
The carrying amounts of cash, restricted cash, accounts receivable, net, other receivables, security deposits for energy, other refundable deposits, and accounts payable and accrued expenses presented in the table above are a reasonable approximation of their fair value due to their short-term maturity or they are valued using the income approach valuation technique.
F-24
NOTE 15: FINANCIAL INSTRUMENTS (Continued)
a. Measurement categories and fair value (Continued)
Derivative assets and liabilities
The fair value of derivatives is categorized as Level 2 as applicable, in the fair value hierarchy and is presented under derivative assets and liabilities in the unaudited condensed consolidated balance sheets when there is an outstanding contract at period end. The derivatives are measured at fair values on a recurring basis. Refer to Note 6 for more details.
i. Bitcoin option and selling contracts (derivatives)
Fair value of derivative financial instruments generally reflects the estimated amounts that the Company would receive or pay, taking into consideration the counterparty credit risk or the Company’s credit risk at each reporting date. The Company uses market data such as Bitcoin option futures to estimate the fair value of option contracts at each reporting date. Refer to Note 6 for more details.
Bitcoin Redemption Options (embedded derivatives)
The purchase order agreements explained in Note 6 provide the Company with the option to redeem the Bitcoin Pledged at a market price determined when the Bitcoin was first pledged (“Agreed Bitcoin Price”).
The right to redeem the Bitcoin Pledged meets the definition of an embedded derivative as the derivative that is embedded in the non-financial contract is not closely related to the economic characteristics and risks of the host non-financial contract. The fair value of the embedded derivative is determined using a combination of the Monte Carlo simulation model to simulate future Bitcoin prices based on probability factors and the Black-Scholes Model to estimate the value of each Bitcoin Redemption Option.
At each reporting date, the fair value is determined by multiplying the number of redeemable Bitcoin pledged by the present value of the difference between the Agreed Bitcoin Price and the simulated spot price of Bitcoin while considering the likelihood of exercising the quarterly installments. Change in fair value is recognized in Other expenses.
ii. Capped call transactions (derivatives assets)
In October 2025, the Company entered into capped call transactions in connection with the issuance of Convertible Notes. The fair value of the capped call transactions is determined using an option pricing model that incorporates observable market inputs, including the Company’s share price, expected volatility, risk-free interest rate, expected term and contractual terms of the instruments. As the valuation primarily incorporates observable inputs, the fair value measurement is classified within Level 2 of the fair value hierarchy. The most significant input in the model is the Company’s share price and expected volatility. Due to the decline in the share price, there was a loss of $3,440 during three months ended March 31, 2026 presented within (loss) gain from derivative assets and liabilities in the unaudited condensed consolidated statement of operations.
F-25
NOTE 16: LOSS PER SHARE
The following table presents the computation of basic and diluted loss per share from continuing operations:
The following table presents the computation of basic and diluted loss per share from discontinued operations:
F-26
NOTE 16: LOSS PER SHARE (Continued)
Earnings per share
For the three months ended March 31, 2026 and 2025 potentially dilutive securities were excluded from the calculation of diluted loss per share due to their anti-dilutive effect.
The following table presents additional potentially dilutive securities that were excluded from the calculation of diluted loss per share as their inclusion would be anti-dilutive:
NOTE 17: SEGMENT AND GEOGRAPHICAL INFORMATION
Reportable segment
The Company has aggregated all of its Cryptocurrency Mining operating segments into a single operating segment, which is the Company’s only reportable segment, Cryptocurrency Mining. The Chief Operating Decision Maker (“CODM”) manages segment performance and resource allocation based upon net income (loss). The CODM uses consolidated net income (loss) to evaluate the overall financial performance of the Company, to compare actual results against internal budgets and forecasts and to inform capital allocation decisions, including the prioritization of investments across the Company’s Bitcoin Mining Operations. The measure of segment assets is reported on the unaudited condensed consolidated balance sheets as total consolidated assets. Significant expenses reviewed by the CODM include those that are presented in the unaudited condensed consolidated statements of operations and the more detailed component disclosed in Note 18.
Revenues
Revenues by country are as follows:
Revenues are presented based on the geographical contribution of computational power used for hashing calculations (measured by hashrate) or sales to external customers.
F-27
NOTE 17: SEGMENT AND GEOGRAPHICAL INFORMATION (Continued)
Property, Plant and Equipment and other non-current assets
The carrying amount of property, plant and equipment and other non-current assets (excluding financial assets, intangible assets and deferred tax assets) by country is as follows:
NOTE 18: ADDITIONAL DETAILS TO THE STATEMENTS OF OPERATIONS
Disaggregated revenues
F-28
NOTE 18: ADDITIONAL DETAILS TO THE STATEMENTS OF OPERATIONS (Continued)
Cost of revenues
Inventories
During the three months ended March 31, 2026, the cost of electrical component inventory and waste, limestone and fuel oil recognized as an expense and included in cost of revenues was $11,206 (three months ended March 31, 2025: $678).
Energy costs are net of RECs and WTCs
During the three months ended March 31, 2026, RECs amounted to $1,077, and the WTCs amounted to $804, (three months ended March 31, 2025: RECs and WTCs amounted to nil), all of which offset energy expenses in the cost of revenues.
General and administrative expenses
Other expenses
F-29
NOTE 19: ADDITIONAL DETAILS TO THE STATEMENTS OF CASH FLOW
The following table provides a reconciliation of cash and restricted cash reported within the unaudited condensed consolidated balance sheets that sum to the total of the same amounts shown in the unaudited condensed consolidated statements of cash flows:
As of March 31, 2026, restricted cash represents letters of credit contractually required by an electric service arrangement. Refer to Note 20 for more details.
F-30
NOTE 20: COMMITMENTS AND CONTINGENCIES
Contingent Liability
As the Company continues to periodically import products into the United States, it is subject to review by the CBP regarding the classification and origin of such imports. Refer to Note 25 of the consolidated financial statements in the Annual Report for more details regarding the Company’s Miners imported in 2021. There were no Miners imported into the United States in 2022, 2023 or during the three months ended March 31, 2026; and for 2024 and 2025, the Company has not received any assessment or communication of a potential assessment.
Furthermore, the Company took several steps to ensure compliance with CBP rules and regulations by sourcing non-Chinese origin equipment including, but not limited to, the specifications of which non-Chinese production facilities could be supplied under our purchase agreements with Bitmain Development PTE. Ltd., in person factory inspections by the Company’s employees to verify production, and the collection of various importation documents that confer non-Chinese origin. While the Company has addressed certain concerns related to previous importations, additional assessments may be made by the CBP in connection with other importations.
The Company imported 34,179 Miners in the United States during 2025 (2024: 9,399) and had delivered asset values of $130,698 (2024: $25,782). Importation tariffs from China fluctuated between 22.4% and 150.5% in 2025 (2024: 22.4%). Any assessments made on previous importations by the CBP could also include penalties and interest.
In March 2026, the U.S. Supreme Court IEEPA Tariff Ruling determined that certain tariffs previously imposed under the International Emergency Economic Powers Act were not lawful. Based on currently available guidance, the tariff rate for imports of Chinese origin is expected to be approximately 27.6%. However, the timing, scope, and implementation of such changes remain subject to regulatory interpretation and potential further governmental action.
At this time, while the Company believes it has taken the appropriate steps to reduce the risk of potential exposure, the Company is unable to predict the outcome of any future assessments or to reasonably estimate the amount, if any, that may be payable in connection with these matters. The facts surrounding each importation may vary and the Company reserves the right and may challenge any assessments.
Letters of Credit
In March 2026, the Company entered into an agreement with a utility provider to supply high-voltage electricity to a large-scale, energy-intensive facility to its Panther Creek property in Pennsylvania, United States. The utility provider is responsible for providing electrical power and, if necessary, designing and constructing essential infrastructure such as transmission links and substations. As part of the arrangement, the Company issued a letter of credit in the amount of $40,000 to the utility provider, which is secured by an amount of $40,200 of restricted cash pledged as collateral as of March 31, 2026. In addition, the Company is required to provide a letter of credit in the amount of $60,800 by January 31, 2027, contingent upon the utility provider’s completion of specified transmission infrastructure upgrades.
The Company entered into an agreement for the sale and delivery of electricity to its Sharon property in Pennsylvania, United States, over a four-year term. As part of the arrangement, the Company issued a letter of credit in the amount of $875 to the utility provider, which is secured by an equivalent amount of restricted cash pledged as collateral as of March 31, 2026.
F-31
NOTE 20: COMMITMENTS AND CONTINGENCIES (Continued)
Lawsuits
Class Action Lawsuit
On May 9, 2025, and as amended on October 21, 2025, a purported shareholder filed a putative class action complaint in the United States District Court for the Eastern District of New York, in a case now titled In re: Bitfarms Securities Litigation, case no 1:25-cv-02630. Co-Lead Plaintiffs Zhao Jun, Gong Lanfang, Michael Pearl, Kazim Khan, and Michael Lawarre sued Bitfarms Ltd., Benjamin Gagnon, Jeffrey Lucas and Geoffrey Morphy alleging violations of Sections 10(b) and 20(a) of the Securities Exchange Act of 1934 and Rule 10b-5, promulgated thereunder. The lawsuit alleges that the Company, its current CEO, its former CFO and its former CEO made materially false and/or misleading statements regarding the Company’s business, operations and internal controls over financial reporting. The Plaintiff seeks class certification, unspecified damages plus interest and attorney and expert witness fees and other costs on behalf of a purported class consisting of all persons and entities (subject to specified exceptions) that purchased or otherwise acquired Company common stock from March 21, 2023 and December 9, 2024. The lawsuit was filed by Pomerantz Law Firm. The Company cannot predict the duration or outcome of this lawsuit at this time. As a result, the Company is unable to estimate the reasonably possible loss or range of reasonably possible loss arising from this lawsuit and no provision was recognized as of March 31, 2026. The Company intends to vigorously defend itself in this matter.
Commitments
The Company is committed to purchase the following property, plant and equipment as of March 31, 2026:
Commitment for HPC Data Center Projects
As of March 31, 2026, the Company has entered into agreements with suppliers for the purchase and construction of property, plant and equipment related to its HPC infrastructure projects. These agreements encompass a range of services, including but not limited to engineering, project management support, procurement and manufacturing, site management, and factory acceptance testing. The aggregate future payment commitments under these arrangements amount to approximately $121,384 in 2026 and $48,864 in 2027. These commitments are primarily related to the expansion of the Company’s HPC infrastructure across its operating sites in the United States and Canada.
F-32
NOTE 21: SUBSEQUENT EVENTS
Redomiciliation
On April 1, 2026, the Company completed the U.S. Redomiciliation Transaction from Canada to the United States pursuant to a statutory plan of arrangement (the “Arrangement”). Upon completion of the U.S. Redomiciliation Transaction, the ultimate parent company of Bitfarms is a new corporation formed under the laws of the State of Delaware that is operating under the name Keel Infrastructure Corp. (“Keel”). To effect the U.S. Redomiciliation Transaction, each outstanding common share of Bitfarms was exchanged for one share of common stock of Keel, pursuant to the Arrangement. Following completion of the U.S. Redomiciliation Transaction, Bitfarms became an indirect wholly owned subsidiary of Keel, which together with Bitfarms and its other subsidiaries will carry on the business previously conducted by Bitfarms and its subsidiaries.
Sale of Paso Pe Bitcoin data center
On April 21, 2026, the Company completed the sale of Paso Pe Bitcoin data center pursuant to a January 2026 definitive share purchase agreement. The transaction involved the sale of the Company’s 100% ownership stake in the Company’s subsidiary, D&N Ingeniería S.A. The total agreed purchase price was approximately $13,000, which was fully received as of April 21, 2026.
Purchase Commitment for HPC Data Center Projects
On May 3 2026, the Company entered into a purchase commitment totaling $32,640 to be paid over an estimated 14-month period, contingent upon the achievement of specified milestones. The commitment supports the development and expansion of a fully integrated 18 MW hybrid-built data center in Washington State, United States. The provider is responsible for a comprehensive scope of services, including the procurement, manufacturing, installation, commissioning, and startup of generators and related equipment.
Sale of Argentina Subsidiary
On May 8, 2026, the Company entered into a definitive share purchase agreement for the sale of Backbone Argentina.
The agreement includes the transfer of all assets and liabilities of Backbone Argentina, which previously operated the Company’s Bitcoin mining data center in Rio Cuarto, Argentina. The total cash consideration to be received at closing is $400. Closing remains subject to the satisfaction of conditions precedent and is expected during the second quarter of 2026.
As of March 31, 2026, Backbone Argentina asset group subject to the proposed sale agreement had a carrying value of $1,671 in total assets (excluding cash) and $2,006 in total liabilities recorded on the Company’s consolidated balance sheet. The impact of this transaction will be determined and recognized in the Company’s consolidated financial statements for the quarter ending June 30, 2026.
F-33
KEEL INFRASTRUCTURE CORP. (formerly known as Bitfarms Ltd.)ITEM 2 - MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
I. OVERVIEW
1. Introduction
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (the “MD&A”) for Keel Infrastructure Corp. (together with its subsidiaries, “we”, “our”, the “Company” or “Keel”) should be read in conjunction with our unaudited condensed consolidated financial statements and its accompanying notes for the three months ended March 31, 2026 (the “Q1 2026 Financial Statements”) included elsewhere in this Quarterly Report on Form 10-Q (referred to herein as this “Quarterly Report”) and with our audited annual consolidated financial statements and its accompanying notes for the year ended December 31, 2025 (the “2025 Annual Financial Statements”) included in our Annual Report on Form 10-K for the fiscal year ended December 31, 2025 (the “Annual Report”). This discussion contains forward-looking statements that involve risks and uncertainties. Our actual business, financial condition, and results of operations could differ materially from those anticipated in these forward-looking statements as a result of various factors, including those discussed below and elsewhere in this Quarterly Report on Form 10-Q, particularly under “Item 1A. Risk Factors” of Part II. See also “Cautionary Statement Regarding Forward-Looking Statements.” Our historical results are not necessarily indicative of the results that may be expected for any period in the future.
Our Financial Statements and this MD&A are reported in thousands of U.S. dollars and U.S. dollars, respectively, except where otherwise noted.
In this MD&A, the following terms shall have the following definitions:
2. Company Overview
We are a North American digital and energy infrastructure company that develops data centers and energy infrastructure to lease for HPC and AI workloads. We have a portfolio of Infrastructure Assets, which represents a 2.2 GW power capacity pipeline, that includes owned and operated power generation facilities with collocated Bitcoin Mining data centers, established grid interconnections within the wholesale electricity market administered by PJM Interconnection in Pennsylvania, and approximately 100% renewable hydroelectric energy provided by Hydro-Québec in Québec, Canada and by Grant County Public Utility District in Washington State, United States. We are developing our Infrastructure Assets to enable HPC data center operations, with the intention of leasing capacity to hyperscalers, cloud service providers, AI companies, and enterprises under long-term contracts, and expect to continue such development in the coming years.
We maintain our legacy Bitcoin Mining operations to maximize the value of those assets. These Bitcoin Mining operations primarily comprise selling computational power that performs hashing calculations for the purpose of cryptocurrency mining in the United States, Canada and Paraguay, with operations in Paraguay concluding following the sale of our final site there on April 21, 2026. Refer to Note 8 and 21 of the Q1 2026 Financial Statements for disclosures related to discontinued operations in Paraguay and Argentina.
2
I. OVERVIEW (Continued)
3. Factors Affecting our Performance
Ability to Secure Low-Cost Electricity
HPC and Bitcoin Mining data centers consume large amounts of energy, primarily as a result of the computation and cooling aspects of our operations. Additional energy can represent a significant portion of total operating expenses for energy-intensive compute operations like HPC and Bitcoin Mining. Given the recent and potential future growth in energy demand, largely due to global data center development and broader electrification initiatives, we believe that access to reliable, low-cost energy will become increasingly important for both HPC data centers and Bitcoin Mining operations.
Certain governments and regulators are increasingly focused on the energy and environmental impact of data centers used for HPC and Bitcoin Mining. This has led, and could lead, to new governmental measures regulating, restricting or prohibiting the use of electricity for Bitcoin Mining and HPC, or could result in increased power costs for these types of operations.
We currently maintain a portfolio of competitively priced electrical power. However, there is no guarantee that we will be able to negotiate additional power agreements on similar terms, or at all. The price we pay for electricity depends on numerous factors including sources of generation, regulatory environment, electricity market structure, commodity prices, transmission cost allocation, instantaneous supply/demand balances, counterparty consumption and procurement methods. These factors may be subject to change over time and result in increased power costs. In addition, developments in the United States, including actions by the current U.S. administration, signal a policy shift away from supporting renewable energy which could result in fewer such projects being constructed and lead to increases in electricity prices as demand increases. There have also been legislative proposals and other legal developments targeting renewable energy and large electrical loads in certain states. Any reductions or modifications to, or the elimination of laws, programs or incentives that provide electricity to Bitcoin Mining or HPC operations, support renewable energy, or result in the implementation of more arduous requirements for renewable energy projects, could potentially limit the availability of, and increase the costs we incur for, electricity in the United States and Canada.
Competitive Environment
We expect increasing global adoption of HPC and AI use cases as existing industries incorporate AI and other compute-intensive processes and as new industries emerge. We anticipate that the use of AI will expand to a broader set of enterprises that will utilize AI to drive internal efficiencies and implement AI into their products and services. As more non-AI-native organizations across a broader spectrum of industries run training and inference workloads on their own proprietary models, and as new industries with additional HPC and AI workload demands emerge, we believe we will be well-positioned to capture those workloads at our facilities given our utility relationships and power procurement capabilities, our behind-the meter power generation experience, and our experience with grid-management and flexible load operations, among other factors. Successful acquisitions of new customers will depend on our ability to provide sufficient, cost-competitive high-uptime supply for HPC and AI compute demands, demand from end-users of AI-enabled products and services, demand from end-users for HPC workloads, our overall pricing relative to competition, and the location and efficiency of our HPC data centers. If AI and other compute-intensive use cases are not broadly adopted by enterprises to the extent we expect, or if new use cases do not emerge, our market opportunity may be smaller than we expect.
3
3. Factors Affecting our Performance (Continued)
Competitive Environment (Continued)
We compete with a variety of Bitcoin Mining companies globally, including individual hobbyists, Mining Pools and public and private companies. We also compete with HPC data center operators, which include large and well-funded companies. We believe that, even if the price of Bitcoin decreases, the Bitcoin Mining market will continue to draw new Mining companies, potentially increasing the scale and sophistication of competition in the Bitcoin Mining industry, which could result in an increase to the global hashrate, leading to a reduction in the percentage share of the fixed Bitcoin network rewards that Bitcoin Mining companies, including Keel, would earn. We believe that the digital infrastructure sector will continue to draw companies with significant resources to dedicate to growing their HPC data center business as well as expertise in the industry, which could make it more difficult for us to be competitive, including in attracting and retaining customers.
Expansion into HPC Data Center Development and Operations
A key factor affecting our performance is our ability to expand into HPC data center development and operation. We are leveraging our existing development and operational expertise to develop HPC data centers that support specialized workloads for enterprise and hyperscale customers and other next-generation, energy-intensive use cases. Success in this area depends on various factors, including our ability to secure and retain customers, manage capital efficiently, develop future sites, and compete effectively in emerging technology markets. While this expansion may increase operating and capital costs and expose us to execution and market risks, management believes our experience in power origination, development, and management in large-scale digital infrastructure development position us to capture long-term growth opportunities in the evolving data center landscape.
Market Value of Bitcoin
We primarily derive our revenues from Bitcoin Mining. We earn Bitcoin in exchange for computational power used for hashing calculations that we sell to Mining Pool operators. We currently liquidate Bitcoin earned into fiat currencies such as U.S. dollars or Canadian dollars as needed. Because the compensation received for computational power used for hashing calculations is paid in Bitcoin, our operating and financial results are tied to fluctuations in the value of Bitcoin. In addition, positive or negative changes in the global hashrate impact Mining difficulty and therefore the quantity of Bitcoin earned from our computational power used for hashing calculations, and as a result, materially affect our revenue and margins.
In a declining Bitcoin price environment, the Bitcoin Mining protocol may provide natural downside protection for low-cost Bitcoin Miners through an adjustment to the number of Bitcoin Mined. For example, when the Bitcoin price falls, the ability for higher cost Mining companies to pay their operating costs may be impacted, which in turn may lead to higher cost Mining companies switching off their operations (for example, if their marginal cost of power makes it unprofitable to continue Mining, they may exit the network). As a result, in such circumstances the global hashrate may fall, and remaining low-cost Mining companies may benefit from an increased percentage share of the fixed Bitcoin network rewards. Conversely, in a rising Bitcoin price environment, additional Mining-related equipment may be deployed by Mining companies, leading to increased global hashrate in the overall network.
4
Market Value Bitcoin (Continued)
While the total supply of Bitcoin is capped at 21 million, the price of Bitcoin fluctuates because of the dynamic nature of the market for Bitcoin. The market for Bitcoin is rapidly changing and subject to global regulatory, tax, political, environmental, cybersecurity, and market factors beyond our control. For a discussion of other factors that could lead to material adverse changes in the market value of Bitcoin, which could in turn result in substantial damage to or even the failure of our Bitcoin business, see “Item 1A. Risk Factors—Risks Related to Our Business and Operations” in our Annual Report.
Furthermore, the rewards for each Bitcoin mined are subject to “halving” adjustments at predetermined intervals. At the inception of Bitcoin, the reward for Mining each block was set at 50 Bitcoin and this was cut in half to 25 Bitcoin on November 28, 2012 at block 210,000, cut in half to 12.5 Bitcoin on July 9, 2016 at block 420,000, cut in half to 6.25 Bitcoin on May 11, 2020 at block 630,000, and cut in half again to 3.125 Bitcoin on April 19, 2024 at block 840,000. The next two halving events for Bitcoin are expected to take place in 2028 at block 1,050,000 (when the reward will reduce to 1.5625 Bitcoin), and in 2032 at block 1,260,000 (when the reward will reduce to 0.78125 Bitcoin).
Efficiency of Miners and Ability to Procure Data Center Equipment
As global Mining capacity increases, we would need to correspondingly increase our total hashrate capacity in order to maintain our proportionate share of Bitcoin network rewards to maintain the same amount of Bitcoin Mining revenue. Our Bitcoin Mining operations currently utilize the Bitmain S21 XP Miners, S21 Pro Miners, S21 Miners and T21 Miners. To remain cost competitive compared to other Mining industry participants, in addition to targeting cost effective sources of energy and operating efficient data center infrastructure, we would need to maintain an energy efficient Mining fleet, which would require capital outlays to purchase new Miners in order to make periodic upgrades to our existing Mining fleet.
As we plan to operate our facilities to support HPC and AI uses, our future performance and success will depend in part on our ability to procure latest-generation electrical, cooling, networking, and other equipment required to operate HPC data centers.
From time-to-time, disruption in global supply chains may result in shortages of advanced Mining-related equipment and HPC and AI infrastructure components that meet our standards of quality and efficiency.
5
II. RESULTS OF OPERATIONS
1. Production and Mining Operations1
Key Performance Indicators for HPC Data Center Projects
The following table presents our key performance indicators as of March 31, 2026 and 2025:
Current Energized Capacity
Current Energized Capacity represents the gross power capacity provided by utilities being used at our U.S. Sites and Québec Sites.
Secured Growth Capacity
Secured Growth Capacity represents gross power capacity that is not currently available on site but for which we have executed an electric supply agreement with a utility, whereby the utility agrees to provide that power capacity at a specified future date.
Secured Gross Data Center Capacity
Secured Gross Data Center Capacity represents the total amount of gross power capacity that is subject to electric supply agreements with utilities, including both power capacity currently available on site and power capacity that utilities have agreed to deliver at a future date.
Identified Additional Gross Data Center Capacity
Gross power capacity that has not been contracted under an electric supply agreement but is currently being evaluated at the U.S. Sites and Quebec Sites. This includes capacity that is currently under utility load studies as well as potential on-site, behind-the-meter natural gas power generation at Scrubgrass.
Total Pipeline
Total Pipeline represents the sum of Secured Gross Data Center Capacity and Identified Additional Gross Capacity. This measure encompasses both committed capacity and early-stage opportunities under evaluation. Management monitors the total pipeline to understand the full spectrum of current and potential future growth and to prioritize development efforts aligned with strategic objectives.
II. RESULTS OF OPERATIONS (Continued)
1. Production and Mining Operations1 (Continued)
Key Performance Indicators for Legacy Mining Operations
In addition to our financial results and U.S. GAAP financial measures, we use certain key performance indicators to evaluate our business, identify trends, and make strategic decisions.
The following table presents our key performance indicators for the three months ended March 31, 2026 and 2025:
Total Bitcoin earned
Total Bitcoin earned represents the aggregate number of Bitcoin received in exchange from its computational power used for hashing calculations during the period. This metric is a key indicator of our operational performance and Mining productivity, as it reflects uptime, fleet efficiency, network difficulty, and deployed hashrate.
During Q1 2026, we earned 388 Bitcoin, compared to 492 Bitcoin earned during Q1 2025, representing a decrease of 21% from the prior period as a result of a 27% higher average Network Difficulty, partially offset by an increase in hashrate from our expansions and upgrades to our Miner fleet with higher efficiency Miners.
Cost per kWh
Cost per kWh represents the average electricity price incurred to power our Mining operations. This metric allows users to assess our operational energy efficiency. Power cost is a key driver of Mining profitability.
During Q1 2026 the cost per kWh was $0.058 compared to $0.047 in Q1 2025. The 24% increase is mainly due to higher cost in the United States due to higher generation costs and the acquisition of Stronghold, late in the first quarter of 2025.
6
Key Performance Indicators for Legacy Mining Operations (Continued)
Average Watts/Average TH
Average watts/Average TH measures the energy efficiency of our active Mining fleet by calculating the average power consumption in watts required to generate one TH per second of computational capacity. Lower Watts/TH indicates greater fleet efficiency, which directly impacts operating costs and Mining margins.
Ending energy efficiency remained stable at 18 Watts/TH as of March 31, 2026, compared to March 31, 2025. This stability was supported by the average efficiency also holding constant at 18 average Watts/TH across both periods.
8
2. Financial Performance
Consolidated Financial & Operational Results
nm: not meaningful
The financial performance discussed below for continuing operations does not include our Argentina and Paraguay operations.
9
2. Financial Performance (Continued)
A. Revenues from continuing operations
Q1 2026 v. Q1 2025
Revenues were $37.0 million in Q1 2026 compared to $47.7 million in Q1 2025. The decrease of $10.7 million, or 22% is mainly due to a $16.0 million decrease in Bitcoin Mining revenue resulting from the decrease in average Bitcoin price and a higher Network Difficulty. During Q1 2026, we mined 388 Bitcoins with an average Bitcoin price of $75,840, compared to 492 Bitcoins with an average Bitcoin price of $92,138 in Q1 2025. In addition, following the acquisition of Stronghold, late in the first quarter of 2025, we recorded Energy Sales for only 17 days during Q1 2025, compared to 90 days in Q1 2026, resulting in a $5.6 million increase in Energy Sales.
We earned our revenues during Q1 2026 from our North American operations. Canada and the United States accounted for 48% and 52% of total revenues, respectively, compared to 61% and 39% in Q1 2025, respectively.
In Q1 2026, revenues from our operations in Canada decreased by $11.5 million compared to Q1 2025 due to the decrease in average Bitcoin price and the increase in Network Difficulty. Revenues from our operations in the United States increased by $0.8 million compared to Q1 2025 due to the $5.6 million increase in the sale of energy in the United States, partially offset by the factors explained above.
10
II. RESULTS OF OPERATIONS(Continued)
B. Cost of Revenues from continuing operations
Our cost of revenues was $63.3 million for Q1 2026, compared to $47.4 million for Q1 2025. The higher cost of revenues was largely due to a $9.2 million, or 50%, increase in non-cash depreciation and amortization expenses as we added new Miners and energy infrastructure in 2025 and electrical infrastructure as well as accelerated depreciation started during the fourth quarter of 2025 as we initiated a strategic transition from Bitcoin Mining operations to HPC; and a $9.6 million, or 223%, increase in infrastructure expenses. Infrastructure expenses increased by $11.0 million in relation to the operating expenses at the Panther Creek and Scrubgrass power plants following the acquisition of Stronghold, towards the end of the first quarter of 2025. The Stronghold infrastructure expenses in Q1 2026 consisted of $3.6 million of labor costs and other employee benefits, $3.9 million of plant maintenance costs and $3.8 million of other operating expenses.
Energy expenses in Q1 2026 increased by $5.1 million, or 32%, largely due to a $6.6 million increase in electricity costs, partially offset by $3.3 million of electricity credits received through the sale of energy. In addition, fuel expenses increased by $1.9 million for the Panther Creek and Scrubgrass power plants following the acquisition of Stronghold, towards the end of Q1 2025, partially offset by renewable energy credits (“RECs”) and waste tax credits (“WTCs”) of $1.1 million and $0.8 million, respectively, in Q1 2026.
The increase was partially offset by a $7.7 million decrease in hosting expense, resulting from our Miners no longer being hosted by Stronghold subsequent to the acquisition in Q1 2025.
C. General & Administrative Expenses from continuing operations
For Q1 2026, our G&A expenses were $26.8 million, compared to $17.6 million in Q1 2025. The increase in G&A expenses of $9.2 million, or 52%, was largely due to a $6.8 million increase in professional services related to our U.S. redomiciliation, U.S. GAAP conversion, and sale of Paso Pe Bitcoin data center that was completed on April 21, 2026.
Salaries and wages increased by $3.3 million due to (i) the increase in our overall headcount in Q1 2026 compared to Q1 2025 to support the expansion in the United States as well as merit and market-based adjustments and cost of living salary increases and (ii) the salaries paid to Stronghold employees following the acquisition, towards the end of Q1 2025.
The increase was partially offset by a $1.4 million decrease in stock-based compensation due to no restricted stock units (“RSUs”) granted in Q1 2026 compared to the RSUs granted in Q1 2025 in association with the Stronghold acquisition, with the majority of Q1 2025 RSUs already being fully vested.
11
D. Total other expenses from continuing operations
Interest expense was $3.6 million in Q1 2026, compared to $0.2 million for Q1 2025. This increase was primarily attributable to the interest incurred on both the Macquarie credit facility (the “Credit Facility”) and the $588,000 aggregate principal amount of convertible senior notes (the “Convertible Notes”), which were issued in the second and fourth quarters of 2025, respectively. During Q1 2026, the Credit Facility was fully repaid for a total of $117.0 million, including interest, principal and additional base return fees, and was no longer required to have restricted cash. We recorded a total $21.6 million loss related to the termination of the Credit Facility, which included $19.9 million from the extinguishment itself and $1.7 million in transaction costs recorded in long-term deposits and other related fees. These amounts are presented within Loss on extinguishment of long-term debt in the Q1 2026 Financial Statements.
Interest income was $3.7 million for Q1 2026, compared to $0.8 million for Q1 2025. The increase was due to our higher average cash balance during Q1 2026 compared to Q1 2025.
Our other expenses were $6.2 million in Q1 2026, compared to $0.2 million in Q1 2025. The $5.9 million unfavorable change was largely due to (i) the $4.2 million provision for receivables relating to our receivable position of Bitcoin options and selling contracts held in BlockFills, which filed for bankruptcy during Q1 2026; and (ii) a $1.6 million unfavorable change in amortization of transaction costs and debt discount related to the Credit Facility and the Convertible Notes.
E. Discontinued Operations
In 2025, we began a significant transformation in our corporate strategy, pivoting away from our Latin American Bitcoin Mining operations to concentrate on the North America HPC infrastructure market. As a result of these strategic decisions, we classified certain of our Latin American assets as “held for sale” and their operations as discontinued operations.
During the second quarter of 2025, our energy supplier halted the supply of electricity to our Rio Cuarto, Argentina Bitcoin data center. Following this event, on August 11, 2025, we determined that we would discontinue and abandon our operations in Rio Cuarto, Argentina. We negotiated to eliminate our asset retirement obligation and reduced the reserved power to a minimum. As of September 30, 2025, our Argentina operations were abandoned and classified as a discontinued operation.
The agreement includes the transfer of all assets and liabilities of Backbone Argentina, which previously operated the Company’s Bitcoin mining data center in Rio Cuarto, Argentina. The total cash consideration to be received at closing is $0.4 million. Closing remains subject to the satisfaction of conditions precedent and is expected during the second quarter of 2026.
12
E. Discontinued Operations (Continued)
i. Argentina’s operations as discontinued operations (Continued)
Sale of Argentina Subsidiary (Continued)
As of March 31, 2026, Backbone Argentina asset group subject to the proposed sale agreement had a carrying value of $1.7 million in total assets (excluding cash) and $2.0 million in total liabilities recorded on the Company’s consolidated balance sheet. The impact of this transaction will be determined and recognized in the Company’s consolidated financial statements for the quarter ending June 30, 2026.
During the first quarter of 2025, we finalized the sale of our Yguazu Bitcoin data center in Paraguay. During the third quarter of 2025, we determined that the Paso Pe Bitcoin data center met the criteria to be classified as held for sale, and all operations in Paraguay were classified as discontinued operations as we make a strategic shift towards HPC infrastructure projects in North America. The sale of the Paso Pe Bitcoin data center operations is anticipated to close within twelve months of the date the Bitcoin data center was classified as “held for sale”.
Refer to Note 8 - Assets Held for Sale and Discontinued Operations to the Q1 2026 Financial Statements for more information on the results of Argentina’s and Paraguay’s operations and the impairment loss of our Paraguay and Argentina asset groups.
During the three months ended March 31, 2026, discontinued operations in Paraguay resulted in a net loss of $13.5 million, which is largely explained by an impairment loss of $12.8 million related to the Paraguay asset group, reflecting the write-down to fair value less costs to sell during Q1 2026.
On April 21, 2026, the Company completed the sale of Paso Pe Bitcoin data center pursuant to a January 2026 definitive share purchase agreement. The transaction involved the sale of the Company’s 100% ownership stake in the Company’s subsidiary, D&N Ingeniería S.A. The total agreed purchase price is approximately $13.0 million, which was fully received as of April 21, 2026.
F. Change in fair value of digital assets
In Q1 2026, a $41.4 million loss on the change in fair value of digital assets was recognized, compared to $23.0 million in Q1 2025, primarily due to a further decline in Bitcoin prices.
G. Realized gain (loss) on sale of digital assets from continuing operations
In Q1 2026, the realized loss on disposition of digital assets amounted to $1.8 million, compared to a $5.0 million gain for Q1 2025 as a result of a lower Bitcoin average selling price, partially offset by a lower quantity of Bitcoin sold.
13
3. Selected Quarterly Information from Continuing Operations1
Set forth below is unaudited supplemental quarterly financial information that reflects material retrospective adjustments to our consolidated statements of operations as a result of the transition to U.S. GAAP and is intended to assist investors in evaluating our results of operations on a consistent basis across periods. This data should be read in conjunction with our unaudited condensed consolidated financial statements and audited consolidated financial statements and related notes for the relevant period. These quarterly operating results are not necessarily indicative of our operating results for a full year or any future periods.
Although the Bitcoin Mining industry experiences volatility, Bitcoin prices are not generally subject to seasonality or seasonal effects. Seasonal fluctuations in energy supply, however, may impact our operations. We had operations in Québec, Canada, where power was sourced from Hydro-Québec, Hydro-Magog, Hydro-Sherbrooke and the City of Baie-Comeau. We also had operations in Washington State, United States, that were powered by the Grant County Power Utility District, as well as operations in Pennsylvania, United States, that were powered by Stronghold and the PJM Interconnection Merchant Market. Among other phenomena, changing weather in Québec (Canada), Washington State and Pennsylvania (United States) may impact seasonal electricity needs and costs. Periods of extreme cold or extreme hot weather may contribute to service interruptions in Bitcoin Mining operations. Changes to supply and/or demand of electricity may result in curtailment of electricity to our Bitcoin Mining operations.
14
4. Non-GAAP and Other Financial Measures and Ratios
Non-GAAP financial measures from continuing operations1
In addition to our results determined in accordance with U.S. GAAP, we utilize a number of non-GAAP financial measures and ratios in assessing operating performance, including “EBITDA”, “EBITDA margin”, “Adjusted EBITDA” and “Adjusted EBITDA margin”. Non-GAAP measures and ratios may exclude the impact of certain items and are used internally when analyzing operating performance. The definitions of the non-GAAP measures referenced herein, and the reasons the Board and Management use such non-GAAP measures, are set forth below.
These measures are provided as additional information to supplement U.S. GAAP measures by providing further understanding of our results of operations from Management’s perspective. Accordingly, they should not be considered in isolation nor as a substitute for analysis of our financial information reported under U.S. GAAP. Furthermore, because our calculation of these non-GAAP financial measures may differ from other companies, our presentation of these measures may not be comparable to similarly-titled measures of other companies.
The definitions and the data in the non-GAAP section exclude the discontinued operations in Rio Cuarto, Argentina and in Paraguay.
15
4. Non-GAAP and Other Financial Measures and Ratios (Continued)
A. Reconciliation of Consolidated Net (loss) income from continuing operations to EBITDA and Adjusted EBITDA from Continuing Operations
EBITDA is defined as net income (loss) from continuing operations adjusted to exclude: (i) interest expense; (ii) interest income; (iii) income tax expense; and (iv) depreciation and amortization. EBITDA Margin is defined as the percentage obtained when dividing EBITDA by Revenues. EBITDA and EBITDA Margin are used to:
Adjusted EBITDA is defined as EBITDA adjusted to exclude: (i) stock-based compensation; (ii) realized gain and loss on disposition of digital assets; (iii) change in fair value of digital assets; (iv) impairment of long-lived assets; (v) gain on settlement of Refundable Hosting Deposits, disposition of marketable securities, gains or losses on derivative assets and liabilities ; (vi) loss on currency exchange; (vii) other expense (income); and (viii) other non-recurring items that do not reflect our core performance. Adjusted EBITDA Margin is defined as the percentage obtained when dividing Adjusted EBITDA by Revenues. Adjusted EBITDA and Adjusted EBITDA Margin are used to:
16
A. Reconciliation of Consolidated Net (loss) income from continuing operations to EBITDA and Adjusted EBITDA from Continuing Operations(Continued)
17
III. LIQUIDITY AND CAPITAL RESOURCES
1. Overview
As discussed below, our current financing strategy involves (a) strategically selling the Bitcoin we earn and the Bitcoin we hold in treasury and (b) utilizing short-term debt, long-term debt and equity instruments to fund our expansion activities, operating expenses and debt service requirements. We may require additional funds to complete our 2026 growth plans as the cash flows generated from Mining activities are expected to decrease as sites are transitioned to HPC Data Centers.
2. Cash Flows
The following discussion on cash flows include the discontinued operations in Rio Cuarto, Argentina and in Paraguay. On May 12, 2025, our energy provider Generación Mediterránea S.A (“GMSA”), halted the supply of electricity to our Rio Cuarto Bitcoin data center with energized capacity of 58 MW. On August 11, 2025, three months after being informed that electricity supply was being halted and with no path forward to resume operations in the future, the decision was made to shut down the plant, which was abandoned by September 30, 2025. Additionally, as of September 30, 2025, the Paso Pe Bitcoin data center met the criteria to be classified as “held for sale”, and all operations in Paraguay were designated as discontinued operations as we make a strategic shift towards HPC infrastructure in North America. Subsequently, on April 21, 2026, we sold the Paso Pe Bitcoin data center.
Cash Flows used in Operating Activities
Cash flows used in operating activities increased by $45.8 million during Q1 2026 compared to Q1 2025. Our operating cash flows are negative as the proceeds from the Bitcoin sold from our Mining operations are classified within investing activities.
The increase in cash flows used in operating activities is driven by higher cash G&A expenses from continuing operations of $10.6 million. We incurred higher cash energy costs of $5.1 million from continuing operations during Q1 2025 due to higher electricity costs, and higher infrastructure expenses from continuing operations of $9.6 million in relation to the operating expenses at the Panther Creek and Scrubgrass power plants. In addition, during Q1 2026, we paid interest expense of $3.6 million, mainly attributable to the complete settlement of both interest and principal on the Credit Facility, compared to interest expense paid of $0.6 million during Q1 2025. Our working capital decreased by $37.6 million as explained in the Working Capital Section of this MD&A.
The increase was partially offset by net proceeds of $8.6 million received from the disposition of RECs and WTCs in Q1 2026, compared to nil in Q1 2025.
18
III. LIQUIDITY AND CAPITAL RESOURCES (Continued)
2. Cash Flows (Continued)
Cash Flows used in Investing Activities
Cash flows used in investing activities increased by $29.2 million in Q1 2026 compared to Q1 2025.
The increase in cash flows used in investing activities is driven primarily by (i) lower proceeds earned from the sale of digital assets of $32.9 million as a result of lower Bitcoin prices when selling 64 Bitcoin in Q1 2026 compared to higher Bitcoin prices when selling 428 Bitcoin in Q1 2025, (ii) higher equipment and construction prepayments for the HPC infrastructure projects of $47.4 million in Q1 2026, compared to Q1 2025, mainly driven by our focus on HPC development activities, and (iii) the benefit from $32.0 million in proceeds from the sale of the Yguazu Bitcoin data center during Q1 2025.
The increase was partially offset by the net addition of $8.8 million of PPE during Q1 2026, compared to $41.2 million for Q1 2025, as last year’s focus was investing in the acquisition of Miners and infrastructure build-out. Additionally, the acquisition of Stronghold included a $48.1 million cash payment in Q1 2025. The net cash flow impact from derivative assets and liabilities improved to $3.0 million, with net proceeds of $1.4 million received in Q1 2026, compared to net payments of $1.6 million made in Q1 2025.
Cash flows used in financing activities
Cash flows used in financing activities increased by $136.7 million from $23.6 million of cash generated for Q1 2025 to cash used of $113.1 million for Q1 2026.
Q1 2026
The cash used of $113.1 million for Q1 2026 is mainly due to the repayment of the Credit Facility.
Macquarie Loan
In April 2025, we signed the Credit Facility for up to $300.0 million with Macquarie. In October 2025, we converted the entirety of the Credit Facility into a $300.0 million project debt facility for the development of the Panther Creek property and secured at the project level with a parent company guarantee. During the year ended December 31, 2025, we drew the initial tranche of $50.0 million and the second tranche of $50.0 million for a total of $100.0 million drawn. In February 2026, the Credit Facility was fully repaid, for a total of $117.0 million, including interest, principal and additional base return fees.
19
Q1 2025
We raised $23.6 million of net proceeds from our 2024 ATM Program as discussed below.
At-The-Market Equity Offering Program
We commenced the 2024 ATM Program on March 11, 2024, by means of a prospectus supplement dated March 8, 2024 (“March Supplement”), to our short form base shelf prospectus dated November 10, 2023 (“Base Shelf”), and U.S. registration statement on Form F-10, which included a prospectus supplement related to the 2024 ATM Program.
We filed amended and restated prospectus supplements dated October 4, 2024, and December 17, 2024, providing disclosure regarding the Stronghold Transaction and amending and restating the March Supplement, to our existing $375.0 million Base Shelf, with both the Base Shelf and amended and restated prospectus supplement forming a part of our registration statement on Form F-10.
On October 7, 2025, the 2024 ATM Program was completed, as we issued a total of 165,091,099 common shares in exchange for gross proceeds of $375.0 million, receiving net proceeds of $363.2 million since the inception of the 2024 ATM Program.
3. Capital Resources
Our capital management objective is to provide financial resources that will enable us to maximize the return to our shareholders while optimizing our cost of capital and ensuring we have sufficient liquidity to fund our operating and growth activities. In order to achieve this objective, we monitor our capital structure and make adjustments as required in light of our funding requirements, changes in economic conditions, the cost of providing and the availability of financing, and the risks to which we are exposed. Our financing strategy is to maintain a flexible capital structure that optimizes the cost of capital at an acceptable level of risk, to preserve our ability to meet financial obligations as they come due, and to ensure we have sufficient financial resources to fund our organic and acquisitive growth.
Based on our current plans and business conditions, we believe that our existing cash and Bitcoin, together with cash generated from operations and our future investing and financing activities, will be sufficient to satisfy our anticipated cash requirements for the next 12 months and beyond. Our expansion into HPC/AI infrastructure development is expected to increase capital intensity and shift the timing of cash inflows relative to capital outlays.
20
3. Capital Resources(Continued)
In October 2025, we drew an additional $50.0 million from the Macquarie Credit Facility, bringing the total drawn to $100.0 million and completed an offering of $588.0 million aggregate principal amount of convertible senior notes which included an over allotment option by the initial purchasers to purchase $88.0 million aggregate amount of convertible senior notes. Net proceeds were approximately $569.1 million after transaction fees and approximately $69.1 million was used to fund a 125% capped call transaction. In February 2026, the Macquarie Credit Facility was fully repaid and the restricted cash balance of $57.5 million as of December 31, 2025 was no longer restricted.
On July 22, 2025, we announced that the TSX had approved a normal course issuer bid (“NCIB”), under which we may repurchase up to 49,943,031 of our common shares, representing approximately 10% of our public float as of July 14, 2025. Purchases under the NCIB commenced on July 28, 2025. All common shares purchased on the TSX or Nasdaq under the NCIB were cancelled. Following the U.S. Redomiciliation Transaction, Keel is continuing the NCIB under the same terms.
Developing and constructing data centers requires substantial up-front capital expenditures for land, substations, interconnection and specialized cooling systems, which may temporarily reduce liquidity. Although we expect to fund a portion of these expenditures through the strategic use of cash available, we may also supplement this source with external financing depending on market conditions and project timing.
We are likely to require additional capital to respond to technological advancements, competitive dynamics or technologies, business opportunities, challenges, acquisitions or unforeseen circumstances and, in either the short-term or long-term, may determine to engage in equity or debt financings. If we are unable to obtain adequate financing or financing on terms satisfactory to us when we require it, our ability to continue to grow or support our business and to respond to business challenges could be significantly limited. In particular, the ongoing impacts of inflation and fluctuations in interest rates, global conflicts and other macroeconomic factors, including the imposition and enforceability of tariffs or other changes in trade policies and related uncertainties, have resulted in, and may continue to result in, significant disruption and volatility in the global financial markets, reducing our ability to access capital. If we are unable to raise additional funds when or on the terms desired, our business, financial condition and results of operations could be adversely affected.
21
Digital Asset Management Program
We operate a digital asset management program under which we hold Bitcoin for its intrinsic value and as a source of liquidity. We maintain internal controls over the management of our digital assets and evaluate and enhance these controls as appropriate, on a quarterly basis.
Under this program, Management is authorized to sell Bitcoin from treasury at its discretion.
The following table presents the total Bitcoin sold and proceeds in Q1 2026, which was used to fund operations and expansion plans:
The sale of Bitcoin as described above, while we continued to earn Bitcoin, resulted in total holdings of 2,469 BTC as of March 31, 2026, valued at approximately $168.5 million based on a Bitcoin price of approximately $68,200, as of March 31, 2026.
Bitcoin 2.1 program for digital assets management
During the third quarter of 2025, we implemented a new program, Bitcoin 2.1. Bitcoin 2.1 is a multi-strategy program that primarily sells both short and long dated out of the money calls on the Bitcoin in treasury and future Bitcoin production in order to offset Bitcoin production costs and potentially achieve higher revenues per Bitcoin sold. Bitcoin 2.1 is designed as a low-cost and low-risk funding mechanism for energy infrastructure investments and has no objective around Bitcoin accumulation. The Board authorized the risk management committee to deploy up to (i) 100% of our Bitcoin in treasury, plus (ii) three months of expected forward production calculated on a rolling basis, plus (iii) $10.0 million under Bitcoin 2.1 to be actively managed and participate in volatility-targeting strategies.
On March 16, 2026, Reliz Ltd., the operating entity of BlockFills, a Chicago-based cryptocurrency brokerage, trading platform, and liquidity provider, filed voluntary petitions for relief under Chapter 11 restructuring proceedings of the United States Bankruptcy Code. Prior to March 16, 2026, in connection with our Bitcoin option and selling contracts, we settled all outstanding contracts with BlockFills. During the three months ended March 31, 2026, we recognized a net gain of $1.9 million to close all positions and a credit loss expense for the $4.2 million receivable from BlockFills after closing the contracts.
22
4. Contractual Obligations
The following table presents the future principal capital payment of long-term debt and the future minimum lease payments required under non-cancellable leases as of March 31, 2026:
5. Lawsuits
Our lawsuits are summarized in Note 20 (Commitments and Contingencies) to the Q1 2026 Financial Statements.
6. Commitments
Our commitments are summarized in Note 20 (Commitments and Contingencies) to the Q1 2026 Financial Statements.
7. Contingent liability
Our contingent liability is summarized in Note 20 (Commitments and Contingencies) to the Q1 2026 Financial Statements.
8. Working Capital
We continue to place importance on maintaining sufficient liquidity to fund our HPC development activities. We also anticipate requiring additional funds to complete our 2026 and 2027 growth plans. As of March 31, 2026, we had working capital of $515.7 million, compared to $678.4 million as of December 31, 2025.
The decrease in working capital was largely due to our cash decreasing by $216.2 million as explained in the “Liquidity and Capital Resources” section above. Our digital assets decreased by $11.8 million, mainly due to a lower Bitcoin price as of March 31, 2026, partially offset by our Bitcoin balance increasing by 409. In addition, we had a $7.7 million decrease in RECs and WTCs derived from Stronghold’s refuse operations due to the timing of sales of credits to third parties. Additionally, assets held for sale decreased by $14.6 million mainly due to the impairment loss of $12.8 million related to the Paraguay asset group, reflecting the write-down to fair value less costs to sell during Q1 2026.
The decrease was partially offset by a $88.2 million decrease in current liabilities, mainly due to the full reimbursement of the Credit Facility with the principal amounting to $100.0 million during Q1 2026.
23
IV. CRITICAL ACCOUNTING POLICIES AND ESTIMATES
We describe our most significant accounting policies in detail in Note 2 (Significant Accounting Policies) to our 2025 Annual Financial Statements (Part II, Item 8), included in the Annual Report. Management regularly evaluates its estimates and their underlying assumptions using historical experience and other factors it believes to be reasonable under the circumstances. The following select accounting policies and estimates are believed to be critical to understanding this MD&A, but are not limited to:
Estimation of useful lives of property, plant, and equipment
Property, plant and equipment are carried at cost, including directly attributable costs, less accumulated depreciation, accumulated impairment losses and any related investment grants, and include the initial estimate of the costs of dismantling and removing the item and restoring the site on which the item is located when a legal obligation exists at the time the asset is placed in service. We determine the estimated useful lives, residual values and related depreciation expense based on historical experience, anticipated usage, technological changes and replacements schedules. Determining useful lives requires judgment regarding the expected period over which the assets will provide economic benefits, and is subject to uncertainty, particularly in industries where assets may become obsolete due to technological innovation or changes in business strategy. Management periodically reviews these estimates and adjusts them when events or changes in circumstances indicate that the current estimated useful lives may no longer be appropriate, which would affect the timing and amount of depreciation expense, resulting in changes that could have a material impact on our financial results in future periods.
Impairment of long-lived assets
Our long-lived assets (including property, plant, and equipment, right-of-use assets and intangible assets with finite useful lives) are assessed for impairment when events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. When indicators of potential impairment are present, we prepare a projected undiscounted cash flow analysis for the respective asset or asset group, and if the sum of the undiscounted cash flow is less than the carrying amount of the asset or asset group, an impairment loss is recognized equal to the excess of the carrying amount over the fair value of the asset or asset group. Impairment losses are recognized in the consolidated statements of operations in the period in which the impairment is identified and are not reversed in subsequent periods.
Indicators of impairment may include significant declines in market demand, adverse changes in business or economic conditions, technological obsolescence, or a decision to significantly modify or dispose of an asset. These estimates require significant judgment and are sensitive to changes in assumptions regarding future revenues, operating costs and market conditions. Actual future outcomes could result in different conclusions that could materially affect the consolidated financial statements.
Measurement of financial instruments
We measure certain derivative financial instruments and assets at fair value either on a recurring or non-recurring basis depending on their nature. Derivative financial instruments reflect the estimated amounts that we would receive or pay, taking into consideration counterparty risk or our credit risk, and in the case of embedded derivatives, are determined using a combination of the Monte Carlo simulation model to simulate future prices based on probability factors and the Black-Scholes Model. Derivative financial instruments include, but are not limited, to Bitcoin option and selling contracts, Bitcoin redemption options and capped calls. Changes in fair value are recognized in Loss on derivative assets and liabilities, and may have a material impact on the amounts reported in our financial statements.
V. RECENT AND SUBSEQUENT EVENTS
Our recent and subsequent events are summarized in Note 21 to the Q1 2026 Financial Statements.
We are exposed to market risk in the ordinary course of our business. Market risk represents the risk of loss that may impact our financial position due to adverse changes in financial market prices and rates.
24
KEEL INFRASTRUCTURE CORP. (formerly known as Bitfarms Ltd.) PART I - FINANCIAL INFORMATIONITEM 3 - QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Market value and price risk of Bitcoin
We hold a significant amount of Bitcoin, and therefore are exposed to the impact of market price changes in Bitcoin. The price of Bitcoin is volatile, and is impacted by factors such as global economic conditions, regulatory developments affecting digital assets, technological changes in the blockchain ecosystem, market liquidity and shifts in investor demand. Further, the rewards for each Bitcoin mined are subject to “halving” adjustments at predetermined intervals.
As of March 31, 2026, we held 2,469 Bitcoin with a fair value of $168.5 million, reflecting a fair value of a single Bitcoin of approximately $68,200. A decline in the market price of Bitcoin could reduce the value of our digital asset holdings and negatively affect our revenue and profitability and could also reduce the amount of cash available to us upon disposition of these holdings, which may adversely affect our liquidity. A 10% increase or decrease in the market price of Bitcoin over the course of the three months ended March 31, 2026, would have increased or decreased our revenue by $3.0 million for the quarter and would have had a material effect on our total revenue as at that date.
Impact of tariffs
Changes in government and economic policies, incentives, trade regulations, or tariffs may have a material adverse impact on hardware and equipment that we import, our business, prospects, operations and financial performance. In addition to those tariffs which have already come into effect, additional tariffs and trade restrictions may be suggested in the future, which, if they were to be enacted, could further impact our business. While the final scope, timing, and application of recently announced or proposed changes in U.S. trade policy remain uncertain, increases in tariffs on imported equipment, as well as the potential imposition of retaliatory tariffs by foreign jurisdictions, could materially increase our equipment and infrastructure costs or limit the availability of certain components, our ability to procure equipment on a timely basis or at cost-effective levels, which in turn may impact project timelines, capital expenditures, and operating margins. We continuously monitor developments in trade policy and may adjust our procurement strategies, sourcing arrangements, or deployment plans in response to such changes. Any such developments could negatively affect our overall financial performance.
Interest rate risk
We have limited exposure to interest rate risk, which is the risk that a financial instrument’s value will fluctuate as a result of changes in the market interest rates on variable interest-bearing financial instruments. As of March 31, 2026, we do not use derivatives to mitigate interest rate exposures. We only hold cash and maintain our cash balance with major financial institutions that are insured by the Federal Deposit Insurance Corporation.
25
KEEL INFRASTRUCTURE CORP. (formerly known as Bitfarms Ltd.) PART I - FINANCIAL INFORMATION ITEM 4 - CONTROLS AND PROCEDURES
Disclosure Controls and Procedures
Evaluation of Disclosure Controls and Procedures
Our Management is responsible for establishing and maintaining a system of disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) designed to ensure that information required to be disclosed in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the U.S. Securities and Exchange Commission’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed in our reports filed or submitted under the Exchange Act is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, to allow timely decisions regarding required disclosure.
Management, under the supervision of and with the participation of our Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures and concluded that they were effective as of March 31, 2026.
A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that its objectives are met. Due to inherent limitations in all such systems, no evaluation of controls can provide absolute assurance that all control issues within a company have been detected. Accordingly, our disclosure controls and procedures are designed to provide reasonable, but not absolute, assurance that the objectives of our disclosure control system are met.
Changes in internal control over financial reporting
We did not identify any changes in our internal control over financial reporting, in connection with our evaluation required by Rules 13a-15(d) and 15d-15(d) of the Exchange Act, that occurred during the quarter ended March 31, 2026 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
26
KEEL INFRASTRUCTURE CORP. (formerly known as Bitfarms Ltd.) PART II - OTHER INFORMATION
ITEM 1. LEGAL PROCEEDINGS
For a description of our material pending legal proceedings, refer to Note 20 - Commitments and Contingencies included in our notes to our consolidated financial statements included elsewhere in this Quarterly Report, which is incorporated herein by reference.
We are not presently a party to any other legal or regulatory proceedings that, in the opinion of our management based on information currently available, if determined adversely to us, would individually or taken together have a material adverse effect on our business, financial condition, or results of operations. However, we are subject to regulatory oversight by numerous federal, state, provincial, local, and other regulators and we are, and we may become, subject to various legal proceedings, inquiries, investigations, and demand letters that arise in the course of our business, any of which may result in judgments, settlements, fines, penalties, injunctions or other relief. Such matters are subject to many uncertainties and outcomes that are not predictable.
ITEM 1A. RISK FACTORS
There have been no material changes from the risk factors set forth in Part I, Item 1A of our Annual Report. We are subject to various risks and uncertainties that could materially adversely affect our business, financial condition, results of operations, and the trading price of our common stock. You should carefully read and consider the risks and uncertainties included in the Annual Report, together with all of the other information in the Annual Report and this Quarterly Report, including “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and our consolidated financial statements and related notes, and other documents that we file with the SEC. The risks and uncertainties described in these reports may not be the only ones we face. Additional risks and uncertainties that we are unaware of, or that we currently believe are not material, may also become important factors that adversely affect our business, financial condition, or results of operations.
ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
None.
ITEM 3. DEFAULTS UPON SENIOR SECURITIES
ITEM 4. MINE SAFETY DISCLOSURES
ITEM 5. OTHER INFORMATION
During the three months ended March 31, 2026,none of the Company’s directors or officers (as defined in Rule 16a-1(f) under the Exchange Act) adopted, modified or terminated any “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” (in each case, as defined in Item 408 of Regulation S-K).
27
ITEM 6. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES
28
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
29